Link to Document 10

Total Page:16

File Type:pdf, Size:1020Kb

Link to Document 10 EUROPEAN COMMISSION Brussels, 11.2.2016 COM(2016) 64 final ANNEX 4 ANNEX to the Proposal for a Council Decision on the conclusion of the Economic Partnership Agreement (EPA) between the East African Community (EAC) Partner States, of the one part, and the European Union and its Member States, of the other part EN EN ANNEX III and IV to the Agreement ANNEX III(a) EPA DEVELOPMENT MATRIX 11 SEPTEMBER 2015 Project Sub- Location Geographi Current Status Total EU EU Other EAC PS Gap to be Equivalent Implementa Comments component cal Estimate Member Donors financed ($ in Euros tion Period Coverage d Cost ($ States millions) (1 $ = 0.78 million) Euro) Northern Mombasa Kenya Burundi, Feasibility Studies 1,375.00 - - 885.00 690.00 5 years Modernize infrastructure Corridor No. Port Uganda, and detailed designs at the port to allow larger 1 Development Rwanda completed and vessels to call at the port (Mombasa- (MPDP) and phase 1ongoing & and enhance trade - It Malaba- Tanzania phase 2 funding is includes development of Katuna) available new container terminal berth No. 23 at a cost of $ 300 million. The conversion of conventional cargo berths 11 to 14 into container berths at a cost of $ 73 million. Relocation of Kipevu Oil terminal at $ 152 million. Development of Dongo Kundu Free Port at a cost of $300 Million. Dredging of the Channel $ 60 Million EN 2 EN Voi Dry port Kenya Burundi, Feasibility study 104.00 81.12 4 years To decongest Mombasa Uganda, done Port and regional transit Rwanda point. 97 acres of land and available. Tanzania Container Tanzania/ Kenya, Project study is 212.00 5 years Enabling easier Ship Hub Zanzibar Uganda already completed transhipment and good development link along EAC coast wise and in land container ports destination Development of Kisumu Port and other Lake Victoria Ports Development Kenya Kenya, Initiated 22,000.00 30.00 21,170.00 5 years Development of the Port of new Rwanda, of Lamu, Road Network, transport Uganda, 3 International Airports, corridor from Tanzania Oil Refinery, Pipeline Lamu to and and 3 Resort Cities for an Ethiopia and Burundi efficient rail transport South Sudan linking Lamu Port to South Sudan and Ethiopia Widening of Burundi Burundi, Feasibility studies 19.00 - - - - 19.00 14.82 This project will allow the port basin Tanzania & completed Bujumbura Port and Rwanda Construction of Construction Breakwater at Port of a container Entrance and terminal in Rehabilitation of Oil Bujumbura Terminal Port EN 3 EN Shipyard Burundi Kenya, Ongoing Feasibility 7.00 - - - - 7.00 5.46 Improvement of construction Tanzania, studies available equipment handling, at Bujumbura Uganda, (within Ports construction of a port Rwanda Master Plan) warehouse, enlargement of docks, construction of a new port authorities building. Cost to be determined. Renovation of the fleet, construction of new vessels, improving navigation safety. Construction Uganda Uganda & Feasibility study to 300.00 - - - - 300.00 234.00 5 years Will enable the easy of Bukasa Tanzania be undertaken access and connection to Port and Tanzania associated ships to connect with Mwanza Port in Tanzania Establish Off Rwanda Rwanda, Feasibility studies 34.00 - - WB - 34.00 26.52 7years GoR is implementing Dock Burundi, completed for both and this project as part of the Container Kenya, Mombasa and Dar. TMEA integrated logistics Depots in Uganda and Land acquisition in facilities project seeking Mombasa and Tanzania Mombasa is in the to transform the Dar Es final stage while the Logistics chain from the Salaam process has not ports to the hinterland; started in Dar es reduce costs and improve Salaam. operations. EN 4 EN Development Tanzania Tanzania, The feasibility 500.00 - - - - 500.00 390.00 3 years The railway project is of a New Port Uganda study was part of the Tanga at Mwambani completed in (Mwambani) – Arusha - Bay Tanga November, 2012. Musoma - New Kampala and the Following Railway and