Table of Contents
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Port Mann/Highway 1 Improvement Project—PP Shows Status As of Summer 2010 • Project Construction Started August 2008
• Total project cost $2.5 billion (Canadian) • Financed by tolls – about $3 each direction. • Total project length 37 km (McGill St in Vancouver to 216th in Langley) • The new Port Mann bridge – 10 lanes (existing bridge has 5 lanes). – Replaces the existing 45 year old bridge. – Includes Rapid Bus service from Langley to Burnaby SkyTrain. – Can accommodate installation of light rapid transit underneath the main deck at a future date. Source: “Port Mann Bridge Plans Unveiled Today,” CBC News, February 4, 2009. • Project website – http://www.pmh1project.com/ • Port Mann/Highway 1 Improvement Project—PP shows status as of Summer 2010 • Project construction started August 2008. • Port Mann Bridge to be operational by December 2012. • All of project complete by December 2013. North Approximate Vancouver project limits Coquitlam Vancouver Burnaby Port Mann YVR Richmond Surrey Langley All satellite images in PP from Google Maps Coquitlam side of bridge Surrey side of bridge • Three major parts – Cable-stayed main bridge across Fraser River. • Main span 470 m. • South span 190 m. • North span 190 m. – South approach • 350 m constructed using 327 precast sections with HMA road surface. – North approach • 820 m constructed using 831 precast sections also with an asphalt surface. Source: PMH1 newsletter—Summer 2010 • Designer: T.Y. Lin International • Materials – New bridge deck requires 25,000 tonnes of HMA – 28,000 tonnes of rebar – 13,000 tonnes of structural steel Source: PMH1 newsletter—Summer 2010 78 drilled shafts 2.5 m in 129 driven piles 1.8 m in 30 drilled shafts 2.5 m diameter with average diameter with average in diameter with depth = 53 m. -
For Lease Vancouver, Bc
8889 LAUREL STREET FOR LEASE VANCOUVER, BC BUILDING 3 COMPLETING IN MID-OCTOBER OAK STREET BRIDGE LAUREL STREET MANAGED BY: DEVELOPED BY: MARKETED BY: JASON KISELBACH ILYA TIHANENOKS CHRIS MACCAULEY PERSONAL REAL ESTATE CORPORATION 778 372 3930 PERSONAL REAL ESTATE CORPORATION 604 662 5108 [email protected] 604 662 5190 [email protected] [email protected] 2 8899 Laurel Street, KENT AVENUE SOUTH 112 111 110 109 108 107 106 105 The subject property is conveniently located in South Vancouver’s industrial district, situated just south of SW Marine Drive. The property benefits from excellent access to all areas of Metro Vancouver via Marine Drive, Cambie Street, Boundary Road, as well as, Arthur Laing, Oak Street and Knight Street bridges. RARE OPPORTUNITY TO LEASE BRAND NEW UNITS FROM 2,144 UP TO 8,071 SQUARE FEET. SW MARINE DRIVE 106 105 104 103 102 LAUREL STREET 101 4 8899 Laurel Street, BE A PART OF THE TRANSFORMATION In the last 5 years, the area bordered by Granville Street, Cambie Street, SW Marine Drive and the Fraser River has seen extraordinary development. In the next 5 years, it is destined to evolve even further. AREA HIGHLIGHTS INCLUDE: • Quick access to YVR • Marine Drive Station a short walk away • Densification of the South Marpole neighbourhood is ongoing • Convenient access to 3 bridges and Highway 99 • Gateway to Richmond & Burnaby 8889 LAUREL STREET 5 15 MINS MINS Vancouver International Airport Downtown Vancouver 8889 LAUREL STREET VANCOUVER, BC VANCOUVER COQUITLAM BURNABY SKYTRAIN CANADA SKYTRAIN SKYTRAIN MILLENIUM 1 SKYTRAIN EXPO NEW VANCOUVER INTERNATIONAL WESTMINSTER AIRPORT 1 91 RICHMOND 99 91 SURREY 17 DELTA 25 40 MINS MINS Downtown Vancouver Vanterm Container Terminal Deltaport Highway 1 US Border NO. -
Agenda Public Works and Transportation Committee MINUTES NEXT COMMITTEE MEETING DATE PRESENTATION PLANNING and DEVELOPMENT DIVIS
