PCAB List of Special License Issued for Calendar Year 2017 As of 02
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
PCAB List of Special License Issued for Calendar Year 2017 As of 26
PCAB LIST OF SPECIAL LICENSES ISSUED FOR CALENDAR YEAR 2017 as of 26 April 2017 # Authorized Managing Classifications / Category / Special Validity Period Project Title / Funding Source / Implementing License Name Participants Address Officer / License No. Agency Company Represented Project Kind GP Size Range From Until Description Project Location 1 3RB CONSTRUCTION & 3RB CONSTRUCTION & SUPPLY Luis B. Boyon / 3RB P-7, Panal, General B / Medium A JV-16-1545 March 01, June 30, Contract ID: 17F00011 Local / Burias DPWH SUPPLY / GRELIPS Construction & Supply Tabaco City Engineering Road 2017 2017 MFO 1 - National Road Island, Masbate CONSTRUCTION & GRELIPS CONSTRUCTION & Network Services, Road DEVELOPMENT JOINT DEVELOPMENT Upgrading (Unpaved to VENTURE paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) San Pascual- Claveria Road, K025+900 to K041+980 with exceptions 2 3RB CONSTRUCTION & 3RB CONSTRUCTION & SUPPLY Luis B. Boyon / 3RB Brgy. 38 Imelda General B / Medium A JV-16-1573 March 06, June 30, Contract ID: 17FB0061 Local / Daraga, DPWH SUPPLY / DN''D Construction & Supply C. Roces Ave., Engineering 2017 2017 Construction/Maintenan Albay CONSTRUCTION & DN''D CONSTRUCTION & Tahao Road, Flood Control ce of Flood Mitigation DEVELOPMENT JOINT DEVELOPMENT Gogon, Legazpi Structures and Drainage VENTURE City Systems - Construction of Flood Control and Drainage System of Daraga Poblacion 3 4B CONSTRUCTION 4B CONSTRUCTION CORPORATION Antonio F. Arizapa, Jr. / Brgy. Mulawin, General AAA / Large A JV-16-1592 March 07, June 30, Contract ID: 17CRN003 Local / Hermosa, LGU-Hermosa, CORPORATION / AFAJI Afaji Builders Orani, Bataan Engineering Road 2017 2017 Supply of Materials, Bataan Bataan BUILDERSJOINT VENTURE AFAJI BUILDERS Labor and Equipment for the Asphalt Overlay of Various Barangay Road Municipal Wide 4 739 BUILDERS / FIT 739 BUILDERS Felix T. -
The Project for Study on Improvement of Bridges Through Disaster Mitigating Measures for Large Scale Earthquakes in the Republic of the Philippines
THE REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH) THE PROJECT FOR STUDY ON IMPROVEMENT OF BRIDGES THROUGH DISASTER MITIGATING MEASURES FOR LARGE SCALE EARTHQUAKES IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT MAIN TEXT [2/2] DECEMBER 2013 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) CTI ENGINEERING INTERNATIONAL CO., LTD CHODAI CO., LTD. NIPPON KOEI CO., LTD. EI JR(先) 13-261(3) Exchange Rate used in the Report is: PHP 1.00 = JPY 2.222 US$ 1.00 = JPY 97.229 = PHP 43.756 (Average Value in August 2013, Central Bank of the Philippines) LOCATION MAP OF STUDY BRIDGES (PACKAGE B : WITHIN METRO MANILA) i LOCATION MAP OF STUDY BRIDGES (PACKAGE C : OUTSIDE METRO MANILA) ii B01 Delpan Bridge B02 Jones Bridge B03 Mc Arthur Bridge B04 Quezon Bridge B05 Ayala Bridge B06 Nagtahan Bridge B07 Pandacan Bridge B08 Lambingan Bridge B09 Makati-Mandaluyong Bridge B10 Guadalupe Bridge Photos of Package B Bridges (1/2) iii B11 C-5 Bridge B12 Bambang Bridge B13-1 Vargas Bridge (1 & 2) B14 Rosario Bridge B15 Marcos Bridge B16 Marikina Bridge B17 San Jose Bridge Photos of Package B Bridges (2/2) iv C01 Badiwan Bridge C02 Buntun Bridge C03 Lucban Bridge C04 Magapit Bridge C05 Sicsican Bridge C06 Bamban Bridge C07 1st Mandaue-Mactan Bridge C08 Marcelo Fernan Bridge C09 Palanit Bridge C10 Jibatang Bridge Photos of Package C Bridges (1/2) v C11 Mawo Bridge C12 Biliran Bridge C13 San Juanico Bridge C14 Lilo-an Bridge C15 Wawa Bridge C16 2nd Magsaysay Bridge Photos