Overview of Copper Mining in Tanzania
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
World Bank Document
CA. 7h?F Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No. P-3547-TA REPORT AND RECOMMENDATION OF THE PRESIDENT OF THE INTERNATIONAL DEVELOPMENT ASSOCIATION TO THE EXECUTIVE DIRECTORS Public Disclosure Authorized ON A PROPOSED DEVELOPMENT CREDIT OF SDR 5.9 MILLION (AN AMOUNT EQUIVALENT TO US$6.3 MILLION) TO THE UNITED REPUBLIC OF TANZANIA Public Disclosure Authorized FOR A COAL ENGINEERING PROJECT .May 2, 1983 Public Disclosure Authorized This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS Currency Unit = Tanzania Shilling (TSh) TSh 1.00 = US$0.11 US$1.00 = TSh 9.40 US$1.00 = SDR 0.927 (As the Tanzania Shilling is officially valued in relation to a basket of the currencies of Tanzania's trading partners, the USDollar/Tanzania Shilling exchange rate is subject to change. Conversions in this report were made at US$1.00 to TSh 9.40 which was the level set in the most recent exchange rate adjustment in March 1982. The USDollar/SDR exchange rate used in this report is that of March 31, 1983.) ABBREVTATIONS AND ACRONYMS CDC - Colonial (now Commonwealth) Development Corporation MOM - Ministry of Minerals MWE - Ministry of Water and Energy STAMICO - State Mining Corporation TANESCO - Tanzania Electric Supply Company TPDC - Tanzania Petroleum Development Corporation toe - tonnes of oil equivalent tpy - tonnes per year FISCAL YEAR Government - July 1 to June 30 TrANZANIA FOR OFFICIAL USE ONLY Coal Engineering Project Credit and Project Summary Borrower: United Republic of Tanzania Beneficiary: Ministry of Minerals (MOM) and State, Mining Corporation (STAMICO) Amount: SDR 5.9 million (US$6.3 million equivalent) Terms: Standard Project Description: The project would support Government efforts ro evaluate the economic potential of the indigenous coal resources of Tanzania. -
Link to Document 10
EUROPEAN COMMISSION Brussels, 11.2.2016 COM(2016) 64 final ANNEX 4 ANNEX to the Proposal for a Council Decision on the conclusion of the Economic Partnership Agreement (EPA) between the East African Community (EAC) Partner States, of the one part, and the European Union and its Member States, of the other part EN EN ANNEX III and IV to the Agreement ANNEX III(a) EPA DEVELOPMENT MATRIX 11 SEPTEMBER 2015 Project Sub- Location Geographi Current Status Total EU EU Other EAC PS Gap to be Equivalent Implementa Comments component cal Estimate Member Donors financed ($ in Euros tion Period Coverage d Cost ($ States millions) (1 $ = 0.78 million) Euro) Northern Mombasa Kenya Burundi, Feasibility Studies 1,375.00 - - 885.00 690.00 5 years Modernize infrastructure Corridor No. Port Uganda, and detailed designs at the port to allow larger 1 Development Rwanda completed and vessels to call at the port (Mombasa- (MPDP) and phase 1ongoing & and enhance trade - It Malaba- Tanzania phase 2 funding is includes development of Katuna) available new container terminal berth No. 23 at a cost of $ 300 million. The conversion of conventional cargo berths 11 to 14 into container berths at a cost of $ 73 million. Relocation of Kipevu Oil terminal at $ 152 million. Development of Dongo Kundu Free Port at a cost of $300 Million. Dredging of the Channel $ 60 Million EN 2 EN Voi Dry port Kenya Burundi, Feasibility study 104.00 81.12 4 years To decongest Mombasa Uganda, done Port and regional transit Rwanda point. 97 acres of land and available. Tanzania Container -
Governing Petroleum Resources Prospects and Challenges for Tanzania
Governing Petroleum Resources Prospects and Challenges for Tanzania Edited by Odd-Helge Fjeldstad • Donald Mmari • Kendra Dupuy Governing Petroleum Resources: Prospects and Challenges for Tanzania Edited by Odd-Helge Fjeldstad, Donald Mmari and Kendra Dupuy Content Editors iv Acknowledgements v Contributors vi Forewords xi Abbreviations xiv Part I: Becoming a petro-state: An overview of the petroleum sector in Tanzania 1 Governing Petroleum Resources: 1. Petroleum resources, institutions and politics: An introduction to the book Prospects and Challenges for Tanzania Odd-Helge Fjeldstad, Donald Mmari and Kendra Dupuy 4 2. The evolution and current status of the petroleum sector in Tanzania Donald Mmari, James Andilile and Odd-Helge Fjeldstad 13 PART II: The legislative framework and fiscal management of the petroleum sector 23 3. The legislative landscape