Maritime Musoma unsuccessful project, which also has a Railway international maritime component of competitive tender developing high capacity procurement Under new ports at Mwambani - Design build Tanga, Musoma and Finance (DBF) on Kampala. The line will 27 January 2015 it open Tanga has been decided Development Corridor to that the project will the International gateway be undertaken in and promote cross border two phases starting trade with neighbouring with detailed countries. The railway designs independent line will be used to of construction transport agriculture and works. ToR for forest products, soda ash, design is expected phosphates and other to be advertised in mineral products to the August 2015 market centres. The project will also stimulate evacuation of a huge nickel deposit which has been discovered at Dutwa, some 100 km east of Mwanza and a huge soda ash deposit at /near Lake Natron. Construct oil Burundi Rwanda & Not initiated - - - - - - - Feasibility studies and pipeline from Burundi construction not yet Kigali to initiated. Costs to be EN 5 EN Bujumbura determined by the study. BAD accepted (579,368$) the financial support in the framework of the EAC Construction Kenya Kenya, Feasibility study 194.74 - - - - 194.74 151.90 5 years Installation of a 14-inch of parallel Uganda, completed diameter oil pipeline pipeline from Rwanda from Nairobi to Eldoret Nairobi to and Eldoret to Burundi increase the pumping capacity Extension of Kenya Kenya & Design 144.94 - - - - 144.94 113.05 5 years Construction of Eldoret - the Kenya- Uganda /procurement Malaba - Kampala oil Uganda initiated pipeline to ensure safety Petroleum and supply of oil Pipeline products to Uganda, (KUPPE) install a 10 inch diameter oil pipeline in the reverse implemented by both countries. EN 6 EN Central Development Tanzania Tanzania, TPA is in the 120.00 - - - - 120.00 93.60 5 years The project will increase Corridor No. of Kisarawe Uganda, process of acquiring capacity of the port of 2 (Dar es Freight Rwanda 1,760 acres for Dar es Salaam to handle Salaam- Station (KFS). and project traffic for Tanzania and Dodoma- Burundi development. The neighbouring countries Isaka- Contract for of Burundi, Rwanda and Mutukula- carrying out Uganda. Masaka) Feasibility Study was signed on 17th September 2014 and the Consultant now is at Interim stage of the study and expected to complete the study by end of September, 2015. EN 7 EN Construction Tanzania, Tanzania, Feasibility Study on 5,580.00 - - - - 5,580.00 4,352.40 8 years of a standard Burundi Burundi construction of a gauge railway and and standard gauge line from Dar Rwanda Rwanda railway from Isaka - es Salaam - Kigali /Keza - Isaka - Kigali Gitega -Musongati /Keza - Gitega was completed - Musongati under AfDB (km 1,670). financing ($2.80ml). Feasibility study for upgrading to standard gauge of Dar-Isaka line was completed by BNSF under USTDA & BNSF joint financing ($ 0.9 ml). Detailed Engineering study for the whole railway line (Dar es Salaam-Isaka- Kigali/Keza-Gitega- Musongati) was finalised in November 2014 under AfDB financing ($8.9ml) Project coordinated by a Secretariat chaired by Tanzania and Rwanda hosting the project secretariat. EN 8 EN A Transaction Advisor (CPSC) was recruited to package the project into PPPs and assist in finance negotiations. An EoI was requested in July 2015. EN 9 EN Upgrading to Tanzania Tanzania, 124.00 - - - - 124.00 96.72 5 years Funding is sought for bitumen Burundi, 124 km only standard of Rwanda Mutukula- and Uganda Kyaka- Bugene – Kasulo (277 km). Development Tanzania Burundi, A Transaction 400.00 - - - - 400.00 312.00 3 years Estimate cost is for of berths 13 & Rwanda Advisor (CPSC) construction and 14 at Dar es and Uganda was recruited to equipment procurement Salaam Port package the project into PPPs and assist in finance negotiations. An EoI was requested in July 2015. Improvements Tanzania Tanzania, Feasibility study for 400.00 - - - - 400.00 312.00 5 years to Mwanza Kenya, Mwanza Port