PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Flood Management Program - Construction/Maintenance of Flood Control Mitigation Structures and Drainage Systems - Construction/Maintenance of Flood Mitigation Structures and 91.8% 11 Diamond Eagle Construction 33328 09/05/2019 3rd DEO 19.061 240 C 0.49 0.13 0.30 - - - 91.80% Very Satisfactory Drainage Systems - Construction/Rehabilitation of Flood Structures along Right Side Downstream of Gating-Gating River at Gating-Gating Bridge Local Infrastructure Program - Flood Control and Drainage - 11 Diamond Eagle Construction / Bhenllabien Flood Control Structures/Facilities - Construction/Rehabilitation 90.9% JV-17-2349 09/06/2019 Laguna 2nd DEO 38.090 360 C 0.48 0.13 0.30 - - - 90.90% Very Satisfactory Builders Construction of a Grouted Slope Protection along Petang Creek from RSBS up to Roseville Subd. Asset Preservation-Preventive Maintenance - Tertiary Roads- Ilocos Sur 2nd 115 Construction & Development 38309 08/28/2019 8.697 74 O 0.36 0.24 0.15 0.03 0.05 0.05 88.00% - On-going Jct. Candon-Salcedo-Del Pilar Road, K0349+580 - K0350+454 DEO Repair/Rehabilitation of Multi-Purpose Building (Health Center Metro 1st 92.7% 121 Construction Corporation 21686 08/30/2019 4.798 120 C 0.49 0.13 0.30 - - - 92.70% Very Satisfactory and Lying Inn) Barangay Mauway DEO Network Development-Road Widening-Primary Roads Daang 128 Dragon Construction And Supplies 35408 11/10/2019 43.757 189 O 0.37 0.23 0.15 0.03 0.06 0.05 88.60% - On-going Maharlika (LZ) K0352+229 - K0353+805 DEO Improvement/ Construction/ Concreting of Labasan - Camanga 2M Construction & Enterprises 33331 05/29/2018 28.649 133 O 0.39 0.24 0.15 0.03 0.07 0.05 92.10 - On-going Road Sibugay 2nd DEO

Road Widening Including Drainage along Ipil-Magdaup Wharf Zamboanga 2M Construction & Enterprises 33331 03/13/2018 16.187 177 C 0.49 0.20 0.28 - - - 96.60 92.92% Very Satisfactory Road (S01143MN) (K2014+800 - K2015+297) Sibugay 2nd DEO Road Widening on Secondary Roads along Villasis - Malasiqui - 4th 2-R Construction & Supply 15304 San Carlos Road, K0190+660 - K0192+018, K0192+700 - 08/22/2019 19.781 120 O 0.39 0.24 0.15 0.03 0.06 0.05 91.80% - On-going DEO K0192+729 Road Widening Of Secondary Roads along Villasis-Malasiqui- Pangasinan 4th 2-R Construction & Supply 15304 San Carlos Road, K0190+660-K0192+018, K0192+700- 11/06/2019 14.549 150 O 0.39 0.24 0.15 0.03 0.05 0.05 90.80% - On-going DEO K0192+729 Organizational Outcome 1: Ensure Safe and Reliable National 93.3% 301 Engineers 38364 Road System Bridge Program-Retrofitting/Strengthening of 08/24/2019 2.790 72 C 0.50 0.13 0.30 - - - 93.30% Very Satisfactory 3rd DEO Permanent Bridge-San Isidro Bridge Construction of Road - Purok 3 Afga-Anahawan- Kauswagan-San Vicente Road Connecting Coconut and Agusan del Sur 3C Sl Construction And Supply 36393 11/11/2019 19.599 170 O 0.39 0.24 0.15 0.03 0.04 0.03 89.00% - On-going Falcata Plantation Sittes and National in Support 1st DEO to Coconut and Wood Industries Improvement of Multi-Purpose Building at Pinyahan Elementary City 2nd 3Fj Construction 37156 11/26/2019 2.965 93 O 0.39 0.24 0.11 0.03 0.05 0.03 85.00% - On-going School DEO Road Upgrading (Unpaved to Paved) based on Gravel Roads Strategies, Traffic Benchmark for Uprading to Paved Road 1st DEO, 3K Rock Engineering 27908 06/05/2018 96.499 417 O 0.363 0.255 0.112 0.03 0.055 0.033 84.80 - On-going Standards (HDM-4) Project Analysis)- Tertiary Roads+ Apayao- CAR Ilocos Norte Road Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads: Reconstruction to Concrete Pavement - Specific 3K Rock Engineering 27908 11/20/2019 1st DEO 48.534 203 O 0.37 0.30 0.10 0.03 0.06 0.03 88.70% - On-going Locations Along Kennon Road (S00393LZ) , K0234+000 to K0237+011 3K'S Industrial Maintenance And Services, 2nd Inc. 40070 Construction of Capanican Bridge 08/22/2019 12.992 199 O 0.39 0.24 0.15 0.03 0.06 0.05 92.20% - On-going DEO

Concreting of Barangay Moto Norte to Tubodio Road, Barangay 3N Construction & Supply 37872 11/05/2019 Bohol 1st DEO 1.960 30 C 0.48 0.13 0.30 - - - 91.10% 91.1% Very Satisfactory Napo and Barangay Tubodio Construction of Drainage Structure Along Road - On Specific 3Rb Consturction & Supply 19541 11/11/2019 Masbate 1st DEO 29.519 210 O 0.38 0.24 0.15 0.01 0.05 0.05 87.20% - On-going Locations Along San Fernando North Road (S00009TC) Misamis 3R'S Builders And Resources 35922 Concreting of Roads, Sinacaban Cluster 11/08/2019 Occidental 2nd 23.401 100 O 0.39 0.30 0.10 0.03 0.05 0.03 90.50% - On-going DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 1 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) 1st 4 Doublers Trading & Contractor 35452 Rehabilitation of Dahlia St., Barangay Fairview 11/25/2019 9.800 150 C 0.40 0.14 0.30 - - - 83.90% 87.74% Satisfactory DEO Quezon City 1st 4 Doublers Trading & Contractor 35452 Rehabilitation of Dahlia Street, Barangay Fairview 08/23/2019 9.800 150 O 0.39 0.25 0.15 0.03 0.04 0.05 90.30% - On-going DEO Off-Carriageway Improvement: Construction of Laybys - On 4Rm Construction & Supplies 35767 Specific Locations along Quirino H-Way (- ) 11/22/2019 Baguio City DEO 9.724 160 O 0.39 0.24 0.15 0.03 0.04 0.05 89.40% - On-going S00420LZ), K0299+570 to K0303+790 Lower Construction of Trapezoidal Concrete Canal Lining and Irrigation System 511 Builders 34324 Declogging of Structures (Sta. 3+926.00 - Sta. 5+528.00 of 12/19/2020 12.408 270 C 0.44 0.20 0.30 - - - - 93.80% Very Satisfactory Improvement LARIS Lateral B, L=1,571.00m) Project ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Batangas 3rd 515 Life Construction Corp. 41520 11/22/2019 44.969 240 O 0.40 0.24 0.15 0.02 0.05 0.05 91.20% - On-going Widening- Tertiary Roads, Talisay-Laurel-Agoncillo Rd.- DEO K0094+332- K0095+530 LOCAL PROGRAM, Construction/Repair/Rehabilitation/Improvement of Various Batangas 3rd 515 Life Construction Corp. 41520 Infrastructure including Local Projects, Local Roads and 11/22/2019 61.409 270 O 0.40 0.24 0.15 0.02 0.05 0.05 90.60% - On-going DEO Bridges, Local Roads, Construction of Natatas- Balete- Wawa- Boot Road Construction / Upgrading / Rehabilitation of drainage along national roads - Tertiary Roads - Baliwag-Candaba Road 525 Construction 28532 11/19/2019 1st DEO 28.704 270 O 0.39 0.24 0.09 0.03 0.06 0.02 82.10% - On-going K0052+150-K0052+800, K0055+137-K0055+470, K0055+800- K0056+808.50 Road Widening of Catarman- Road K0755+585- Northern 90.3% 5G Galvez Construction And Supply 34736 08/22/2019 29.479 294 C 0.47 0.13 0.30 - - - 90.30% Very Satisfactory K0755+775, K0759+883-K0759+1472 1st DEO 6 Jewels Construction JV-17-1886 Development of Pocket Forest Park, Gardens and Playground 09/19/19 TIEZA 23.000 195 C 0.40 0.17 0.30 - - - 86.80 92.57% Very Satisfactory Rehabilitation & Improvement of and Picnic 626 Construction & Trading, Inc. 34990 09/27/2018 TIEZA 7.500 90 O 0.38 0.30 0.13 0.03 0.06 0.05 95.30 - On - Going Grounds Construction of Flood Control Structure along Angat River, San 722 Construction, Inc. 21923 08/25/2019 Bulacan 1st DEO 18.620 147 O 0.39 0.24 0.15 0.03 0.06 0.05 91.60% - On-going Jose Section Construction of Flood Control structures along Angat River San 722 Construction, Inc. 21923 11/19/2019 Bulacan 1st DEO 18.620 147 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory Jose Section Barbar Small River Irrigation Project, Package 9 - Construction 739 Builders 31174 10/26/2019 NIA 10.764 270 O 0.39 0.18 0.13 0.03 0.05 0.05 82.30 - On-going of Main Canal Nagsupotan (Canalization, Sta. 3+000 - 5+000) Barbar Small River Irrigation Project, Package 11 - Construction 739 Builders 31174 10/26/2019 NIA 15.134 270 O 0.31 0.24 0.13 0.03 0.05 0.05 81.00 - On-going of Slope Protection Works at Diversion Ilocos Sur 1st 739 Builders 31174 Construction of Flood Control along (Phase I) 11/11/2019 18.816 200 O 0.39 0.24 0.15 0.03 0.05 0.05 91.00% - On-going DEO Provincial 31174 / Upgrading and Improvement of Sta. Lucia - Nagrebcan - Ronda 739 Builders / Arthit Corporation 10/09/2018 Government of 44.784 211 O 0.40 0.30 0.15 0.03 0.07 0.05 100.00 - On - Going 40667 Road Ilocos Sur 31174 / Barbar Small River Irrigation Project, Package 10 - Construction 739 Builders / Arthit Corporation (JV) 40667 - SN1- of Lateral D & Lateral E (Canalization Sta. 0+008.00 to Sta. 10/26/2019 NIA 10.297 240 O 0.38 0.18 0.13 0.03 0.05 0.05 82.20 - On-going SN-16780 1+490.00) L=1,481.20 l.m. 31174 / Barbar Small River Irrigation Project, Package 12 - Construction 739 Builders / Arthit Corporation (JV) 40667 - SN1- 10/26/2019 NIA 10.791 240 O 0.38 0.18 0.12 0.03 0.06 0.05 81.20 - On-going of Re-Road Surfacing of Access Road at Sta. 0+000 - 5+179.14 SN-16780 Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Calapan North Road K0008+600 - K0009+000, Mindoro Oriental 811 Trading & Construction 21215 K0011+403 - K0011+493, K0013+935 - K0014+224, 11/04/2019 53.760 210 O 0.37 0.26 0.15 0.03 0.06 0.05 91.40% - On-going DEO K0015+058 - K0015+351, K0026+1065 - K0027+311, K0050+014 - K0050+644, K0050+985 - K0051+106

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 2 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) 816 Allen Construction And Development 12584 Construction of Zabali Flood Control 11/24/19 Aurora DEO 19.600 166 C 0.43 0.20 0.30 - - - 93.00% 93% Very Satisfactory Corporation 816 Allen Construction And Development 12584 Construction of Zabali Flood Contol, So , Control 08/21/2019 Aurora DEO 18.600 128 O 0.39 0.23 0.15 0.03 0.06 0.05 91.50% - On-going Corporation 85 Aquarius Builders Corporation 41653 Construction of Road, Brgy. Matina Pangi 11/26/2019 Davao City DEO 3.960 51 C 0.44 0.13 0.30 - - - 87.60% 87.6% Satisfactory Davao City 2nd 85 Aquarius Builders Corporation 41653 Construction of Multi-Purpose Building 08/28/2019 4.750 170 O 0.39 0.24 0.15 0.02 0.05 0.05 90.00% - On-going DEO Off-Carriageway Improvement along Taft - Oras - San Policarpio - Arteche Road, K0939+500 - K0940+744, Eastern Samar 888 Acy Enterprises 32898 04/10/2018 39.857 210 C 0.48 0.19 0.30 - - - 96.70 91.48% Very Satisfactory K0942+280 - K0943+344, K0943+432 - K0944+490, DEO K0944+672 - K0944+1087 Construction of One (1) Storey Unique Workshop School Southern 93.1% 888 Acy Enterprises 32898 08/21/2019 52.227 145 C 0.50 0.13 0.30 - - - 93.10% Very Satisfactory Building at Sogod National High School DEO Retrofitting/Strengthening of Permanent Bridges at Danao Eastern Samar 888 Acy Enterprises 32898 11/11/2019 19.557 102 C 0.50 0.13 0.30 - - - 93.00% 93% Very Satisfactory Bridge (B00456SM) along Wright- Taft- Borongan Road DEO Construction/Improvement of Access Road Leading to Paninihi- Eastern Samar 888 Acy Enterprises 32898 11/11/2019 41.941 270 O 0.39 0.20 0.15 0.03 0.04 0.03 83.90% - On-going an Island and Barangitaw Beach DEO

A. C. Rivero Development Corporation 5122 Concreting of Brgy. San Miguel - Brgy. Cantandoy FMR 09/18/2019 DA 4.722 60 O 0.37 0.30 0.15 0.03 0.04 0.05 94.40 - On-going

Network Development-Improvement/Widening of National Roads-Primary Roads-Other Primary Roads along National A. De Guia Construction 18228 Roads along Santiago- Road, K0369+000- 04/09/2018 2nd DEO 91.157 281 C 0.36 0.20 0.30 - - - 86.30 91.40% Very Satisfactory K0371+000, K0373+000-K0374+000 & K0374+947- K0376+000

Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Trades, A. De Guia Construction 18228 Industries and Economic Zones - Brgy. Upi Road Connecting 08/26/2019 Isabela 2nd DEO 19.584 131 O 0.38 0.24 0.15 0.03 0.06 0.05 90.90% - On-going Rice and Corn Production to National Road leading to Rice Milling Companies in Support to Agri-Business Industry

Organizational Outcome 2: Protect Lives and Properties Against Major Floods: Flood Management Program: A. De Guia Construction / J.H. Pajara Construction/Rehabilitation of Flood Mitigation Facilities within Regional Office JV-18-545 11/09/2019 122.062 320 O 0.38 0.24 0.15 0.03 0.06 0.05 90.30% - On-going Construction Corporation Joint Venture Major River Basins and Principal Rivers: Construction of Magat No. II River Flood Management Projects at San Roque, San Mateo, Isabela, Sta. 0+000 - Sta. 0+840

Convergence and Special Support Program - Construction/Improvement of Access Roads Leading to Trades, A. De Guia Construction And Development 18228 Industries and Economic Zones- Brgy. Upi Road Connecting 11/11/2019 Isabela 2nd DEO 19.584 131 O 0.35 0.30 0.12 0.02 0.04 0.03 86.00% - On-going Rice and Corn Production to National Road leading to Rice Milling Companies in Support to Agri-Business Industry Network Development - Construction of Bypass and Diversion A. De Guia Construction And Development 18228 Road - Alicia Bypass Road including ROW and Slope 08/24/2019 Isabela 3rd DEO 75.360 208 O 0.33 0.24 0.15 0.03 0.04 0.03 82.60% - On-going Corporation Protection Construction/Improvement of Access Roads leading to Declared Tourism Destinations- Jct. TNR Anislag- Aliguay Provincial 91.6% A.A. De Vera Construction 6191 08/24/2019 Bohol 1st DEO 7.500 56 C 0.48 0.13 0.30 - - - 91.60% Very Satisfactory Road Leading to Aghao Resort. Mag-aso Falls, Catagbacan Cruise Ship Port Local Roads and Bridges - Local Roads - Local Infrastructure Southern Leyte A.C. Rivero Development Corporation 5122 05/29/2018 9.296 180 O 0.39 0.24 0.15 0.03 0.05 0.03 88.80 - On-going Program / Concreting og Brgy. Road, Batuan - San Isidro DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 3 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Road Upgrading (Unpaved to Paved) of Quezon-Aramaywan Palawan 2nd A.C. Rivero Development Corporation 5122 Road K)158+KO665-K158+749, KO158+749-KO158+849 and 06/02/2018 74.758 225 O 0.35 0.22 0.15 0.02 0.05 0.05 84.10 - On-going DEO KO172+635-KO175+005 Construction/Maintenance of Flood Mitigation Structures and Drainage Systems Desilting / Channel Improvement / Camarines Sur A.C. Rivero Development Corporation 5122 11/05/2019 18.601 164 C 0.47 0.13 0.30 - - - 90.50% 90.5% Very Satisfactory Revetment at Barit River Outafall (Bula and Nabua Section), 5th DEO Camarines Sur (Sta. 0+168.00 - Sta. 0+343.00) Asset Preservation-Rehabilitation/Reconstruction of Toledo- A.C. Rivero Development Corporation 5122 Tabuelan-Sn Remegio Rd with Slips, K0071+130 - K0071+180, 08/23/2019 3rd DEO 14.254 198 O 0.39 0.25 0.15 0.02 0.06 0.05 92.40% - On-going K0071+266 - K0071+348 Construction of Three (3) Storey - Fifteen (15) Classroom Southern Leyte A.C. Rivero Development Corporation 5122 School Building at Liloan National Technical Vocational High 08/21/2019 46.827 445 O 0.39 0.24 0.15 0.03 0.06 0.05 91.20% - On-going DEO School Construction/Maintenance of Flood Mitigation Structures and Camarines Norte A.C. Rivero Development Corporation 5122 11/10/2019 46.606 194 O 0.40 0.24 0.15 0.03 0.06 0.03 90.40% - On-going Drainage System - Construction of Flood Control Project DEO Construction of Concrete Road Including Drainage and Construction of Road Slope Protection Structure - Malubi - A.C. Rivero Development Corporation 5122 Cabangcalan - Dayhagan- Tinigban - Mataba Road, Masbate 11/12/2019 Masbate 2nd DEO 79.659 216 O 0.38 0.24 0.15 0.01 0.06 0.05 89.20% - On-going Including ROW Acquisition, Net Length = 1.930 lane KM (0.965 km) Asset Preservation - Rehabilitation / Reconstruction of Toledo - A.C. Rivero Development Corporation 5122 Tabuelan - San Remegio Rd. with Slips, K0071+130 to 11/09/2019 Cebu 3rd DEO 14.254 198 O 0.31 0.26 0.15 0.02 0.06 0.05 84.10% - On-going K0071+180, K0071+266 to K0071+348 Local Infrastructure Program- Local Roads and Bridges - Local Southern Leyte A.C. Rivero Development Corporation 5122 Roads, Concreting of Matin-ao - Cansirong Road, Brgys. Matin- 11/05/2019 9.900 210 O 0.38 0.24 0.15 0.03 0.06 0.03 89.20% - On-going DEO ao and Cansirong Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads, Butuan City - de Oro City - A.C. Rivero Development Corporation 5122 Iligan City Road, Naawan to Manticao, K1495+838 - 11/04/2019 40.617 208 O 0.37 0.30 0.15 0.03 0.05 0.05 95.40% - On-going 2nd DEO K1496+100, K1496+399 - K1497+302, K1499+695 - K1500+903 Construction of By-pass and Diversion Roads/Maasin City A.C. Rivero Development Corporation / Jqd Coastal Bypass Road, Including Slope Protection, Southern Southern Leyte Construction & General Services (Joint JV-18-0108 11/05/2019 96.500 465 O 0.39 0.24 0.15 0.03 0.06 0.05 92.30% - On-going Leyte (Construction of Concrete Road and Construction of DEO Venture) Road Slope Protection Structure) A.C. Rivero Development Corporation/ Jqd Construction of By-Pass and Diversion Roads/ Maasin Coastal Southern Leyte Construction & General Services (Joint 18852 Bypass Road, Including Slope Protection, Southern Leyte 08/20/2019 96.500 405 O 0.39 0.23 0.15 0.03 0.04 0.05 89.10% - On-going DEO Venture) (Construction of Road Slope Protection Structure) Flood Mitigation Program - Construction/ Maintenance of Flood A.C. Soliven Construction & General 93% 19278 Mitigation Structures and Drainage Systems - Construction of 08/29/2019 Tarlac 1st DEO 46.948 181 C 0.50 0.13 0.30 - - - 93.00% Very Satisfactory Merchandise Flood Control Structures along Camiling River Left Bank

A.C. Soliven Construction & General Rehabilitation/ Improvement of Existing Dike along Lucung Rier 19278 11/25/2019 Tarlac 1st DEO 28.623 196 O 0.38 0.23 0.15 0.03 0.05 0.05 89.20% - On-going Merchandise (San Rafael Section, Right Bank) Sta (-)7+585 to Sta (-)7+825 Construction/Improvement of Access Roads Leading to Trades, A.D. Marrero General Construction 32448 Industries and Economic Zones, Abra-Cervantes Road- 09/11/2019 Abra DEO 16.931 121 O 0.37 0.20 0.15 0.03 0.05 0.05 84.10% - On-going Palaquio Road in Support of Cacao Industry Construction of School Buildings in the Elementary Classrooms 89.29% A.D. Pendon Construction & Supply, Inc. 3466 08/19/2019 City DEO 25.750 317 C 0.48 0.14 0.24 - - - 86.00% Very Satisfactory JARO ES I, 3STY9CL Retrofitting/Strengthening of Bridge- Dungon Br.5 9B00115PN) A.D. Pendon Construction & Supply, Inc. 3466 11/13/2019 Iloilo City DEO 23.284 140 C 0.50 0.13 0.30 - - - 93.20% 93.2% Very Satisfactory Along Airport Spur Road Construction of Bypass Road- Lapayon- Cabugao Norte- Sen. 91% A.D. Pendon Construction & Supply, Inc. 3466 08/29/2019 Iloilo 4th DEO 35.653 325 C 0.48 0.13 0.30 - - - 91.00% Very Satisfactory Benigno Aquino Jr. Avenue Road Construction/ Concreting of San Jose Proper - Sitio - Bal-ong, Southern Mindoro A.D.L. Constrak 25442 11/08/2019 9.799 120 C 0.44 0.17 0.30 - - - 91.00% 91% Very Satisfactory San Jose DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 4 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction/Maintenance of Flood Mitigation Structures and Southern Mindoro A.D.L. General Construction 26442 Drainage Sytems, Construction of Flood Control of San Mariano 08/26/2019 18.639 221 O 0.37 0.24 0.15 0.03 0.04 0.05 88.00% - On-going DEO River Control, Madugo River Construction/Improvement of Access Roads Leading to Declared Tourism Destinations: Guisset-Binga-Baloy- A.I.P. Construction 32458 05/29/2018 Benguet 1st DEO 96.500 416 C 0.37 0.20 0.30 - - - 86.50 88.90% Satisfactory Tinongdan Road leading to Binga Dam and Mt. Ugo, Site for the International Sky Running Event Nerwork Development: Construction of Missing Links/ New Ilocos Sur 2nd 88.1% A.I.P. Construction 32458 08/29/2019 4.656 46 C 0.45 0.13 0.30 - - - 88.10% Satisfactory Roads, Cervantes-Abra Road DEO Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads along Junction Santiago - Banayoyo - Lidlidda - San Emilio - Quirino Road, Ilocos Sur 2nd A.I.P. Construction 32458 11/12/2019 53.003 227 O 0.39 0.24 0.15 0.03 0.06 0.05 91.30% - On-going K0372+000 to K0372+470, K0373+332 to K0374+514, DEO K0375+193 to K0375+479, K0375+574 to K0375+695, Barangay Tiagan

Local Program-Construction/Repair/Rehabilitation/Improvement of Various Infrastructure Including Local Projects- Flood Control A.J. Lava Builders Corp. 22265 11/25/2019 2nd DEO 48.252 220 O 0.39 0.24 0.15 0.02 0.05 0.05 90.10% - On-going and Drainage- Flood Control Structures/Facilities- River Improvement along Manggahan River Bank Improvement/Protection along Pateros River (Phase III), 1st A.J. Lava Builders Corp. 22265 08/29/2019 45.596 240 O 0.32 0.24 0.15 0.03 0.05 0.05 84.00% - On-going Barangay Aguho DEO A.J.Taylan Construction Corp./Jlp Ilocos Norte 2nd JV-16-1092 Improvement/Concreting of Sand Dunes Access Road 03/15/2018 39.688 236 C 0.46 0.12 0.30 - - - 88.00 89.00% Satisfactory Construction & Supply, Joint Venture DEO A.M. Abdon Construction & Supplies 35681 Construction of Multi-Purpose Building (Covered Court) 11/23/2019 Quezon 2nd DEO 2.350 180 O 0.39 0.24 0.15 0.03 0.06 0.05 91.90% - On-going Construction and Maintenance of Bridges along National A.M. Oreta & Co., Inc. / Camia Const. Roads, Construction of New Permanent Bridges, along Igawe 06/05/2018 Apayao 1st DEO 57.890 527 O 0.36 0.30 0.05 0.03 0.06 0.03 82.40 - On-going Development Corporation (Formerl Bridge, Apayao-Ilocos Norte Road 108 / 13524 - A.M. Oreta & Company Inc. / Labb Small Reservoir Irrigation Project - Benliw SRIP - Construction SL2-SN- 07/09/2019 NIA 367.082 941 O 0.34 0.24 0.14 0.03 0.04 0.05 83.90 - On-going Construction (JV) of Benliw Earthfill Dam & Appurtenant Structures 03029 1st A.M.P. Construction 16574 Rehabilitation of Flood Control Structures along Talavera River 06/20/2018 27.925 210 O 0.36 0.30 0.15 0.03 0.055 0.05 94.10 - On-going DEO Improvement of Canal Service Road - Concreting of Canal A.M.P. Construction 16574 09/28/2019 NIA 3.804 90 O 0.32 0.24 0.15 0.03 0.06 0.03 83.40 - On-going Service / Access Road at SEE Lateral IA (Sta. 0+000 - 0+471) Nueva Ecija 1st 95% A.M.P. Construction 16574 Rehabilitation of Dike along Talavera River 08/20/2019 49.000 270 C 0.50 0.15 0.30 - - - 95.00% Very Satisfactory DEO A.M.P. Construction / M.M. Serrano Construction of By-Pass Diversion Roads, Licab - Victoria Road, Nueva Ecija 1st 92.7% JV-17-2444 08/19/2019 53.075 270 C 0.49 0.13 0.30 - - - 92.70% Very Satisfactory Construction Company (Joint Venture) Nueva Ecija DEO Construction/Rehabilitation of Flood Mitigation Facilities within A.M.P. Construction / Vnkc Construction Major River Basins and Principal Rivers - Nueva Ecija 2nd 89.2% JV-18-1270 08/24/2019 51.980 240 C 0.46 0.13 0.30 - - - 89.20% Very Satisfactory (Joint Venture) Rehabilitation/Improvement of River Flood Control DEO (left) Construction/ Maintenance of Flood Mitigation Structures and A.M.P. Construction/ Forthright Construction Nueva Ecija 2nd JV-16-1612 Drainage Systems, Rehabilitation/ Improvement of Pampanga 03/15/2018 39.200 161 C 0.47 0.13 0.30 - - - 90.50 88.46% Satisfactory Joint Venture DEO River Control, Brgy. Sapang Buho, Palayan City, Nueva Ecija A.M.P. Construction/W.J.P. Construction And Construction of Flood Control Structure along Dipalo River, Pangasinan 3rd JV-18-1739 11/05/2019 50.236 192 C 0.48 0.13 0.30 - - - 90.90% 90.9% Very Satisfactory Supply Barangay Bantog-Casantanarian DEO A.P. Tagarino Engineering and Construction Mabolo Communal Irrigation System - Diversion Work and 32730 05/10/2019 NIA 28.040 300 O 0.33 0.28 0.15 0.02 0.04 0.05 87.00 - On-going Services Embankment Protection Construction/Improvement of Access Roads leading to Trades, Regional Office A.P.B. Construction 17055 11/13/2019 96.500 398 C 0.47 0.13 0.30 - - - 90.20% 90.2% Very Satisfactory Industries and Economic Zones, Poro Point Freeport Zone No. I

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 5 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Flood Control Mitigation Structures Facilities 2nd A.P.B. Construction 17055 08/19/2019 46.489 163 O 0.40 0.24 0.13 0.03 0.06 0.03 89.10% - On-going along Aringay River Basin DEO Ilocos Sur 1st A.P.B. Construction 17055 Construction of Flood Control along Abra River 11/09/2019 37.240 159 O 0.38 0.24 0.15 0.03 0.05 0.03 88.70% - On-going DEO Construction/Rehabilitation of Flood Mitigation Facilities within Regional Office A.P.B. Construction 17055 Major River Basins and Principal Rivers, Construction of Flood 11/10/2019 52.210 176 O 0.38 0.20 0.15 0.03 0.06 0.05 86.60% - On-going No. I Control along Abra River, Bantay Section, Phase II

Organizational Outcome 1: Ensure Safe and Reliable National Road System Asset Preservation Program - Rehabilitation / A.P.O. General Construction / Jtm JV- 18-1045 Reconstruction of Roads with Slips, Slope Collapse and 11/21/2019 CAR 101.925 286 O 0.38 0.24 0.15 0.03 0.06 0.05 90.50% - On-going Construction (Joint Venture) Landslide (tertiary Road) Balbalan - Pinukpuk Road, (S00537LZ) Chainage 206…… Chainage 25872 (intermittent) Construction/ Improvement of Access Road NRJ leading to Palawan 2nd 85.3% A.R. Lustre Consruction Corporation 7680 08/20/2019 33.451 244 C 0.49 0.20 0.21 - - - 89.70% Satisfactory Kapangyan Falls DEO Improvement / Extension of PSHS Training and Administration A.S.S Construction 31509 05/31/2019 DOST 11.890 358 C 0.47 0.20 0.27 - - - 94.20 *94.20% Very Satisfactory Center under Design and Build Scheme A.S.S. Construction 31509 Construction of Dormitory Building II Phase I 8/14/19 DOST 40.350 356 C 0.48 0.20 0.30 - - - 98.20 0.94645 Very Satisfactory A.S.S. Construction 31509 Construction of Academic Building Phase 3 8/14/19 DOST 34.988 356 C 0.38 0.30 0.08 0.03 0.06 0.05 90.00 *90.00% Very Satisfactory A.S.S. Construction 31509 Site Development Phase 3 8/14/19 DOST 9.990 444 C 0.47 0.20 0.25 - - - 91.50 *91.50% Very Satisfactory Local Roads and Bridges - Local Roads - Construction/ Repair / Rehabilitation Improvement of Various Infrastructure including A.S.V. Construction Supply And Services 13490 11/11/2019 1st DEO 1.860 180 O 0.36 0.24 0.15 0.03 0.05 0.05 87.80% - On-going Local Projects - Concreting of Barangay Road, Pag-asa - Tala Road Retrofitting/Strengthening of Bayugan III Bridge (B00924MN) Agusan del Sur A.T. Dumlao Construction, Inc. 34028 along Daang Maharlika Road (Agusan-Davao-Section) 05/31/2018 6.370 84 O 0.399 0.200 0.150 0.03 0.058 0.05 88.70 - On-going 2nd DEO K1334+135-K1334+156.95 Construction of One-Storey Two Classroom School Building at Dinagat Islands A.T. Dumlao Construction, Inc. 34028 08/20/2019 3.639 150 O 0.39 0.21 0.00 0.02 0.04 0.00 65.60% - On-going Cabungaan ES, School ID: 132359, Brgy. Cabungaan DEO Retrofitting/Strengthening of Bridge - Carayungan Bridge Pangasinan 3rd A.T. Dumlao Construction, Inc. 34028 08/20/2019 12.498 118 O 0.40 0.20 0.15 0.03 0.05 0.05 87.40% - On-going (B00878LZ) along Bakit-Bakit Junction- Umingan Road DEO A.T. Dumlao Construction, Inc. Retrofitting/Strengthening of Bridge-Carayungan Bridge Pangasinan 3rd 34028 11/05/2019 48.884 118 C 0.50 0.13 0.30 - - - 93.30% 89.76% Very Satisfactory Formerlyandoni T. D (B00878LZ) along Bakit-Bakit Jct.-Umingan Road DEO A.T.P. Construction 35481 Construction of Flood Control Structures along Umagol River 11/12/2019 Bataan 2nd DEO 18.806 165 O 0.37 0.24 0.15 0.03 0.05 0.05 89.50% - On-going Construction of Concrete Road, San Andres - Pandan - Hiyop Catanduanes A.V. Laynes Trading And Construction 42583 Access Road Leading to Hiyop Highlands and SU-NOG Sea 08/29/2019 18.684 120 O 0.39 0.24 0.15 0.03 0.07 0.05 93.00% - On-going DEO Cave A.V. Pamatong Trading And Construction, Construction of Drainage System (Diversion Cagayan de Oro 13290 11/11/2019 62.949 347 O 0.39 0.25 0.15 0.03 0.06 0.05 92.60% - On-going Inc. Channel along Kauswagan - Bayabas Section) City 1st DEO Network Development - Road Widening - Primary Roads, A.V. Pamatong Trading And Construction, Misamis Oriental 13290 Butuan City - Cagayan de Oro City - Iligan City Road, 11/04/2019 60.105 207 O 0.38 0.30 0.15 0.03 0.06 0.05 96.90% - On-going Inc. 2nd DEO K1502+000 - K1502+759, K1502+780 - K1503+798 Local Program, Local Roads and Bridges - Local Roads - Local A3 Construction & Supply 39671 Infrastructure Program, Construction of Concrete Road - 08/24/2019 Masbate 3rd DEO 14.111 79 O 0.39 0.24 0.15 0.03 0.06 0.03 89.90% - On-going Concreting of Mactan - Pulot Road A5R Dynamic Const. Corp. ARN Builders Inc. 37540 / Abra De Ilog Port Expansion Project 04/18/2018 PPA 76.000 360 O 0.40 0.30 0.15 0.03 0.07 0.00 95.00 - On - Going (JV) 18930

A5R Dynamics Construction Corporation 37540 Brooks Ville 1 9/20/20 NHA 137.313 405 O 0.38 0.28 0.00 0.03 0.06 0.03 78.57 - On-going

A5R Dynamics Construction Corporation / 37540 / ARN Builders Inc. (Formerly: ARN Builders) Abra de Ilog Port Expansion Project 7/31/19 PPA 75.997 510 C 0.50 0.20 0.00 - - - 70.00 0.815 Unsatisfactory 18930 (JV) Camarines Sur Aa Pahati Construction And Supply 40647 Concreting of Road Network, CBSUA Calabanga Campus 11/07/2019 1.878 60 C 0.46 0.13 0.30 - - - 89.50% 89.5% Very Satisfactory 3rd DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 6 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Concrete Road- Access Road leading to Tribal Davao del Norte Aaa Rock Construction Corporation 19250 11/23/2019 28.509 170 O 0.36 0.24 0.12 0.03 0.06 0.03 83.90% - On-going Village, Tibuyan Cave, San Miguel & Paradise Cave DEO Organizational Outcome 2: Protect Lives and Properties Againts Major Floods - Flood Management Program - 84.5% Aarcon Builders 28336 Construction/Maintenance of Flood Mitigation Structures and 09/02/2019 Rizal 2nd DEO 39.200 229 C 0.41 0.13 0.30 - - - 84.50% Satisfactory Drainage Systems - Construction/Improvement of Flood Control Structures and Bank Protection Morong River Improvement/Sheet Piling of Parañaque River North (Airport Metro Manila 2nd Aarcon Builders 28336 11/21/2019 46.550 300 O 0.40 0.25 0.15 0.03 0.05 0.05 92.20% - On-going Road to San Carlos Bridge), East Side DEO 28336 / Aarcon Builders / P.E.R.R.C. Construction & 23869 - Quipot Irrigation Project - Construction of Terminal Facilities and 11/13/19 NIA 29.182 240 O 0.33 0.24 0.00 0.03 0.05 0.05 70.46 - On-going Development Corp. (JV) SLN1-SN- Its Appurtenant Structures 16940 Quipot Irrigation Project - Construction of 2,672.77 l.m. 28336 / Aarcon Builders / P.E.R.R.C. Construction & Concrete Canal with Canal Structures at Lateral A2, 1,249 l.m. 23869 - 11/13/19 NIA 18.183 240 O 0.37 0.24 0.08 0.02 0.05 0.05 82.08 - On-going Development Corp. (JV) at MFD B1 Lat A2, 700 l.m. SFD D1 and 8 Units Drainage 96577 Crossing along Lateral A Rehab./Reconstruction of National Roads with Slip, Slope Ab Aponesto Construction Parts And Compostela 92.1% 22998 Collapse and Landslide of Asuncion-San Isidro-Laak-Veruela 08/23/2019 25.479 245 C 0.49 0.13 0.30 - - - 92.10% Very Satisfactory Supplies, Inc. Valley DEO Road Ab Aponesto Construction Parts And Construction of Concrete Road - Monkayo - Boston Road Regional Office Supplies, Inc./Rangay Construction And JV-18-928 11/28/2019 132.280 300 O 0.38 0.25 0.15 0.03 0.05 0.03 89.10% - On-going (Boston Section), Package 1 No. XI Supply (Joint Venture) Road Widening - Primary Roads - Marbel - Makar Rd - South Cotabato Ab Vision Engineering Construction 19845 11/20/2019 14.520 90 C 0.50 0.13 0.30 - - - 92.70% 92.4% Very Satisfactory K1665+477 - K1665+722, K1665+847 - K1666+072 2nd DEO Road Widening-Primary Roads-Marbel-Makar Rd- K1665+477- South Cotabato Ab Vision Engineering Construction 19845 08/28/2019 13.737 90 O 0.39 0.24 0.15 0.03 0.06 0.05 92.20% - On-going K1665+722, K1665+847-K1666+072 2nd DEO Construction of Protection Dike (Seawall) along Brgy. Mindoro Oriental Ab1 Mega Builders, Inc. 38827 11/04/2019 29.399 270 O 0.39 0.25 0.15 0.03 0.06 0.05 93.50% - On-going Pulangtubig, San Andres and Pambisan DEO Agusan del Sur Abada Construction And Supply 37005 Construction of Multi-Purpose Building, Poblacion 11/11/2019 1.919 120 C 0.49 0.13 0.30 - - - 92.30% 87.54% Satisfactory 1st DEO Agusan del Sur Abada Construction And Supply 37005 Construction of Multi-Purpose Building, Poblacion 08/26/2019 1.919 120 O 0.40 0.20 0.15 0.02 0.04 0.05 85.50% - On-going 1st DEO Rehabilitation of Flood Control/Drainage Structure at Sto. Nino, South Cotabato 85.8% Abu Construction 22313 08/20/2019 16.714 115 C 0.38 0.13 0.30 - - - 81.00% Satisfactory Brgy. 2 1st DEO Widening (2 into 4 lanes) of Hijo Bridge (B00209MN) including Regional Office Abu Construction 23313 11/28/2019 132.282 627 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory Approaches and RROW along Surigao-Davao Coastal Road No. XI Construction of One (1) Unit Two (2) Storey Six (6) 95% Acadama Builder'S & Construction Supply 39355 Classsrooms, Alcarde Gustillo Memorial National High School 08/28/2019 Iloilo 2nd DEO 12.162 185 C 0.48 0.17 0.30 - - - 95.00% Very Satisfactory (Batch 3) Accelerated Metal Technology & 91.2% 32073 Concreting of Brgy. Ragan Sur - Brgy. San Juan Road 08/28/2019 Isabela 1st DEO 2.821 37 C 0.48 0.13 0.30 - - - 91.20% Very Satisfactory Construction, Inc. Accelerated Metal Technology & 32071 Construction of Flood Control Structures 11/13/2019 Isabela 1st DEO 46.547 238 O 0.30 0.29 0.15 0.03 0.06 0.03 85.30% - On-going Construction, Inc. Construction/ Upgrading / Rehabilitation of Drainage Along National Roads - Secondary Roads - Catanduanes Catanduanes Aci Design & Build 42260 11/05/2019 8.945 156 O 0.40 0.24 0.12 0.01 0.05 0.03 84.90% - On-going Circumferential Road K0170+500 - K0171+300, K0175+054 - DEO K0175+300 Construction of Concrete Road - Jct. Dualing-New - Cotabato 2nd Acj Construction Resources 10635 06/02/2018 32.667 131 O 0.38 0.24 0.15 0.03 0.047 0.05 89.40 - On-going Midsayap Road to Katalicanan-UK Peak DEO Concreting of New Igbaras -Gallo Area Pigcawayan Road, Acj Construction Resources 10635 11/26/2019 Cotabato 1st DEO 5.761 36 C 0.50 0.20 0.16 - - - 85.90% 85.9% Satisfactory Brgy. New Igbaras Construction of One-Storey Two Classroom School Building @ Dinagat Islands Acq Solomonic Builders Development Corp. 38640 11/07/2019 3.567 180 C 0.50 0.20 0.30 - - - 82.30% 78.34% Unsatisfactory Dinagat School of Fisheries, School ID: 304822 DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 7 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of One-Storey Two Classroom School Building at Dinagat Islands Acq Solomonic Builders Development Corp. 38640 Dinagat School of Fisheries, School ID: 304822, Brgy. White 08/20/2019 3.567 150 O 0.39 0.22 0.06 0.02 0.04 0.02 74.40% - On-going DEO Beach Construction of By-Passes/Diversion Road, Including ROW, Regional Office Adfil Corporation 14437 NRJ Daang Maharlika, Taguibo - Masao Port (Pagatpatan - 06/06/2018 125.444 589 C 0.43 0.14 0.30 - - - 86.40 94.20% Very Satisfatory No. XIII Lumbocan - Masao Section) Construction/Improvement of Access Roads Leading to Trades Industries and Economic Zones, Access Road Leading to Regional Office 92.3% Adfil Corporation 14437 08/28/2019 110.895 450 C 0.49 0.13 0.30 - - - 92.30% Very Satisfactory Nasipit - Agusan del Norte Industrial Estate Special Economic No. XIII Zone (NANIE-SEZ) Construction of Main Drainage Canal along Jct. Montilla Adfil Corporation 14437 11/15/2019 Butuan City DEO 14.679 156 C 0.49 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory Boulevard-Salvador Calo Street to LADP Main Drainage Canal

Construction/Maintenance of Flood Mitigation Structures and Agusan del Norte Adfil Corporation 14437 Drainage System Systems - Construction/Improvement of 08/27/2019 47.507 204 O 0.39 0.24 0.15 0.03 0.05 0.05 90.60% - On-going DEO Kinabjangan River Bank Protection with Rechannelization Construction/Maintenance of Flood Mitigation Structures and Agusan del Norte Adfil Corporation 14437 Drainage Systems-Construction of Dike with Concrete 08/27/2019 91.674 290 O 0.36 0.30 0.15 0.02 0.05 0.05 93.40% - On-going DEO Revetment along Pandanon-Magallanes Roads Lower Agusan Development Project, Flood Control Component, Adfil Corporation 14437 Stage I, Phase I and II East Bank Drainage, Ampayon River 08/28/2019 Butuan City DEO 48.962 195 O 0.40 0.24 0.15 0.03 0.06 0.05 92.60% - On-going Channel Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structures - Regional Office Adfil Corporation 14437 08/29/2019 101.871 240 O 0.40 0.24 0.15 0.02 0.04 0.05 90.40% - On-going Lower Agusan Development Project, Floof Control Component, No. XIII Stage 1, Phase II, East Bank Drainage Revetment along Basin, Esperanza Bridge Agusan del Sur Adfil Corporation 14437 11/12/2019 46.523 248 O 0.39 0.24 0.15 0.03 0.06 0.05 91.70% - On-going Approaches 1st DEO Construction of By-Passes/Diversion Road, Including ROW, Regional Office Adfil Corporation/Jqg Builders (Joint Venture) NRJ Daang Maharlika, Taguibo - Masao Port (Banza-Maug 06/06/2018 144.680 673 C 0.43 0.13 0.30 - - - 85.70 89.54% Very Satisfatory No. XIII Section) Adroit Construction 11169 Building Improvement / Renovation 11/09/2018 NIA 28.830 210 O 0.39 0.24 0.15 0.02 0.04 0.05 89.52 - On - Going

Restoration of Damages Wrought by Typhoon Karen along Adroit Construction 11169 08/06/2019 NIA 13.325 180 C 0.50 0.17 0.18 - - - 84.00 *84.00% Satisfactory Fatima - San Juan Road - Slope Protection Works RIO - LMC - 19 - 2018 Engineering Building and Archive - Adroit Construction 11169 07/09/2019 NIA 6.059 165 C 0.48 0.07 0.30 - - - 84.30 *84.30% Satisfactory Construction of Engineering Building and Archive Marlangga Port Development Project - Rehabilitation / Repair of Advance Tech Construction & Trading Corp. 35288 06/12/2019 DOTR 23.849 180 C 0.48 0.20 0.30 - - - 97.90 *97.90% Outstanding Marlangga Port

Advance Tech Construction and Trading 35288 Gumaca Port Development Project 05/16/2019 DOTC 18.481 261 O 0.40 0.30 0.07 0.03 0.06 0.05 90.80 - On-going

Advance Tech Construction and Trading 35288 Gumaca Port Development Project 07/25/19 DOTC 16.481 261 C 0.50 0.20 0.00 - - - 70.00 82.50% Satisfactory

Advance Tech Construction and Trading 35288 Airport Development Project 12/02/2019 DOTC 9.451 75 C 0.47 0.20 0.30 - - - 96.70 *96.70% Outstanding Corporation Advance Tech Construction and Trading 35288 Kawayan Port Development College 06/25/19 DOTC 42.178 300 C 0.46 0.20 0.30 - - - 96.00 *96.00% Very Satisfactory Corporation Advance Tech Construction and Trading 35288 Biliran Airport Development Project 06/25/19 DOTC 12.571 150 C 0.45 0.20 0.30 - - - 94.70 *94.70% Very Satisfactory Corporation Advance Tech Construction and Trading 35288 Merida Port Development Project 06/26/19 DOTC 6.686 120 C 0.43 0.20 0.30 - - - 93.20 *93.20% Very Satisfactory Corporation Advance Tech Construction and Trading 35288 Paracale Port Development Project 07/25/19 DOTC 25.295 300 C 0.47 0.20 0.30 - - - 97.20 *97.20 Outstanding Corporation

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 8 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Advanced Foundation Construction Systems Construction of New Bridges, San Antonio Br. 1 along Manila Regional Office 15449 11/09/2019 40.354 223 O 0.40 0.24 0.08 0.03 0.06 0.03 83.50% - On-going Corp. North Road (Phase II) No. I NIA / Construction of Canal Lining, Canal Structures, Canal Turnout Pangsasinan Aeraka Construction And Supply 42575 Facilities & Supply and Delivery of 7HP Water Engine with 11/28/2020 Irrigation 9.303 300 C 0.40 0.13 0.30 - - - - 82.80% Satisfactory Complete Accessories Management Office Construction of Flood Control Structure along Abo-Abo River, Afaji Builders 39489 08/23/2019 Bataan 2nd DEO 7.522 101 O 0.39 0.26 0.15 0.03 0.04 0.05 92.20% - On-going Brgy. Dangcol Afaji Builders 39489 Construction of Flood Control Structure along Abo-abo River 11/12/2019 Bataan 2nd DEO 7.840 101 C 0.48 0.13 0.30 - - - 91.10% 91.76% Very Satisfactory Construction of Pedestrian along Taytay Diversion Afg Zillion Construction Corporation 17161 Road going to Manila East Road (Near Jollibee and 11/27/2019 Rizal 1st DEO 32.501 240 O 0.40 0.30 0.15 0.03 0.06 0.05 98.00% - On-going Mcdonald's) K0023+550-K0023+570 Road Widening-along Jct. New Sagay- Old Sagay Rd. Negros Occidental Afg Zillion Construction Corporation 17161 11/07/2019 36.043 178 O 0.39 0.24 0.13 0.02 0.05 0.03 87.00% - On-going (S00014NR) K0086+000- K0087+240 1st DEO

Zamboanga Afs Construction & Enterprises 31139 Construction of Multi-Purpose Building, Brgy. San Vicente 11/11/2019 1.978 85 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory Sibugay 1st DEO Construction/Rehabilitation/Upgrading/Improvement of Local Mt. Province 2nd 92% Ag Chungalan Construction 41320 09/10/2019 1.898 45 C 0.49 0.13 0.30 - - - 92.00% Very Satisfactory Road DEO Local Program - Buildings and Other Structures - Multi- Purpose / facilities Construction/ Repair / Rehabilitation/ Improvement of Mt. Province 2nd Ag Chungalan Construction 41320 11/22/2019 3.960 120 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Various Infrastructure Including Local Projects - Construction of DEO Multi- Purpose Building Water Management Facilities Water Supply- Construction/Repair/Rehabilitation of Various Infrastructure Agafer Construction And Trading 7912 Including Local Project, 11/08/2019 Cagayan 3rd DEO 22.121 270 O 0.40 0.23 0.15 0.02 0.04 0.03 87.50% - On-going Construction/Rehabilitation/Improvement of Level III Water Supply System Organizational Outcome 1: Ensure Safe and Reliable National Road System- Network Development Program- Road Widening- Agafer Construction And Trading 7912 11/25/2019 Rizal 2nd DEO 47.393 210 O 0.40 0.24 0.15 0.02 0.05 0.05 91.00% - On-going Secondary Roads- Manila East Road- K0044+000- K0044+880, K0048+300- K0048+855 Construction of Concrete Road- Padada-Piape-Palili Davao del Sur Agong Builders And Construction Supply, Inc. 40494 Circumferential Road leading to Scuba Diving, Beach Resorts, 11/24/19 14.697 75 C 0.49 0.13 0.30 - - - 92.70% 88.8% Satisfactory DEO Mangrove Plantations, Brgy. Piape Jct. San Antonio-Baybay Leading to Creamsand Longbeach Davao Oriental 1st Agong Builders And Construction Supply, Inc. 40494 11/20/2019 19.593 110 C 0.47 0.13 0.30 - - - 90.10% 90.1% Very Satisfactory Brgy. Baybay DEO Construction of Concrete Road Access - Road Leading to Twin Cotabato 2nd Agong Builders And Construction Supply, Inc. 40494 11/26/2019 11.758 110 C 0.49 0.13 0.30 - - - 92.50% 90.4% Very Satisfactory Falls, Brgy. Manongol DEO Construction of Concrete Road-Padada-Piape-Palili Davao del Sur Agong Builders And Construction Supply, Inc. 40494 Circumferential Road leading to Scuba Diving, Beach Resorts, 08/25/2019 14.259 75 O 0.39 0.20 0.15 0.02 0.05 0.05 86.20% - On-going DEO Mangrove Plantation Construction of Concrete Road Access-Road Leading to Twin Agong Builders And Construction Supply, Inc. 40494 08/21/2019 Cotabato 1st DEO 11.229 95 O 0.38 0.24 0.15 0.03 0.06 0.03 89.00% - On-going Falls, Brgy. Manongol, Kidapawan City Provincial Aguero Construction 23338 Concreting of NRJ Patin-ay-Lucac-Pisaan Road 04/06/2018 Government of 62.645 270 O 0.40 0.23 0.11 0.03 0.06 0.05 88.50 - On - Going Agusan del Sur Provincial Concreting of NRJ Barangay 1-Das agan-Barobo Boundary Aguero Construction 23338 02/20/2018 Government of 60.533 270 O 0.39 0.24 0.15 0.03 0.05 0.05 91.20 - On-going Road Agusan del Sur Provincial Aguero Construction 23338 Concreting of NRJ Patin-ay-Lucac-Pisaan Road 11/13/2018 Government of 63.910 429 C 0.49 0.20 0.30 - - - 98.50 92.00% Very Satisfactory Agusan del Sur

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 9 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Provincial Concreting of NRJ Barangay 1-Das agan-Barobo Boundary Aguero Construction 23338 01/07/2019 Government of 60.938 409 C 0.47 0.20 0.30 - - - 97.00 93.55% Very Satisfactory Road Agusan del Sur Construction of Two (2) Storey Six (6) Classroom School Surigao del Sur Aguero Construction 23338 03/19/2018 8.100 200 C 0.48 0.16 0.30 - - - 94.10 *94.03% Very Satisfactory Building Tambis National High School 2nd DEO Ahe Construction 33486 Construction of Flood Control Structure along Cawit River 11/13/2019 9.744 131 C 0.47 0.13 0.30 - - - 90.00% 86.64% Satisfactory DEO Zamboanga City Ahe Construction 33486 Construction of Flood Control Structure along Cawit River 08/29/2019 9.505 131 O 0.35 0.24 0.15 0.02 0.04 0.05 84.40% - On-going DEO NIA / Pangsasinan Rehabilitation of Existing Communal Irrigation System Tobuan Ahyok Construction And Supply 36657 11/28/2020 Irrigation 4.594 300 C 0.40 0.13 0.30 - - - - 82.90% Satisfactory Communal Irrigation System Management Office Procurement of Fully Developed Lots and Completed Housing Aina Construction 30026 11/23/2018 NHA 147.000 602 O 0.39 0.30 0.15 0.03 0.06 0.05 98.29 - On - Going Units (510 units) Aina Construction/ Eddmari Construction & St. Peter and Paul Housing Project 10/05/2019 NHA 289.600 809 C 0.43 0.20 0.26 - - - 89.36 93.60% Very Satisfactory Trading - JV Aina Construction/Eddmari Construction And Procument of 1000 Fully Developed House and Lot Packages 02/02/2018 NHA 289.600 604 D 0.37 0.30 0.15 0.03 0.06 0.05 95.41 - On-going Trading - Jv (St, Peter and Paul Housing Project) Pinabacdao Port Development Project - Repair / Rehabilitation AJ & A Construction 29727 12/09/2019 DOTR 27.590 270 C 0.34 0.20 0.30 - - - 84.30 *84.30% Satisfactory of Port Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Tertiary Roads, (LDNICR) Ajd Construction And Supply 39893 11/07/2019 10.816 161 O 0.39 0.25 0.15 0.03 0.06 0.05 92.50% - On-going Magsaysay - Tubod Road - S00943MN, K1581+216 - 1st DEO K1582+220 Construction of National Road Junction to Sultan Naga Ali Lanao del Norte Ajj Strukture Builders Inc. 40356 Dimaporo Beach Resort (Sta. 0+000 - Sta. 1+200), Brgy. 11/07/2019 18.408 120 C 0.49 0.16 0.30 - - - 95.40% 92.58% Very Satisfactory 1st DEO Bauyan Construction of National Road Junction to Sultan Naga Lanao del Norte Ajj Strukture Builders Inc. 40356 08/23/2019 18.408 120 O 0.38 0.24 0.15 0.03 0.05 0.05 90.70% - On-going Dimaporo Beach Resort (Sta. 0+000- Sta. 1+200) 1st DEO Provincial Improvement of NHW Jct. Lomutan - Upper Kalaneg Farm to AJYSC Marketing 26924 03/20/2019 Government of 41.336 480 O 0.02 0.30 0.14 0.24 0.06 0.02 77.29 - On - Going Market Road Sarangani Improvement/Sheet Piling of Parañaque River South near Avida Metro Manila 2nd Akn Construction Corporation 11845 11/21/2019 46.060 489 C 0.50 0.14 0.30 - - - 94.20% 94.2% Very Satisfactory Tower DEO Construction of Concrete Revetment, Mangalcal Bank Davao del Norte Akn Construction Corporation 11845 08/23/2019 44.921 168 O 0.39 0.24 0.15 0.02 0.05 0.03 88.60% - On-going Protection along Carmen-Dapecol Compund Road DEO Construction of Concrete Revetment, Mangalcal Bank Davao del Norte Akn Construction Corporation 11845 11/23/2019 44.921 168 O 0.40 0.24 0.13 0.03 0.06 0.03 88.60% - On-going Protection along Carmen-Dapecol Compound Road DEO Local Infrastructure Program; Building and Other Structures; Pampanga 3rd Al- B Development Corporation 11740 Multi- Purpose / Facilities, Rehabilitation/ Improvement of Multi- 11/08/2019 2.454 90 C 0.43 0.13 0.30 - - - 86.20% 86.2% Satisfactory DEO purpose Building Network Development Program - Off- Carriageway Pampanga 3rd Al- B Development Corporation 11740 Improvement - Secondary Roads, Friendship Circum. Road 11/08/2019 39.103 180 O 0.38 0.24 0.15 0.03 0.06 0.05 91.20% - On-going DEO (West Circum Road) K0084+400 to K0085+800 MFO-1- National Road Network Service-Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads Including Drainage Based on AL Chris Construction 12406 Pavement Management System/ Development 04/03/2018 Bohol 1st DEO 30.457 186 C 0.47 0.13 0.30 - - - 89.80 93.16% Very Satisfactory Management-4 (HDM-4) Secondary at Tagbilaran North Road (Tagbilaran-Jetafe Section)-S00030BH, 1) K0024+120- K0025+000 and K0028+330-K0028+393 Construction/Improvement of Access Roads Leading to Trades, Al Chris Construction 12406 Industries and Economic Zones – Jct. (TER) Alburquerque – 11/05/2019 Bohol 1st DEO 9.506 70 C 0.47 0.20 0.30 - - - 97.10% 97.1% Outstanding Sikatuna Road

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 10 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Davao Occidental 91.2% Al Handasa Construction 36974 Construction of 1 Sty., 3 CL School Building, Tanglad ES 08/27/2019 4.397 95 C 0.48 0.13 0.30 - - - 91.20% Very Satisfactory DEO Asset Preservation- Rehabilitation/Reconstruction of Naional Roads with Slip Slope Collapse and Landslide- Tertiary Road; Lanao del Norte Al Hussein Construction 18438 08/23/2019 43.753 242 O 0.34 0.26 0.15 0.03 0.05 0.05 88.40% - On-going Dobleston- Butadon Road- S00928, K1994+(-653) to 1st DEO K2001+825 (Intermitent Sections) Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Lanao del Norte Al Hussein Construction 18438 Construction of Revetment/River Control on Steel Sheet Pile 11/07/2019 46.546 171 O 0.40 0.30 0.15 0.03 0.05 0.05 97.50% - On-going 1st DEO along Malabang - Dobleston - Tukuran Road, Karomatan Bridge (Phase 2), Brgy. Poblacion, K1989+449- K1989+484 Network Development Program - Construction of Bypass and Al Nino Construction & Supply/ 3Rb Sorsogon 1st 92% JV-17-1223 Diversion Roads - Castilla Bypass Road including Right of Way 08/21/2019 83.940 390 C 0.49 0.13 0.30 - - - 92.00% Very Satisfactory Construction & Supply Joint Venture DEO (ROW) and Bridge 19MH0038 - Construction of Multi-Purpose Building Sultan Kudarat Albanor Construction 41645 11/23/2019 0.645 60 C 0.49 0.19 0.30 - - - 98.40% 90.91% Very Satisfactory (Gymnasium) 2nd DEO Sultan Kudarat Albanor Construction 41645 Construction of Multi-Pupose Building (Gymnasium) 08/24/2019 0.645 60 O 0.40 0.21 0.15 0.03 0.04 0.05 87.70% - On-going 2nd DEO Construction of Multi-Purpose Building (Brgy. Hall), Brgy. Southern Mindoro Alberto Uy Construction & Development 20924 11/08/2019 4.313 190 O 0.40 0.25 0.15 0.03 0.05 0.05 92.80% - On-going Formon DEO Asset Preservation Program- Preventive Maintenance- Alcel Construction 15129 Secondary Roads-Sta. Rosa-Ulat-Tagaytay Road., K0040+670- 06/14/2018 Laguna 2nd DEO 19.793 90 O 0.4 0.2 0.15 0.03 0.058 0.05 88.80 - On-going K0041+264, K0041+336-K041+400, Sta. Rosa City, Laguna Widening of Carmen Jct. - Bayambang - Manat Road, Pangasinan 4th Alcel Construction 15129 K0193+439 to K0193+989 and K0195+608 to K0196+161, 06/07/2018 29.547 198 O 0.364 0.24 0.115 0.03 0.065 0.033 84.70 - On-going DEO Bayambang, Pangasinan Provincial Alcel Construction 15129 Rehabilitation of Banaoang - Mapandan Road 01/22/2018 Government of 45.449 195 O 0.36 0.30 0.15 0.03 0.05 0.05 93.20 - On - Going Pangasinan Provincial Alcel Construction 15129 Rehabilitation of Banaoang-Mapandan Road 01/22/2018 Government of 45.449 195 O 0.39 0.30 0.15 0.03 0.047 0.05 96.70 - On - Going Pangasinan Asphalt Overlay along Pangasinan- Road, Pangasinan 1st Alcel Construction 15129 11/12/2019 18.628 90 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory K0293+000 to K0296+000 with exception DEO Organizational Outcome: Ensure Safe and Reliable National Road System Network Development - Construction of Missing Alcel Construction / Isnag Builders &Dev'T. JV-17-1019 Links/New Roads Abra - Kalinga - Apayao Road (Buluan - 09/10/2019 CAR 93.513 371 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory Corporation (Joint Venture) Banban - Puguin - Sacpil - Pinukpuk), Apayao Sta. 3+960 - Sta. 4+900, Sta. 4+960 - Sta. 7+520 Construction / Improvement of Bugnay (Mangape) - Buscalan - Alcel Construction / Jtm Construction (Joint Upper Kalinga JV-17-610 Loccong - Butbut Proper Road Leading to Buscalan Tattoo 11/21/2019 95.474 413 C 0.49 0.13 0.19 - - - 80.70% 83.92% Satisfactory Venture) DEO Village Preventive Maintenance of Road : Asphalt Overlay - Catarman - Alcel Construction / Pj Tan Construction (Joint Northern Samar JV-17-2938 Calbayog Road - K0762+000 - K0763+173, K0770+234 - 08/22/2019 44.830 232 C 0.44 0.20 0.22 - - - 85.30% 85.3% Satisfactory Venture) 1st DEO K0770+868, K0775+750-K0777+499 Alcel Construction / Ramdc Construction And Network Development - Road Widening - Bani - Agno Road Pangasinan 1st JV-18-1096 08/27/2019 77.492 180 O 0.40 0.24 0.15 0.03 0.06 0.05 92.20% - On-going Trading (Joint Venture) (K0342+790 - K0349+300) DEO Organizational Outcome 1: Ensure Safe and Reliable National Alcel Construction/Djy Construction Joint Road System Taloy Norte Junction Jct. - San Pascual brgy Hall JV-17-1023 09/07/2019 CAR 138.944 420 C 0.41 0.20 0.30 - - - 91.40% 91.4% Very Satisfactory Venture Jct. (Section 7 of BLISTT Outer Ring of Circumferential Road) incl. RROW, Bridge and Slope Protection Works Network Development - Improvement/Widening of National Alcel Construction/Oriental Sales Center And Pangasinan 3rd JV-17-1917 Road along Binalonan - Asingan - Sta. Maria Road, K0198+786 08/20/2019 55.939 336 C 0.49 0.13 0.30 - - - 92.30% 90.62% Very Satisfactory Contractor DEO - K0200+405, K0208+700 - K0208+980