Agenda Public Works and Transportation Committee Anderson Room, City Hall 6911 No. 3 Road Wednesday, March 21, 2018 4:00 p.m. Pg. # ITEM MINUTES PWT-5 Motion to adopt the minutes of the meeting of the Public Works and Transportation Committee held on February 21, 2018. NEXT COMMITTEE MEETING DATE April 18, 2018, (tentative date) at 4:00 p.m. in the Anderson Room PRESENTATION 1. Leo Chan, Vice President, Canadian High-Speed Rail Research Institute, to present on the Richmond-Chilliwack High Speed Rail proposal. PLANNING AND DEVELOPMENT DIVISION 2. TRANSLINK SOUTHWEST AREA TRANSPORT PLAN – FINAL PLAN (File Ref. No. 01-0154-04) (REDMS No. 5684886 v. 2; 5688976) PWT-81 See Page PWT-81 for full report Designated Speaker: Victor Wei PWT – 1 Public Works & Transportation Committee Agenda – Wednesday, March 21, 2018 Pg. # ITEM STAFF RECOMMENDATION (1) That TransLink’s Southwest Area Transport Plan, as attached to the report titled “TransLink Southwest Area Plan – Final Plan,” be endorsed for implementation; (2) That a copy of the report titled “TransLink Southwest Area Plan – Final Plan” be forwarded to the Richmond Council-School Board Liaison Committee for information; and (3) That Traffic Bylaw No. 5870, Amendment Bylaw No. 9816, to revise the posted speed limits on sections of Alderbridge Way and Garden City Road to support the planned transit improvements, be introduced and given first, second and third reading. 3. PUBLIC BIKE SHARE - PROPOSED PILOT PROJECT (File Ref. No. 10-6500-01) (REDMS No. 5754120 v. 4) PWT-113 See Page PWT-113 for full report Designated Speaker: Victor Wei STAFF RECOMMENDATION (1) That staff be directed to issue a Request for Proposals for the development and operation of a public bike share system as a pilot project, as described in the staff report dated February 28, 2018, from the Director, Transportation; and (2) That staff report back on the responses to the above Request for Proposals with further recommendations prior to the award of any contract(s) and implementation of the pilot program. -
Alex Fraser Bridge Capacity Improvement Project
p ALEX FRASER BRIDGE CAPACITY IMPROVEMENT PROJECT Date: Tuesday, February 20,2018 Time: 4:30 - 5:00 p.m. Location: Annacis Room Introduction: Steven Lan, Director of Engineering Presentation: Gerry Fleming, Project Manager South Coast Region Ministry of Transportation and Infrastructure Background Materials: • Memorandum from the Director of Engineering dated February 14, 2018 M M RANDUM City of Delta Engineering To: Mayor and Council From: Steven Lan, P.Eng., Director of Engineering Date: February 14, 2018 Subject: Council Workshop: Alex Fraser Bridge Capacity Improvement Project File No.: 5220-20/ALEX F CC: Ken Kuntz, Acting City Manager The Alex Fraser Bridge Capacity Improvement Project incorporates improvements to the Alex Fraser Bridge and Highway 91 including the introduction of counter-flow over the bridge to increase the capacity. Besides other improvements, an additional centre lane will be created that will provide for four lanes northbound and three lanes southbound during the morning commute and, four lanes southbound with three lanes northbound during the rest of the day. Staff from the South Coast Region of the Ministry of Transportation and Infrastructure will be presenting the project to Council on Tuesday, February 20,2018. An overview of the presentation is included (Attachment A) for Council's information. Please do not hesitate to contact me if you have further questions at 604-946-3299. ,-f{N~-----~ '~Steven Lan, P.Eng. Director of Engineering Attachment: A. Alex Fraser Bridge Capacity Improvement Project Overview GWB/bm -'-_'-___-.:-.:_..:....,._ ·-,o.:!.-..:·.:;·..:.:.:.::..=.::::.:...:= ~~~~~, ....l ' .. _.-- --.---:;; ~.- ..... -n-'- -~---;""'"" --.-..-::--: .'"tf': .~"-;;.~w:---~-:" Alex Fraser Bridge Capacity Improvement Project BRITISH COLUMBIA Project Overview February 201 -8 Gerry Fleming Project Ma nager -0» om :::::m CD () South Coast Region, Ministry of Transportation a nd Infrastruc ture ::::r ->'3 o CD -::l """-I»c..v ...... -
Waterworks Utility Annual Report 2020
WATERWORKS UTILITY ANNUAL REPORT 2020 The Waterworks Utility Annual Report 2020 cover image was designed by Cynthia Nguyen, a Media Arts student at Sir Charles Tupper Secondary School. Waterworks Utility Annual Report 2020 This report summarizes the City of Vancouver Waterworks Utility activities and program outcomes for 2020. It provides a financial synopsis for the year, and gives detailed information on Waterworks performance in programs for: Water Quality; Water Conservation; Capital Asset Management, and; Asset Operations & Maintenance. In 2020, a new strain of coronavirus called COVID-19 reached the City of Vancouver. This report includes details on related operational challenges and opportunities as Waterworks staff adapted to new health and safety protocols and continued to work diligently to monitor water quality, minimize