South, Uganda, Modernization Kigoma and Rwanda started in August, Kasanga and 2014 by Consultant ports. Burundi Royal Haskoning and will be completed in March, 2015. Modernization works to start after completion of studies EN 10 EN Upgrading of Tanzania EAC- A total of 50km 203.46 0 0 0 1.46 202 5 years Mpanda – SADC- from Mpanda- Uvinza – COMESA Mishamo (Mpanda- Kanyani (252 Usiumbili section km) (35 km)) is under The road procurement for section is part works under GOT of the funding. The Western missing link which Corridor requires financing is namely: the Usimbili- Tunduma – Mishamo-Uvinza- Sumbawanga Kanyani 267km. – Mpanda – Feasibility Study Kigoma - and Designs Nyakanazi completed by the (1286 km). GoT. Economic activities along this corridor include agriculture, tourism, mining, timberworks, fishing and gold smiting. Section of Tz's major western corridor, opening up central- western Tanzania and EN 11 EN connecting with EAC and COMESA regions. It is an important linkage to the TANZAM, at Tunduma and Central Corridors, at Nyakanazi. Dar es Salaam Tanzania Tanzania, Feasibility study 200 0 0 0 0 200 5 years Expressway Southern EAC, and design are will Bypass COMESA ongoing under GOT decongest Expressway financing the central (85.5 km) - transport Link Dar Port corridor and with proposed increase Kisarawe Dry efficiency of Port and traffic Mlandizi. throughput into and out of Dar city. Upgrading to Tanzania Tanzania, Feasibility study 460.00 - - - - 460.00 358.80 5 years bitumen Rwanda and design are on- standard of and going under the Handeni - Burundi Government of Kiberashi - Tanzania financing Singida Road (460 km). EN 12 EN Dar es Salaam Tanzania Tanzania, Feasibility study 200.00 - - - - 200.00 156.00 5 years Expressway will Southern Burundi and design are on- decongest the central Bypass and going under the transport corridor and Expressway Rwanda Government of increase efficiency of (85.5 km) Tanzania financing traffic throughput into and out of Dar city.
Recommended publications
  • Kigoma Airport
    The United Republic of Tanzania Ministry of Infrastructure Development Tanzania Airports Authority Feasibility Study and Detailed Design for the Rehabilitation and Upgrading of Kigoma Airport Preliminary Design Report Environmental Impact Assessment July 2008 In Association With : Sir Frederick Snow & Partners Ltd Belva Consult Limited Corinthian House, PO Box 7521, Mikocheni Area, 17 Lansdowne Road, Croydon, Rose Garden Road, Plot No 455, United Kingdom CR0 2BX, UK Dar es Salaam Tel: +44(02) 08604 8999 Tel: +255 22 2120447 Fax: +44 (02)0 8604 8877 Email: [email protected] Fax: +255 22 2120448 Web Site: www.fsnow.co.uk Email: [email protected] The United Republic of Tanzania Ministry of Infrastructure Development Tanzania Airports Authority Feasibility Study and Detailed Design for the Rehabilitation and Upgrading of Kigoma Airport Preliminary Design Report Environmental Impact Assessment Prepared by Sir Frederick Snow and Partners Limited in association with Belva Consult Limited Issue and Revision Record Rev Date Originator Checker Approver Description 0 July 08 Belva KC Preliminary Submission EXECUTIVE SUMMARY 1. Introduction The Government of Tanzania through the Tanzania Airports Authority is undertaking a feasibility study and detailed engineering design for the rehabilitation and upgrading of the Kigoma airport, located in Kigoma-Ujiji Municipality, Kigoma region. The project is part of a larger project being undertaken by the Tanzania Airport Authority involving rehabilitation and upgrading of high priority commercial airports across the country. The Tanzania Airport Authority has commissioned two companies M/S Sir Frederick Snow & Partners Limited of UK in association with Belva Consult Limited of Tanzania to undertake a Feasibility Study, Detail Engineering Design, Preparation of Tender Documents and Environmental and Social Impact Assessments of seven airports namely Arusha, Bukoba, Kigoma, Tabora, Mafia Island, Shinyanga and Sumbawanga.