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 11 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Cagayan de Oro Alebon Genuine Merchandising Incorporated 26300 Concreting of Upper Zone 3 08/27/2019 15.604 210 C 0.46 0.13 0.30 - - - 88.90% 88.9% Satisfactory City 2nd DEO Construction/Improvement of Access Roads leading to Declared Misamis Oriental Alebon Genuine Merchandising Incorporated 26300 11/11/2019 13.964 90 C 0.49 0.15 0.30 - - - 94.00% 89.62% Very Satisfactory Tourism Destinations, Silad-Balongis Beach Road 1st DEO Construction/ Improvement of Access Roads Leading to Misamis Oriental Alebon Genuine Merchandising Incorporated 26300 08/26/2019 13.964 90 O 0.38 0.24 0.15 0.02 0.04 0.05 86.70% - On-going Declared Tourism Destinations, Silad- Balongis Beach Road 1st DEO Alexi Louisse Construction And General 35492 Construction of Calabuanan to Setan Flood Control 11/23/2019 Aurora DEO 29.400 201 O 0.37 0.24 0.15 0.03 0.06 0.05 89.70% - On-going Merchandise Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Lanao del Norte Alfahad Builders And Enterprises 40063 Damaged Paved Roads - Tertiary Roads: Dobleston - Butadon 10/14/2019 17.511 126 C 0.49 0.13 0.30 - - - 92.40% 90.42% Very Satisfactory 1st DEO Road, K1995+850 to K1996+000 / K1996+670 to K1996+970

Asset Preservation- Rehabilitation/Reconstruction/Upgrading of Lanao del Norte Alfahad Builders And Enterprises 40063 Damaged Paved Roads- Tertiary Road; Dobleston- Buadon 08/23/2019 17.511 114 O 0.40 0.24 0.15 0.02 0.05 0.03 89.10% - On-going 1st DEO Road, K1995+850- K1996+000, K1996+670- K1996+970 Al-Fahdel Const. and Eng'g. 17953 Rehab. & Improvement of Existing Water System 01/08/2019 DOST 1.727 105 O 0.40 0.24 0.15 0.02 0.04 0.05 89.50 - On-going Road Rehabilitation/Improvement, Barangay Sitio Mappit, Alfalfa Construction 29712 09/04/2019 Ifugao 1st DEO 1.920 42 C 0.46 0.13 0.30 - - - 89.70% 89.7% Very Satisfactory Barangay Duit, Kiangan - Barangay Panubtuban Improvement/ Concreting of Luta - Ponghal - Buyabuyan - Alfalfa Construction 29712 11/26/2019 Ifugao 1st DEO 94.206 345 C 0.48 0.13 0.30 - - - 91.20% 90.72% Very Satisfactory Olilicon Road Road Widening - Manila North Road, K0295+339 to Alfalfa Construction 29712 11/05/2019 La Union 1st DEO 81.246 312 O 0.38 0.24 0.15 0.03 0.06 0.05 90.40% - On-going K0295+455, K0295+477 to K0299+329 Protect Lives and Properties against Major Floods - Construction/Maintenance of Flood Mitigation Structures and Nueva Vizcaya 1st Alfalfa Construction / Brg Construction JV-18-415 08/24/2019 37.240 175 O 0.35 0.24 0.15 0.03 0.06 0.03 86.10% - On-going Drainage Systems - Construction of River Flood Control DEO Structure, Maddiangat Section, Phase II Protect Lives and Properties againts Major Flood- Alfalfa Construction / Brg Construction Joint Construction/Maintenace of Flood Mitigation Structures and Nueva Vizcaya 1st JV-18-415 11/11/2019 37.240 170 C 0.46 0.13 0.30 - - - 89.20% 89.2% Very Satisfactory Venture Drainage Systems - Construction of River Flood Control DEO Structure, Maddiangat Section, Phase II, Sta.0+948 - Sta.1+613 NHJ San Vicente connecting Banaybanay Public Terminal and Davao Oriental Alfrego Builders & Supply 19284 Banana, Corn and Rice Processing Sites in support of 11/18/2019 22.050 198 O 0.32 0.24 0.15 0.03 0.06 0.05 84.40% - On-going 2nd DEO Agribusiness: Banana. Corn and Rice Industries Network Development - Road Widening -Secondary Roads, Algimar Consrtuction 15232 Buenavista - Kawayan Road, K0035+000 - K0037+500, 11/13/2019 Masbate 3rd DEO 96.220 266 O 0.37 0.24 0.15 0.01 0.06 0.05 87.80% - On-going K0042+164 - K0042+963 Algon Engineering Construction Corporation 270 Construction of the Fabrication Laboratory Phase 1 01/24/2019 DOST 14.116 314 O 0.39 0.30 0.00 0.03 0.01 0.05 77.40 - On-going

Algon Engineering Construction Corporation 270 Construction of the Fabrication Laboratory Phase 1 03/07/2019 DOST 14.116 314 O 0.36 0.29 0.13 0.02 0.06 0.05 90.20 - On-going Road Widening, Sayre highway (Jct -Davao City Rd- Regional Office Algon Engineering Construction Corporation 270 Cotabato Bdry), K1592+197 - K1593+042, K1593+712 - 11/07/2019 137.797 270 O 0.39 0.24 0.15 0.03 0.06 0.05 92.30% - On-going No. X K1596+058, K1596+088 - K1598+000 Reconstruction to Concrete - Revetment-On Specific Locations Regional Office Algon Engineering Construction Corporation 270 along Davao-Bukidnon Road (S01406MN) K1629+120- 11/28/2019 96.996 263 O 0.37 0.24 0.15 0.03 0.06 0.05 89.90% - On-going No. XI K1635+157 NIA/Pangasinan Agno River Irrigation System / Construction of Canal Structure, Irrigation Aliño Construction Corporation 38560 12/05/2020 4.702 300 C 0.39 0.13 0.30 - - - - 82.30% Satisfactory Canal Turnout Facilities Management Office Alj Construction And Supply 30571 Construction of Multi-Purpose Building 08/27/2019 Guimaras DEO 0.945 60 C 0.34 0.20 0.30 - - - 84.20% 84.2% Satisfactory Construction of Multi-Purpose Building (Phase II) at Municipal Alj Construction And Supply 30571 11/12/2019 Guimaras DEO 6.584 150 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory Market Replacement of Permanent Weak Bridges, Pilot Bridge Catanduanes Aljon Construction & Supply 34481 08/29/2019 42.790 360 C 0.46 0.13 0.30 - - - 89.00% 89% Satisfactory (B00018CN) along Catanduanes Circumferential Road DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 12 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Cagayan de Oro All Weather Construction 35645 Construction of Bank Protection Structure along Cugman River 11/12/2019 9.405 91 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory City 2nd DEO Allen Construction 12584 Casecnan Multipurpose Irrigation & Power Project - IC PH II 05/22/2018 NIA 7.968 610 O 0.32 0.3 0.15 0.03 0.06 0.05 90.70 - On - Going Preventive Maintenance of Road: Asphalt Overlay-along Jct Negros Occidental Allencon Development Corporation 12302 National Road Sagay-Bato-Dian-Marcelo-Balea Jct Road 08/21/2019 4.625 28 C 0.43 0.14 0.30 - - - 86.60% 86.6% Satisfactory 1st DEO (S00019NR) K0106+461 to K0106+958 Construction of Four (4) Storey, Sixteen (16) Classroom School Almakar Builders And Metal Works 21929 11/28/2019 3rd DEO 45.556 270 C 0.49 0.13 0.30 - - - 92.60% 91.62% Very Satisfactory Building at Lantic Elementary School Provincial Upgrading/Improvement of Nabunturan-Nuevo Iloco Provincial Government of Alonzo Construction 32145 07/25/2018 75.713 140 O 0.38 0.29 0.15 0.03 0.06 0.05 96.08 - On - Going Road Phase II Compostela Valley Provincial Alonzo Construction / Gemma Construction Rehabilitation of Cabinuangan - Magangit FMR with 3 units Government of 06/03/2019 190.825 450 O 0.36 0.26 0.15 0.03 0.06 0.05 90.90 - On - Going and Supply Bridge Retrofitting Works Compostela Valley Alpha & Omega Gen. Contractor & Construction/ Improvement of Access Road to New Ibajay- 38958 05/30/2018 Palawan 1st DEO 65.856 185 O 0.386 0.237 0.15 0.03 0.061 0.033 89.70 - On-going Development Corp. Mabini-Sandoval Access Road Leading to Taytay Airport Construction of River Bank Protection and other Structures Alpha & Omega Gen. Contractor & Batangas 1st 38958 along Pansipit River, Brgy. Pob. Zone 4 & 5, Brgy. Tatlong 09/03/2019 96.500 450 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory Development Corp. DEO Maria, Brgy. Laguile Alpha & Omega Gen. Contractor & Las Piñas- 38958 Construction of Road including Drainage, Lakeview 08/20/2019 15.865 486 C 0.49 0.13 0.30 - - - 92.10% 88.5% Satisfactory Development Corp. DEO Construction /Upgrading/Rehabilittaion of Drainage Alpha & Omega Gen. Contractor & South Manila 38958 Improvement along NAIA Road (MIA Road), Nayong Pilipino to 08/22/2019 23.527 300 C 0.41 0.20 0.30 - - - 91.10% 91.1% Very Satisfactory Development Corp. DEO Parañaque River Alpha & Omega Gen. Contractor & Construction of Four (4) Storey Twelve (12) Classroom School Metro Manila 2nd 38958 08/20/2019 19.800 527 C 0.50 0.13 0.30 - - - 93.10% 88.97% Satisfactory Development Corp. Building at Baclaran Elementary School Unit II DEO Alpha & Omega Gen. Contractor & Construction of Four Storey (8 Classrooms) 2 Sci Lab. & 1 ICT 38958 11/06/2019 Isabela 4th DEO 17.978 268 C 0.48 0.20 0.15 - - - 83.40% 82.12% Satisfactory Development Corp. Lab. Bldg. General National High School Alpha & Omega Gen. Contractor & Construction of Missing Links/New Roads, Cabugao - Nueva Regional Office 38958 08/25/2019 26.356 162 O 0.36 0.24 0.15 0.02 0.04 0.05 85.70% - On-going Development Corp. Era - Danglas No. I Alpha & Omega Gen. Contractor & Construction of Four-Storey (8 Classrooms) 2 Sci. Lab & 2 ICT 38958 08/22/2019 Isabela 4th DEO 17.978 268 O 0.39 0.21 0.10 0.03 0.05 0.03 81.40% - On-going Development Corp. Lab. Building, General Emilio Aguinaldo National High School Alpha & Omega Gen. Contractor & Construction of Four (4) Storey Twelve (12) Classroom School 38958 09/02/2019 Rizal 2nd DEO 42.784 274 O 0.38 0.22 0.15 0.03 0.05 0.05 88.20% - On-going Development Corp. Building at Teresa Elementary School Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Alpha & Omega Gen. Contractor & Maintenance of Flood Mitigation Structures and Drainage 38958 11/11/2019 North Manila DEO 44.099 150 O 0.40 0.24 0.15 0.03 0.04 0.05 91.00% - On-going Development Corp. Systems - Bank Improvement , Estero de Quiapo, (RS) Sta. 0+335.51 to Sta. 0+362.31; (LS) Sta. 0+330.60 to Sta. 0+376.20, Sta. 0+390.20 to Sta. 0+434.60 Construction/Maintenance of Flood Mitigation Structures and Alpha & Omega Gen. Contractor & Ilocos Norte 2nd 38958 Drainage Systems - Construction of Flood Control Structures 11/08/2019 49.686 162 O 0.38 0.22 0.15 0.03 0.05 0.05 87.80% - On-going Development Corp. DEO along Uguis River Asset Preservation Program - Rehabilitation/ Reconstruction of Alpha & Omega Gen. Contractor & Roads with Slips, Slope Collapse and Landslide - Primary Regional Office 38958 11/26/2019 138.999 240 O 0.40 0.24 0.13 0.03 0.05 0.03 88.40% - On-going Development Corp. Roads, Daang Maharlika (LZ), Nueva Ecija 2nd Legislative No. III District Flood Management Program-Construction/Maintenance of Alpha & Omega Gen. Contractor & Batangas 1st 38958 Flood Mitigation and Drainage Systems-Construction of 11/19/2019 47.775 210 O 0.40 0.24 0.15 0.02 0.05 0.05 90.70% - On-going Development Corp. DEO Riverbank protection along Pansipit River

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 13 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Asset Preservation-Rehabilitation/ Reconstruction/ Upgrading of Alpha & Omega Gen. Contractor & Damaged Paved Roads- Secondary Road, Lipanto along Jct. Southern Leyte 38958 11/05/2019 38.847 330 O 0.39 0.24 0.15 0.03 0.06 0.03 90.70% - On-going Development Corp. Himay-angan-Silago-Abuyog Bdry. Rd., (K1056+590- DEO K1056+950) Asset Preservation of Nati. Roads- Rehab./Reconst./Upgrading of Damaged Paved Natl. Roads including Drainage Based on Pavement Management System-Highway Development Sorsogon 1st Alpha Ryder Construction And Supplies 12197 06/02/2018 47.040 240 C 0.47 0.13 0.30 - - - 90.10 87.52% Satisfactory Management (HDM-4) Tertiary Reconst. From Concrete to DEO Concrete Donsol-Banuang Gurang Road (SO4433LZ), K0583+540-K0583+832 Construction and Maintenance of Bridges along National Roads- Rehabilitation/ Major Repair of Permanent Bridges, Panas Alphatec Chemical Corporation 39928 04/05/2018 Bohol 2nd DEO 8.781 172 C 0.44 0.13 0.30 - - - 87.00 91.86% Very Satisfactory Bridge (B00190BH) along Tagbilaran North Road (Tagbilaran- Getefe Section) Bridge Retrofitting/Strengthening of Permanent Bridges Pudtol Alphatec Chemical Corporation 39938 Bridge1 (B02260LZ) along Kabugao - Pudtol - Luna - Cagayan 09/11/2019 Apayao 2nd DEO 7.337 150 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Boundary Road Bridge Retrofitting/Strengthening of Permanent Bridges Bunot 1 Alphatec Chemical Corporation 39938 Bridge (B04287LZ) along Apayao (Calanasan) - Ilocos Norte 09/11/2019 Apayao 2nd DEO 6.137 150 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Road Lower Agno River Construction of Rectangular Concrete Canal Lining and Irrigation System Alphil Trading & Construction 26260 Appurtenant Structures (Sta.0+659.50 - Sta. 1+442.00 of 12/19/2020 9.568 270 C 0.40 0.20 0.30 - - - - 90.40% Very Satisfactory Improvement Lateral H, L=750.00m) Project Alphin Trading & Construction 26260 Improvement of Mangaldan Municipal Plaza 03/14/2019 TIEZA 15.000 202 C 0.48 0.19 0.30 96.80 96.80% Outstanding Alpiz Construction & Development Quezon City 1st 11039 Rehabilitation of Paved Road- Improvement of Biak na Bato St. 11/25/2019 33.271 330 O 0.38 0.27 0.15 0.03 0.05 0.05 92.70% - On-going Corporation DEO Construction (Completion) of Multi-Purpose Building (Mini GYM) Sultan Kudarat 1st Alpxr Const. & Bldrs. Corp. 44667 11/23/2019 2.267 135 C 0.50 0.13 0.30 - - - 93.10% 89.95% Very Satisfactory at Brgy. Impao, Isulan DEO Construction (Completion) of Multi-Purpose Building (Mini GYM) Sultan Kudarat 1st Alpxr Const. Builder & Corp. 44667 08/20/2019 2.267 135 O 0.37 0.24 0.15 0.03 0.05 0.05 88.60% - On-going at Brgy. Impao DEO Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road along Teres - Garchitorena Road. Camarines Sur Alro Construction & Development Corp. 18361 Section 1: K0545+(-180) - K0545+(-044.00), Section 2: 11/06/2019 8.044 80 C 0.49 0.13 0.30 - - - 92.50% 91.18% Very Satisfactory 4th DEO K0546+041.00 - K0546+144.00, Section 3: K0547+887.00 - K0548+000.00 Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road Along Jct. Teres-Garchitorena Road, Camarines Sur Alro Construction & Development Corp. 18361 Section 1: K0545+ (-180) to K0545+(-044.00), Section 2: 08/27/2019 8.004 80 O 0.40 0.24 0.15 0.03 0.05 0.03 90.30% - On-going 4th DEO K0546+041.00 to K0546+144.00, Section 3: K0547+887.00 to K0548+000.00 Converge and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Regional Office Alro Construction & Development Corp. 18361 Destinations, Pasacao-Balatan Tourism Coastal Highway 11/04/2019 46.555 205 O 0.40 0.24 0.15 0.03 0.05 0.05 91.70% - On-going No. V leading to Pasacao Port to White Sand Beaches (Balatan Section - Package I), Camarines Sur ALXM Construction and Development 33436 Construction of Panoypoyan Small Water Impounding Project 11/12/2019 DA 15.985 240 O 0.36 0.30 0.00 0.03 0.05 0.05 79.70 - On-going Corporation Zamboanga del Alz Construction 40974 Construction of Multi-Purpose Building Barangay Alegria 11/09/2019 2.472 80 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Sur 1st DEO Provincial Alzam Enterprises 19113 Rehabilitation of Esperanza - Sto. Tomas Farm to Market Road 04/13/2018 Government of 117.410 853 O 0.03 0.06 0.05 0.33 0.30 0.06 82.40 - On - Going Davao del Norte

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 14 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Provincial Alzam Enterprises 19113 Rehabilitation of Esperanza - Sto Tomas Farm to Market Road 04/13/2018 Government of 117.410 853 O 0.03 0.06 0.05 0.33 0.3 0.056 82.40 - On - Going Davao del Norte Preventive Maintenance Daang Maharlika (MN) K1468+670- Davao del Norte Alzam Enterprises Incorporated 19113 11/22/2019 34.934 106 C 0.45 0.13 0.30 - - - 87.90% 87.9% Satisfactory K1469+800, K1470+100-K1470+400 DEO Alzen Engineering & Construction Supplies / 3K'S Industrial Maintenance And Services, Rehabilitation of Cadiis-Sitio Libertad-Sitio Negan-Baruyon Cotabato 2nd JV-18-1384 08/22/2019 68.949 279 O 0.38 0.23 0.15 0.03 0.06 0.05 89.70% - On-going Inc. (Joint Venture) farm to market road with Negan Bridge DEO

Construction of Two Units One-Storey Three Classroom School Dinagat Islands Amalgo Construction 42423 Building at Dona Helen NHS, School ID: 305482, Brgy. Dona 08/20/2019 9.608 330 O 0.37 0.22 0.15 0.03 0.04 0.05 86.20% - On-going DEO Helen Construction of Two Units One-Storey Three Classroom School Dinagat Islands Amalgo Construction 42423 11/08/2019 9.608 330 O 0.39 0.30 0.08 0.03 0.04 0.03 86.90% - On-going Building @ Dona Helen NHS, School ID: 305482 DEO Widening of Permanent Bridge San Ignacio Bridge (B0055MN) Zamboanga City Amarro Construction & Realty Developer 34562 08/29/2019 16.547 333 C 0.50 0.18 0.30 - - - 98.10% 98.1% Outstanding along Governor Camins Road DEO Amazing Find Builders 32932 Rehabilitation of Canteen Phase 2 01/24/2019 DOST 4.996 130 O 0.38 0.30 0.15 0.03 0.01 0.05 92.30 - On-going Amazing Find Builders Corporation (Formerly: Skilled Contractors & Laborers 32932 Rehabilitation of Canteen Phase 2 03/07/2019 DOST 4.996 147 C 0.35 0.20 0.30 - - - 84.60 0.8999 Very Satisfactory Empowerment Cooperative) Construction/Maintenance of Flood Mitigation Structures and Ameg Construction & Supply 21556 Drainage Systems-Construction of Flood Control Dike Along 08/29/2019 Albay 2nd DEO 18.966 145 C 0.48 0.13 0.30 - - - 91.50% 91.5% Very Satisfactory Cawayan River Amp Construction/ Tierra De Ferrand Reality Nueva Ecija 1st Rehabilitation of Flood Control along Baliwag River 06/20/2018 81.329 300 O 0.38 0.3 0.15 0.03 0.051 0.05 96.10 - On-going Development Joint Venture DEO Rehabilitation/ Major Repair of Kipit Br. 2 (B01183MN) along Zamboanga del Amplex Construction And Supplies 35090 05/30/2018 96.972 139 O 0.395 0.3 0.049 0.03 0.07 0.033 87.70 - On-going Liloy - Siocon Rd. Norte 2nd DEO Retrofitting/Strengthening of Permanent Bridges, South Tupi South Cotabato Amplex Construction And Supplies 35090 06/09/2018 9.800 105 O 0.4 0.24 0.143 0.03 0.047 0.033 89.30 - On-going Bridge (B01032MN) along Marbel -Makar Road 2nd DEO Road Wideing - Primary Roads - Marbel -Makar Rd K1695+520 South Cotabato Amplex Construction And Supplies 35090 08/29/2019 2.197 45 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory - K1695+596 2nd DEO Construction of Flood Mitigation Structures along Marbel - South Cotabato Amplex Construction And Supplies 35090 Makar Road (Pagalungan Section), (Apopong -Silway - Sinawal 11/20/2019 24.500 163 C 0.49 0.13 0.30 - - - 92.10% 90.42% Very Satisfactory 2nd DEO River Basin), Sta. 0+000 - Sta. 0+233 Retrofitting/Strenthening of Bagong Taas Bridge (B01009MN) Amplex Construction And Supplies 35090 11/21/2019 Sarangani DEO 13.248 90 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory along Sarangani - Davao del Sur Coastal Road Construction of Flood Mitigation Structure along Marbel - Makar South Cotabato Amplex Construction And Supplies 35090 Road, (Pagalungan Section), (Apong - Silway - Sinawal River 08/29/2019 23.262 152 O 0.39 0.21 0.15 0.03 0.06 0.05 89.30% - On-going 2nd DEO Basin), Sta 0+000 to Sta 0+233 Lanao del Norte Amscon Builders & Enterprises 39248 Concreting of Roads, Brgy. Lantawan to Capocao 08/23/2019 19.132 145 O 0.40 0.25 0.14 0.03 0.06 0.03 91.00% - On-going 1st DEO Lower Agno River Construction of Rectangular Concrete Canal Lining and Irrigation System Amvil Construction And Supplies 31102 Appurtenant Structures (Sta.0+000.00 - Sta.2+089.00) of 12/19/2020 4.267 210 O 0.35 0.30 0.09 0.03 0.04 0.05 86.60% - On-going Improvement LARIS Sub-Lateral D-1 Extra Project Anasavilla Construction And Development Southern Mindoro 38518 Concreting of Brgy. San Isidro 11/07/2019 13.965 158 O 0.35 0.27 0.15 0.03 0.06 0.05 90.00% - On-going Corporation DEO Provincial Angel & Sam Construction & General 19968 Concreting of Miglamin-Cabulohan-Iba Road 01/16/2019 Government of 53.682 271 O 0.28 0.29 0.15 0.02 0.06 0.05 84.87 - On - Going Merchandise Bukidnon Angel Gabriel Builders 36204 Construction of Auditorium 05/14/2019 DOST 49.356 390 O 0.38 0.30 0.15 0.03 0.01 0.05 91.40 - On-going Construction of Multi-Purpose Building, Cupayon Elementary Angkat Construction And Supplies 34328 11/26/2019 Cotabato 1st DEO 1.872 79 C 0.50 0.13 0.30 - - - 93.20% 89.14% Very Satisfactory School, Brgy. Cuyapon

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 15 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Multi-Purpose Building, Cuyapon Elementary Cotabato 2nd Angkat Construction And Supplies 34328 08/22/2019 1.872 79 O 0.39 0.24 0.14 0.03 0.04 0.03 87.40% - On-going School DEO Construction/Maintenance of Flood Mitigation Structure and Ankor Gaulle Construction And Supply 43215 Drainage System - Construction of Anoling - Cabangan - 11/12/2019 Albay 2nd DEO 28.651 160 C 0.46 0.13 0.30 - - - 89.60% 86.78% Satisfactory Salvacion Flood Control System, Cabangan Section Construction/Maintenance of Flood Mitgation Structures and Ankor Gaulle Construction And Supply 43215 Drainage Systems - Construction of Anoling - Cabangan - 08/29/2019 Albay 2nd DEO 28.651 160 O 0.33 0.24 0.15 0.03 0.05 0.05 84.90% - On-going Salvacion Flood Control System Construction/Maintenance of Flood Mitigation Structures and Antonio V. Nidea Construction, Inc. (Formerly: Albay 1st District 6382 Drainage Systems Rehabilitation/Construction/ Extension of 04/12/2018 96.500 288 C 0.48 0.13 0.30 - - - 91.10 87.90% Satisfactory Antonio V. Nidea Construction) DEO Seawall at Fatima, San Roque and Sto. Cristo Local Infrastructure Program: Completion/Improvement of Apaklo Kin Construction And Eng'G Services 37744 09/07/2019 Benguet 2nd DEO 0.737 35 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Palina Multi-Purpose Building (Phase 2) NIA / Pangasinan Apb Construction / Rivbros Construction Irrigation Improvement of Agno River Irrigation System Road (ISRIS) 11/07/2020 73.903 360 O 0.34 0.24 0.15 0.02 0.02 0.05 82.20% - Satisfactory Factors & Dev'T (Jv) Management Office APB Construction / Rivbros Construction AGNO RIS CY 2019 07/11/2020 NIA 73.903 360 O 0.34 0.24 0.15 0.02 0.02 0.05 8220.00% - On-going Factors & Dev't (JV) Network Development - Road Widening - Tertiary Roads along Apd Construction 17467 Jct. Mangandingay - Saguday - Isabela Boundary Road, 08/20/2019 Quirino DEO 11.803 120 C 0.46 0.13 0.30 - - - 89.60% 89.6% Very Satisfactory K0339+236 to K0339+756 Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads-Secondary Roads along Apd Construction 17467 11/05/2019 Quirino DEO 18.034 127 O 0.34 0.24 0.15 0.02 0.04 0.05 84.00% - On-going Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) K0335+887-K0336+548, K0337+389-K0337+770 Organizational Outcome 1: Ensure Safe and Reliable National Road System: Network Development: Paving of Unpaved Roads-Tertiary Roads-Construction of Concrete Roads along Regional Office Apd Construction 17467 11/06/2019 99.324 231 O 0.35 0.30 0.15 0.02 0.04 0.05 90.50% - On-going Jct. Abbag-Nagtipunan-Nueva Vizcaya Road via Dupax Quirino- No. II (S04764LZ) Chainage 2373.22 - Chainage 3598, Chainage 4019 - Chainage 5216 Construction of Drainage Structure along East Road - Appgil Construction & Supply 43673 11/06/2019 Aklan DEO 8.751 121 O 0.37 0.24 0.15 0.03 0.03 0.05 87.20% - On-going KO277+305 - KO277+344, KO277+563 - KO277+655 ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National System, Bridge Program, Construction of New April Rose Ent. & Builders 42590 08/21/2019 Cebu 4th DEO 14.259 188 C 0.50 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory Permanent Bridges, Mompeller Bridge along Argao-Moalboal Road Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Construction / Maintenance of Flood Mitigation April Rose Ent. & Builders 42590 11/07/2019 Cebu 4th DEO 29.400 152 C 0.46 0.20 0.30 - - - 96.10% 96.1% Outstanding Structures and Drainage Systems, Construction of Alo Seawall along N. Bacalso Ave. Aps Construction 37304 Construction of Multi-Purpose Building (Gymnasium Phase III) 11/05/2019 Cagayan 1st DEO 1.978 95 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory

Construction of One (1) Unit Three (3) Storey Regular Negros Occidental Aqua Dragon Construction & Supply 36405 08/22/2019 13.268 180 C 0.41 0.20 0.30 - - - 91.10% 91.1% Very Satisfactory Workshop Building at Salong National High School 3rd DEO

Negros Occidental Aqua Dragon Construction & Supply 36405 Construction of Local Road- Sitio San Ramon 11/09/2019 9.900 101 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory 3rd DEO

Negros Occidental Aqua Dragon Construction & Supply 36405 Access Road Leading to Aguisan Port 11/09/2019 15.519 188 O 0.39 0.24 0.15 0.02 0.05 0.05 90.50% - On-going 2nd DEO

Aqualand Engineering and Construction 38209 Malitubog Maridagao Irrigation Project Stage II 05/12/2018 NIA 2.172 474 O 0.40 0.30 0.00 0.02 0.06 0.05 82.10 - On - Going

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 16 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction/ Repair/ Rehabilitation/ Improvement of Various Aquaterra Konstrukt Inc. 15929 Infrastructure including Local Projects, Construction of Water 03/16/2018 1st DEO 55.003 277 OG 0.389 0.220 0.150 0.030 0.070 0.050 90.90 - On - Going Supply Project

Aquaterra Konstrukt Inc. / Mcgabriel Construction of Flood Control Structure at Maasin Creek Zamboanga City JV-16-449 03/20/2018 22.504 487 OG 0.3 0.3 0.15 0.03 0.05 0.05 88.00 - On - Going Construction Joint Venture (Including ROW Acquisition) DEO

Cluster I:1.) Rehabilitation/ Major Repair of Alag Maliit Bridge Aquino-Dela Cruz Eng'G & (B00182MR) along Calapan North Road, Baco, Oriental Mindoro Oriental Construction/Alphatec Chemical Corporation 06/02/2018 47.408 180 O 0.386 0.240 0.150 0.030 0.061 0.050 91.70 - On-going Mindoro 2.) Rehabilitation/ Major Repair of Baguin I Bridge I, DEO Joint Venture Baco Oriental Mindoro 3.) Rehabilitation/ Major Repair of Widening of Permanent Bridges to more than two lanes Pangasinan 3rd Aquino-Dela Cruz Eng'G. & Construction 16751 including ROW at Mitura Bridge (B00726LZ) along Manila North 06/08/2018 25.962 379 C 0.46 0.13 0.30 - - - 89.40 84.66% Satisfactory DEO Road (Phase II) Construction/Improvement of Access Road Leading to Junction - Pangasinan 3rd Aquino-Dela Cruz Eng'G. & Construction 16751 Tayug - San Quintin Road Leading To Amazing Sunflower 03/21/2019 18.628 99 O 0.39 0.24 0.15 0.03 0.06 0.03 89.80% - On-going DEO Farm, Barangay Panganiban Widening of Malabago Bridge (B04566LZ) along San Carlos - Pangasinan 4th Aquino-Dela Cruz Eng'G. & Construction 16751 08/22/2019 40.162 571 O 0.39 0.30 0.09 0.03 0.06 0.03 89.70% - On-going Calasiao Road DEO Road Widening on Secondary Roads along Camiling-Wawa- Aquino-Dela Cruz Engineering & Pangasinan 4th 16751 Bayambang-Malasiqui-Sta.Barbara Road, K0175+038.50- 11/07/2019 53.097 240 O 0.39 0.24 0.15 0.03 0.06 0.05 91.30% - On-going Construction DEO K0176+165, K0195+456-K0197+080,K0196+625-K0197+400

Aquino-Dela Cruz Engineering & Construction/Improvement of Access Road Leading to Junction- Pangasinan 3rd 16751 11/05/2019 19.781 174 O 0.39 0.23 0.15 0.03 0.05 0.03 88.40% - On-going Construction Tayug-San Quintin Road Leading to Amazing Sunflower Farm DEO Aquino-Dela Cruz Engineering & Construction of By-Pass and Diversion Roads, Tayug-San Pangasinan 3rd 16751 11/05/2019 28.474 258 O 0.39 0.24 0.15 0.03 0.06 0.03 90.10% - On-going Construction Quintin Road DEO Aquino-Dela Cruz Engineering & Retrofitting/Strengthening of Permanent Bridges, Gabor Bridge Zambales 1st Construction / Alphatec Chemical Corporation JV-18-703 08/20/2019 77.910 290 C 0.50 0.19 0.30 - - - 98.80% 98.8% Outstanding (BO1395LZ) along -Bugallon Road DEO (Joint Venture) Network Development-Off-Carriageway Improvement including Drainage-Primary Roads, Natalio Bacalso Avenue (Cebu South AR Adlawan Construction 13108 Road),Cebu Section 1: K009+(570) to 9+687,410; Section 2: 04/10/2018 Cebu 2nd DEO 45.227 458 OG 0.393 0.239 0.15 0.03 0.04 0.05 90.20 - On - Going K0015+496 to K0015+830;, Section 3: K0053+266 to K0054+391 Marikit Irrigation Project - Phase II - Gabion Works - Slope AR. Esbi Construction 42234 08/06/2019 NIA 2.305 60 C 0.40 0.16 0.30 - - - 85.62 *85.62% Satisfactory Protection Works Construction/Improvement of Access Roads Leading to Davao City 1st Arcinue Comm'L Corporation 6746 Declared Tourism Destinations Jct. Davao-Cotabato Old Road- 08/29/2019 32.845 280 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory DEO Bago Oshiro Road Leading to UP NIA/Pangasinan San Fabian River Irrigation System / Improvement of Road Irrigation Arcinue Comm'L. Corporation 6746 12/05/2020 2.848 180 C 0.43 0.10 0.30 - - - - 83.40% Satisfactory Concreting Management Office Construction of Standard 1-Storey 3-Cl School Building, Aresef Engineering 34611 09/11/2019 Apayao 2nd DEO 7.434 270 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory Consuelo Elementary School Arky Construction And Supply 32692 Balog Balog Multipurpose Project II 02/16/2019 NIA 9.777 120 O 0.37 0.30 0.00 0.03 0.05 0.03 78.20 - On - Going Organizational Outcome 1 - Ensure Safe and Reliable National Road System, Asset Preservation Program, Preventive Arky Construction And Supply 32692 11/13/2019 Masbate 3rd DEO 22.651 100 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Maintenance, Asphalt Overlay, Buenavista - Kawayan Road K0047+844 - K0048+640 and K0049+616- K0049+755.40

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 17 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Local Infrastructure Program, Construction of Concrete Road - Arky Construction And Supply 32692 Concreting of Dapdap - Simawa Road (Sta. 2+360 to Sta. 08/24/2019 Masbate 3rd DEO 18.631 102 O 0.39 0.24 0.15 0.03 0.07 0.05 93.30% - On-going 3+600) Asset Preservation program, Preventive Maintenmance Arky Construction And Supply 32692 Secondary Roads, Masbate-Cataingan-Placer Rd, K0000+480- 06/04/2018 Masbate 1st DEO 14.501 90 O 0.361 0.300 0.110 0.022 0.050 0.033 87.60 - On-going K0001+294 Construction/Maintenance of Flood Mitigation Structures and Arm-Asia Construction & Engineering 27561 Drainange Systems - Rehabilitation of Borobor River Control, 11/05/2019 La Union 1st DEO 19.600 225 C 0.41 0.13 0.30 - - - 84.30% 84.3% Satisfactory Barangay Paratong Lower Kalinga Armcore Construction 44631 Construction of Pantar Flood Control 09/07/2019 0.922 30 C 0.48 0.13 0.30 - - - 90.80% 90.8% Very Satisfactory DEO Local Infrastructure Program Construction of Multi-Purpose Hall, Armd Construction And General Merchandise 38248 11/28/2019 Tarlac 1st DEO 1.940 90 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory Panampunan, Tarlac City Construction of Canal Extension / Appurtenant Structure at D2C Armson Construction & Enterprises 36065 09/28/2019 NIA 3.771 90 O 0.22 0.30 0.15 0.02 0.06 0.05 80.10 - On-going Extension

ARN Builders, Incorporated / A5R Dynamic Abra De Ilog Port Expansion Project 07/27/2018 PPA 75.997 360 O 0.4 0.3 0 0.03 0.07 0.03 83.00 - On - Going Const. Corp. (J.V.)

Rehabilitation/Major Repair of Permanent Bridge Polangi Bridge Eastern Samar Arnold G. Cosipag Construction 12700 08/28/2019 4.649 71 O 0.37 0.30 0.00 0.02 0.05 0.02 75.70% - On-going (B00458SM) along Wright-Taft-Borongan Road DEO Aroboan Construction and Supplies 37917 Completion of Site Development, Phase 4 09/07/2019 DOST 3.360 275 C 0.50 0.20 0.30 - - - 99.70 0.9493 Very Satisfactory Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads along NRJ - Barobo - Agusan del Surigao del Sur Arq Builders 35966 05/31/2018 32.241 144 O 0.389 0.286 0.150 0.030 0.035 0.050 94.00 - On-going Sur Boundary Road K1413+402.5 - K1413+977, K1410+492.8 - 2nd DEO K1411+044.80 Road Widening - Primary Roads Jct. Lingig - Trento Rd. - Surigao del Sur Arq Builders 35966 11/10/2019 91.511 233 O 0.38 0.24 0.15 0.03 0.07 0.05 91.70% - On-going K1475+138 - K1477+211 2nd DEO 002: Protect Lives and Properties Against Major Floods-Flood Arq Builders / A.T. Tan Construction Management Program-Construction/Maintenance of Flood JV-18-1009 08/28/2019 DEO 62.263 331 O 0.33 0.25 0.15 0.03 0.05 0.05 85.70% - On-going Corporation (Joint Venture) Mitigation Structure and Drainage Systems-Construction of Flood Mitigation Structure at Butuanon River

002: Protect Lives and Properties Against Major Floods-Flood Arq Builders / Win Construction (Joint Management Program-Construction/ Maintenance of Flood JV-18-1186 08/29/2019 Cebu City DEO 33.220 232 O 0.39 0.30 0.15 0.03 0.05 0.05 96.50% - On-going Venture) Mitigation Structure and Drainage Systems-Construction of Flood Mitigation Structure at Guadalupe River Protect Lives and Properties against Major Floods - Flood Management Program - Construction / Maintenance of Flood Arq Builders / Win Construction (Joitn JV-18-1021 Mitigation Structure and Drainage Systems - Construction of 11/14/2019 Cebu City DEO 34.054 253 O 0.39 0.30 0.09 0.03 0.06 0.03 89.80% - On-going Venture) Flood Mitigation Structure, Guadalupe River, Barangay Sapangdaku ARR Construction 17300 Batan Permanent Housing Project Site 1 7/19/19 NHA 98.500 695 O 0.33 0.27 0.04 0.03 0.05 0.03 74.87 - On-going

Procurement of Fully Developed Lots and Completed Housing ARR Construction 17300 8/16/19 NHA 232.577 365 O 0.34 0.30 0.00 0.03 0.07 0.03 76.37 - On-going Units for Typhoon Yolanda Housing Program (802 Units)

ARR Construction 17300 Batan Permanent Housing Project Site 2 7/19/19 NHA 98.500 695 O 0.33 0.27 0.03 0.03 0.05 0.03 73.25 - On-going

ARR Construction 17300 Esperanza Homes Site 1 04/27/2018 NHA 298.760 617 O 0.48 0.20 0.21 - - - 88.62 89.86% Very Satisfactory

ARR Construction 17300 Batan Permanent Housing Project Site 1 07/27/2018 NHA 98.500 695 O 0.33 0.27 0.06 0.03 0.06 0.03 78.07 - On - Going

ARR Construction 17300 Batan Permanent Housing Project Site 2 07/27/2018 NHA 98.500 695 O 0.34 0.28 0.05 0.03 0.06 0.03 79.90 - On - Going

ARR Construction 17300 New Washington Homes Site 1 10/02/2018 NHA 98.28 525 E 0.43 0.18 0.61 - - - 61.81 74.60% Poor

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 18 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

ARR Construction 17300 New Washington Homes Site 2 02/10/2018 NHA 46.190 425 E 0.33 0.28 0.00 0.03 0.05 0.02 71.13 - On-going

ARR Construction 17300 New Washington Homes Housing Project Site 2 07/27/2018 NHA 46.194 425 C 0.45 0.18 0.00 - - - 62.39 72.40% Poor Arrianne Merchandising And Construction Construction of Flood Mitigation Structure - Construction of 41643 11/15/2019 Iloilo 1st DEO 23.271 145 C 0.48 0.13 0.30 - - - 91.20% 90.24% Very Satisfactory Services Incorporated Guimbal Flood Control Structures, Guimbal, Iloilo Arrianne Merchandising And Construction Construction of Flood Mitigation Structure- Construction of 41643 08/30/2019 Iloilo 1st DEO 23.271 145 O 0.36 0.25 0.15 0.03 0.06 0.05 89.60% - On-going Services Incorporated Guimbal Flood Control Structures Arrianne Merchandising And Construction Construction of Flood Mitigation Structure- Construction of Negros Occidental 41643 08/30/2019 23.271 145 O 0.36 0.25 0.15 0.03 0.06 0.05 89.60% - On-going Services Incorporated Guimbal Flood Control Structures 1st DEO Rehabilitation/Major Repair of Permanent Bridge Sta. Cruz Br. 1 Pampanga 2nd Arrow Construction 32834 08/27/2019 5.842 60 O 0.38 0.24 0.15 0.03 0.05 0.03 88.00% - On-going (B01505LZ) along Jose (JASA) DEO Rehabilitation / Major Repair of Permanent Bridge Sta. Cruz Br. Pampanga 2nd Arrow Construction 32834 11/07/2019 5.842 60 C 0.50 0.13 0.30 - - - 93.30% 90.12% Very Satisfactory 1 (B01505LZ) along DEO CY 2017 Basic Educational Facilities Fund (Construction of Batangas 3rd Arsvico Construction And Development Corp. 23518 Classrooms) Batch 10, Construction of 2STY 6CL, Banadero 06/19/2018 12.347 200 O 0.377 0.240 0.134 0.030 0.050 0.033 86.40 - On-going DEO ES ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Batangas 3rd Arsvico Construction And Development Corp. 23518 11/22/2019 27.831 240 O 0.40 0.24 0.15 0.02 0.05 0.05 90.40% - On-going Widening- Tertiary Roads, Talisay- Laurel- Agoncillo Rd.- DEO K0084+330- K0084+754, K0086+183- K0086+432 Construction/Rehabilitation of Flood Mitigation Facilities within Ilocos Sur 2nd Arthit Corporation 40667 Major Basins and Principal Rivers: Construction of Flood 08/29/2019 18.628 187 O 0.39 0.24 0.15 0.03 0.05 0.05 90.70% - On-going DEO Control Structures along Abra River (Quirino Section) Bridge Program - Retrofitting/ Strengthening of Permanent As Macha Construction And Trading 36878 Bridges - Mabatang Bridge (BO1704LZ) along Roman 11/11/2019 Bataan 1st DEO 13.230 130 C 0.50 0.13 0.30 - - - 93.30% 92.34% Very Satisfactory Expressway Bridge Program - Retrofitting/Strengthening of Permanent As Macha Construction And Trading 36878 Bridges - Mabatang Bridge (B01704LZ) along Roman 08/25/2019 Bataan 1st DEO 12.574 90 O 0.40 0.24 0.15 0.03 0.05 0.05 91.70% - On-going Expressway Construction/Maintenance of Flood Mitigation Structures and Southern Mindoro As Yang Construction 11322 Drainage System, Construction of Flood Control at M. Adriatico 08/26/2019 18.601 180 O 0.36 0.24 0.15 0.03 0.05 0.05 87.30% - On-going DEO to Brgy. Papandungin Construction/ Maintenance of Flood Mitigation Structures and Southern Mindoro As Yang Construction 11322 Drainage System, Construction of Flood Control at M. Adriatico 11/07/2019 19.600 181 O 0.35 0.25 0.15 0.03 0.06 0.05 88.30% - On-going DEO to Brgy. Papandungin ASC Construction and Concrete Products 26788 Nassiping Pump Irrigation Project 10/27/2018 NIA 45.109 330 O 0.34 0.30 0.15 0.02 0.02 0.03 87.07 - On - Going Construction/Maintenance of Flood Mitigation Structures and Asc Construction And Concrete Products 26788 Drainage System, Construction of San Sebastian Flood Control 09/11/2019 Apayao 2nd DEO 19.006 250 C 0.43 0.13 0.30 - - - 86.60% 86.6% Satisfactory Structure along Apayao River Construction of 3 Storey 9 Classroom School Building at Sonog Ascentia Construction, Inc. 35984 08/27/2019 Cebu 5th DEO 23.994 195 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory ES Construction of Flood Mitigation Structure Construction of Sipa Asg Construction And Concrete Products 26788 Flood Control Structure along Apayao - Abulug River Basin, 11/23/2019 Apayao 2nd DEO 84.269 330 C 0.46 0.13 0.30 - - - 89.60% 89.6% Very Satisfactory Sta. 1+499 - Sta. 2+299 Asian Pearl Construction & Development Concreting of Parparoroc - Namoroc - Ester - Pllas Road, Ilocos Norte 1st 9059 05/29/2018 48.509 283 C 0.21 0.20 0.30 - - - 71.30 76.22% Unsatisfactory Corp. Vintar, Ilocos Norte DEO Asian Pearl Construction & Development Construction of Classrooms, 2 Storey 4 Classrooms, Calayab Ilocos Norte 1st 9059 08/22/2019 10.019 207 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory Corp. Elementary School, Calayab DEO Construction of 2 Storey, 4 Classroom School Building FS Cagayan de Oro At Builders & General Merchandise 38199 08/28/2019 12.288 213 O 0.39 0.23 0.11 0.02 0.05 0.03 82.70% - On-going Catanico Elementary School City 2nd DEO Construction of 2 Storey, 4 Classroom School Building FS Cagayan de Oro At Builders And General Merchandise 38199 11/12/2019 12.286 213 C 0.47 0.20 0.17 - - - 84.30% 83.18% Satisfactory Catanico Elementary School City 2nd DEO Construction of Multi-Purpose Building (Covered Athena Construction And Development 37750 11/14/2019 Romblon DEO 4.321 150 O 0.34 0.24 0.15 0.03 0.06 0.05 87.70% - On-going Court/Evacuation Center) Atlantic Construction 24232 Construction of Multi-purpose Building (Community Center) 11/12/2019 Isabela 2nd DEO 2.348 120 C 0.41 0.13 0.30 - - - 84.50% 89.47% Very Satisfactory

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 19 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Completion of Multi-purpose Building (Community Center) Brgy. Atlantic Construction 24232 08/26/2019 Isabela 2nd DEO 2.348 120 O 0.39 0.24 0.15 0.03 0.05 0.05 91.60% - On-going Songsong Atlantic Construction 24232 Construction of Multi-Purpose Building 11/05/2019 Cagayan 1st DEO 2.965 120 O 0.40 0.20 0.15 0.02 0.04 0.05 86.80% - On-going ATR Construction 35965 Completion of Dormitory Building III, Phase 2 7/22/19 DOST 19.119 390 O 0.39 0.24 0.15 0.03 0.03 0.05 89.70 - On-going Audric Construction & Supply 34376 Construction of Multi-Purpose Building (Covered Court) 11/07/2019 Aklan DEO 2.876 112 C 0.49 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory Audric Construction & Supply 34376 Construction of River COntrol Along Basin 08/24/2019 Capiz 2nd DEO 19.231 166 O 0.37 0.24 0.15 0.03 0.06 0.05 89.80% - On-going Reconstruction to Concrete Pavement - on Specific Locations Audric Construction & Supply 34376 11/09/2019 Capiz 2nd DEO 27.952 201 O 0.34 0.24 0.15 0.03 0.04 0.05 84.40% - On-going along Capiz - Aklan Rd. (S00298PN) KO331+120 - KO332+902 Construction of 1 Unit, 2 Storey - 10 Classroom School Building Bukidnon 2nd Avecs Corporation 23228 11/06/2019 22.506 225 C 0.49 0.13 0.30 - - - 92.30% 85.58% Satisfactory with Toilet at CES DEO Construction of 1 Unit, 2 Storey - 10 Classroom School Building Bukidnon 2nd Avecs Corporation 23228 08/20/2019 22.265 222 O 0.40 0.25 0.08 0.03 0.04 0.03 82.70% - On-going with Toilet DEO Local Infrastructure Program - Buildings and Other Structures - Ave-Maria Construction And Trading 42759 Multi Purpose / Facilities - Construction of Multi- Purpose 11/11/2019 Bataan 1st DEO 8.910 133 C 0.49 0.13 0.30 - - - 92.20% 91.29% Very Satisfactory Building (Senior Citizen & Sports Center) Local Infrastructure Program - Buildings and Other Structures - Ave-Mira Construction And Trading 42759 Multi-Purpose / Facilities - Construction of Multi-Purpose 08/25/2019 Bataan 1st DEO 8.705 120 O 0.39 0.24 0.15 0.03 0.05 0.05 90.90% - On-going Building (Senior Citizen & Sports Center) Construction of Classrooms (2-Storey 4-Classroom Scholl Avic Construction And Supply 28784 Building, 1 Regular Workshop and 2SHS Classrooms) at 11/07/2019 Albay 3rd DEO 10.043 204 C 0.50 0.20 0.18 - - - 87.10% 85.91% Satisfactory Mauraro High School Retroffiting /Strengthening of Bridge-San Guillermo Bridge Las Piñas- Ayana Construction And Trading 38623 08/20/2019 3.255 80 C 0.50 0.13 0.30 - - - 93.20% 93.2% Very Satisfactory (BO1809LZ) along -Muntinlupa Road Muntinlupa DEO Construction of Overpass along near T. Quezon City 2nd Ayana Construction And Trading 38623 11/27/2019 15.031 180 O 0.32 0.24 0.15 0.02 0.06 0.05 84.30% - On-going Castro Street DEO Construction of Classrooms: Two (2) Storey, Six (6) Classroom Ayson P.D. Construction 15724 08/28/2019 Tarlac 2nd DEO 12.900 200 C 0.49 0.14 0.30 - - - 92.90% 90.59% Very Satisfactory School Building at Dapdap Resettlement Elementary School Aztek Construction Firm 32911 Marinduque Airport Development Project 02/13/19 DOTC 9.088 155 C 0.50 0.20 0.00 - - - 69.90 *69.90% Poor Construction of Flood Control Structures along Jibatang River B. Vicencio Builders (Bvb), Inc. 9687 11/08/2019 Samar 1st DEO 39.552 166 C 0.47 0.13 0.30 - - - 90.40% 90.4% Very Satisfactory (Downstream), Barangay Caybago 002: Construction of Flood Control Structure along Jibatang B. Vicencio Builders (Bvb), Inc. 9687 08/24/2019 Samar 1st DEO 39.552 166 O 0.39 0.29 0.15 0.02 0.03 0.03 90.90% - On-going River (Downstream) Asset Preservation - Preventive Maintenance - Tertiary Roads, B. Vicencio Builders (Bvb), Inc. 9687 Tanauan - Dagami Road (S00059LT), K0922+ (-643) to 08/28/2019 Leyte 1st DEO 34.762 230 O 0.39 0.24 0.15 0.03 0.03 0.05 89.70% - On-going K0922+367 Construction/Upgrading/Rehabilitation of Structure along City B. Vicencio Builders (Bvb), Inc. 9687 11/13/2019 25.133 180 O 0.40 0.24 0.15 0.03 0.04 0.03 89.00% - On-going National Road DEO B. Vicencio Construction / Patrila Builders, Construction of Tigum Flood Control Project (Jro-Tigum River), JV-18-1273 11/13/2019 Iloilo 4th DEO 46.550 170 O 0.40 0.24 0.15 0.03 0.05 0.05 91.70% - On-going Inc. (Joint Venture) Brgy. Agutayan Construction/Improvement of Access Roads Leading to Cagayan 2nd B.A. Lagazo Builders 34648 Declared Tourism Destinations-Access Road leading to Briza 11/06/2019 9.510 118 C 0.47 0.13 0.30 - - - 90.30% 91.02% Very Satisfactory DEO Beach Resort Construction/Improvement of Access Roads Leading to Cagayan 2nd B.A. Lagazo Builders 34648 Declared Tourism Destinations - Access Road Leading to Briza 08/21/2019 9.510 118 O 0.39 0.24 0.15 0.03 0.06 0.05 91.50% - On-going DEO Beach Resort Rehabilitation of Calumpang Diversion Road to Caray-caray, B.C. Cuerpo Construction Corporation 11898 Naval, Biliran (From 11.62732°, 124.37993" to 11.62752°, 08/26/2019 Biliran DEO 28.418 180 O 0.39 0.24 0.15 0.03 0.04 0.05 90.30% - On-going 124.37986") Reconstruction of Caray-caray Flood Control Structures along B.C. Cuerpo Construction Corporation 11898 Biliran Circumferential Road (124.41165⁰, 11.55882⁰ to 11/11/2019 Biliran DEO 28.636 185 O 0.35 0.24 0.15 0.03 0.06 0.05 87.60% - On-going 124.559720⁰, 11.412717⁰) Network Development - Paving of Unpaved Roads - Tabuk - B.C. Cuerpo Construction Corporation / Mgsr Lower Kalinga JV-17-697 Banawe via Tanudan - Barlig Road, K0536+780 to K0536+966, 09/07/2019 74.692 525 C 0.45 0.20 0.16 - - - 81.30% 79.74% Unsatisfactory Construction (Joint Venture) DEO K0541+120 to K0541+252 and K0543+395 to K0545+581

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 20 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Lower Agno River Construction of Trapezoidal Concrete Canal Lining and Irrigation System B.F.T. Construction 14424 Appurtenant of Structures (Sta. 0+009.00 - Sta. 2+310.00 of 12/19/2020 12.437 270 C 0.38 0.20 0.30 - - - - 87.70% Satisfactory Improvement LARIS Lateral A-Extra, L=2,286.00m) Project Rehabilitation/ Improvement of Existing Dike along Lucung Rier B.K. Sy Tu Construction 12655 11/25/2019 Tarlac 1st DEO 27.932 206 O 0.36 0.23 0.15 0.03 0.05 0.03 85.50% - On-going (Café Section, Left Bank) B.M. Marketing 9852 Tacloban Airport Development Project 08/24/2018 DOTr 264.911 360 O 0.40 0.30 0.15 0.03 0.05 0.05 97.90 - On - Going B.M. Marketing 9852 Tacloban Airport Development Project 08/24/2018 DOTr 264.911 360 O 0.39 0.30 0.15 0.03 0.05 0.05 97.00 - On - Going Tacloban Airport Development Project - Asphalt Overlay of Runway, Improvement of Vehicular Parking Area, Construction B.M. Marketing 9852 12/09/2019 DOTR 263.113 360 C 0.45 0.20 0.30 - - - 95.40 0.969 Outstanding of North-West Shore Protection and Site Development of New Terminal Area San Jose Airport Development Project - Asphalt Overlay of B.M. Marketing 9852 9/24/19 DOTR 283.377 270 C 0.43 0.20 0.30 - - - 92.50 0.956 Very Satisfactory Runway and Shoulder Grade Correction Asphalt Overlay, Naval-Caibiran Cross Country Road B.M. Marketing 9852 11/11/2019 Biliran DEO 70.655 110 C 0.49 0.13 0.30 - - - 92.20% 92.2% Very Satisfactory K1032+620-K1033+709, K1033+735-K1033+988 B.M. Marketing 39937 Visitor'S Center and Multi-Purpose Building (Viewdeck) 07/02/2019 TIEZA 2.000 60 O 0.321 0.217 0.150 0.030 0.070 0.050 83.80 - On-going

B.M. Marketing 9852 San Jose Airport Development Project 06/19/2019 DOTC 283.377 270 O 0.39 0.30 0.15 0.03 0.06 0.05 97.70 - On-going

B.M. Marketing 9852 Airport Development Project 06/20/2019 DOTC 50.138 210 O 0.38 0.30 0.15 0.02 0.05 0.05 95.50 - On-going Rehabilitation / Major repair of Slope Protection - Rehabilitation Pampanga 3rd B.P. Cruz Builders And Trading 33272 11/08/2019 27.635 180 O 0.34 0.24 0.13 0.03 0.06 0.03 82.90% - On-going of Slope Protection along Quitangil Creek DEO Organizational Outcome 2: Protect Lives and Properties against Major Floods- Flood Management Program- Nueva Vizcaya 1st B.R.G. Construction 21931 Construction/Maintenance of Flood Mitigation Structures and 06/06/2018 14.105 121 O 0.4 0.225 0.15 0.015 0.025 0.033 84.80 - On-going DEO Drainage Systems- Construction of Flood Control Structure San Leonardo Section along Matuno River Construction / Rehabilitation of Sta. Barbara - Maliwalu Road ( Pampanga 1st B-12 Construction And Trading Corporation 31997 11/05/2019 91.431 255 O 0.38 0.24 0.15 0.03 0.05 0.03 88.00% - On-going R.A. 9506- Rehabilitation Act) DEO

B-12 Construction And Trading Corporation 16712 Modular Floating Docks 09/26/19 TIEZA 29.000 60 C 0.49 0.20 0.30 - - - 98.60 98.60% Outstanding

Negros Occidental Bacolod Red Dragon Construction, Inc. 36519 Completion of Isabela RHU Isabela 08/23/2019 4.383 80 C 0.44 0.20 0.30 - - - 93.60% 93.6% Very Satisfactory 2nd DEO Convergence and Special Support Program- Construction/Improvement of Access Roads Leading to Negros Oriental Bacolod Red Dragon Construction, Inc. 36519 08/22/2019 21.249 141 O 0.36 0.22 0.15 0.03 0.05 0.05 85.90% - On-going Declared Tourism Destinations-Tabon-Guba Barangay Road 1st DEO Leading to Binakayan Caves Construction/Improvement of Access Roads Leading to Ilocos Norte 1st Badoc Builders & Supply, Inc. 31564 Declared Tourism Destination, Virbira - Barbaquezo Road 08/22/2019 29.272 373 C 0.44 0.13 0.30 - - - 87.10% 87.1% Satisfactory DEO Network Leading to Sabo Dam, Brgy. Barbaquezo Ilocos Norte 1st Badoc Builders & Supply, Inc. 31564 Rehabilitation of Municipal Auditorium 08/22/2019 14.998 240 C 0.49 0.13 0.30 - - - 92.30% 92.3% Very Satisfactory DEO Construction/Maintenance of Flood Mitigation Structures and Ilocos Norte 2nd Badoc Builders & Supply, Inc. 31564 Drainage Systems - Construction of Flood Control Structures 05/31/2019 21.836 116 C 0.39 0.20 0.30 - - - 89.40% 89.4% Very Satisfactory DEO along Badoc River, Brgy. Lacuben Construction/Improvement of Circumferential Road leading to Ilocos Norte 2nd Badoc Builders & Supply, Inc. 31564 Shrine, La Virgen Milagroso Shrine and Other 11/08/2019 86.850 353 O 0.39 0.24 0.15 0.03 0.05 0.03 89.70% - On-going DEO Access Roads Construction/Repair/Improvement of Various Infrastructure Regional Office Badoc Builders & Supply, Inc. 31564 including Local Projects, Improvement/Concreting of Paoay 11/06/2019 115.790 240 O 0.38 0.23 0.15 0.03 0.06 0.05 89.10% - On-going No. I Lake Circumferential Road and Malacanang to Amianan

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 21 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Constrution of Flood Control along Lanao - Pagadian - Badsbro Construction And General Zamboanga 32876 Zamboanga City Road, Part of Sibuguey River, (Sta. 00+142.20 06/05/2018 27.929 175 O 0.394 0.24 0.15 0.03 0.06 0.05 92.40 - On-going Merchandise Sibugay 1st DEO - Sta. 00+408.50), (Upstream), Brgy. Balugo Provincial Badsbro Construction and General Government of 32876 Concreting of Tungawan-Malongon Provincial Road 02/22/2019 113.016 292 O 0.38 0.30 0.12 0.03 0.07 0.05 95.32 - On - Going Merchandise Construction of Flood Control Structure along Lanao - Pagadian Badsbro Construction And General Zamboanga 32876 - Zamboanga City Road, Part of Sibuguey River, (Sta. 00+(- 06/05/2018 39.147 270 C 0.48 0.13 0.30 - - - 91.10 90.26% Very Satisfactory Merchandise Sibugay 2nd DEO 002) - Sta. 00+539) Construction / Improvement of Access Roads leading to Badsbro Construction And General Zamboanga 32876 Declared Tourism Destinations - NRJ to Bawang Provincial 08/28/2019 74.475 190 O 0.40 0.24 0.15 0.03 0.06 0.05 92.80% - On-going Merchandise Sibugay 1st DEO Road leading to Silupa Beach Construction of Flood Control Structure (Revetment Wall) along Badsbro Construction And General Zamboanga 32876 Sibuguey River, Sta. 1+160 to Sta. 1+240 and Sta. 0+000 to 11/11/2019 46.055 213 O 0.39 0.24 0.15 0.03 0.06 0.05 92.00% - On-going Merchandise Sibugay 1st DEO Sta. 0+320, Balugo Lower Kalinga Bahramley Construction 42050 Construction of Dupag, Tabuk City, Kalinga 11/20/2019 15.890 215 O 0.40 0.24 0.15 0.03 0.06 0.05 92.00% - On-going DEO Provincial Baje Construction 33252 Upgrading Aguibo-Malibcong Road 10/12/2020 Government of 36.320 203 O 0.39 0.30 0.15 0.03 0.06 0.05 9800.00% - On-going Abra Construction/Improvement of Access Roads Leading to Declared Tourism Destinations: Reconstruction to Concrete Balintugan Construction 34566 Pavement Specific Location along Ballay-Tabio-Tonoman- 09/06/2019 Benguet 1st DEO 9.688 90 C 0.45 0.18 0.30 - - - 92.70% 92.7% Very Satisfactory Bulalacao-Tawangan-Lusod Road Leading to Bulalacao Lakes and Mt. Tabeo Cotabato City Bamec Developers Construction of 2 Storey 6 CL at Usman Baunga ES 06/04/2018 10.797 170 O 0.395 0.24 0.15 0.03 0.047 0.033 89.50 - On-going DEO Sultan Kudarat Bandar Kutawato Construction And Supply 38119 Construction of Multi-Purpose Building (Senior Citizen Bldg.) 08/24/2019 0.840 60 O 0.38 0.24 0.15 0.03 0.05 0.05 90.10% - On-going 2nd DEO Bansoy Construction & Supply 36882 Site Development Phase 3 (Design & Build) 10/04/2018 DOST 19.220 225 O 0.38 0.30 0.15 0.02 0.01 0.05 91.60 - On - Going Local Infrastructure Program - Buildings and Other Structures - Bantay Construction 35290 Multi-Purpose / Facilities - Repair / Rehabilitation of Multi- 11/14/2019 Cebu 6th DEO 2.977 90 C 0.46 0.20 0.30 - - - 95.90% 95.9% Very Satisfactory Purpose Building (Covered Court) Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Construction/ Baqprince Construction 28337 11/28/2019 Cavite 1st DEO 46.535 171 O 0.39 0.24 0.15 0.02 0.05 0.05 90.50% - On-going Maintenance of Flood Mitigation Structures and Drainage Systems- Construction of Revetment along Julian River Construction of Concrete Road- Gen. Aguinaldo- Magallanes- Baqprince Construction 28337 Nasugbu Road (East-West Road), Magallanes- Gen. Aguinaldo 11/26/2019 Cavite 2nd DEO 54.732 240 O 0.39 0.24 0.15 0.02 0.05 0.05 90.70% - On-going Section Construction of 2 Storey 8 Classroom School Building at Zamboanga Barillo Construction 23836 05/29/2018 16.933 180 O 0.387 0.241 0.101 0.03 0.059 0.033 85.10 - On-going Palomoc NHS Sibugay 2nd DEO Ipil Airport Development Project - Continuation of Concreting of Barillo Construction & Enterprises 23836 9/18/19 DOTR 74.084 240 O 0.37 0.30 0.15 0.02 0.05 0.05 94.40 - On-going Runway Brgy. Tambanan Road Connecting Brgy. Tambanan and Zamboanga Barillo Construction & Enterprises 23836 11/05/2019 17.056 111 O 0.39 0.23 0.15 0.03 0.04 0.03 87.50% - On-going Junction National Highway in Support of Rubber Industry Sibugay 2nd DEO

Zamboanga Barillo Construction And Enterprises 23836 Comprehensive Drainage System within Metro Ipil Area 08/29/2019 23.525 497 C 0.49 0.13 0.30 - - - 92.00% 91.18% Very Satisfactory Sibugay 2nd DEO Construction of 3-Storey, 12-Classroom School Building at Barkadahan Young Builders, Inc. 40331 08/21/2019 Bukidnon 1st DEO 26.645 190 C 0.50 0.13 0.24 - - - 86.90% 86.9% Satisfactory Impasug-ong CES Barkdahan Young Builders, Inc. 40331 Labor and Materials for the Construction of Seed Storage 09/25/2019 DA 9.761 141 O 0.39 0.27 0.00 0.03 0.06 0.05 80.10 - On-going