water waste, maintain Vancouver’s drinking water system, and to ensure the delivery of over 100 billion litres of safe, high quality drinking water to our customers. This report is posted on the City’s website to assure the public of the excellent quality of Vancouver’s drinking water, and to promote the programs and activities supporting continuous delivery of clean, safe drinking water to Vancouver customers. Provincial regulations governing water suppliers in British Columbia require the City of Vancouver to conduct drinking water quality monitoring and publicly post the results within 6 months of year- end. This report satisfies those requirements. 2020 Report Statistics at a Glance • Waterworks delivered 108.5 billion litres of drinking water throughout Vancouver. • The drinking water quality met or exceeded Provincial Regulatory requirements, Health Canada standards and relevant International best practices. • Water conservation policies and projects resulted in a 26% decrease of potable water use from 2006 rates. -
Mayor and Council From
City of Delta COUNCIL REPORT F.07 Regular Meeting To: Mayor and Council From: Corporate Services Department Date: February 21, 2018 George Massey Tunnel Replacement Project Update The following recommendations have been endorsed by the Acting City Manager. • RECOMMENDATION: THAT copies of this report be provided to: • Honourable Marc Garneau, Minister of Transport • Honourable Carla Qualtrough, Member of Parliament for Delta • Chief Bryce Williams, Tsawwassen First Nation • Honourable Claire Trevena, Minister of Transportation & Infrastructure • Ravi Kahlon, MLA Delta-North • Ian Paton, MLA Delta-South • Metro Vancouver Board of Directors • Mayors' Council on Regional Transportation • PURPOSE: The purpose of this report is to provide an update on some of the key issues related to the George Massey Tunnel Replacement Project (GMTRP), particularly in light of the Province's recent announcement regarding the Pattullo Bridge, and to provide a consolidated summary for Council's information. • BACKGROUND: On February 16, 2018, the BC government announced that it is moving forward with the construction of a $1.38 billion bridge to replace the Pattullo Bridge. This raises some questions regarding the George Massey Tunnel Replacement Project, which has been on a five-month hiatus since the Province announced last September that it was undertaking an independent technical review of the crossing. Both projects are badly needed; however, unlike the Pattullo project which is only part-way through the environmental assessment process, the tunnel replacement project is shovel-ready, has received its environmental assessment certificate and has completed the bidding process. Furthermore, in terms of both vehicular and transit traffic, the George Massey Tunnel carries Page 2 of 5 GMTRP Update February 21 , 2018 significantly higher volumes than the Pattullo Bridge (Attachments 'A' and 'B' show the volumes for all the Fraser River crossings). -
Water Committee Agenda
METRO VANCOUVER REGIONAL DISTRICT WATER COMMITTEE REGULAR MEETING April 15, 2021 9:00 am 28th Floor Boardroom, 4730 Kingsway, Burnaby, British Columbia A G E N D A1 1. ADOPTION OF THE AGENDA 1.1 April 15, 2021 Regular Meeting Agenda That the Water Committee adopt the agenda for its regular meeting scheduled for April 15, 2021 as circulated. 2. ADOPTION OF THE MINUTES 2.1 March 11, 2021 Regular Meeting Minutes That the Water Committee adopt the minutes of its regular meeting held March 11, 2021 as circulated. 3. DELEGATIONS 4. INVITED PRESENTATIONS 5. REPORTS FROM COMMITTEE OR STAFF 5.1 Water Services Capital Program Expenditure Update to December 31, 2020 That the Water Committee receive for information the report dated March 18, 2021, titled “Water Services Capital Program Expenditure Update to December 31, 2020”. 5.2 GVWD 2020 Water Quality Annual Report That the GVWD Board receive for information the report dated April 1, 2021, titled “GVWD 2020 Water Quality Annual Report”. 1 Note: Recommendation is shown under each item, where applicable. April 8, 2021 Water Committee Water Committee Regular Agenda April 15, 2021 Agenda Page 2 of 3 5.3 Seymour Salmonid Society’s 2020 Annual Report for Greater Vancouver Water District That the GVWD Board receive for information the report dated April 1, 2021, titled “Seymour Salmonid Society’s 2020 Annual Report for Greater Vancouver Water District“. 5.4 Watering Regulations Communications and Regional Water Conservation Campaign for 2021 That the Water Committee receive for information the report dated March 9, 2021, titled “Watering Regulations Communications and Regional Water Conservation Campaign for 2021”. -