of Package C Bridges (2/2) vi vii Perspective View of Lambingan Bridge (1/2) viii Perspective View of Lambingan Bridge (2/2) ix Perspective View of Guadalupe Bridge x Perspective View of Palanit Bridge xi Perspective View of Mawo Bridge (1/2) xii Perspective View of Mawo Bridge (2/2) xiii Perspective View of Wawa Bridge TABLE OF CONTENTS Location Map Photos Perspective View Table of Contents List of Figures & Tables Abbreviations Main Text Appendices MAIN TEXT PART 1 GENERAL CHAPTER 1 INTRODUCTION ..................................................................................... -
The Feasibility Study of the Flood Control Project for the Lower Cagayan River in the Republic of the Philippines
JAPAN INTERNATIONAL COOPERATION AGENCY DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS THE REPUBLIC OF THE PHILIPPINES THE FEASIBILITY STUDY OF THE FLOOD CONTROL PROJECT FOR THE LOWER CAGAYAN RIVER IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT VOLUME I EXECUTIVE SUMMARY FEBRUARY 2002 NIPPON KOEI CO., LTD. NIKKEN Consultants, Inc. SSS JR 02- 07 List of Volumes Volume I : Executive Summary Volume II : Main Report Volume III-1 : Supporting Report Annex I : Socio-economy Annex II : Topography Annex III : Geology Annex IV : Meteo-hydrology Annex V : Environment Annex VI : Flood Control Volume III-2 : Supporting Report Annex VII : Watershed Management Annex VIII : Land Use Annex IX : Cost Estimate Annex X : Project Evaluation Annex XI : Institution Annex XII : Transfer of Technology Volume III-3 : Supporting Report Drawings Volume IV : Data Book The cost estimate is based on the price level and exchange rate of June 2001. The exchange rate is: US$1.00 = PHP50.0 = ¥120.0 PREFACE In response to a request from the Government of the Republic of the Philippines, the Government of Japan decided to conduct the Feasibility Study of the Flood Control Project for the Lower Cagayan River in the Republic of the Philippines and entrusted the study to the Japan International Cooperation Agency (JICA). JICA selected and dispatched a study team headed by Mr. Hideki SATO of NIPPON KOEI Co.,LTD. (consist of NIPPON KOEI Co.,LTD. and NIKKEN Consultants, Inc.) to the Philippines, six times between March 2000 and December 2001. In addition, JICA set up an advisory committee headed by Mr. Hidetomi Oi, Senior Advisor of JICA between March 2000 and February 2002, which examined the study from technical points of view. -
Chapter 4 Safety in the Philippines
Table of Contents Chapter 1 Philippine Regions ...................................................................................................................................... Chapter 2 Philippine Visa............................................................................................................................................. Chapter 3 Philippine Culture........................................................................................................................................ Chapter 4 Safety in the Philippines.............................................................................................................................. Chapter 5 Health & Wellness in the Philippines........................................................................................................... Chapter 6 Philippines Transportation........................................................................................................................... Chapter 7 Philippines Dating – Marriage..................................................................................................................... Chapter 8 Making a Living (Working & Investing) .................................................................................................... Chapter 9 Philippine Real Estate.................................................................................................................................. Chapter 10 Retiring in the Philippines........................................................................................................................... -