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 22 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Local Infrastructure Program - Local Roads and Bridges, Local Mt. Province 1st Batakagan Construction 32298 11/25/2019 9.602 143 O 0.36 0.29 0.15 0.03 0.04 0.05 92.80% - On-going Roads - Construction of Sadsadan - Cuba Provincial Road DEO Construction (Completion) of Multi-Purpose Building (Hall), Villa Bda Jr Construction 40445 08/25/2019 Isabela 3rd DEO 3.325 130 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory Concepcion National High School Local Infrastructure Program - Concreting of Lunac - Duroc Bda Jr Construction 40445 11/09/2019 Isabela 3rd DEO 4.702 75 C 0.44 0.13 0.30 - - - 87.70% 86.02% Satisfactory Road Local Infrastructure Program - Concreting of Lunac - Duroc Bda Jr Construction 40445 11/09/2019 Isabela 3rd DEO 9.405 76 C 0.46 0.13 0.30 - - - 89.40% 85.44% Satisfactory Road Bda Jr Construction 40445 Concreting of Sitio Lunac - Duroc Road, Barangay Duroc 08/24/2019 Isabela 3rd DEO 9.405 76 O 0.37 0.20 0.15 0.03 0.05 0.05 84.90% - On-going Local Infrastructure Program: Concreting of Sitio Lunac - Duroc Bda Jr Construction 40445 08/24/2019 Isabela 3rd DEO 4.702 75 O 0.34 0.20 0.15 0.03 0.05 0.05 82.80% - On-going Road Construction of Flood Control Structures, Hinulugang Taktak Bell Construction 27851 11/27/2019 Rizal 1st DEO 19.600 210 O 0.39 0.30 0.15 0.03 0.06 0.05 97.20% - On-going river (Upstream Phase 3) LIP: Buildings and other Structures - Multi-purpose/ Facilities - Camarines Sur Beltran Sb Aga Gen. Merchandise & Const 30823 08/23/2019 3.901 135 O 0.34 0.27 0.12 0.03 0.03 0.03 83.10% - On-going Construction of Multi-purpose Building (Covered Court) 2nd DEO

Cluster VI-2017: Completion and Construction of Multi-Purpose Beltran SB Aga Gen. Merchandise & 30823 Buildings in Pioduran National High School & Brgy. 5, 04/03/2018 Albay 3rd DEO 6.803 150 C 0.46 0.20 0.30 - - - 96.30 82.58% Satisfactory Construction Cagmanaba Elementary School & Nagas

Beltran Sb Aga Gen. Merchandise & Building and other Structures - Multi-Purpose/ Facilities- Camarines Sur 30823 11/08/2019 3.901 135 C 0.50 0.13 0.30 - - - 93.40% 86.19% Satisfactory Construction Construction of Multi-Purpose Building. (Covered Court) 2nd DEO Organizational Outcome 1: Ensure Safe and Reliable National Beltran Sb Aga Gen. Merchandise & Road System Bridge Program - Retrofitting / Strengthening of Camarines Sur 30823 11/07/2019 12.586 90 C 0.50 0.13 0.21 - - - 84.00% 84% Satisfactory Construction Permanent Bridges - Hinulid Bridge (B00427LZ) Along Naga 3rd DEO City Boundary - Calabanga - Balongay Road

Bemkar Construction 33047 Extension of RC Pier and Provision of RoRo Ramp 06/21/2019 PPA 50.475 360 O 0.40 0.30 0.00 0.03 0.05 0.03 81.00 - On-going Bridge Program; Widening of Permanent Bridges; Laniton Camarines Norte Bemkar Construction 33047 11/10/2019 17.107 318 C 0.43 0.13 0.00 - - - 56.80% 75.46% Unsatisfactory Bridge (B04506LZ) along Daang Maharlika (LZ) DEO Organizational Outcome 1: Bridge Program; Widening of Camarines Norte Bemkar Construction 33047 Permanent Bridges; Laniton Bridge (B04506LZ) along Daang 08/20/2019 17.107 318 O 0.40 0.20 0.13 0.03 0.05 0.02 82.50% - On-going DEO Maharlika (LZ) Network Development - Road Widening-Primary Roads Daang Camarines Norte Bemkar Construction 33047 11/10/2019 27.925 138 O 0.37 0.24 0.00 0.03 0.06 0.00 69.70% - On-going Maharlika (LZ) K0360+111 - K0361+140 DEO Cofcaville Communal Irrigation System - Construction of Canal Benbubod Construction Corporation 42836 11/30/19 NIA 2.262 180 C 0.33 0.20 0.30 - - - 83.20 *83.20% Satisfactory Lining and Canal Structures Widening of Permanent Bridges - Tigbao Bridge (B00556MN) Bendimil Construction & Development along Pagadian City - Zamboanga City Road, K1854+360 to Regional Office 6135 11/04/2019 116.803 360 O 0.38 0.24 0.15 0.03 0.04 0.05 88.90% - On-going Corporation 1854+585.21 (Approach), K1854+585.21 to K1854+706.41 No. IX (Bridge), K1854+706.41 to K1854+800 (Approach) Construction of Reinforced Concrete Wall for Slope Protection Zamboanga del Benram Construction 32198 along Liloy - Siocon Rd. (S01146MN) K2010+946 to 11/06/2019 24.098 210 O 0.38 0.30 0.15 0.03 0.04 0.05 95.40% - On-going Norte 2nd DEO K2010+990, K2011+197 to K2011+249 Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones, Cupang-Poblacion Road Regional Office Berson'S Construction & Trading 31181 08/19/2019 6.934 60 O 0.39 0.30 0.06 0.03 0.05 0.00 83.00% - On-going Connecting Manila North Road in Support of Fish Processing No. I Industry Berson's Construction & Trading/Samantha Construction of River Control Revetment along Balincaguing Pangasinan 1st JV-16-1210 03/21/2018 19.508 310 C 0.42 0.20 0.30 - - - 91.80 88.58% Satisfactory Enterprises Joint Venture River (Poblacion Section) DEO Berson's Construction & Trading/T.F. Flores Construction of Bank Protection Works at Barangay Pangasinan 2nd JV-16-1448 03/20/2018 19.598 229 C 0.46 0.13 0.30 - - - 89.60 89.04% Very Satisfactory Builders & Supplies Joint Venture Domalandan DEO Berto Lucci Builders & Supply 32560 Construction of Dormitory Building II Phase 2 06/09/2019 DOST 8.824 245 C 0.48 0.20 0.30 - - - 98.40 *98.40% Outstanding

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 23 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Berto Lucci Builders & Supply 32560 Site Development Phase 5 (Design and Build Scheme) 06/09/2019 DOST 9.575 230 C 0.39 0.30 0.15 0.02 0.04 0.05 95.00 *95.00% Very Satisfactory Berto Lucci Builders & Supply 32560 Design and Build of Site Development 06/09/2019 DOST 29.991 280 C 0.48 0.20 0.30 - - - 98.40 0.94072 Very Satisfactory Provincial Bet Construction & Supply 31764 Rehabilitation of Malasiqui - Catablan Road 01/22/2019 Government of 82.982 266 O 0.389 0.30 0.15 0.03 0.05 0.05 96.90 - On - Going Pangasinan Provincial Bet Construction & Supply 31764 Rehabilitation of Malasiqui - Catablan Road 01/22/2018 Government of 82.982 281 O 0.32 0.30 0.15 0.03 0.05 0.05 90.40 - On - Going Pangasinan Agno River Basin and Allied Rivers Flood Control Project - Pangasinan 3rd Bet Construction & Supply 31764 Construction of Slope Protection Works along Agno River 06/08/2018 48.991 279 C 0.34 0.20 0.30 - - - 83.60 88.84% Satisfactory DEO Vacante - Pogo - Diaz Section NIA / Pangasinan Irrigation Bet Construction & Supply 3174 Concrete Canal Lining at Asan Communal Irrigation system 11/07/2020 3.694 270 C 0.33 0.20 0.30 - - - - 82.90% Satisfactory Management Office Bet Construction & Supply 3174 Asan Communal Irrigation System 07/11/2020 NIA 3.695 330 C 0.33 0.20 0.30 - - - 8290.00% *82.90% Satisfactory Construction of Protection Works along Angalacan Road, Pangasinan 4th Bet Construction & Supply 31764 08/22/2019 47.476 195 O 0.36 0.24 0.15 0.03 0.06 0.05 89.00% - On-going Barangay Baloling DEO Pangasinan 3rd Bet Construction & Supply 31764 Construction of Flood Control Structure along Aloragat River 11/05/2019 47.355 251 O 0.40 0.24 0.15 0.03 0.05 0.03 90.00% - On-going DEO Asset Preservation - Construction / Upgrading / Rehabilitation of Bet Construction & Supply / Alphin Trading & Drainage along National Roads - Secondary Roads - Alaminos - Pangasinan 1st 06/05/2018 46.550 270 O 0.309 0.240 0.150 0.030 0.045 0.050 82.40 - On-going Construction (Joint Venture) Bolinao Road (K0321+(-204) to K0321+600, K0336+927 to DEO K0339+533 Rehabilitation of Flood Mitigation Facilities within Major River Bet Construction & Supply / M.G. Lualhati Basins and Principal Rivers, Construction of Flood Control Regional Office JV-18-1257 11/09/2019 57.053 180 C 0.47 0.13 0.30 - - - 90.10% 90.1% Very Satisfactory Construction Corp. Joint Venture System along Abra River (Upstream and Downstream) of No. I Calungbuyan Bridge Consruction of 2-Units 3 STY 3 CL RW Brooke's Point National Palawan 2nd Beta-J Construction 36442 08/20/2019 27.270 225 O 0.39 0.30 0.03 0.03 0.06 0.00 79.70% - On-going High School, Pangobilian NHS ProvincialDEO Upgrading of Tampakan-Tablu-Boundary Road, Tampakan, Better Work Construction 24432 03/12/2020 Government of 13.643 132 O 0.36 0.30 0.15 0.03 0.05 0.05 94.10 - On-going South Cotabato South Cotabato Better Work Construction 24432 Malitubog Maridagao Irrigation Project II 03/10/2018 NIA 35.76 667 O 0.333 0.300 0.095 0.023 0.042 0.050 84.30 - On-going Channel Excavation with Revetment along Allah River (Dajay South Cotabato Better Work Construction 24432 11/19/2019 19.549 115 C 0.46 0.13 0.30 - - - 89.20% 89.8% Very Satisfactory Section) 1st DEO Channel Excavation with Revetment aling Allah River (Dajay South Cotabato Better Work Construction 24432 08/19/2019 19.549 115 O 0.37 0.24 0.15 0.03 0.06 0.05 90.20% - On-going Section) 1st DEO Provincial Upgrading of Junction National Highway-Cebuano-Kipalbig- Better Work Construction 24432 08/26/2020 Government of 22.515 135 O 0.34 0.30 0.15 0.03 0.06 0.05 9350.00% - On-going Boundary Road, Tupi, South Cotabato South Cotabato Construction /Maintenance of Flood Mitigation Structures and Bhenllabien Builders Construction 36496 Drainage Systems - Construction of Flood Mitigation Structures - 11/18/2019 Laguna 2nd DEO 39.190 216 O 0.40 0.24 0.15 0.03 0.06 0.05 92.10% - opn Construction of River Control along Maitim Waterways Asset Preservation - Rehabilitation / Reconstruction of Roads Upper Kalinga Bhm Construction 30724 with Slips, Slope Collapse and Landslide along Kalinga - Abra 09/08/2019 95.048 433 C 0.48 0.13 0.26 - - - 87.00% 87.15% Satisfactory DEO Road Bridge Retrofitting/ Strengthening Oling Brideg along Kalinga - Upper Kalinga Bhm Construction 30724 06/21/2019 7.680 125 C 0.49 0.13 0.30 - - - 92.60% 82.94% Satisfactory Abra Road DEO Construction/ Improvement of access Roads Leading to Upper Kalinga Bhm Construction 30724 Declared Tourism Destinations - Bulo Nawoy Road Leading to 11/21/2019 9.563 150 C 0.49 0.13 0.30 - - - 92.70% 78.72% Unsatisfactory DEO Bulo - Nawoy Rice Terraces Retrofitting /Strengthening of Oling Bridge along Kalinga - Abra Upper Kalinga Bhm Construction 30724 09/08/2019 7.680 85 O 0.40 0.30 0.00 0.03 0.04 0.00 76.50% - On-going Road DEO Construction / Improvement of Access Roads Leading to Upper Kalinga Bhm Construction 30724 declared Tourism Destinations - Bulo - Nawoy Road leading to 09/08/2019 9.563 90 O 0.39 0.24 0.00 0.03 0.03 0.00 69.40% - On-going DEO Bulo - Nawoy Rice terraces

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 24 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction/ Rehab. Of Flood Mitigation Facilities, Within Major Camarines Sur Bicol Goldrock Construction Corporation 32376 River Basins and Principal Rivers - Construction of Dike Bicol 11/08/2019 29.398 237 O 0.40 0.24 0.15 0.03 0.06 0.05 92.40% - On-going 2nd DEO River Basin Network Development Program, Road Widening - Secondary Big Bertha Construction And Development // Roads along Mt. Province Boundary - Calanan - Pinukpuk Lower Kalinga JV-18-1735 11/20/2019 60.097 215 O 0.39 0.24 0.15 0.03 0.06 0.05 91.60% - On-going Jtm Construction (Joint Venture) Abbut Road (Calanan - Pinukpuk Section), K0496+ (-700) - DEO K0497+313 Big Bertha Construction And Development/ Construction/ Improvement of Pato-o to Gabawan Local Road Athena Construction And Development Joint JV-17-2069 08/29/2019 Romblon DEO 46.188 279 C 0.48 0.13 0.25 - - - 86.10% 86.1% Satisfactory including Bridge, Pato-o to Gabawan Venture Convergence and Special Support Program: Construction/Improvement at Access Roads leading to Declared Negros Oriental Bigfoot Construction And Supply 24769 Tourism Destinations-Access Road Leading to Negros Oriental 11/11/2019 13.964 136 C 0.47 0.20 0.30 - - - 96.60% 93.24% Very Satisfactory 2nd DEO State University (Mabinay Campus) Going to Sitio Bangkal to Proper Old Namangka Leading to Cave, Brgy. Poblacion Convergence and Special Support Program: Negros Oriental Bigfoot Construction And Supply 24769 Construction/Improvement of Access Roads Leading to 08/20/2019 13.964 136 O 0.39 0.24 0.15 0.03 0.05 0.05 91.00% - On-going 2nd DEO Declared Tourism Destinations-Access Road Leading to Negros Bilrey Construction 32877 Madayaw Residences 12/07/2019 NHA 1045.000 946 O 0.38 0.29 0.11 0.03 0.06 0.03 90.43 - On-going

Bilrey Construction 32877 Guia Homes 1 10/28/18 NHA 144.88 548 D 0.49 0.20 0.24 - - - 92.38 83.65% Satisfactory Bilrey Construction / Eddmari Construction & 32877 / Tingib Homes 07/27/2018 NHA 289.870 815 O 0.37 0.30 0.12 0.02 0.07 0.03 90.73 - On - Going Trading - (JV) 20301 - JV- Bilrey Construction / Eddmari Construction & 32877 / Tingib Homes 6/21/19 NHA 289.870 905 C 0.47 0.20 0.22 - - - 89.13 90.25% Very Satisfactory Trading - (JV) 20301 - JV- Construction of Flood Mitigation Structure - Construction of Bislig Venture Construction & Dev'T. Inc. 36370 Flood Mitigation Structures within Mindanao River Basin (along 11/08/2019 Bukidnon 1st DEO 43.463 270 O 0.40 0.23 0.15 0.03 0.06 0.05 91.00% - On-going Pulangui River), Brgy. Lumbayao Section Bislig Venture Construction and Development 36370 Completion of Dormitory building I Phase 3 10/04/2018 DOST 50.549 475 C 0.35 0.20 0.30 - - - 85.44 93.32% Very Satisfactory Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Mt. Province 1st Bka Construction And Surveying 39361 09/10/2019 3.627 75 C 0.49 0.13 0.30 - - - 91.90% 91.9% Very Satisfactory Roads - Secondary Roads, Mountain Province - Cagayan via DEO Tabuk - Enrile Rd., K0398+407 - K0398+495, K0402+328 - K0402+369 BL Pangan Construction 25158 Completion of Academic Building III (Lab Building) Phase IV 10/11/2018 DOST 16.855 320 C 0.44 0.20 0.04 - - - 67.60 83.83% Satisfactory

BL Pangan Construction 25158 Construction of School Canteen - Annex Bldg. 10/11/2018 DOST 4.511 259 C 0.49 0.20 0.30 - - - 98.60 96.57% Outstanding Construction of Dormitory for Boys - Annex Building & BL Pangan Construction 25158 03/10/2019 DOST 37.382 583 C 0.45 0.20 0.30 - - - 95.20 0.9426 Very Satisfactory Construction of Dormitory for Girls - Annex Building BL Pangan Construction 25158 Construction of Motor Pool and Parking Area 03/10/2019 DOST 4.516 380 C 0.48 0.20 0.30 - - - 98.10 *98.10% Outstanding BL Pangan Construction 25158 Construction of Retaining Wall and Riprap 03/10/2019 DOST 9.417 380 C 0.48 0.20 0.30 - - - 98.00 0.8795 Satisfactory Design and Build of Advanced Science and Technology BLBS & Granby Trading and Construction - 06/09/2019 DOST 84.443 437 O 0.34 0.24 0.15 0.03 0.04 0.05 84.60 - On-going Building Construction of 1 Stry 2 Classrooms with Toilet @ Virginia F. Sultan Kudarat 1st Blimex Construction and Supply 27259 03/13/2018 2.716 105 OG 0.385 0.238 0.150 0.030 0.058 0.050 91.10 - On - Going Griño NHS DEO Lower Kalinga Bmj Builders 42191 Construction of Ngipen, Bantay Flood Control along Chico River 11/20/2019 28.922 247 C 0.48 0.13 0.30 - - - 91.20% 91.2% Very Satisfactory DEO Organizational Outcome 1: Ensure Safe and Reliable National Bmk Construction Corporation / A.I.P. Road System -- Bridge Program - Replacement of Permanent JV-18-1895 11/26/2019 CAR 126.092 360 O 0.39 0.30 0.15 0.03 0.04 0.03 94.00% - On-going Construction (Joint Venture) Weak Bridges Lunas Bridge (B04609LZ) along Junction Talubin - Barlig - Natonin - Paracelis - Calaccad Road

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 25 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Convergence and Special Support Program : Construction/Improvement of Access Roads leading to Declared Bmk Construction Corporation/A.I.P. JV-17-2656 Tourism destinations - Guisset - Binga - Baloy - Tinongdan 09/06/2019 CAR 140.287 360 C 0.48 0.20 0.20 - - - 87.90% 89.22% Very Satisfactory Construction Joint Venture Road leading to Binga Dam and Mt. Ugo, Site for International Sky Running Event

Construction/ Improvement of Access Roads Leading to Declared Tourism Destination San Isidro Sur - Poblacion - Lappa - Marag - Cadaclan - Salagunting Tourism Road Leading to Manacota Underground River, Dupag Rock Formations, Bmk Contruction Corporation 8292 11/30/2019 CAR 57.900 360 O 0.39 0.24 0.15 0.03 0.06 0.05 92.20% - On-going Cagandugan Hanging Bridge, Calayucay Waterfalls, Calabigan Caves, Siamsiambiri Waterfalls, Marag Heroes Shrine, Calanasan Critical Wildlife and Sanctuary, Ziwanan - Zumingi River and Maragmin Hotspring BMNY Construction and Enterprises 38417 Site Development at 60 Units Corehouses 9/13/19 NIA 5.220 28 O 0.27 0.30 0.15 0.02 0.07 0.02 82.88 - On-going Construction of Two (2) Storey 8-CL, Buenavista Special Agusan del Norte BN Builders & Construction Supplies 28232 03/22/2018 11.373 210 C 0.50 0.15 0.30 - - - 94.40 89.92% Very Satisfactory Education HS DEO Construction of 2 Sty 8-CL with Handwashing Facility, Agusan del Norte Bn Builders & Construction Supplies 28232 08/27/2019 23.324 180 C 0.49 0.13 0.30 - - - 91.90% 91.9% Very Satisfactory Buenavista SPED ES DEO Concreting of Leon Kilat St., Extension (Connecting Matabao Agusan del Norte Bn Builders & Construction Supplies 28232 08/15/2019 3.955 35 C 0.48 0.13 0.30 - - - 91.10% 91.1% Very Satisfactory and Tinago) in Brgy. Matabao DEO Construction/Improvement of Access Road Leading to Sumile Bn Builders & Construction Supplies 28232 11/14/2019 Butuan City DEO 9.797 72 C 0.48 0.13 0.30 - - - 91.70% 91.7% Very Satisfactory Zoological and Botanical Park, Brgy. Sumile Construction/Upgrading/Rehabilitation of Drainage along Agusan del Norte Bn Builders & Construction Supplies 28232 National Roads Tertiary Roads Buenavista-Bunaguit Road, 11/13/2019 14.688 163 O 0.34 0.24 0.15 0.03 0.04 0.05 85.00% - On-going DEO K1257+000 to K1257+554 Construction of Concrete Road with Slope Protection, Albuera- Bnr Construction & Development Corp. 12903 11/07/2019 Leyte 4th DEO 46.777 150 C 0.48 0.13 0.30 - - - 91.50% 91.2% Very Satisfactory Burauen Road (Albuera-Burauen Road (Albuera Section) Construction Flood Control Structure at Sapangdaku River Bnr Construction & Development Corp. 12903 08/24/2019 Cebu 3rd DEO 20.596 154 O 0.40 0.24 0.15 0.02 0.07 0.05 93.20% - On-going Basin along Toledo-Tabuelan-San Remegio Rd Construction of Flood Control Structure at Sapangdaku River Bnr Construction & Development Corp. 12903 Basin along Toledo - Tabuelan - San Remegio Rd., Sta. 0+060 - 11/09/2019 Cebu 3rd DEO 20.596 154 O 0.36 0.30 0.15 0.03 0.05 0.05 94.10% - On-going Sta. 01+305 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Maintenance of Flood Bnr Construction & Development Corp. 12903 11/04/2019 Cebu City DEO 69.500 314 O 0.40 0.24 0.15 0.03 0.05 0.05 91.50% - On-going Mitigation Structures and Drainage Systems - Construction of Flood Mitigation Structure at Kinalumsan River, Brgy. Buhisan Protect Lives and Properties Against Major Floods – FLood Bnr Construction & Development Corp. / Management Program, – Construction Maintenance of Flood, JV-18-1018 11/04/2019 Cebu City DEO 67.550 288 C 0.47 0.20 0.30 - - - 96.70% 96.1% Outstanding Flusskrebs Constructors (Joint Venture) Mitigation Structure and Drainage System – Construction of Flood Mitigation Structure Construction of Concrete Road with Slope Protection, Albuera - Bnr Construction & Development Corporation 12903 08/24/2019 Leyte 4th DEO 46.777 150 O 0.40 0.24 0.15 0.03 0.04 0.05 91.00% - On-going Burauen Road (Albuera Section) 002: Protect Lives and Properties Against Major Floods-Flood Bnr Construction & Development Corporation/ Management Program-Construction/Maintenance of Flood JV-18-1018 08/28/2019 Cebu City DEO 67.550 288 O 0.39 0.30 0.15 0.03 0.04 0.05 95.70% - On-going Flusskrebs Constructors (Joint Venture) Mitigation Structure and Drainage Systems-Construction of Flood Mitigation Structure Provincial Concreting of Maribojoc-Pagnitoan-Candavid-Tubuan-Basak BNYU Development Corporation 27725 07/20/2018 Government of 101.97 360 O 0.35 0.30 0.15 0.03 0.05 0.05 93.49 - On - Going (Loon) Road Bohol Provincial Concreting of Maribojoc-Pagnitoan-Candavid-Tubuan-Basak BNYU Development Corporation 27725 04/23/2019 Government of 101.970 506 C 0.46 0.20 0.30 - - - 96.45 94.67% Very Satisfactory (Loon) Road Bohol

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 26 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Asset Preservation Of National Roads- Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads Including Drainage Based on Pavement Management System/ BNYU DEVELOPMENT CORPORATION 27725 Highway Development Management -4 (HDM-4) Secondary 04/06/2018 Bohol 3rd DEO 20.441 155 C 0.49 0.13 0.30 - - - 92.50 *95.32% Very Satisfactory Roads Jct (TER) Jagna-Sierra Bullones Road, Section 1: KO063+390-KO063+910;Section 2: KO091+145-KO091+321; Section 3: KO091+377-KO091+886.68

Construction/Maintenance of Flood Mitigation Structures and Bnyu Enterprises & Construction 27725 08/24/2019 Bohol 1st DEO 28.510 209 O 0.39 0.24 0.15 0.03 0.07 0.05 92.20% - On-going Drainage Systems-Construction of Liboron Flood Control

Construction/Maintenance of Flood Mitigation Structures and Bnyu First Development Corporation 27725 11/05/2019 Bohol 1st DEO 285.100 209 O 0.26 0.30 0.15 0.03 0.06 0.05 84.80% - On-going Drainage Systems – Construction of Liboron Flood Control Boki Construction Services And Supply 43177 Construction of Local Road 11/26/2019 Ifugao 1st DEO 1.332 42 C 0.49 0.20 0.20 - - - 88.50% 88.5% Satisfactory Barbar Small River Irrigation Project, Package 13 - Construction Bonicab Builders 28100 10/26/19 NIA 8.034 240 C 0.45 0.10 0.30 - - - 85.00 *85.00% Satisfactory of Service Road & Drainage Structure Bonifacio M. Carlos Trading Corp. (Formerly: Improvement/Widening of National Roads, Puerto Princesa 3303 03/14/2018 Palawan 3rd DEO 18.823 225 C 0.48 0.13 0.30 - - - 91.20 89.46% Very Satisfactory Bonifacio M. Carlos Construction) North Road, K0037+304-K0037+1004 Pangasinan 2nd Bonimar Construction Enterprises 23760 Concreting of Drainage Canal at Barangay Libsong East 08/23/2019 2.969 79 C 0.49 0.13 0.30 - - - 92.20% 92.2% Very Satisfactory DEO Network Development , Road Widening of Primary Roads, La Union 2nd Bonimar Construction Enterprises 23760 Manila North Road, K0225+611 - K0226+169, K0226+196 - 08/29/2019 23.250 128 O 0.38 0.24 0.15 0.03 0.05 0.03 88.70% - On-going DEO K0226+637 Completion of Brgy. Magsaysay to Brgy. Cabitoonan Road, Sta. Surigao del Norte Boometrix Development Corp. 40441 06/03/2018 14.387 90 O 0.375 0.223 0.15 0.03 0.045 0.033 85.60 - On-going 0+000 to Sta. 0+298 2nd DEO Provincial Borderline Construction and Supply 24433 Concreting of Napanlahan - Dallag Road 01/08/2019 Government of 76.931 310 O 0.30 0.23 0.10 0.03 0.04 0.03 73.43 - On-going Cotabato Construction of Multi-Purpose Building (Covered Court) Ubay Zamboanga del Borgonia Construction And Enterprises 38141 11/06/2019 3.574 195 O 0.39 0.27 0.15 0.03 0.04 0.05 93.20% - On-going National High School, Brgy. Ubay Norte 2nd DEO Construction of Flood Control Structures/ Slope Protection Bpq Construction And Trading 12345 11/12/2019 Bataan 2nd DEO 16.517 147 C 0.48 0.13 0.30 - - - 91.10% 91.58% Very Satisfactory along Abo-abo River Construction of Flood Control Structures/Slope Protection along Bpq Construction And Trading 40632 08/23/2019 Bataan 2nd DEO 15.847 147 O 0.40 0.26 0.15 0.03 0.05 0.03 91.90% - On-going Abo-Abo River Retrofitting/Strengthening of Permanent Bridges, Gacub Bridge Surigao del Sur Bqpc Corporation 36768 (B01406MN) along Jct. Gamut-San Miguel Bayugan Road, San 11/09/2019 5.385 132 C 0.49 0.13 0.30 - - - 92.70% 88.86% Satisfactory 1st DEO Miguel, Surigao del Sur Retrofitting/Strengthening of Permanent Bridge, Gacub Bridge Surigao del Sur Bqpc Corporation 36768 08/23/2019 5.335 132 O 0.37 0.22 0.15 0.03 0.05 0.05 86.30% - On-going (B01406MN) along Jct. Gamut - San Miguel Bayugan Road 1st DEO Construction of Multi-Purpose Building (PNP Office) Camp South Cotabato Br Gultiano Construction 36401 08/28/2019 7.524 240 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Fermin Lira 2nd DEO Camarines Norte Brentmin Roofing Enterprise 37191 Road Opening of Purok Sais (6) going to Purok (5) 11/10/2019 24.001 167 C 0.50 0.13 0.09 - - - 72.00% 67.74% Poor DEO Camarines Norte Brentmin Roofing Enterprise 37191 Road Opening of Purok Sais (6) Going To Purok Singko (5) 08/20/2019 2.401 167 O 0.35 0.23 0.00 0.02 0.05 0.00 64.90% - On-going DEO Flood Management Program; Construction / Maintenance of Flood Mitigation Structures and Drainage Systems; Brentmin Roofing Enterprise / Eus Camarines Norte Construction of Mercedes River Control Structures and 06/01/2018 33.424 294 O 0.32 0.3 0.15 0.022 0.042 0.05 88.40 - on-going Construction Joint Venture DEO Drainage Systems; Construction of Mercedes River Control Structure ( San Roque Section ) Local Program - Local Infrastructure Project - Flood Control and Nueva Vizcaya 1st Brg Construction 21931 Drainage Flood Control Structure - Construction of Sta. Fe 11/11/2019 24.750 86 C 0.47 0.13 0.30 - - - 90.50% 90.5% Very Satisfactory DEO Control, Brgy. Indiana Section, Phase 3

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 27 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Flood Management Program Construction/Maintenance of Nueva Vizcaya Brg Construction 21931 Flood Mitigation Structures and Drainage System - Construction 11/13/2019 26.620 142 C 0.46 0.13 0.30 - - - 89.70% 89.7% Very Satisfactory 2nd DEO of Sta. Fe River Flood Control Structures, Mangayang Section Construction of Manga River Flood Control Structures, Bitnong Nueva Vizcaya Brg Construction 21931 11/12/2019 26.460 134 C 0.49 0.13 0.30 - - - 92.00% 92% Very Satisfactory Section, 2nd DEO Local Program - Local Infrastructure Project - Flood Control and Nueva Vizcaya 1st Brg Construction 21931 Drainage Flood Control Structure - Construction of Sta. Fe. 08/24/2019 23.760 86 O 0.36 0.21 0.15 0.03 0.06 0.05 86.10% - On-going DEO Control, Brgy. Indiana Section Phase 3 Construction of Concrete Barrier Protection for Agus 6 Brima Construction and Enterprises 8746 02/18/2019 NPC 6.385 150 C 0.50 0.20 0.08 - - - 78.13 *78.13% Unsatisfactory Hydroelectric Plant Brima Construction and Enterprises 8746 Const. of Student Learning Resource Center 01/08/2019 DOST 48.732 344 C 0.37 0.15 0.22 - - - 73.50 0.8923 Very Satisfactory Construction of 3 Storey, 15CL School Building Macabalan Cagayan de Oro Brima Construction And Enterprises 8746 11/12/2019 51.866 240 C 0.49 0.13 0.30 - - - 92.40% 87.36% Satisfactory Elementary School City 2nd DEO Construction of 3 Storey, 15 Classroom School Building Cagayan de Oro Brima Construction And Enterprises 8746 08/27/2019 51.866 240 O 0.40 0.20 0.15 0.03 0.03 0.05 85.30% - On-going Macabalan Elementary School City 2nd DEO Boracay Drainage Improvement Project Phase II, Packages 1 BSP & Company Inc. 19091 08/30/2018 TIEZA 200.000 365 O 0.33 0.2715 0.15 0.03 0.0233 0.05 85.49 - On - Going and 2 BSP & Company Inc. . B.M. Marketing Joint JV - 15 - 424 Calbayog Airport Development Project 08/21/2018 DOTr 273.588 471 C 0.49 0.20 0.30 - - - 99.00 95.30% Very Satisfactory Venture Aklan River Irrigation System Improvement Project - BSP & Company Inc. / Silver Dragon 19091 / Construction of Two (2) Diversion Dams of Aklan River Irrigation Construction & Lumber & Glass Supply Inc. 30835 - JV- System (East & West Side) and Appurtenant Structures 12/10/2019 NIA 374.466 820 O 0.35 0.21 0.13 0.03 0.07 0.05 83.70 - On-going (Formerly: Silver Dragon Construction & 17-458 including Supply, Delivery, Installation and Commissioning of Lumber & Glass Supply) (JV) Steel Gates BSP & Company, Inc. 19091 Roxas Airport Development Project 04/11/2019 DOTC 58.816 150 O 0.37 0.30 0.15 0.03 0.05 0.05 95.70 - On-going BSP & Company, Inc. 19091 Roxas Airport Development Project 12/07/2019 DOTC 58.816 150 C 0.47 0.20 0.30 - - - 97.20 96.30% Outstanding ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable Bstech Eng Construction Corp. / Jasmig National Road System, Bridge Program, Widening of Batangas 2nd JV-18-1626 11/20/2019 22.045 177 O 0.40 0.24 0.14 0.02 0.05 0.03 87.90% - On-going Construction Corporation Joint Venture Permanent Bridges, San Pedro Br. (BO2925LZ) along Bauan- DEO Mabini Rd. Construction of Flood Mitigation Structure-Construction of Btcjr Construction And Engineering Services 38675 09/05/2019 Benguet 2nd DEO 4.274 88 O 0.39 0.23 0.15 0.03 0.05 0.03 88.40% - On-going Bacawatan Flood Control Construction of Flood Mitigation Structure - Construction of Btcjr Constructions And Engineering Services 38675 11/21/2019 Benguet 2nd DEO 4.274 88 C 0.50 0.13 0.30 - - - 90.36% 93.3% Very Satisfactory Bacawatan Flood Control Buffalo Construction and Supply 34179 Construction of Maranhog Diversion Dam 07/16/2019 DA 9.283 135 O 0.35 0.28 0.15 0.03 0.06 0.05 92.20 - On-going

Buffalo Construction and Supply 34179 Construction of Maranhog Diversion Dam 09/24/2019 DA 9.283 178 O 0.33 0.28 0.00 0.03 0.05 0.05 73.87 - On-going

Construction/Improvement of Access Road Leading to Declared Tourism Destinations-Construction of Concrete Road-Cudog- Ifugao 1st DEO, Bugani Construction And Enterprises Inc. 36435 05/31/2018 34.429 269 O 0.335 0.297 0.072 0.03 0.035 0.033 80.20 - On-going Munggayang-Kiangan Road Leading to Ambuwaya Lake, CAR Yamashita Shrine and Kiangan Settlement Provincial Bugani Contruction & Enterprises, Inc. 36435 Improvement of Zamora-San Quintin-Bangar Road 6/25/20 Government of 45.431 178 O 0.33 0.23 0.15 0.02 0.04 0.05 8143.00% - On-going Ifugao C & F Construction & Development Improvement of Sta. Catalina St, San Simon St. and BF Homes Quezon City 1st 3509 06/05/2018 18.413 210 O 0.393 0.24 0.15 0.022 0.05 0.033 88.80 - On-going Corporation Road DEO Preventive Maintenance (Asphalt Overlay) Along IBP/San C & F Construction & Development Quezon City 1st 3509 Mateo Road, Q.C. A) S055180LZ K0020+(-745) to K0021+415; 11/25/2019 55.871 180 C 0.45 0.14 0.30 - - - 88.30% 88.3% Satisfactory Corporation DEO B) S05181LZ K0021+(-423) to K0020+756 C & F Construction & Development Quezon City 2nd 3509 Improvement of Roads, Sct. Chuatoco Street 08/27/2019 18.597 183 O 0.28 0.30 0.15 0.03 0.05 0.05 86.00% - On-going Corporation DEO Preventive Maintenance of Road (Asphalt Overlay) along C & F Construction & Development Quezon City 1st 3509 Avenue, K0013+177.2 - K0013+616 and K0013+639 08/22/2019 25.889 180 O 0.39 0.24 0.15 0.03 0.05 0.05 91.10% - On-going Corporation DEO to K0014+328 with exception

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 28 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Calbiga Irrigation Project - Construction of Concrete Canal C D U Construction 13915 Lining, Canal Structures, Terminal Facilities and Project 12/14/19 NIA 60.859 560 O 0.39 0.30 0.00 0.02 0.06 0.05 82.10 - On-going Facilities of Calbiga IP Retrofitting/Strengthening of Permanent Bridges, Cabatuan Br. Northern Samar C D U Construction 13915 (B00305SM) along Pangpang-Palapag-Mapanas-Gamay- 08/21/2019 18.011 90 C 0.43 0.20 0.30 - - - 92.70% 92.7% Very Satisfactory 2nd DEO Lapinig Rd. C D U Construction / Jbm Engineers And Retrofitting/Strentghening of Permanent Bridges, Las Navas Br. Northern Samar JV-18-628 08/20/2019 43.970 150 O 0.36 0.23 0.15 0.03 0.04 0.05 86.50% - On-going Supply (Joint Venture) (B00559SM) along Arteche-Jipapad-Las Navas-Rawis Rd. 2nd DEO

C. B Garay Philwide Builders 6004 Giporlos Greenfields 03/13/2020 NHA 215.170 985 O 0.34 0.28 0.14 0.03 0.07 0.03 9031.00% - On-going

C. J. Construction, Inc. JV-14-1100 Construction of Port Operations Building 01/26/2018 PPA 58.74 420 C 0.50 0.20 0.19 - - - 88.40 91.41% Very Satisfactory

C. R. Domingo Construction, Inc. (Formerly: 6004 Green Park Site 12 01/27/2018 NHA 232.990 404 O 0.332 0.256 0.150 0.030 0.051 0.050 86.89 - On-going C. R. Domingo Construction)

Implementation of Civil Works of Contract Package IV, Plaridel C. R. Domingo Construction, Inc. (Formerly: Bypass Road, Sta. 049+625 to Sta. 057+365.73, Under Arterial 183 03/21/2018 UPMO RMC-I 562.322 780 OG 0.374 0.298 0.150 0.03 0.0513 0.05 95.33 - On - Going C. R. Domingo Construction) Road Bypass Project, Phase II, JICA Loan Agreement No. PH- P250, Province of Bulacan MFO 1-National Road Network Services-Asset Preservation of C. R. Domingo Construction, Inc. (Formerly: National Roads-Rehabilitation/Reconstruction/Upgrading of 18505 03/23/2018 North Manila DEO 19.598 276 C 0.45 0.20 0.30 - - - 94.60 91.42% Very Satisfactory C. R. Domingo Construction) Damaged Paved National Roads including Drainage based on PMS/HDM-4 H. Lopez Blvd K0006+383.5-K0006+611.25 Rehabilitation/Reconstruction of National Roads with Slips, C. R. Domingo Construction, Inc. (Formerly: 29494 Slope Collapse and Landslide along Masbate-Cataingan-Placer 04/10/2018 Masbate 1st DEO 16.218 190 C 0.50 0.20 0.30 - - - 87.90 84.06% Satisfactory C. R. Domingo Construction) Road, K0018+037 – K0018+530 C. R. Domingo Construction, Inc. (Formerly: 2992 Repair/Maintenance of Cosili Flood Control 04/04/2018 Ifugao 2nd DEO 1.958 185 C 0.40 0.20 0.30 - - - 90.00 88.91% Satisfactory C. R. Domingo Construction) C..T. Leoncio Construction & Trading/Arq Regional Office Rehabilitation of San Luis - Binicalan Road (Phase 3) 06/05/2018 120.943 335 C 0.44 0.20 0.30 - - - 93.70 93.80% Very Satisfatory Builders Joint Venture No. XIII C.B. Garay Philwide Builders 6004 Green Park 2 8/16/19 NHA 232.990 800 O 0.36 0.29 0.02 0.03 0.07 0.02 78.87 - On-going

Construction of Concrete Road- Sitio Lomboy, Brgy. C.B. Garay Philwide Builders 6004 Linambasan to Brgy. Ganzon, Brgy. Jaena and Brgy. San Juan 08/24/2019 Capiz 2nd DEO 27.746 140 O 0.37 0.24 0.15 0.03 0.06 0.05 88.80% - On-going to National Highway in support to Abaca Industry,

Local Program: Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Project, Water C.B. Garay Philwide Builders 6004 08/21/2019 Cebu 4th DEO 32.583 186 O 0.40 0.24 0.15 0.02 0.04 0.03 88.80% - On-going Management Facilities/Water Supply, Construction of Water Supply Project, Oslob, Cebu Construction of River Control along Ala River (Taga Section), Sultan Kudarat 1st C.B. Garay Philwide Builders 6004 08/26/2019 46.535 274 O 0.38 0.28 0.10 0.03 0.05 0.03 86.70% - On-going Tinumiguez, Lambayong, Sultan Kudarat DEO Construction of Concrete Road- Sitio Lomboy, Brgy. Regional Office C.B. Garay Philwide Builders 6004 Linambasan to Brgy. Ganzon, Brgy. Jaena and Brgy. San Juan 08/24/2019 27.746 140 O 0.37 0.24 0.15 0.03 0.06 0.05 88.80% - On-going No. VI to National Highway in support to Abaca Industry, Jamindan C.B. Garay Philwide Builders / Castillanes Sultan Kudarat JV-18-743 Construction of River Bank Protection/Flood Control 08/24/2019 46.371 200 O 0.39 0.24 0.15 0.03 0.05 0.05 90.00% - On-going Construction And Supply (Joint Venture) 2nd DEO C.B. Garay Philwide Builders / D.O.T. Misamis Oriental JV-17-2655 Construction of 4 Storey 10 Laboratories, Salay NHS 08/26/2019 42.197 315 C 0.49 0.13 0.26 - - - 88.80% 88.8% Satisfactory Construction (Joint Venture) 1st DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 29 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) C.B. Garay Philwide Builders / Eins Hana Construction of River Control along Kabulakan Lambayong, Sultan Kudarat 1st JV-17-2185 08/26/2019 43.632 274 O 0.39 0.24 0.11 0.03 0.05 0.03 84.10% - On-going Construction Sultan Kudarat DEO Construction of 1 Unit 2 Storey ICT lab, 2 Storey Sci Lab at Mindoro Oriental C.B. Tampengco Construction & Supply 18505 08/22/2019 17.029 315 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory Fortuna NHS, Socorro DEO Organizational Outcome 2: Protect Lives and Properties against Major Floods- Flood Management Program- C.D.J. Builders & Construction Supplies/ Nueva Vizcaya 1st Construction/Maintenance of Flood Mitigation Structures and 06/06/2018 18.810 158 O 0.400 0.300 0.102 0.015 0.025 0.033 87.50 - On-going B.R.G. Construction (Joint Venture ) DEO Drainage Systems- Construction of Flood Control Structures, Bagahabag Section along Magat River C.F. Trinidad Construction And Supplies Asset Preservation-Preventive Maintenance-Tertiary Roads, 9199 05/27/2019 Rizal 1st DEO 19.600 90 C 0.46 0.13 0.30 - - - 89.20% 89.2% Very Satisfactory Corp. Taytay Diversion Road, K0023+056 - K0023+378 Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, C.L. Carandang Enterprises 29494 Rehabilitation/Reconstruction/ Upgrading of Damaged Paved 08/23/2019 Masbate 3rd DEO 20.682 141 O 0.39 0.24 0.15 0.03 0.07 0.05 92.50% - On-going Roads, Buenavista - Kawayan Road, K0056+284 to K0056+851 Malabon-Navotas C.L. Morales Construction And Trading 38367 Rehabilitation of Road, Bangus St., Brgy. NBBS Kaunlaran 08/30/2019 8.143 135 O 0.38 0.24 0.15 0.03 0.06 0.05 90.30% - On-going DEO C.R. Domingo Construction And Power Rehab./Improvement of Various Flood Control Structures in 2992 11/07/2019 Isabela 4th DEO 45.427 280 C 0.47 0.20 0.18 - - - 85.10% 85.73% Satisfactory Development, Inc. Isabela - Abulan (Sta. 0+000 - Sta. 0+426) C.R. Domingo Construction And Power Rehabilitation/Improvement of Various Flood Control Structures 2992 08/21/2019 Isabela 4th DEO 44.061 250 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory Development, Inc. in Isabela, Dalibubon (Sta.0+000 to Sta.0+426) C.R. Domingo Construction And Power Rehabilitation/Improvement of Various Flood Control Structures 2992 08/21/2019 Isabela 4th DEO 45.248 280 O 0.38 0.24 0.09 0.03 0.05 0.03 83.40% - On-going Development, Inc. in Isabela - Diarao (Sta.0+000 to Sta.0+406) C.R. Domingo Construction And Power Rehab./ Improvement of Various Flood Control Structures in 2992 08/21/2019 Isabela 4th DEO 45.427 280 O 0.37 0.24 0.11 0.03 0.05 0.03 83.40% - On-going Development, Inc. Isabela - Abulan (Sta. 0+000 - Sta. 0+426) C.R. Domingo Construction And Power 2992 Concreting of Bagabag - Biga Oriental - Biga Occidental Road 08/28/2019 Isabela 1st DEO 18.808 118 O 0.36 0.24 0.14 0.03 0.04 0.03 84.00% - On-going Development, Inc. C.R. Domingo Construction And Power Construction of Four (4) Storey Sixteen (16) Classroom School Development, Inc. / Montalban Concrete And JV-18-659 09/02/2019 Rizal 2nd DEO 48.513 317 O 0.39 0.22 0.15 0.03 0.05 0.05 89.00% - On-going Building at Jr. Elementary School Asphalt Inc. Joint Venture C.S. Rayos Construction & General Serices, CY 2017 Basic Educational Facilities Fund, Construction of Batangas 2nd 9790 06/20/2018 36.941 270 O 0.400 0.239 0.102 0.030 0.035 0.033 83.90 - On-going Inc. 4STY 16 CL at Alangilan Senior High School DEO Construction of Flood Control Wall along Marilao River C.T. Leoncio Construction & Trading 17371 06/18/2018 Bulacan 2nd DEO 46.476 170 O 0.376 0.3 0.15 0.03 0.042 0.05 94.80 - On-going Poblacion I- Poblacion Construction of Flood Control Structure along Embarcadero Sorsogon 2nd C.T. Leoncio Construction & Trading 17371 08/19/2019 37.634 317 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory River DEO Asset Preservation Program - Preventive Maintenance - Primary C.T. Leoncio Construction & Trading / Roads - Daang Maharlika (LZ) - K0077+00-K0077+320, Bhenllabien Builders Construction Joint JV-18-944 11/20/2019 Laguna 3rd DEO 92.740 135 C 0.46 0.20 0.30 - - - 95.80% 95.8% Very Satisfactory K0079+500-K0079+620, K0079+650.63-K0081+100, Venture K0083+580-K0084+068, K0085+000-K0085+150 Organizational Outcome 1: Ensure Safe and Reliable National Road System Network Development Program Construction of C.T. Leoncio Construction & Trading / Jasmig Regional Office JV-17-2251 By-Pass and Diversion Roads BATANGAS CITY - SAN 09/04/2019 121.657 380 C 0.50 0.18 0.30 - - - 97.50% 97.5% Outstanding Construction Corporation Joint Venture No. IV-A PASCUAL - BAUNAN ROAD (SECTION 1), PACKAGE B, INCLUDING ROW AND BRIDGE C.T. Leoncio Construction & Trading / Jobel Widening of National Roads, Tertiary Roads, - Caliraya JV-171467 11/21/2019 Laguna 1st DEO 96.500 455 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory Enterprises Joint Venture Road (S01674LZ), K0100+564-K0103+310 C.T. Leoncio Construction & Trading / Construction of Four (4) Storey Sixteen (16) Classroom School Las Piñas - Kpgonzales Construction Supply And Trading JV-18-997 11/23/2019 39.083 300 C 0.49 0.20 0.30 - - - 98.60% 92.23% Very Satisfactory Building at Muntinlupa National High School, Brgy. Poblacion Muntinlupa DEO (Joint Venture) C.T. Leoncio Construction & Trading / Construction of Four (4) Storey Sixtenn (16) Classroom School Las Piñas- Kpgonzales Construction Supply And Trading JV-18-997 08/10/2019 39.083 300 O 0.38 0.27 0.15 0.03 0.05 0.02 89.50% - On-going Building at Muntinlupa National High School Muntinlupa DEO Joint Venture

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 30 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Organizational Outcome 2: Protect Lives and Properties Against C.T. Leoncio Construction & Trading / M.V. Major Floods - Flood Management Program - Construction / Caldo Construction And Supply Corporation JV-18-548 Maintenance of Flood Mitigation Structures and Drainage 11/08/2019 North Manila DEO 43.427 165 O 0.38 0.24 0.15 0.03 0.04 0.05 89.00% - On-going (Joint Venture) Systems - Bank Improvement, Estero se Vitas, Sta. 0+801.67 to Sta. 0+916.67 C.T. Leoncio Construction & Trading / Magna Construction/Improvement of Access Roads Leading to JV-17-1957 09/04/2019 Laguna 1st DEO 85.465 300 C 0.48 0.12 0.30 - - - 89.50% 89.5% Very Satisfactory Rich Trading & Construction Declared Tourism Destinations, Ilog Romero C.T. Leoncio Construction and Trading 17371 Tayamaan Port Development Project 06/20/2019 DOTC 33.366 330 O 0.40 0.30 0.11 0.02 0.05 0.03 91.50 - On-going

C.T. Leoncio Construction and Trading 17371 Sablayan Port Development Project 06/21/2019 DOTC 46.980 240 O 0.40 0.30 0.09 0.02 0.06 0.03 90.70 - On-going

C.T. Leoncio Construction and Trading 1711 Romblon Airport Development Project 05/30/19 DOTC 35.594 180 C 0.45 0.20 0.30 - - - 95.00 *95.00% Very Satisfactory C.V. Construction & Development / Cean Maasin Airport Development Project - Excavation and JV-17-131 8/27/19 DOTR 25.864 254 C 0.44 0.20 0.30 - - - 93.60 *93.60% Very Satisfactory Construction (JV) Embankment Construction / Improvement of Access Roads leading to Misamis Oriental Cagalawan Enterprises 38019 Declared Tourism Destinations, Access Road leading to Takob 11/11/2019 9.796 105 C 0.48 0.13 0.30 - - - 91.50% 86.1% Satisfactory 1st DEO Cold Spring Construction/ Improvement of Access Roads Leading to Misamis Oriental Cagalawan Enterprises 38019 Declared Tourism Destinations, Access Road Leading to 08/26/2019 16.701 90 O 0.38 0.21 0.15 0.02 0.05 0.05 85.70% - On-going 1st DEO Tiningalan Viewing Deck Construction/ Improvement of Access Roads Leading to Misamis Oriental Cagalawan Enterprises 38019 Declared Tourism Destinations, Access Road Leading to Takob 08/26/2019 9.230 105 O 0.36 0.21 0.15 0.02 0.04 0.05 82.50% - On-going 1st DEO Cold Spring Construction/ Improvement of Access Roads Leading to Misamis Oriental Cagalawan Enterprises 38019 08/26/2019 9.309 133 O 0.36 0.24 0.15 0.02 0.04 0.05 85.80% - On-going Seaports, Access Road Leading to Balingoan Port 1st DEO Cluster II - Construction / Improvement of Access Roads Cajugotan Construction & Supply 41979 Leading to Declared Tourism Destination on the First District of 11/06/2019 Albay 1st DEO 29.400 141 O 0.40 0.24 0.15 0.01 0.06 0.05 90.40% - On-going Albay Camberwell Construction And Supplies 39624 Construction of Multi-Purpose Building 11/11/2019 Isabela 2nd DEO 4.676 120 O 0.33 0.27 0.15 0.02 0.03 0.03 83.80% - On-going Reconstruction to Concrete Pavement Guimbal-Igbaras- Camcu Construction & Supplies 18507 Tubungan-Leon Rd. KO069+209 - KO069+578; KO069+598 - 11/13/2019 Iloilo 4th DEO 17.740 134 O 0.37 0.24 0.15 0.03 0.04 0.05 87.50% - On-going KO069+978 Cagayan 2nd Camia Const. Development Corporation 20506 Construction of Water Supply Project 05/30/2018 17.640 270 O 0.399 0.299 0.045 0.015 0.017 0.033 80.80 - On-going DEO ORGANIZATIONAL OUTCOME 1:Ensure Safe and Reliable National Road System - Network Development Program - Off- Carriageway Improvement Secondary Roads - Abbut - Conner Camia Const. Development Corporation 20506 09/09/2019 Apayao 1st DEO 34.580 200 O 0.39 0.24 0.15 0.03 0.06 0.05 92.00% - On-going Road - K0552+185 to K0552+737, K0559+120 to K0560+314, K0561+872 to K0561+935, K0561+951 to K0562+308, K0562+552 to K0563+232 Organizational Outcome 1: Ensure Safe and Reliable National Road System - Network Development Program - Off- Carriageway Improvement Secondary Roads -Abbut - Conner Camia Const. Development Corporation 20506 11/22/2019 Apayao 1st DEO 34.580 200 O 0.38 0.24 0.15 0.03 0.06 0.05 90.50% - On-going Road K0552+185 - K0552+737, K0559+129 - K0560+314, K0561+872 - K0561+935, K0561+951 - K0562+308, K0562+552 - K0563+232 Ensure Safe and Reliable National Road System, Bridge Camia Const. Development Corporation 20506 Widening of Permanent Bridges, Barucbuc Br. (B03199) along 11/08/2019 Cagayan 3rd DEO 23.843 209 O 0.38 0.24 0.15 0.02 0.05 0.05 89.10% - On-going Cagayan Valley Road Camia Construction and Development 20506 Calayan Airport Development Project 03/26/19 DOTC 9.125 105 C 0.41 0.20 0.30 - - - 90.50 *90.50% Very Satisfactory Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse and Landslide along Mt. Province Bdry - Calanan - Pinukpuk - Abut Road (Calanan - Lower Kalinga Capcon Realty And Development 42176 Pinukpuk Section) K0500+837 - K0500+977, K0502+040 - 11/20/2019 11.046 150 O 0.38 0.24 0.15 0.03 0.06 0.05 90.90% - On-going DEO K0502+120, K0502+157 - K0502+180, K0502+160 to K0502+187, K0507+572 - K0507+757, K0516+051 - K0516+151, K0519+600 - K0519+630

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 31 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Multi-Purpose Building - Upgrading/ Renovation Mindoro Capitol Builders And Construction Supplies 36777 11/09/2019 9.497 195 O 0.39 0.25 0.15 0.03 0.06 0.05 92.90% - On-going of Multi-Purpose Building Occidental DEO Metro Manila 3rd Cardrian Builders Co. 25673 Construction of Valenzuela Convention Center, Brgy Pinturin 08/29/2019 198.105 450 O 0.39 0.23 0.11 0.03 0.05 0.03 84.50% - On-going DEO Construction/Maintenance of Flood Mitigation Structures and Carl Josh Builders 33437 Drainage System, Construction/Rehabilitation of Sitio Bato, 11/13/2019 Marinduque DEO 14.467 180 O 0.39 0.24 0.15 0.03 0.04 0.05 90.30% - On-going Janagdong Flood Control Lamut Bridge (B01361LZ) along Nueva Vizcaya - Ifugao - Mt. Carlyz Construction 19776 11/26/2019 Ifugao 1st DEO 6.332 60 C 0.50 0.20 0.18 - - - 88.00% 88% Satisfactory Province Road Provincial Cartesian Builders 35386 Concreting of Matinao-Binga Road 01/10/2019 Government of 19.287 128 O 0.31 0.30 0.15 0.01 0.02 0.03 82.36 - On - Going Surigao del Norte Cartesian Builders 35386 Concreting of Ombong-Camp Edward Road 12/10/2019 Surigao del Norte 22.612 170 C 0.42 0.16 0.30 - - - 88.00 *88.01% Satisfactory Cartesian Builders 35386 Concreting of Magupangi Feeder Road 12/10/2019 Surigao del Norte 18.618 155 C 0.38 0.16 0.30 - - - 84.30 *84.31% Satisfactory Construction of Flood Control Structure - Construction of Northern Samar Catarman Builders Construction 37123 11/06/2019 15.268 197 O 0.39 0.24 0.15 0.02 0.03 0.03 86.50% - On-going Caglanipao River Control 1st DEO Construction/ Improvement of Access Roads Leading to Regional Office Cavacon Corporation 2622 Deaclared Tourism Destination, Dinadiawan - Ditawani By-pass 08/21/2019 128.347 450 O 0.39 0.30 0.05 0.03 0.05 0.03 84.30% - On-going No.III Road Leading to Tourism Sites/ Destinations Asset Preservation Program- Construction/Upgrading/Rehabilitation of Drinage along Mindoro Cavacon Corporation 2622 National Roads-Secondary Roads, Mindoro West Coastal Road- 08/19/2019 47.807 280 O 0.32 0.30 0.14 0.03 0.05 0.00 82.90% - On-going Occidental DEO KO335+500-KO337+200, KO348+250-KO349+000, KO396+000-KO397+635 (S00095MR)

Cavacon Corporation (Formerly: Cagayan 2622 Construction of Series of Groundsill along Baul River 06/20/2018 Aurora DEO 49.000 334 O 0.389 0.249 0.150 0.030 0.030 0.033 88.10 - On-going Valley Construction Corporation)

Cavdeal-Cavite Ideal International Construction And Development Corporation 39586 World War II Marker 07/18/2019 TIEZA 12.000 480 O 0.327 0.266 0.150 0.030 0.070 0.050 89.30 - On-going (Formerly: Cavite Ideal Int'L. & Dev. Corp.)

CAVDEAL-Cavite Ideal International Procurement of Fully Developed Lots and Complete Housing Construction and Development Corporation 5599 01/26/18 NHA 290.000 862 D 0.40 0.20 0.24 - - - 84.29 84.13% Satisfactory Units (Formerly: Cavite Ideal Int'l. & Dev. Corp.) CAVDEAL-Cavite Ideal International Construction and Development Corporation 5599 Basey Pointe 2 02/03/2018 NHA 225.387 636 D 0.32 0.27 0.00 0.03 0.05 0.03 70.66 - On - Going (Formerly: Cavite Ideal Int'l. & Dev. Corp.) CAVDEAL-Cavite Ideal International Construction and Development Corporation 5599 Basey Pointe 2 03/22/19 NHA 226.160 688 C 0.46 0.20 0.00 - - - 66.33 69.36% Poor (Formerly: Cavite Ideal Int'l. & Dev. Corp.)