of the petroleum sector in Tanzania James Andilile, Odd-Helge Fjeldstad and Donald Mmari 26 4. An overview of the fiscal systems for the petroleum sector in Tanzania Donald Mmari, James Andilile, Odd-Helge Fjeldstad and Aslak Orre 35 5. Is the current fiscal regime suitable for the development of Tanzania’s offshore gas reserves? Copyright © Chr. Michelsen Institute 2019 James Andilile, Odd-Helge Fjeldstad, Donald Mmari and Aslak Orre 42 Copyright © Repoa 2019 6. Negotiating Tanzania’s gas future: What matters for investment and government revenues? Thomas Scurfield and David Manley 49 CMI 7. Uncertain potential: Managing Tanzania’s gas revenues P. O. Box 6033 Thomas Scurfield and David Mihalyi 59 N-5892 Bergen 8. Non-resource taxation in a resource-rich setting Norway Odd-Helge Fjeldstad, Cornel Jahari, Donald Mmari and Ingrid Hoem Sjursen 66 [email protected] 9. -
Kigoma Airport
The United Republic of Tanzania Ministry of Infrastructure Development Tanzania Airports Authority Feasibility Study and Detailed Design for the Rehabilitation and Upgrading of Kigoma Airport Preliminary Design Report Environmental Impact Assessment July 2008 In Association With : Sir Frederick Snow & Partners Ltd Belva Consult Limited Corinthian House, PO Box 7521, Mikocheni Area, 17 Lansdowne Road, Croydon, Rose Garden Road, Plot No 455, United Kingdom CR0 2BX, UK Dar es Salaam Tel: +44(02) 08604 8999 Tel: +255 22 2120447 Fax: +44 (02)0 8604 8877 Email: [email protected] Fax: +255 22 2120448 Web Site: www.fsnow.co.uk Email: [email protected] The United Republic of Tanzania Ministry of Infrastructure Development Tanzania Airports Authority Feasibility Study and Detailed Design for the Rehabilitation and Upgrading of Kigoma Airport Preliminary Design Report Environmental Impact Assessment Prepared by Sir Frederick Snow and Partners Limited in association with Belva Consult Limited Issue and Revision Record Rev Date Originator Checker Approver Description 0 July 08 Belva KC Preliminary Submission EXECUTIVE SUMMARY 1. Introduction The Government of Tanzania through the Tanzania Airports Authority is undertaking a feasibility study and detailed engineering design for the rehabilitation and upgrading of the Kigoma airport, located in Kigoma-Ujiji Municipality, Kigoma region. The project is part of a larger project being undertaken by the Tanzania Airport Authority involving rehabilitation and upgrading of high priority commercial airports across the country. The Tanzania Airport Authority has commissioned two companies M/S Sir Frederick Snow & Partners Limited of UK in association with Belva Consult Limited of Tanzania to undertake a Feasibility Study, Detail Engineering Design, Preparation of Tender Documents and Environmental and Social Impact Assessments of seven airports namely Arusha, Bukoba, Kigoma, Tabora, Mafia Island, Shinyanga and Sumbawanga. -
October 29, 2019 Tanzania Electric Supply Company Limited
ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT SUMMARY FOR THE PROPOSED CONSTRUCTION OF 44.8MW MALAGARASI HPP AND ASSOCIATED 132KV TRANSMISSION LINE FROM MALAGARASI HYDROPOWER PLANT TO KIGOMA 400/132/33KV SUBSTATION AT KIDAHWE KIGOMA OCTOBER 29, 2019 TANZANIA ELECTRIC SUPPLY COMPANY LIMITED 1 PROJECT TITLE: MALAGARASI 45MW HYDRO POWER PROJECT PROJECT NUMBER: P-TZ-FAB-004 COUNTRY: TANZANIA CATEGORY: 1 Sector: PICU Project Category: 1 2 1. TABLE CONTENTS 1. TABLE CONTENTS ............................................................................................................................................................... 3 2. INTRODUCTION.................................................................................................................................................................. 4 3. PROJECT DESCRIPTION ....................................................................................................................................................... 4 4. PROJECT DESCRIPTION ....................................................................................................................................................... 6 5. POLICY AND LEGAL FRAMEWORK ....................................................................................................................................... 6 6. ENVIRONMENTAL AND SOCIAL BASELINE ............................................................................................................................ 7 7. STAKEHOLDER ENGAGEMENT PROCESS ............................................................................................................................. -