    [Show full text]
  • October 29, 2019 Tanzania Electric Supply Company Limited
    ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT SUMMARY FOR THE PROPOSED CONSTRUCTION OF 44.8MW MALAGARASI HPP AND ASSOCIATED 132KV TRANSMISSION LINE FROM MALAGARASI HYDROPOWER PLANT TO KIGOMA 400/132/33KV SUBSTATION AT KIDAHWE KIGOMA OCTOBER 29, 2019 TANZANIA ELECTRIC SUPPLY COMPANY LIMITED 1 PROJECT TITLE: MALAGARASI 45MW HYDRO POWER PROJECT PROJECT NUMBER: P-TZ-FAB-004 COUNTRY: TANZANIA CATEGORY: 1 Sector: PICU Project Category: 1 2 1. TABLE CONTENTS 1. TABLE CONTENTS ............................................................................................................................................................... 3 2. INTRODUCTION.................................................................................................................................................................. 4 3. PROJECT DESCRIPTION ....................................................................................................................................................... 4 4. PROJECT DESCRIPTION ....................................................................................................................................................... 6 5. POLICY AND LEGAL FRAMEWORK ....................................................................................................................................... 6 6. ENVIRONMENTAL AND SOCIAL BASELINE ............................................................................................................................ 7 7. STAKEHOLDER ENGAGEMENT PROCESS .............................................................................................................................
    [Show full text]
  • Referral Transit Time Between Sending and First-Line Receiving Health Facilities: a Geographical Analysis in Tanzania
    Research BMJ Glob Health: first published as 10.1136/bmjgh-2019-001568 on 17 August 2019. Downloaded from Referral transit time between sending and first-line receiving health facilities: a geographical analysis in Tanzania Michelle M Schmitz, 1 Florina Serbanescu,1 George E Arnott,1 Michelle Dynes,1 Paul Chaote,2 Abdulaziz Ally Msuya,3 Yi No Chen1 To cite: Schmitz MM, ABSTRACT Summary box Serbanescu F, Arnott GE, Background Timely, high-quality obstetric services et al. Referral transit time are vital to reduce maternal and perinatal mortality. We What is already known? between sending and first- spatially modelled referral pathways between sending line receiving health facilities: Strengthening obstetric inter-facility referral sys- and receiving health facilities in Kigoma Region, Tanzania, ► a geographical analysis in tems in developing countries, including reducing de- identifying communication and transportation delays to Tanzania. BMJ Global Health lays due to inadequate transportation and unreliable timely care and inefficient links within the referral system. 2019;4:e001568. doi:10.1136/ communication, increases access to timely, appro- Methods We linked sending and receiving facilities to bmjgh-2019-001568 priate obstetric and neonatal care. form facility pairs, based on information from a 2016 Handling editor Seye Abimbola Health Facility Assessment. We used an AccessMod cost- What are the new findings? friction surface model, incorporating road classifications ► About 57.8% of facility pairs in Kigoma did not refer Additional material is ► and speed limits, to estimate direct travel time between to facilities providing higher levels of care. published online only. To facilities in each pair. We adjusted for transportation view please visit the journal ► When accounting for communication and transpor- online (http:// dx.