10472 Scott Road, Surrey, BC
FOR SALE 10472 Scott Road, Surrey, BC 3.68 ACRE INDUSTRIAL DEVELOPMENT PROPERTY WITH DIRECT ACCESS TO THE SOUTH FRASER PERIMETER ROAD PATULLO BRIDGE KING GEORGE BOULEVARD SOUTH FRASER PERIMETER ROAD (HIGHWAY #17) 10472 SCOTT ROAD TANNERY ROAD SCOTT ROAD 104 AVENUE Location The subject property is located on the corner of Scott Road and 104 Avenue, situated in the South Westminster area of Surrey, British Columbia. This location benefits from direct access to the South Fraser Perimeter Road (Highway #17) which connects to all locations in Metro Vancouver via Highways 1, 91, and 99. The location also provides convenient access south to the U.S. border, which is a 45 minute drive away via the SFPR and either Highway 1 or Highway 91. The property is surrounded by a variety of restaurants and neighbours, such as Williams Machinery, BA Robinson, Frito Lay, Lordco, Texcan and the Home Depot. SCOTT ROAD Opportunity A rare opportunity to acquire a large corner Scott Road frontage property that has been preloaded and has a development permit at third reading for a 69,400 SF warehouse. 104 AVENUE Buntzen Lake Capilano Lake West Vancouver rm A n ia North d n I 99 Vancouver BC RAIL Pitt Lake 1 Harrison Lake Bridge Lions Gate Ir o Port Moody n 99 W o PORT METRO r VANCOUVER Burrard Inlet k e r s M e m o r i a l B C.P.R. English Bay r i d g e 7A Stave Lake Port Coquitlam Vancouver Maple Ridge 7 Key Features CP INTERMODAL Coquitlam 7 1 7 9 Burnaby Pitt 7 Meadows 7 VANCOUVER P o r t M a C.P.R. -
Pattullo Bridge Replacement
L P PATTULLO BRIDGE REPLACEMENT Date: Monday, July 15, 2013 Location: Annacis Room Time: 4:15 - 4:45 pm Presentation: Steven Lan, Director of Engineering Background Materials: Memorandum from the Director of Engineering dated July 9, 2013. i. MEMORANDUM The Corporation of Delta Engineering To: Mayor and Council From: Steven Lan, P.Eng., Director of Engineerin g Date: July 9, 201 3 Subject: Council Workshop: Pattullo Bri dge Replacement File No.: 1220·20/PATT CC: George V. Harvi e, Chief Administrative Officer TransLink recently completed the initial round of public consultation sessions in New Westminster and Surrey to solicit feedback from the public on the Pattullo Bridge. A number of alternative crossings were developed for three possible corridors: 1. Existing Pattullo Bridge Corridor 2. Sapperton Bar Corridor • New crossing located east of the existing Pattullo Bridge that would provide a more direct connection between Surrey and Coquitlam 3. Tree Island Corridor • New crossing located west of the existing Pattullo Bridge that would essentially function as an alternative to the Queensborough Bridge Based on the initial screening work that has been undertaken, six alternatives have been identified for further consideration: 1. Pattullo Bridge Corridor - Rehabilitated Bridge (3 lanes) 2. Pattullo Bridge Corridor - Rehabilitated Bridge (4 lanes) 3. Pattullo Bridge Corridor - New Bridge (4 lanes) 4. Pattullo Bridge Corridor - New Bridge (5 lanes) 5. Pattullo Bridge Corridor - New Bridge (6 lanes) 6. Sapperton Bar Corridor - New Bridge (4 lanes) coupled with Rehabilitated Pattullo Bridge (2-3 lanes) Options involving a new bridge are based on the implementation of user based charges (tolls) to help pay for the bridge upgrades. -
George Massey Tunnel Replacement Project
GEORGE MASSEY TUNNEL REPLACEMENT PROJECT SUMMARY ASSESSMENT REPORT With Respect to the Application by the British Columbia Ministry of Transportation and Infrastructure for an Environmental Assessment Certificate pursuant to the Environmental Assessment Act, S.B.C. 2002, c.43 Prepared by: Environmental Assessment Office January 19, 2017 1 Introduction This summary assessment report provides an overview of the environmental assessment (EA) of the proposed George Massey Tunnel Replacement Project (GMTR) conducted by the Environmental Assessment Office (EAO). This report cross-references relevant sections of EAO’s Assessment Report, where more in-depth analysis and discussion can be found. 