Referral Transit Time Between Sending and First-Line Receiving Health Facilities: a Geographical Analysis in Tanzania
Research BMJ Glob Health: first published as 10.1136/bmjgh-2019-001568 on 17 August 2019. Downloaded from Referral transit time between sending and first-line receiving health facilities: a geographical analysis in Tanzania Michelle M Schmitz, 1 Florina Serbanescu,1 George E Arnott,1 Michelle Dynes,1 Paul Chaote,2 Abdulaziz Ally Msuya,3 Yi No Chen1 To cite: Schmitz MM, ABSTRACT Summary box Serbanescu F, Arnott GE, Background Timely, high-quality obstetric services et al. Referral transit time are vital to reduce maternal and perinatal mortality. We What is already known? between sending and first- spatially modelled referral pathways between sending line receiving health facilities: Strengthening obstetric inter-facility referral sys- and receiving health facilities in Kigoma Region, Tanzania, ► a geographical analysis in tems in developing countries, including reducing de- identifying communication and transportation delays to Tanzania. BMJ Global Health lays due to inadequate transportation and unreliable timely care and inefficient links within the referral system. 2019;4:e001568. doi:10.1136/ communication, increases access to timely, appro- Methods We linked sending and receiving facilities to bmjgh-2019-001568 priate obstetric and neonatal care. form facility pairs, based on information from a 2016 Handling editor Seye Abimbola Health Facility Assessment. We used an AccessMod cost- What are the new findings? friction surface model, incorporating road classifications ► About 57.8% of facility pairs in Kigoma did not refer Additional material is ► and speed limits, to estimate direct travel time between to facilities providing higher levels of care. published online only. To facilities in each pair. We adjusted for transportation view please visit the journal ► When accounting for communication and transpor- online (http:// dx. -
Federal Register/Vol. 86, No. 5/Friday, January 8, 2021/Notices
1560 Federal Register / Vol. 86, No. 5 / Friday, January 8, 2021 / Notices The Interest Rates are: 409 3rd Street SW, Suite 6050, system determined by the President to Washington, DC 20416, (202) 205–6734. meet substantially the standards, Percent SUPPLEMENTARY INFORMATION: The notice practices, and procedures of the KPCS. of an Administrative declaration for the The referenced regulations are For Physical Damage:. contained at 31 CFR part 592 (‘‘Rough Homeowners With Credit Avail- State of California, dated 06/17/2020, is able Elsewhere ...................... 2.375 hereby amended to establish the Diamond Control Regulations’’) (68 FR Homeowners Without Credit incident period for this disaster as 45777, August 4, 2003). Available Elsewhere .............. 1.188 beginning 05/26/2020 and continuing Section 6(b) of the Act requires the Businesses With Credit Avail- through 12/28/2020. President to publish in the Federal able Elsewhere ...................... 6.000 All other information in the original Register a list of all Participants, and all Businesses Without Credit declaration remains unchanged. Importing and Exporting Authorities of Available Elsewhere .............. 3.000 Participants, and to update the list as Non-Profit Organizations With (Catalog of Federal Domestic Assistance Number 59008) necessary. Section 2 of Executive Order Credit Available Elsewhere ... 2.750 13312 of July 29, 2003 delegates this Non-Profit Organizations With- Jovita Carranza, function to the Secretary of State. out Credit Available Else- Administrator. where ..................................... 2.750 Section 3(7) of the Act defines For Economic Injury:. [FR Doc. 2021–00169 Filed 1–7–21; 8:45 am] ‘‘Participant’’ as a state, customs Businesses & Small Agricultural BILLING CODE 8026–03–P territory, or regional economic Cooperatives Without Credit integration organization identified by Available Elsewhere ............. -
Background of Community-Based Conservation