    [Show full text]
  • The Center for Research Libraries Scans to Provide Digital Delivery of Its Holdings. in the Center for Research Libraries Scans
    The Center for Research Libraries scans to provide digital delivery of its holdings. In The Center for Research Libraries scans to provide digital delivery of its holdings. In some cases problems with the quality of the original document or microfilm reproduction may result in a lower quality scan, but it will be legible. In some cases pages may be damaged or missing. Files include OCR (machine searchable text) when the quality of the scan and the language or format of the text allows. If preferred, you may request a loan by contacting Center for Research Libraries through your Interlibrary Loan Office. Rights and usage Materials digitized by the Center for Research Libraries are intended for the personal educational and research use of students, scholars, and other researchers of the CRL member community. Copyrighted images and texts are not to be reproduced, displayed, distributed, broadcast, or downloaded for other purposes without the expressed, written permission of the Center for Research Libraries. © Center for Research Libraries Scan Date: December 27, 2007 Identifier: m-n-000128 fl7, THE UNITED REPUBLIC OF TANZANIA MINISTRY OF NATIONAL EDUCATION NATIONAL ARCHIVES DIVISION Guide to The Microfilms of Regional and District Books 1973 PRINTED BY THE GOVERNMENT PRINTER, DAR ES SALAAMs,-TANZANA. Price: S&. 6152 MINISTRY OF NATIONAL EDUCATION NATIONAL ARCHIVES DIVISION Guide to The Microfilms of Regional and District Books vn CONTENTS. Introduction ... .... ... ... ... History of Regional Administration .... ... District Books and their Subject Headings ... THE GUIDE: Arusha Region ... ... ... Coast Region ............... ... Dodoma Region .. ... ... ... Iringa Region ............... ... Kigoma ... ... ... ... ... Kilimanjaro Region .... .... .... ... Mara Region .... .... .... .... ... Mbeya Region ... ... ... ... Morogoro Region ... ... ... ... Mtwara Region ... ... Mwanza Region ..
    [Show full text]
  • Tanzania-Rwanda-Burundi Phase II Dar Es Salaam-Isaka-Kigali/Keza-Musongati Railway Project Study 2
    AFRICAN DEVELOPMENT FUND PROJECT : PHASE II DAR ES SALAAM-ISAKA-KIGALI/KEZA- MUSONGATI RAILWAY PROJECT STUDY COUNTRY: TANZANIA - RWANDA and BURUNDI Date: September 2009 Team Leader: A. MOHAMED, Transport Economist, OINF.2 Members E. MASENGO, Transport Engineer, OINF.2 N. SENOU, Transport Economist , OINF.2 Project Team Division Manager: J. RWAMABUGA, OINF.2 Sector Director : G. MBESHERUBUSA, OINF Regional Director D. GAYE, OREA/OREB A. OUMAROU, Transport Engineer, OINF.2 B. TRAORE, Transport Engineer, OINF.1 P. RUGUMIRE., Transport Engineer, OINF.1 N. KULEMEKA, Socio-economist, OINF.2 Peer Review M. FARAOUN, Financial Analyst, OPSM A. BABALOLA, Transport Engineer, OPSM H. IMAN, Financial Analyst, OPSM M. SALAWOU, Financial Analyst, ONRI M. AJIJO, Transport Economist, ONRI AFRICAN DEVELOPMENT FUND TRA-TUNIS B.P. 323 TUNIS-BELVEDERE 1002 Tel.: (216) 71 333 511 Fax: (216) 71 352 933 PROJECT INFORMATION SHEET Date: 31 July 2009 The information given hereunder is intended to provide guidance to prospective suppliers, contractors, consultants and all persons interested in the procurement of goods and services for projects approved by the Boards of Directors of the Bank Group. More detailed information can be obtained from the executing agencies of the Borrower and the Donees. 1. COUNTRY AND PROJECT TITLE : Multinational: Tanzania-Rwanda-Burundi Phase II Dar es Salaam-Isaka-Kigali/Keza-Musongati Railway Project Study 2. PROJECT LOCATION : Tanzania, Rwanda and Burundi 3. - BORROWER : United Republic of Tanzania - DONEES : Republic of Rwanda and Republic of Burundi 4. EXECUTING AGENCY : Ministry of Infrastructure of Rwanda Boulevard de l’Umuganda B.P. 24 Kigali, Rwanda 5. STUDY DESCRIPTION : The study comprises: (A) Study Services; (B) Technical Assistance Services; (C) Financial Audit Services; and (D) Study Coordination and Management.
