Capitol Corridor Extension to Salinas 80 Suisun City/Fairfield 101 VALLEJO Project Overview, Capital Improvements Project Benefits 34 Tons Annual Reduction of 12 T
Total Page:16
File Type:pdf, Size:1020Kb
TO SACRAMENTO, AUBURN CAPITOL CORRIDOR EXTENSION TO SALINAS 80 Suisun City/Fairfield 101 VALLEJO PROJECT OVERVIEW, CAPITAL IMPROVEMENTS PROJECT BENEFITS 34 tons annual reduction of 12 T OPERATIONS PLAN o carbon dioxide, a greenhouse gas 580 S acramento & INSTITUTIONAL Kick-Start: Provides an alternative to the highly and contributing factor in global Richmond congested US 101 corridor to access Martinez ARRANGEMENTS • A downsized Salinas station: climate change, as a result of reducing 4 160 to jobs, education, health care and Lincoln Avenue extension, total vehicle miles traveled on the Berkeley Antioch interregional transportation in Silicon Emeryville CONCORD The Transportation Agency for improved car and bike parking regional road and highway network. SAN FRANCISCO 24 Monterey County, as the local lead facilities, two-train layover facility Valley and the San Francisco Bay Area. 4th & King Jack London Square 22nd St. agency, grantee agency and owner 5 • Track and platform improvements ton annual reduction in volatile OAKLAND of the project, proposes to extend Promotes mixed-use, transit-oriented 1 Bayshore at Gilroy, Morgan Hill, and Tamien organic compounds, also passenger rail service from Santa development, affordable housing, S. San Francisco Oakland Coliseum N livable communities and economic smog-forming toxic gases. Clara County south to Salinas. 680 Stockton Future Phases: growth around the three stations. San Bruno Millbrae 580 STOCKTON • A new station at Pajaro/ Watsonville estimated Burlingame The project would function as an 150,000 Hayward (connection to the Santa Cruz annual ridership. San Mateo 92 extension of existing state-sponsored 825 new jobs created in an area Hayward Park Pleasanton branch line) Hillsdale 880 Capitol Corridor intercity passenger with high unemployment Belmont Lathrop/Manteca rail service, operated and maintained • Expansion of the Salinas train estimated farebox San Carlos Livermore Vasco Rd. 205 66% Redwood City 84 Bakersfield To by the Capitol Corridor Joint Powers station and layover facility recovery. Fremont $2.2 million saved annually Menlo Park Authority. • A new station at Castroville 680 in avoidance of highway accidents. Palo Alto 101 580 Tracy (connection to the Monterey Extensively collaborative California Ave. 280 The service will start with two branch line) endeavor and has regional San Antonio tons annual reduction in Mountain View round trips, expanding to up to six 40 and statewide support, as Great America carbon monoxide, a smog-forming Sunnyvale round trips as demand warrants. Track access rights and track well as support from every Lawrence toxic gas. Santa Clara improvements to 38 miles of existing Congressional Representative Proposed Passenger Rail SILICON VALLEY San Jose Diridon Union Pacific Coast Mainline track along the rail corridor. Tamien SAN JOSE Altamont Corridor Express between Gilroy and Salinas. 1 Capitol 85 Caltrain 17 Blossom Hill Capitol Corridor Rail Mileage from San Jose to Salinas: San Joaquin 68 Miles 101 Proposed Santa Cruz Service SANTA CRUZ Morgan Hill Proposed Monterey Light Rail San Martin 1 Amtrak Coast Starlight 152 Gilroy Existing Station WATSONVILLE Pajaro 129 Proposed Station 152 156 156 Castroville HOLLISTER 1 Salinas MONTEREY SALINAS VALLEY 68 1 101 PROJECT TIMELINE 2013 2014 2015 2016 2017 2018 Environmental Engineering & Design Construction START OF SERVICE Right-of-way Acquisition CAPITOL CORRIDOR EXTENSION TO SALINAS: FUNDING PLAN TOTAL PROJECT COST $69.7 MILLION $23.4 Million $20.0 Million State Transportation80 Suisun City/Fairfield Traffic Congestion 101 Improvement Program Relief Program VALLEJO 12 580 Richmond Martinez 4 160 Berkeley Antioch Emeryville CONCORD 24 San Francisco 22nd St. Jack London Square OAKLAND 5 Bayshore S. San Francisco Oakland Coliseum N $7.2 Million 680 Stockton Proposition 116 Rail Bond San Bruno $18.1 Million Millbrae Valley Transportation580 STOCKTON Burlingame Hayward San Mateo 92 Authority (VTA) Hayward Park Pleasanton Hillsdale 880 Belmont Lathrop/Manteca $1 Million San Carlos Livermore Vasco Rd. 205 Local Funding (Various Sources) CAPITOL CORRIDOR Redwood City 84 Fremont Menlo Park 680 Palo Alto 101 EXTENSION TO SALINAS California Ave. Project costs do not include required new trainsets to support the Capitol Corridor service extension. 280 San Antonio SILICON VALLEY DRAFT TRAIN SCHEDULE Note: weekend times will vary. San Jose Diridon Station Train #1 Train #2 Station Train #1 Train #2 SAN JOSE Tamien NORTHBOUND (AM) SOUTHBOUND (PM) 85 Sacramento 2:10 p 3:35 p 17 Salinas 5:06 a 6:01 a Castroville 5:16 a 6:11 a Oakland 4:03 p 5:28 p Pajaro/Watsonville 5:31 a 6:26 a San Jose Diridon 5:14 p 6:45 p Gilroy 6:00 a 6:55 a Tamien 5:19 p 6:50 p 101 Morgan Hill 6:14 a 7:09 a Morgan Hill 5:37 p 7:08 p SANTA CRUZ Morgan Hill Tamien 6:32 a 7:27 a Gilroy 5:51 p 7:22 p San Jose Diridon 6:37 a 7:32 a Pajaro/Watsonville 6:20 p 7:51 p 1 Oakland 7:43 a 8:40 a Castroville 6:35 p 8:06 p 152 Sacramento 9:48 a 10:40 a Salinas 6:45 p 8:16 p Gilroy WATSONVILLE Pajaro 129 DISTANCES & TRAVEL TIME Proposed Project Miles Time Salinas-Gilroy 38 54 minutes 101 156 Salinas-San Jose (skip stop) 68 1 hour, 31 minutes Castroville Existing Services Miles Time 1 Gilroy-San Jose (Caltrain) 30 approx. 51 minutes Salinas San Jose-San Francisco (Caltrain) 47 min. 1 hour (Baby Bullet) MONTEREY SALINAS VALLEY San Jose-Sacramento (Capitols) 133 min. 3 hours, 5 minutes 68 1 CONTACT: Transportation Agency for Monterey County 55-B Plaza Circle, Salinas, CA 93901 • Phone (831) 775-0903 • www.tamcmonterey.org Updated October 2014.