Beyond Community: "Global" Conservation Networks and "Local" Organization in Tanzania and Zanzibar Item Type text; Electronic Dissertation Authors Dean, Erin Publisher The University of Arizona. Rights Copyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author. Download date 30/09/2021 01:23:33 Link to Item http://hdl.handle.net/10150/195624 BEYOND COMMUNITY: “GLOBAL” CONSERVATION NETWORKS AND “LOCAL” ORGANIZATION IN TANZANIA AND ZANZIBAR by Erin Dean _____________________ A Dissertation Submitted to the Faculty of the DEPARTMENT OF ANTHROPOLOGY In Partial Fulfillment of the Requirements For the Degree of DOCTOR OF PHILOSOPHY In the Graduate College THE UNIVERSITY OF ARIZONA 2007 2 THE UNIVERSITY OF ARIZONA GRADUATE COLLEGE As members of the Dissertation Committee, we certify that we have read the dissertation prepared by ERIN DEAN entitled BEYOND COMMUNITY: "GLOBAL" CONSERVATION NETWORKS AND "LOCAL" ORGANIZATION IN TANZANIA AND ZANZIBAR and recommend that it be accepted as fulfilling the dissertation requirement for the Degree of Doctor of Philosophy _______________________________________________________________________ Date: August 14, 2007 Diane Austin _______________________________________________________________________ Date: August 14, 2007 Mamadou Baro _______________________________________________________________________ -
Prospectus 2016/2017
MINERAL RESOURCES INSTITUTE (MRI) P. O. Box 1696, Dodoma, Tanzania Telephone/Fax: +255 (0) 26 23 00 472 / +255 (0) 26 23 03 159 E-mail: [email protected] / [email protected] Website: www.mri.ac.tz PROSPECTUS 2016/2017 August, 2016 Prospectus 2016/2017 i FORWORD We are very pleased to welcome you to undertake tertiary studies at The Mineral Resources Institute (MRI). This Prospectus will provide you with a flavour of academic life in our Institution. The Mineral Resources Institute (MRI) is an institution of Earth Sciences Education which was established by the former Ministry of Minerals in Dodoma in August, 1982. It is fully accredited by the National Council for Technical Education (NACTE) to offer Geology and Mineral Exploration, mining engineering, Petroleum Geoscience, Mineral Processing Engineering and Environmental Engineering and Management in Mines programmes leading to the qualifications of National Technical Awards (NTA) level 4 – 6. NTA level 4 programmes lead to Basic Technician Certificate, NTA level 5 programme lead to Technician Certificate and NTA level 6 programme lead to Ordinary Diploma Certificate. Along with the introduction of the new curricula, the previous curricula leading to Mineral Resources Technology Certificate and Full Technician Certificate in Earth Sciences have already been phased out. With the cooperation of main stakeholders under the auspices of the Ministry of Energy and Minerals (MEM), the Institute is still undergoing transformation to match with the envisaged expectations and aspirations of the Tanzania. Our ultimate goal is to transform our institution to be the best academic institution in Africa in 25 years from 2012 in areas of quality training in mining sector including gemology and petroleum sciences; quality research in geological sciences and mining related sciences and quality consultancy and provisional of sound short courses. -
A Multi-Agency Task Team Working Together to End Destructive Blast Fishing
Fiche 33 by © IOC-SmartFish© A Multi-Agency Task Team Working together to end destructive blast fishing Background The story Blast fishing, also known as dynamite fishing, is a highly Many factors contribute to the prevalence of blast fishing in destructive, illegal method of catching fish which uses dynamite Tanzania; the low cost and easy accessibility of explosives or other types of explosives to send shock-waves through the from the mining sector, road construction projects and water, stunning or killing fish which are then collected and sold. cement factories; the relatively easy methods of making Blast fishing can be lucrative: both from the sale of the fish home-made explosives using simple ingredients such as a caught and also from the trade of illegal explosives. Improvised plastic bottle filled with chemical fertilizers and diesel; the explosive devices may explode prematurely and have been low and ineffective rate of enforcement and prosecutions; known to injure or kill the person using them, or innocent environmental stresses resulting in reduced catches by bystanders. traditional fishing methods; and the high levels of poverty and unemployment. Blast fishing was first recorded in Africa in the early 1960s and while it has been brought under control in neighbouring Law enforcement is severely hampered by corruption of some countries it remains a huge problem in Tanzania. Blast fishing officials who tip off blast fishers about patrols, and intimidation occurs along the entire Tanzanian coastline and often takes of officials and the local community who fear the consequences place within the coral reefs, biodiversity hotspots that provide of informing on blast fishers1 . -