CB Garay Philwide Builders 6004 Giporlos Greenfield 11/26/2018 NHA 212.170 325 O 0.33 0.30 0.00 0.03 0.05 0.03 74.05 - On - Going Bingan Communal Irrigation System - Construction of Canal C-Bros Construction 36606 11/30/19 NIA 6.709 180 O 0.35 0.24 0.15 0.02 0.01 0.05 82.60 - On-going Lining and Canal Structures Mataddi 2 Small Irrigation Project - Construction of Diversion C-Bros Construction 36606 11/30/19 NIA 13.420 240 O 0.38 0.23 0.15 0.02 0.01 0.03 82.60 - On-going Dam, Canal Lining and Canal Structures Macate Communal Irrigation System - Construction of Canal C-Bros Construction 36606 11/30/19 NIA 3.352 180 C 0.33 0.20 0.30 - - - 83.20 *83.20% Satisfactory Lining and Canal Structures Construction of Multi-purpose Building at Upper Gabriela C-Bros Construction 36606 06/06/2019 Quirino DEO 2.475 120 C 0.49 0.13 0.30 - - - 91.90% 91.9% Very Satisfactory Elementary School C-Bros Construction 36606 Local Infrastructure Program - Construction of Local Road 11/27/2019 Ifugao 2nd DEO 1.920 28 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory C-Bros Construction 36606 Construction of Multi-Purpose Building at Barangay Banuar 08/20/2019 Quirino DEO 4.452 135 O 0.36 0.24 0.15 0.00 0.05 0.05 85.80% - On-going C-Bros Construction 39586 Old Light House Restoration 07/18/19 TIEZA 5.500 232 C 0.44 0.20 0.30 - - - 93.90 93.90% Very Satisfactory

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 32 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Convergence and Special Support Program Construction /Improvement of Access Road Leading to Declared Tourism Ccmaluenda Construction Inc. 11043 11/07/2019 Bohol 2nd DEO 14.584 94 C 0.50 0.18 0.30 - - - 97.80% 95.28% Very Satisfactory Destinations- Lomangog Brgy. Road Leading to Ubay Stock Farm, Brgy. Lomangog Construction/ Improvement of Access Roads leading to Airports - Ccmaluenda Construction Inc. 11043 Jct. Dauis–Panglao Road to Lourdes-Bolod-Tawala leading to 11/05/2019 Bohol 1st DEO 47.038 178 O 0.40 0.24 0.15 0.03 0.06 0.05 92.10% - On-going New Bohol International Airport Construction/Improvement of Access Roads leading to Airports- Ccmaluenda Construction, Inc. 11043 Jct. Dauis-Panglao Road to Lourdes-Bolod-Tawala leading to 08/24/2019 Bohol 1st DEO 47.038 178 O 0.40 0.24 0.15 0.03 0.06 0.05 93.00% - On-going New Bohol International Airport 003: Convergence and Special Support Program: Construction/Improvement of Access Road Leading to Declared Ccmaluenda Construction, Inc. 11043 08/27/2019 Bohol 2nd DEO 14.584 94 O 0.38 0.27 0.15 0.03 0.06 0.05 93.60% - On-going Tourism Destinations-Lomangog Barangay Road Leading to Ubay Stock Farm Raising of Grade of Slope Protection along Bucao River (PMS Zambales 1st Cdc Construction And Supplies 28275 11/13/2019 15.548 150 C 0.48 0.13 0.30 - - - 90.80% 90.8% Very Satisfactory ID No. P003222198LZ-CWI) DEO Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads: Malabang - Dobleston - Tukuran Road - S00931MN, Lanao del Norte Cdh Construction 37936 11/07/2019 36.622 160 O 0.38 0.27 0.15 0.03 0.06 0.03 91.50% - On-going K1971+960 - K1972+260, K1986+282 - K1886+430, 1st DEO K1986+480 - K1986+777, K1988+030 - K1988+088, K1988+123- K1988+190 CDJ Builders Construction and Supply 30347 Talisay Small Irrigation Project 05/12/2019 NIA 2.740 180 C 0.38 0.20 0.30 - - - 8800.00% *88.00% Satisfactory CDJ Builders Construction and Supply 30347 Talisay Small Irrigation Project 05/12/2019 NIA 6.163 180 O 0.28 0.30 0.15 0.02 0.02 0.03 8066.00% - On-going Zamboanga del Cdtech Builders 39093 Construction of Multi-Purpose Covered Court at Don Jose 11/11/2019 2.909 165 O 0.39 0.24 0.15 0.03 0.05 0.05 91.30% - On-going Sur 2nd DEO Construction / Upgrading / Rehabilitationof Drainage along Northern Samar CDU Construction 13915 National Roads, Laoang - Calomotan Road, K0791+(-200) - 04/04/2018 39.001 180 C 0.48 0.19 0.16 - - - 83.00 86.00% Satisfactory 2nd DEO K0792+738 Construction of Flood Control Structures along Bugtong River Cdu Construction 13915 11/08/2019 Samar 1st DEO 40.792 143 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory (Upstream), Phase II, Barangay Bugtong Construction/Maintenance of Flood Mitigation Structures and Northern Samar Cdu Construction 13915 Drainage Systems, Construction of Palapag River Control, 11/05/2019 62.372 270 O 0.39 0.24 0.15 0.03 0.04 0.03 88.10% - On-going 2nd DEO Palapag River Basin Network Development, Construction of By-Pass and Diversion Northern Samar Cdu Construction 13915 11/04/2019 54.538 270 O 0.36 0.24 0.15 0.03 0.03 0.03 84.40% - On-going Roads, San Roque By-Pass Road, 2nd DEO Ce Padilla Construction Incorporated 15781 Repair of Hanging Bridge and Construction of Riprap 11/09/2019 TIEZA 8.000 180 C 0.45 0.20 0.30 - - - 94.90 97.70% Very Satisfactory Buildings and Other Structure - Multi Purpose/ Facilities - Local Southern Leyte Cean Construction 41086 08/21/2019 1.933 90 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Progaram, Completion of Multi- Purpose Building DEO Buildings and Other Structure - Multi - Purpose/ Facilities - Local Infrastructure Program/ Construction of Multi- Purpose Building - Southern Leyte Cean Construction 41086 08/21/2019 4.832 145 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Construction of Senior Citizen's Building and Provincial DEO Dissability Affair Office (Construction of Multi-Purpose Building) Construction of Multi-Purpose Building , Completion of Multi Southern Leyte Cean Construction 41086 08/21/2019 3.385 90 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Purpose Building, Tigbao DEO Asset Preservation, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads/ Junction Himay- angan - Silago- Abuyog - Boundary Road - K1056+465 to K1056+515, K1058+228 to K1058+260, K1059+176 to Southern Leyte Cean Construction 41086 08/21/2019 12.537 180 O 0.39 0.24 0.15 0.03 0.04 0.05 90.30% - On-going K1059+096, K1059+123 to K1059+191, K1065+691 to DEO K1065+761, K1066+518 to K1066+523m K1066+774 to K1066+872, K1071+181 to K1071+000 and K1111+000 to K1111+022

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 33 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Asset Preservation-Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads-Primary Roads/ Daang Maharlika (LT)- Southern Leyte Cean Construction 41086 K1007+479.80-K1008+154, k1018+147.80-k1018+157, 11/05/2019 15.680 180 O 0.39 0.24 0.15 0.03 0.06 0.05 92.20% - On-going DEO k1018+781.90-k1018+976.30, k1032+288.10-k1032+408, K1037+008.30-k1037+096.70

Asset Preservation-Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Secondary Roads/JCT. Himay-angan- Silago-Abuyog-Bdry. Road-K1056+465-K1056+515, Southern Leyte Cean Construction 41086 K1058+228-K1058+260, K1059+176-K1059+096, K1059+123- 11/05/2019 13.230 180 O 0.36 0.24 0.15 0.03 0.06 0.05 88.80% - On-going DEO K1059+191, K1065+691-K1065+761, K1066+518-K1066+523, K1066+774-K1066+872.70, K1071+181- K1071+000, K1111+000-K111+022 Provincial Cebu 7H Technochem Industries, Inc. 31578 Concreting of Jct. (TER) Dimiao-Oac-Bilar road, Dimiao, Bohol 01/10/2019 Government of 132.635 196 O 0.39 0.24 0.15 0.02 0.06 0.05 90.30 - On-going Bohol Provincial Cebu 7H Technochem Industries, Inc. 31578 Concreting of Jct. (TER) Dimiao-Oac-Bilar road, Dimiao, Bohol 04/29/2019 Government of 132.635 264 O 0.37 0.30 0.15 0.02 0.06 0.05 94.30 - On-going Bohol Provincial Cebu 7H Technochem Industries, Inc. 31578 Concreting of Jct (TER) Dimiao - Oac - Bilar Road 7/31/19 Government of 133.540 293 C 0.47 0.20 0.20 - - - 87.30 0.903 Very Satisfactory Bohol Preventive Maintenance- Tagbilaran East Road (Tagbilaran- Cebu 7H Technochem Industries, Inc. 31578 08/24/2019 Bohol 1st DEO 13.438 53 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Jagna) K0247+000 to K0248+000 Ensure Safe and Reliable National Road System: Asset Preservation-Preventive Maintenance Secondary Road at Loay Cebu 7H Technochem Industries, Inc. 31578 11/06/2019 Bohol 2nd DEO 34.432 114 O 0.39 0.24 0.10 0.03 0.06 0.03 85.50% - On-going Interior Road K0148+000 – K0149+000 And K0149+000 – K0150+000 Preventive Maintenance Asphalt Overlay at Antequera- San Cebu 7H Technochem Industries, Inc. 31578 06/04/2018 Bohol 2nd DEO 7.295 35 O 0.384 0.3 0.102 0.03 0.035 0 85.10 - On-going Isidro- Libertad (Tubigon Road, K0043+498 to K0034+992 River Rehabilitation and Development of Estero de Kabulusan Cecilian Builders 33534 11/23/2018 Rehabilitation 12.779 365 O 0.26 0.18 0.07 0.02 0.04 0.05 61.10 - On - Going (RMMW-MNL-EDKAB) Commission NIA / Pangsasinan Improvement of Service Road for Sinocalan River Irrigation Celbros Construction & Supplies 44901 12/05/2020 Irrigation 1.904 150 C 0.43 0.10 0.30 - - - - 83.30% Satisfactory System Management Office NIA/Pangasinan Sinocolan River Irrigation System / Improvement of Service Irrigation Celbros Construction & Supplies 44901 12/05/2020 1.904 150 C 0.43 0.10 0.30 - - - - 83.30% Satisfactory Road Management Office Construction of Control Barangay Sumacab Nueva Ecija 2nd Celso C. Ferrer Contractor 10643 06/21/2018 48.507 240 O 0.393 0.218 0.150 0.030 0.042 0.050 88.30 - On-going (Kaingin) DEO Network Development Program - Construction of By-pass and Nueva Ecija 2nd Celso C. Ferrer Contractor 10643 Diversion Roads - Sta. Rosa - Cesar Angeles - Emilio Vergara 08/24/2019 48.510 150 O 0.37 0.24 0.15 0.03 0.06 0.03 87.60% - On-going DEO Bypass Road Ensure Safe and Reliable National Road System - Network Centerways Construction And Development, Development Program - Construction of By-pass and Diversion Regional Office 34105 11/08/2019 81.414 202 O 0.37 0.24 0.15 0.02 0.06 0.05 89.20% - On-going Inc. Roads - Barcelona - Casiguran Diversion Road (Barcelona No. V Section) Construction/Improvement of Access Roads leading to Trades, Cevic Construction And Development 18015 Industries and Economic Zones- Ubujan-Manga Coastal Road 08/24/2019 Bohol 1st DEO 9.310 65 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory Corporation in Support of the Agribusiness Industry Supply of Labor & Materials for the Construction Farm CFV ARAR Contractors Phils., Inc. 37988 09/17/2019 DA 14.467 263 O 0.35 0.24 0.15 0.03 0.06 0.05 87.76 - On-going Machinery Shed (Established)

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 34 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Building and other Structures - Multi-Purpose/ Facilities- Construction of Multi-Purpose Building. (Covered Court) A.) Camarines Sur Cha Construction & Supply 28420 11/08/2019 4.321 120 O 0.37 0.24 0.15 0.03 0.05 0.05 89.50% - On-going Gainza Central School, Brgy. District I (Poblacion), Gainza, 2nd DEO Camarines Sur and B.) San Juan Elementary School Camarines Sur 1st Cha Construction & Supply 28420 Construction of Multi-Purpose Building at Brgy. Sibujo 05/31/2018 4.700 120 O 0.369 0.3 0.15 0.022 0.053 0.050 94.40 - On-going DEO Cha Construction & Supply 28420 Construction of Santicon Diversion Dam 12/12/2019 DA 4.181 120 O 0.362 0.3 0.107 0.03 0.057 0.05 90.60 - On-going Construction of 1 Unit 3 STY 15 CL School Building, Leonora S. Champion Builders And Supply 34222 08/29/2019 Iloilo 4th DEO 31.540 291 C 0.50 0.20 0.30 - - - 87.30% 87.3% Satisfactory Salapantan NHS Construction of One (1) Unit, Three (3) Storey, 15 Classroom Chanbar Builders Corporation 30292 5/17/19 NHA 23.667 330 O 0.39 0.30 0.00 0.03 0.06 0.03 81.09 - On-going School Building Provincial Concreting of NHW-JCT. Poblacion - Sta. Maria P/R, Phase II Charifer Builders Inc. 33498 10/03/2018 Government of 39.996 203 C 0.46 0.20 0.30 - - - 95.80 94.54% Very Satisfactory (Brgy. Upper Mainit - Brgy. San Roque) Sarangani Construction/ Maintenance of Flood Control and Mitigation Charlz Construction 8709 04/12/2018 Cebu City DEO 49.000 259 C 0.50 0.13 0.30 - - - 93.30 87.42% Satisfactory Structures at Brgy. Pulangbato Network Development Off-Carriageway Improvement, Surigao del Norte Charlz Construction 8709 Secondary Roads Surigao-Davao Coastal Road K1160+306 to 11/04/2019 30.210 142 C 0.48 0.16 0.30 - - - 93.60% 93.6% Very Satisfactory 2nd DEO K1162+000 Network Development Off-Carriageway Improvement, Surigao del Norte Charlz Construction 8709 Secondary Roads Surigao-Davao Coastal Road K1160+306.00 08/19/2019 28.722 142 O 0.38 0.24 0.15 0.03 0.05 0.05 89.80% - On-going 2nd DEO - K1162+000.00 Nueva Vizcaya Cheina Construction 42483 Construction of Multi-purpose Building (Forest Park) 11/12/2019 4.948 150 C 0.49 0.13 0.30 - - - 91.90% 91.9% Very Satisfactory 2nd DEO Nueva Vizcaya Cheina Construction 42483 Construction of Multi Purpose Building (Forest Park) 08/26/2019 4.745 120 O 0.38 0.20 0.15 0.03 0.04 0.05 85.30% - On-going 2nd DEO Rehabilitation of Riverbank Protection of San Jose Creek, Pangasinan 2nd Chiara Construction 8736 Barangay Poblacion, Barangay Libsong. Section 1, Sta. 2+697 - 08/23/2019 48.997 253 C 0.36 0.20 0.30 - - - 85.80% 85.8% Satisfactory DEO Sta. 2+960, Section 2, Sta. 0+525 - Sta. 1+240 Flood Management Program, Construction/ Maintenance of Zambales 2nd Chiara Construction 8736 Flood Mitigation Structures and Drainage Systems, 11/14/2019 90.792 260 O 0.36 0.24 0.15 0.03 0.05 0.03 85.90% - On-going DEO Improvement of Camachile River (Downstream) Chiara Construction/Ejr Builders And Pangasinan 1st JV-18-1414 Construction of Flood Control Structures along Alaminos River 11/12/2019 12.498 330 O 0.39 0.24 0.15 0.03 0.06 0.05 91.20% - On-going Construction Supply DEO Retrofitting/Strenghtening of permanent bridges - Manat Bridge Regional Office Chriatian Ian Construction Corporation 8191 08/24/2019 76.433 240 O 0.40 0.24 0.15 0.03 0.06 0.05 92.80% - On-going (B02148LZ) along Pangasinan - Zambales Road No. I Construction of DPWH Building - Catanduanes District Catanduanes Chrisman Construction And Supplies 33274 11/05/2019 34.299 180 O 0.37 0.24 0.15 0.01 0.04 0.05 85.80% - On-going Engineering Office, San Isidro Village DEO Christfer Construction & Supply / Ec Retrofitting/Strengthening of Permanent Bridge, Kalaw Bridge Northern Samar JV-18-716 11/05/2019 28.547 180 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Structural Composites, Inc. (Joint Venture) along San Policarpio - Arteche - Lapinig Road 2nd DEO Christian Ian Construction Corporation / Bridge Program - Replacement of Permanent Weak Bridge Regional Office Rebcor Const. And Trading Corporation (Joint JV-17-2647 08/20/2019 119.363 450 O 0.37 0.30 0.00 0.03 0.05 0.03 77.80% - On-going Sisican Bridge (B01963LZ) Along Daan Maharlika (LZ) No.III Venture) Rehabilitation of Roads and Drainage in Sapang Bakaw, Metro Manila 3rd Chrizmarie Builders And Construction Supply 45526 11/06/2019 14.034 240 O 0.39 0.24 0.15 0.03 0.04 0.05 89.80% - On-going Barangay Lawang Bato DEO Provincial Chu Construction 33747 Concreting of Clever - Sapa Road 01/18/2019 Government of 58.847 210 O 0.32 0.30 0.15 0.03 0.03 0.05 87.74 - On - Going Surigao del Norte Preventive Maintenance of Road: Asphalt Overlay Picas - San Tacloban City Chu Construction 33747 Jose DZR Airport Road K0910+051 to K0910+928. K0912+130 11/13/2019 29.084 78 C 0.47 0.13 0.30 - - - 90.50% 90.5% Very Satisfactory DEO to K0912+407 Reconstruction of Balaquid of Flood Control Structure along Chu Construction 33747 Biliran Circumferential Road, Cabucgayan, Biliran 08/26/2019 Biliran DEO 28.487 145 O 0.40 0.24 0.15 0.03 0.04 0.03 89.30% - On-going (124.537194°, 11.477034° to 124.537040° , 11.377889°)

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 35 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction/Maintenance of Flood Mitigation Structures and Chu Construction 33747 Drainage Systems-Construction of Flood Control Structure 11/13/2019 Leyte 2nd DEO 38.036 158 O 0.38 0.24 0.15 0.03 0.06 0.05 91.10% - On-going along Binahaan River K0002+255-K002+880 Retrofitting/ Strengthening of Permanent Bridges, Panilahan Circle Z Ventures & Development Corp. 36765 (B00571LT) along -Baybay-Southern Leyte - Boundary 08/24/2019 Leyte 4th DEO 9.951 85 O 0.40 0.24 0.15 0.03 0.04 0.05 91.20% - On-going Road Retrofitting/ Strengthening of Permanent Bridge, Panilahan Br Circle Z Ventures And Development Corp. 36765 11/07/2019 Leyte 4th DEO 9.951 85 C 0.50 0.13 0.30 - - - 93.10% 91.96% Very Satisfactory (B00571LT) along Ormoc-Baybay So. Leyte Bdry. Road Construction of Concrete Road - Reconstruction o Roads Mindoro Citystar Construction 32774 11/10/2019 29.396 253 O 0.38 0.24 0.15 0.03 0.06 0.05 90.50% - On-going leading to Government Center (Tuguilan Br. To Napocor) Occidental DEO Construction of Flood Mitigation Structure-Construction of Flood Mindoro Citystar Construction 32774 11/10/2019 18.129 243 O 0.34 0.25 0.15 0.03 0.05 0.05 86.50% - On-going Control Structures, Amnay FC (Kabangkalan Section) Occidental DEO CJA Construction and Supplies, Inc. 34140 Palanan Airport Development Project 05/02/2019 DOTC 4.691 135 C 0.46 0.20 0.30 - - - 96.40 *96.40% Outstanding Construction of Two Storey Four Classroom School Building Surigao del Sur Cjep Builders And Engineering Services 39365 08/24/2019 13.432 205 C 0.49 0.13 0.30 - - - 92.20% 89.19% Very Satisfactory San Fernando Elementary School (132631) 2nd DEO Construction of Revetment at along San Remigio- Clifford Construction Corporation 3724 05/29/2018 Antique DEO 32.499 205 C 0.37 0.20 0.30 - - - 87.40 88.36% Satisfactory Bugo Road Clifford Construction Corporation 3724 Construction of Flood Control Structure, Along Aklan River 08/22/2019 Aklan DEO 41.706 240 C 0.48 0.20 0.17 - - - 85.50% 77.34% Unsatisfactory Repair of Siphon of Adris Lateral I (Sta. 3+760) & CMMS Construction & Enterprise 32461 10/27/2018 NIA 6.358 180 O 0.33 0.30 0.15 0.03 0.05 0.05 90.50 - On - Going Canal Lining (Sta. 4+720-Sta. 5+600) Road Widening (2-4 lanes) along Pres. Diosdado P. Macapagal Coastland Construction And Development Davao Oriental 11487 National Highway- K1769+200- K1769+600, K1770+200- 11/18/2019 56.164 253 O 0.32 0.24 0.15 0.03 0.06 0.05 84.60% - On-going Corporation 2nd DEO K1771+000, K1772+600- K1773+603 South Cotabato Cofejok Construction And Supply Corporation 27493 Construction of Multipurpose Building, Brgy. Magsaysay 05/29/2018 1.481 90 O 0.400 0.300 0.028 0.030 0.047 0.033 83.80 - On-going 1st DEO Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Pvaed Road Colby Construction 33969 04/04/2018 Ifugao 2nd DEO 95.904 277 CD C 0.49 0.13 0.30 - - - 92.40 89.64% Very Satisfactory Standards (HDM-4 Project Analysis, Alfonso lista - Aurora Bdry. Road, K0452+392 - K0453+849, K0453+950 - K0453+993 Colby Construction 33969 Construction of Dike along Malupa River Control 08/21/2019 Aurora DEO 46.535 199 O 0.40 0.24 0.15 0.03 0.06 0.05 91.90% - On-going Construction of Sea Wall with Wave Deflector front along War Collera Construction 13246 11/07/2019 Leyte 4th DEO 18.724 150 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory Veterans Street in front of Brgy. Punta Elementary School Convergence and Special Support Program - Construction/ Improvement of Access Road Leading to Declared Tourism Collera Construction 13246 08/28/2019 Leyte 1st DEO 16.561 192 O 0.40 0.27 0.15 0.03 0.04 0.05 94.10% - On-going Destination Salvacion - Baras Road Leading to MacArthur Leyte Landing Memorial Park, Barangay Salvacion Off-Carriageway Improvement - Primary Roads, Palo - Carigara - Ormoc Road, K984+000 to K984+320.5, K984+401 to K984+727, K1001+863 to K1001+928, K1002+520 to Collera Construction 13246 08/24/2019 Leyte 4th DEO 54.972 150 O 0.40 0.24 0.15 0.03 0.03 0.05 90.30% - On-going K1003+719, K1003+726 to K1004+478, K1004+483 to K1004+694, K1004+717 to K1004+729 and K1005+221.8 to K1007+000, Ormoc City, Leyte Comfac Corporation 26293 Design and Build Services for the Construction of Powerhouse 06/25/2019 DOST 4.997 429 O 0.39 0.30 0.00 0.02 0.01 0.05 76.40 - On-going

Comfac Corporation 26293 Design and Build Services for the Construction of Powerhouse 02/14/2020 PSHS-ZRC 4.997 165 C 0.43 0.20 0.00 - - - 62.50% 72.23% Poor Construction of New Permanent Bridges, Puyo Bridge (Parrallel Agusan del Norte Concepcion Basic Builders Inc. 5255 Bridge) along Daang Maharlika (Surigao-Agusan Section) 11/14/2019 88.913 449 C 0.48 0.13 0.30 - - - 91.20% 92.19% Very Satisfactory DEO Including ROW Construction of One (1) Unit Two (2) Storey Eight (8) Conte Builders & Construction Supply 37935 08/28/2019 Iloilo 2nd DEO 15.376 180 C 0.47 0.16 0.30 - - - 92.60% 92.6% Very Satisfactory Classsrooms, Aglalana Elementary School Corillo Builders And Supply 44922 Improvement of Multi-Purpose Building (Brgy. Hall) 11/13/2019 Leyte 1st DEO 1.850 90 O 0.40 0.24 0.15 0.03 0.06 0.05 92.80% - On-going Cpr Construction And Supply / Gane Tekno JV-18-0150 Concreting of Pinaric - Agpay Road with Spillway (Phase II) 08/26/2019 Albay 3rd DEO 22.332 210 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Builders Joint Venture

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 36 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Provincial Construction of Lined Canal at Junction Provincial Road M. Crisnard Construction and Supply 23884 10/16/2019 Government of 2.593 148 O 0.38 0.30 0.15 0.03 0.06 0.05 97.40 - On-going Roxas - Poblacion, Sto. Niño Road South Cotabato Construction of 2-Units 2-Storey 4-Classrooms School Building Sultan Kudarat 1st Cs Construction And Supply 24237 08/20/2019 21.133 300 C 0.49 0.13 0.22 - - - 84.70% 84.7% Satisfactory at Josue Alcasid CS. DEO Construction of Seawall Protection, K0+000 -K0+890 and Sultan Kudarat Cs Construction And Supply 24237 09/19/2019 46.520 254 C 0.48 0.16 0.30 - - - 93.50% 93.5% Very Satisfactory K0+900-K0+990, Brgy. Milbuk, Palimbang 2nd DEO Provincial CS Construction and Supply (Formerly: CS Construction of NHW Jct. Matiompong - Lambayong Road - 24237 7/17/19 Government of 32.601 139 O 0.31 0.26 0.14 0.02 0.06 0.03 82.08 - On-going Construction) Kapingkong Section Sultan Kudarat Construction of One (1) Unit Three-Storey 15 Classroom School CSE Builders 37615 04/12/2019 NHA 21.151 458 O 0.35 0.22 0.15 0.03 0.06 0.05 86.55 - On-going Building, Padre Pio Resettlement Project Construction of One (1) Unit Three - Storey 15 - Classroom CSE Builders 37615 7/23/19 NHA 21.151 240 O 0.32 0.28 0.00 0.03 0.06 0.03 72.55 - On-going School Building, Padre Pio Resettlement Project CSE Builders / Eddmari Construction and 37615 / Green Park 1 8/16/19 NHA 289.700 975 O 0.37 0.27 0.00 0.03 0.07 0.02 75.83 - On-going Trading - J.V. 20301 - JV CSE Builders / Eddmari Construction& 37615 / Green Park Site 1 01/27/18 NHA 289.700 681 D 0.35 0.28 0.12 0.03 0.05 0.03 85.72 - On-going Trading - Jv 20301 - JV CSE Builders / Studio 26 Construction, Inc. - Villa Verde (Villaba Site 2) 03/13/2020 NHA 136.435 563 O 0.36 0.30 0.04 0.03 0.07 0.03 8312.00% - On-going J.V. Ensure Safe and Reliable National Road System, Asset Preservation Program- Preventive Maintenance, Rehabilitation/ Regional Office Ctc Builder & Supplies Incorporated 12088 10/25/2019 141.423 373 C 0.48 0.17 0.30 - - - 95.30% 95.3% Very Satisfactory Reconstruction/ Upgrading of Damaged Paved Roads - No. V Secondary Roads - Catanduanes Circumferential Road CTC Builder & Supplies Incorporated Repair/Rehabilitation/ Construction of Poblacion Norte Sorsogon 2nd 12088 04/08/2018 33.775 198 C 0.49 0.13 0.30 - - - 91.90 92.00% Very Satisfactory (Formerly: CTC Builder) Protection Wall (Phase II), Barangay Poblacion Norte DEO Repair/Rehabilitation /Construction of Poblacion Norte CTC Builder & Supplies Incorporated Sorsogon 2nd 12088 Protection Wall (Phase I), Barangay Poblacion Central and 04/08/2018 33.775 198 C 0.49 0.14 0.30 - - - 92.10 92.04% Very Satisfactory (Formerly: CTC Builder) DEO Poblacion Norte Replacement of Permanent Weak Bridges - Sabang Br. Sorsogon 2nd Ctc Builder And Supplies Incorporated 12088 08/19/2019 35.634 402 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory (B00183LZ) along Ariman - Bulusan Lake Road DEO Cluster VIII - Construction of CY 2018 Basic Educational Sorsogon 1st Ctc Builder And Supplies Incorporated 12088 08/21/2019 91.565 360 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Facilities Fund (BEFF) Batch 1 DEO Construction/Improvement of Access Road Leading to Declared Ilocos Norte 2nd Currimao Construction & Development, Inc. 5129 Tourism Destinations, Access Road Leading to Coral Rock 08/23/2019 19.600 160 O 0.37 0.24 0.15 0.03 0.05 0.05 88.70% - On-going DEO Formations, Brgy. Torre Construction/Improvement of Acces Roads Leading to Seaport, Ilocos Norte 2nd Currimao Integrated Builders Corporation 8738 11/08/2019 49.000 325 O 0.39 0.24 0.15 0.03 0.06 0.05 91.70% - On-going Ilocos Fly-in Cruise Road DEO Provincial Upgrading of Junction National Highway-Poblacion-Tantangan- Cyrus James Builders and Supply 41070 08/25/2020 Government of 16.480 146 C 0.47 0.20 0.30 - - - 9670.00% 94.48% Very Satisfactory Tacub-Tinago Boundary Road, Tantangan, South Cotabato South Cotabato Provincial Upgrading of Junction National Highway-New Iloilo-Cabuling- Cyrus James Builders and Supply 41070 08/25/2020 Government of 27.393 172 O 0.38 0.30 0.15 0.03 0.05 0.05 9620.00% - On-going New Lambunao Boundary Road South Cotabato Construction of Three (3) Storey - Six (6) Classroom School Czerj Construction & Trading 38803 06/15/2018 Cavite 2nd DEO 13.868 270 O 0.4 0.239 0.15 0.03 0.037 0.033 88.90 - On-going Building at Pedro Alegre Aure Senior High School Construction of 4 Storey 8 Classroom Building, Teodora Alonzo Quezon City 2nd 91.81% Czerj Construction & Trading 38803 08/27/2019 17.101 285 C 0.50 0.13 0.30 - - - 93.00% Very Satisfactory Elementary School, Quezon City DEO Rehabilitation of Boac-Torrijos 69KV Transmission Line Project, D. M. Consunji, Inc. 101 03/27/2019 NPC 369.550 360 O 0.39 0.30 0.15 0.03 0.07 0.05 99.34 - On - Going 47km : Log MSSP 2081-07-055-ZCT Contract for the Rehabilitation of Calapan - Bansud "1" 69 KV D. M. Consunji, Inc. 101 11/20/2018 NPC 231.796 360 C 0.50 0.20 0.25 - - - 94.98 90.88% Very Satisfactory Transmission Line Project LuzP16Z630Sr/HO-PIB16-002 Libuganon Left River IS - Construction of Main Canal & Supply, D.B. Ravelo Construction & Supply 39402 11/16/19 NIA 11.930 240 O 0.31 0.22 0.15 0.02 0.06 0.05 80.81 - On-going Delivery and Installation of Mechanical Works

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 37 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Paving of Unpaved Roads -Lubuangan-Batong Buhay-Abra Upper Kalinga D.C.E. Construction 29347 Bdry. Road Chainage 000- Chainage 1510 Lubuangan, 05/31/2018 52.220 185 O 0.291 0.286 0.130 0.030 0.054 0.033 82.40 - On-going DEO, CAR Kalinga Paving of Unpaved Roads - Lubuagan - Batong Buhay - Abra Upper Kalinga D.C.E. Construction 29347 11/21/2019 52.220 306 C 0.48 0.13 0.18 - - - 79.30% 80.92% Unsatisfactory Bdry Road Chainage 000 - Chainage 1510 DEO D.C.M. Construction / Chiu Builders (Joint Misamis Oriental JV-18-938 Concreting of Local Road, Brgy. Magkarila 11/11/2019 27.968 130 O 0.40 0.23 0.15 0.03 0.05 0.05 90.50% - On-going Venture) 1st DEO Widening of National Roads, Secondary Roads, Calamba - Sta. D.L. Cervantes Construction Corporation / 11 JV-17-1814 Cruz - Jct. Road (S06099LZ), K0103+535 to K0104+505, 09/04/2019 Laguna 1st DEO 83.318 398 C 0.49 0.13 0.30 - - - 92.20% 92.2% Very Satisfactory Diamond Eagle Construction K0104+516.03 to K0105+427, K0105+464 to K0105+510

Organizational Outcome 1: Ensure Safe and Reliable National D.L. Cervantes Construction Corporation/ Road System Asset Preservation Program - Rehabilitation/ Jomarcann General Construction Joint JV-17-1678 Reconstruction/ Upgrading of Damaged Paved National Roads 09/12/2019 CAR 210.365 540 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Venture ( Secondary Roads) Baguio- Bontoc Road, K0267+810 - K0268+000, K0316+127 - K0317+000(Various Location) Provincial D.L. Cervantes Corp./Bigfoot Construction & Concreting/Improvement/Upgrading of Paniabonan - Luyang - 24769 04/04/2018 Government of 88.701 240 O 0.34 0.30 0.14 0.02 0.04 0.05 88.50 - On - Going Supply - Joint Venture Panciao - Cabcaban (Highway 2000) Provincial Road Negros Oriental Provincial D.L. Cervantes Corp./Bigfoot Construction & Concreting/Improvement/Upgrading of Paniabonan-Luyang- 24769 04/04/2018 Government of 88.701 430 O 0.34 0.30 0.14 0.02 0.04 0.05 88.50 - On - Going Supply - Joint Venture Panciao-Cabcaban-(Highway 2000) Provincial Road Negros Oriental Southern Mindoro D.M. Maliwanag Builders And Enterprises 32589 Consruction of 2 Units ICT & 2 STY SCI LAB @ Manual NHS 08/27/2019 18.027 321 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory DEO Preventive Maintenance of Road (Asphalt Overlay with Quezon City 1st D.R. Robles Construction 28559 Concrete Reblocking) along , 08/22/2019 48.413 240 O 0.21 0.30 0.15 0.03 0.05 0.03 77.20% - On-going DEO K0016+295.10 to K0018+236 with exception Construction of Slope Protection along Pampanga River Flood D.S. Pamintuan Construction 31868 06/20/2018 Nueva Ecija DEO 48.666 240 O 0.392 0.246 0.15 0.03 0.037 0.05 90.50 - On-going Control D.S.T. Metalcraft And Engineering Works 34382 Construction of Multi-Purpose Building (Community Center) 11/11/2019 Isabela 2nd DEO 2.966 120 C 0.43 0.13 0.30 - - - 86.40% 86.26% Satisfactory Construction of Multi-Purpose Building (Community Center), D.S.T. Metalcraft And Engineering Works 34382 08/27/2019 Isabela 2nd DEO 2.821 120 O 0.36 0.22 0.15 0.03 0.05 0.05 86.20% - On-going Brgy. Suerte Access Road from National Highway Leading to Borongan City Eastern Samar D.T. Estaron Engineering & Construction 5082 11/11/2019 18.591 81 C 0.46 0.13 0.30 - - - 89.50% 89.5% Very Satisfactory Airport DEO Bank Improvement/Protection along Pateros River, Barangay Metro Manila 1st Dahl Construction Corp. 8931 08/29/2019 45.596 240 O 0.32 0.24 0.15 0.03 0.06 0.05 84.50% - On-going Aguho, (Phase IV) DEO Metro Manila 1st Dahl Construction Corp. 8931 Bank Improvement/Protection along Pateros River (Phase II) 11/20/2019 45.726 240 O 0.40 0.24 0.15 0.01 0.02 0.05 87.40% - On-going DEO Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Dahl Construction Corp. 8931 Maintenance of Flood Mitigation Structures and Drainage 11/08/2019 North Manila DEO 39.182 165 O 0.38 0.24 0.15 0.03 0.03 0.05 88.10% - On-going Systems - Bank Improvement, Estero de Kabulusan, Sta. 080.80 to Sta. 0+133.60 Dakay Construction & Development Corp. 8838 Construction of Port Operation Building 11/29/2018 PPA 47.846 390 O 0.39 0.30 0.11 0.03 0.07 0.05 95.16 - On - Going Dalcon Construction 40601 Construction of Dinalungan Flood Control 11/24/19 Aurora DEO 24.500 192 C 0.46 0.13 0.30 - - - 88.90% 88.9% Satisfactory Dalcon Constuction 40601 Construction of Dinalungan Flood Control 08/09/2019 Aurora DEO 23.246 170 O 0.40 0.24 0.15 0.03 0.06 0.05 92.70% - On-going Construction of Multi-Purpose Building at Barangay Ricarte Dalcon Constuction 40601 08/20/2019 Quirino DEO 1.089 120 O 0.39 0.19 0.15 0.00 0.05 0.05 82.90% - On-going Norte Construction/Improvement of Access Roads Leading to Declared Tourism Destinations along NRJ Poblacion - Agusan del Sur Dan-Bel Construction & Supply 17375 11/12/2019 14.700 129 C 0.49 0.13 0.30 - - - 92.00% 92% Very Satisfactory Concepcion, Sayon, Tagmanoro-Awao crossing Doldol Road 2nd DEO Leading to Tugpan Falls and Binugwakan Cold Spring Contruction/Improvement of Access Roads Leading to Declared Tourism Destinations along NRJ Poblacion - Concepcion, Agusan del Sur Dan-Bel Construction & Supply 17375 08/24/2019 13.844 115 O 0.39 0.24 0.15 0.03 0.04 0.05 89.80% - On-going Sayon, Tagmanoro-Awao crossing Doldol Road Leading to 2nd DEO Tugpan Falls & Binugwakan Cold Spring.

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 38 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Convergence and Special Support Program - Construction/Improvement of Access Roads Leading to Trades, Industries and Economic Zones - San Pedro - Magsaysay - Cagayan 2nd Dandex Construction 36946 11/07/2019 9.800 133 C 0.48 0.13 0.30 - - - 91.00% 89.26% Very Satisfactory Cabatacan West Barangay Road to Jct. Logac - Lasam - DEO Gagabutan Road Connecting to Banana, Coconut and Cacao Plantation and Processing Convergence and Special Support Program - Construction/Improvement of Access Roads Leading to Trades Cagayan 2nd Dandex Construction 36946 08/21/2019 9.800 133 O 0.33 0.29 0.15 0.02 0.06 0.03 88.10% - On-going Industries and Economic Zones - San Pedro - Magsaysay - DEO Cabatacan West Barangay Road to Jct. Logac - Lasam - Construction of Seawall, Brgy. Wilson, San Jose, Dinagat Dinagat Islands Danrev Construction And Supply 45161 11/07/2019 4.950 92 C 0.49 0.20 0.30 - - - 76.40% 76.4% Unsatisfactory Islands DEO Construction/Maintenance of Flood Mitigation Structures and Danysons Construction 25452 Drainage Systems- Construction of Siffu River Flood Control 06/02/2018 Isabela 2nd DEO 27.920 123 O 0.385 0.238 0.100 0.015 0.035 0.033 80.60 - On-going Project (Quiling Section) Network Development-Off-Carriageway Improvement-Tertiary Danysons Construction 25452 Road along Ilagan-Delfin Albano-Mallig Road (S00761LZ), 06/02/2018 Isabela 2nd DEO 20.953 90 O 0.387 0.2 0.15 0.015 0.029 0.05 83.10 - On-going K0438+375-K0440+638 Network Development-Improvement/Widening of National Danysons Construction 25452 Roads-Primary Roads-Other Primary Roads along Santiago- 03/17/2018 Isabela 2nd DEO 54.949 210 C 0.35 0.20 0.30 - - - 84.80 86.00% Satisfactory Tuguegarao Road (S00760LZ) Ensure Safe and Reliable National Road System: Network Danysons Construction And Development 25452 Development - Construction of Missing Links/New Roads - 11/12/2019 Isabela 2nd DEO 44.000 193 O 0.35 0.23 0.15 0.03 0.06 0.05 87.00% - On-going Corporation Naguilian (Jct CVR)-Palanan Road, Isabela Daungan Construction Development & Pampanga 1st 35024 Construction / Widening of San Jose Malino - Anao Raod 11/05/2019 25.766 150 O 0.37 0.22 0.15 0.03 0.06 0.05 86.80% - On-going General Supplies Company Inc. DEO Provincial Road Upgrading of Purok Narafil - Brgy. Site Magupising Davao Concrete Products 12090 08/23/2018 Government of 51.423 247 O 0.39 0.30 0.15 0.02 0.04 0.05 95.10 - On - Going Provincial Road Davao del Norte

Davao Rock Mixer Enterprises 19250 Malitubog - Maridugao Irrigation Project Phase 2 03/10/2018 NIA 92.37 1,060 O 0.343 0.200 0.000 0.015 0.037 0.017 61.19 - On-going

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Road - Tertiary Road - Road Network - (S05562LZ) Chainage 0 - Chainage 131, Quezon City 2nd Davao Rock Mixer Enterprises 19250 08/27/2019 20.733 300 C 0.43 0.13 0.30 - - - 86.60% 86.6% Satisfactory (S05563LZ) Chainage 0 - Chainage 127, (S05564LZ) DEO Chainage 0 - Chainage 393, (S05566LZ) Chainage 0-Chainage 325 Construction of Slope Protection along Manggahan Floodway Metro Manila 1st Davao Rock Mixer Enterprises 19250 11/19/2019 96.496 255 O 0.40 0.24 0.15 0.02 0.04 0.05 89.70% - On-going (Eastbank) DEO Construction of Multi-purpose building (Covered Court at Las Piñas- Davhez Trading And Construction 9833 08/20/2019 4.630 150 O 0.40 0.21 0.15 0.03 0.05 0.03 87.40% - On-going Greymarville Subdivision) Muntinlupa DEO Rehabilitation/Reconstruction of National Roads with Slips, Northern Samar Dca Builders & Enterpises 38029 Slope Collapse and Landslides, Daang Maharlika (SM) (San 11/06/2019 23.608 190 O 0.38 0.24 0.14 0.02 0.03 0.03 84.50% - On-going 1st DEO Isidro - ), K0684+700 - K0684+740 Rehabilitation/Major Repair of Permanent Bridges, Kinaguitman Northern Samar Dca Construction & Supply 40878 11/06/2019 4.778 120 C 0.48 0.13 0.30 - - - 91.10% 88.88% Satisfactory Bridge along Poblacion - Barangay Cabacungan Road 1st DEO Paving of Unpaved Roads - Lubuangan - Batong Buhay - Abra Upper Kalinga Dcestranero Corporation 29347 09/08/2019 52.220 306 O 0.38 0.20 0.11 0.02 0.05 0.02 77.00% - On-going Boundary Road, Chainage 000 to Chainage 1510 DEO Construction (Completion) of Multi-Purpose Building - San Dcestranero Corporation 29347 11/07/2019 Isabela 4th DEO 11.187 187 O 0.39 0.22 0.15 0.02 0.04 0.05 86.50% - On-going Agustin Misamis Rehabilitation (Completion) of Multi-Purpose Building, Dds Builders 37010 11/09/2019 Occidental 1st 0.983 75 C 0.50 0.13 0.30 - - - 93.30% 92.95% Very Satisfactory (Oroquieta Agro-Industrial OAIS) Barangay Villaflor DEO Misamis Rehabilitaion (Compleion) of Multi-Purpose Building, (Oroquieta Dds Builders 37010 08/20/2019 Occidental 1st 0.983 75 O 0.34 0.30 0.15 0.03 0.06 0.05 92.80% - On-going Agro Industrial OAIS) Barangay Villaflor DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 39 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of One-Storey Two Classroom School Building at Dinagat Islands Dds Builders 37010 Don Ruben Elementary School, School ID: 132516, Brgy. Don 08/20/2019 3.902 180 O 0.38 0.23 0.00 0.02 0.03 0.02 68.30% - On-going DEO Ruben Construction of One-Storey Two Classroom School Building at Dinagat Islands Dds Builders 37010 08/20/2019 3.748 180 O 0.38 0.20 0.00 0.02 0.04 0.02 66.10% - On-going Luna ES, School ID: 132519, Brgy. Luna DEO NIA / Pangasinan Irrigation Deabsres Construction & Supply 10392 Construction of Protection / Rubble Masonry 11/07/2020 4.116 360 C 0.43 0.10 0.30 - - - - 82.50% Satisfactory Management Office Deadsres Construction & Supply 10392 Ambayaoan River Irrigation System 07/11/2020 NIA 4.113 360 C 0.43 0.10 0.30 - - - 8250.00% *82.50% Satisfactory Local Infrastracture Program - Construction of Multi-Purpose Camarines Sur Delpar Construction & Supplies 32677 11/06/2019 1.879 90 C 0.49 0.13 0.03 - - - 65.20% 65.2% Poor Building, Barangay Pagolinan, Caramoan, Camarines Sur 4th DEO Asset Preservation of National Roads - Construction / Upgrading / Rehabilitation of Drainage along National Roads, Northern Samar Delpar Construction and Supply 32677 04/05/2018 15.657 210 OG 0.367 0.24 0.111 0.022 0.028 0.033 80.10 - On - Going Catarman - Calbayog Road, K0756+000 - K0757+000, 1st DEO K0761+500, K0768+000 - K0769+000 Rehabilitation/ Major Repair of Casilihan Bridge 2 along Mindoro Oriental Delrol Enterprises 37858 03/20/2018 6.804 330 OG 0.335 0.300 0.150 0.030 0.070 0.033 91.80 - On - Going Calapan North Road DEO Construction of Satellite Materials Laboratoty Building, DPWH- Mindoro Oriental Delrol Enterprises 37858 Mindoro Oriental District Engineering Office Compound, Masipit, 08/23/2019 6.477 120 O 0.39 0.30 0.00 0.03 0.04 0.00 75.60% - On-going DEO Calapan City Denisse-John Construction And Supplies 37550 Improvement of Bahay Pag-asa 09/05/2019 Ifugao 1st DEO 5.000 137 C 0.49 0.13 0.30 - - - 92.40% 91.35% Very Satisfactory Improvement of Multi-Purpose Building (Indigenous People Denisse-John Construction And Supplies 37550 09/05/2019 Ifugao 1st DEO 0.990 30 C 0.44 0.13 0.30 - - - 87.20% 87.2% Satisfactory Center) Nueva Vizcaya Denisse-John Construction And Supplies 37550 Construction of Multi-Purpose Building Brgy. Tanibong 11/12/2019 1.979 90 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory 2nd DEO Nueva Vizcaya Denisse-John Construction And Supplies 37550 Construction of Multi Purpose Building Brgy. Tanibong 08/26/2019 1.899 90 O 0.36 0.20 0.15 0.03 0.05 0.05 84.00% - On-going 2nd DEO Construction of Three (3) Unit 2-Classroom Day Care Center at Dezmar Construction and Development 36224 11/28/2018 NHA 11.502 229 O 0.37 0.21 0.15 0.02 0.05 0.05 84.16 - On - Going Southville Housing Project Construction of Three (3) Units 2-Classroom Day Care Center Dezmar Construction and Development 36224 03/05/2019 NHA 11.502 229 E 0.46 0.20 0.15 - - - 80.38 83.02% Satisfactory at Southville 9 Quezon City 2nd Diadema Enterprises 16759 Improvement/Rehabilitation of Drainage System 06/05/2018 9.215 150 O 0.396 0.24 0.15 0.022 0.04 0.033 88.10 - On-going DEO Improvement of Road and Drainage System -Balubaran Road Metro Manila 3rd Diadema Enterprises 16759 Brgy. Malinta (from McArthur HW to L. Prodon St. Maysan 08/29/2019 23.623 513 O 0.37 0.24 0.15 0.03 0.06 0.05 89.10% - On-going DEO Road) , Poblacion, Malinta Mataddi 1 Communal Irrigation System - Construction of Canal Diamond J Builders 38868 11/30/19 NIA 7.980 210 O 0.33 0.30 0.15 0.02 0.01 0.03 84.80 - On-going Lining, Pipelines and Water Tanks with Complete Accessories Improvement of Canal Service Roads - Road Concreting of Diamond J Builders 38868 09/28/2019 NIA 1.444 90 C 0.43 0.10 0.30 - - - 83.30 *83.30% Satisfactory Canal along Service Road Diamond J Builders 38868 Construction of Footbridge at Barangay Ramos 08/20/2019 Quirino DEO 2.178 78 O 0.37 0.24 0.15 0.00 0.05 0.05 85.80% - On-going Dianne Builders 32316 Balog Balog Multipurpose Project II 02/16/2019 NIA 3.268 90 O 0.40 0.30 0.00 0.02 0.04 0.03 79.03 - On - Going Organizational Outcome 1: Ensure Safe and Reliable National road System, Asset Preservation Program: Construction/ Dicay Construction Supply And Services 41564 Upgrading/ Rehabilitation of Drainage Along National Roads, 11/24/19 Benguet 2nd DEO 29.342 180 O 0.34 0.30 0.14 0.20 0.06 0.03 89.00% - On-going Baguio - Bontoc Road (Secondary), K0332+000 to K0334+250, K0337+500 to K0338+000 Widening of Permanent Bridges Tag-anga Bridge (B01114MN) Misamis Oriental Dicon Builders Corp. 33181 along Butuan City- Cagayan de Oro Ciy- Iligan City Road 08/28/2019 17.640 161 O 0.40 0.24 0.15 0.03 0.06 0.05 92.30% - On-going 2nd DEO (Phase II) Widening of Permanent Bridges Tag-anga Bridge (B01114MN) Misamis Oriental Dicon Builders Corp. 33181 along Butuan City - Cagayan de Oro City - Iligan City Road 11/04/2019 17.640 161 O 0.40 0.30 0.09 0.03 0.06 0.03 90.80% - On-going 2nd DEO (Phase II) Misamis Oriental Dicon Builders Corp. 33181 Concreting of Road, Dig-aguyan 11/11/2019 23.487 120 O 0.39 0.24 0.14 0.03 0.05 0.03 88.00% - On-going 1st DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 40 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Quezon City 2nd Dimaguila Construction & Supply, Inc. 14904 Improvement of Road 06/07/2018 11.705 193 O 0.388 0.24 0.15 0.022 0.05 0.033 88.30 - On-going DEO Construction of Multi-Purpose Building, Brgy. Antipolo, Medellin, Dinah Jane Construction And Supply 33925 08/26/2019 Cebu 1st DEO 2.821 40 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory Cebu Construction of a Multi-purpose Building, Annex Building, Dinah Jane Construction And Supply 33925 08/26/2019 Cebu 1st DEO 14.108 180 C 0.50 0.14 0.30 - - - 93.30% 93.3% Very Satisfactory Poblacion, Medellin, Cebu Dinah Jane Construction And Supply 33925 Construction of Multi-purpose Building, Cebu Normal University 08/25/2019 Cebu 1st DEO 3.724 40 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Construction of Flood Mitigation Structure at Guinabasan River Dinah Jane Construction And Supply 33925 11/09/2019 Cebu 3rd DEO 19.600 163 O 0.39 0.24 0.15 0.03 0.05 0.05 91.30% - On-going along along Toledo - Tabuelan - San Remegio Rd. Construction of One (1) Storey Two (2) Classroom School Negros Oriental Dinah Jane Construction Supply 33925 08/21/2019 2.329 85 C 0.47 0.13 0.30 - - - 90.30% 90.3% Very Satisfactory Building with Toilet at Banga CES 3rd DEO Construction of Flood Mitigation Structure at Guinabasan River Dinah Jane Construction Supply 33925 08/24/2019 Cebu 3rd DEO 19.600 163 O 0.40 0.25 0.15 0.02 0.05 0.05 92.20% - On-going along Toledo-Tabuelan-San Remegio Road Davao City 2nd Ditche Construction And Supply 41953 Construction of Multi-Purpose Building at Brgy. Lubogan 08/28/2019 6.760 210 O 0.35 0.24 0.15 0.02 0.05 0.05 85.40% - On-going DEO Construction/Improvement of Access Roads Leading to Ilocos Norte 2nd Djcm Construction Corporation 27678 Declared Tourism Destinations, Access Road Leading to 08/24/2019 37.436 205 O 0.37 0.24 0.15 0.03 0.05 0.05 88.90% - On-going DEO Madongan Dam at Brgy. San Marcelino Construction/Maintenance of Flood Mitigation Structures and Djcm Construction Corporation (Formerly: Drainage Systems - Construction of Flood Control Ilocos Norte 2nd 27678 11/08/2019 39.063 191 C 0.46 0.13 0.30 - - - 89.70% 89.7% Very Satisfactory Djcm Construction) Structure/Facility along Badoc River Upstream, Sta.0+112 to DEO Sta.0+510 Concreting of Selecta Drive/Don Ramon/Doña Carmen, Quezon City 1st Djl Robles Builders 39672 11/25/2019 4.753 120 C 0.39 0.20 0.30 - - - 88.50% 88.5% Satisfactory Barangay Pag-ibig sa Nayon DEO Concreting of Selecta Drive/Don Ramon/Dona Carmen. Quezon City 1st Djl Robles Builders 39672 08/23/2019 4.753 120 O 0.38 0.24 0.15 0.03 0.04 0.05 88.50% - On-going Barangay Pag-ibig sa Nayon DEO Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development Program: Paving of Djy Construction 35651 09/07/2019 Benguet 2nd DEO 13.199 116 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory Unpaved Roads (Tertiary)-Acop-Kapangan-Kibungan-Bakun Road, K0330+220-K0330+520 Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development Program: Paving of Djy Construction 35651 09/07/2019 Benguet 2nd DEO 4.748 48 C 0.48 0.13 0.30 - - - 91.50% 91.5% Very Satisfactory Unpaved Roads (Tertiary)-Acop-Kapangan-Kibungan-Bakun Road, K0309+461-K0309+555 and K0311+308-K0311+322 Convergence and Special Support Program, Access Road Leading to Trades, Industries and Economic Zones, Guiswak - Djy Construction 35651 11/21/2019 Benguet 2nd DEO 9.763 156 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory Lokot - Ambalideng, Access Road in Support of Coffee, Cacao, Bamboo and Other Highland Vegetables Construction of Gravel Road - Construction of Missing Links / New Roads along baguio - La Trinidad - - Sablan -- Tuba Djy Construction 35651 11/20/2019 Benguet 1st DEO 95.047 274 O 0.39 0.24 0.15 0.03 0.05 0.05 90.60% - On-going and Tublay (BLISTT), Taloy Norte JCt. - San Pascual Brgy. Hall (Section 7 of Blistt Outer Ring Circumferential Road) Package A Organizational Outcome 1: Ensure Safe and Reliable National Road System , Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - tertiary Djy Construction 35651 11/24/19 Benguet 2nd DEO 34.256 235 O 0.37 0.30 0.15 0.03 0.05 0.05 95.00% - On-going Roads, Acop - kapangan - Kibungan - Bakun Road, K0337+118 to K0337+208, K0337+789 to K0337+963, K0338+000 to K0338+500 Dl Builders And Real Properties Development Construction of Concrete Road - Access Road leading to 38031 11/07/2019 Bukidnon 1st DEO 14.700 135 C 0.49 0.13 0.30 - - - 92.60% 92.24% Very Satisfactory Inc. Salawao Cave Dl Builders And Real Properties Development Construction of Concrete Road- Access Road Leading to 38031 08/21/2019 Bukidnon 1st DEO 14.404 135 O 0.39 0.28 0.15 0.01 0.05 0.05 92.00% - On-going Inc. Salawao Cave Construction of Classrooms: 3STY6CL Bonbon Elementary Cagayan de Oro Dl Enterprises 18155 08/29/2019 24.296 326 O 0.34 0.29 0.15 0.03 0.05 0.05 91.10% - On-going School City 1st DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 41 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of By-pass and Diversion Road, Gingoog By-Pass Misamis Oriental Dl Enterprises 18155 11/11/2019 46.549 280 O 0.40 0.25 0.15 0.03 0.06 0.03 91.80% - On-going Road, Misamis Oriental (PhaseI) 1st DEO Construction / Maintenance of Flood Mitigation Structure and Pampanga 2nd Dmdanan Construction And Trading 41374 Drainage Systems - Construction/ Rehabilitation of Slope 11/06/2019 24.448 180 C 0.37 0.20 0.30 - - - 87.00% 87% Satisfactory DEO Protection along Porac River, Brgy. San Isidro Dmlc Builders 36650 Construction of Retaining Wall, Sto. Nino Creek 08/23/2019 NCR 74.037 360 O 0.39 0.24 0.15 0.02 0.05 0.05 90.10% - On-going Camarines Sur 1st Donber Construction & Supply 15334 Concreting of Road 08/21/2019 1.881 45 C 0.43 0.13 0.30 - - - 85.90% 85.9% Satisfactory DEO Local Infrastructure Program-Construction of Local Roads, 1. Camarines Sur Donlee Construction And Supply 40083 Brgy. Salvacion Poblacion: Sta. 0+000.00 to Sta. 0+089.60, 2. 08/26/2019 1.881 47 C 0.44 0.13 0.30 - - - 86.90% 86.9% Satisfactory 4th DEO Brgy. San Vicente: Sta. 0+000.00 to Sta. 0+133.30 Shoulder Paving/Construction- on Specific Locations along Donlee Construction And Supply 40083 Tagaytay- Laguna via Calamba Road (SO6087LZ) K0057+494- 11/26/2019 Cavite 2nd DEO 12.657 116 O 0.40 0.24 0.15 0.02 0.04 0.05 89.60% - On-going K0058+534 to K0058+884- K00059+572 Local Infrastructure Program - Buildings and Other Structures - Mt. Province 1st Dory Construction 40924 Multi-Purpose Facilities, Construction of Multipurpose Building 11/26/2019 1.956 107 C 0.46 0.18 0.30 - - - 94.40% 94.4% Very Satisfactory DEO (Indegenous People's Center) Organizational Outcome 2: Protect Lives and Properties Againts Major Floods - Flood Management Program - Double 12 Construction And Supply 13028 Construction/Maintenance of Flood Mitigation Structures and 09/02/2019 Rizal 2nd DEO 47.160 200 O 0.39 0.24 0.15 0.03 0.05 0.05 90.70% - On-going Drainage Systems - Construction/Rehabilitation and Improvement of River Bank Protection along Teresa River Pangasinan 2nd Dpv Builders And Construction Supply 41114 Rehabilitation of Multi-Purpose Building at Camp Tito B. Abat 08/23/2019 3.837 120 C 0.50 0.13 0.30 - - - 93.00% 93% Very Satisfactory DEO Rehab/Improvement of Mawab CES Gym (with bleacher), Compostela Dqmb Construction & Supply Corp. 42964 11/22/2019 1.950 90 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory Mawab Valley DEO Network Development Road Widening along MSR Diversion Dqt Builders Corporation 7950 Road K0125+(-350) - K0126+000 along MSR Diversion Road 11/21/2019 Quezon 1st DEO 67.501 260 O 0.39 0.24 0.15 0.03 0.04 0.03 87.70% - On-going K0125+(-350) - K0126+000 Construction of One-Storey (2 Classrooms) School Building Dragon Hatched Construction 40546 11/14/2019 Isabela 1st DEO 4.446 85 O 0.33 0.30 0.11 0.02 0.03 0.03 82.30% - On-going Cabeceria 3 Elementary School Dragon Twelve Builders & Construction Network Development - Road Widening - Primary Road, Daang 39808 11/14/2019 Isabela 1st DEO 10.167 85 C 0.46 0.13 0.30 - - - 88.90% 89.8% Very Satisfactory Supply Maharlika (LZ) including Slope Protection and Drainage

Dragon Twelve Builders & Construction Network Development - Road Widening - Primary Road, Daang 39808 08/28/2019 Isabela 1st DEO 10.167 85 O 0.39 0.24 0.15 0.03 0.05 0.05 90.40% - On-going Supply Maharlika (LZ) including Slope Protection and Drainage Construction of Multi-purpose Building (Covered Court) Brgy. Metro Manila 3rd Dreamworx Builder & Trading, Inc. 34004 08/29/2019 5.503 236 C 0.48 0.13 0.30 - - - 91.00% 91% Very Satisfactory 171 DEO Metro Manila 3rd Dreamworx Builder & Trading, Inc. 34004 Construction of Drainage along Barangay 13 11/06/2019 4.706 90 C 0.47 0.13 0.30 - - - 90.50% 90.5% Very Satisfactory DEO Construction/Rehabilitation of Brgy. Nagas River Control Dsb Construction & Supply, Inc. 16126 08/28/2019 Albay 1st DEO 46.511 171 O 0.38 0.24 0.15 0.03 0.07 0.05 92.40% - On-going (Upstream) along Nagas/Taki River Construction / Rehabilitation of Brgy. Nagas River Control Dsb Construction & Supply, Inc 16126 11/06/2019 Albay 1st DEO 49.000 171 C 0.47 0.13 0.30 - - - 90.30% 91.56% Very Satisfactory (Upstream) Along Nagas Taki River Dsb Construction And Supply, Inc. (Formerly: Rehabilitation/Upgrading of San Diego de Alcala Shrine and 15781 08/02/2019 TIEZA 8.500 120 O 0.391 0.300 0.150 0.030 0.050 0.050 97.10 - On-going Dsb Construction & Supply) Viewdeck DSB Construction And Supply, Inc. (Formerly: Cluster 20 - Construction/Completion of Multi-Purpose Building 16126 04/12/2018 Albay 1st DEO 47.798 225 C 0.50 0.14 0.30 - - - 93.50 91.75% Very Satisfactory DSB Construction & Supply) in the First District of Albay Construction of One (1) Unit, One (1) Storey, Four (4) Compostela Dtv Construction And Supply 38257 06/01/2018 8.538 170 C 0.47 0.16 0.26 - - - 89.30 89.50% Very Satisfactory Classroom Building at CW1. C.M Recto ES, Nabunturan Valley DEO Rehabilitation/Major Repair of Permanent Bridges along Davao Oriental 1st Dtv Construction And Supply 38257 Surigao del Sur Bdry.-Davao Oriental Coastal Road and 11/20/2019 9.863 57 C 0.49 0.13 0.23 - - - 86.00% 86% Satisfactory DEO Compostela-Cateel Road (Davao Oriental Side)

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 42 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Provincial Dumalag Surveying and Engineering 36273 Construction of Latian River Control Phase II 05/21/2019 Government of 3.188 70 O 0.14 0.15 0.01 0.02 0.05 0.03 40.15 - On-going Services Sarangani Dumduma Construction And Trading Construction of Four (4) Storey Twenty (20) Classroom School 37256 06/17/2018 39.881 330 O 0.386 0.240 0.150 0.030 0.056 0.050 91.20 - On-going Corporation Building at San Gabriel II Elementary School Dumduma Construction and Trading Construction of Fourteen (14) Three Storey Meduim Rise 37256 05/04/2018 NHA 171.476 453 O 0.28 0.16 0.13 0.03 0.05 0.03 68.37 - On - Going Corporation Buildings Disiplina Village Site 4 Package 1 Dumduma Construction and Trading 37256 Disiplina Village Site 4, Package 1 10/19/2018 NHA 184.776 597 O 0.39 0.23 0.07 0.03 0.05 0.03 80.18 - On - Going Corporation Reconstruction of Concrete Revetment - along Mindoro West Mindoro Dungan Constructors And Trading Corp. 19301 Coastal Rd (S00095MR) K0328+748 - K0329+000; K0340+469 11/09/2019 44.547 287 O 0.35 0.25 0.15 0.03 0.06 0.05 88.70% - On-going Occidental DEO - K0341+000, K0329+000 - K0393+000 Road Widening along Antonio y De Pio Highway, K0115+800 to Duros Development Corp. 22729 11/11/2019 Cebu 1st DEO 29.654 132 O 0.39 0.30 0.15 0.03 0.06 0.05 97.50% - On-going K0117+000 Dwd Construction And Services / Linsco 2- Units - 2- Storey, 6 - Classroom School Building. Lagawe JV-18-1142 11/26/2019 Ifugao 1st DEO 34.130 306 C 0.49 0.14 0.30 - - - 92.80% 89.23% Very Satisfactory Construction (Joint Venture) National High School - Annex Dynamic Builders & Construction Co. (Phils.), Bacolod Negros Occidental Economic Highway (BANOCEH), Regional Office 24712 08/26/2019 319.771 692 O 0.25 0.30 0.04 0.03 0.05 0.03 70.00% - On-going Inc. Section 2, Package B, including ROW No. VI Construction of 2 Units 2 Storey ICT Lab, 2 Storey Sci Lab at Mindoro Oriental Dzee Builders And Consruction Supply 36200 08/22/2019 18.645 255 C 0.46 0.13 0.30 - - - 89.50% 89.71% Very Satisfactory Leandro Panganiban Sr. Tagmpay High School, Pola DEO Bukidnon 3rd E And R Enterprises And Construction 39063 Concreting of Road 08/23/2019 5.940 46 C 0.44 0.13 0.30 - - - 87.60% 87.6% Satisfactory DEO E S De Guzman Construction 17494 Construction of Administration Building 09/07/2019 DOST 23.609 93 O 0.39 0.24 0.09 0.02 0.04 0.05 83.00 - On-going Construction of Slope Protection & Improvement of Zapote Las Piñas- E. F. Chua Construction, Inc. 37826 08/20/2019 91.479 617 O 0.36 0.24 0.15 0.03 0.04 0.05 86.70% - On-going River Muntinlupa DEO Local Program - Construction/ Repair/Rehabilitation / Improvement of Various Infrastructure Including Local Projects - Regional Office E. Garcia Construction Corp. 7243 08/24/2019 93.605 204 C 0.48 0.14 0.30 - - - 91.90% 91.9% Very Satisfactory Flood Control and Drainage - Flood Control Structures/ No. V Facilities, Construction of Flood Control Project Construction of Two (2) Units, Three (3) Storey, One (1) Camarines Sur 1st E. Garcia Construction Corp. 7243 Regular, One (1) Science Lab. & One (1) ICT Building, 11/09/2019 48.198 315 C 0.49 0.13 0.30 - - - 92.80% 91.33% Very Satisfactory DEO National H/S Ensure Safe and Reliable National Road System - Network Regional Office E. Garcia Construction Corp. 7243 Development - Road gyidening - Primary Roads, Rolando A. 11/09/2019 141.124 258 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory No. V , K0283+183 - K0286+760 (with exceptions)

Construction of Two (2) Units, Three (3) Storey, One (1) Camarines Sur 1st E. Garcia Construction Corp. 7243 08/21/2019 9.867 315 O 0.40 0.23 0.15 0.03 0.05 0.05 90.70% - On-going Regular, One (1) Science Laboratory and One (1) ICT Building DEO Ensure Safe and Reliavle National Road System, Bridge Rehabilitation/Major Repair of Permanent Bridges, Cabulunan E. Guadiz Construction 27172 11/08/2019 Cagayan 3rd DEO 5.690 90 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory Br., (BO4778LZ) along Kalinga Cagayan Road (Calanan-Enrile Section) E. M. Cuerpo Inc. 30963 Bolo's Peoples Village 10/20/2018 NHA 144.800 560 C 0.44 0.14 0.18 - - - 77.12 80.58% Unsatisfactory E. M. Cuerpo Inc. 30963 Abong People's Village Site 3 10/20/2018 NHA 144.800 622 C 0.44 0.14 0.22 - - - 80.52 89.11% Very Satisfactory

E. M. Cuerpo, Inc. / J.C. Uyecio Construction 30963 / San Agustin Village 3/15/19 NHA 279.555 602 O 0.38 0.29 0.15 0.02 0.06 0.05 95.61 - On-going and Development Company (JV) 34910 - JV E. M. Cuerpo, Inc. / Prismodial Construction 30963 / Corporation (Formerly: Prismodial Harmony Hills Terraces, Phase 1, Package B 06/07/2018 NHA 454.610 842 O 0.32 0.27 0.10 0.03 0.06 0.02 80.71 - On-going 28345 - JV- - Construction) (JV) E. M. Paule Construction & Trading, Inc 19006 Balangiga Port Development Project 06/28/19 DOTC 8.638 150 C 0.45 0.20 0.30 - - - 94.70 *94.70% Very Satisfactory E. M. Paule Construction & Trading, Inc., / JV-17-2606 Quinapondan Port Development Project 06/28/2019 DOTC 39.714 300 O 0.40 0.3 0.15 0.02 0.05 0.033 95.60 - On-going Solid M Construction - JV E. U. Jingco Construction Corp. (Formerly: Hindang Port Development Project: Rehabilitation / 31486 8/27/19 DOTR 26.531 310 C 0.45 0.20 0.30 - - - 95.30 *95.30% Very Satisfactory E.U. Jingco Construction) Improvement of Port

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 43 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

E. U. Jingco Construction Corporation 31486 Balangkayan Port Development Project 06/27/19 DOTC 17.779 315 C 0.43 0.20 0.30 - - - 92.90 *92.90% Very Satisfactory

E. U. Jingco Construction Corporation 31486 Maydolong Port Development Project 06/27/19 DOTC 18.916 285 C 0.45 0.20 0.30 - - - 95.20 *95.20% Very Satisfactory