The Project for Study on Improvement of Bridges Through Disaster Mitigating Measures for Large Scale Earthquakes in the Republic of the Philippines
THE REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH) THE PROJECT FOR STUDY ON IMPROVEMENT OF BRIDGES THROUGH DISASTER MITIGATING MEASURES FOR LARGE SCALE EARTHQUAKES IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT MAIN TEXT [1/2] DECEMBER 2013 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) CTI ENGINEERING INTERNATIONAL CO., LTD CHODAI CO., LTD. NIPPON KOEI CO., LTD. EI JR(先) 13-261(2) Exchange Rate used in the Report is: PHP 1.00 = JPY 2.222 US$ 1.00 = JPY 97.229 = PHP 43.756 (Average Value in August 2013, Central Bank of the Philippines) LOCATION MAP OF STUDY BRIDGES (PACKAGE B : WITHIN METRO MANILA) i LOCATION MAP OF STUDY BRIDGES (PACKAGE C : OUTSIDE METRO MANILA) ii B01 Delpan Bridge B02 Jones Bridge B03 Mc Arthur Bridge B04 Quezon Bridge B05 Ayala Bridge B06 Nagtahan Bridge B07 Pandacan Bridge B08 Lambingan Bridge B09 Makati-Mandaluyong Bridge B10 Guadalupe Bridge Photos of Package B Bridges (1/2) iii B11 C-5 Bridge B12 Bambang Bridge B13-1 Vargas Bridge (1 & 2) B14 Rosario Bridge B15 Marcos Bridge B16 Marikina Bridge B17 San Jose Bridge Photos of Package B Bridges (2/2) iv C01 Badiwan Bridge C02 Buntun Bridge C03 Lucban Bridge C04 Magapit Bridge C05 Sicsican Bridge C06 Bamban Bridge C07 1st Mandaue-Mactan Bridge C08 Marcelo Fernan Bridge C09 Palanit Bridge C10 Jibatang Bridge Photos of Package C Bridges (1/2) v C11 Mawo Bridge C12 Biliran Bridge C13 San Juanico Bridge C14 Lilo-an Bridge C15 Wawa Bridge C16 2nd Magsaysay Bridge Photos of Package C Bridges (2/2) vi vii Perspective View of Lambingan Bridge (1/2) viii Perspective View of Lambingan Bridge (2/2) ix Perspective View of Guadalupe Bridge x Perspective View of Palanit Bridge xi Perspective View of Mawo Bridge (1/2) xii Perspective View of Mawo Bridge (2/2) xiii Perspective View of Wawa Bridge TABLE OF CONTENTS Location Map Photos Perspective View Table of Contents List of Figures & Tables Abbreviations Main Text Appendices MAIN TEXT PART 1 GENERAL CHAPTER 1 INTRODUCTION ..................................................................................... -
16 NOVEMBER 2020, MONDAY Headline STRATEGIC November 16, 2020 COMMUNICATION & Editorial Date INITIATIVES Column SERVICE 1 of 2 Opinion Page Feature Article
16 NOVEMBER 2020, MONDAY Headline STRATEGIC November 16, 2020 COMMUNICATION & Editorial Date INITIATIVES Column SERVICE 1 of 2 Opinion Page Feature Article Probe illegal logging, mining in Region 2, Duterte to Cimatu By Azer Parrocha November 15, 2020, 4:46 pm ILLEGAL LOGGING. President Rodrigo Roa Duterte presides a situation briefing to discuss the aftermath of Typhoon Ulysses in the Cagayan Valley Region at Tuguegarao airport in Cagayan on (Sunday) Nov. 15, 2020. Duterte ordered Environment Secretary Roy Cimatu to look into reports of illegal logging and mining following massive flooding in Cagayan Valley during the onslaught of Typhoon Ulysses. (Screenshot) MANILA – President Rodrigo Duterte on Sunday ordered Environment Secretary Roy Cimatu to look into reports of illegal logging and mining after Cagayan Valley experienced massive flooding triggered by heavy rainfall due to Typhoon Ulysses and enhanced by the