FROM HIGHWAYS TO BOULEVARDS: STREET TRANSFORMATIONS FOR PUBLIC LIFE BONAVENTURE PROJECT

By Simon Pouliot, Urban designer - City of Designing Cities 2018: Los Angeles / NACTO October 3rd, 2018 PRESENTATION OUTLINE

1. CONTEXT

2. TRANSPORT AND MOBILITY

3. PUBLIC SPACE

4. RESULTS 1. CONTEXT

MONTREAL METROPOLITAN REGION Population: 4.1 Million

DOWNTOWN AREA Population: 90,000 Daily commuters: 580,000 Laval

Montreal

Downtown area

South Shore St. Lawrence River 1. CONTEXT

MONTREAL METROPOLITAN REGION North Shore Population: 4.1 Million

DOWNTOWN AREA Population: 90,000 Daily commuters: 580,000 Laval

Montreal

Downtown CBD area

South Shore St. Lawrence River 1. CONTEXT

1966 - 1967 CBD CONSTRUCTION OF THE BONAVENTURE EXPRESSWAY

Bonaventure Expressway

St. Lawrence River

Champlain Bridge

South Shore 1. CONTEXT

1990s - 2000s CBD INFRASTRUCTURE INCOMPATIBLE

WITH ADJACENT NEIGHBORHOODS Faubourg des Récollets

Bonaventure Expressway

Champlain Bridge

South Shore

Project limits 1. CONTEXT

CBD 1990s - 2000s INFRASTRUCTURE INCOMPATIBLE WITH ADJACENT NEIGHBORHOODS Faubourg des Récollets

Griffintown 1. CONTEXT

2008 CBD POLITICAL DECISION TO DEMOLISH THE MUNICIPAL SECTION OF THE HIGHWAY

Bonaventure Expressway

St. Lawrence River

Champlain Bridge

South Shore

Municipal section Provincial section Federal section 1. CONTEXT

OBJECTIVES

Create a prestigious, functional and user- friendly gateway to downtown

Mesh together adjacent Support urban neighborhoods development

2017 2. TRANSPORT AND MOBILITY 2. TRANSPORT AND MOBILITY

2008 VEHICULAR TRAFFIC

3 EXPRESSWAY LANES + 3 STREET LANES TOWARD DOWNTOWN 3 EXPRESSWAY LANES + 3 STREET LANES TOWARD THE SOUTH SHORE

AM PEAK HOUR: 4,000 VEHICLES PM PEAK HOUR: 4,800 VEHICLES 2. TRANSPORT AND MOBILITY

2018 VEHICULAR TRAFFIC

3 STREET LANES TOWARD DOWNTOWN + ONE DEDICATED BUS LANE 4 STREET LANES TOWARD THE SOUTH SHORE + ONE DEDICATED BUS LANE

4 +1 3 +1

1,900 BUSES/DAY 2. TRANSPORT AND MOBILITY

2018 VEHICULAR TRAFFIC

3 STREET LANES TOWARD DOWNTOWN + ONE DEDICATED BUS LANE 4 STREET LANES TOWARD THE SOUTH SHORE + ONE DEDICATED BUS LANE

4 +1 3 +1 45% DECREASE DURING AM PEAK HOUR 35% DECREASE DURING PM PEAK HOUR

AM PEAK HOUR: 2,200 VEHICLES PM PEAK HOUR: 3,100 VEHICLES 1,900 BUSES/DAY 2. TRANSPORT AND MOBILITY

Autoroute 720

IMPLEMENTATION OF AN INTELLIGENT TRANSPORTATION SYSTEM (ITS)

QUEUE DETECTION IN THE OFF-RAMP

• 11 INFRARED DETECTION CAMERAS • 5 SURVEILLANCE CAMERAS 2. TRANSPORT AND MOBILITY

IMPLEMENTATION OF AN INTELLIGENT TRANSPORTATION SYSTEM (ITS)

DYNAMIC TRAFFIC LIGHT MANAGEMENT

• 30 DETECTORS • 9 SURVEILLANCE CAMERAS 2. TRANSPORT AND MOBILITY

BICYCLE TRAFFIC

PRE-EXISTING BICYCLE LINKS NEW LOCAL BICYCLE LINKS

1 MILE OF NEW BICYCLE LINKS 2. TRANSPORT AND MOBILITY

2011 PEDESTRIAN TRAFFIC

SIDEWALKS RANGING IN WIDTH (from 5ft to 10ft) 2. TRANSPORT AND MOBILITY

2017 PEDESTRIAN TRAFFIC

LANDSCAPED SIDEWALKS 20ft WIDE

MORE THAN 1,000 PEDESTRIANS/HOUR DURING PEAK MORNING AND EVENING HOURS 3. PUBLIC SPACE 3. PUBLIC SPACE

2011 PARKS AND PUBLIC SPACES

5 minute walk radius

10 minute walk radius 3. PUBLIC SPACE

2017 PARKS AND PUBLIC SPACES

5 minute walk radius

• ADDITION 6 ACRES OF NEW PUBLIC SPACE 10 minute • EQUIVALENT TO 5 FOOTBALL FIELDS walk radius 3. PUBLIC SPACE

COMPARABLE PARKS

Grand Park, David Crombie Bonaventure Project Sara D. Roosevelt Rose Fitzgerald Kennedy Los Angeles Park, Toronto Montreal Park, New York Greenway, Boston 12 acres 4 acres 6 acres 8 acres 17 acres