E.A. Ramirez Construction, Inc. (Formerly: Construction of One (1) Unit Three - Storey - 15 Classroom 11631 5/17/19 NHA 23.947 341 C 0.48 0.15 0.13 - - - 76.00 *76.00% Unsatisfactory E.A. Ramirez Construction) School Building Rehabilitation/Major Repair of Permanent Bridge Lupi Bridge I Camarines Sur E.A. Sancho Const. Inc. 5648 (B00509LZ) along Jct. Digdigon (Goa) - Tinambac Road, Lupi 11/06/2019 3.723 79 C 0.50 0.13 0.30 - - - 93.30% 92.58% Very Satisfactory 4th DEO Tinambac, K0501+918.00 - K0501+933.60 Bridge Rehabilitation/Major Repair of Permanent Bridge, Lupi Camarines Sur E.A. Sancho Const. Inc. 5648 Bridge I (B005091LZ) Along Jct. Digdigon (Goa) – Tinambac 08/26/2019 3.723 79 O 0.37 0.30 0.15 0.03 0.04 0.03 92.10% - On-going 4th DEO Road, K0501+918.00 – K0501+903.60 Construction of One (1) Unit Covered Court/Multipurpose E.B. Matias Construction and Trading 24996 04/12/2019 NHA 4.791 210 O 0.40 0.30 0.00 0.03 0.07 0.03 83.00 - On-going Center, Pandi Village 2 Resettlement Project Construction of One (1) Unit Three-Storey 15 Classroom School E.B. Matias Construction and Trading 24996 04/12/2019 NHA 21.147 370 O 0.35 0.28 0.10 0.03 0.07 0.03 87.15 - On-going Building, Pandi Village 2 Resettlement Project Organizational Ouctome 2: Protect Lives and Properties Against Major Flood Management Program - Construction / E.B.J.R Construction 19780 11/22/2019 Apayao 1st DEO 13.782 192 C 0.48 0.13 0.30 - - - 91.10% 79.28% Unsatisfactory Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Nabuangan (Upstream) Flood Control

Convergence and Special Support Program : Consrtuction / Improvement of Access Roads Leading to Declared Tourism E.B.J.R Construction 19780 11/22/2019 Apayao 1st DEO 18.982 215 O 0.39 0.24 0.15 0.03 0.05 0.05 91.00% - On-going Destination, Caglayan - Paddig - Cupis Road Leading to Nabuangan River, Banselan Cave, Cupis Loomweaving ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Flood Management Program - E.B.J.R. Construction 19780 Construction / Maintenance of flood Mitigation Structures and 09/09/2019 Apayao 1st DEO 13.782 192 O 0.39 0.24 0.00 0.03 0.05 0.00 71.40% - On-going Drainage Systems - Construction of Nabuangan (Upstream) Flood Control Nueva Ecija 2nd E.D. Libunao Construction & Trading 36525 Construction of Multi-Purpose Building at Poblacion 11/22/2019 1.940 75 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory DEO San Felipe Communal Irrigation System - Construction of Canal E.E. Madayag Construction 25029 03/10/2019 NIA 18.392 300 O 0.290 0.300 0.102 0.030 0.051 0.050 82.33 - On-going Lining, Canal Structures, and Terminal Facilities Construction/Rehabilitation of Flood Mitigation Facilities within E.E. Madayag Construction 25029 Major River Basins and Principal Rivers - 11/13/2019 La Union 1st DEO 15.689 130 C 0.48 0.13 0.30 - - - 91.40% 87.62% Satisfactory Rehabilitation/Improvement of Amburayan River Control, Sitio

Construction/Rehabilitation of Flood Mitigation Facilities within E.E. Madayag Construction 25029 Major Basins and Principal Rivers - Rehabilitation/Improvement 08/20/2019 La Union 1st DEO 14.908 130 O 0.36 0.22 0.15 0.03 0.04 0.05 85.10% - On-going of A.R.C., Sitio Pudoc, Brgy. Alzate

Network Development Road Widening of Primary Roads, La Union 2nd E.E. Madayag Construction 25029 11/04/2019 14.700 182 O 0.40 0.24 0.10 0.03 0.04 0.03 84.80% - On-going Bauang-Baguio Road, K0266+004-K0266+270 DEO Construction/Maintenance of Flood Mitigation Structures and E.E. Madayag Construction 25029 Drainage Systems - Rehabilitation and Improvement of Carlatan 11/14/2019 La Union 1st DEO 18.734 240 O 0.40 0.24 0.15 0.03 0.05 0.05 92.30% - On-going - Biday - Tanqui Waterways E.F Chua Construction Inc./ Peter G. Chua Las Piñas- JV-16-2204 Zapote River Improvement Works (C-5 to Almanza 2) 03/15/2018 91.154 300 OG 0.376 0.241 0.150 0.030 0.060 0.050 90.70 - On - Going Builders Joint Venture Muntinlupa DEO MFO-2: Flood Management Services, Regional Office E.F. Chua Construction, Inc. 37826 Construction/Maintenance of Flood Mitigation Structures and 03/22/2018 55.295 286 OG 0.390 0.300 0.150 0.022 0.042 0.050 95.40 - On - Going No. IV-A Drainage Systems, Construction of Slope Protection Structure Construction of Flood Control Structures along Zapote River Las Piñas - E.F. Chua Construction, Inc. 37826 11/13/2019 91.537 300 O 0.37 0.30 0.15 0.03 0.04 0.05 93.90% - On-going Tributaries Muntinlupa DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 44 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Construction of 1 Unit, 2 Storey, Four Classroom and 2 Storey E.G. Canabe Construction 27358 Six Classroom School Building, Carigara National Vocational 08/27/2019 Leyte 2nd DEO 23.345 232 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory School Rehabilitation of Local Road, Lapu-Lapu Extension Brgy. NBBS Malabon- Navotas E.L. Torres Construction And Trading Inc. 31406 11/04/2019 3.759 90 C 0.47 0.13 0.30 - - - 90.70% 89.8% Very Satisfactory Proper DEO Construction of Riverwall along South Pinagkabalian River Malabon- Navotas E.L. Torres Construction And Trading Inc. 31406 11/05/2019 46.255 246 O 0.40 0.24 0.15 0.03 0.04 0.05 91.20% - On-going (Phase IV) Brgy. Panghulo DEO Rehabilitation of Local Road, Lapu-Lapu Ext. Brgy. NBBS Malabon-Navotas E.L. Torres Construction And Trading, Inc. 31406 08/30/2019 3.759 90 O 0.38 0.24 0.15 0.03 0.05 0.05 89.20% - On-going Proper DEO Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Draiganeg System, Nueva Vizcaya E.M. Bayatan Construction 21332 08/26/2019 26.117 136 C 0.48 0.13 0.30 - - - 90.90% 90.9% Very Satisfactory Construction of Benay River Flood Control Structures, 2nd DEO Bagumbayan Section

E.M. Cuerpo, Inc. 30963 Galas Port Development Project 03/21/2018 DOTC 39.183 420 C 0.48 0.20 0.30 - - - 98.10 95.50% Very Satisfactory

Construction of Ten (10) 5-Storey Residential Buildings with E.M. Cuerpo, Inc. 30963 01/17/2018 NHA 296.888 1,210 C 0.39 0.14 0.19 - - - 71.02 78.06% Unsatisfactory Land Development, Pleasant Hills Package 2 E.M. Cuerpo, Inc. 30963 Manggahan Residences 2 11/20/2018 NHA 226.635 1,215 C 0.48 0.19 0.14 - - - 81.43 70.28% Poor

E.M. Cuerpo, Inc. 30963 St. Francis Village 01/25/2019 NHA 289.844 813 C 0.45 0.20 0.25 - - - 90.39 74.32% Poor

Construction/Rehabilitation of Flood Mitigation Facilities within Ilocos Norte 2nd E.M. Cuerpo, Inc. 30963 Major River Basins and Principal Rivers - Construction of Water 11/08/2019 46.182 282 O 0.39 0.24 0.15 0.03 0.05 0.05 91.80% - On-going DEO Revetment along Laoag - Bongo River Protect Lives and Properties against Major Floods: Flood Management Program: Conctruction/ Maintenance of Flood E.M. Cuerpo, Inc./ Egb Contstruction (Joint Regional Office JV-17-666 Mitigation Structures and Drainage Systems: Flood Control/ 08/28/2019 185.986 436 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory Venture) No. II Urgent River Bank Protection Works, Sta. 0+000 to Sta. 1+020 (Downstream) Flood Management Services: Construction/ Maintenance of E.M. Cuerpo, Inc./ Egb Contstruction Joint Flood Mitigation Structures and Drainage System - Cagayan Regional Office JV-16-101 08/28/2019 256.216 839 C 0.46 0.13 0.30 - - - 89.80% 89.8% Very Satisfactory Venture River Flood Management Projects - Sta. 0+000 to Sta. 0+510 No. II Sect. 2; Sta. 0+000 to Sta. 0+135 Ilocos Sur 1st E.M. Palomares Construction 23471 Construction of Flood Control along Laoingen 11/11/2019 4.655 88 C 0.46 0.13 0.30 - - - 89.10% 66.9% Poor DEO Ilocos Sur 1st E.M. Palomares Construction 23471 Construction of Flood Control along Laoingen 08/26/2019 4.655 88 O 0.04 0.20 0.15 0.03 0.05 0.05 52.10% - On-going DEO Road Widening - tertiary Roads - Amungan - Palauig - Banlopg Zambales 1st E.M.L. Construction & Trading 10151 Road, including ROW - K0212+480 - K0213+680, K0213+888 - 11/13/2019 57.494 210 C 0.48 0.13 0.30 - - - 91.20% 91.2% Very Satisfactory DEO K0214+100 (PMS ID No. P00201409LZ-CWI) E.M.L. Construction & Trading / Tonka Pampanga 2nd JV-18-0044 Construction of Angeles - Porac - By-Pass Road 08/27/2019 96.498 300 C 0.50 0.13 0.30 - - - 93.00% 87.18% Satisfactory Construction (Joint Venture) DEO E.P. Manantan Construction & Development Construction of Concrete Road San Miguel leading to Jerrienor Davao del Norte 6457 08/23/2019 16.193 122 O 0.39 0.24 0.15 0.02 0.05 0.05 90.40% - On-going Corp. Inland Resort DEO Mindoro Oriental E.S.L. Builders And Parts Supply 9014 Road Concreting of General Esco - Inarawan - Tagumpay Road 06/02/2018 18.815 144 O 0.374 0.237 0.15 0.03 0.061 0.05 90.20 - On-going DEO Construction of Flood Mitigation Structures and Draiange E.S.L. Builders And Parts Supply/ Orient Star Southern Mindoro 9014 Systems, Construction of Flood Control Structures at Brgy. 11/07/2019 19.600 180 C 0.45 0.14 0.30 - - - 89.10% 87.72% Satisfactory Construction, Inc. Joint Venture DEO Pambisan Malaki to Sta. Maria - Sto. Niño - Pagalagala Construction / Improvement of Canal System of Upper Salaza CIS - Construction of Main Canal at Station 0+800 - 1+325 and E.T. Castro Construction & Supplies 42252 10/22/2019 NIA 3.671 150 O 0.36 0.21 0.15 0.03 0.04 0.05 84.81 - On-going Canal Structure at Main Canal Sta. 0+444 - 0+469 and Slope Protection

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 45 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of 2 Buildings - 2 Storey/ 12 Classrooms at Mindoro Oriental E.T.V.R. Trading And Construction 14581 03/20/2018 30.019 403 C 0.50 0.14 0.30 - - - 93.70 88.17% Satisfactory Oriental Mindoro National High School DEO Protect Lives and Properties Againts Major Flood, Construction/Rehabilitation of Flood Mitigation of Facilities E.V. Interior Construction 39699 11/08/2019 Cagayan 3rd DEO 48.987 224 O 0.39 0.22 0.15 0.03 0.05 0.05 89.40% - On-going within Major River Basins and Principal Rivers- Flood Management Project Nueva Ecija 2nd E.V. Interior Construction 39699 Construction of Road in Sta. Barbara 11/23/2019 33.048 183 O 0.32 0.24 0.00 0.03 0.04 0.00 62.60% - On-going DEO Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads - E.V. Interior Construction 39699 08/24/2019 Cagayan 1st DEO 9.378 50 C 0.44 0.13 0.00 - - - 57.00% 57% Poor Preventive Maintenance of Road: Asphalt Overlay - Airport Rd - K0583+ -714.20 - K0583+589 Road Concreting of Anangue Street, Brgy. Santiago, Iriga City, Camarines Sur (Section A: Sta. 0+084.00 - Sta. 0+247.00, Sta. Camarines Sur Ea-Ec Construction And Supply 15737 11/05/2019 18.810 94 C 0.49 0.13 0.30 - - - 92.10% 91.8% Very Satisfactory 0+347.00 - Sta. 0+465.00, Sta. 0+612.30 - Sta. 1+374.00, 5th DEO Section B: Sta. 0+210.00 - Sta. 1+209.00) Road Concreting of Anangue Street, (Section A: Sta. 0+084 to Camarines Sur Ea-Ec Construction And Supply 15737 Sta. 0+247, Sta. 0+347 to Sta. 0+465, Sta. 0+612.3 to Sta. 08/28/2019 18.810 94 O 0.40 0.23 0.15 0.03 0.06 0.05 91.60% - On-going 5th DEO 1+374, Section B: Sta. 0+210 to Sta. 1+209) Reconstruction to Concrete Pavement of Iloilo-Capiz (New East Asia Construction, Inc. 1904 11/11/2019 Iloilo 2nd DEO 20.970 186 C 0.47 0.13 0.30 - - - 90.00% 90% Very Satisfactory Route); KO034+051 - KO035+570 Reconstruction to Concrete Pavement- at Specific locations East Asia Construction, Inc. 1904 along Iloilo-Jaron Diversion Rd (S00493PN) K0002+383- 11/13/2019 Iloilo City DEO 16.062 70 C 0.49 0.13 0.30 - - - 92.10% 88.08% Satisfactory K0002+749, (S00498PN), Chainage 0- Chainage 356 Reconstruction to Concrete Pavement of Iloilo- Capiz (New East Asia Construction, Inc. 1904 08/27/2019 Iloilo 2nd DEO 19.920 161 O 0.33 0.24 0.15 0.03 0.05 0.05 84.30% - On-going Route ), K0034+051 - K0035+570 Reconstruction to Concrete Pavement-at Specific Locations East Asia Construction, Inc. 1904 along Iloilo-Jaro Diversion Road (S00493PN), K0002+383- 08/19/2019 Iloilo City DEO 15.148 63 O 0.34 0.30 0.15 0.00 0.02 0.05 85.40% - On-going K0002+749, (S000498PN) Chainage 0_Chainage 356 Reconstruction to Concrete Pavement Iloilo-Capiz Road (New Route), KO010+(-745) - KO010+000, KO011+300 - East Asia Construction, Inc. 1904 11/13/2019 Iloilo 4th DEO 42.155 148 O 0.33 0.24 0.15 0.03 0.05 0.05 85.30% - On-going KO012+000, KO015+090 - KO015+600, KO020+000 - KO020+526 Construction/Maintenance of Flood Mitigation Structure and Ilocos Sur 2nd Eastern Line Development And Construction 42894 11/12/2019 14.077 190 O 0.37 0.24 0.15 0.03 0.05 0.05 89.60% - On-going Drainage Systems - Construction of Bilidbid Flood Control DEO Local Program: Construction of Road (Phase II), Consolatrix Ebs Construction And Supplies 39574 08/25/2019 Samar 1st DEO 2.725 30 C 0.44 0.13 0.30 - - - 87.40% 87.4% Satisfactory Homeowners Association Rehabilitation/Upgrading of Drainage System along Metro Manila 2nd Ebuilders Construction & Development Corp 36855 11/21/2019 19.012 180 O 0.33 0.30 0.10 0.03 0.05 0.03 84.20% - On-going Street and its Vicinity, Barangay San Martin De Porres DEO Construction and Maintenance of Bridges along National Roads Zamboanga del EC Structural Composites, Inc. 31961 (Retrofitting/ Strengthening of Permanent Bridges) at Ingin 03/15/2018 11.592 116 C 0.50 0.17 0.30 - - - 97.20 83.38% Satisfactory Norte 1st DEO Bridge (B000457MN) along Dipolog - Sindangan - Liloy Road Bridge Retrofitting/Strengthening of Permanent Bridges Bunot Ec Structural Composites, Inc. 31961 Bridge2 (B00997LZ) along Apayao (Calanasan) - Ilocos Norte 09/11/2019 Apayao 2nd DEO 7.309 150 O 0.40 0.20 0.15 0.03 0.05 0.05 88.40% - On-going Road Retrofitting/Strengthening of Bridge -Pangawitao Br. Ec Structural Composites, Inc. 31961 (B00498PN) along Jct. National Rd., Cuartero-Tapulang- 08/24/2019 Capiz 2nd DEO 14.627 107 O 0.39 0.23 0.15 0.03 0.05 0.05 89.90% - On-going Maayon Rd. Retrofitting/Strengthening of Bridge - San Jose Br. (B00074PN) Ec Sturctural Composites, Inc. 31961 11/09/2019 Capiz 2nd DEO 45.972 179 O 0.40 0.24 0.13 0.03 0.04 0.03 86.80% - On-going along Tapaz-Jamindan-Altavas Rd. Bridge Retrofitting/ Strengthening of Permanent Bridges Bunot Ec Sturctural Composites, Inc. 31961 Bridge 2 (B00997LZ) along Apayao (Calanasan) - Ilocos Norte 11/23/2019 Apayao 2nd DEO 7.309 180 O 0.40 0.24 0.15 0.03 0.06 0.05 92.90% - On-going Road Eccon Dev't Corporation (Formerly: E. Construction of Multi-Purpose Building Center in Brgy Cang- 22168 04/07/2018 Siquijor DEO 4.950 150 C 0.49 0.13 0.30 - - - 92.00 *92.00% Very Satisfactory Caneda Construction) alwang

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 46 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Ilocos Norte 1st Eddie G. Guillen Builders 14174 Construction of Flood Control Structure along Bongo River 05/29/2018 23.272 136 O 0.367 0.236 0.11 0.03 0.051 0.033 82.70 - On-going DEO Network Development Program - Construction of By-pass and Cagayan 2nd Eddie G. Guillen Builders 14174 08/21/2019 66.360 248 O 0.36 0.22 0.15 0.03 0.05 0.05 86.00% - On-going Diversion Roads - Claveria Bypass Road DEO Construction of Flood Mitigation Structure - Construction of Cagayan 2nd Eddie G. Guillen Builders 14174 Cabicungan Flood Control Project along Cabicungan River 11/07/2019 71.973 346 O 0.39 0.24 0.15 0.03 0.05 0.05 90.20% - On-going DEO (San Antonio - Kappanikian - Tabbugan Section) Eddmari Construction & Trading 20301 Cool Mont Crest 1 8/30/19 NHA 299.256 1,237 C 0.44 0.20 0.19 - - - 82.59 79.84% Unsatisfactory

Eddmari Construction & Trading 20301 Divine Grace Village 09/08/2019 NHA 130.152 882 C 0.43 0.19 0.19 - - - 80.12 76.51% Unsatisfactory

Eddmari Construction & Trading 20301 San Antonio Village 09/08/2019 NHA 236.540 855 C 0.43 0.19 0.13 - - - 75.13 74.65% Poor

Eddmari Construction and Trading 20301 Sagrado Villas 02/23/18 NHA 295.940 455 O 0.339 0.300 0.149 0.030 0.058 0.050 92.52 - On-going

Eddmari Construction and Trading 20301 St. John The Baptist Ville 02/24/18 NHA 152.526 183 E 0.46 0.19 0.27 - - - 92.75 95.78% Very Satisfactory

Eddmari Construction and Trading 20301 Cool Mont Crest 1 07/06/2018 NHA 289.900 327 O 0.31 0.26 0.12 0.03 0.07 0.03 82.08 - On - Going

Eddmari Construction and Trading 20301 San Antonio Village 07/06/2018 NHA 236.540 300 O 0.32 0.29 0.00 0.03 0.06 0.03 73.42 - On - Going

Eddmari Construction and Trading 20301 Sto. Niño Homes 10/05/2018 NHA 289.800 453 O 0.35 0.24 0.12 0.03 0.06 0.03 83.82 - On - Going

Eddmari Construction and Trading 20301 Villa Lindero Nuevo 10/19/2018 NHA 86.930 453 O 0.36 0.29 0.15 0.03 0.07 0.05 93.93 - On - Going

Eddmari Construction and Trading 20301 Divine Grace Village 10/26/2018 NHA 130.152 796 E 0.35 0.29 0.00 0.03 0.07 0.02 74.95 - On - Going

Eddmari Construction and Trading 20301 Scout Ranger Ville 12/18/2018 NHA 944.360 405 O 0.38 0.28 0.15 0.03 0.04 0.05 92.14 - On - Going

Eddmari Construction and Trading 20301 Fatima Homes Permanent Housing Project 04/06/2018 NHA 289.700 628 C 0.42 0.20 0.20 81.80 82.65% Satisfactory

Eddmari Construction and Trading 20301 Sto. Ñino Homes 03/16/2019 NHA 289.800 489 C 0.45 0.20 0.20 - - - 84.93 84.15% Satisfactory Eddmari Construction and Trading / Aina Villa Jawili 03/09/2019 NHA 171.015 783 O 0.35 0.28 0.15 0.03 0.07 0.05 92.95 - On - Going Construction - J.V. Rehabilitation / Reconstruction of National Roads with Slips, Zamboanga del Edison Development & Construction 2400 Slope Collapse and Landslide along Jct. Dumalinao - 08/27/2019 6.777 156 C 0.47 0.13 0.30 - - - 90.50% 90.5% Very Satisfactory Sur 2nd DEO Margosatubig Road (Molum), K1704+721 to K1705+035 Construction / Maintenance of Flood Mitigation Structures and Edison Development & Construction 2400 09/09/2019 Apayao 1st DEO 30.102 296 O 0.40 0.24 0.09 0.02 0.04 0.00 79.50% - On-going Drainage Systems - Construction of Paddaoan Flood Control

Construction / Maintenance of Flood Mitigation Structure and Edison Development & Construction 2400 09/09/2019 Apayao 1st DEO 35.563 447 O 0.40 0.24 0.07 0.03 0.05 0.00 79.20% - On-going Drainage Systems - Construction of Cupis Flood Control Edison Development & Construction /Patrila Construction of Aganan Flood Control Project (jaro-Aganan JV-17-1263 08/29/2019 Iloilo 4th DEO 55.005 365 C 0.44 0.13 0.30 - - - 87.20% 87.2% Satisfactory Builders, Inc. (Joint Venture) River) Edison Development & Construction Inc. (Formerly:Edison Development & 2400 / 37738 Bagong Pagasa Subdivision Phase 1 8/16/19 NHA 306.661 980 C 0.44 0.20 0.11 - - - 75.21 74.35% Poor Construction) / 3R Metal Craft (JV) Edison Development and Construction 2400 Limlim Communal Irrigation System 10/10/2018 NIA 18.360 180 O 0.35 0.30 0.06 0.01 0.06 0.03 81.00 - On - Going Edison Development and Construction 2400 Construction of Cebu 5th DEO 04/05/2018 Cebu 5th DEO 38.018 240 OG 0.389 0.240 0.150 0.030 0.050 0.050 90.90 - On - Going MFO-1 National Road Network Services, Network Development, Improvement/ Widening of National Roads, Batangas 3rd Edison Development and Construction 2400 Secondary Roads, Banay-Banay-Mojon Cuenca Road, 03/18/2018 118.406 390 OG 0.396 0.225 0.150 0.022 0.033 0.033 85.87 - On - Going DEO K0090+073+K0090+740, K0092+661 - K0093+441, K0100+000-K0102+…

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 47 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Edison Development and Construction 2480 Guinticgan Village Ph. 1 04/06/2018 NHA 289.850 459 O 0.48 0.18 0.30 - - - 95.98 - On-going Rehabilitation and Development of Estero de Paco (RMMW- Edison Development and Construction 2480 03/18/2019 PRRC 24.195 605 O 0.28 0.22 0.04 0.02 0.04 0.05 63.40 - On - Going MNL-EDPAC) Construction of Four (4) Storey, Twenty Four (24) Classroom Malabon-Navotas Edison Development and Construction 2400 03/22/2018 36.263 330 C 0.43 0.19 0.30 - - - 92.20 85.27% Satisfactory School, Imelda Elementary School, Malabon City DEO Construction of Aganan Flood Control Project (Jaro - Aganan Edison Development and Construction 2400 03/15/2018 Iloilo 4th DEO 46.539 369 C 0.45 0.13 0.30 - - - 87.90 *87.90% Satisfactory River) Rehabilitation/ Strengthening of Bridge on Various Locations at Edison Development and Construction 2400 04/03/2018 Samar 2nd DEO 18.752 245 C 0.42 0.13 0.30 - - - 85.00 *85.00% Satisfactory Polangi Bridge,

Edison Development and Construction / 3R Bagong Pag -asa Subdivision- Phase 1 02/03/2018 NHA 289.490 623 E 0.35 0.28 0.00 0.03 0.04 0.03 73.00 - On - Going Metal Craft - Joint Venture

Edison Development and Construction / 3R Bagong Pagasa Subdivision Phase 1 01/25/2019 NHA 289.490 901 E 0.35 0.30 0.00 0.03 0.05 0.03 74.95 - On - Going Metal Craft - Joint Venture Edison Development and Construction / Construction/Extension Flood Control at Saaz River (Including Zamboanga City JV-16-461 03/20/2018 29.208 382 C 0.50 0.13 0.30 - - - 93.30 90.54% Very Satisfactory JM2K Construction Right of Way Acquisition) DEO Edison Development and Construction / JV-16-1619 Construction of Tigum Flood Control (Jaro- Tigum River) 03/22/2018 Iloilo 4th DEO 18.617 315 C 0.47 0.13 0.30 - - - 90.30 *90.30% Very Satisfactory Patrila Builders, Inc. MFO1-National Road Networks Services, Network Development, Improvement/ Widening of National Roads, Batangas 3rd Edison Development Construction 2400 06/19/2018 91.716 330 C 0.49 0.13 0.30 - - - 92.20 92.20% Very Satisfactory Secondary Roads, Tanauan-Talisay-Tagaytay Rd, K0065+570- DEO K0068+431, K0074+299-K75+851, K0075+862-K0076+146 Construction/Maintenance of Flood Mitigation Structure and Edison Devleopment & Construction/ Ptk Palawan 2nd Drainage Systems, Construction of Malatgao Flood Control 05/28/2018 96.012 306 O 0.363 0.237 0.15 0.03 0.047 0.05 87.70 - On-going Group Inc. Joint Venture DEO Structure Procurement of 474 Fully Developed Lots and Completed Edly Construction 34421 9/27/19 NHA 178.982 347 O 0.37 0.30 0.00 0.03 0.07 0.03 79.21 - On-going Housing Units (Capoocan Village) Construction (Completion) of Multi-Purpose Building, Brgy. San Edly Construction 34421 11/08/2019 Capiz 1st DEO 2.423 60 C 0.50 0.13 0.30 - - - 93.10% 93.24% Very Satisfactory Fernando, Pilar, Capiz Edly Construction 34421 Construction (Completion) Of Multi-Purpose Building 08/23/2019 Capiz 1st DEO 2.423 60 O 0.38 0.27 0.15 0.03 0.05 0.05 93.30% - On-going Edly Construction / Goldenville Realty and 34421 / North Hill Arbour 2 03/09/2018 NHA 287.976 700 C 0.49 0.20 0.24 - - - 93.56 95.03% Very Satisfactory Development Corporation (JV) 33640 Cluster - LIP: Buildings and other Structures - Multi-Purpose/ Facilities-Construction of Multi-Purpose Building. (Covered Camarines Sur Edrox Construction, Inc. 10926 11/08/2019 4.839 120 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory Court) A.) Brgy. Mataoroc, Minalabac, Camarines Sur and B.) 2nd DEO Brgy. Sagrada Familia Buildings and other Structures-MultiPurpose/Facilities- Construction of Multi-Purpose Building. (Covered Court), Brgy. Camarines Sur Edrox Construction, Inc. 10926 Planza, San Fernando, Cam. Sur and B.) VILP-Buildings and 11/08/2019 4.324 120 C 0.50 0.13 0.30 - - - 93.40% 88.15% Satisfactory 2nd DEO other Structures-Multi-Purpose/Facilities-Constructiom of Multi- Purpose Building at Poblacion, San Fernando, Camarines Sur

Cluster - A) LIP: Buildings and other Structures - Multipurpose/ Facilities - Construction of Multi-purpose Building (Covered Camarines Sur Edrox Construction, Inc. 10926 Court), Barangay Planza, San Fernando, Camarines Sur, B) 08/22/2019 4.324 120 O 0.37 0.26 0.12 0.03 0.05 0.03 85.90% - On-going 2nd DEO VLIP - Buildings and other Structures - Multipurpose/ Facilities - Construction of Multipurpose Building at Poblacion Design and Build Services for the Construction of Administration Edtaha Builders 37249 06/25/2019 DOST 29.598 362 O 0.378 0.300 0.150 0.030 0.035 0.050 94.30 - On-going Building Northern Samar Efc Development Corporation 45005 Concreting of San Jose - San Antonio - Bonifacio Road 11/04/2019 9.410 120 C 0.49 0.13 0.30 - - - 91.90% 89.14% Very Satisfactory 2nd DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 48 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Northern Samar Efc Development Corporation 45005 Concreting of San Jose - San Antonio - Bonifacio Road 08/20/2019 9.410 120 O 0.36 0.24 0.15 0.02 0.05 0.05 86.50% - On-going 2nd DEO Network Development - Off-Carriageway Improvement - Pangasinan 1st Eff Builders Corporation 31225 Secondary Roads, Pangasinan - Zambales Road, K0309+975 06/05/2018 13.475 135 O 0.293 0.279 0.150 0.030 0.035 0.050 83.70 - On-going DEO to K0310+1012 Provincial Efler Construction and Enterprise 41046 Improvement along Tulodan - Sayangan Provincial Road 01/10/2020 Government of 4.974 108 O 0.39 0.29 0.15 0.03 0.07 0.05 9830.00% - On-going Benguet Protect Lives and Properties againts Major Floods, Egb Construction / Megay Construction Joint Construction/Rehabilitation of Flood Mitigation of Facilities JV-18-1556 11/08/2019 Cagayan 3rd DEO 60.211 224 O 0.39 0.21 0.15 0.03 0.05 0.03 86.10% - On-going Venture within Major River Basins and Principal Rivers-Cagayan River Flood Management Projects MFO2 : Flood Management Services: Egb Const./ Dandex Construction Joint Construction/Maintenance of Flood Mitigation Structures and Cagayan 2nd JV-16-450 03/14/2018 39.200 335 C 0.34 0.20 0.15 - - - 69.00 82.46% Satisfactory Venture Drainage System-Construction of Cabicungan Flood Control DEO Project along Cabicungan River Egb Const./ Dandex Construction Joint MFO 1: National Road Network Services-Construction of By Cagayan 2nd JV-16-600 03/14/2018 48.510 269 C 0.38 0.20 0.30 - - - 87.70 87.28% Satisfactory Venture Passes/Diversion Roads, including ROW-Claveria Bypass Road DEO 17BE0072- Widening of Santa Bridge (B011132LZ) along Egb Construction 13722 06/01/2018 Isabela 1st DEO 16.767 275 C 0.49 0.18 0.30 - - - 97.20 97.20% Outstanding Daang Maharlika (LZ) Construction/Repair/ Rehabilitation/Improvement of Various Baguio City DEO, Egb Construction 13722 Infrastructure including Local Projects /Upgrading of Roads 06/08/2018 9.793 150 C 0.43 0.17 0.00 - - - 60.70 60.70% Poor CAR Including Drainage Facilities Along Wright Park MFO 1: National Road Network Services- Asset Preservation of National Roads- Construction/Upgrading/Rehabilitation of Egb Construction 13722 Drainage along National Roads-Primary, Daang Maharlika (LZ)- 06/01/2018 Isabela 1st DEO 11.160 337 C 0.50 0.13 0.30 - - - 93.00 93.00% Very Satisfactory (S00731LZ), (Construction of Drainage Structure along Road Road/Shoulder Paving/Construction) Isabela Irrigation Management Office - Remove and Constructed 4 Units Box Siphon along River Bed, Remove and EGB Construction 13722 5/25/19 NIA 7.817 270 C 0.37 0.19 0.30 - - - 86.27 *86.27% Satisfactory Construct Lined Canal and Construction of 6 Units Canal Structures & Drainage MFO2: Construction of Flood Control System, Egb Construction 13722 03/15/2018 Cagayan 3rd DEO 45.014 300 C 0.40 0.20 0.30 - - - 90.30 *90.30% Very Satisfactory Tuguegarao Side (Upstream), Sta. 0+(-020)-Sta. 0+200

MFO 1: National Road Network Services: Asset Preservation of National Roads-Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage Based on PMS/HDM-4-Primary: Santiago-Tuguegarao Road, K0424+142- Egb Construction 13722 K0424+670, K0425+000-K0425+721, K0430+000-K0431+000, 03/14/2018 Isabela 1st DEO 32.566 163 C 0.37 0.20 0.30 - - - 86.70 *86.70% Satisfactory K0431+208.40-K0431+348.40, K0431+360-K0431+400, K0431+430-K431+506, K0431+520-K0431+542.50, K0431+620-K0432+000, K0432+240-K0432+316, K0432+379- K0432+430, K0433+193.50- K0433+260

MFO 1: National Road Network Services-Construction of Bridges along National Roads-Widening of Permanent Bridges, Egb Construction 13722 03/16/2018 Isabela 1st DEO 15.047 225 C 0.47 0.18 0.30 - - - 94.50 *94.50% Very Satisfactory including ROW-To More Than 2 Lanes Magassi Br. (B01133LZ) along Daang Maharlika Highway (LZ) Cagayan 2nd Egb Construction 13722 Restoration of Dugo Flood Control 03/14/2018 37.634 330 C 0.39 0.20 0.30 - - - 73.70 *86.30% Satisfactory DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 49 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Organizational Outcome 2: Protect Lives and Properties against Major Floods: Flood Management Program: Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Regional Office Egb Construction 13722 08/28/2019 87.735 418 C 0.49 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory Basins and Principal Rivers - Construction of Pinacanauan No. II River Revetment with Steel Sheet Piles, Capo-Bangag River Control Egb Construction 13722 Construction of Flood Control Project 11/13/2019 Isabela 1st DEO 27.927 210 C 0.40 0.20 0.30 - - - 90.20% 90.32% Very Satisfactory Egb Construction 13722 Construction of Flood Control Project, Brgy. Lanna 08/28/2019 Isabela 1st DEO 27.927 210 O 0.37 0.24 0.15 0.03 0.06 0.05 90.40% - On-going Construction of Flood Mitigation Structure - Construction of Cagayan 2nd Egb Construction 13722 08/21/2019 19.047 234 O 0.40 0.24 0.15 0.03 0.07 0.05 93.20% - On-going Negro - Cabayu Flood Control Project DEO Network Development - Road Widening - Primary Roads, Egb Construction 13722 11/13/2019 Isabela 1st DEO 23.446 164 O 0.36 0.30 0.12 0.02 0.05 0.03 88.20% - On-going Daang Maharlika (LZ) Ensure Safe and Reliable National Road System, Bridge Egb Construction 13722 Widening of Permanent Bridge, Widening of Permanent Bridge, 11/08/2019 Cagayan 3rd DEO 65.508 272 O 0.40 0.22 0.15 0.03 0.05 0.05 89.70% - On-going Labato Bridge (B03198LZ) along Cagayan Valley Road Ensure Safe and Reliable National Road System, Bridge Egb Construction / Double J1908 Joint JV-19-214 Widening of Permanent Bridges, Pinacunauan Br. (B01910LZ) 11/08/2019 Cagayan 3rd DEO 93.582 300 O 0.38 0.24 0.15 0.02 0.05 0.05 89.70% - On-going Venture along Cagayan Valley Road, Phase II Organizational Outcome 1: Ensure Safe and Reliable National Road System: Network Development Program- Road Egb Construction / E.M. Cuerpo, Inc. Joint Widening: Primary Roads, Daang Maharlika (LZ) -K0423+200- Regional Office JV-17-774 09/14/2019 168.428 540 C 0.47 0.15 0.30 - - - 92.60% 92.6% Very Satisfactory Venture K0423+304, K0423+355-K0423+871, K0423+1311- No. II K0423+1971, K0424+303-K0425+701.30, K0429+696.50- K0430+255.9 Egb Construction / Katha Builders & Supplies Construction of By-pass and Diversion Roads-Claveria Bypass Cagayan 2nd JV-17-2537 11/06/2019 93.610 464 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory Joint Venture Road including Bridge DEO Asset Preservation of National Roads- Rehabilitation/ Reconstruction of National Roads with Slip, Slope Collapse, Egb Construction / Mep Construction Joint JV-16-1137 and Landslide- Secondary : Rehabilitation Major Repair of Road 06/07/2018 Bagiou City DEO 14.804 195 C 0.50 0.13 0.30 - - - 92.90 92.90% Very Satisfactory Venture Slope Protection Structure -Western Link Circumferential Rd., KO 247 + 485 - KO247+616 Construction of By-Passes/ Diversion Roads, including ROW, Egb Construction / Mep Construction Joint JV-16-1137 (Baguio to Bauang Road) to Quezon Hill Drive 04/12/2018 Baguio City DEO 48.902 287 C 0.47 0.13 0.30 - - - 91.10 *91.10% Very Satisfactory Venture By-Pass Road ) OO2: Protect Lives and Properties Against Major Floods: Egb Construction / Rcps Construction & Construction/Rehabilitation of Flood Mitigation Facilities within JV-18-859 11/09/2019 Isabela 3rd DEO 46.121 171 O 0.35 0.30 0.10 0.02 0.04 0.03 83.40% - On-going General Trading Joint Venture Major River Basins and Principal Rivers - Construction of Cagayan River Flood Management Project Egb Construction / Spiderone Construction National Building Program: Repair/ Rehabilitation of the Baguio JV-17-1885 11/29/2019 CAR 169.226 601 C 0.47 0.18 0.30 - - - 94.60% 88.37% Satisfactory Company Ltd. (Jv) Convention Center Convergence and Special Support Program - Construction/Improvement of Access Roads Leading to Egb Construction / Tjmt Construction JV-18-1201 08/19/2019 Cagayan 1st DEO 37.240 164 O 0.37 0.24 0.15 0.03 0.05 0.05 89.40% - On-going Declared Tourism Destinations - Construction of Concrete Road - Luga - Palagao Road (Package II) Asset Preservation of National Roads, Egb Construction/ Pacific Star Erectors Joint Rehabilitation/Reconstruction of National Roads with Slips, Apayao 1st DEO, 06/05/2018 71.151 346 O 0.400 0.300 0.052 0.030 0.047 0.033 86.20 - On-going Venture Slope Collapse and Landslide -Secondary Roads along Conner- CAR Kabugao Road KO 567 + 113- KO 599 + 600 Protect Lives and Properties against Major Floods: Egb Construction/ Rcps Construction & Construction/Rehabilitation of Flood Mitigation Facilities within JV-18-859 08/25/2019 Isabela 3rd DEO 46.121 171 O 0.40 0.24 0.15 0.03 0.06 0.05 92.60% - On-going General Trading (Joint Venture) Major River Basins and Principal Rivers: Construction of Cagayan River Flood Control Project

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 50 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Organizational Outcome 1: Ensure and Reliable National Road System: Network Development: Road Widening: Primary Roads Egb Construction/ Rcps Construction & Regional Office JV-17-604 Daang Maharlika (LZ), K0365+198 to K0365+491, K0365+616 08/23/2019 119.915 382 C 0.49 0.13 0.30 - - - 92.00% 92% Very Satisfactory General Trading Joint Venture No. II to K0366+027, K0366+613 to K0367+500. K0368+778.5 to K0369+275, K0370+575 to K0371+988

Egb Construction/ Rpf Construction (Joint Network Development-Improvement/Widening of National 05/29/2018 Cagayan 1st DEO 91.174 308 O 0.393 0.241 0.150 0.015 0.020 0.033 85.20 - On-going Venture) Roads at Barangay Alasula to Magapit, Lal-lo Egb Construction/ Spiderone Construction National Building Program, Repair/Rehabilitation of the Baguio JV-17-1885 09/06/2019 CAR 169.226 568 O 0.36 0.30 0.09 0.03 0.04 0.03 85.70% - On-going Company Ltd. Joint Venture convention Center Construction/Maintenance of Flood Control Mitigation Structure Egb Construction/Katha Builders & Supply and Drainage Systems, Completion of Guisit River Control, Regional Office JV-16-1162 03/14/2018 77.200 359 C 0.41 0.20 0.30 - - - 90.80 *90.80% Very Satisfactory Joint Venture Brgys. Estancia,Dupitac, Abucay, Gayamat, Calluza, Anao and No. I Bimmanga Construction of Flood Control Mitigation Structure - Egb Construction/Mep Construction Joint Construction/Rehabilitation of Flood Control Mitigation - 09/06/2019 Baguio City DEO 46.853 220 O 0.39 0.24 0.15 0.03 0.04 0.03 88.30% - On-going Venture Facilities/Drainage System along Asin-Gallano River, Baguio City Construction of Concrete Road - Access Road Leading to Don Cotabato 2nd Egcg Builders And Supply 41942 Bosco Biodynamic Farm, Sanggawan Falls and Hotspring, 11/26/2019 11.759 110 C 0.50 0.13 0.30 - - - 92.90% 92.84% Very Satisfactory DEO Brgy. Batasan Construction of Conrete Road - Access Road leading to Don Egcg Builders And Supply 41942 Bosco Biodynamic Farm, Sanggawan Falls and Hotspring, 08/21/2019 Cotabato 1st DEO 11.164 95 O 0.40 0.24 0.15 0.03 0.06 0.05 92.80% - On-going Brgy. Batasan, Makilala,North Cotabato Local Program - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure Including Local Projects - Eight J'S Construction Services 41912 11/08/2019 North Manila DEO 9.789 135 C 0.50 0.13 0.30 - - - 92.80% 89.32% Very Satisfactory Local Roads and Bridges - Local Roads - Concreting of Roads with Drainage Improvement along

Local Program - Construction / Repair/ Rehabilitation / Improvement of Various Infrastructure including Local Projects - Eight J'S Construction Services 41912 08/27/2019 North Manila DEO 9.780 135 O 0.36 0.24 0.15 0.03 0.05 0.05 87.50% - On-going Local Roads and Bridges - Local Roads - Concreting of Roads with Drainage Improvement along Anona Street, Sta Mesa Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Construction / Maintenance of Flood Mitigation South Manila Eight J'S Construction Services 41912 Structures and Drainage System - Rehabilitation / Major Repair 11/11/2019 27.679 300 O 0.39 0.30 0.15 0.03 0.04 0.05 95.10% - On-going DEO of Drainage Structure - Improvement of Drainage and Outfall, New Panaderos Street Network Development - Construction of Aaminos - Bani By-pass Pangasinan 1st Ejr Builders & Construction Supply 24255 06/05/2018 34.062 240 O 0.369 0.269 0.150 0.030 0.040 0.050 90.80 - On-going Road, including Slope Protection DEO Pangasinan 1st Ejr Builders & Construction Supply 24255 Network Development-Road Widening Alaminos By Pass Road 11/12/2019 9.895 330 O 0.39 0.24 0.15 0.03 0.05 0.03 88.90% - On-going DEO Local Infrastructure Program, Building and Other Structures, Mt. Province 1st El Bana Construction And Supply 39160 Multi-Purpose/ Facilities , Construction of Multi - Purpose 11/26/2019 3.960 140 C 0.50 0.13 0.30 - - - 93.30% 89.38% Very Satisfactory DEO Building Local Infrastructure Program-Buildings and Other Structures- Mt. Province 1st El Bana Construction And Supply 39160 09/09/2019 3.863 117 O 0.39 0.24 0.13 0.03 0.05 0.03 87.70% - On-going Multipurpose Building DEO NIA / Pangsasinan Concreting of Canal & Structures for Cabayaosan Pump El Felipe Design And Construction 36041 11/28/2020 Irrigation 10.208 300 C 0.43 0.10 0.30 - - - - 82.80% Satisfactory Irrigation Project Management Office Rehabilitation with Slope Protection of Creek, Tinapantay Back El-Jake Builders 38162 09/03/2019 Rizal 1st DEO 29.400 360 C 0.41 0.13 0.30 - - - 83.90% 83.9% Satisfactory of Marcelino M. Santos NHS

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 51 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program- Construction/Maintenance of Flood Mitigation Structures and El-Jake Builders 38162 08/27/2019 North Manila DEO 30.271 240 O 0.38 0.24 0.15 0.03 0.06 0.05 90.40% - On-going Drainage Systems-Construction of Drainage Feeder Lines Connecting to Blumentritt Interceptors Alignments inside (Entrance Road) El-Jake Builders/Rucs Konsult & Construction Construction of Bocboc Flood Control Structure 06/08/2018 Marinduque DEO 23.830 284 O 0.385 0.251 0.15 0.03 0.051 0.033 90.00 - On-going Rehabilitation/Reconstruction of National Roads with Slips, Elkankonstrak Development Corporation 26220 Slope Collapse, and Landslide - Tertiary Roads, San Fernando - 06/05/2018 Masbate 3rd DEO 29.888 120 O 0.332 0.3 0.15 0.022 0.051 0.05 90.50 - On-going Talisay Road Construction of Various Flood Control Mitigation Structures Elkankonstrak Development Corporation 26220 04/11/2018 Masbate 3rd DEO 46.403 210 C 0.49 0.13 0.30 - - - 92.40 91.92% Very Satisfactory (Dike), Convergence and Special Support Program - Construction/ Regional Office Elkankonstrak Development Corporation 26220 Improvement of Access Roads Leading to Seaports, 11/08/2019 22.919 165 O 0.34 0.24 0.15 0.03 0.06 0.05 86.50% - On-going No. V Guinobatan - Jovellar - Donsol Road Leading to Pilar Network Development: Off-Carriageaway Imporvement Elleo Construction And Supply 40568 Including Drainage along Antequera-San Isidro-Libertad 04/05/2018 Bohol 2nd DEO 4.781 59 C 0.47 0.13 0.30 - - - 90.80 *90.80% Very Satisfactory (Tubigon) Road, K0031+509 - K0032+200 Elohim Construction 38017 Construction of Multi-Purpose Building 11/07/2019 Isabela 4th DEO 4.950 205 O 0.39 0.22 0.15 0.03 0.04 0.05 86.90% - On-going Construction of Fronthaul for the Bypass Infrastructure Em Cuerpo, Inc. 30963 02/01/2019 BCDA 30.333 90 C 0.33 0.20 0.30 - - - 83.23 *83.23% Satisfactory Project EM Paule Construction and Trading Inc. 19006 Caraigara Port Development Project - Rehabilitation of Port 11/09/2019 DOTR 16.776 240 C 0.40 0.20 0.27 - - - 86.90 *86.90% Satisfactory (Formerly: EM Paule Construction & Trading) Construction off Multi-Purpose Building (Covered Court/ Emq Design & Construction 16128 11/14/2019 Romblon DEO 7.425 120 O 0.34 0.24 0.14 0.03 0.06 0.03 84.20% - On-going Evacuation Center) Construction of One (1) Unit Three (3) Storey Regular Negros Occidental Emr Builders 32224 08/22/2019 13.573 150 C 0.46 0.17 0.30 - - - 92.60% 92.6% Very Satisfactory Workshop Building at Cauayan National High School 3rd DEO

Negros Occidental Emr Builders 32224 Construction of Multi-Purpose Building 11/09/2019 4.950 150 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory 2nd DEO CONSTRUCTION ORGANIZATIONAL OUTCOME 1: Ensure Enrique T. Chua Construction Development Safe and Reliable National Road System - Network 37893 09/09/2019 Apayao 1st DEO 17.937 270 O 0.36 0.24 0.15 0.03 0.04 0.03 85.50% - On-going Corporation Development Program - Construction of Missing Links / New OrganizationalRoads - Abra Outcome - Kalinga 1:- Apayao Ensure RoadSafe and(Buluan Reliable - Banban National - Enrique T. Chua Construction Development 37893 Road System - Network Development Program - Construction 11/22/2019 Apayao 1st DEO 17.937 270 O 0.37 0.24 0.15 0.03 0.06 0.05 89.90% - On-going Corporation of Missing Links / New Roads Abra - Kalinga - Apayao Road EPM Construction 40511 Construction of Property Building 05/14/2019 DOST 9.565 230 O 0.36 0.3 0 0.03 0.046 0.033 76.90 - On-going Provincial Upgrading/ Improvement of Sacol Beach Road-NRJ-Agong-ong- Eqiuparco Construction Company 14332 08/07/2018 Government of 115.342 272 O 0.39 0.30 0.15 0.03 0.07 0.05 98.50 - On - Going Macalang-Upper Makalang-Cabang-ayan Provincial Road Agusan del Sur Provincial Upgrading/ Improvement of Sacol Beach Road-NRJ-Agong-ong- Eqiuparco Construction Company 14332 01/30/2019 Government of 115.500 372 C 0.48 0.20 0.30 - - - 97.50 98.10% Outstanding Macalang-Upper Makalang-Cabang-ayan Provincial Road Agusan del Sur Eqiuparco Construction Company 14332 Umayam River Irrigation Project 02/03/2018 NIA 246.40 943 O 0.339 0.264 0.150 0.022 0.049 0.040 86.34 - On-going Construction/Maintenance of Flood Mitigation Sturctures and Agusan del Norte Eqiuparco Construction Company 14332 Drainage Systems-Rechanneling of Puyo River, Barangay 05/28/2018 48.199 261 C 0.50 0.14 0.30 - - - 93.20 93.20% Very Satisfatory DEO Bangonay, Magsaysay and Cuyago Construction of By-Passes/ Diversion Roads, Cagayan de Oro Regional Office Equi-Parco Construction Company 14332 Coastal Road incl. ROW and Slope Protection (Punta- 03/18/2018 111.940 299 C 0.50 0.13 0.30 - - - 93.00 *93.00% Very Satisfactory No. X Macabalan Section), Package 3 Widening of Ngilan Bridge along Daang Maharlika (Surigao- Equi-Parco Construction Company 14332 03/22/2018 Butuan City DEO 18.339 195 C 0.49 0.13 0.30 - - - 92.70 *92.70% Very Satisfactory Agusan Section) Construction of Iponan Flood Control Proje (Downstream of Regional Office Equi-Parco Construction Company 14332 08/28/2019 63.690 297 C 0.48 0.20 0.30 - - - 97.60% 97.6% Outstanding Iponan Bridge III), Bulua Side, Including ROW No. X

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 52 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Network Development Program Construction of Bypass/Diversion Roads: Cagayan de Oro Bypass/Alternate Cagayan de Oro Equi-Parco Construction Company 14332 08/29/2019 34.376 239 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory Road (Jct. Lumbia/CDO- Camp Kibaritan Road- Pagatpat- Jct. City 1st DEO BCIR) Construction of Outfall (Cagayan de Oro River) Diversion Cagayan de Oro Equi-Parco Construction Company 14332 08/29/2019 48.000 269 C 0.48 0.14 0.30 - - - 92.40% 94.92% Very Satisfactory Channel for Gumamela Acasia City 1st DEO Construction of Missing Links/New Road, Tagoloan-Misamis Regional Office Equi-Parco Construction Company 14332 08/28/2019 81.621 326 C 0.49 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory Oriental Boundary No. X Construction of Missing Links/New Roads, Sta. Felomina- Regional Office Equi-Parco Construction Company 14332 08/28/2019 131.301 400 C 0.47 0.20 0.30 - - - 96.90% 96.9% Outstanding Bonbonon-Digkilaan-Rogongon Road, incl. ROW No. X Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Iponan Flood Control Regional Office Equi-Parco Construction Company 14332 08/28/2019 94.420 274 C 0.49 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory Projects- Construction of Dike Downstream of Iponan Bridge III No. X (Phase II) Widening of Permanent Bridges, Gahub Bridge (B01346MN) Regional Office Equi-Parco Construction Company 14332 08/26/2019 72.572 284 C 0.48 0.13 0.30 - - - 91.00% 91% Very Satisfactory Along Butuan City- Cagayan de oro City- Iligan City Road No. X Construction of Bypass/ Diversion Roads, Gingoong Bypass Regional Office Equi-Parco Construction Company 14332 08/26/2019 119.146 307 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory Road, Including ROW and Bridge No. X Surigao del Sur Equi-Parco Construction Company 14332 Tago- Lapaz Bypass Road 08/22/2019 56.892 379 C 0.43 0.20 0.30 - - - 93.40% 93.4% Very Satisfactory 1st DEO Construction/Improvement of Libertad-Ambago Access Road Equi-Parco Construction Company 14332 08/28/2019 Butuan City DEO 86.850 481 C 0.48 0.13 0.30 - - - 91.70% 91.7% Very Satisfactory Leading to Masao Port 19KL0063 - Asset Preservation/Preventive Maintenance - Secondary Roads, Gingoog City - Claveria - Villanueva Road, K1343+(-731) - K1343+054, K1343+378 - K1344+037, Misamis Oriental Equi-Parco Construction Company 14332 K1345+824 - K1346+000, K1346+128 - K1346+322, 11/05/2019 96.500 106 C 0.49 0.20 0.30 - - - 98.80% 97.36% Outstanding 2nd DEO K1346+492 - K1346+677, K1348+000 - K1348+563, K1348+664- K1349+000, K1349+843- K1350+000, K1351+376- K1351+1586 Consruction of Flood Control Strucure from Alubijid River Regional Office Equi-Parco Construction Company 14332 08/27/2019 154.191 270 O 0.36 0.30 0.15 0.03 0.05 0.05 94.30% - On-going (Upstream- Downstream of Alubijid Bridge) No. X Asset Preservation/Preventive Maintenance- Primary Roads, Butuan City- Cagayan de Oro Ciy- Iligan City Road, Gitagum to Manticao, Misamis Oriental, K1471+176- K1472+115, Misamis Oriental Equi-Parco Construction Company 14332 K1476+000- K1477+246, K1477+383- K1478+068, K1478+094- 08/27/2019 91.593 106 O 0.37 0.30 0.15 0.03 0.06 0.05 95.90% - On-going 2nd DEO K1479+691, K1490+500- K1491+298, K1491+330-K1491+731, K1491+749-K1492+251, K1497+876-K1498+000, K1498+900- K1499+370

Asset Preservation/Preventive Mainenance- Secondary Roads, Gingoog Ciy- Claveria- Villanueva Road, Claveria, Misamis Oriental, K1343+(-731)- K1743+054, K1343+378- K1344+037, Misamis Oriental Equi-Parco Construction Company 14332 08/27/2019 92.789 106 O 0.38 0.30 0.15 0.03 0.06 0.05 96.40% - On-going K1345+824- K1346+000, K1346+128- K1346+322, K1346+492- 2nd DEO K1346+677, K1348+000- K134+563, K1348+664-K1349+000, K1349+843-K1350+000, K1351+376-K1351+1586 Regional Office Equi-Parco Construction Company 14332 Construction of Cruise Port and Facilities-Package A 11/07/2019 187.003 300 O 0.39 0.29 0.15 0.03 0.06 0.05 96.50% - On-going No. IV-B 19KL0002 - Asset Preservation/Preventive Maintenance - Primary Roads, Butuan City - Cagayan de Oro City - Iligan City Road, Gitagum to Manticao, K1471+176 - K1472+115, Misamis Oriental Equi-Parco Construction Company 14332 K1476+000 - K1477+246, K1477+383 - K1478+066, 11/04/2019 96.500 136 O 0.38 0.21 0.15 0.03 0.05 0.05 86.70% - On-going 2nd DEO K1478+094 - K1479+691, K1490+500 - K1491+298, K1491+330- K1491+731, K1491+749- K1492+251, K1497+876- K1498+000, K1498+900-K1499+370 Construction of By-Pass and Diversion Roads, Iligan City Regional Office Equi-Parco Construction Company 14332 11/06/2019 137.504 270 O 0.37 0.30 0.15 0.03 0.05 0.03 93.30% - On-going Coastal By-Pass Road, Package 3 No. X

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 53 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of New Bridges - Sta. Ana Brridge along Daang Agusan del Norte Equi-Parco Construction Company 14332 11/13/2019 64.164 259 O 0.37 0.24 0.15 0.03 0.06 0.05 90.10% - On-going Maharlika (Surigao-Agusan Section) (Phase II) DEO Implementation of Civil Works of Hybrid Long Term Equi-Parco Construction Company / Sino Performance Based Maintenance Contract, PBM-4, Surigao- UPMO RMC I Road And Bridge Group Co., Ltd. Joint FC-14-029 Davao Road, Surigao (Lipata) - Agusan Del Norte Boundary 03/13/2018 (Bilateral) Region 3321.106 1,827 OG 0.396 0.239 0.150 0.030 0.042 0.033 89.00 - On - Going Venture (K1113+500 to K1237+000) under the Road Upgrading and XIII Preservation Project (RUPP), Asset Pres Cluster "34" Road Widening in Misamis Oriental: 1) Butuan City- Cagayan de Oro City- Iligan City Road- K1329+(-1069) - Equi-Parco Construction Company / Triparco K1330+959, K1331+109 - K1331+256, K1331+408 - Regional Office JV-17-2358 08/26/2019 289.500 388 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory Development Corporation (Joint Venture) K1332+900; 2) Butuan City- Cagayan de Oro City- Iligan City No. X Road- K1319+000 - K1320+200, K1321+300-K1322+340, K1322+430-K1323+500, K1323+589-K1324+585 Construction/Maintenance of Flood Mitigation Structures Eric Van P. Sesbreño Construction Drainage Systems Construction of Dalibubon Flood Control 06/05/2018 Isabela 4th DEO 45.884 235 O 0.387 0.240 0.150 0.022 0.025 0.050 87.40 - On-going Project Road Widening-Tertiary Roads Santiago-Baluarte-Quirino Eric Van P. Sesbreño Construction 06/05/2018 Isabela 4th DEO 45.382 173 O 0.386 0.3 0.054 0.02 0.02 0.017 79.70 - On-going Boundary (K0329+305-K0331+000) Cagayan de Oro Ers Construction 42135 Construction (Completion) of Multi-Purpose Building Kabina 11/11/2019 2.970 160 C 0.50 0.13 0.30 - - - 93.30% 87.42% Satisfactory City 1st DEO Cagayan de Oro Ers Construction 42135 Construction (Completion) of Multi-Purpose Building, Kabina 08/29/2019 2.822 100 O 0.33 0.24 0.15 0.03 0.05 0.05 84.90% - On-going City 1st DEO 19ME0012 - Construction of Concrete Road: Road Alkikan - Escorr Builders And Traders, Inc. 43230 11/21/2019 Sarangani DEO 18.620 150 O 0.39 0.30 0.15 0.03 0.06 0.05 97.50% - On-going Datal Batong - Datal Bila in Support of Agro Industries; Off-Carriageway Improvement, Secondary Roads, Catarman- Laoang Road, K0768+179-K0769+166, K0776+393- Northern Samar Esd Cruz Construction & Supply 32368 08/20/2019 36.888 180 O 0.36 0.24 0.15 0.02 0.06 0.03 85.90% - On-going K0776+668, K0777+389-K0778+000, K0785+000-K0785+148, 2nd DEO K0786+000-K0786+575 Esd Cruz Construction & Supply / Cdu Construction of Flood Mitigation Structure, Construction of Dale Northern Samar JV-18-918 11/04/2019 72.769 270 O 0.39 0.24 0.15 0.03 0.04 0.03 87.70% - On-going Construction (Joint Venture) River Control 2nd DEO Construction of Four (4) Storey-Eight (8) Laboratory (4 Regular Esj And Sons Construction & Construction 17162 Workshop, 2 Science Lab & 2 ICT Lab) at Luis Hervias National 08/26/2019 Bacolod City DEO 36.681 240 C 0.41 0.17 0.28 - - - 86.30% 86.3% Satisfactory Supply, Inc. High School Road Widening-Bacolod North Rd incl. ROW K0051+626- Esj And Sons Construction & Construction Negros Occidental 17162 K0052+121, K0052+130- K0057+878, K0057+896- 11/07/2019 153.619 502 C 0.48 0.13 0.30 - - - 91.70% 90.98% Very Satisfactory Supply, Inc. 2nd DEO K0058+1167 Esj And Sons Construction & Construction Bacolod Negros Occidental Economic Highway (BANOCEH), Regional Office 17162 08/20/2019 162.440 535 O 0.28 0.30 0.15 0.03 0.05 0.05 85.60% - On-going Supply, Inc. Section 1, Package B, incl. ROW, Bridge and Slope Protection No. VI

Esj And Sons Construction & Construction Road Widening- along Jct National Road Sagay-Bato-Dian- Negros Occidental 17162 11/06/2019 39.172 200 O 0.34 0.24 0.15 0.02 0.05 0.05 84.40% - On-going Supply, Inc. Marcelo-Balea Jct Road (S00019NR) K0090+000-K0091+423 1st DEO

Esj And Sons Construction & Construction Reconstruction to Concrete Pavement- on Specific Locations Regional Office 17162 11/09/2019 137.495 323 O 0.39 0.24 0.15 0.02 0.05 0.05 89.80% - On-going Supply, Inc. along Kabankalan-Bais Rd. K0089+(-805) to K0104+804 No. VI Construction/Maintenance of Flood Mitigation Structures and Esl Builders & Parts Supply/ Orient Star Southern Mindoro JV-18-1174 Drainage Systems, Construction of Flood Control Structures at 08/26/2019 19.600 180 O 0.36 0.24 0.15 0.03 0.04 0.05 86.80% - On-going Construction, Inc. Joint Venture DEO Brgy. Pambisan Malaki to Sta. Maria-Sto. Niño-Pagalagala Road Widening including Drainage of National Roads along N1 Esr Construction And Development Regional Office 10451 of Lanao-Pagadian-Zamboanga City Road, K1770+539.00 - 03/19/2018 112.857 249 OG 0.262 0.300 0.135 0.030 0.064 0.017 80.82 - On - Going Corporation No. IX K1773+295.87 and K1773+323.83 - K1775+094.29 Construction of One (1) Unit Two (2) Storey - Four (4) Esr Construction And Development Zamboanga del 10451 Classroom Regular Workshop Building La Libertad National 08/24/2019 9.581 210 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Corporation Norte 3rd DEO High School Esr Construction And Development Construction of 3 Storey, 6 Classroom School Building Cagayan de Oro 10451 08/27/2019 24.074 170 O 0.39 0.24 0.11 0.03 0.04 0.03 84.80% - On-going Corporation Elementary School City 2nd DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 54 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) ESR Construction and Development 10451 / Corporation (Formerly: ESR Construction & 41086 - JV- Limasawa Port Development Project - Construction of Port 12/27/19 DOTR 34.899 270 O 0.40 0.30 0.05 0.03 0.05 0.05 88.70 - On-going Supplies) / Cean Construction (JV) 17-2993 Restoration of Slope Protection at Agusan Canyon Bridge, Esr Construction And Supplies 10451 X 14.040 149 O 0.342 0.259 0.150 0.010 0.042 0.033 83.60% - On-going along S.H. - - Libona - Indahag Road Zamboanga City Essa Builders 34452 Concreting of Road at Fortunato Brgy. Lapaz 11/11/2019 7.642 137 C 0.49 0.14 0.30 - - - 92.40% 92.58% Very Satisfactory DEO Zamboanga City Essa Builders 34452 Concreting of Road at Fortunato Barangay La Paz 08/29/2019 7.642 137 O 0.40 0.24 0.15 0.03 0.06 0.05 92.70% - On-going DEO Asset Preservation- Rehabilitation/Reconstruction/Upgrading of Negros Oriental Ethan Property Developer 36181 Damaged Paved Roads – Tertiary Roads- Guihulngan- Baloc – 11/13/2019 17.408 139 C 0.49 0.20 0.30 - - - 92.40% 92.4% Very Satisfactory 1st DEO Isabela Road Dinagat Islands Etp Builders 36355 Construction of Barangay Hall 03/14/2018 4.309 180 C 0.48 0.13 0.30 - - - 91.30 *91.30% Very Satisfactory DEO Contract Package – XVI (1-2) Construction of One (1) Storey Camarines Sur Euge Construction And Supply 35854 04/04/2018 7.417 124 C 0.49 0.13 0.30 - - - 92.60 92.60% Very Satisfactory Three (3) Classroom School Building 4th DEO Const. of 1 Unit TVL Regular Workshop Bldg./Lab for SHS Davao del Norte Exact Construction 15975 06/02/2018 3.004 65 C 0.47 0.13 0.30 - - - 90.80 90.80% Very Satisfactory Limbaan NHS 1st DEO Structural Improvement of Public Building (Industrial Building) Las Piñas- Excelsius Engineering Services 35269 08/20/2019 1.956 90 C 0.48 0.13 0.30 - - - 91.70% 91.7% Very Satisfactory and Construction of Evacuation Center, Buli Elementary School Muntinlupa DEO