tail-end of a cold front. “I will direct here Cimatu to look into the illegal minings especially where people are building their shelter downwards,” Duterte said in a situation briefing in Tuguegarao City on Sunday. He lamented that despite being discussed in various meetings, “nothing” has been done to address illegal logging and mining in the country. “We always talk about illegal logging and mining but actually nothing has been done about it,” he said. Duterte also asked Cimatu to ensure that residents in flood-prone areas are relocated to higher grounds. “In other areas, yung convincing the people to move to a place where it’s not prone to flooding. That’s the only way that we can erase agony every time that there is a typhoon over here,” he said. -
Part 3 Selection of Bridges for Seismic Capacity Improvement
PART 3 SELECTION OF BRIDGES FOR SEISMIC CAPACITY IMPROVEMENT (PACKAGE B AND C) CHAPTER 11 PROCEDURES FOR SELECTION OF BRIDGES FOR OUTLINE DESIGN 11.1 General In order to determine the bridges which require retrofitting or replacement to mitigate the seismic disaster inside and outside Metro Manila, two steps of screening were employed which includes inspection of the bridge conditions, environmental and social conditions around the bridge, and undertaking traffic volume survey on the roads related to the bridges. The prioritization and selection of the bridges to be retrofitted or replaced was carried-out based on these steps of screening. The detailed evaluation criteria of first screening and second screening are described in 11.4 Evaluation Criteria for the First Screening and 11.5 Evaluation Criteria for the Second Screening. The first screening aims to prioritize bridges which should be widely categorized by not only physical factors due to condition of the bridge but also seismic performance factors to reduce seismic hazards and geotechnical factors. The purpose of the second screening is to select the target bridges for the outline design stage. 11.2 Flowchart for Selection The selection of priority bridges for seismic strengthening shall be undertaken as a two-screening process as shown in Figure 11.2-1. 11-1 Figure 11.2-1 Procedure of Identification of Prioritized Bridges 11-2 11.3 Contents of Survey for the First and Second Screenings The detailed scope of works and survey method for each survey work is shown in Table 11.3-1. -
PCAB List of Special License Issued for Calendar Year 2017 As of 15
PCAB LIST OF SPECIAL LICENSES ISSUED FOR CALENDAR YEAR 2017 as of 15 May 2017 # Authorized Managing Classifications / Category / Special Validity Period Project Title / Funding Source / Implementing License Name Participants Address Officer / License No. Agency Company Represented Project Kind GP Size Range From Until Description Project Location 1 3RB CONSTRUCTION & 3RB CONSTRUCTION & SUPPLY Luis B. Boyon / 3RB P-7, Panal, General B / Medium A JV-16-1545 March 01, June 30, Contract ID: 17F00011 Local / Burias DPWH SUPPLY / GRELIPS Construction & Supply Tabaco City Engineering Road 2017 2017 MFO 1 - National Road Island, Masbate CONSTRUCTION & GRELIPS CONSTRUCTION & Network Services, Road DEVELOPMENT JOINT DEVELOPMENT Upgrading (Unpaved to VENTURE paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) San Pascual- Claveria Road, K025+900 to K041+980 with exceptions 2 3RB CONSTRUCTION & 3RB CONSTRUCTION & SUPPLY Luis B. Boyon / 3RB Brgy. 38 Imelda General B / Medium A JV-16-1573 March 06, June 30, Contract ID: 17FB0061 Local / Daraga, DPWH SUPPLY / DN''D Construction & Supply C. Roces Ave., Engineering 2017 2017 Construction/Maintenan Albay CONSTRUCTION & DN''D CONSTRUCTION & Tahao Road, Flood Control ce of Flood Mitigation