2 Project Description The British Columbia Ministry of Transportation and Infrastructure (MOTI) is proposing to: Construct a 10-lane, clear span bridge over the Fraser River; Replace three interchanges at Westminster Highway, Steveston Highway and Highway 17A; Widen approximately 24 km of Highway 99 to accommodate dedicated transit and High Occupancy Vehicle (HOV) lanes from Bridgeport Road in Richmond to Highway 91 in Delta; Replace the Deas Slough Bridge with the south approach of the new bridge; Restore Green Slough to its historical alignment; Construct multi-use pathways on either side of the new bridge for cyclists and pedestrians; and Decommission the existing George Massey Tunnel (Tunnel), which would include removal and disposal of the four in-river Tunnel segments, and flooding and backfilling the two Tunnel approaches. GMTR would become part of the provincial highway system and would be part of the Highway 99 corridor in BC’s Lower Mainland, between the Bridgeport Road interchange in Richmond and the Highway 91 interchange in Delta (see Figure 1-1). -
George Massey Tunnel Expansion Plan Study
Report to MINISTRY OF TRANSPORTATION AND HIGHWAYS i On GEORGE MASSEY TUNNEL EXPANSION PLANNING STUDY TTaffic Impact Taffic Operations Parking ransit Tansportation rucking Planning Modelling 4 March 26, 1991 Ministry of Transportation and Highways South Coast Regional District 7818 Sixth Street Burnaby, B.C. V3N 4N8; Attention:: Ms. Maria Swan, P.Eng. Senior Transportation Planning Engineer Dear Sir: RE: Expansion of George Massey Tunnel - Preliminary Planning Studv In accordance with your instructions, we have now carried out the preliminary planning study of the future expansion of the George Massey Tunnel on Highway 99. The attached report presents an overview of the study together with the resultant conclusions and recommendations. Thank you for the opportunity to work on this project on behalf of the Ministry. I trust that this report enables your staff to continue with the next steps necessary to bring these recommendations to fruition. 145gmasy\gmt.rpt 520 - 1112 West Pender Street, Vancouver, British Columbia, Canada V6E 2S1 Tel: (604) 688-8826 Fax: 688-9562 TABLE OF CONTENTS Page 1.0 INTRODUCTION ........................................... 1 1.1 Background to Study ....................................... 1 1.2 Scope of Study ........................................... 2 1.3 History and Role of the George Massey Tunnel ...................... 2 2.0 EXISTING TRANSPORTATION SYSTEM .......................... 5 2.1 Regional Road Network ..................................... 5 2.2 Current Traffic Volumes on Fraser River Crossings .................... 8 2.3 Historic Growth in Traffic Volumes .............................. 12 2.4 Growth in Capacity Across the South Arm ......................... 21 2.5 Physical Constraints on Highway 99 .............................. 22 2.6 Projected Growth in Ferry Traffic ............................... 22 2.7 Role of Transit ........................................... 23 3.0 GROWTH IN TRAVEL DEMAND ............................... -
Bridges to Buntzen 200K
Permanent Brevet #53 Submitted by: Tracy Barill Bridges to Buntzen 200K Distance Distance (km- Turn Direction Route (Interval) cumulative) Start – King Edward Canada Line Station (Cambie Street and King Edward Ave, Vancouver) 0 R W 5.9 King Edward Avenue 5.9 R N 0.9 Crown Street 6.8 L W 4.1 W 16th Ave 10.9 L S 4.1 SW Marine Drive 15.0 BR S 5.4 SW Marine Drive 20.4 R S 0.4 SW Marine Drive 20.8 BL E 0.1 SW Marine Drive 20.9 R S 0.2 SW Marine Drive CAUTION – Bear left to follow Grant 21.1 BL S 1.1 McConachie Way over Arthur Laing Bridge 22.2 R N 0.3 new BIKE PATH to access Grauer Road 22.5 L SW 1.1 Grauer Road 23.6 R SW 5.2 Templeton Street – becomes Ferguson Road CONTROL 1: IONA ISLAND Park Gate – Information Control (washrooms 28.8 another .5 km further) 28.8 T NE 7.1 Ferguson Road becomes Templeton Street 35.9 SO E 0.1 Cross Grant McConachie Way 36.0 L N 0.4 Miller Road Wellington Crescent (1st on right – may not have a 36.4 R E 1.0 sign – bike access only) 37.4 R NE 0.4 Airport Road 37.8 R E 0.4 Russ Baker Way 38.2 SO E 2.0 No. 2 Road (continue over bridge) 40.2 R S 0.8 Granville Ave (becomes Railway) 41.0 BL E 2.4 Railway Ave 43.4 R S 1.6 Williams Ave 45.0 L E 0.6 Springmont Dr.