Excelsius Engineering Services &Gulf-Canary Construction of New Annex (GSD/COSO) Building 01/19/18 NHA 104.875 585 D 0.49 0.20 0.21 - - - 89.60 93.12% Very Satisfactory Construction And Development. Inc. (Jv)

Design and Build for the Comprehensive Rehabilitation of Fort Ethan Property Developer JV-14-1126 04/11/2019 TIEZA 218.000 635 C 0.48 0.20 0.00 - - - 68.30 68.30% Poor Santiago Construction of Canal System of North Lawis (Palongohon) Expe Construction & Trading / Raedag - / 38274 - JV- Irrigation Project - Package 2 - Construction of Canal System 10/23/2019 NIA 60.684 320 O 0.35 0.22 0.15 0.03 0.05 0.03 82.95 - On-going Construction (JV) 18-684 (Main Canal Sta. 4+135 - Sta. 5+110) Construction of Canal System of North Lawis (Palongohon) Expe Construction & Trading / Raedag - / 38274 - JV- Irrigation Project - Package 2 - Construction of Canal System 10/23/2019 NIA 40.751 300 O 0.39 0.24 0.15 0.02 0.05 0.05 90.33 - On-going Construction (JV) 18-690 (Main Canal Sta. 4+135 - Sta. 5+110) Construction of Four Storey (8 Classroom) 2 Sci Lab 2 ICT Extreme Builders 40315 08/22/2019 Isabela 4th DEO 16.380 238 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory Building, Santiago City National High School Construction and Completion of School Buildings in the South Cotabato Eyman Realty & Construction Services 39498 Elementary and Secondary Classrooms 2-Storey 8-Classroom, 08/29/2019 16.764 150 C 0.49 0.20 0.15 - - - 83.90% 83.9% Satisfactory 2nd DEO Nicolas B. Barreras NHS-Bentung Sulit NHS Annex Construction of One (1) Unit Two (2) Eight (8) Classrooms, Cali Ez Gold Construction & Supply 39408 08/28/2019 Iloilo 2nd DEO 17.030 210 C 0.48 0.16 0.30 - - - 93.60% 93.6% Very Satisfactory Elementary School Construction of Storm Surge Protection; Road Heightening and Regional Office Ezjones Construction Inc. 34462 04/10/2018 274.912 570 C 0.50 0.13 0.30 - - - 93.00 *93.00% Very Satisfactory Tide Embankment, Section 4-2B No. VIII Network Development - Construction of By-Passes/Diversion Regional Office Ezjones Construction Inc. 34462 Roads Including ROW, Tacloban City By-Pass Road, Including 04/11/2018 233.289 510 C 0.37 0.29 0.15 - - - 90.50 *90.50% Very Satisfactory No. VIII ROW (Phase IV) Construction of Flood Mitigation Structures and Drainage Systems: Contruction of Labason River Control, Antonio-Imelda, Regional Office Ezjones Construction Inc. 34462 08/25/2019 140.035 514 C 0.43 0.20 0.30 - - - 92.80% 91.72% Very Satisfactory Labason, Zamboanga del Norte (Beg. Of Project: 0+000.00, No. IX End of Project : 0+718.00 ln.m Construction of Flood Mitigation Structure - Construction of Tacloban City Ezjones Construction Inc. 34462 11/13/2019 23.272 135 C 0.47 0.13 0.30 - - - 90.50% 89.84% Very Satisfactory Revetment along Nula-tula Waterway DEO Construction of Flood Mitigation Structure-Construction of Tacloban City Ezjones Construction Inc. 34462 08/30/2019 23.272 135 O 0.37 0.30 0.15 0.02 0.04 0.05 92.70% - On-going Revetment along Nula-tula Waterway DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 55 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) 1. Construction of Daguitan - Marabong Flood Control Structures (Package A), Sitio Bagang, Brgy. Cabacungan 2. Regional Office Ezjones Construction Inc. 34462 11/13/2019 233.522 318 O 0.34 0.20 0.15 0.03 0.06 0.05 83.30% - On-going Construction (Extension) of Daguitan-Marabong Flood Control No. VIII Structures (Package A), Brgy. Fatima Asset Preservation, Preventive Maintenance Secondary Roads, Catarman - Laoang Road, K0769+166 - K0770+189, Northern Samar Ezjones Construction Inc. 34462 K0770+372 - K0770+732, K0778+426 - K0779+767, 11/04/2019 82.227 120 O 0.40 0.20 0.15 0.02 0.03 0.03 83.50% - On-going 2nd DEO K0779+793 - K0781+000, K0781+832 - K0781+952, K0781+990 - K0783+135 Network Development- Construction of By-Pass and Diversion Regional Office Ezjones Construction Inc. 34462 Roads, Tacloban City By-Pass Road Extension, Package A, 11/12/2019 75.195 317 O 0.40 0.29 0.15 0.03 0.04 0.05 95.60% - On-going No. VIII Leyte Network Development- Construction of By-Pass and Diversion Regional Office Ezjones Construction Inc. 34462 Roads, Tacloban City By-Pass Road Extension, Package A, 11/12/2019 98.170 317 O 0.38 0.29 0.15 0.03 0.04 0.05 93.60% - On-going No. VIII Leyte Tacloban City By-Pass Road (Construction of Road Slope Regional Office Ezjones Construction Inc. 34462 11/12/2019 116.701 300 O 0.40 0.24 0.15 0.03 0.04 0.05 90.70% - On-going Protection Structure), Phase I No. VIII Construction (Completion) of Storm Surge Protection: Regional Office Ezjones Construction Inc. 34462 Hightened Road and Tide Embankment Subsection 4.2B, 11/12/2019 118.112 300 O 0.40 0.24 0.15 0.03 0.04 0.05 90.20% - On-going No. VIII Sta.3+050 - Sta.3+740 Network Development - Construction of By-Pass and Diversion Regional Office Ezjones Construction Inc. 34462 11/12/2019 55.092 317 O 0.40 0.30 0.15 0.03 0.04 0.05 96.30% - On-going Roads, Tacloban City By-Pass Road Extension, Package B No. VIII Ezjones Construction Inc. / Leda Construction of Cadac-an Flood Control Structures (Cadac-an JV-16-1130 04/11/2018 Leyte 5th DEO 96.500 360 OG 0.388 0.240 0.116 0.022 0.037 0.033 83.60 - On - Going Construction Incorporated River Basin) Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Paved National Roads Including Drainage Based on Pavement Management System / Highway Ezjones Construction Inc. / Unitec Builder, Development and Management-4 (HDM-4) Primary Roads, Regional Office JV-16-1874 04/09/2018 156.242 330 C 0.48 0.13 0.30 - - - 91.60 *91.60% Very Satisfactory Incorporated Daang Maharlika (SM) (San Isidro-San Juanico Bridge) No. VIII K0680+524-K0683+000, K0690+000-K0690+565, K0685+970- K0686+805, K0685+970-K0686+075, K0686+130-K0686+267, K0691+000-K0692+000 Ezjones Construction Inc./ E.G. Cannabe 18I00034- Construction of Missing Links/ New Roads, Jaro- Regional Office JV-17-117 10/16/2019 133.550 390 C 0.48 0.16 0.30 - - - 94.80% 94.02% Very Satisfactory Construction (Joint Venture) Rubas- Ormoc Road (Jaro Side), including RROW No. VIII 18ID0079- Rehabilitation/Reconstruction of Roads with Slips, Ezjones Construction Inc./ E.G. Cannabe JV-17-1988 Slope Collapse and Landslide -Primary Roads, Palo-Carigara- 10/16/2019 Leyte 2nd DEO 49.000 306 C 0.44 0.20 0.30 - - - 93.50% 93.5% Very Satisfactory Construction (Joint Venture) Ormoc Road, K0972+410 to K0972+760 Improvement/Widening of National Roads, Daang Maharlika Ezjones Construction, Inc / Mwj Construction (LT), K0941+1488 - K0943+277, K0944+225 - K0945+212, Regional Office 06/05/2018 86.416 446 C 0.46 0.13 0.30 - - - 88.90 88.90% Satisfactory Joint Venture K0946+460 - K0947+000, K0949+000 - K0949+290, No. VIII K0945+212, K0955+550, (S00083LT) Construction/Extension of Dagauitan- Marabong Flood Control Regional Office Ezjones Construction, Inc. 34462 04/03/2018 132.266 258 C 0.49 0.13 0.30 - - - 92.80 *92.80% Very Satisfactory Structures No. VIII Preventive Maintenance of Road: Asphalt Overlay, Arteche- Ezjones Construction, Inc. / Unitec Builder, Regional Office JV-17-874 Jipapad-Las Navas-Rawis Road, K0805+(-237)-K0806+748, 08/20/2019 59.152 270 C 0.48 0.13 0.30 - - - 91.00% 91% Very Satisfactory Incorporated (Joint Venture) No. VIII K0806+778-K0811+000 Rehab./ Reconst. of Nat'l Rds. w/ Slips, Slope Collapse and F & J General Construction And Supply Misamis Oriental 31963 Landslide BCIR- K1342+460-K1342+830, K1343+190- 03/13/2018 47.577 231 C 0.45 0.13 0.30 - - - 88.10 *88.10% Satisfactory Corporation 1st DEO K1343+340, K1343+890, K1344+160, K1310+050-K1310+200 F & J General Construction And Supply Impv't./ Widening of Nat'l. Rds.- Primary Rds.- Other Primary Misamis Oriental 31963 03/13/2018 31.978 183 C 0.46 0.13 0.30 - - - 89.60 *89.60% Very Satisfactory Corporation Rds. BCIR -K1280+-818 - K1280+182 1st DEO F & J General Construction And Supply Misamis Oriental 31963 Concreting of Road, Brgy. Macopa, Talisayan 11/11/2019 23.511 120 O 0.40 0.20 0.15 0.03 0.05 0.05 87.50% - On-going Corporation 1st DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 56 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Rehabilitation/Reconstruction of National Roads with Slips, Slopes Collapse and Landslide along Dinagat-Loreto Road, F & J General Construction And Supply Dinagat Islands 31963 K0003+080- K0003+280, K0022+000-K0022+100, K0022+548- 06/04/2018 37.390 215 C 0.45 0.13 0.30 - - - 88.10 88.10% Satisfactory Corporation DEO K0022+631, K0022+605-K022+651, K0022+870-K022+970, K0027+600-K0027+653 F. Gurrea Construction Inc. 6995 Construction of Back-up Area with Roro Ramp on Fill, ICPC 05/04/2018 PPA 158.803 420 O 0.39 0.27 0.15 0.02 0.06 0.05 94.77 - On - Going F. Gurrea Construction Inc. 6995 Construction of Back up Area with Roro Ramp on Fill, ICPC 09/21/2018 PPA 158.803 420 O 0.36 0.26 0.14 0.03 0.05 0.05 89.30 - On - Going F. Gurrea Construction Inc. 6995 Construction of Back-up Area with Roro Ramp on Fill, ICPC 5/17/19 PPA 158.803 540 C 0.50 0.20 0.00 - - - 69.80 0.8313 Satisfactory Retrofitting/Strengthening of Bridge-Dungon Br. 2 (B00536PN) F. Gurrea Construction, Incorporated 6995 08/19/2019 Iloilo City DEO 55.790 246 O 0.34 0.30 0.15 0.01 0.02 0.05 87.50% - On-going along Sen. Benigno S. Aquino, Jr. Avenue Retrofitting/Strengthening of Bridge- Dungon Br.2 (B00536PN) F. Gurrea Construction, Incorporated 6995 11/13/2019 Iloilo City DEO 56.798 246 O 0.40 0.24 0.15 0.02 0.05 0.05 89.50% - On-going Along Sen. Benigno S. Aquino Jr. Ave. F.A. Torres Construction 27150 San Nicholas Communal Irrigation System 10/10/2018 NIA 13.075 240 C 0.36 0.20 0.30 85.90 *85.90% Satisfactory F.A. Torres Construction / M.A. Guinto Network Development: Construction of By-Passes/Diversion Mindoro Construction (San Jose Branch) (Joint JV-16-1025 03/19/2018 48.902 260 C 0.48 0.17 0.30 - - - 95.40 *95.40% Very Satisfactory Roads Including Road-Right-Of-Way, San Jose By-Pass Road Occidental DEO Venture) Rehabilitation/Reconstruction of National Roads wit Slips, F.B. Bantales Engineering Construction 31045 Slope Collapses and Landslides along Kennon Road, KO 236 + 05/29/2018 Benguet 1st DEO 48.756 240 C 0.50 0.13 0.25 - - - 88.30 88.30% Satisfactory 305 + KO 236 + 365, Tuba, Benguet Balog-Balog Improvement of Service Road along Conveyance Canal F.B. Bantales Engineering Construction 31045 12/19/2020 Multipurpose 22.447 96 C 0.33 0.20 0.30 - - - - 82.70% Satisfactory (Sta. 1+894.87 - Sta. 3+990.27) Project Phase II Construction / Maintenance of Flood Control Mitigation F.B. Bantales Engineering Construction 31045 Structure and Drainage Systems: Construction of Lower Boning 11/23/2019 Benguet 1st DEO 35.242 225 O 0.34 0.30 0.15 0.03 0.05 0.03 89.90% - On-going Flood Control Rehabilitation/ Reconstruction of Roads with Slip, Slope F.B. Bantales Engineering Construction / Collapse and Landslide: Construction of Road Slope Protection JV-18-848 11/23/2019 Benguet 1st DEO 32.771 150 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Balintugan Construction (Jv) Structure along Benguet - Nueva Viscaya Road (S00382LZ) , K0271+690 to K0271+725 Construction of Municipal Evacuation Center/Multi-Purpose Nueva Ecija 1st F.C. Martinez Construction 31243 03/13/2018 6.196 150 C 0.49 0.13 0.30 - - - 92.60 90.79% Very Satisfactory Building Lupao, Nueva Ecija DEO Network Development Program-Off- Carriageway Improvement- Nueva Ecija 1st F.C. Martinez Construction 31243 11/25/2019 14.046 180 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory Tertiary Roads DEO Network Development Program - Off-Carriageway Improvement Nueva Ecija 1st F.C. Martinez Construction 31243 - Tertiary Roads, Munoz - Lupao Road, K0155+000 - 08/20/2019 14.046 180 O 0.38 0.24 0.15 0.03 0.06 0.05 90.80% - On-going DEO K0155+454, K0157+000 - K0158+000 Implementation of Civil Works for Arterial Road Bypass Project, F.F. Cruz & Co., Inc./ Shimizu Corporation FC-13-014 Phase II, Contract Package III, Plaridel Bypass Road, Sta. 03/20/2018 UPMO RMC-I 1211.304 1,393 OG 0.399 0.250 0.150 0.030 0.065 0.050 94.40 - On - Going (Japanese) 47+400.00 to Sta. 49+625.00, Province of Bulacan

F.F. Galang Construction 26801 Concreting of PAC Road FMR, Sta. 00+000 to Sta. 00+368 03/14/2018 Palawan 3rd DEO 4.104 105 C 0.49 0.13 0.30 - - - 92.60 *92.60% Very Satisfactory A. Organizational Outcome 1. Asset Ensure Safe and Reliable National Road System 1. Asset Preservation Program C. Rehabilitation/Reconstruction of Roads with Slips, Slope, F.F. Rosales General Contractor 8814 06/20/2018 Quezon 4th DEO 80.451 210 O 0.396 0.239 0.15 0.03 0.06 0.05 92.50 - On-going Collapse and Landslide 2. Tertiary Roads 1. Jct MSR-Old Zigzag Road - K0155+970 - K0156+278, K0156+844- K0157+000, K0157+055-K0157+155 Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved F.F. Rosales General Contractor 8814 National Roads (Secondary Roads) along -Mainit- 03/15/2018 Quezon 1st DEO 24.141 326 C 0.48 0.13 0.30 - - - 91.50 *91.50% Very Satisfactory Mauban Road, K0141+(-395) to K0141+313, Quezon Province Construction of Two (2) Storey ICT Laboratory Building, Camarines Sur F.F. Rosales General Contractor 8814 08/28/2019 8.910 120 C 0.47 0.13 0.30 - - - 89.80% 89.45% Very Satisfactory Fabrica High School La Victoria Annex High School 5th DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 57 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) D. Local Program 2. Construction / Repair / Rehabilitation / Improvement of Various Infrastructure Including Local Projects F.F. Rosales General Contractor 8814 11/25/2019 Quezon 4th DEO 35.280 285 O 0.40 0.25 0.15 0.03 0.06 0.05 93.50% - On-going A. Local Roads and Bridges 1. Local Bridges A. Construction of Caridad Ilaya Bridge Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along F.F. Rosales General Contractor / Tan Tay JV-16-1857 National Roads - Secondary Roads, - Tayabas - 06/18/2018 Quezon 1st DEO 48.510 217 C 0.49 0.13 0.30 - - - 92.10 92.10% Very Satisfactory Lim Builders And General Con Sampaloc - Mauban Port Road, K0128+460 - K0130+024, K0131+190 - K0131+660, K0139+(-)066 - K0139+535 Asset Preservation of National Roads - Construction/ F.F. Rosales General Contractor/ Tan Tay Upgrading/ Rehabilitation of Drainage along National Roads - Lim Builders And General Contractor Joint JV-16-1857 Secondary Roads, Lucena-Tayabas-Lucban-Sampaloc- 03/15/2018 Quezon 1st DEO 48.510 265 C 0.50 0.13 0.30 - - - 92.80 *92.80% Very Satisfactory Venture Mauban Port Road, K0128+460 - K0130+024, K0131+190 - K0131+660, K0139+(-)066 - K0139+535, Quezon Province South Cotabato F.H. Gopiteo Construction & Supply 21336 Construction of 2- Units-4 sty 12 CL at Koronadal NCHS 05/29/2018 48.188 312 C 0.46 0.20 0.21 - - - 86.60 86.60% Satisfactory 1st DEO Ensure Safe and Reliable National Road System, Bridge- F.P. De Guzman Construction, Inc. 10296 Retrofitting/Strengthening of Permanent Bridges, Dumacan 11/22/2019 Quezon 2nd DEO 22.920 120 C 0.49 0.13 0.30 - - - 91.90% 91.9% Very Satisfactory Bridge (B02936LZ) along MSR Diversion Road Rehabilitation / Major Repair of Bridge - Repair / Redecking of F.P. De Guzman Construction, Inc. 10296 Barkadahan Bridge Across Manggahan Floodway, Highway 11/27/2019 Rizal 1st DEO 34.293 270 O 0.40 0.29 0.15 0.03 0.06 0.05 98.00% - On-going 2000 Ilocos Norte 1st F.R. Espiritu Jr. Builders 36719 Construction of Road, Tadao-Saricao, Pasuquin-Vintar 08/21/2019 96.499 306 O 0.23 0.24 0.15 0.03 0.05 0.05 74.90% - On-going DEO Local Infrastructure Program - Rehabilitation of Multi - Purpose F.V. Sangalang Construction 37083 11/11/2019 Bataan 1st DEO 2.401 90 C 0.47 0.13 0.30 - - - 90.40% 89.21% Very Satisfactory Building, Barangay Roxas Local Infrastracture Program - Rehabilitation of Multi - Purpose F.V. Sangalang Construction 37083 08/25/2019 Bataan 1st DEO 2.401 90 O 0.40 0.21 0.15 0.03 0.05 0.05 88.70% - On-going Building, Barangay Roxas Faaa Construction And Trading 39275 Cabra Port Development Project 10/03/2018 DOTr 14.844 200 C 0.47 0.20 0.30 97.10 *97.10% Outstanding Kaputian Port Development Project - Construction of Concrete FAAA Construction and Trading 39275 09/10/2019 DOTR 4.474 120 C 0.46 0.20 0.30 - - - 96.40 *96.40% Outstanding Platform Mualbual Port Development Project - Repair / Rehabilitation of FAAA Construction and Trading 39275 10/24/19 DOTR 9.359 195 C 0.45 0.20 0.30 - - - 95.00 *95.00% Very Satisfactory Wharf FAAA Construction and Trading 39275 Canwarak Port Developnment Project - Extension of Wharf 10/25/19 DOTR 9.489 150 C 0.50 0.20 0.21 - - - 91.00 *91.00% Very Satisfactory Construction/Improvement of Various Infrastructure in Support Fabro Construction 36506 of National Security-HNSEO Covered Shooting Range, Head 08/19/2019 La Union 1st DEO 4.410 120 O 0.33 0.24 0.15 0.03 0.04 0.05 83.00% - On-going Quarters Naval Station Ernesto Ogbinar Construction/Improvement of Various Infrastructure in Support Fabro Construction 36506 of National Security - HNSEO Covered Shooting Range, Head 11/04/2019 La Union 1st DEO 4.410 171 O 0.36 0.24 0.10 0.03 0.05 0.05 82.80% - On-going Quarters Naval Station Ernesto Ogbinar Bridge Program - Widening of Permanent Bridges, Pamunawan Fairchild Builders & Developers, Inc. 10024 08/21/2019 Leyte 5th DEO 14.859 152 O 0.40 0.21 0.15 0.03 0.04 0.05 88.50% - On-going Bridge along Daang Maharlika (LT) Fairchild Builders And Developers, Improvement/Widening of National Roads Abuyog-Silago Road, 10024 04/11/2018 Leyte 5th DEO 29.400 210 C 0.48 0.13 0.30 - - - 91.10 *91.10% Very Satisfactory Incorporated K0970+750-K0971+959 Off-Cariageway Improvement : Construction of Laybys - along Family Circle Construction 32608 09/10/2019 Baguio City DEO 6.104 90 O 0.39 0.24 0.15 0.03 0.06 0.05 92.00% - On-going Pacdal Road (S00461LZ), K0253+640 - K0253+700 Fastruct Design and Construction 37980 Site Development with STEM Park Development 7/22/19 DOST 7.450 80 C 0.46 0.20 0.30 - - - 96.00 *96.00% Very Satisfactory 19MG0043 - Construction of Multi-Purpose Building (2 Storey), South Cotabato Fastruct Design And Construction 37980 11/19/2019 4.944 120 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory Carpenter Hill Elementary School 1st DEO Construction/Rehabilitation of Flood Control Structure at Tacloban City Ferdstar Builders Contractors 4965 04/11/2018 27.035 240 C 0.48 0.13 0.30 - - - 91.30 *91.30% Very Satisfactory Burayan River DEO

Construction/Rehabilitation of Flood Control Mitigation Facilities along Major River Basins and Principal Rivers- Construction of Ferdstar Builders Contractors 1965 03/22/2018 Tarlac 2nd DEO 44.687 207 C 0.48 0.17 0.30 - - - 94.30 *94.30% Very Satisfactory Protective Dike along Bangut River, Left Bank, Upstream of Bangut Bridge, Sta. (-)1+152 to Sta. (-)1+766.40, Capas, Tarlac

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 58 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Costruction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection along Pampanga 2nd Ferdstar Builders Contractors 4965 11/06/2019 39.182 240 O 0.38 0.24 0.15 0.03 0.05 0.03 87.20% - On-going Sapang Maragul Diversion Channel, Sta. 0+000 - Sta. DEO 0+358.38 Construction/Maintenance of Flood Mitigation Structures and Pampanga 2nd Ferdstar Builders Contractors Drainage System-Rehabilitation of Dike with Slope Protection 06/15/2018 28.092 240 C 0.48 0.13 0.30 - - - 91.70 91.70% Very Satisfactory DEO along Labuan River Malabon-Navotas Fermida Construction Services And Supplies 25424 Construction of Tanza Pabahay Health Center 08/30/2019 7.000 150 C 0.48 0.13 0.30 - - - 91.70% 91.7% Very Satisfactory DEO Fermida Construction Services And Supplies Zambales 1st JV-18-1354 Construction of Slope Protection/Flood Control at Linoron River 08/20/2019 30.335 200 O 0.40 0.24 0.15 0.03 0.04 0.05 90.80% - On-going / R.J. Ibarra Construction (Joint Venture) DEO Davao Oriental Ffjj Construction 16712 Construction of Concrete Revetment , Calapagan River 05/29/2018 28.783 147 O 0.396 0.24 0.15 0.03 0.045 0.033 89.40 - On-going 2nd DEO Construction of NRJ Pasta-Buenasuerte-Caimpugan Road Agusan del Sur Ffjj Construction 16712 (Peat Dome), Sta. 4+032 - Sta. 4+572 & Sta. 5+340 - Sta. 05/31/2018 76.172 220 O 0.399 0.300 0.150 0.03 0.055 0.05 98.40 - On-going 2nd DEO 6+900 Ffjj Construction 16712 Navotaas 4 05/24/2018 NHA 160.570 270 O 0.36 0.30 0.07 0.03 0.06 0.03 84.59 - On - Going

Ffjj Construction 16712 Malitubog Irrigation Project 03/06/2018 NIA 71.00 1,100 O 0.394 0.298 0.059 0.023 0.051 0.017 84.05 - On-going

Provincial Upgrading/Improvement of Mayaon San Antonio Provincial Government of Ffjj Construction 6712 04/16/2019 200.000 629 O 0.35 0.28 0.15 0.03 0.06 0.05 92.32 - On - Going Road Compostela Valley Construction of Revetment Wall along Cangaranan River at Ffjj Construction 16712 05/29/2018 Antique DEO 32.577 214 C 0.38 0.20 0.30 - - - 87.60 87.60% Satisfactory Pociento Bridge

Ffjj Construction 16712 Construction New Academic Bldg. (Design & Built Scheme) 07/19/2018 DOST 39.001 365 C 0.42 0.20 0.22 - - - 84.20 87.90% Satisfactory

Ffjj Construction 16712 Malitubog Maridagao Irrigation Project Stage II 05/12/2018 NIA 16.733 855 C 0.46 0.20 0.29 - - - 95.01 *95.01% Very Satisfactory

Construction/Maintenance of Flood Mitigation Structure and Surigao del Norte Ffjj Construction 16712 Drainage System of Mainit Lakewall, Sta. 0+360 to Sta.0+730.6 03/13/2018 49.000 273 C 0.46 0.15 0.30 - - - 90.90 93.98% Very Satisfactory 1st DEO and Sta. 0+020 to Sta. 0+206 Surigao - Davao Coastal Road - K1305+229 - K1306+326, Surigao del Sur Ffjj Construction 16712 08/22/2019 89.582 335 C 0.48 0.13 0.30 - - - 91.10% 92.18% Very Satisfactory K1306+341 - K1307+980, K1308+000 - K1308+256 1st DEO Ffjj Construction 16712 Construction of Revetment Wall along Sibalom River 11/05/2019 Antique DEO 57.782 394 C 0.47 0.13 0.28 - - - 88.40% 87.26% Satisfactory Construction of Concrete Revetment, Sitio Bankerohan Flood Davao Occidental Ffjj Construction 16712 11/25/2019 19.540 172 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory Control DEO Ffjj Construction 16712 Construction of Revetment Wall along Sibalom River 08/19/2019 Antique DEO 57.752 394 O 0.38 0.27 0.14 0.03 0.05 0.00 86.50% - On-going Construction of Concrete Revetment, Sitio Bankerohan Flood Davao Occidental Ffjj Construction 16712 08/26/2019 19.540 172 O 0.40 0.24 0.15 0.02 0.05 0.05 90.70% - On-going Control DEO Construction of Eight (8) Three- Storey Low Rise Buildings, FFJJ Construction 16712 02/07/2019 NHA 155.180 469 O 0.39 0.30 0.08 0.03 0.07 0.03 90.43 - On-going Navotas Homes 4 Construction of Eight (8) Three Storey Low Rise Buildings, FFJJ Construction 16712 02/20/2020 NHA 161.720 571 C 0.47 0.20 0.25 - - - 9197.00% 88.85% Satisfactory Navotas Homes 4 Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Ffjj Construction / Pyramid Consolidated Misamis Oriental JV-18-838 Roads, Gingoog City - Claveria - Villanueva Road, K1346+700 - 12/05/2019 82.408 354 C 0.50 0.18 0.30 - - - 98.00% 96.5% Outstanding Builders & Gen. Merchandise (Joint Venture) 2nd DEO K1346+815, K1348+078.77 - K1348+180, K1348+224 - K1348+478, K1355+405 -K1355+700, K1355+722-K1355+749

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 59 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Ffjj Construction / Pyramid Consolidated Misamis Oriental JV-18-838 Roads, Gingoog City - Claveria - Villanueva Road, K1346+700 - 11/05/2019 82.408 354 O 0.39 0.30 0.15 0.03 0.05 0.03 95.50% - On-going Builders & Gen. Merchandise (Joint Venture) 2nd DEO K1346+815, K1348+078.77 - K1348+180, K1348+224 - K1348+478, K1355+405 -K1355+700, K1355+722-K1355+749 Construction of Missing Gaps connecting National Roads Ffjj Construction Joint Venture / Jd-Rg Agusan del Norte JV-16-681 including ROW Bdry. Bukidnon/Agusan del Norte (Lawan 03/22/2018 42.796 284 C 0.48 0.14 0.30 - - - 91.70 *91.70% Very Satisfactory Construction Corporation Joint Venture DEO Lawan Section) Province of Fh Gopiteo Construction And Supply 21336 Upgrading of Yangco-Rang-ay Road 09/19/2018 Government of 10.985 125 O 0.33 0.24 0.15 0.03 0.06 0.05 85.80 - On - Going South Cotabato Provincial Fh Gopiteo Construction And Supply 21336 Upgrading of Yangco-Rang-ay Road 11/16/2018 Government of 10.985 125 O 0.40 0.30 0.15 0.03 0.07 0.05 99.80 - On - Going South Cotabato Provincial FH Gopiteo Construction and Supply 21336 Upgrading of Yangco-Rang-ay Road 05/21/19 Government of 10.985 165 C 0.48 0.20 0.30 - - - 97.50 94.68% Very Satisfactory South Cotabato Provincial Fh Gopiteo Construction And Supply 21336 Upgrading of Yangco-Rang-ay Road 05/21/2019 Government of 10.985 165 C 0.48 0.20 0.30 - - - 97.50 94.68% Very Satisfactory South Cotabato Fiat Construction 5463 Malitubog - Maridagao Irrigation Project, Stage II 03/10/2018 NIA 26.87 180 O 0.380 0.300 0.150 0.030 0.051 0.017 92.80 - On-going

Palompon Port Improvement Project - A) Back-Up Area & Roro FIAT Construction Services 5463 11/15/19 PPA 122.188 540 O 0.38 0.30 0.07 0.02 0.06 0.03 86.49 - On-going Ramp B) Port Operations Building (POB) C) Transit Shield

Construction/Maintenance of Flood Mitigation Structures and Fiat Construction Services / M.G,Samidan Mt. Province 1st Drainage Systems; Construction of Flood Control along Chico 05/30/2018 39.200 198 C 0.42 0.20 0.30 - - - 92.20 92.20% Very Satisfactory Construction Joint Venture DEO, CAR River, sta. 067 + 756- 068 + 664 (Intermittent Sect.) Fiat Construction Services/ A.P.B Regional Office JV-16-1950 Construction of Flood Control along Abra River 03/14/2018 86.126 240 C 0.46 0.13 0.30 - - - 89.80 *89.80% Very Satisfactory Construction No. I Firmabuilt Construction / Mpjr Builders Construction of Two (2) Units - Three (3) Storey, Fifteen (15) Camarines Norte JV-18-1126 08/20/2019 82.104 308 O 0.36 0.24 0.15 0.03 0.04 0.03 84.80% - On-going Company Joint Venture Classrooms School Building DEO Construction of Two (2) Units - Three (3) Storey, Fifteen (15) Firmabuilt Construction / Mpjr Builders Camarines Norte 301755 Classroom School Building, Camarines Norte National 11/10/2019 82.104 368 O 0.36 0.24 0.15 0.03 0.06 0.05 89.30% - On-going Company Joint Venture DEO Highschool, Daet Camarines Norte First Grandeur Builders 35388 Construction of Concrete Road Barangay Japitan to Candugay 05/31/2018 Cebu 3rd DEO 1.980 45 C 0.45 0.20 0.30 - - - 95.10 95.10% Very Satisfactory Concreting of Budbud to Balao Road FMR Section 1: Sta. First Grandeur Builders 35388 0+000.00-Sta. 0+119.00; Section 2: Sta. 0+000.00-Sta. 04/07/2018 Cebu 3rd DEO 4.815 35 C 0.49 0.13 0.30 - - - 92.10 *92.10% Very Satisfactory 0+552.50 First Grandeur Builders 35388 Concreting of Road 08/20/2019 Cebu 2nd DEO 4.701 35 C 0.50 0.19 0.30 - - - 98.30% 98.3% Outstanding Construction of DPWH Building (Quality Assurance Section) First Grandeur Builders 35388 08/24/2019 Cebu 3rd DEO 15.200 150 O 0.40 0.24 0.10 0.02 0.06 0.02 83.60% - On-going Cebu 3rd District Engineering Office Construction of Multi-Purpose Building (Covered Court), Brgy. First Makeen Construction 32352 06/08/2018 Marinduque DEO 3.834 150 O 0.392 0.24 0.15 0.03 0.047 0.05 90.90 - On-going Tumagabok Construction/Maintenance of Flood Mitigation Structures and First Northway Development And Ilocos Sur 2nd 11645 Systems: Construction of Salvador - Bucong - Darapidap Flood 11/12/2019 42.159 284 O 0.40 0.24 0.15 0.03 0.05 0.05 92.20% - On-going Construction Corporation DEO Control (Upstream Section) Rehabilitation/Reconstruction/Upgrading of Damaged Paved First Northway Development And National Roads - Tertiary Roads: Junction Sta. Lucia - Salcedo Ilocos Sur 2nd 11645 11/12/2019 39.502 260 O 0.39 0.24 0.15 0.03 0.05 0.05 91.40% - On-going Construction Corporation Road, K0339+(-712) to K01339+(-399); K0343+180 to DEO K0344+130; K0350+116 to K0350+515 First R+J Builders Phils. Corp. (Formerly R+J Construction, Upgrading and Improvement of Road and Metro Manila 3rd 32530 11/06/2019 29.479 240 O 0.40 0.24 0.15 0.03 0.04 0.05 90.80% - On-going Builders) Drainage of Punturin to Lawang Bato Bypass Road DEO Ilocos Sur 1st Fit Construction 35857 Construction of Flood Control along Bical River 11/11/2019 18.621 140 C 0.45 0.13 0.30 - - - 87.80% 87.8% Satisfactory DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 60 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Ilocos Sur 1st Fit Construction 35857 Construction of Cabugao River, Brgy. Caellayan 08/27/2019 13.965 74 O 0.35 0.24 0.00 0.02 0.04 0.00 65.10% - On-going DEO Provincial JV - 18 - Fit Construction / 739 Builders (Jv) Upgrading & Improvement of San Ildefonso Port Road 10/10/2018 Government of 66.088 300 O 0.40 0.30 0.15 0.03 0.07 0.05 99.50 - On - Going 0061 Ilocos Sur Fit Construction/ Viking Construction And Construction of Flood Control along Bantaoay River, Brgy. Ilocos Sur 1st JV-18-677 08/26/2019 34.300 156 O 0.37 0.24 0.15 0.02 0.04 0.05 87.50% - On-going Supplies Joint Venture Busiing DEO Construction of Two (2) Units Regular TVL Workshop Building Davao del Norte Five Massive Infra & Supply Corp. 36876 08/23/2019 7.995 85 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory at Panabo NHS DEO Construction of Multi-Purpose Building at Davao City 2nd Davao City 2nd Five Massive Infra & Supply Corp. 36876 08/28/2019 11.409 300 O 0.36 0.24 0.15 0.02 0.05 0.05 86.50% - On-going District Engineering Office DEO Zamboanga Five Star Builders 37371 Construction of New Infirmary Building 03/18/2018 14.179 180 C 0.50 0.13 0.30 - - - 93.10 *93.10% Very Satisfactory Sibugay 1st DEO Construction (Completion) of Multi-Purpose Building Barangay Zamboanga del Five Star Builders 37371 11/09/2019 4.851 96 C 0.49 0.13 0.30 - - - 92.20% 92.2% Very Satisfactory Poblacion B Sur 1st DEO Contract for the Construction of Stockroom, Motorpool, and Fixtructure Construction & Supply 43767 10/11/2020 NPC 3.320 90 C 0.50 0.20 0.30 - - - 9993.00% 99.93% Outstanding Central Maintenance Area in Daraga, Albay for BOD Construction of Two (2) Storey Six (6) Classroom Building at Zamboanga del Fj Construction & Enterprises 31368 08/25/2019 9.528 105 C 0.49 0.13 0.30 - - - 92.20% 92.2% Very Satisfactory Aurora Regional Pilot School Regular Sur 1st DEO Construction/Improvement/Rehabilitation/Upgrading of Mountain Fj Miranda Construction 41349 Balicanao-Salin FMR, Brgy. Sadsadan, Bauko, Mountain 05/30/2018 Province 1st DEO, 2.848 67 C 0.46 0.16 0.01 - - - 62.70 62.70% Poor Province CAR Local Infrastructure Program: Local Roads and Bridges, Fj Miranda Construction 41349 09/07/2019 Benguet 2nd DEO 0.999 20 C 0.47 0.13 0.30 - - - 90.70% 90.7% Very Satisfactory Construction of Mang-o to Polidan Road Local Infrastructure Program - Local Roads and Bridges, Mt. Province 1st Fleurdelis Construction And Supply 44201 Construction / Rehabilitation / Upgrading / Improvement of Local 11/26/2019 5.940 117 C 0.48 0.16 0.30 - - - 93.60% 93.6% Very Satisfactory DEO Road Flfb Enterprises And Construction Services 32836 Construction of Salugan - Anoling Road 05/28/2018 Albay 2nd DEO 23.381 130 O 0.378 0.234 0.150 0.022 0.056 0.050 89.00 - On-going

Flordes Construction & Trading Corp. 16916 Construction of Flood Control Structures, San Jose River 06/13/2018 Bulacan 2nd DEO 18.581 140 O 0.395 0.275 0.150 0.030 0.023 0.050 92.30 - On-going Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads Including Drainage Based on Pavement Metro Manila 3rd Flordes Construction & Trading Corp. 16916 03/21/2018 45.680 270 C 0.45 0.13 0.30 - - - 87.70 88.30% Satisfactory Management System/Higway HDM-4 -Mac Arthur Highway, DEO K0015+198-K0015+878 Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Flordes Construction & Trading Corp. 16916 Maintenance of Flood Mitigation Structures and Drainage 11/11/2019 North Manila DEO 48.998 180 O 0.34 0.30 0.15 0.03 0.04 0.05 90.90% - On-going Systems - Bank Improvement Along Estero de San Miguel, Sta. 1+718.60 to Sta. 1+849.00, Estero de San Miguel Construction of Flood Control Structures along NCR/Bulacan Flordes Construction & Trading Corp. 16916 11/20/2019 Bulacan 2nd DEO 95.533 240 O 0.40 0.24 0.15 0.03 0.06 0.05 92.30% - On-going Bdry.-Bigte- Road San Jose River Local Program-Local Infrastructure Program, Flood Control and Flordes Construction & Trading Corp. 16916 Drainage, Flood Control Structures/Facilities, Construction of 11/27/2019 Cavite 1st DEO 99.000 273 O 0.39 0.24 0.11 0.02 0.05 0.03 83.90% - On-going Revetment along Ilang-Ilang River, Brgy. F. Manalo, Phase II Floriane Construction And Supply 12261 Construction of Covered Court 11/08/2019 Cebu 2nd DEO 4.950 150 O 0.38 0.30 0.15 0.03 0.05 0.05 96.30% - On-going Isabela Irrigation Management Office - Construction of Pipeline FM Orani & Son's Development Corporation 39108 5/21/19 NIA 1.335 150 C 0.35 0.20 0.30 - - - 84.80 *84.80% Satisfactory using Reinforced Concrete Pipes with Manholes Constuction of 1STY 5CL School Building with Toilet, Imbatug Bukidnon 3rd Footprints Construction 16713 05/30/2018 6.092 135 C 0.49 0.13 0.30 - - - 92.10 92.10% Very Satisfactory CES DEO Footprints Construction / Cagalawan Construction of Standard Four-Storey (20 Classrooms) School Misamis Oriental JV-18-519 11/04/2019 42.354 249 C 0.49 0.13 0.30 - - - 92.20% 92.06% Very Satisfactory Enterprises (Joint Venture) Building, VN Chavez Memorial Central School 2nd DEO Construction of Concrete Revetment, Sitio Dologan Flood Davao Occidental Fortstone Construction Enterprises 31668 11/25/2019 29.377 184 C 0.47 0.13 0.30 - - - 90.60% 87.06% Satisfactory Control DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 61 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Concrete Revetment, Sitio Dologan Flood Davao Occidental Fortstone Construction Enterprises 31668 08/26/2019 29.377 184 O 0.37 0.24 0.15 0.02 0.04 0.03 84.70% - On-going Control, (Sta.0+000 - Sta.0+600) DEO Construction (Completion) of Multi-Purpose Building (Mini Gym) Sultan Kudarat 1st Fpj Construction And Supply 28493 08/26/2019 0.995 50 C 0.40 0.14 0.30 - - - 83.40% 83.4% Satisfactory at Brgy. Bagumbayan DEO 19MH0042 - Construction of Multi-Purpose Building (Senior Sultan Kudarat Fpj Construction And Supply 28493 11/23/2019 0.997 60 C 0.50 0.13 0.30 - - - 93.30% 90.29% Very Satisfactory Citizen Building) 2nd DEO Sultan Kudarat Fpj Construction And Supply 28493 Construction of Multi-Purpose Building (Senior Citizen Building) 08/24/2019 0.997 60 O 0.38 0.23 0.15 0.03 0.05 0.05 89.00% - On-going 2nd DEO Widening of Permanent Bridge - Kalawag Bridge (B00289MN) Sultan Kudarat 1st Fpj Construction And Supply 28493 11/23/2019 19.109 195 O 0.39 0.21 0.15 0.03 0.05 0.03 86.40% - On-going along Kidapawan - Allah Junction Road DEO Off-Carriageway Improvement including Drainage along Laoag- Balacad Road, K0484+942 to K0485+339, K0480+540 to Ilocos Norte 1st Fr Espiritu Jr Builders 36719 05/30/2018 29.400 223 C 0.30 0.20 0.30 - - - 80.30 73.16% Poor K0481+000, K0483+644 to K0484+572, K0485+415 to DEO K0486+522 and K0482+005 to K0482+681 Local Program - Buildings and Other Structures - Multipurpose/Facilities - Local Intrastructure Program - Nueva Vizcaya 1st Framada Construction And Material Supplies 45435 11/11/2019 4.950 178 O 0.38 0.18 0.15 0.02 0.03 0.05 81.70% - On-going Construction of Multi-Purpose Building, Barangay La Torre DEO South Mindoro Oriental Framecon Builders 22482 Construction of Pula River Control Structure 06/02/2018 23.507 186 O 0.377 0.240 0.150 0.030 0.061 0.050 90.80 - On-going DEO Construction/Maintenance of Flood Mitigation Structures and Framecon Builders 22482 Rehabilitation with Slope Protection of Sitio Paenaan River, 06/13/2018 Rizal 1st DEO 18.957 270 C 0.43 0.15 0.30 - - - 87.80 87.80% Satisfactory K0037+484 along - Infanta Road (Upstream Phase 4) Construction/Maintenance of Flood Mitigation Structures and Nueva Ecija 2nd Framecon Builders 22482 Drainage Systems - Rehabilitation/Improvement of Digmala 08/24/2019 56.743 250 O 0.39 0.24 0.15 0.03 0.06 0.05 91.90% - On-going DEO River, Digmala Section Quezon City 1st Framecon Builders 22482 Rehabilitation of General Avenue 08/23/2019 13.965 150 O 0.27 0.24 0.15 0.03 0.06 0.05 79.30% - On-going DEO Quezon City 1st Framecon Builders 22482 Rehabilitation of General Avenue 11/25/2019 14.701 180 O 0.36 0.24 0.15 0.03 0.03 0.05 86.60% - On-going DEO Framecon Builders/ E.T.V.R. Trading & Construction of Flood Control/ Drainage System, Bucayao Mindoro Oriental JV-18-741 11/05/2019 37.622 285 O 0.38 0.27 0.15 0.03 0.06 0.05 94.00% - On-going Construction Joint Venture Concrete Revetment Armouring BBRIS DEO Framecon Builders/ Jaro Builders & Mindoro Oriental Flood Control Project, Poblacion II 06/02/2018 47.022 345 C 0.47 0.15 0.30 - - - 92.10 92.10% Very Satisfactory Construction Supply Joint Venture DEO Frandel Construction And Development Corp. 36116 Quipot Irrigation Project (Package 1) - 2017 04/06/2018 NIA 14.229 300 O 0.29 0.30 0.10 0.02 0.03 0.02 75.18 - On - Going Construction of Box Culvert and Drainage Outfall Including Metro Manila 1st Franzcor Trading & Construction 18082 11/19/2019 14.699 150 O 0.28 0.30 0.15 0.01 0.04 0.05 82.70% - On-going Laterals at Palingon River DEO Provincial Concreting of Provincial Road, Lapuz to Brgy. Liberty, Norala, Freden Construction 22665 10/16/2019 Government of 17.240 125 O 0.36 0.30 0.15 0.03 0.07 0.05 95.60 - On-going South Cotabato South Cotabato Construction of River Bank Protection with Revetment along Freden Construction 22665 06/07/2018 Sarangani DEO 8.910 120 O 0.400 0.240 0.128 0.030 0.051 0.033 88.20 - On-going Matling River (Saub Bridge Section) Provincial Upgrading of Provincial Road Junction National Highway, Brgy. Freden Construction 22665 09/18/2018 Government of 14.990 135 O 0.32 0.24 0.15 0.02 0.03 0.05 81.40 - On - Going Teresita South Cotabato Provincial Upgrading of Provincial Road Junction National Highway, Brgy. Freden Construction 22665 10/17/2018 Government of 14.990 135 O 0.39 0.30 0.15 0.03 0.07 0.05 99.30 - On - Going Teresita South Cotabato 19MB0027 - Construction/Improvement of Access Roads Leading to Trades, Industries and Economic Zones, Blagan - South Cotabato Freden Construction 22665 11/20/2019 34.300 165 O 0.39 0.30 0.15 0.03 0.06 0.03 95.80% - On-going Datal Laguh San Jose - Pao Pao Sinawal Road connecting to 2nd DEO Gensan Diversion Road in support of the Agribusiness Industry Provincial Concreting of NHW Jct. Lun Padidu-Daan Suyan-Upper Suyan Freden Construction 22665 04/02/2019 Government of 70.000 292 O 0.34 0.27 0.15 0.03 0.06 0.05 89.91 - On - Going Provincial Road Phase II Sarangani

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 62 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Regional Office Frey-Fil Corporation 31521 08/22/2019 472.733 792 O 0.40 0.24 0.00 0.03 0.06 0.00 73.00% - On-going Weak Bridges - Abusag Bridge (B04258LZ) along Baybayug - No. II Baggao - Dalin - Sta. Margarita Road Organizational Outcome 1: Ensure Safe and Reliable National Road System: Bridge Program: Replacement of Permanent Regional Office Frey-Fil Corporation 31521 11/05/2019 472.733 792 O 0.40 0.23 0.10 0.02 0.05 0.03 82.90% - On-going Weak Bridge - Abusag Bridge - (B04258LZ) along Baybayog- No. II Baggao-Dalin-Sta.Margarita Road Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Fromarc Builders & Gen. Merchandise 26244 Construction/Rehabilitation of Flood Mitigation Facilities within 11/28/2019 Cavite 1st DEO 19.207 138 O 0.38 0.24 0.15 0.02 0.05 0.05 89.30% - On-going Major River Basins and Principal Rivers, Construction of Revetment along River NIA / Pangasinan Concrete Canal Lining and Canal Structures for Carayungan Irrigation Fsb Construction, Inc. 46131 11/07/2020 4.708 300 C 0.43 0.10 0.30 - - - - 82.90% Satisfactory CIS Management Office FSB Construction, Inc. 46131 Carayungan Communal Irrigation System 07/11/2020 NIA 4.708 300 C 0.43 0.10 0.30 - - - 8290.00% *82.90% Satisfactory Davao del Norte Ft Construction And General Merchandise 41265 Construction of 1 STY - 3 CL School Building at Marsman NHS 03/21/2018 3.996 95 C 0.47 0.13 0.30 - - - 90.60 *90.60% Very Satisfactory 1st DEO Network Development - Off - Carriageway Improvement - Tertiary Roads Bacon- Sawanga- Prieto Diaz RD, K0596+240- Sorsogon 1st Fulleros Botox Builders And Design 33848 K0596+497, K0602+088-K0602+142, K0602+169-K0602+223, 11/10/2019 28.095 120 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory DEO K0603+000-K0603+261, K0603+578-K0604+145, K604+167- K0604+421 G. Arabia Platinum Construction & Road Widening & Reconstruction of Roxas City Circumferential 39888 11/08/2019 Capiz 1st DEO 19.526 130 O 0.39 0.24 0.15 0.03 0.04 0.03 87.40% - On-going Development Co. Road Leading to Culasi Port, Roxas City, Capiz Construction of 1 Unit 1 Storey 2 CL School Building Dilawa Zamboanga del G. Baron Construction 37142 06/02/2018 2.841 115 C 0.50 0.13 0.30 - - - 93.10 93.10% Very Satisfactory NHS, Piñan ( New Piñan) Norte 3rd DEO Restoration of Damages Wrought by Typhoon Karen along G. T. Y. Construction 24448 08/06/2019 NIA 15.382 213 C 0.38 0.17 0.30 - - - 84.65 *84.65% Satisfactory Fatima - Tanauan Road - Restoration of Typhoon Damages Reconstruction from Paved- Concrete Iloilo- Antique Rd., G. Uy Construction 27999 K0011+086-K0011+319, K0013+118-K0013+724, K0028+412- 08/30/2019 Iloilo 1st DEO 32.489 208 C 0.43 0.13 0.30 - - - 86.00% 86% Satisfactory K0029+023 Road Widening - Iloilo-Antique Road, KO014+974 - G. Uy Construction 27999 KO015+434, KO015+777-KO015+793, KO015+819- 11/15/2019 Iloilo 1st DEO 53.261 267 O 0.38 0.30 0.15 0.03 0.05 0.05 96.30% - On-going KO015+841, KO015+870 - KO016+718 G.A Flores Construction, Inc. 611 Development Project 02/06/2019 DOTC 55.775 181 O 0.37 0.30 0.15 0.03 0.07 0.05 97.30 - On-going G.A Flores Construction, Inc. 611 Cauayan Airport Development Project 03/27/19 DOTC 55.775 181 C 0.46 0.20 0.30 - - - 95.80 96.70% Outstanding Airport Horizontal Structures: Construction of G.A. Flores Construction, Inc. 611 8/29/19 DOTR 20.927 181 O 0.40 0.30 0.15 0.02 0.05 0.05 97.40 - On-going Barbed Wire Perimeter Fence and Runway Network Development Improvement/Widening of National G.C.I. Construction And Development Corp. / Batangas 1st Roads Palico-Balayan-Batangas Road (S01854LZ) - 06/21/2018 120.320 328 C 0.48 0.13 0.30 - - - 91.70 91.70% Very Satisfactory X.Y.Z. Construction & Sup DEO K0100+640-K0103+229 OO1: Ensure Safe and Reliable National Road System, Network Development - Paving of Unpaved Roads - Secondary Regional Office G.C.I. Construction And Dev'T. Corp. 11346 08/29/2019 158.001 345 O 0.38 0.24 0.14 0.03 0.07 0.03 88.40% - On-going Roads - Panganiban - Sabloyon Road, K0062+493 to No. V K0076+520 with Exceptions Ensure Safe and Reliable National Road System, Network G.C.I. Construction And Dev'T. Corp. / Bicol Development - Construction of By-Pass and Diversion Roads, Regional Office Goldrock Construction Corporation Joint JV-18-0395 08/24/2019 289.476 465 O 0.36 0.30 0.15 0.03 0.04 0.03 91.20% - On-going Camarines Sur Expressway Project (San Fernando - Pili), No. V Venture Package 2, Including ROW Reconstruction to Concrete Pavement-7th Street Lawa-an G.F. Falcis Construction & Supply 26147 Village Leading to Various Seafood Restaurants, Terminals and 08/19/2019 Iloilo City DEO 19.803 88 O 0.33 0.30 0.15 0.03 0.04 0.03 87.70% - On-going Malls

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 63 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Reconstruction to Concrete Pavement- So-oc Area leading to G.F. Falcis Construction And Supply 26147 Balay nga Bato, Sinamay House Plaza, Churches Villa 11/13/2019 Iloilo City DEO 14.680 63 C 0.47 0.13 0.30 - - - 90.30% 90.3% Very Satisfactory Beaches, Various Seafood Restaurant, and Resorts G.F. Rovero Merchandising 27268 Rehabilitation/Improvement of Boracay Circumferential Road 11/06/2019 Aklan DEO 46.540 179 O 0.39 0.24 0.15 0.03 0.05 0.05 90.30% - On-going Local Program - Local Infrastructure Program - Building and Nueva Vizcaya 1st G.M. Pajarillaga Construction & Supply 21760 Other Structure - Multipurpose/Facilities - Construction of Multi- 03/22/2018 1.906 90 OG 0.392 0.212 0.150 0.030 0.048 0.050 88.25 - On - Going DEO Purpose Building Organizational Outcom 2: Protect Lives and Properties againts Major Flood - Flood Management Program - Nueva Vizcaya 1st G.M. Pajarillaga Construction & Supply 21760 Construction/Rehabilitation of Flood Mitigation Facilities within 11/11/2019 4.900 33 C 0.45 0.13 0.30 - - - 88.30% 88.3% Satisfactory DEO Major River Basins and Principal Rivers - Construction of Sta. Fe River Control, Almaguer South Section (Phase 3) Construction of Unique Workshop (7x22.5), Malacampa G.M. Talavera Construction And Supplies 39035 03/23/2018 Tarlac 1st DEO 2.644 90 C 0.49 0.13 0.30 - - - 92.00 *92.00% Very Satisfactory National High School, Camiling, Tarlac Preventive Maintenance of Road: Asphalt Overlay Tigbao Sta. Tacloban City G.O.C. Builders 36230 Fe San Miguel Road-K0903+-138-K0903+401, K0905+909- 08/30/2019 17.109 61 C 0.45 0.13 0.30 - - - 87.90% 87.9% Satisfactory DEO K0906,+795 Preventive Maintenance of Road: Asphalt Overlay Tigbao Sta. Tacloban City G.O.C. Builders 36230 Fe San Miguel Road K0903+(-138) - K0903+401, K0905+909 - 11/13/2019 17.109 61 C 0.46 0.13 0.30 - - - 89.50% 88.36% Satisfactory DEO K0906+795 Provincial Gabriellas Enterprises 43025 Upgrading of Brgy. Poblacion-Matapol Road 06/25/2019 Government of 9.976 195 O 0.37 0.30 0.11 0.03 0.07 0.03 91.12 - On-going South Cotabato Provincial Gabriellas Enterprises 43025 Upgrading of Junction Nhwy. - El Nonok Road 04/12/2019 Government of 14.952 150 O 0.38 0.30 0.15 0.03 0.06 0.05 96.10 - On-going South Cotabato Provincial Gabriellas Enterprises 43025 Upgrading of Brgy. Poblacion - Matapol Road 03/21/2019 Government of 9.976 150 O 0.33 0.20 0.15 0.03 0.05 0.05 80.30 - On - Going South Cotabato 19MG0090 - Concreting of Road at Balmores Street to National South Cotabato Gabriellas Enterprises 43025 11/19/2019 29.009 165 O 0.40 0.26 0.15 0.03 0.06 0.05 93.80% - On-going Highway 1st DEO Construction of Drainage Structure along Road - On Specific Gact Enterprises 36867 Locations along Jct. Milagros - Baleno - Lagta Rd. (S00016MT), 08/22/2019 Masbate 2nd DEO 12.068 164 O 0.38 0.24 0.15 0.03 0.07 0.05 92.30% - On-going K0039+311 to K0039+947, Length = 636.0 l.m. (0.636 km) Gacutan Construction / D.A. Cadelina Network Development - Road Widening - Primary Roads - JV-18-900 11/08/2019 Isabela 3rd DEO 48.534 209 O 0.37 0.24 0.15 0.03 0.06 0.03 86.90% - On-going Construction Joint Venture Santiago - Tuguegarao Road- K0345+000 - K0346+825 OO2: Protect Lives and Properties Against Major Floods: Construction/Rehabilitation of Flood Mitigation Facilities within Gacutan Construction Inc. 10789 11/08/2019 Isabela 3rd DEO 18.625 140 C 0.43 0.13 0.30 - - - 86.10% 85.2% Satisfactory Major River Basins and Principal Rivers - Construction of Magat River Flood Control Project (Phase I) Protect Lives and Properties Against Major Floods: Construction/Rehabilitation of Flood Mitigation Facilities within Gacutan Construction Inc. 10789 08/24/2019 Isabela 3rd DEO 18.625 140 O 0.32 0.24 0.15 0.03 0.06 0.05 84.60% - On-going Major River Basins and Proncipal Rivers - Construction of Magat River Flood Control Project (Phase I) Gacutan Construction Inc./ D.A. Cadelina Network Development - Road Widening - Primary Roads - JV-18-900 08/24/2019 Isabela 3rd DEO 48.534 209 O 0.35 0.24 0.15 0.03 0.05 0.05 87.00% - On-going Construction Joint Venture Santiago - Tuguegarao Road - K0345+000 to K0346+825 Rehabilitation/ Reconstruction/ Upgrading of Paved Road, Gail Construction And Supply Tagbilaran City- Sikatuna- Loboc Road, K0012+000 to 06/04/2018 Bohol 1st DEO 9.262 93 O 0.376 0.300 0.087 0.030 0.058 0.000 85.10 - On-going K0012+400 Gail Construction And Supply 33832 Concreting of Graham Avenue, Booy 08/24/2019 Bohol 1st DEO 1.975 32 C 0.50 0.13 0.30 - - - 93.00% 93% Very Satisfactory Widening of Permanent Bridges, Malinao Br. (B00488NR) along Negros Occidental Galeno Construction, Inc. 3427 08/22/2019 10.236 241 C 0.47 0.20 0.19 - - - 85.90% 85.9% Satisfactory (Kabankalan-Hinoba-an Section) 3rd DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 64 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Construction of Satelite Material Laboratory Building, DPWH Lower Kalinga Gallica Construction 39077 09/07/2019 6.735 135 O 0.38 0.24 0.02 0.03 0.05 0.00 72.40% - On-going Lower Kalinga District Engineering Office Compound DEO Off-Carriageway / Improvement : Shoulder Paving / Gamie Construction And Supply 37367 Construction, San Fernando Port Road K0267+(-393) to 05/28/2018 La Union 1st DEO 5.595 105 O 0.344 0.23 0.15 0.03 0.051 0.05 85.50 - On-going K0267+752, Baranggay Madayegdey - Roro City

Garnic Construction 22861 Bataraza Expansion Project, Bataraza, Palawan 03/24/2018 PPA 121.302 480 C 0.48 0.20 0.22 - - - 89.36 85.42% Satisfactory

Network Development Program- Road Widening-Secondary Roads, Palico- Balayan-Batangas Rd.- K0104+713- K0104+857, K0106+328.3-K0106+343.3, K0106+508- Batangas 1st Gci. Construction And Development Corp. 11346 11/19/2019 93.272 330 O 0.40 0.24 0.15 0.02 0.05 0.03 88.90% - On-going K0106+828, K0114+468-K0114+820, K0115+645- K0115+956, DEO K0118+500- K0118+580, K0118+640-K0119+160, K0123+044.5 - K0123+062 Construction/Rehabilitation of Flood Mitigation Facilities, Within Camarines Sur Gci. Construction And Development Corp. 11346 Major River Basins and Principal Rivers - Construction of Dike 11/08/2019 28.225 237 O 0.40 0.24 0.15 0.03 0.06 0.05 92.40% - On-going 2nd DEO (Cut-off Channel), Within Basin Ensure Safe and Reliable National Road System, Network Gci. Construction And Development Corp. / Development - Construction of By-Pass and Diversion Roads, Regional Office Bicol Goldrock Construction Corporation Joint JV-18-0395 11/08/2019 289.476 466 O 0.39 0.20 0.10 0.03 0.05 0.03 80.50% - On-going Camarines Sur Expressway Project (San Fernando - Pili), No. V Venture Package 2, Including ROW Nueva Ecija 2nd Gclt Construction 30657 Rehabilitation of Slope Protection along Pampanga River 06/21/2018 13.688 150 O 0.387 0.251 0.150 0.03 0.028 0.033 87.90 - On-going DEO Construction / Maintenance of Flood Mitigation Structures and Zambales 2nd Gclt Construction 30657 Drainage System, Improvement of Sta. Rita River, Sta. 11/14/2019 39.599 180 O 0.38 0.24 0.15 0.03 0.05 0.05 89.80% - On-going DEO 006+667 - Sta. 006+871 (Left Side) Pangasinan 1st Ged Construction 13614 Construction of Multi Purpose Building at Brgy. Cabatuan 08/28/2019 1.980 97 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory DEO Construction of Flood Control Mitigation Facilities along Pangasinan 1st Ged Construction 13614 11/12/2019 28.072 240 O 0.38 0.24 0.12 0.03 0.05 0.03 84.90% - On-going Alaminos River (Cabanatuan Section) DEO Quezon City 2nd Geecee Builders & Construction Supplies 36551 Rehabilitation of Drainage System, Barangay Kamuning 11/27/2019 18.422 268 O 0.39 0.25 0.15 0.03 0.06 0.03 90.80% - On-going DEO Construction of Bank Protection along Upper Sillway River with South Cotabato Gemma Construction Supply, Inc. 5044 Road Slope Protection on Upper Silway Br. Approaches, Sta. 06/09/2018 44.696 200 O 0.400 0.240 0.150 0.03 0.061 0.05 93.10 - On-going 2nd DEO 0+000 to Sta. 0+355

Gemma Construction Supply, Inc. 5044 Malitubog - Maridagao Irrigation Project, Stage II 03/10/2018 NIA 138.50 1,051 O 0.260 0.300 0.016 0.015 0.028 0.017 63.61 - On-going