DEVELOPMENT JOINT DEVELOPMENT Gogon, Legazpi Structures and Drainage VENTURE City Systems - Construction of Flood Control and Drainage System of Daraga Poblacion 3 4B CONSTRUCTION 4B CONSTRUCTION CORPORATION Antonio F. Arizapa, Jr. / Brgy. Mulawin, General AAA / Large A JV-16-1592 March 07, June 30, Contract ID: 17CRN003 Local / Hermosa, LGU-Hermosa, CORPORATION / AFAJI Afaji Builders Orani, Bataan Engineering Road 2017 2017 Supply of Materials, Bataan Bataan BUILDERSJOINT VENTURE AFAJI BUILDERS Labor and Equipment for the Asphalt Overlay of Various Barangay Road Municipal Wide 4 739 BUILDERS / FIT 739 BUILDERS Felix T. -
2Nd Quarter 2018 Page 1 of 35 DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 2Nd Quarter CY 2018
DPWH CONSTRUCTORS' PERFORMANCE SUMMARY REPORT (ON-GOING / COMPLETED PROJECTS) 2nd Quarter CY 2018 No. of CATEGORY PROJECT CONTRACT DATE FINAL RATING/ No. of NAME OF LICENSE DATE OF NO. OF *IMPL. FUNDING SLIPPAG CPES VISIT Contracto L/F STATUS WMS MTL TIME FAC ESH RDR QUALITATIVE REMARKS Project CONSTRUCTOR NO. EVALUATION VISIT AGENCY SOURCE AMOUNT DUR E (%) RATING r PCAB ARC TYPE NAME LOCATION STARTED COMP DESCRIPTION (Php, M) (C.D) Zamboanga 2M CONSTRUCTION & Improvement/ Construction/ Concreting Siay, Zamboanga 1 1 33331 L B MA GE 5/29/2018 1st Sibugay 2nd LF 28.649 133 3/19/2018 7/29/2018 13.70 % OG 0.385 0.236 0.150 0.030 0.070 0.050 92.10% - AHD ENTERPRISES of Labasan - Camanga Road Sibugay DEO Road Upgrading (Unpaved to Paved) KO623+771 to based on Gravel Roads Strategies, KO626 + 301 Traffic Benchmark for Uprading to (Intermittent Apayao 1st 2 2 3K ROCK ENGINEERING 27908 L A MA GE 6/5/2018 2nd LF 96.499 417 4/4/2017 5/25/2018 -3.76% OG 0.363 0.255 0.112 0.030 0.055 0.033 84.80% - DEL Paved Road Standards (HDM-4) Project Sections), DEO, CAR Analysis)- Tertiary Roads+ Apayao- Kabugao, Ilocos Norte Road Apayao CY 2017 Basic Educational Facilities 515 LIFE CONSTRUCTION, Fund, Construction of 2STY 6CL Tanauan City, Batangas 3rd 91.70% 3 3 41520 L B SB GB 6/19/2018 Final LF 11.598 170 12/27/2017 6/14/2018 0.00 % C 0.482 0.135 0.300 - - - 91.70% ONS CORP. -
Pdf | 280.9 Kb
D. Initial Report on Damage to Agriculture (sources: RDRRMCs II and III) Region II - 30,092 hectares of palay and corn were damaged in Isabela and Cagayan: (5,597 hectares totally and 24,495 hectares partially) with estimated loss pegged at PhP313,749,207.00 or 15.169 metric tons - 641,187 kgs. or an estimated 7,717,270 pcs. of fingerings and marketable fish and 294.53 hectares of fishponds with an estimated cost of PhP 88,564,213.00 were damaged/affected in Cagayan, Isabela, Nueva and Vizcaya Region III - 57 hectares of rice, 19 hectares assorted vegetable, fruit trees and 2 hectares fishery amounting to PhP2,439,364.00 were damaged in Aurora Province II. STATUS OF LIFELINES Roads/Bridges Conditions (Tab C) 5 Six (6) road sections and six (5) bridges in Cagayan, Isabela, Aurora, Apayao and Kalinga are still not passable due to flooding, landslides and washed-out approach Status of Dams 5 Magat Dam (as of 08 November 2010, 5;00 AM) – water level: 193.48m (spilling level: 193m); inflow: 1,340 cu m/sec; outflow: 569 cu m/sec; with 2 gates opened @ 4m height Water Level of Gauging Stations 5 Buntun Bridge Gauging Station in Tuguegarao, Cagayan (as of 07 November 2010, 4:00 PM) – water level: 9.5m (alarm: 9.0m; and critical: 12.0m) 5 Gamu Gauging Station in Isabela–water level: 1.06m, no rainfall (as of 08 November 2010, 05:00 AM) III. INCIDENTS MONITORED Floods – 3 Region III: Fifteen (15) barangays in Casiguran, Aurora (Esperanza, Culas, Calantas, Lual, Marikit, Calaqcuasan, Tinib, Dibacong, Bianuan, Esteves, Calabagan, Ditinagyan, Tabas, Poblacion and Dibet) CAR: Brgys San Quintin, San Isidro, Balabag East and San Pascual in Rizal, Kalinga and Laya East, Dagupan, Tabuk Landslides - 4 Region II: Purok 4 Brgy Libertad and Brgy Dipuso in San Mariano, Isabela CAR: Brookside, Bulanao, Tabuk and Dupang Old Tanglag, Lubuagan, Kalinga Province Lubuagan Landslide 5 On 06 November, the collapsed portion of Mt. -