The Center for Research Libraries Scans to Provide Digital Delivery of Its Holdings. in the Center for Research Libraries Scans
The Center for Research Libraries scans to provide digital delivery of its holdings. In The Center for Research Libraries scans to provide digital delivery of its holdings. In some cases problems with the quality of the original document or microfilm reproduction may result in a lower quality scan, but it will be legible. In some cases pages may be damaged or missing. Files include OCR (machine searchable text) when the quality of the scan and the language or format of the text allows. If preferred, you may request a loan by contacting Center for Research Libraries through your Interlibrary Loan Office. Rights and usage Materials digitized by the Center for Research Libraries are intended for the personal educational and research use of students, scholars, and other researchers of the CRL member community. Copyrighted images and texts are not to be reproduced, displayed, distributed, broadcast, or downloaded for other purposes without the expressed, written permission of the Center for Research Libraries. © Center for Research Libraries Scan Date: December 27, 2007 Identifier: m-n-000128 fl7, THE UNITED REPUBLIC OF TANZANIA MINISTRY OF NATIONAL EDUCATION NATIONAL ARCHIVES DIVISION Guide to The Microfilms of Regional and District Books 1973 PRINTED BY THE GOVERNMENT PRINTER, DAR ES SALAAMs,-TANZANA. Price: S&. 6152 MINISTRY OF NATIONAL EDUCATION NATIONAL ARCHIVES DIVISION Guide to The Microfilms of Regional and District Books vn CONTENTS. Introduction ... .... ... ... ... History of Regional Administration .... ... District Books and their Subject Headings ... THE GUIDE: Arusha Region ... ... ... Coast Region ............... ... Dodoma Region .. ... ... ... Iringa Region ............... ... Kigoma ... ... ... ... ... Kilimanjaro Region .... .... .... ... Mara Region .... .... .... .... ... Mbeya Region ... ... ... ... Morogoro Region ... ... ... ... Mtwara Region ... ... Mwanza Region .. -
Tanzania-Rwanda-Burundi Phase II Dar Es Salaam-Isaka-Kigali/Keza-Musongati Railway Project Study 2
AFRICAN DEVELOPMENT FUND PROJECT : PHASE II DAR ES SALAAM-ISAKA-KIGALI/KEZA- MUSONGATI RAILWAY PROJECT STUDY COUNTRY: TANZANIA - RWANDA and BURUNDI Date: September 2009 Team Leader: A. MOHAMED, Transport Economist, OINF.2 Members E. MASENGO, Transport Engineer, OINF.2 N. SENOU, Transport Economist , OINF.2 Project Team Division Manager: J. RWAMABUGA, OINF.2 Sector Director : G. MBESHERUBUSA, OINF Regional Director D. GAYE, OREA/OREB A. OUMAROU, Transport Engineer, OINF.2 B. TRAORE, Transport Engineer, OINF.1 P. RUGUMIRE., Transport Engineer, OINF.1 N. KULEMEKA, Socio-economist, OINF.2 Peer Review M. FARAOUN, Financial Analyst, OPSM A. BABALOLA, Transport Engineer, OPSM H. IMAN, Financial Analyst, OPSM M. SALAWOU, Financial Analyst, ONRI M. AJIJO, Transport Economist, ONRI AFRICAN DEVELOPMENT FUND TRA-TUNIS B.P. 323 TUNIS-BELVEDERE 1002 Tel.: (216) 71 333 511 Fax: (216) 71 352 933 PROJECT INFORMATION SHEET Date: 31 July 2009 The information given hereunder is intended to provide guidance to prospective suppliers, contractors, consultants and all persons interested in the procurement of goods and services for projects approved by the Boards of Directors of the Bank Group. More detailed information can be obtained from the executing agencies of the Borrower and the Donees. 1. COUNTRY AND PROJECT TITLE : Multinational: Tanzania-Rwanda-Burundi Phase II Dar es Salaam-Isaka-Kigali/Keza-Musongati Railway Project Study 2. PROJECT LOCATION : Tanzania, Rwanda and Burundi 3. - BORROWER : United Republic of Tanzania - DONEES : Republic of Rwanda and Republic of Burundi 4. EXECUTING AGENCY : Ministry of Infrastructure of Rwanda Boulevard de l’Umuganda B.P. 24 Kigali, Rwanda 5. STUDY DESCRIPTION : The study comprises: (A) Study Services; (B) Technical Assistance Services; (C) Financial Audit Services; and (D) Study Coordination and Management.