100 m x 100 m

1 acre 3. PUBLIC SPACE

2011 SPATIAL DISTRIBUTION 3. PUBLIC SPACE

2011 SPATIAL DISTRIBUTION Motor vehicles (60%) Residual space (30%) Active transportation (10%) 3. PUBLIC SPACE

2017 SPATIAL DISTRIBUTION Active transportation (65%) Private motor vehicles (25%) Public transit (10%) 3. PUBLIC SPACE CONCEPTUAL SCHEME MONUMENTAL PUBLIC ART

SEQUENCE OF POINTS OF INTEREST

TOPOGRAPHICAL VARIATIONS

GREENING OPERATION

HISTORIC FABRIC 3. PUBLIC SPACE

THRESHOLDS 3. PUBLIC SPACE

SOUTHERN THRESHOLD

Source - Jaume Plensa 3. PUBLIC SPACE

NORTHERN THRESHOLD

Dendrites - Michel de Broin 3. PUBLIC SPACE

THRESHOLDS

CENTRAL AXIS 3. PUBLIC SPACE

POINTS OF INTEREST 1 2 3

6 5

4 3

2 4 5 6

1 4. RESULTS 4. RESULTS

MARCH 2014 JULY 2016 AUGUST 2016 JANUARY 2017 SEPTEMBER 2017

Unveiling: September 6th, 2017 Completed within the set budget of CAN$ 141.7 M 4. RESULTS

2015 - 2016 DEMOLITION OF THE HIGHWAY

• DEMOLITION OF MORE THAN HALF A MILE OF ELEVATED EXPRESSWAY • 47,000 TONS OF CRUSHED CONCRETE ON-SITE • 95% REUSED ON-SITE AS FILL • MORE THAN CAN$ 450,000 IN SAVINGS 4. RESULTS

2017 COMPLETION OF THE PUBLIC SPACE

• 6 ACRES OF NEW PUBLIC SPACE • 300 NEW TREES • 30,000 SHRUBS AND PERENNIALS 4. RESULTS

2011 - 2018 DYNAMIC REAL-ESTATE SECTOR

BUILDINGS CONSTRUCTED BETWEEN 2011 AND 2017 BUILDINGS UNDER CONSTRUCTION BUILDING CONSTRUCTION ANNOUNCED

TOTAL OF CAN$ 2.14 BILLION IN INVESTMENTS SINCE 2011 4. RESULTS

BEFORE 2011

AFTER 2017 4. RESULTS

BEFORE 2011

AFTER 2017 4. RESULTS

BEFORE 2011

AFTER 2017 SITES CERTIFICATION GREEN BUSINESS CERTIFICATION INC. (GBCI)

SUSTAINABLE URBAN TRANSPORTATION AWARD TRANSPORTATION ASSOCIATION OF CANADA (TAC)

GRAND PRIX D’EXCELLENCE EN TRANSPORT 2018 – « INFRASTRUCTURES » ASSOCIATION QUÉBÉCOISE DES TRANSPORTS (AQTr)

AWARDS FOR PLANNING EXCELLENCE 2018 – « URBAN DESIGN » CANADIAN INSTITUTE OF PLANNERS (CIP)

PRIX ÉLIXIR 2017 PROJECT MANAGEMENT INSTITUTE (PMI) MONTRÉAL

PROJETBONAVENTURE.CA

2017 NEW OWNERSHIP: FROM PRIVATE RAILWAY COMPANY TO PUBLICLY OWNED METROPOLITAIN TRANSIT PROJECT 2011 2017 PHASE 1 PHASE 2 PHASE 3 Construction of civil infrastructure (combined Construction of Public space sewers, sanitary sewers, water pipes and urban the ramps and construction public utilities) the boulevard

2011 2012 2013 2014 2015 2016 2017 2. TRANSPORT AND MOBILITY

VEHICULAR TRAFFIC

3 STREET LANES TOWARD DOWNTOWN + ONE DEDICATED BUS LANE 4 STREET LANES TOWARD THE SOUTH SHORE + ONE DEDICATED BUS LANE

4 +1 3 +1

AM PEAK HOUR: 4,000 VEHICLES PM PEAK HOUR: 4,800 VEHICLES 2. TRANSPORT AND MOBILITY

PUBLIC TRANSIT

DEDICATED BUS LANE TOWARD DOWNTOWN DEDICATED BUS LANE TOWARD THE SOUTH SHORE

1,900 BUSES/DAY PUBLIC TRANSIT

DEDICATED BUS LANE TOWARD DOWNTOWN 2017 SPACE STRUCTURE Sidewalks and streets Centre blocks (138ft)

Lawn area (39ft) Sidewalk (20ft) rue Nazareth (56ft) Sidewalk (16ft) Arboretum (39ft) Central axis (26ft) Sidewalk (16ft) rue Duke (46ft) Sidewalk (19ft) REPLACEMENT OF ALL UNDERGROUND INFRASTRUCTURE

• WATER PIPES: 1.36 MILE • SEWERS: 1.55 MILE • UNDERGROUND ELECTRICAL CONDUITS: 1.55 MILE • NEW TELECOMMUNICATIONS INFRASTRUCTURE • NEW GAS AND HEATING PIPES SOIL REHABILITATION

DECONTAMINATION OF 35,000 TONS OF SOIL