    [Show full text]
  • United Republic of Tanzania
    UNITED REPUBLIC OF TANZANIA PRESIDENT’S OFFICE REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT AUTHORITIES KASULU TOWN COUNCIL COUNCIL PROFILE PREPARED BY, TOWN DIRECTORS OFFICE, P.O. BOX 475, KASULU FOREWORD Kasulu Town Council forms a part of Kigoma Region, the region that is situated at the extreme Western part of the Republic of Tanzania. Kasulu Town Council is a new Local Government Authority established with effect from 1st July, 2011 through Parliamentary letter signed in Dodoma on 19th April, 2012 under the Local Government (Urban Authorities) ACT (Cap 288). Kasulu Town Council covers total area of 878.8 Km² approximately 11.5% of the total area of District. According to 2012 Population and Housing Census the total population of Kasulu Town Council was 208,244 having an annual population growth rate of 2.4% per annum which is below national average growth rate of 2.7%. The life expectancy of people estimated to reach 52 years. In 2017 total population is approximated to 234,462. Kasulu Town Council is a land for investment found in the North -Eastern part of Kigoma Region. It is a junction with linking roads to Kibondo, Uvinza and Buhigwe districts respectively. The people of Kasulu Town Council widening the markets through International business exchange with businessmen from the Republic of Burundi. Its natural geographical position, topography, soil fertility, favorable climatic conditions with reliable infrastructures, and to date the council is electrified by thermal power of 2.5MW that makes Kasulu Town to be the best option for investors. The Council is proud of production of food crops like maize, beans, banana and cassava just to name the few, and cash crops such as coffee and sunflower.
    [Show full text]
  • Rice Market Chain Analysis in Kigoma, March 2018
    MARKET CHAIN ANALYSIS AND DEVELOPMENT FOR RICE PRODUCED IN KIGOMA REGION, TANZANIA FINAL REPORT CONSULTANTS NICHOLAUS .E. NIKUSEKELA & GWALUSAJO K.J, KAPANDE MARCH, 2018 ACKNOWLEDGEMENT This comprehensive market analysis and development for rice produced in Kigoma region is the result of the invaluable efforts of many people and organizations. There is insufficient space and time to mention all organisations and individuals that made it possible to conduct a successful market chain analysis. However, our sincere gratitude goes to all who contributed technically and/or financially to this work. We are most grateful to the cooperation accorded by the management of NIRAS-LIC and all local leaders in the targeted irrigation schemes, villages and districts as well as all market chain actors (farmers, traders, transporters, millers and consumers) who made possible for this market analysis to take place. Specifically we would like to acknowledge the NIRAS-LIC for commissioning this work and supporting it technically and financially up to the end. We would also like to acknowledge the team from Nkamson Consultancy Co. Ltd who collected, analyses data/information, drafted the report and worked tirelessly to improve it to this final report. i Market Chain Analysis and Development for Rice Produced in Kigoma Region, Tanzania CONTENT ACKNOWLEDGEMENT i CONTENT ii LIST OF FIGURES iv ACRONYMS vii EXECUTIVE SUMMARY viii 1.0 INTRODUCTION 1 1.1. Project Background ...............................................................................................................