Road Upgrading (Gravel to Concrete) of Awang-Upi-Lebak- Regional Office Gemma Construction Supply, Inc. 5044 Kalamansig - Palimbang - Sarangani Road, K1970+620 - 01/03/2018 145.610 420 C 0.49 0.13 0.30 - - - 92.30 *92.30% Very Satisfactory No XII K1971+277; K1971+283 - K1972+276; K1972+286 - 1973+100 Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Regional Office Gemma Construction Supply, Inc. 5044 Control Mitigation Facilities along Amburayan River Basin, 11/10/2019 141.855 261 O 0.38 0.24 0.15 0.03 0.06 0.05 90.40% - On-going No. I Barangay Jardin - Tarangotong, Sta.8+18 to Sta.9+810, Left Side Gemma Construction Supply, Inc./ Arcinue Rehabilitation and Construction of Basin Flood JV-18-0269 09/01/2019 Benguet 1st DEO 92.519 375 O 0.32 0.24 0.15 0.03 0.04 0.05 83.80% - On-going Comm'L Corporation Joint Venture Mitigation Structure Local Program-Local _Roads_and_Bridges, local Roads, Gemstrong Construction, Inc. 38301 Construction of Concrete Road - Concreting of Brgy. Jampang - 08/21/2019 Cebu 4th DEO 4.702 60 C 0.48 0.13 0.30 - - - 90.90% 90.9% Very Satisfactory Brgy. Mabasa Road, Jampang and Mabasa Gemstrong Construction, Inc. 38301 Road Improvement of Anajao Road at Brgy. Anajao 04/07/2018 Cebu 4th DEO 2.836 20 C 0.44 0.13 0.30 - - - 86.80 *86.80% Satisfactory Gendiesel Philippines, Inc. 42490 Construction of Centralized Generator System 7/22/19 DOST 0.100 241 C 0.46 0.20 0.30 - - - 96.10 *96.10% Outstanding

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 65 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Design and Build Services for the Construction of Cafeteria and Genetian Builder 18052 02/14/2020 PSHS-ZRC 19.490 481 C 0.49 0.20 0.00 - - - 69.09% 79.67% Unsatisfactory Student Activity Center Genetian Builder 18052 Design and Build Services for Academic Building 1 02/14/2020 PSHS-ZRC 27.807 488 C 0.47 0.20 0.00 - - - 67.13% 80.55% Unsatisfactory Design & Build Services for the Construction of Academic Genetian Builders 18052 06/26/2019 DOST 27.807 443 O 0.38 0.30 0.00 0.03 0.06 0.05 81.40 - On-going Building 1 Design & Build Services for the Construction of Cafeteria and Genetian Builders 18052 06/25/2019 DOST 19.490 481 O 0.39 0.30 0.02 0.03 0.01 0.05 79.00 - On-going Student Activity Center Provincial Genetian Builders 18052 Concreting of Jct. Sayre H'way (Kisolon) -Puntian Road 05/31/2018 Government of 30.776 271 O 0.32 0.30 0.15 0.03 0.06 0.05 90.74 - On - Going Bukidnon Provincial Genetian Builders 18052 Concreting of Jct. (Kuya) Dagumbaan Road 06/13/2018 Government of 95.597 401 O 0.37 0.30 0.15 0.03 0.07 0.05 96.50 - On - Going Bukidnon Provincial Genetian Builders 18052 Concretingof Jct. (Kuya) Dagumbaan Road 08/29/2018 Government of 95.597 401 O 0.368 0.300 0.026 0.030 0.065 0.033 82.20 - On - Going Bukidnon Misamis Genetian Builders 18052 Construction of Bonifacio Water System 06/04/2018 Occidental 2nd 38.392 165 C 0.50 0.20 0.21 - - - 91.10 91.10% Very Satisfactory DEO Lanao del Norte Genetian Builders 18052 Construction of Water Supply Project 06/06/2018 61.420 251 C 0.50 0.13 0.30 - - - 93.40 93.40% Very Satisfactory 1st DEO Provincial Genetian Builders 18052 Concreting of Jct. Sayre H'way (Kisolon) Sumilao-Puntian Road 09/06/2018 Government of 30.776 271 C 0.39 0.19 0.30 - - - 87.70 89.52% Very Satisfactory Bukidnon Construction of Two (2) Unit Two (2) Storey - Ten (10) Zamboanga Genetian Builders 18052 03/18/2018 24.494 350 C 0.45 0.13 0.30 - - - 88.70 85.97% Satisfactory Classroom School Building at Imelda NHS Sibugay 1st DEO Construction of Two (2) Units Four (4) Storey Sixteen (16) Zamboanga del Genetian Builders 18052 03/16/2018 53.104 275 C 0.49 0.17 0.30 - - - 95.30 90.17% Very Satisfactory Classroom School Building at Midsalip NHS-Main Sur 1st DEO Construction / Improvement of Access Roads leading to Trades, Industries and Economic Zones - Jct. Lanao - Pagadian - Zamboanga Genetian Builders 18052 08/28/2019 23.757 120 O 0.40 0.24 0.15 0.03 0.06 0.05 92.80% - On-going Zamboanga City Road connecting Barangay Poblacion - Bliss Sibugay 1st DEO Road in support of Processed Fruits Industry Misamis Construction of Bypass/Diversion Roads Ozamiz City- Clarin Genetian Builders 18052 08/21/2019 Occidental 2nd 63.127 169 O 0.34 0.30 0.00 0.03 0.06 0.00 72.80% - On-going Interior Bypass Link (OCCIBALL), Incl. ROW DEO

Construction of Flood Mitigation Structure, Construction of Zamboanga del Genetian Builders 18052 11/08/2019 47.968 258 O 0.38 0.24 0.15 0.03 0.05 0.05 90.80% - On-going Flood Control Structure (Poblacion Side) along Layawan River Norte 3rd DEO

Misamis Genetian Builders 18052 Construction (Improvement) of Multi-Purpose Building Cluster 3 11/08/2019 Occidental 2nd 28.519 190 O 0.39 0.30 0.15 0.03 0.05 0.05 97.40% - On-going DEO Misamis Road Widening - Primary Roads, Oroquieta City - Plaridel - Genetian Builders 18052 11/09/2019 Occidental 1st 86.274 240 O 0.39 0.30 0.15 0.03 0.04 0.05 95.90% - On-going Calamba - Sapang Dalaga Road, K1773+000 - K1775+780 DEO Provincial SL1-SN- Government of Genetian Builders Jv With Kvc Construction Concreting of Guintolan-Payao Provincial Road 10/25/2018 186.239 499 O 0.39 0.30 0.15 0.03 0.07 0.05 98.53 - On - Going 13506 Zamboanga Sibugay Gerra Construction Incorporated 29359 Construction of Abitonan River Control 11/24/19 Aurora DEO 24.500 232 O 0.39 0.22 0.15 0.03 0.06 0.05 89.70% - On-going Gerra Construction Incorporated/ 1St Cut & Construction of Abitonan River Control 06/20/2018 Aurora DEO 28.418 288 O 0.365 0.290 0.150 0.030 0.030 0.033 89.80 - On-going Fill Construction of One Unit One-Storey Three Classroom School Dinagat Islands Gevans Construction And Supply 43267 Building at Dinagat Central Elementary School, School ID: 08/20/2019 5.174 233 O 0.40 0.23 0.13 0.02 0.04 0.03 84.10% - On-going DEO 132396, Brgy. White Beach

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 66 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of One One-Storey Three Classroom School Dinagat Islands Gevans Constructtion And Supply 43267 Building @ Dinagat Central Elementary School School ID: 11/07/2019 5.174 233 C 0.48 0.14 0.30 - - - 91.10% 85.64% Satisfactory DEO 132396 Construction of Four (4) Storey Sixteen (16) Classroom School Zamboanga City Ghr Construction 34464 06/07/2018 37.910 350 O 0.393 0.238 0.150 0.030 0.070 0.050 93.10 - On-going Building at San Roque National High School DEO Dinagat Islands Gicar Construction, Inc. 12624 Improvement of Cayetano Waterways 03/14/2018 9.300 264 C 0.47 0.19 0.30 - - - 95.60 95.60% Very Satisfactory DEO Widening of Bridge- Lantay Bridge (B01442MN) Along Bukidnon 3rd Gicar Construction, Inc. 12624 08/23/2019 20.628 228 O 0.37 0.24 0.15 0.02 0.04 0.05 86.90% - On-going Maramag- Maradugao Road DEO Construction of Flood Mitigation Structure along Surigao River, Surigao del Norte Gicar Construction, Inc. 12624 11/04/2019 48.996 177 O 0.38 0.30 0.15 0.03 0.05 0.05 95.30% - On-going Sta. 0+690 to Sta. 1+128 2nd DEO Surigao del Sur Gicar Construction, Inc. 12624 Construction of Consuelo Seawall 06/01/2018 32.585 223 O 0.369 0.233 0.150 0.030 0.040 0.050 87.20 - On-going 1st DEO Preventive Maintenance Secondary Roads Asphalt Overlay (50 Gicar Construction, Inc./ Santech Builders Surigao del Norte JV-18-1203 mm thick) along Surigao Wharf Road, K1123 +(-810) - 11/10/2019 70.320 138 C 0.47 0.20 0.30 - - - 96.50% 96.5% Outstanding Corporation (Joint Venture) 2nd DEO K1123+466 Giovanni Construction / Datrebil Construction Construction of Classrooms (2 Sty/12 CL) Esperanza National Agusan del Sur JV-16-247 03/21/2018 16.310 360 C 0.49 0.14 0.30 - - - 92.90 88.93% Satisfactory & Supply Joint Venture High School 1st DEO Zamboanga Gjd Construction & Supply 25866 Construction of Covered Court, Brgy. Kulambugan 11/05/2019 1.976 60 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Sibugay 2nd DEO Flood Management Program - Construction / Maintenance of Gje Builders Corporation (Formerly: Gje Flood Mitigation Structures and Drainage Systems Construction 18286 08/29/2019 Tarlac 1st DEO 18.816 149 C 0.50 0.13 0.30 - - - 93.20% 93.2% Very Satisfactory Builders) of Flood Control Structure along Tarlac River left Dike, Brillante - Rang -Ayan Section Flood Management Program Construction/Maintenance of Gje Builders Corporation (Formerly: Gje Flood Mitigation Structures and Drainage Systems Construction 18286 11/28/2019 Tarlac 1st DEO 18.816 149 C 0.47 0.13 0.30 - - - 90.30% 90.3% Very Satisfactory Builders) of Flood Control Structure along Tarlac River Left Dike, Brillante- Rang Ayan Section Construction of 1-Storey 3-CL with Toilet Each Room, Tumog Gka Engineering And Construction 43080 11/23/2019 Apayao 2nd DEO 7.688 240 C 0.48 0.14 0.30 - - - 91.30% 91.3% Very Satisfactory ES Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones Dagupan - Salvacion Road in Gka Engineering And Construction 43080 11/23/2019 Apayao 2nd DEO 9.449 195 C 0.49 0.13 0.30 - - - 91.80% 89.46% Very Satisfactory Support of Handicrafts, Furniture, Pineapple, Banana, Vegetable, Rice and Corn Industries Construction/Improvement of Acces Roads Leading to Trades, Industries and Economin Zones Dagupan - Salvacion Road in Gka Engineering And Contstruction 43080 09/11/2019 Apayao 2nd DEO 9.449 195 O 0.37 0.24 0.15 0.02 0.05 0.05 87.90% - On-going Support of Handicrafts Furniture, Pineapple, Banana, Vegetables, Rice and Corn Industries Reconstruction to Concrete Pavement- on Specific Locations Negros Occidental Gkmm Construction & Supplies 32953 along (S00406NR), K0036+902 to 11/07/2019 25.477 174 O 0.39 0.24 0.15 0.02 0.05 0.05 90.20% - On-going 1st DEO K0043+281 GLS Construction and General Merchandise 34233 Lantawan Homes (Tuburan Ville) 3/30/19 NHA 49.297 410 O 0.36 0.28 0.07 0.03 0.06 0.02 82.21 - On-going

GLS Construction and General Merchandise 34233 Seawoods Residences 7/20/19 NHA 53.354 492 O 0.33 0.30 0.07 0.03 0.06 0.03 82.67 - On-going Construction/ Maintenance of Flood Mitigation Structures and Go Solid Builders Inc. 32885 Drainage Systems - Rehabilitation of Flood Control Structures 08/27/2019 Leyte 2nd DEO 8.855 146 O 0.40 0.24 0.15 0.03 0.04 0.05 90.90% - On-going along Domiri River, Barangay Culasian Construction/Maintenance of Flood Mitigation Structures and Go_Solid Builders Inc. 38948 Drainage Systems-Rehabilitation Flood Control Structure along 11/12/2019 Leyte 2nd DEO 8.855 123 C 0.49 0.13 0.30 - - - 92.20% 91.42% Very Satisfactory Domiri River, Brgy. Culasian Construction of Multi-Purpose Building, F. David Elementary Camarines Norte Golden Construction And Supply 35001 08/20/2019 1.928 75 C 0.44 0.13 0.30 - - - 87.50% 87.5% Satisfactory School DEO Golden Deer Enterprises 26179 Nasugbo Beach Park Phase II 10/30/2018 TIEZA 7.500 180 C 0.48 0.19 0.30 - - - 96.80 84.26% Satisfactory

Golden Vido Builder & Supply 1632 Completion of Academic Bldg. 1, Phase 2 06/07/2018 DOST 35.121 385 C 0.49 0.20 0.27 - - - 95.28 96.70% Outstanding

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 67 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Golden Ville Realty and Development 33640 Barugo Town Ville Phase 1 03/13/2020 NHA 189.124 484 O 0.37 0.28 0.13 0.03 0.07 0.03 9153.00% - On-going Corporation Construction/Maintenance of Flood Mitigating Structures and Baguio City s Goldrich Construction & Trading 16489 Drainage Systems: Construction/Rehabilitation of Flood 06/07/2018 97.381 280 C 0.49 0.13 0.30 - - - 92.20 92.20% Very Satisfactory DEO, CAR Mitigation Facilities along Balili River (Tributaries) Contract Package I: Construction of Road Slope Protection Structure on Specific Locations Along A) Kennon Road Goldrich Construction & Trading 16489 (S00407LZ), K0241+145 to K0247+890 B) Quirino Highway 11/22/2019 Baguio City DEO 74.108 250 C 0.50 0.13 0.30 - - - 93.00% 93% Very Satisfactory (Baguio - Bauang)(S00420LZ), K0303+462 to K0303+512 C) Quezon Hill Road #1 (S04690LZ), K0308+345 to K0308+428

Contract Package 2: Preventive Maintenance of Road: Asphalt Overlay along : a.) Quezon Hill Road #1 (S04690LZ) K0307+529 to K0308+000, b) Military Cut0Off Road Goldrich Construction & Trading 16489 (S00440LZ) K0249+(-462) to K0249+182, c) PMA Rd. 09/12/2019 Baguio City DEO 34.289 195 O 0.39 0.24 0.15 0.03 0.06 0.05 91.60% - On-going (S00519LZ) Chainage 0 to Chainage 320, d) Rimando- Ambiong Rd. (S00519LZ), K0253+307 to K0253+557 (Intermittent Sections) Construction of Flood Mitigation Structure - Goldrich Construction & Trading 16489 Construction/Rehabilitation of Flood Mitigation 09/12/2019 Baguio City DEO 42.958 156 O 0.37 0.24 0.15 0.03 0.05 0.05 89.30% - On-going Facilities/Drainage System along Balili River (Main) Contract Package 1: Consruction of Road Slope Protection Structure on Specific Locations along A) Kennon Road Goldrich Construction & Trading 16489 (S00407LZ) K0241+145 - K0247+890 B) Quirino Highway 09/12/2019 Baguio City DEO 70.335 210 O 0.37 0.20 0.15 0.03 0.05 0.05 84.50% - On-going (Baguio-Bauang)S0042LZ) K0303+462 - K0303+512 c) Quezon Hill Road #1 (S04690LZ) K0308+345 - K0308+428 Local Program - Construction / Repair / rehabilitation / Improvement of Various Infrastructure Including Local Projects - Goldrich Construction & Trading 16489 11/29/2019 CAR 28.514 180 O 0.40 0.24 0.15 0.03 0.04 0.05 90.50% - On-going Construction of Water Supply Systems - Construction of rain Harvesting facility, Busol Watershed Construction of Concrete Road and Construction of Road Slope Goldrich Construction & Trading 16489 11/22/2019 Baguio City DEO 61.471 315 O 0.39 0.30 0.15 0.03 0.04 0.05 95.60% - On-going Protection Structure, Majot Mane to Kenon Road By-Pass Road Rehabilitation of Concrete Road, Magsaysay Avenue (Trinidad Goldrich Construction & Trading 16489 11/22/2019 Baguio City DEO 43.075 294 O 0.39 0.27 0.15 0.03 0.03 0.05 91.60% - On-going Road) to Rimando -Ambiong Road Bypass Construction of Flood Mitigation Structure - Construction / Goldrich Construction & Trading 16489 Rehabilitation of Flood Mitigation Facilities / Drainage System 11/28/2019 Baguio City DEO 44.100 209 O 0.35 0.30 0.15 0.03 0.03 0.05 90.80% - On-going along Balili River (Tributaries) Goldridge Construction & Dev. Corp 29946 Construction of Port Operations Building 04/27/2018 PPA 66.089 420 O 0.37 0.30 0.06 0.03 0.07 0.03 85.50 - On - Going

Goldridge Construction & Dev. Corp 29946 Construction of Port Operations Building 10/05/2018 PPA 66.089 492 C 0.50 0.20 0.22 92.00 87.44% Satisfactory

Goldrock Construction & Development Corp. 5389 Reconstruction of Roxas Street, Sta. 0+000 to Sta. 0+382 11/08/2019 Palawan 3rd DEO 26.694 185 O 0.39 0.24 0.15 0.03 0.04 0.05 89.90% - On-going Off-Carriageway Improvement Including Drainage Along Puerto Goldrock Construction & Development Corp. 5389 Princesa North Road, K0202+015 to K0202+971 and K0211 + 03/13/2018 Palawan 1st DEO 43.472 260 C 0.45 0.20 0.30 - - - 95.40 *95.40% Very Satisfactory 000 to K0211+523 Construction / Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Flood Gonzalo Construction 1826 11/23/2019 Benguet 1st DEO 48.424 240 O 0.32 0.30 0.15 0.03 0.05 0.05 89.80% - On-going Mitigation Structure along Agno River Basin, Ambalanga River, Section Rehabilitation/ Reconstruction/Upgrading of Damaged Paved Gonzalodo Enterprises 30681 National Roads Cebu North Hagnaya Wharf Road Tabogon 05/30/2018 Cebu 1st DEO 30.719 211 O 0.376 0.238 0.15 0.022 0.005 0.033 82.40 - On-going and Bogo City, Cebu Construction of Farm to Mill Roads, Brgy. Luy-a (Bomedco Gonzalodo Enterprises 30681 Gate) to Brgy. Caputatan Sur Junction Mainline National 04/06/2018 Cebu 1st DEO 8.742 79 C 0.50 0.13 0.30 - - - 93.00 *93.00% Very Satisfactory Highway

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 68 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Construction / Improvement of Access Roads leading to Gonzalodo Enterprises 30681 Declared Tourism Destinations, Nailon - Siocon - Libertad Road 11/12/2019 Cebu 1st DEO 11.360 81 C 0.45 0.20 0.30 - - - 95.30% 92.7% Very Satisfactory leading to Jump-off station of Bogo's Islet of Capitancillo Retroffiting/Strengthening of Permanent Bridges, Poblacion Gonzalodo Enterprises 30681 08/24/2019 Cebu 1st DEO 9.421 88 O 0.40 0.24 0.15 0.02 0.05 0.05 91.00% - On-going Tabuelan Br. (B00014CB) along Antonio y De Pio H-way Construction/Improvement of Access Roads leading to Declared Gonzalodo Enterprises 30681 Tourism Destinations, Nailon-Siocon-Libertad Road leading to 08/26/2019 Cebu 1st DEO 11.360 82 O 0.40 0.24 0.15 0.03 0.05 0.05 90.90% - On-going Jump-off station of Bogo's Islet of Capitancillo Rehabilitiation/Major Repair of Permanent Bridges, Guihao-an Agusan del Norte Gonzalodo Enterprises 30681 Bridge (B00871MN) along Butuan City-Cagayan de Oro City- 11/13/2019 47.190 167 O 0.40 0.24 0.15 0.03 0.04 0.05 90.90% - On-going DEO Iligan City Road (Agusan-Misamis Oriental Road) Gonzalodo Enterprises / Wtg Construction Road Widening along Cebu North Hagnaya Wharf Rd., JV-18-874 11/12/2019 Cebu 1st DEO 91.578 254 O 0.37 0.30 0.15 0.03 0.06 0.05 95.20% - On-going And Development Corporation (Joint Venture) K0094+500 to K0097+852 Gonzalodo Enterprises/ On Point Construction of Four (4) Storey Twelve (12) Classroom School JV-17-829 08/28/2019 Cebu City DEO 32.648 274 O 0.36 0.26 0.15 0.03 0.06 0.05 89.80% - On-going Construction (Joint Venture) Building, Banilad Night High School Reconstruction to Concrete Pavement - Mandurriao-San Miguelc- Alimodian- Maasin - Cabatuan Rd. KO011+380 - Good Fortune International, Inc. 9246 KO011+600; KO017+002 - KO017+202; KO018+1006 - 11/14/2019 Iloilo 4th DEO 30.608 203 O 0.37 0.24 0.15 0.03 0.05 0.05 88.00% - On-going KO019+314; KO024+180 - KO024+563; KO020+000 - KO020+851 Construction/Maintenance of Flood Mitigation Structures & Gowil Builders 18733 Drainage Systems, Construction of Flood Control Sogod- 04/04/2018 Cebu 5th DEO 18.202 180 C 0.48 0.13 0.30 - - - 91.70 *91.7% Very Satisfactory Tabuelan Road, K0124+740+K0126+247 Construction of (Completion) of Line Canal, Brgy. Manuel South Cotabato Goyo Construction & Supply 38349 08/19/2019 1.083 75 C 0.49 0.13 0.30 - - - 92.00% 92% Very Satisfactory Roxas 1st DEO Upper Saug River Irrigation Project - Construction of Irrigation GP & H Construction Incorporated (Formerly: 36141 and Drainage Facilities, Protection Works and Supply, Delivery 11/16/19 NIA 89.595 300 O 0.23 0.30 0.15 0.03 0.05 0.05 81.52 - On-going GP & H Construction & Supply) & Installation of Steel Gates Misamis Widening of Permanent Bridge, Bagumbang Br. (B00347MN) Grace Construction Corporation 3771 08/22/2019 Occidental 2nd 24.671 199 O 0.31 0.26 0.00 0.03 0.05 0.00 65.00% - On-going along Ozamiz-Pagadian Road DEO Improvement/Completion of Four (4) Storey School Building at Metro Manila 2nd Grac-Ta Builders 38078 8/19;19 2.926 120 C 0.46 0.13 0.30 - - - 89.70% 89.7% Very Satisfactory Baclaran Elementary School - Central, Barangay Baclaran DEO

Granby Trading And Construction 27554 Balai Bantayan 1 06/08/2018 NHA 130.310 882 C 0.46 0.20 0.12 - - - 78.06 82.77% Satisfactory Off-Carriageway Improvement including Drainage along Lanao del Norte Grand Builders 6845 Bacolod-Madalum Highway KO 1556+047 - KO1558+024, 03/22/2018 26.128 90 C 0.46 0.13 0.30 - - - 89.10 *89.10% Very Satisfactory 2nd DEO KO1562+205-KO1564+315 Assets Preservation of National Roads: Rehabilitation/Reconstruction of National Roads with Slips, Lanao del Norte Grand Builders 6845 Slope Collapse and Landslide: Primary Roads: Iligan City- 03/21/2018 36.002 244 C 0.49 0.13 0.30 - - - 92.20 *92.20% Very Satisfactory 1st DEO Marawi City Road, K1546+267-K1546+384; K1550+957- K1551+034; K1551+728-K1551+780; K1551+780-K1551+8 Construction of 2 - Units 4 Storey - 24 Classroom Sapang Palay Grandconst Builders Corp. 32280 06/18/2018 Bulacan 2nd DEO 74.275 450 C 0.49 0.13 0.30 - - - 92.70 92.70% Very Satisfactory National High Construction of Convention Center (Phase Grandconst Builders Corp. 32280 08/27/2019 Bulacan 2nd DEO 144.746 360 C 0.50 0.13 0.30 - - - 93.20% 88.65% Satisfactory II) Construction of Multi-Purpose Building, San Jose Del Monte Grandconst Builders Corp. 32280 11/21/2019 Bulacan 2nd DEO 9.898 180 O 0.39 0.22 0.15 0.03 0.05 0.05 88.70% - On-going Central Elementary School Construction/Rehabilitation of Flood Control Structures of Mag- Mindoro Oriental Great Lakes Enterprises 31429 08/23/2019 23.519 210 O 0.33 0.24 0.15 0.03 0.04 0.03 82.10% - On-going asawang Tubig Barangay Masagana Section (Phase I), Naujan DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 69 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Rehabilitation / Major Repair of Other Building - Repair/ Great Zone Enterprise 33485 Rehabilitation of the Seante Building Annex III (Senate 11/20/2019 Baguio City DEO 3.491 158 C 0.48 0.13 0.30 - - - 91.40% 91.6% Very Satisfactory President's Cottage) Rehabilitation/Major Repair of Other Building - Great Zone Enterprise 33485 Repair/Rehabilitation of the Senate Building Annex III (Senate 09/03/2019 Baguio City DEO 3.311 105 O 0.40 0.24 0.15 0.03 0.05 0.05 91.70% - On-going President's Cottage) Green Asia Construction And Development 6374 Casecnan Multipurpose Irrigation and Power Project II 02/03/2018 NIA 296.93 360 O 0.374 0.300 0.000 0.030 0.070 0.050 82.35 - On-going Corporation Construction/ Maintenance of Flood Control Mitigation Structure Southern Mindoro Green Island Enterprises 36835 and Drainage Systems, Construction of Flood Control 08/26/2019 19.598 184 O 0.38 0.24 0.15 0.03 0.04 0.05 89.50% - On-going DEO Structures (Gabions) at San Isidro Construction/ Maintenance of Flood Mitigation Structures and Southern Mindoro Green Island Enterprises 36835 Drainage Systems, Construction of Flood Control Structures, 11/07/2019 19.598 184 O 0.38 0.25 0.15 0.03 0.06 0.05 91.30% - On-going DEO (Gabions) at San Isidro Green World Construction 38099 Concreting of Road, Barangay Cuanos, Minglanilla, Cebu 08/20/2019 Cebu 2nd DEO 2.965 26 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory CY 2017 Basic Educational Facilities Fund, Construction of Batangas 2nd Greenfield Construction 31101 06/20/2018 9.397 120 C 0.48 0.14 0.30 - - - 91.20 91.20% Very Satisfactory 2STY 4CL at Ilat Elementary School DEO CY 2018 Basic Educational Facilities Fund Batch 1 - Batangas 2nd Greenfield Construction 31101 09/04/2019 12.222 140 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory Construction of 2STY 6CL at Soloc Elementary School DEO Construction of Two (2) Storey, 4 Workshop Building, Rizal, Mindoro Greenfield Construction 31101 08/20/2019 19.590 237 O 0.40 0.20 0.14 0.03 0.03 0.02 82.20% - On-going Occidental DEO Greenwall Construction 14457 Pantabangan Slope Protection with Coconet Application 08/06/2019 NIA 19.382 381 O 0.36 0.22 0.14 0.02 0.04 0.05 83.00 - On-going Construction of Drainage Outfall and Laterals, Barangay Sto. Metro Manila 1st Greenwall Construction 14457 08/30/2019 9.148 90 O 0.39 0.24 0.15 0.03 0.04 0.05 90.30% - On-going Rosario Silangan DEO Construction of Drainage Outfall Including Laterals at Barangay Metro Manila 1st Greenwall Construction 14457 08/30/2019 9.148 90 O 0.39 0.23 0.15 0.03 0.05 0.05 89.90% - On-going Sta. Ana DEO Las Piñas - Greenwall Construction 14457 Construction of Multi-Purpose Building, Talon Village 11/13/2019 4.635 150 O 0.40 0.24 0.15 0.03 0.04 0.05 91.20% - On-going Muntinlupa DEO Construction of Drainage Outfall including Laterals at Brgy. Sta. Metro Manila 1st Greenwall Construction 14457 11/19/2019 9.800 180 O 0.38 0.30 0.15 0.01 0.04 0.05 92.80% - On-going Ana DEO Construction of Drainage Outfall including Laterals at Brgy. Sta. Metro Manila 1st Greenwall Construction 14457 11/19/2019 9.152 150 O 0.34 0.30 0.09 0.03 0.05 0.03 84.40% - On-going Ana DEO G-Rhino Construction & Supply 40617 Construction of Multi-Purpose Building, Brgy. Dampas 04/03/2018 Bohol 1st DEO 4.809 120 C 0.48 0.13 0.30 - - - 91.50 *91.50% Very Satisfactory

Ground Hug Construction 40689 Construction of Singao Diversion Dam 08/10/2019 DA 5.553 157 O 0.34 0.30 0.15 0.03 0.06 0.05 92.30 - On-going

Ground Specialist, Inc. 32270 Site Development Phase 4 (Design and Build) 11/26/19 DOST 4.446 195 C 0.50 0.20 0.30 - - - 99.50 *99.50% Outstanding Ground Specialist, Inc. 32270 Site Development Phase 3 (Design and Build) 11/26/19 DOST 4.467 165 C 0.50 0.20 0.30 - - - 99.90 0.9766 Outstanding Road Widening: Widening of Road Including Canal and Guava Construction 37027 11/19/2019 Baguio City DEO 1.980 115 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Sidewalk (Purok 3 and 4) Off-Carriageway Improvement Including Drainage along Subic- Philseco Road, K0141+350 - K0142+019; K0141+462 - Zambales 2nd Gvdpm Construction Corp. 9052 06/21/2018 48.902 270 C 0.46 0.13 0.30 - - - 89.30 89.30% Very Satisfactory K0141+334; K0142+037 - K0142+143; K-142+159 - DEO K0142+500 Gvdpm Construction Corp. (Formerly: Zm Rehabilitation of San Marcelino - San Antonio - San Narciso Zambales 2nd 9052 03/14/2018 39.182 220 C 0.45 0.13 0.30 - - - 88.40 *88.40% Satisfactory Construction) Road, K0153+701 - K0156+505, San Marcelino, Zambales DEO Cagayan de Oro H & N Builders & Enterprises 41819 Construction of Drainage 11/12/2019 3.762 80 C 0.48 0.13 0.30 - - - 91.50% 91.5% Very Satisfactory City 2nd DEO Construction/ Improvement/ Rehabilitation of Sto. Tomas Proper Baguio City DEO, H.D. De Castro Construction 33146 06/08/2018 2.650 60 C 0.44 0.13 0.30 - - - 87.40 87.40% Satisfactory FMR CAR Reconstruction of Concrete Pavement- Binalbagan-Isabela Road, K0062+(-411)- K0062+(-339), K0062+(-339)- Negros Occidental H.L.J Construction & Enterprises 18080 11/09/2019 35.430 188 O 0.38 0.24 0.15 0.02 0.05 0.05 89.40% - On-going K0062+730, K0063+116-K0063+999, K0066+529- 2nd DEO K00066+680 Construction/ Improvement of Access Roads leading to Negros Occidental H.L.J. Construction & Enterprises 06/05/2018 43.664 189 C 0.38 0.20 0.30 - - - 87.70 87.70% Satisfactory Kabankalan Airport 3rd DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 70 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Road Upgrading Gravel to Paved-Mati-Maragusan Road Davao Oriental H2 Landmark Builders, Inc. 7400 including RROW, K1501 + 529.517 - K1502 + 080.00, K1505 + 03/17/2018 84.338 223 C 0.49 0.19 0.30 - - - 97.20 *97.20% Outstanding 2nd DEO 280.00 - K1506 + 060.37 Road Widening - Along Mati-Maragusan Road (S00112MN) Davao Oriental H2 Landmark Builders, Inc. 7400 11/18/2019 38.409 212 O 0.29 0.30 0.15 0.03 0.06 0.05 87.70% - On-going K1532+000-K1533+540 2nd DEO Construction of Flood Control Structures along Sta. Maria River Halrey Construction Inc. 2267 08/27/2019 Bulacan 2nd DEO 39.199 150 O 0.40 0.24 0.15 0.03 0.05 0.05 92.20% - On-going (Guyong Section) Phase II Halrey Construction Inc. / Jamjle Properties Construction and Maintenance of Bridges along National (Subic) And Development Corporation (Joint 33146 Roads, replacement of Permanent Weak Bridges, Tuyo Br. 06/20/2018 Bataan 2nd DEO 59.783 207 O 0.374 0.240 0.150 0.022 0.035 0.033 85.40 - On-going Venture) (BO159LZ) Construction of Flood Control Structures along Sta. Maria River Halrey Construction, Inc. 2267 11/20/2019 Bulacan 2nd DEO 39.200 150 O 0.40 0.23 0.11 0.03 0.06 0.03 86.10% - On-going (Guyong Section) Phase II Widening of Permanent Bridges Apo Aporawan Br (B00355PN) Palawan 2nd Hardrockplatinum Development Corporation 39263 08/20/2019 23.284 225 O 0.40 0.24 0.15 0.03 0.05 0.05 92.20% - On-going along Puerto Princesa South Road DEO Widening of Permanent Bridges-Apo Aporawan Bridge Palawan 2nd Hardrockplatinum Development Corporation 39263 11/05/2019 23.284 225 O 0.40 0.29 0.15 0.03 0.05 0.05 96.10% - On-going (B00355PW) along Puerto Princesa South Road DEO Construction of One Unit One Storey Three Classroom School Dinagat Islands Heavy John Engineering Consultancy 41939 Building at New Mabuhay ES, School ID: 132400, Brgy. New 08/20/2019 5.174 260 O 0.27 0.30 0.02 0.02 0.04 0.00 63.80% - On-going DEO Mabuhay Gandara Irrigation Project - Construction of Earthfill Dam and Its Henscha Phils. Inc. 34164 12/14/19 NIA 109.853 1,025 O 0.38 0.24 0.07 0.03 0.07 0.05 82.90 - On-going Appurtenant Structures Bank Improvement/Protection along Pateros River, (Phase II), Metro Manila 1st Henscha Phils. Inc. 34164 08/29/2019 45.548 240 O 0.32 0.24 0.15 0.03 0.06 0.03 83.40% - On-going Barangay Tabacalera DEO Construction of Two (2) Storey Building of Quality Assurance Metro Manila 1st Henscha Phils. Inc. 34164 Office including Laboratories DPWH Metro Manila 1st District 11/19/2019 14.699 195 O 0.38 0.30 0.10 0.03 0.04 0.03 88.10% - On-going DEO Engineering Office Road Widening Pagadian Zamboanga City Road, Zamboanga City Henso Construction 10720 11/13/2019 3.615 148 O 0.39 0.23 0.15 0.03 0.06 0.05 90.80% - On-going K1919+692.09 to K1919+775.14 DEO Region VIII - LTFRB Regional Office Building Project - Repair of Herbana Builders and Supply 32523 11/09/2019 DOTR 12.234 360 C 0.43 0.20 0.24 - - - 86.50 *86.50% Satisfactory LTFRB Regional Office Building Construction of Classrooms (3-Storey 12-Classroom School Herbana Builders And Supply / 4Dove Building, 2 Regular Workshop, 2 ICT Workshop and 2 Science JV-18-769 08/24/2019 Albay 3rd DEO 33.238 322 O 0.40 0.24 0.15 0.03 0.06 0.05 93.00% - On-going Builders Corporation Joint Venture Workshop) at Ligao City National Technical Vocational High School Herbana Builders And Supply / Jt Paredes Road Widening of Catarman-Calbayog Road K0744+(-154)- Northern Samar JV-17-2071 08/23/2019 37.957 317 O 0.38 0.24 0.15 0.02 0.04 0.05 88.50% - On-going Construction & Supply (Joint Venture) K0745+100 1st DEO Construction/Improvement of Access Roads Leading to Herbert Malmis General Merchandising & Seaports - Antequera-Balilihan via Dorol Road Leading to 4593 11/05/2019 Bohol 1st DEO 28.290 113 O 0.39 0.24 0.15 0.03 0.06 0.05 91.30% - On-going Contractor, Inc. Chocolate Hills via Balilihan-Hanopol-Batuan Road from Catagbacan International Cruise Ship Port Hexamindz Construction 31666 Quipot Irrigation Project 04/06/2018 NIA 19.915 300 O 0.39 0.30 0.01 0.03 0.05 0.05 82.48 - On - Going Provincial Hexamindz Construction 31666 Rehabilitation of San Jose -Sitio Mahayahay, Magwawa FMR 01/30/2018 Government of 13.913 218 C 0.46 0.20 0.20 - - - 85.50 88.16% Very Satisfactory Davao del Norte Quezon City 2nd Hexamindz Corporation 31666 Asphalt Overlay of Roads 06/05/2018 27.577 90 O 0.400 0.240 0.150 0.022 0.040 0.050 90.20 - On-going DEO Construction of Three (3) Storey Nine (9) Classroom School Batangas 1st Hexamindz Corporation 31666 06/21/2018 24.299 240 O 0.373 0.240 0.121 0.030 0.051 0.033 84.80 - On-going Building at Don Leon Martinez MES DEO Construction of Four (4) Storey, Eight (8) Classroom School Malabon-Navotas Hexamindz Corporation 31666 05/30/2018 19.961 264 C 0.49 0.13 0.30 - - - 92.60 92.60% Very Satisfactory Building, Ninoy Aquino Elementary School DEO Organizational Outcome 2: Protect Lives and Properties Against Major Floods- Flood Management Program - Hexamindz Corporation 31666 Construction/Maintenance of Flood Mitigation Structures and 06/04/2018 North Manila DEO 23.167 75 C 0.43 0.13 0.30 - - - 86.50 86.50% Satisfactory Drainage Systems-Bank Improvement (Steel Sheet Pile), Sta. 0+700 to Sta. 0+766.40 Rehabilitation with Slope Protection of Creek, River, Hexamindz Corporation 31666 06/13/2018 Rizal 1st DEO 18.873 210 C 0.45 0.14 0.30 - - - 88.90 88.90% Satisfactory Phase 2, Brgy. San Roque

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 71 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction/ Upgrading/ Rehabilitation of Drainage along National Roads- Construction of Concrete lined Canal along Agusan del Norte Hexamindz Corporation 31666 03/12/2018 89.549 280 C 0.46 0.13 0.30 - - - 89.80 *89.80% Very Satisfactory Butuan- Cagayan de Oro- Iligan (Agusan- Misamis Oriental DEO Road) K1266+558.51 to K1266+960) Construction of Revetment along Labangan Channel Iba Este Hexamindz Corporation 31666 03/19/2018 Bulacan 1st DEO 46.224 210 C 0.49 0.13 0.30 - - - 92.20 *92.20% Very Satisfactory Section Calumpit, Bulacan Construction of By-Pass and Diversion Road , San Francisco Agusan del Sur Hexamindz Corporation 31666 (NRJ Hubang-Sta.Ana-San Isidro) By-Pass Road (Daang 08/25/2019 95.168 347 C 0.47 0.13 0.30 - - - 89.90% 89.9% Very Satisfactory 2nd DEO Maharlika Alternative Route incl. ROW Hexamindz Corporation (Formerly: Kilusang MFO2-Flood Management Services, Construction/ Maintenance Magkaibigan Multi-Purpose Cooperative 31666 of Flood Mitigation Structures and Drainage Systems: 03/22/2018 Cavite 1st DEO 29.400 210 C 0.48 0.13 0.30 - - - 91.70 *91.70% Very Satisfactory (Kmmpc)) Construction of Revetment in Anabu I-A Phase II, Imus, Cavite Hg Iii Construction And Development 8431 Dinahican Port Development Project 07/20/2018 DOTr 38.887 240 C 0.46 0.20 0.30 - - - 95.90 *95.90% Very Satisfactory Corporation Local Program - Construction / Repair/Rehabilitation / Improvement of Various Infrastructure Including Local Projects - Regional Office Hgg Builders & Supply 17824 08/22/2019 93.738 204 C 0.44 0.19 0.30 - - - 93.60% 93.6% Very Satisfactory Flood Control and Drainage - Flood Control Structures / No. V Facilities, Construction of Flood Control Project Construction/Maintenance of of Flood Mitigation Structures and Drainage System Construction of Revetment - Camarines Norte Hgg Builders And Supply 17824 04/07/2018 29.400 255 C 0.48 0.13 0.30 - - - 91.70 90.38% Very Satisfactory Extension/Rehabilitation/ Construction of Daet River Control DEO Structure, Barangay San Isidro HG-III Construction and Development Borac Port Development Project - General Expenses, Back-Up Corporation (Formerly: Golden City 8431 10/24/19 PPA 319.888 540 O 0.40 0.30 0.15 0.02 0.07 0.05 97.91 - On-going Area, Mooring and Fendering Systems, Reimbursable Items Engineering and Construction) Hi Tone Construction & Development 23385 Rehabilitation/Up-Grading of Damaged Wharf 06/22/2018 PPA 154.701 480 O 0.40 0.30 0.00 0.03 0.07 0.05 84.90 - On - Going Corporation Construction of Cover and Backfilling of Drainage Canal along Zambales 2nd High Strength Dev Corporation 31976 03/14/2018 24.583 300 OG 0.400 0.200 0.150 0.030 0.048 0.033 86.15 - On - Going KM142, Olongapo - Bugallon Road, Subic, Zambales DEO Construction/Upgrading/Rehabilitation of Drainage along High Strength Dev. Corporation 31976 National roads - Tertiary Road - Old Cagayan Valley Road, 08/25/2019 Bulacan 1st DEO 17.373 240 O 0.35 0.24 0.05 0.03 0.07 0.03 77.10% - On-going K0043+ (-100) to K0045+377 Concreting of Road Barangay Sta. Teresita and Barangay San Camarines Sur Hillside Construction 7401 08/28/2019 1.881 27 C 0.46 0.13 0.30 - - - 88.90% 88.9% Satisfactory Andres 5th DEO FY 2019 Local Infrastructure Program: Local Roads and Hillstone Builders 33901 09/05/2019 Benguet 2nd DEO 1.969 77 C 0.48 0.13 0.30 - - - 91.70% 91.7% Very Satisfactory Bridges, Construction of Batwag Road Hillstone Builders 33901 Construction of Multi-Purpose Building for Senior Citizens 09/12/2019 Baguio City DEO 28.215 120 O 0.39 0.30 0.11 0.03 0.05 0.00 87.30% - On-going

Hinunangan Enterprises 19891 Repair and Construction of Canal System 10/13/2018 NIA 4.694 120 C 0.38 0.20 0.30 88.30 *88.30% Satisfactory

Protect Lives and Properties Against Major Floods - Flood Management Program- Construction/Maintenance of Flood Hi-Tone Construction & Development Corp. / Regional Office JV-17-2760 Mitigation Structures Drainage Systems: 08/30/2019 96.499 269 C 0.46 0.14 0.30 - - - 89.70% 89.7% Very Satisfactory Ameg Construction & Supply Joint Venture No. V Rehabilitation/Improvement of Sitio Buco, Buyo Flood Control Dike, Sta. 0+340.00 - Sta. 1+258.00 Hi-Tone Construction & Development Corp. / Cluster VI - Construction of CY 2018 Basic Educational Sorsogon 1st Centerways Construction And Development JV-17-2554 08/21/2019 91.904 340 C 0.49 0.13 0.30 - - - 92.30% 92.23% Very Satisfactory Facilities Fund (BEFF) Batch I DEO Inc. Joint Venture Hi-Tone Construction & Development 23385 Construction/Improvement at Nagas River Control Structure 08/27/2019 Albay 3rd DEO 47.282 240 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory Corporation Asset Preservation - Preventive Maintenance - Tertiary Road, Hi-Tone Construction & Development 23385 Ligao Poblacion Road (Asphalt Overlay 50mm with correction), 08/26/2019 Albay 3rd DEO 8.788 30 C 0.48 0.13 0.30 - - - 90.80% 90.8% Very Satisfactory Corporation K0503+299.39 to K0504+428 Hi-Tone Construction & Development Construction of Gorund Sill Dam Along Tobgon River, Upstream 23385 11/07/2019 Albay 3rd DEO 93.109 270 O 0.37 0.24 0.15 0.01 0.06 0.05 87.30% - On-going Corporation of Tobgon Bridge Hi-Tone Construction & Development Construction of Liago Flood Control Along Tobgon River, 23385 11/07/2019 Albay 3rd DEO 93.116 270 O 0.36 0.24 0.15 0.01 0.05 0.05 85.90% - On-going Corporation Upstream of Tobgon Bridge

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 72 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Hi-Tone Construction & Development Retrofitting/Strengthening of Sapu Masla Bridge (B01051MN) 23385 06/07/2018 Sarangani DEO 7.447 90 C 0.50 0.13 0.30 - - - 93.30 93.30% Very Satisfactory Corporation along Sarangani-Davao del Sur Coastal Road Hi-Tone Construction And Development 23385 San Jose Port Development Project 06/28/2018 DOTr 9.467 150 C 0.40 0.20 0.30 90.00 *90.00% Very Satisfactory Corporation Construction/Upgrading/ Rehabilitation of Drainage along Hi-Tone Construction And Development National Roads-Daang Maharlika Jct.-Legazpi-Sto. Domingo- 23385 04/02/2018 Albay 2nd DEO 45.835 282 C 0.49 0.19 0.30 - - - 97.80 *97.80% Outstanding Corporation Tabaco-Camarines Sur Bdry. Road, K0527+(-305.50)- K0528+852, K0530++796.0-K0531+127.50 Construction/ Repair/ Rehabilitation/ Improvement of Variouus Hi-Tone Construction And Development Infrastructure including Local Projects: Rehabilitation/ Mindoro 23385 08/19/2019 93.108 303 C 0.45 0.13 0.30 - - - 88.50% 88.5% Satisfactory Corporation Improvement/ Concreting of Poblacion-Calawagan-Harison Occidental DEO Road Hi-Tone Construction And Development Construction of Tumingad - Canlumay - Patoo Road, leading to 23385 08/30/2019 Romblon DEO 91.645 252 C 0.40 0.01 0.30 - - - 71.60% 71.6% Poor Corporation Romblon Airport, Phase 2 Rehabilitation/Reconstruction of National Roads with Slips, Hi-Tone Construction And Development Slope Colapse and Landslide, Catanduanes Circumferencial Catanduanes 23385 06/07/2018 47.283 216 C 0.48 0.13 0.25 - - - 86.10 86.10% Satisfactory Corporation Road K0143+900-K0144+750, K0145+500-K0145+600, DEO K0154+700- K0154+800, K0157+800-K0157+900

Hi-Tri Development Corp. 1758 San Remigio Heights 11/29/2018 NHA 173.000 426 O 0.33 0.19 0.15 0.03 0.06 0.05 80.81 - On - Going

Hi-Tri Development Corp. 1758 Maya Park Homes 06/09/2018 NHA 187.865 446 E 0.46 0.20 0.08 - - - 74.29 88.06% Satisfactory

Hi-Tri Development Corporation 1758 San Remigio Heights 7/19/19 NHA 172.999 496 O 0.35 0.26 0.10 0.03 0.06 0.03 82.57 - On-going

Hi-Tri Development Corporation 1758 Carigara Housing Project 1 05/11/2018 NHA 196.857 570 O 0.36 0.30 0.00 0.03 0.03 0.00 71.84 - On - Going Rehabilitation with Slope Protection of Creek, Brgy. Bagong Hi-Tri Development Corporation 1758 06/13/2018 Rizal 1st DEO 18.994 240 C 0.45 0.14 0.30 - - - 88.90 88.90% Satisfactory Nayon Construction of Flood Control (Revetment) at Camanchilles Hi-Tri Development Corporation 1758 River along Toledo-Tabuelan-San Remegio Road, K0048+ 864 04/07/2018 Cebu 3rd DEO 44.094 202 C 0.50 0.20 0.15 - - - 85.20 *85.20% Satisfactory (Sta. 00+720 - Sta. 01+280), Sitio Camanchilles Dinagat Islands Hjv Construction 44843 Construction of Brgy. Hall, Brgy. San Antonio 11/07/2019 4.796 150 O 0.38 0.30 0.15 0.03 0.04 0.03 93.90% - On-going DEO Construction of One (1) Storey Two (2) Classroom School Camarines Sur Hkp Construction And Supply 34274 04/06/2018 2.846 85 C 0.50 0.13 0.30 - - - 93.00 *93.00% Very Satisfactory Building, North Villazar Elementary School 5th DEO Construction of Drainage Structure along Road - on Specific Hkp Construction And Supply 34274 Locations along Masbate - Milagros Rd, K0006+576 to 08/22/2019 Masbate 2nd DEO 13.116 171 O 0.38 0.24 0.15 0.03 0.07 0.05 91.60% - On-going K0024+000, Length = 1,023.00 l.m. (0.765 km) Construction of Drainage Structure along Road - on Specific Hkp Construction And Supply 34274 Locations along Jct. Tawad - Balud Rd, (S00023MT) 08/22/2019 Masbate 2nd DEO 15.834 191 O 0.38 0.24 0.15 0.03 0.07 0.05 91.60% - On-going K0037+854 to K0038+595, length = 1,366.00 l.m. (0.683 km) Lanao del Norte Hnt Builders & Enterprises 40757 Concreting of Roads, Brgy. Lininding 11/07/2019 9.110 87 C 0.49 0.15 0.30 - - - 94.00% 88.6% Satisfactory 1st DEO Lanao del Norte Hnt Builders And Enterprises 40757 Concretiong of Roads, Brgy. Lininding 08/23/2019 9.109 87 O 0.33 0.24 0.15 0.03 0.05 0.05 85.00% - On-going 1st DEO Construction of One (1) Unit Two (2) Storey Six (6) Classroom Holy Rock Builders And Supplies 39732 08/24/2019 Masbate 3rd DEO 11.510 140 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory School Building at Tomas M. Conde CS Organizational Outcome 2: Protect lives and Properties against Major Floods, Flood Management Program, Batangas 3rd Honeyville Construction 32160 09/03/2019 48.989 210 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Construction/Maintenance of Flood Mitigation Structures and DEO Drainage Systems, Construction of Slope Protection

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 73 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) FY 2018 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties against Major Floods Flood Management program Construction Regional Office Honeyville Construction 32160 09/06/2019 182.732 405 C 0.49 0.14 0.30 - - - 93.60% 93.6% Very Satisfactory / Maintenance of Flood Mitigation Structures and Drainage No. IV-A Systems CONSTRUCTION OF SLOPE PROTECTION WORKS

FY 2018 Network Development Off-Carriageway Improvement including Drainage along jct. Binalay (Tinambac) - Tamban Road, Banga-tamban Section, Section 1: K0523+943.00- Camarines Sur Honeyville Construction 32160 05/30/2018 68.788 221 O 0.385 0.240 0.150 0.022 0.050 0.033 88.00 - On-going K0524+457.00, Section 2: K0524+470.00-K0526+387.00, 3rd DEO Section 3: K0526+419-K0527+454.00, Section 4: K0527+486+486.00-K0528+293.0 Construction of Drainage Outfall Including Laterals Panday Metro Manila 1st Hony Trading And Construction 26898 08/29/2019 9.152 120 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory Creek, Barangay Sta. Ana DEO Construction of Road Network and Drainage System at Metro Manila 1st Hony Trading And Construction 26898 08/29/2019 4.689 90 O 0.38 0.23 0.15 0.03 0.05 0.05 88.38% - On-going Barangay Sta. Ana DEO Construction of Road Network and Drainage System at Brgy. Metro Manila 1st Hony Trading And Construction 26898 11/19/2019 4.950 180 O 0.39 0.30 0.13 0.00 0.04 0.03 88.70% - On-going Sta. Ana DEO Construction of One (1) Unit One (1) Storey Three (3) Hortinela Construction & Supply 38219 03/20/2018 Iloilo 2nd DEO 3.405 110 C 0.48 0.13 0.30 - - - 91.40 *91.40% Very Satisfactory Classroom Houston Hydrotech Products and System, 31893 Lumil and Tartaria CIS 04/12/2019 NIA 2.188 120 C 0.38 0.20 0.30 - - - 8800.00% *88.00% Satisfactory Inc. Camarines Sur Hrb Construction 10528 Local Infrastructure Program – Construction of Local Roads 08/26/2019 1.878 47 C 0.44 0.13 0.30 - - - 87.60% 87.6% Satisfactory 4th DEO Local Infrastructure Program - Improvement of Multi-Purpose Camarines Sur Hrb Construction 10528 Buildings, Barangay III and Barangay Nato, Garchitorena and 11/06/2019 1.881 90 C 0.50 0.13 0.20 - - - 83.20% 83.2% Satisfactory 4th DEO Sagnay Upgrading (Asphalt to Concrete) including Drainage of Sindangan-Liloy Road, Zamboanga del Norte, 2nd, Regional Office Hso Construction Corporation 10578 03/14/2018 107.853 357 OG 0.391 0.3 0.15 0.03 0.047 0.033 95.10 - On - Going K1943+560.43-K1945+067.26, K1946+000-K1946+833.24, No. IX K1958+754-K1959+000 and K1959+679.0-K1961+054.86 South Cotabato Hvc Sagittarius Commercial And Construction 12954 Construction of New Barangay Hall, Rotunda 05/29/2018 1.380 90 O 0.335 0.240 0.150 0.030 0.047 0.033 83.50 - On-going 1st DEO Construction of 4 Storey 20 Classroom at Turbina Elementary Hyper J Construction & Supply 33184 09/06/2019 Laguna 2nd DEO 55.418 390 O 0.39 0.24 0.14 0.03 0.05 0.03 88.30% - On-going School Las Piñas- I&E Construction Corporation 10410 Construction of Slope Protection Structure at Naga Creek 06/10/2018 69.480 420 C 0.49 0.13 0.30 - - - 92.70 92.70% Very Satisfactory Muntinlupa DEO Preventive Maintenance of Road: Asphalt Overlay along Las Piñas - I&E Construction Corporation 10410 International Road K0019+(-330) - K0019+982 (80mm with 11/13/2019 51.515 150 O 0.39 0.24 0.15 0.03 0.04 0.05 89.90% - On-going Muntinlupa DEO Correction) Off-Carriageway Improvement: Shoulder Paving/Construction - MSR Jct. - Lopez - Buenavista Road - K0238+(-1055) - I.A . Bosque Construction Corporation 12597 09/10/2019 Quezon 3rd DEO 93.101 270 C 0.44 0.20 0.30 - - - 94.20% 94.2% Very Satisfactory K0240+310, K0240+332 - K0245+530, K0245+575 - K0249+181, Lopez - Buenavista Section Network Development Program: Off-Carriageway Improvement - I.A. Bosque Construction Corp. 12597 Secondary Roads - Gumaca-Pitogo-Malunay-Sn Narciso Road 11/26/2019 Quezon 3rd DEO 59.493 270 C 0.49 0.18 0.30 - - - 96.20% 96.2% Outstanding K0207+(-295) - K0211+000 Off-Carriageway Improvement: Shoulder Paving/Construction - Gumaca-Pitogo-Mulanay-San Narciso Rd - K0213+000 - K0213+853, K0214+140 - K0214+235, K0215+(-514) - I.A. Bosque Construction Corporation 12597 06/21/2018 Quezon 3rd DEO 93.100 240 O 0.378 0.240 0.150 0.03 0.055 0.05 90.30 - On-going K0216+316, K0216+355 - K0217+014, K0217+027 - K0218+000, K0222+000 - K0224+000, K0225+000 - K0226+000, K0232+379-K234+000 Improvement/Widening of National Roads Along Calapan South Southern Mindoro I.F. Blancos Construction 25350 03/22/2018 18.616 215 C 0.47 0.20 0.30 - - - 96.70 *96.70% Outstanding Road, K0181+191 to K0182+010 DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 74 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction (Completion) of Multi-purpose Building I.G.D Construction And Development 42947 06/03/2019 Isabela 2nd DEO 1.411 90 O 0.38 0.22 0.12 0.03 0.05 0.03 83.30% - On-going (Community Center) Brgy. Abut Construction of One-Storey Three Classroom School Building I.G.D. Construction And Development 42947 with Toilet Attached, Roxas National High School-San Antonio 03/17/2018 Isabela 2nd DEO 3.552 105 OG 0.343 0.300 0.150 0.020 0.035 0.050 89.80 - On - Going Extension Construction (Completion) of Multi-Purpose Building I.G.D. Construction And Development 42947 11/11/2019 Isabela 2nd DEO 1.481 90 C 0.44 0.13 0.30 - - - 87.30% 84.5% Satisfactory (Community Center) Construction of Standard One-Storey Three Classroom School I.G.D. Construction And Development 42947 06/02/2018 Isabela 2nd DEO 3.749 140 C 0.49 0.13 0.30 - - - 92.40 92.40% Very Satisfactory Building with Toilet Attached Roxas National School Extension Ibc International Builders Corporation 8576 Roxas City Circumferential Road including RROW 05/31/2018 Capiz 1st DEO 38.993 236 C 0.47 0.14 0.30 - - - 90.10 90.10% Very Satisfactory Ibc International Builders Corporation 8576 Antique Airport Development Project 06/14/2018 DOTr 30.350 90 C 0.46 0.20 0.30 95.80 *95.80% Very Satisfactory

Ibc International Builders Corporation 8576 Caticlan Jetty Port Development Project 09/27/2018 DOTr 161.912 460 C 0.50 0.20 0.30 99.70 93.90% Very Satisfactory

Ibc International Builders Corporation 8576 Development Project 02/13/2018 DOTC 44.778 242 C 0.38 0.20 0.30 - - - 88.40 *88.40% Satisfactory

Construction of Slope Protection at Roxas City, Circumferential Ibc International Builders Corporation 8576 03/16/2018 Capiz 1st DEO 39.176 201 C 0.42 0.13 0.30 - - - 85.20 *85.20% Satisfactory Road along, Panay River, Sta. 125+888.61 to Sta.126+388.60

Construction/Improvement of Access Road from Jalandoni St. Ibc International Builders Corporation 8576 Jaro to Hechanova St. Lapaz (Including RROW), Jalandoni St., 03/23/2018 Iloilo City 23.500 155 C 0.50 0.13 0.30 - - - 93.20 *93.20% Very Satisfactory Jaro to Magsaysay Village, Lapaz, Sta. 0+000 to Sta. 0+840

Widening /Deepening/ Bank Protection along Taloc Creek, Sta. Negros Occidental Ibc International Builders Corporation 8576 03/18/2018 37.000 265 C 0.48 0.13 0.08 - - - 69.10 *69.10% Poor 0+000 to Sta. 1+500 with Guimaras Strait as an Outfall 4th DEO Preventive Maintenance of Road: Asphalt Overlay-on Specific Negros Occidental Ibc International Builders Corporation 8576 Locations along Jct DS Benedicto-Spur 16-Calatrava Rd 08/21/2019 14.620 61 C 0.37 0.20 0.30 - - - 86.90% 86.9% Satisfactory 1st DEO (S00001NR) K0054+(-129) to K0076+515 Preventive Maintenance of Road Asphalt Overlay along Iloilo- Ibc International Builders Corporation 8576 Capiz Road (New Route) KO121+468 - KO122+183, 11/08/2019 Capiz 1st DEO 15.280 89 C 0.47 0.13 0.30 - - - 90.10% 90.1% Very Satisfactory KO122+283 - KO122+568 Roxas City, Capiz Ibc International Builders Corporation 8576 Preventive Maintenance Along Ibajay- Antique Road 08/21/2019 Aklan DEO 30.950 179 O 0.38 0.24 0.15 0.03 0.06 0.05 90.60% - On-going Preventive Maintenance of Road: Asphalt Overlay-along Iloilo- Ibc International Builders Corporation 8576 08/19/2019 Iloilo City DEO 83.800 215 O 0.36 0.30 0.15 0.03 0.04 0.05 92.70% - On-going Capiz Road (New Route) (S00003PN) K0004+471-K0009+381 Construction of Road Slope Protection Structure - Jct. Bancal- Leon-Antique Bdry. Rd -KO041+561 -KO041+729, Ibc International Builders Corporation 8576 11/13/2019 Iloilo 4th DEO 55.500 182 O 0.30 0.30 0.15 0.03 0.04 0.05 86.70% - On-going KO044+44+272 - KO44+405, KO044+592 - KO044+697, KO044+801 - KO45+260, KO045+422 - KO45+596 Road Widening - along Iloilo-Capiz Road. (New Route) Ibc International Builders Corporation 8576 11/09/2019 Capiz 2nd DEO 39.224 233 O 0.38 0.24 0.15 0.03 0.04 0.05 88.80% - On-going (S00254PN) KO080+217 - KO081+090 Bacolod South Road (S00133NR), K0006+421-K0009+000, Ibc International Builders Corporation 8576 Bacolod City (Preventive Maintenance of Road: Asphalt 11/05/2019 Bacolod City DEO 84.135 200 O 0.40 0.24 0.15 0.02 0.03 0.05 89.00% - On-going Overlay) Bacolod, San Carlos Road (S00093NR) K0005+(-1053)- Ibc International Builders Corporation 8576 K0006+753; K0006+777- K0007+273 (Preventive Maintenance 11/05/2019 Bacolod City DEO 65.800 159 O 0.40 0.24 0.14 0.02 0.05 0.03 88.20% - On-going Road: Asphalt Overlay) Construction of Flood Mitigation Structure- Construction of Slope Protection/Bank Improvement along Iloilo River, Right Ibc International Builders Corporation 8576 11/13/2019 Iloilo City DEO 18.800 273 O 0.40 0.24 0.15 0.02 0.05 0.05 91.30% - On-going bank (from B.S. Aquino Jr. Avenue to Jalandoni Bridge), (Esplanade 4), Sta.0+000 - Sta.0+820 Ormoc Airport Development Project - Completion of Asphalt IBC International Builders Corporation 8576 Overlay of Runway including Runway Markings and Shoulder 10/09/2019 DOTR 72.263 120 C 0.43 0.20 0.30 - - - 93.00 *93.00% Very Satisfactory Grade Correction

