TO SACRAMENTO, AUBURN

MONTEREY COUNTY RAIL EXTENSION 80 Suisun City/Fairfield 101 VALLEJO PROJECT OVERVIEW, CAPITAL IMPROVEMENTS PROJECT BENEFITS 34 tons annual reduction of carbon 12 580 OPERATIONS PLAN dioxide, a greenhouse gas and To Sacramento Kick Start: Provides an alternative to the highly Richmond & INSTITUTIONAL contributing factor in global climate Martinez congested US 101 corridor to access 4 160 ARRANGEMENTS Salinas change, as a result of reducing jobs, education, health care and inter- Berkeley Antioch • Lincoln Avenue Extension total vehicle miles traveled on the Emeryville CONCORD regional transportation in Silicon SAN FRANCISCO 24 The Transportation Agency for regional road and highway network. 4th & King • Train layover facility Valley and the . Jack London Square Monterey County, as the local lead 22nd St. 5 OAKLAND agency, grantee agency and owner • Bus facility Bayshore ‡ Promotes mixed-use, transit-oriented 1 ton annual reduction in volatile Oakland Coliseum of the project, proposes to extend • Car, bike parking S. San Francisco development, affordable housing, organic compounds, smog-forming N passenger rail service from Santa 680 Stockton livable communities and economic toxic gases. San Bruno Clara County south to Salinas. Millbrae Gilroy 580 STOCKTON growth around stations. Burlingame Hayward • Track and grade crossing San Mateo 92 The service will start with two round estimated Hayward Park Pleasanton 112,000 Hillsdale improvements 880 trips, expanding to up to six round 825 new jobs created in an area annual ridership. Belmont Lathrop/Manteca San Carlos Livermore Vasco Rd. 205 trips as demand warrants. with high unemployment. Redwood City 84 Future Phases: Fremont estimated farebox Menlo Park 66% 680 Palo Alto 101 Tracy • A new station in Pajaro/Watsonville 580 To Bakersfield $2.2 million saved annually recovery. California Ave. (connection to the Santa Cruz 280 in avoidance of highway accidents. San Antonio branch line) Mountain View Extensively collaborative Great America Sunnyvale • A new station in Castroville endeavor and has regional Lawrence 40 tons annual reduction in carbon Santa Clara (connection to the Monterey and statewide support. Project is in Proposed Passenger Rail monoxide, a smog-forming toxic gas. SILICON VALLEY San Jose Diridon the near-term scenario of the 2018 branch line) Tamien Altamont Corridor Express SAN JOSE California Statewide Rail Plan. 1 Capitol 85 17 Blossom Hill High Speed Rail Rail Mileage from San Jose to Salinas: San Joaquin 68 Miles 101 Proposed Santa Cruz Service SANTA CRUZ Morgan Hill Proposed Monterey Light Rail San Martin / 1 152 Gilroy Existing Station WATSONVILLE Proposed Station 129 152 TO LOS ANGELES

156 156

HOLLISTER 1

Salinas

MONTEREY SALINAS VALLEY 68 1 101 KICK START PROJECT TIMELINE 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022  Environmental Engineering & Design Construction START OF SERVICE Right-of-way Acquisition

Salinas Station Parking

Salinas Train Layover Facility

Gilroy Tracks 80 Suisun City/Fairfield 101 VALLEJO

12

580 Richmond Martinez 4 160 Berkeley Antioch COLOR PALETTE Emeryville CONCORD 24 SanMONTEREY Francisco COUNTY RAIL EXTENSION: FUNDING PLAN 22nd St. Jack London Square TOTAL PROJECT COSTOAKLAN $81.5 MillionD 5 Bayshore ‡ Oakland Coliseum S. San Francisco� $7.2 M Proposition 116 N � $2.7 M Local Funding 680 Stockton San Bruno Rail Bond (Various Sources) Millbrae 580 STOCKTON PANTONE 350 C PANTONE 2013 C BLACK 40% PANTONE 375 C PANTONE 306 C Burlingam� $10.1e M Transit Intercity Hayward � $23.4 M State Transportation C80 M21 Y79 K64 C0 M46 Y100 K0 C0 M0 Y0 K40 C46 M0 Y90 K0 C75 M0 Y5 K0 San Mateo 92 Hayward RailPark Capital Program Pleasanton Improvement Program R44 G82 B52 R255 G152 B0 R153 G153 B153 R151 G215 B0 R0 G181 B226 Hillsdale 880 Belmont Lathrop/Manteca HEX #2C5234 HEX #FF9800 HEX #999999 HEX #97D700 HEX #00B5E2 � $18.1 M Valley Transportation � $20 M Traffic Congestion San Carlos Livermore Vasco Rd. 205 RedwoodAuthority City (VTA) 84 Fremont Relief Program Menlo Park 680 Palo Alto 101 Project costs do not include California Ave. operations, nor the cost of new trainsets. TYPOGRAPHY 280 Montserrat and Lato are the brand’s fonts and can be used for print DRAFT TRAIN SCHEDULE and digital. Montserrat should be used for headers and Lato for body SILICON VALLEY MORNING NORTHBOUND TRAINS STATION TRAIN 1 TRAIN 2 copy. San Jose Diridon Salinas 5:33 AM 6:11 AM SAN JOSE Gilroy 6:28 AM 7:06 AM Lato Regular 85 Montserrat Light San Jose (Diridon) 7:23 AM 7:59 AM ABCDEFGHIJKLMNOPQRSTUVWXYZ 17 ABCDEFGHIJKLMNOPQRSTUVWXYZ San Francisco 8:58 AM 9:29 AM abcdefghijklmnopqrstuvwxyz abcdefghijklmnopqrstuvwxyz EVENING SOUTHBOUND TRAINS STATION TRAIN 1 TRAIN 2 Lato Italic 101 Montserrat Regular San Francisco 3:00 PM 4:23 PM ABCDEFGHIJKLMNOPQRSTUVWXYZ ABCDEFGHIJKLMNOPQRSTUVWXYZ SANTA CRUZ San Jose (Diridon) 4:44 PM 5:41 PM abcdefghijklmnopqrstuvwxyz abcdefghijklmnopqrstuvwxyz Gilroy 5:37 PM 6:35 PM

1 Salinas 6:32 PM 7:30 PM Montserrat Bold Lato Bold KICK START PROJECT 152 A BCDEFGHIJKLMNOPQRSTUVWXYZ ABCDEFGHIJKLMNOPQRSTUVWXYZ Gilroy DISTANCES & TRAVEL TIME abcdefghijklmnopqrstuvwxyz WATSONVILLE abcd efghij klmnopqrstuvwxyz EXISTING SERVICES MILES TIME 129 Gilroy-San Jose (Caltrain) 30 Approx. 51 mins

San Jose-San Francisco (Caltrain) 47 Min. 1 hr (Baby Bullet)

101 San Jose-Sacramento (Capitol) 133 Min. 3 hrs, 5 mins 156 PROPOSED PROJECT MILES TIME

1 Salinas-Gilroy 38 54 mins

Salinas Salinas-San Jose 68 1 hr, 31 mins MONTEREY SALINAS VALLEY 68 CONTACT 1 Transportation Agency for Monterey County 55-B Plaza Circle, Salinas, CA 93901 Phone (831) 775-0903 • www.tamcmonterey.org

April 2020