    [Show full text]
  • The United Republic of Tanzania
    The United Republic of Tanzania Ministry of Infrastructure Development Tanzania Airports Authority Public Disclosure Authorized Public Disclosure Authorized Feasibility Study and Detailed Design for The Rehabilitation and Upgrading of Kigoma Airport Final Design Report Public Disclosure Authorized Environmental Impact Assessment November 2009 Public Disclosure Authorized In Association With: Sir Frederick Snow & Partners Ltd Belva Consult Limited Corinthian House, PO Box 7521, Mikocheni Area, 17 Lansdowne Road, Croydon, January 2008 Rose Garden Road, Plot No 455, United Kingdom CR0 2BX, UK Dar es Salaam Tel: +44(02) 08604 8999 Tel: +255 22 2775910 Fax: +44 (02)0 8604 8877 Email: [email protected] Fax: +255 22 2775919 Web Site: www.fsnow.co.uk Email: [email protected] The United Republic of Tanzania Ministry of Infrastructure Development Tanzania Airports Authority Feasibility Study and Detailed Design for the Rehabilitation and Upgrading of Kigoma Airport Final Design Report Environmental Impact Assessment Prepared by Sir Frederick Snow and Partners Limited in association with Belva Consult Limited Issue and Revision Record Rev Date Originator Checker Approver Description 0 July 08 Belva KC Preliminary Submission 1 Mar 09 Belva KC Final Draft Submission 2 Nov 09 Belva KC Re-scoping Submission EXECUTIVE SUMMARY 1. Introduction The Government of Tanzania through the Tanzania Airports Authority is undertaking a feasibility study and detailed engineering design for the rehabilitation and upgrading of the Kigoma airport, located in Kigoma-Ujiji Municipality, Kigoma region. The project is part of a larger project being undertaken by the Tanzania Airport Authority involving rehabilitation and upgrading of high priority commercial airports across the country.
    [Show full text]
  • Efficacy of Forest Resources Governance on REDD+ Performance in Uvinza District, Western Tanzania
    Vol. 10(6), pp. 119-132, June, 2017 DOI: 10.5897/JGRP2017.0628 Article Number: 651800164320 ISSN 2070-1845 Journal of Geography and Regional Planning Copyright © 2017 Author(s) retain the copyright of this article http://www.academicjournals.org/JGRP Full Length Research Paper Efficacy of forest resources governance on REDD+ performance in Uvinza district, western Tanzania John E. Makunga1* and Salome B. Misana2 1Ministry of Natural Resources and Tourism, Pasiansi Wildlife Training Institute, Mwanza, Tanzania. 2Department of Geography, University of Dar es Salaam, Dar es Salaam, Tanzania. Received 13 February, 2017; Accepted 20 March, 2017 This paper presents findings of a study on the effectiveness of forest resource governance on the performance of the REDD+ project in the Masito-Ugalla ecosystem in Uvinza district, western Tanzania through transparency, accountability, participation and integrity. The study was conducted in Ilagala, Karago and Kirando villages with the objective of understanding the effects of forest resources governance on REDD+ project performance as well as examining the best ways of integrating forest resource governance with REDD+ projects. The methods used in the study included household interviews that used a structured questionnaire, semi-structured interviews and focus group discussions. Semi-structured interviews were used to gather qualitative data from key informants. The findings revealed that despite the efforts undertaken by REDD+ initiative in Masito-Ugalla ecosystem, its performance was generally average. Such performance was due to the support rendered by JUWAMMA, the inter-village community based organization, to the REDD+ project activities in the area. Poor forest resources governance had, however, continued to hamper its performance.