Annex Vi : Flood Control the Feasibility Study of the Flood Control Project for the Lower Cagayan River in the Republic of the Philippines
The Feasibility Study of the Flood Control Project for the Lower Cagayan River in the Republic of the Philippines Final Report Supporting Report ANNEX VI : FLOOD CONTROL THE FEASIBILITY STUDY OF THE FLOOD CONTROL PROJECT FOR THE LOWER CAGAYAN RIVER IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT Volume VI-1 SUPPORTING REPORT ANNEX VI FLOOD CONTROL Table of Contents Page CHAPTER 1 PRESENT RIVER CONDITION......................................................... VI-1 1.1 Present River Condition..................................................................................... VI-1 1.1.1 River System ....................................................................................... VI-1 1.1.2 General Features of Present River Channel .......................................... VI-2 1.1.3 River Morphology ............................................................................... VI-3 1.2 Flood Damages.................................................................................................. VI-14 1.2.1 Bank Erosion and Sedimentation ......................................................... VI-15 1.2.2 Flood Inundation ................................................................................. VI-18 1.2.3 Flood Damages.................................................................................... VI-19 1.3 Existing Flood Control Projects (Structural Measures)....................................... VI-20 1.4 Flood Disaster Prevention System (Non-structural Measures)............................ VI-21 1.4.1 Existing -
1 Lecture Notes in Geography of the Philippines And
1 LECTURE NOTES IN GEOGRAPHY OF THE PHILIPPINES AND NATURAL RESOURCES The Philippines - is an archipelago comprising 7,107 islands with a total land area of - 300,000 km2. - the archipelago is around 800 km from the Asian mainland and is located between Taiwan and Borneo Continent Asia Region Southeast Asia Coordinates 13°00'N 122°00'E Ranked 73rd 300,000 km2 (120,000 sq mi) Area 99.38% land 0.62 % water Borders None Mount Apo Highest point 2,954 m (9,691 ft) Philippine Sea Lowest point 0 m/0 ft (sea level) Longest river Cagayan River Largest lake Laguna de Bay 11 largest islands - contain 94% of the total land area. Luzon - the largest of these islands at about 105,000 km2. Mindanao - The next largest island is at about 95,000 km2.. islands - are divided into three groups: Luzon, Visayas, and Mindanao. Luzon islands -include Luzon island itself, Palawan, Mindoro, Marinduque, Masbateand Batanes Islands. Visayas - is the group of islands in the central Philippines, the largest of which are: Panay, Negros, Cebu, Bohol, Leyte and Samar. Mindanao islands - include Mindanao itself, plus the Sulu Archipelago, composed primarily of Basilan, Sulu Island, and Tawi-Tawi. 2 PHYSICALSETTING Philippine archipelago - lies in Southeast Asia in a position that has led to its becoming a cultural crossroads, a place where Malays, Arabs, Chinese, Spaniards, Americans, Japanese and others have interacted to forge a unique cultural and racial blend. - numbers some 7,107 islands and the nation claims an exclusive economic zone (EEZ) of 200 nautical miles (370 km) from its shores.