    [Show full text]
  • Appendices to Vol 3
    Council Subvote Index 74 Kigoma Region Subvote Description Council District Councils Number Code 2005 Kigoma/Ujiji Municipal Council 5003 Internal Audit 5004 Admin and HRM 5005 Trade and Economy 5006 Administration and Adult Education 5007 Primary Education 5008 Secondary Education 5009 Land Development & Urban Planning 5010 Health Services 5011 Preventive Services 5012 Health Centres 5013 Dispensaries 5014 Works 5017 Rural Water Supply 5022 Natural Resources 5027 Community Development, Gender & Children 5031 Salaries for VEOs 5032 Salaries for MEOs 5033 Agriculture 5036 Environments 3021 Kigoma District Council 5003 Internal Audit 5004 Admin and HRM 5005 Trade and Economy 5006 Administration and Adult Education 5007 Primary Education 5008 Secondary Education 5009 Land Development & Urban Planning 5010 Health Services 5011 Preventive Services 5012 Health Centres 5013 Dispensaries 5014 Works 5017 Rural Water Supply 5022 Natural Resources 5027 Community Development, Gender & Children 5033 Agriculture 5036 Environments 3022 Kasulu District Council 5003 Internal Audit 5004 Admin and HRM 5005 Trade and Economy 5006 Administration and Adult Education 5007 Primary Education 5008 Secondary Education 5009 Land Development & Urban Planning 5010 Health Services 5011 Preventive Services ii Council Subvote Index 74 Kigoma Region Subvote Description Council District Councils Number Code 3022 Kasulu District Council 5012 Health Centres 5013 Dispensaries 5014 Works 5017 Rural Water Supply 5022 Natural Resources 5027 Community Development, Gender & Children
    [Show full text]
  • Tanzania | a Leader Among Africa’S Emerging Markets
    Tanzania | A Leader among Africa’s Emerging Markets Tanzania A Leader among Africa’s Emerging Markets October 2016 01 Tanzania | A Leader among Africa’s Emerging Markets Brief overview The United Republic of Tanzania (Tanzania) has recorded an annual average growth rate of more than 6% over the past decade and is on course to maintain a robust growth rate of over 6.5% going forward. Despite global economic and financial uncertainties, the economy has been able to achieve these consistent growth rates coupled with a low inflation rate, driven by activity in sectors such as mining, energy, construction and manufacturing. Improving public sector efficiency and a crackdown on corruption has been the focus of the new administration under the leadership of President John Magufuli, elected in 2015. The government intends to stimulate inclusive growth and reduce poverty levels by running a leaner administration, promoting tax compliance, building Private-Public Partnerships (PPPs) and attracting investment into industrial sector development. Underpinned by favourable demographics and supported by a government that is showing signs of principled leadership with intentions to invest in education, skills transfers and infrastructure to drive growth, Tanzania is well-positioned to continue on its current rapid growth path. Its young and culturally-diverse population of more than 50 million makes it eastern Africa’s second most- populous nation after Ethiopia; expected to reach almost 83 million by 2030. Greater emphasis on upscaling urban hard and soft infrastructure and creating employment opportunities in light of a rapidly-growing urban population will be integral in supporting its national development vision, the Tanzania Development Vision (TDV) that looks to transform the economy into a middle-income and semi-industrialised state by 2025.
    [Show full text]
  • BUHIGWE DISTRICT PROFILE FOREWORD Buhigwe District
    BUHIGWE DISTRICT PROFILE FOREWORD Buhigwe District Council was established in 2012 under the Government Notice No. 73 of 2nd march 2012. It is one of 7 councils of Kigoma Region, others districts includes; Kibondo, Kigoma, Kigoma/Ujiji Municipal, Uvinza, Kasulu and Kakonko. It is located in the Western part of Kigoma Region. In the west, it is bordered by Republic of Burundi, in the East and northern part is bordered by Kasulu District Council, in the south-eastern is bordered by Congo DRC, in the southern part is bordered by Kigoma District Council. It is located in the highlands found nearby Republic of Burundi. Buhigwe District Council is among seven Local Government Authorities in Kigoma Region. It has an area of 1,700.29 square Kilometers. Administratively, it is divided into 2 Divisions; 20 Wards, 44 Villages and 188 Sub-villages. The Council has a population of 254,342 people including 120,690 males and 133,652 females as per population and household census of 2012. Its natural geographical position is characterized by topography, soil fertility, favorable climatic conditions and reliable infrastructures and soon the District will be electrified by thermal power that will make Buhigwe best option for investors. The District council is proud of production in maize, beans, banana and cassava for food crops while coffee, oil palm and ginger is considered to be cash crop and opportunity of establishing sugar cane plantation along Malagarasi River. The topographical and favorable condition found in Buhigwe may attract tourism activities. The area is characterized by attractive landscapes such as gullies and a number of valleys.
    [Show full text]