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 75 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Ormoc Airport Development Project - Construction of Ibc International Builders Corporation 8576 Temporary Taxiway, Concrete Taxiway, Concrete Turaround 11/09/2019 DOTR 49.892 330 C 0.48 0.20 0.30 - - - 97.80 *97.80% Outstanding Pad, Vehicular Parking Area, Drainage and Pump House Construction of Barangay Road, Barangay Flormina - Barangay Northern Samar Idap Construction & Supply 33650 11/06/2019 4.900 90 O 0.39 0.29 0.15 0.02 0.04 0.03 92.30% - On-going San Isidro, 1st DEO Lower Agno River Construction and Rectangular Concrete Canal Lining (Sta. Irrigation System Idi Trading And Construction 29006 12/19/2020 8.484 270 O 0.33 0.28 0.12 0.03 0.04 0.03 82.80% Satisfactory 2+311.00 - Sta. 3+487.00 of LARIS Lateral D, L=1,155.00m) Improvement Project Construction of Four (4) Classroom, Maligaya Elementary Nueva Ecija 1st Ijk Mae Construction Inc. 35272 03/13/2018 5.316 185 C 0.48 0.13 0.30 - - - 91.70 88.56% Satisfactory School Muñoz Science City, Nueva Ecija DEO Construction/Repair/Rehabilitation/Improvement of Various Ikm Builders & Construction Supply / T. Infrastructure including Local Projects, Local Roads and Batangas 4th Solomon Construction And Development JV-17-1220 09/05/2019 28.518 213 C 0.50 0.20 0.15 - - - 84.50% 84.5% Satisfactory Bridges, Local Roads, Concreting and Widening of Quilo-Quilo - DEO Corporation Joint Venture San Carlos, Rosario Road Construction/Improvement of Access Roads leading to Declared South Cotabato Ilbi Construction Supply & Services 32021 Tourism Destinations: Jct. Surallah- Road leading to 05/29/2018 18.610 114 O 0.363 0.240 0.150 0.030 0.047 0.050 88.00 - On-going 1st DEO NV Vogt Solar Power Plant, Brgy. Centrala Concreting of San Jose FMR (with Box Culvert) Brgy. San Jose, South Cotabato Ilbi Construction Supply & Services 32021 03/14/2018 9.459 120 C 0.50 0.13 0.30 - - - 93.10 *93.10% Very Satisfactory Banga, South Cotabato 1st DEO Construction of Concrete Road - Jct. Surallah - Lake Sebu South Cotabato Ilbi Construction Supply & Services 32021 11/19/2019 11.723 105 C 0.49 0.13 0.30 - - - 92.50% 91.18% Very Satisfactory Road leading to NV Vogt Solar Power Plant, Brgy. Centrala 1st DEO Construction of Concrete Road-Jct Surallah-Lake Road leading South Cotabato Ilbi Construction Supply & Services 32021 08/19/2019 11.723 105 O 0.38 0.24 0.15 0.03 0.06 0.05 90.30% - On-going to NV Vogt Solar Power Plant, Brgy. Centrala 1st DEO Improvement/Widening of , West Bound Quezon City 2nd Im Construction Corporation 20074 03/17/2018 56.314 300 C 0.46 0.20 0.30 - - - 95.60 92.90% Very Satisfactory ( to Agham Road) DEO Construction of Flood Control Wall/Riprapping along the Banks Metro Manila 3rd Im Construction Corporation 20074 03/21/2018 22.400 180 C 0.44 0.13 0.30 - - - 87.60 *87.60% Satisfactory of Various Creeks in Barangay 185 (Phase 2) DEO Construction/Rehabilitation/ Improvement of Road Leading to Im Construction Corporation 20074 03/17/2018 Bulacan 2nd DEO 27.870 197 C 0.45 0.13 0.30 - - - 88.40 *88.40% Satisfactory Relocation Site Barangay Citrus, San Jose Del Monte, Bulacan Construction of Box Culvert along M. Naval St. from Paltok Malabon-Navotas Im Construction Corporation 20074 08/30/2019 24.498 414 C 0.47 0.13 0.30 - - - 90.20% 90.2% Very Satisfactory Creek to Vadeo 5 DEO Construction of Riverwall along Malabon - Malabon- Navotas Im Construction Corporation 20074 11/04/2019 32.338 156 O 0.40 0.24 0.15 0.03 0.04 0.05 90.70% - On-going (Phase I) Brgy. NBBS Dagat-Dagatan DEO Metro Manila 3rd Im Construction Corporation 20074 Improvement of Drainage System along Barangay 169 11/06/2019 23.373 300 O 0.40 0.24 0.15 0.03 0.04 0.05 91.10% - On-going DEO Road Widening Commonwealth Avenue, K0016+000 to Quezon City 1st Im Construction Corporation 20074 11/25/2019 17.968 210 O 0.33 0.22 0.15 0.03 0.04 0.05 82.40% - On-going K0015+640 DEO Concreting of Local Roads at Barangay Maglambong to Ims Construction 30537 04/11/2018 Masbate 3rd DEO 6.960 90 C 0.48 0.13 0.30 - - - 91.30 *91.30% Very Satisfactory Barangay Guinhadap Construction of Concrete Road - Concreting of Road in Ims Construction 30537 11/11/2019 Masbate 1st DEO 14.254 90 C 0.41 0.13 0.30 - - - 84.60% 84.6% Satisfactory Barangay Buenos Aires to Barangay Buena Suerte Inabanga Drilling, Construction, Steel 35764 Bonot Bonot SRIP 2/28/20 NIA 5.560 180 C 0.33 0.20 0.30 - - - 8280.00% *82.80% Satisfactory Fabrication, and Gen. Mdse. Construction of Multi-Purpose Building (Covered Court), Brgy. Inamarga Enterprises 26728 11/06/2019 Aklan DEO 1.980 75 C 0.45 0.13 0.30 - - - 71.90% 71.9% Poor Pinamuk-an Infraserve Builders And Supplies 36222 Construction of Flood Control 04/06/2018 Biliran DEO 5.510 120 C 0.48 0.13 0.30 - - - 91.20 *91.20% Very Satisfactory Infraserve Builders And Supplies 36222 Construction of Road, Barangay Libagong, Villaba, Leyte 08/23/2019 Leyte 3rd DEO 1.932 30 C 0.49 0.13 0.30 - - - 92.20% 92.2% Very Satisfactory Supply of Labor & Materials for the Construction of Union Infraserve Builders and Supplies 36222 09/19/2019 DA 11.486 210 O 0.34 0.30 0.15 0.03 0.06 0.05 93.64 - On-going Diversion Dam Construction of 1 Storey 3 Units Regular Workshop, 2 Units Surigao del Norte Inmar Builder And Enterprises 38128 Science Lab & 2 Units ICT (7m x 18m per unit) General Luna 08/21/2019 29.823 387 O 0.39 0.24 0.00 0.00 0.01 0.02 65.00% - On-going 1st DEO National High School (Sch. ID 304777) International Builders Corporation (IBC) 8576 Proposed Paving of Existing Back-up Area 06/09/2019 PPA 203.981 534 O 0.38 0.30 0.15 0.03 0.07 0.05 97.65 - On-going

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 76 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Ipm Construction And Development 14699 Adcadarao People's Village 04/19/2018 NHA 173.88 480 O 0.35 0.28 0.00 0.03 0.06 0.03 75.37 - On - Going Corporation IPM Construction and Development 14699 Adcadarao People's Village 08/06/2019 NHA 173.880 878 C 0.44 0.20 0.13 - - - 76.91 75.85% Unsatisfactory Corporation IPM Construction and Development 14699 Malayuan People's Village Site 1 08/06/2019 NHA 289.800 828 C 0.44 0.20 0.08 - - - 71.99 74.79% Poor Corporation Ipm Construction And Development 14699 Estancia People's Village 06/08/2018 NHA 289.800 736 C 0.43 0.19 0.02 - - - 64.71 79.65% Unsatisfactory Corporation Ira Construction And Supply 39936 Construction of Various Barangay Roads at Oas and Polangui 04/04/2018 Albay 3rd DEO 5.791 120 C 0.43 0.13 0.30 - - - 86.20 *86.20% Satisfactory

IRC Construction & Supplies 29943 Marikit Irrigation Project - Construction of Marikit Diversion Dam 08/06/2019 NIA 67.652 514 C 0.41 0.13 0.30 - - - 84.50 83.59% Satisfactory

Irc Construction & Supplies 29943 Construction of San Isidro - Diteki River Flood Control 06/20/2018 Aurora DEO 51.399 319 O 0.340 0.278 0.150 0.030 0.029 0.050 87.70 - On-going

Irc Construction & Supplies / L.M.G. Rehabilitation/Improvement of Existing Dike along Lucung River 06/19/2018 Tarlac 2nd DEO 91.643 203 O 0.372 0.243 0.150 0.030 0.040 0.050 88.50 - On-going Construction Joint Venture (Cut-cut 1st Section, Left Bank), Upstream of Cut-cut Bridge

Irc Construction And Supplies 29943 Marikit Irrigation Project 10/19/2018 NIA 67.652 589 O 0.35 0.22 0.13 0.03 0.06 0.05 83.03 - On - Going

Road Widening-Secondary Roads Cordon-Diffun Road, Isabela Ebc Builders Construction, Inc. 26089 K0318+579-K0318+985, K0318+997-K319+077, 06/04/2018 Isabela 4th DEO 44.750 235 O 0.386 0.2 0.15 0.022 0.025 0.05 83.30 - On-going K0319+085.60-K0320+100 (Intermittent Section) Construction of Four-Storey (4 Classrooms) 4 Regular Isabela Ebc Builders Construction, Inc. 26089 11/07/2019 Isabela 4th DEO 16.267 240 C 0.49 0.20 0.00 - - - 69.80% 72.95% Poor Workshop, Santiago City National High School Construction of Three Storey (2 Sci Lab, 2 Workshop, 2 ICT Lab Isabela Ebc Builders Construction, Inc. 26089 11/06/2019 Isabela 4th DEO 27.751 298 C 0.48 0.20 0.00 - - - 67.80% 79.56% Unsatisfactory Unique Workshop) Construction of Four-Storey (4 Classrooms) 4 Regular Isabela Ebc Builders Construction, Inc. 26089 08/22/2019 Isabela 4th DEO 16.267 240 O 0.37 0.22 0.05 0.03 0.04 0.03 74.30% - On-going Workshop, Santiago City National High School Construction of 3 Storey (2 Sci Lab, 2 Workshop, 2 ICT Lab Isabela Ebc Builders Construction, Inc. 26089 08/22/2019 Isabela 4th DEO 27.751 298 O 0.40 0.24 0.10 0.03 0.05 0.03 84.60% - On-going Unique Workshop), Rizal National High School Convergence and Special Support Program - Construction / Improvement of Access Roads Leading to Trades, Industries Isnag Builders & Dev'T. Corporation 33781 and Economic Zones - Maduang - Dagara - Maragat - Abra 11/22/2019 Apayao 1st DEO 17.095 164 C 0.48 0.13 0.30 - - - 91.10% 77.6% Unsatisfactory Boundary in Support to Blacksmitting, Handicraft, Furniture High Value Crops and Coffee Industries Construction / Improvement of Access Roads Leading to Trades, Industries and Economic Zones Panay- Bato, Sabel Isnag Builders & Dev'T. Corporation 33781 11/23/2019 Apayao 2nd DEO 9.483 195 C 0.48 0.13 0.30 - - - 91.30% 89.32% Very Satisfactory Road in Support of Cassava, Corn, Rice , Mandarin, Tourism Handicraft, Furniture, Fruit Wines and Coconut Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Trades, Industries Isnag Builders & Dev'T. Corporation 33781 and Economic Zones - Maduang - Dagara - Maragat - Abra 09/10/2019 Apayao 1st DEO 17.095 95 O 0.34 0.24 0.00 0.03 0.04 0.00 65.30% - On-going Boundary in Support to Balcksmithing, Handicraft, Furniture, High Value Crops and Coffee Industries Construction/Improvement of Acces Roads Leading to Declared Isnag Builders & Dev'T. Corporation 33781 Tourism Destination San Carlos - Nueva - Marcela Road 09/11/2019 Apayao 2nd DEO 18.989 210 O 0.37 0.24 0.15 0.02 0.05 0.05 88.60% - On-going Leading to Bacut Lake Construction/Improvement of Acces Roads Leading to Trades, Industries and Economic Zones Panay - Bato, Sabel Road in Isnag Builders & Dev'T. Corporation 33781 09/11/2019 Apayao 2nd DEO 9.483 195 O 0.38 0.22 0.15 0.02 0.06 0.05 88.00% - On-going Support of Cassava, Corn, Rice, Mandarin, Tourism, Handicraft, Furniture, Fruit Wines and Coconut Construction/ Rehabilitation of Flood Mitigation Facilities within Isnag Builders & Dev'T. Corporation 33781 Major Rive Basins and Principal, Construction of Flood Control 11/23/2019 Apayao 2nd DEO 18.498 250 O 0.38 0.24 0.15 0.03 0.06 0.05 90.70% - On-going along Cabatacan Bridge

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 77 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Isulan Ect Construction & General 19MH0024 - Construction of Multi-Purpose Building (Barangay Sultan Kudarat 39565 11/23/2019 0.920 60 C 0.48 0.13 0.30 - - - 91.70% 90.44% Very Satisfactory Merchandise Inc. Hall) 2nd DEO Isulan Ect Construction & General Sultan Kudarat 39565 Construction of Multi-Purpose Building (Barangay Hall) 08/24/2019 0.920 60 O 0.39 0.22 0.15 0.03 0.05 0.05 89.90% - On-going Merchandise Inc. 2nd DEO Misamis Oriental J D E Construction 19173 Construction of Evacuation Center, Poblacion, El Salvador City 03/17/2018 34.740 205 C 0.50 0.13 0.30 - - - 93.20 *93.20% Very Satisfactory 2nd DEO J E G Construction Firm Corporation 36486 Construction of Multi-Purpose Building 06/02/2018 Iloilo 4th DEO 1.881 90 O 0.330 0.265 0.150 0.030 0.047 0.050 87.20 - On-going Reconstruction to Concrete Pavement- New Lucena- Sta. Barbara Rd K0017+048- K0018+885, K0019+517-K0019+734, J E G Construction Firm Corporation 36486 08/29/2019 Iloilo 4th DEO 43.437 172 O 0.35 0.23 0.15 0.03 0.06 0.05 86.40% - On-going K0020+403-K0020+584, K0023+603-K0023+760, K0024+242- K0024+342 Reconstruction to Concrete Pavement-8th Street Lawa-an J E G Construction Firm Corporation 36486 Village leading to various Seafood Restaurants, Terminals and 08/19/2019 Iloilo City DEO 12.279 59 O 0.37 0.30 0.15 0.00 0.02 0.05 88.80% - On-going Malls Reconstruction to Concrete Pavement - New Lucena - Sta. Barbara Rd. KO017+048 - KO018+885; KO019+517 - J E G Construction Firm Corporation 36486 11/14/2019 Iloilo 4th DEO 43.437 192 O 0.37 0.24 0.15 0.03 0.05 0.05 89.10% - On-going KO019+734; KO020+403 - KO020+584; KO023+603 - KO023+760; KO024+242 - KO024+342 Reconstruction to Concrete Pavement- along Iloilo- Antique Rd. J E G Construction Firm Corporation 36486 11/13/2019 Iloilo City DEO 32.547 150 O 0.39 0.24 0.14 0.02 0.05 0.03 87.10% - On-going (S00016PN) K0006+474- K0008+103 J. B. Basallo Construction 17391 Repair of PANTAR TAVORA CIS 11/13/2020 NIA 1.281 150 C 0.33 0.20 0.30 - - - 8320.00% *83.20% Satisfactory J. E. Tico Construction Co., Inc. (Formerly: Jet 19242 Pasalubong Center with Restroom 11/21/19 TIEZA 2.500 120 C 0.46 0.20 0.30 - - - 96.10 96.10% Outstanding Construction Supply) J. Simeon Construction / Solenko Metro Manila 3rd JV-18-0208 Construction of Marulas Convention Center, Barangay Marulas 08/29/2019 49.000 390 O 0.39 0.29 0.10 0.03 0.04 0.03 88.80% - On-going Construction Joint Venture DEO J.A. Const. and Trading Corp. (Formerly: J.A. 35189 Higatangan Port Development Project - Construction of Port 09/09/2019 DOTR 9.007 120 C 0.37 0.20 0.30 - - - 87.40 *87.40% Satisfactory Construction) Construction of Pinocawan Flood Control along Dumaguette Negros Oriental J.A. Construction 35189 04/11/2018 4.647 100 C 0.49 0.13 0.30 - - - 91.90 *91.90% Very Satisfactory North Road, Brgy. Bagawines, Vallehermosa, Negros Oriental 1st DEO

Rehabilitation/Major Repair of Permanent Bridge, EDSA - Metro Manila 2nd J.A. Evangelista Construction 42093 Kalayaan - Flyover Bridge (Ramp 2) (B04313LZ) 08/19/2019 2.880 30 C 0.42 0.13 0.30 - - - 84.90% 84.9% Satisfactory DEO along EDSA - Kalayaan - Fort Bonifacio Flyover, District II

Rehabilitation/Major Repair of Permanent Bridge, EDSA - Metro Manila 2nd J.A. Evangelista Construction 42093 Kalayaan - Fort Bonifacio Flyover Bridge (Ramp 1) (B04315LZ) 08/19/2019 2.881 30 C 0.44 0.13 0.30 - - - 87.10% 87.1% Satisfactory DEO along EDSA - Kalayaan - Fort Bonifacio Flyover, District II Cacapian SWIP - Repair of Reservoir and Construction of Canal J.A. Olivar Engineering Design, Construction 35602 Lining, Canal Structures, Terminal Facilities & Procurement of 03/10/2019 NIA 9.192 300 O 0.272 0.300 0.121 0.030 0.051 0.050 82.44 - On-going And Supplies Pumpsets / Engine and PE Irrigation Pipes J.A. Olivar Engineering Design, Construction Construction of Flood Control Structures along Bararo River 35602 05/28/2018 La Union 1st DEO 9.649 152 C 0.46 0.13 0.30 - - - 89.20 84.82% Satisfactory And Supplies Control (Phase II) J.A. Olivar Engineering Design, Construction Widening of Permanent Bridge, Amlang Bridge (B02629LZ) La Union 2nd 35602 11/14/2019 14.700 131 C 0.50 0.13 0.30 - - - 93.10% 86.98% Satisfactory And Supplies Manila North Road, K0222+613 DEO Construction/Maintenance of Flood Control Mitigation Structure J.A. Olivar Engineering Design, Construction 35602 and Drainage Systems - Construction of Flood Control 11/04/2019 La Union 1st DEO 29.150 259 C 0.39 0.13 0.30 - - - 82.70% 82.7% Satisfactory And Supplies Structures along Tanqui - Biday - Carlatan Waterways J.A. Olivar Engineering Design, Construction Widening of Permanent Bridge, Amlang Bridge (B02629LZ), La Union 2nd 35602 08/29/2019 12.396 131 O 0.40 0.30 0.04 0.03 0.06 0.00 82.90% - On-going And Supplies Manila North Road, K0222+613 DEO J.A. Olivar Engineering Design, Construction Off-Carriageway Improvementm San Juan-San Gabriel Rd. 35602 08/19/2019 La Union 1st DEO 18.202 210 O 0.39 0.24 0.15 0.03 0.04 0.05 89.90% - On-going And Supplies K027+036 - 279+000 J.B. Alarcon Enterprises / Miclover General Construction of Four (4) Storey, Sixteen (16) Classroom School JV-18-1239 11/20/2019 Laguna 1st DEO 36.867 330 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory Construction & Iron Works Joint Venture Building Gatid Elementary School

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 78 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Convergence and Special Support Program - Construction/Improvement of Access Roads Leading to Trades, Cagayan 2nd J.B. Alcantara Builders 41693 Industries and Economic Zones - Kilkiling Barangay Road 11/06/2019 7.123 103 C 0.48 0.13 0.30 - - - 91.20% 91.32% Very Satisfactory DEO connecting to Manila North Road to Coffee Plantation and Citrus Plantation and Processing Convergence and Special Support Program - Construction/Improvement of Access Roads Leading to Trades, Cagayan 2nd J.B. Alcantara Builders 41693 Industries and Economic Zones - Kilkiling Barangay Road 08/21/2019 7.123 133 O 0.39 0.24 0.15 0.03 0.06 0.05 91.40% - On-going DEO Connecting to Manila North Road to Coffee Plantation and Citrus Plantation and Processing NIA / La Union Canalization Works, Canal Structures & Terminal Facilities of Irrigation J.B. Basallo 17391 11/13/2020 1.281 150 C 0.33 0.20 0.30 - - - - 83.20% Satisfactory Pantar Tavora Communal Irrigation System Management Office Asset Preservation of National Roads -Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads Lower Kalinga J.C. Baac Construction Corporation 25974 06/03/2018 43.193 229 C 0.40 0.14 0.30 - - - 84.40 84.40% Satisfactory including drainage based on Pavement Management System DEO, CAR /HDM-4: Nambaram-Isabela Road, Asset Prevention of National Roads- Rehabilitation/ Reconstruction/Upgrading of Damaged Paverd National Road Including Drainage Based on Pavemnet Management Lower Kalinga J.C. Baac Construction Corporation 25974 04/07/2018 43.193 229 C 0.48 0.13 0.30 - - - 91.40 *91.40% Very Satisfactory System/HDM4: Nambaran - Isabela Road, K0509+430 to DEO K0509+788, K0511+023 to K0512+000, k0519+490 to K0519+931 J.C. Ferrer Construction 11657 Airport Development Project 07/06/2019 DOTC 8.691 75 C 0.46 0.20 0.30 - - - 96.40 *96.40% Outstanding J.C. Uyecio Construction and Development Construction of Eight (8) Five - Storey Building with Land 09/27/2019 NHA 315.626 660 O 0.36 0.30 0.15 0.03 0.06 0.05 9470.00% - On-going Co., / Aina Construction - JV Development including Survey Works

J.D. Legaspi Construction 9608 Construction of Fisheries Main Building 09/19/2019 DA 242.080 540 O 0.31 0.27 0.00 0.03 0.06 0.00 67.21 - On-going

Rehabilitation/Major Repair of Permanent Bridges, Gengarog J.D. Legaspi Construction / Vcd Construction Northern Samar JV-16-605 Bridge along Poblacion - Gengarog - Tubigdanao - San 04/05/2018 13.479 120 C 0.44 0.13 0.30 - - - 86.90 *86.90% Satisfactory And Supply 1st DEO Lorenzo - Bonglas - Mandugang Road Construction/Improvement of Various Infrastructure in Support J.D. Madrid Construction 30365 of National Security - Naval Command Gymnasium, Head 11/04/2019 La Union 1st DEO 5.488 90 C 0.50 0.13 0.30 - - - 93.20% 87.04% Satisfactory Quarters Naval Station Ernesto Ognibar Construction/Improvement of Various Infrastructure in Support J.D. Madrid Construction 30365 of National Security, Naval Command Gymnasium, Head 08/19/2019 La Union 1st DEO 5.488 90 O 0.34 0.24 0.15 0.03 0.04 0.05 84.40% - On-going Quarters, Naval Station, Ernesto Ogbinar J.D. Madrid Construction / Aquino-Dela Cruz JV-16-1735 Construction of Drainage Canal at Canagay 03/12/2018 La Union 1st DEO 19.598 285 C 0.45 0.13 0.30 - - - 88.40 *88.40% Satisfactory Engineering & Construction (Joint Venture) Northern Samar J.D. Partuza Construction 39161 Construction of Multi-Purpose Building (Covered Court) 08/21/2019 6.546 200 O 0.37 0.26 0.15 0.02 0.04 0.05 88.70% - On-going 2nd DEO Upgrading of Sen. Benigno Aquino Jr. Avenue, Pavia - Sta. Regional Office J.E. Tico Construction Co., Inc. 7063 Barbara, Iloilo, K0015+(-552) - K0015+504, K0014+(-617) - 06/08/2018 120.970 344 C 0.40 0.20 0.30 - - - 89.70 89.70% Very Satisfactory No. VI K0007+476 Rehabilitation of Paved Road- Capiz -Aklan Rd- K0324+420- J.E. Tico Construction Co., Inc. 7063 K0325+236, K0325+436- K0326+522, K0327+402- 08/24/2019 Capiz 2nd DEO 72.133 386 C 0.46 0.14 0.30 - - - 89.70% 89.7% Very Satisfactory K0328+742.84 Widening of Bridge-Utod Br. (B00010GR) along Guimaras J.E. Tico Construction Co., Inc. 7063 08/27/2019 Guimaras DEO 16.680 226 C 0.44 0.20 0.30 - - - 94.40% 94.4% Very Satisfactory Circumferential Rd. incl. ROW Widening of Bridge - Bacjauan Br. (B00104PN) along J.E. Tico Construction Co., Inc. 7063 11/11/2019 Iloilo 3rd DEO 17.395 190 O 0.34 0.23 0.15 0.03 0.05 0.05 84.00% - On-going Concepcion - Sn. Dionisio Rd Preventive Maintenance of Road: Asphalt Overlay-on Specific J.E. Tico Construction Co., Inc. 7063 Locations along Guimaras Circumferential Rd (S00028GR) 11/12/2019 Guimaras DEO 84.413 130 O 0.39 0.24 0.15 0.02 0.06 0.05 91.20% - On-going K0013+637-K0079+792

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 79 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Reconstruction to Concrete Pavement - on Specific Locations J.E. Tico Construction Co., Inc. 7063 along Capiz-Aklan Rd. (S00298PN) KO324+-742 to 11/09/2019 Capiz 2nd DEO 80.205 304 O 0.38 0.24 0.15 0.03 0.04 0.05 88.90% - On-going KO330+580 Construction of Drainage Structure along Road-along Guimaras J.E. Tico Construction Co., Inc. 7063 11/12/2019 Guimaras DEO 48.963 330 O 0.40 0.24 0.15 0.02 0.05 0.05 91.30% - On-going Circumferential Rd (S00028GR) K0091+055- K0099+891 Const./Rehab. of Flood Mitigation Facilities along Major River J.E.L. Construction & Supply / Jann-Norris Nueva Vizcaya 1st jv-17-120 Basins and Principal River-Const. of Sta. Cruz River Control, 03/22/2018 18.528 175 OG 0.345 0.250 0.150 0.030 0.050 0.050 87.50 - On - Going Construction And Supplies I DEO Barat Section. Pangasinan 2nd J.G. Garcia Construction & Supply 21054 Construction of Riverbank Protection along Angalacan River 06/06/2018 29.397 270 C 0.40 0.17 0.30 - - - 87.50 87.50% Satisfactory DEO Pangasinan 2nd J.G. Garcia Construction & Supply 21054 Construction of Riverbank Protection at Barangay Poblacion 08/23/2019 13.965 112 C 0.46 0.13 0.30 - - - 89.20% 89.2% Very Satisfactory DEO Construction of River Bank Protection along Ingalera River, Ano Pangasinan 4th J.G. Garcia Construction & Supply 21054 08/22/2019 30.488 174 O 0.32 0.24 0.15 0.03 0.05 0.05 84.00% - On-going Section DEO Pangasinan 2nd J.G. Garcia Construction & Supply 21054 Concrete Paving of Mabini Street 11/11/2019 29.243 115 C 0.49 0.13 0.30 - - - 91.90% 91.9% Very Satisfactory DEO Construction of River Banks Protection alongAgno River, Pangasinan 4th J.G. Garcia Construction & Supply 21054 11/06/2019 37.946 182 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory Warding Section DEO J.G. Garcia Construction & Supply / Brylle Construction of Multi-Purpose Building (Limahong Tourist Pangasinan 2nd Trading & Construction Supplies Joint JV-18-1671 11/11/2019 49.387 315 O 0.38 0.22 0.15 0.03 0.04 0.03 84.80% - On-going Center) DEO Venture Rehabilitation/Major Repair of Permanent Bridge - Marcos J.H. Pajara Construction Corporation 1890 08/30/2019 NCR 151.026 503 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory Bridge (BO1752LZ) along Marcos Highway Bridge Program- Rehabilitation/Major Repair of Permanent J.H. Pajara Construction Corporation 1890 Bridge- (BO1752LZ) along Marcos Highway 11/23/2019 NCR 62.435 300 C 0.48 0.20 0.30 - - - 98.40% 98.4% Outstanding (Phase II) Construction of By-Passes/Diversion Roads along Brgy. Kilim- J.H. Pajara Construction Corporation / Arca Sitio Tipay Road Junction Ormoc-Baybay-Southern Leyte JV-19-017 11/06/2019 Leyte 5th DEO 36.672 150 O 0.38 0.25 0.15 0.03 0.06 0.05 91.80% - On-going Builders (Joint Venture) Boundary Road to Buenavista Junction Tacloban-Baybay-South Road, Package 1 MFO 1: National Road Network Services - Construction and Maintenance of Bridges along National Roads, New J.H. Pajara Construction Corporation/ E.V. Regional Office JV-16-1822 Construction of Permannent Bridges - Tertiary, Tallang Bridge 1 10/26/2019 186.627 635 C 0.49 0.17 0.30 - - - 95.40% 95.4% Very Satisfactory Interior Construction Joint Venture No. II and Approaches along Baybayog - Baggao Dalin Sta. Margarita Road Cluster DRERF-01-Emergency Repair/ Rehabilitation of Projects damaged by Typhoon Josie: a) Emergency Repair/ Mindoro J.H.R.Enterprises 39894 08/19/2019 11.210 145 C 0.46 0.13 0.30 - - - 89.50% 89.5% Very Satisfactory Restoration of Bridges along National Roadds-Talusungan Br. Occidental DEO 3, K0434+443, Approach B (B00196MR) along MWCR Construction of 1 Unit 1STY5CL School Building, Sta. Barbara J.J.S. Construction 5710 06/02/2018 Iloilo 4th DEO 6.380 120 C 0.46 0.13 0.30 - - - 88.90 88.90% Satisfactory CES Agusan del Sur J.M. Lacorte Construction 39470 Construction of Classroom 1STY, 2CL, Maasin ES 05/29/2018 2.570 105 C 0.49 0.16 0.30 - - - 95.20 95.20% Very Satisfatory 1st DEO Construction of Concrete Road - Sitio San Jose/Bakingking Municipal Road Connecting Coffee, Cacao and Wood Agusan del Sur J.M. Lacorte Construction 39470 11/12/2019 9.800 115 C 0.49 0.13 0.30 - - - 92.30% 89.9% Very Satisfactory Plantation Sites and Provincial Road Junction in Support to 1st DEO Coffee, Cacao and Wood Industries Construction of Concrete Road - Sitio San Jose/Bakingking Municipal Road Connecting Coffee, Cacao and Wood Agusan del Sur J.M. Lacorte Construction 39470 08/26/2019 9.800 115 O 0.39 0.24 0.15 0.02 0.04 0.05 88.30% - On-going Plantation Sites and Provincial Road Junction in Support to 1st DEO Coffee, Cacao and Wood Industries Construction of By-Pass and Diversion Roads - Rosario - Marfil - Regional Office J.M. Luciano Construction, Inc. 2083 08/24/2019 98.611 240 O 0.38 0.23 0.15 0.02 0.05 0.05 88.20% - On-going Tagbina Rd, (Tagbina Rd, Tagbina Section) No. XIII Construction of By-Pass and Diversion Roads - Cantillan-Madrid Regional Office J.M. Luciano Construction, Inc. 2083 11/15/2019 101.325 300 O 0.38 0.24 0.15 0.03 0.04 0.03 88.00% - On-going Bypass Road, (SDCR Alternate Road) No. XIII

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 80 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction/Improvementof Access Roads Leading to Surigao del Sur J.M. Luciano Construction, Inc. 2083 Declared Tourism Destination NRJ-Cumawas-Tinuy-an Falls 05/31/2018 46.269 179 O 0.386 0.278 0.150 0.030 0.051 0.033 92.80 - On-going 2nd DEO Roads, Borboanan Rehabilitation/Reconstruction /Upgrading of Pavement J.S Layson & Co. , Inc. /A.T. Tan Construction Management System/highway Development and Management - JV-17-470 04/12/2018 Cebu City DEO 20.090 120 C 0.46 0.13 0.30 - - - 88.90 *88.90% Satisfactory Corporation Joint Venture 4 (HDM-4), Secondary Roads, Cebu South Coastal Road- (S00018CB) Chainage 324 Widening of Bridge- Italaro Bridge (BO2520LZ) along Novelita- J.S. General Contractor 15258 11/26/2019 Cavite 2nd DEO 43.114 345 O 0.38 0.22 0.15 0.02 0.03 0.05 85.30% - On-going Naic- Tagaytay Road Provincial J.T. Gamolo Construction 15759 Concreting of Jct. Sayre H'way()-Miaray Road 01/10/2019 Government of 34.856 206 O 0.34 0.30 0.05 0.03 0.07 0.05 83.30 - On - Going Bukidnon Improvement/Widening of National Roads, Sayre Highway (Jct Bukidnon 2nd J.T. Gamolo Construction 15759 Bukidnon-Davao City Road - Cotabato Boundary), K1566+000- 05/29/2018 48.048 210 C 0.45 0.20 0.27 - - - 91.20 91.20% Very Satisfactory DEO K1567+010, K1567+637-K1568+223, K1609+000-K1609+550 Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage along Sayre Highway Bukidnon 3rd J.T. Gamolo Construction 15759 05/30/2018 19.056 190 C 0.45 0.13 0.30 - - - 88.70 88.70% Satisfactory K1441+906 - K1442+000, K1452+370 - K1452+470, DEO K1453+180 - K1453+475 Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Regional Office J.T. Gamolo Construction 15759 03/16/2018 87.045 317 C 0.47 0.13 0.30 - - - 90.50 *90.50% Very Satisfactory Standards (HDM-4 Project Analysis), -Kadingilan- No. X Kalilangan Rd, K1612+168-K1615+337 Bukidnon 2nd J.T. Gamolo Construction 15759 Concreting of Farm to Mill Road Brgy. Bocboc to Kiara 08/20/2019 45.302 304 O 0.38 0.24 0.15 0.03 0.05 0.05 90.20% - On-going DEO Bukidnon 2nd J.T. Gamolo Construction 15759 Concreting of Farm to Mill Road Brgy. Bocboc to Kiara, Bocboc 11/06/2019 45.302 304 O 0.39 0.21 0.15 0.03 0.05 0.05 87.00% - On-going DEO Road Widening CDO City - Dominorog - Camp Kibaritan RD. Bukidnon 3rd J.T. Gamolo Construction 15759 11/05/2019 61.939 164 O 0.37 0.23 0.15 0.03 0.05 0.05 87.70% - On-going K1468+180 - K1469+607 DEO

Construction of One Unit One Storey Two Classroom Building, J'14 Construction & Supply 40540 03/22/2018 Iloilo 4th DEO 2.845 115 C 0.48 0.13 0.30 - - - 88.70 *88.70% Satisfactory Cuyad Elementary School

Improvement/Widening of National Roads Ormoc-Baybay- Ja Achacoso Enterprises & General Services 33229 04/11/2018 Leyte 5th DEO 39.991 210 C 0.47 0.13 0.30 - - - 90.80 *90.80% Very Satisfactory Southern Leyte Boundary Road, K1094+340-K1096+000 NIA / Supply and Delivery of 7HP Water Cooled, V-Belt Driven Diesel Pangsasinan Jabanes Enterprises Engine & 5HP Gasoline Engine w/ Pump Set and Complete 12/05/2020 Irrigation 4.529 120 C 0.44 0.50 - - - - 94.00% Very Satisfactory Accessories, 7017170, 1, Lump Sum Management Office Construction of Concrete Road and Construction of Road Slope Jaben General Contracting & Eng'G Services JV-18-755 Protection Structure - Quirino H-Way (Baguio - Bauang Road0 11/22/2019 Baguio City DEO 39.140 323 O 0.39 0.28 0.12 0.03 0.05 0.03 91.30% - On-going / Kane Construction, Inc. (Joint Venture) to Quezon hill Drive By-Pass Road Rehabilitation/ Reconstruction of Damaged Paved National Jabengeneral Contracting & Eng'G Services 34934 roads Including Drainage along Baguio to Bontoc Road 04/10/2018 Benguet 1st DEO 19.460 198 C 0.50 0.13 0.30 - - - 93.90 *93.90% Very Satisfactory K0257+050 to K0257+104, K0257+288 to K0257+932 Jacinto Gerona Construction 8165 Masbate RoRo Port Development Project 10/16/2018 DOTr 28.703 150 C 0.47 0.20 0.30 97.00 *97.00% Outstanding Construction/Sealing/Raising of Riverwall along Malabon Malabon-Navotas Jagonbuild Construction Corp. 24748 03/22/2018 22.947 280 C 0.41 0.20 0.30 - - - 90.50 *90.50% Very Satisfactory Navotas River, Brgy. San Agustin DEO Construction of Riverwall along Malabon Navotas River, Brgy. Malabon-Navotas Jagonbuild Construction Corp. 24748 03/22/2018 24.500 370 C 0.40 0.20 0.30 - - - 90.40 *90.40% Very Satisfactory Ibaba DEO Rehabilitation of Roads and Drainage along 9th Avenue (From Metro Manila 3rd Jagonbuild Construction Corp. 24748 11/06/2019 15.177 150 O 0.38 0.24 0.15 0.03 0.04 0.05 89.00% - On-going Galino Street Quezon City Boundary to 10th Street) DEO Jagonbuild Construction Corp. (For. Jagon Improvement of Lapu-Lapu Avenue Box Culvert (Sta.0+000 to Malabon-Navotas 24748 08/30/2019 4.746 195 C 0.45 0.13 0.30 - - - 88.30% 88.3% Satisfactory Builders Sta. 0+563) along Lapu-Lapu Avenue, Brgy. NBBS DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 81 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Network Development Program - Off-Carriageway Improvement Jaica Const. Corp. 44541 - Secondary Roads, Abuyon-Buenavista Road K0257+- 11/26/2019 Quezon 3rd DEO 24.133 240 C 0.49 0.19 0.30 - - - 98.00% 98% Outstanding K0259+575 Construction and Maintenance of Bridges along National Roads- Negros Occidental Jaime B. Ching Enterprises 4256 Widening of Permanent Bridges, including ROW to more than 03/15/2018 68.751 339 OG 0.390 0.240 0.150 0.030 0.051 0.050 91.10 - On - Going 2nd DEO Two (2) Lanes- Suay Bridge Construction and Maintenance of bridges along Nation Roads - Negros Occidental Jaime B. Ching Enterprises 4256 Widening of Permanent Bridges, including ROW - to more than 06/05/2018 68.751 369 C 0.44 0.13 0.30 - - - 87.40 89.64% Very Satisfactory 2nd DEO 2 lanes - Suay Bridge (BOO363NR) Construction of Farm to Mill Road, Crossing Merced to Merced Negros Occidental Jaime B. Ching Enterprises 4256 03/19/2018 8.675 66 C 0.48 0.13 0.30 - - - 91.40 *91.40% Very Satisfactory Sevillino Proper DBS 4th DEO Construction of Poblacion Flood Control along Dumaguete Negros Oriental Jaime B. Ching Enterprises 4256 04/11/2018 13.949 160 C 0.50 0.13 0.30 - - - 93.30 *93.30% Very Satisfactory North Road 1st DEO Construction of Flood Control along Tibyawan River (Upstream Negros Oriental Jaime B. Ching Enterprises 4256 08/22/2019 27.926 190 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Right Side) 1st DEO Construction of Four (4) Storey Twenty (20) Classroom at Liliw Jaime B. Ching Enterprises 4256 09/05/2019 Laguna 3rd DEO 44.770 480 O 0.40 0.24 0.15 0.02 0.04 0.05 90.40% - On-going Central Elementary School Construction of Four (4) Storey Twenty (20) Classroom at Liliw Jaime B. Ching Enterprises 4256 11/19/2019 Laguna 3rd DEO 44.770 480 O 0.37 0.28 0.15 0.03 0.06 0.03 91.70% - On-going Elementary School Jaime B. Ching Enterprises 4256 Construction of Lupit River Flood Control Structure 11/05/2019 Bacolod City DEO 45.531 239 O 0.40 0.24 0.10 0.02 0.05 0.03 84.50% - On-going

Negros Occidental Jaime B. Ching Enterprises 4256 Construction of Road- Barangay Tabu, Ilog to Barangay Tapi 11/08/2019 19.800 148 O 0.39 0.24 0.15 0.02 0.05 0.05 90.00% - On-going 3rd DEO I. Operations A. Organizational Outcome 1. Ensure Safe and Reliable National Road System 2. Network Development Jaime B. Ching Enterprises / Bcvillaseñor Program A. Road Widening 1. Primary Roads 2. Daang 06/21/2018 Quezon 4th DEO 90.386 210 O 0.384 0.240 0.150 0.030 0.060 0.050 91.40 - On-going Construction Joint Venture Maharlika (LZ) - K0145+179 - K0147+471, K0147+523 - K0148+482 Construction of Flood Ocntrol Facilities, Sto. Tomas River, (PMS Zambales 1st Jam- C Builders 32870 11/13/2019 23.765 228 O 0.37 0.22 0.15 0.03 0.06 0.05 87.60% - On-going ID No. P00322192LZ-CWI) DEO Design and Build Services for the Construction of Academic Jamari Construction 21580 06/26/2019 DOST 39.352 330 O 0.39 0.30 0.08 0.03 0.06 0.05 91.30 - On-going Building 2 Construction of Flood Mitigation Structure at Subangdako River Jamari Construction 21580 04/12/2018 Cebu City DEO 44.100 253 C 0.49 0.13 0.30 - - - 92.30 *92.30% Very Satisfactory Flood Control Design and Build Services for the Construction of Academic Jamari Construction 21580 02/14/2020 PSHS-ZRC 39.352 330 O 0.40 0.29 0.00 0.03 0.05 0.05 81.40% - On-Going Building 2 Zambales 1st Jam-C Builders 32870 Construction of Flood Control Facilities, Sto. Tomas River 08/20/2019 23.765 190 O 0.40 0.24 0.15 0.03 0.05 0.05 91.30% - On-going DEO Concreting of Road leading to Zambales 1st Jam-C Builders 32870 08/20/2019 9.264 120 O 0.39 0.20 0.15 0.03 0.04 0.05 86.70% - On-going Technological University, Brgy. Palanginan DEO Jamjle Properties (Subic) And Development Zambales 2nd 35039 Improvement of Banicain River (upstream - left side) 06/21/2018 45.736 210 C 0.46 0.13 0.30 - - - 89.50 89.50% Very Satisfactory Corporation DEO Jamjle Properties (Subic) And Development Renovation and Improvement of the Subic Sports Complex, Zambales 2nd 35039 03/16/2018 8.424 120 C 0.48 0.10 0.30 - - - 87.90 *87.90% Satisfactory Corporation Subic, Zambales DEO Flood Management Program, Construction/Maintenance of Jamjle Properties (Subic) And Development Zambales 2nd 35039 Flood Mitigation Structures and Drainage System, Improvement 08/22/2019 45.363 210 O 0.38 0.24 0.15 0.03 0.05 0.05 90.20% - On-going Corporation DEO of East Bajac-Bajac Channel Flood Management Program, Construction/ Maintenance of Jamjle Properties (Subic) And Development Zambales 2nd 35039 Flood Mitigation Structures and Drainage System, Improvement 11/14/2019 48.998 210 O 0.38 0.23 0.15 0.03 0.04 0.03 87.00% - On-going Corporation DEO of jadjad River 19MG0029 - Construction of Multi-Purpose Building (New South Cotabato Janmarie Construction Services & Supply 42956 11/19/2019 2.464 105 C 0.42 0.20 0.30 - - - 91.40% 91.4% Very Satisfactory Gym), Concepcion Elementary School 1st DEO Construction of Two (2) Storey Four (4) Classroom Academic Janming Construction And Supplies 35662 09/09/2019 Quezon 2nd DEO 11.476 180 C 0.50 0.13 0.30 - - - 93.88% 93.88% Very Satisfactory School Building at Anastacia Elementary School

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 82 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction/Rehabilitation of Flood Mitigation Facilities along Jann-Norris Construction And Supplies Inc. / Nueva Vizcaya 1st Major River Basins and Principal River Construction of Sta. Cruz 06/06/2018 18.528 175 C 0.50 0.13 0.30 - - - 93.30 93.30% Very Satisfactory J.E.L. Construction & Supply (Joint Venture) DEO River Control, Barat Section Flood Management Program - Construction/Maintenance of Nueva Vizcaya Jann-Norris Construction And Supplies, Inc. 35880 Flood Mitigation Structures and Drainage System - Construction 11/12/2019 29.376 149 C 0.46 0.13 0.30 - - - 89.20% 89.2% Very Satisfactory 2nd DEO of Sta. Fe River Flood Control Structures, Bone North Section Organizational Outcome 2: Protect Lives and Properties Againts Major Flood - Construction/Maintenace of Flood Mitigation Nueva Vizcaya 1st Jann-Norris Construction And Supplies, Inc. 35880 Structures and Drainage Systems - Construction of Matuno 11/11/2019 40.411 172 C 0.48 0.13 0.30 - - - 90.80% 90.8% Very Satisfactory DEO River Control Structure, Manamtam Section Phase II, Sta.0+775 - Sta.1+575 Organizational Outcome 1: Ensure Safe and Reliable National Road System: Network Development: Construction of By-pass Regional Office Jann-Norris Construction And Supplies, Inc. 35880 and Diversion Roads - Bambang, By-pass, Nueva Vizcaya, Sta. 08/24/2019 85.678 243 O 0.37 0.24 0.15 0.03 0.06 0.05 89.80% - On-going No. II 000+400.00 - Sta. 002+326.85 ( Road Concreting), Sta. 003+093.30 - Sta. 193.3 (Road Opening) Flood Management Program-Construction/Maintenace of Flood Nueva Vizcaya Jann-Norris Construction And Supplies, Inc. 35880 Mitigation Structures and Drainage System Construction of 11/12/2019 39.471 192 O 0.38 0.25 0.15 0.03 0.06 0.03 89.40% - On-going 2nd DEO Gabut Flood Control Structures OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges-Macalaoat Br. (B01191LZ) Jann-Norris Construction And Supplies, Inc. 35880 along Santiago-Tuguegarao Rd. APP A. K0360+707 (Sta. 11/08/2019 Isabela 3rd DEO 27.884 215 O 0.39 0.24 0.15 0.03 0.06 0.05 91.20% - On-going 0+000) - k0360+861 (Sta. 0+0154); APP B. K0360+889.6 (Sta. 0+182.6) - K0360+943.6 (Sta. 0+236.6) Rehabilitation/Improvement of Sta. Cruz River Flood Control Nueva Vizcaya Jann-Norris Construction And Supplies, Inc. 35880 02/27/2018 88.000 196 C 0.43 0.20 0.30 - - - 93.40 *93.40% Very Satisfactory Structures, Pingkian Section 2nd DEO Construction of One (1) Storey - Two (2) Classroom School January Builders 39818 04/10/2018 Cebu 2nd DEO 2.655 85 C 0.47 0.13 0.30 - - - 90.80 *90.80% Very Satisfactory Building (Toilet Attached), Manduang, Elementary School January Builders 39818 Concreting of Road 11/08/2019 Cebu 2nd DEO 4.950 35 C 0.45 0.20 0.30 - - - 95.20% 95.2% Very Satisfactory Japuz-Jansol Enterprises 22869 Construction / Improvement of Dinanggasan River Control 03/12/2018 Camiguin DEO 13.825 140 C 0.44 0.20 0.30 - - - 94.30 *94.30% Very Satisfactory Japuz-Jansol Enterprises 22869 Construction of San Roque River Control 11/09/2019 Camiguin DEO 18.616 145 O 0.38 0.24 0.15 0.03 0.06 0.05 90.90% - On-going Jepaco Communal Irrigation Project - Construction of Concrete Japz Construction 40241 Canal, Canal Structure & Terminal Facilities JEPACO CIP-L-01- 12/14/19 NIA 11.840 360 C 0.40 0.13 0.30 - - - 83.61 *83.61% Satisfactory 2018 Sultan Kudarat Jargon Construction & Supply 23474 Construction of Brgy Hall Building (MPB- 7m x 8m) 03/20/2018 0.960 85 C 0.48 0.13 0.30 - - - 91.60 *91.60% Very Satisfactory 2nd DEO Construction of Classroom (3 STY / 12 CL) Stand Alone Senior Agusan del Sur Jargon Construction & Supply 23474 03/21/2018 19.679 360 C 0.48 0.15 0.30 - - - 92.90 88.24% Satisfactory High School 1st DEO Construction of 2 STY 4 CL RW, Maasin National High School Palawan 2nd Jas Trading & Construction 37310 08/20/2019 16.963 233 O 0.40 0.30 0.12 0.03 0.06 0.00 90.70% - On-going (Bernas NHS) DEO MFO-2 Flood Management Services-Construction/Maintenance North Manila Jasa Builders 31330 of Flood Mitigation Structures and Drainage System - Bank 03/23/2018 48.999 245 C 0.39 0.20 0.30 - - - 89.10 *89.10% Very Satisfactory District DEO Improvement (Steel Sheet Pile), Estero de Sunog Apog Construction of Flood Control Wall/Riprapping along Banks of Metro Manila 3rd Jasa Builders 31330 08/29/2019 46.018 360 C 0.47 0.13 0.30 - - - 90.10% 90.1% Very Satisfactory Creeks with Dredging in Brgy 177 DEO Construction of Slope Protection Works along Agno River at Pangasinan 4th Jasa Builders 31330 08/22/2019 47.362 194 O 0.33 0.30 0.15 0.03 0.06 0.05 91.50% - On-going Barangay Manambong Sur DEO Construction of Riverwall along South Pinagkabalian River Malabon- Navotas Jasa Builders 31330 11/05/2019 46.303 171 O 0.40 0.24 0.15 0.03 0.04 0.05 90.70% - On-going (Phase IV) Brgy. Panghulo DEO Construction of Slope Protection Works along Agno River at Pangasinan 4th Jasa Builders 31330 11/06/2019 17.870 231 O 0.38 0.22 0.15 0.03 0.05 0.03 87.10% - On-going Barangay Iton DEO Construction of Slope Protection Works along River at Pangasinan 4th Jasa Builders 31330 11/06/2019 61.754 210 O 0.38 0.20 0.15 0.03 0.05 0.03 84.00% - On-going Barangay Manambong Sur DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 83 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Jasa Builders 16712 Modular Floating Docks 11/13/19 TIEZA 31.000 90 C 0.49 0.20 0.30 - - - 99.40 99.40% Outstanding Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development, Off-Carriageway Batangas 4th Jasmig Construction Corporation 26069 09/05/2019 69.657 276 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Improvement, Secondary Roads, Batangas - Lobo Rd - DEO K0121+169 - K0123+042 Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development - Off-Carriageway Batangas 2nd Jasmig Construction Corporation 26069 09/04/2019 56.811 188 C 0.50 0.13 0.30 - - - 93.20% 93.2% Very Satisfactory Improvement - Secondary Roads, Batangas - Lobo Rd., DEO K0129+272 - K0130+659 A. Organizational Outcome 1: Ensure Safe and Reliable National Road System 2. Network Development Program B. Jasmig Construction Corporation 26069 11/25/2019 Quezon 4th DEO 84.416 375 C 0.44 0.20 0.30 - - - 94.40% 94.4% Very Satisfactory Contstruction of By-pass Road and Diversion Roads 3. Pagbilao By-pass Road, Incl ROW and Bridge ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Batangas 2nd Jasmig Construction Corporation 26069 11/20/2019 70.971 224 O 0.40 0.26 0.15 0.02 0.05 0.05 92.90% - On-going Widening, Secondary Roads, Batangas-Lobo Rd.- K0134+501- DEO K0135+597 CY 2018 Basic Educational Facilities Fund, (BEFF-Batch 1), Jasmig Construction Corporation / Jeris Batangas 3rd JV-172866 Construction of Classrooms, 4STY20CL, Malvar National High 09/03/2019 44.766 285 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory Construction And Supply Joint Venture DEO School Off-Carriageway Improvement including Drainage, Tertiary Batangas 4th Jasmig Construction Supply 26069 03/17/2018 49.000 240 C 0.50 0.13 0.30 - - - 93.00 *93.00% Very Satisfactory Roads, Lipa-Balete Road, Lipa City, Batangas DEO Off-Carriageway Improvement including Drainage, Tertiary Batangas 4th Jasmig Construction Supply 26069 03/06/2018 90.710 330 C 0.50 0.13 0.30 - - - 93.00 *93.00% Very Satisfactory Roads, San Juan-Laiya Road, San Juan, Batangas DEO Construction / Improvement of Access Road leading to Zamboanga Jaykris Enterprises 30906 08/21/2019 19.205 132 O 0.40 0.24 0.15 0.03 0.07 0.05 94.00% - On-going Declared Tourism Destination - NRJ Leading to Buluan Island Sibugay 2nd DEO Construction of Flood Control along Imelda - Bayog - Zamboanga Jaykris Enterprises & Construction 30906 Kumalarang - Lapuyan - Margostubig Road, Part of Sibuguey 06/05/2018 5.865 90 O 0.397 0.212 0.113 0.030 0.070 0.033 85.50 - On-going Sibugay 1st DEO River, Brgy. Paradise Construction of One (1) Unit One (1) Storey-Two (2) Classroom Zamboanga Jaykris Enterprises & Construction 30906 03/18/2018 2.851 115 C 0.49 0.13 0.30 - - - 92.50 *92.50% Very Satisfactory at San Jose Elementary School Sibugay 1st DEO

Construction/Improvement of Access Road leading to Declared Zamboanga Jaykris Enterprises & Construction 30906 11/05/2019 19.900 162 O 0.37 0.23 0.15 0.03 0.05 0.05 88.30% - On-going Tourism Destination - NRJ Leading to Buluan Island, Buluan Sibugay 2nd DEO Palawan 2nd Jb & Sons Trading & Construction 30133 Construction/Improvement of NRJ Leading to Tabon Cave 11/07/2019 19.419 232 O 0.38 0.29 0.15 0.03 0.06 0.05 95.30% - On-going DEO JB & Sons Trading & Construction 30133 Construction of Candawaga, Rizal, Palawan 09/03/2019 DA 5.994 150 O 0.15 0.11 0.15 0.02 0.05 0.03 51.10 - On-going Construction of Modified Standard DPWH- DepEd Two (2) - Jb Balleras Construction And Supply 37853 08/26/2019 Iloilo 3rd DEO 24.067 150 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Storey Eight (8) Classrooms School Building, Lemery NHS Dinagat Islands Jb Lazan Construction And Supply, Inc. 37795 Construction of Barangay Gymnasium, Barangay Tigbao 03/14/2018 4.838 180 C 0.49 0.13 0.30 - - - 91.90 *91.90% Very Satisfactory DEO National Disaster Risk Reduction and Management Fund (NDRRMF) (Calamity Fund) - Nationl Roads and Bridges - Mt. Province 1st Jba Construction And Builders 36321 09/09/2019 13.028 165 C 0.35 0.20 0.30 - - - 85.20% 84.9% Satisfactory Rehabilitation/Restoration of Roadslip along Mountain Province - DEO Ilocos Sur via Tue Road, K0412+930 - K0412+980 Local Infrastructure Program - Local Roads and Bridges, Mt. Province 1st Jba Construction And Builders 36321 Construction / Rehabilitation / Upgrading / Improvement of Local 11/25/2019 2.970 116 C 0.42 0.20 0.30 - - - 92.20% 92.2% Very Satisfactory DEO Road Northern Samar Jbm Engineers And Supply 36885 Concreting of Barangay Cabarian Farm To Market Road 04/04/2018 9.125 90 C 0.47 0.13 0.30 - - - 90.80 *90.80% Very Satisfactory 2nd DEO Retrofitting/Strengthening of Permanent Bridges, Tabonon Northern Samar Jbm Engineers And Supply 36885 11/04/2019 11.413 60 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Bridge along Catarman - Laoang Road 2nd DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 84 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Retrofitting/Strengthening of Permanent Bridges, Opong Bridge Northern Samar Jbm Engineers And Supply 36885 11/05/2019 9.023 60 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory 4 along Rawis - Catubig Road 2nd DEO Jbm Engineers And Supply / Cdu Retrofitting/Strengthening of Permanent Bridge, Las Navas Northern Samar JV-18-628 11/05/2019 43.970 150 C 0.50 0.13 0.30 - - - 93.40% 90.16% Very Satisfactory Construction (Joint Venture) Bridge along Arteche - Jipapad - Las Navas - Rawis Road 2nd DEO

Jbros Construction Corporation / R.R. Encabo 27587 BSP Puerto Princesa Branch 08/03/2018 BSP 273.011 576 O 0.36 0.26 0.00 0.02 0.02 0.02 67.60 - On - Going Constructors Inc. (Jv)

Jc Palomo Construction & Construction Rehab/Improvement of Various Flood Control Structures in 37603 08/22/2019 Isabela 4th DEO 45.277 250 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory Supply Isabela - Gucab (Sta.0+000 to Sta.0+440) Constructionn of Three (3) Strorey (6 Classrooms) Science Jc Palomo Construction & Construction 37603 Laboratory Building, ICT Lab, Regular Workshop, San Isidro 07/12/2019 Isabela 4th DEO 14.156 228 C 0.49 0.16 0.22 - - - 88.10% 88.1% Satisfactory Supply National High School Rehabilitation/Reconstruction/Upgrading of Damaged Paved Jc Palomo Construction & Construction 37603 Roads Primary Road - Santiago -Tuguegarao Road - 11/06/2019 Isabela 4th DEO 8.510 150 O 0.39 0.25 0.15 0.03 0.06 0.03 90.50% - On-going Supply K0340+090-K0340+630 Jc Palomo Construction & Construction Rehabilitation/Improvement of Various Flood Control Structures Supply / Mar-Deb Construction & JV-18-0228 08/22/2019 Isabela 4th DEO 44.468 250 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory in Isabela - Dammang Section (Sta.0+000 to Sta.0+345) Development Joint Venture Jc Solidarity Construction 33170 Nassiping Pump Irrigation Project 10/27/2018 NIA 33.947 300 O 0.31 0.29 0.15 0.01 0.03 0.05 83.32 - On - Going Jca Construction And Construction Supply / Ilocos Norte 1st 39026 Concreting of Road, Barangay Akbir - Alviar - Salsalamagui 11/06/2019 66.598 276 O 0.38 0.24 0.15 0.03 0.04 0.03 87.10% - On-going Katha Builders & Supply Joint Venture DEO Construction/Repair/Rehabilitation of Road Including Drainage Northern Samar Jcad Engineering And Supply 43541 11/06/2019 1.973 80 C 0.49 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory Canal Barangay University of Eastern Philippines Zone II 1st DEO Construction of Multi-Purpose Building (C0vered Court), Northern Samar Jd Partuza Construction 39161 11/05/2019 6.546 200 O 0.40 0.21 0.15 0.02 0.04 0.05 86.80% - On-going Barangay Mapno 2nd DEO Local Program - Buildings and other Structures - Multi Purpose/Facilities - Local Infrastructure Program - Jdl5 Construction Corporation 29050 Construction/Repair/Rehabilitation/Improvement of Various 08/23/2019 Cagayan 3rd DEO 1.769 60 C 0.48 0.13 0.30 - - - 90.90% 90.9% Very Satisfactory Infrastructure Including Local Projects, Construction (Completion) of Tuguegarao West Central Gymnasium Jdr Construction 39397 Construction of Flood Control Structures along Mahaplag River 08/21/2019 Leyte 5th DEO 18.228 120 O 0.37 0.30 0.13 0.03 0.04 0.03 90.10% - On-going JDRC Construction & Supplies 33869 Upgrading and Repair of Administration Building 01/08/2019 DOST 16.909 340 C 0.45 0.15 0.30 - - - 89.10 0.9016 Very Satisfactory Road Widening: Sarangani - Sultan Kudarat Coastal Road, Jdrc Construction & Supplies 33869 11/21/2019 Sarangani DEO 93.122 270 O 0.39 0.30 0.15 0.03 0.05 0.05 97.30% - On-going K1676+(-739) - K1679+000 Local Program - Building and Other Structures - Multipurpose/Facilities - Local Infrastructure Program - Nueva Vizcaya 1st Jdts Const. Corporation 39430 11/11/2019 28.453 300 O 0.36 0.24 0.15 0.02 0.04 0.03 84.50% - On-going Consturction of Multi-Purpose Building, Phase 1, Purok 6, Brgy. DEO Busilac Je Manalo & Co., Inc. 422 Claveria Port Development Project 08/02/2018 PPA 187.006 450 O 0.40 0.30 0.09 0.03 0.07 0.05 93.87 - On - Going

Je Manalo & Co., Inc. 422 Claveria Port Development Project 11/29/2018 PPA 187.006 450 O 0.39 0.30 0.08 0.03 0.07 0.05 91.50 - On - Going Construction of 1 Storey, 2 Classroom Building, Dugmanon Davao Oriental Jecel Construction Supply 21956 03/17/2018 2.646 85 C 0.46 0.13 0.30 - - - 89.30 *89.30% Very Satisfactory Elementary School 2nd DEO Davao Oriental Jecel Construction Supply 21956 Construction of Covered Court, Brgy. Don Enrique 11/18/2019 3.409 120 C 0.44 0.13 0.30 - - - 92.00% 92% Very Satisfactory 2nd DEO Concreting of Purok 4 Sitio , Brgy. Pangolingan FMR, Zambales 1st Jeck Construction 24189 03/13/2018 3.864 90 C 0.43 0.13 0.30 - - - 86.40 *86.40% Satisfactory Palauig, Zambales DEO Jeff Enterprises 25599 Balayan Port Development Project 03/22/19 DOTC 8.371 120 C 0.46 0.20 0.30 - - - 95.90 *95.90% Very Satisfactory Jeff Enterprises 25599 Extension/Construction of Wharf 05/29/2018 DOTC 8.775 120 C 0.48 0.20 0.30 - - - 97.50 *97.50% Outstanding

Jeff Enterprises 25599 Mati Airport Development Project 11/14/2018 DOTr 4.868 120 C 0.49 0.20 0.15 - - - 84.00 *84.00% Satisfactory Construction/Maintenance of Flood Mitigation Structures and Jejan Construction And Supply 34712 Drainage System - Construction of Flood Control System 11/12/2019 Albay 2nd DEO 18.965 145 C 0.45 0.13 0.30 - - - 88.00% 87.4% Satisfactory (Sagumayon River)

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 85 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction/Maintenance of Flood Mitigation Structures and Jejan Construction And Supply 34712 Drainage Systems - Construction of Flood Control System 08/29/2019 Albay 2nd DEO 18.965 145 O 0.35 0.24 0.15 0.03 0.05 0.05 87.00% - On-going (Sagumayon River)

Jejors Construction Corporation 5143 Construction of Passenger Terminal Building 02/09/2018 PPA 276.70 823 O 0.387 0.300 0.097 0.030 0.056 0.050 92.00 - On-going

Retrofitting/ Strengthening of Permanent Bridges at Marcos Cagayan de Oro Jejors Construction Corporation 5143 Bridge (BO1396 MN) along Butuan City-Cagayan de Oro City- 03/19/2018 48.970 280 C 0.50 0.13 0.30 - - - 93.40 *93.40% Very Satisfactory City 2nd DEO Iligan Road Retrofitting/ Strengthening of Permanent Bridges Magting Jejor'S Construction Corporation 5143 08/24/2019 Camiguin DEO 4.509 70 C 0.49 0.13 0.24 - - - 86.80% 86.8% Satisfactory Bridge (B00007CG) Along CCR Asset Preservation-Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide-Tertiary Roads, Jejor'S Construction Corporation 5143 11/14/2019 Marinduque DEO 89.653 300 O 0.40 0.24 0.15 0.03 0.04 0.05 91.20% - On-going Dr. Damian Reyes Road (Boac Side)-K0013+688-K0013+788 and K0013+916-K0013+976 Widening of Permanent Bridges, Cabulig Bridge II (B01340MN) Misamis Oriental Jejor'S Construction Corporation 5143 11/04/2019 29.400 188 O 0.39 0.30 0.15 0.03 0.05 0.05 96.70% - On-going along Butuan City - Cagayan de Oro City - Iligan City Road 2nd DEO Const./Improvement of Access Roads leading to Declared Jejor'S Construction Corporation 5143 11/09/2019 Camiguin DEO 27.899 188 O 0.38 0.24 0.15 0.03 0.06 0.05 90.90% - On-going Tourism Destination

Cluster "57" Construction/ Improvement of Access Roads Leading to Trades, Industries and Economic Zones and Paving of Unpaved Roads in Bukidnon: 1) Jct. (Manolo Fortich) Sankanan- Kalugmayan- Dahilayan Road connecting Mindanao Jejor'S Construction Corporation / Pyramid International Container Terminal (Hineleben Coffee Processing Regional Office Consolidated Builders & General JV-17-2456 08/28/2019 288.927 431 O 0.38 0.24 0.15 0.03 0.06 0.05 90.50% - On-going Plant) and Pegasus-CP Floriculture Company (Cutflower No. X Merchandise (Joint Venture) Exporter) in Support of Transport and Logistics, Manolo Fortich, Bukidnon; 2) Jct SH-Manolo Fortich-Libona-Indahag Road- K1473+715-K1476+820, K1487+897-K1488+843, K1491+263- K1491+638

Construction of 1 unit, 1 Storey, 2 Classroom School Building Jelm Construction 33230 with two (2) units - Toilet Attached at Bienvenido Guillera 04/06/2018 Leyte 2nd DEO 2.820 60 C 0.49 0.09 0.30 - - - 88.50 88.50% Satisfactory Celebre NHS Rehabilitation/ Major Repair of Flood Control Structure - Jelm Construction 33230 Rehabilitation of Flood Control Wall, Limbuhan River, Tolosa 08/28/2019 Leyte 1st DEO 34.399 149 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory Section Rehabilitation/Major Repair of Flood Control Structures- Jelm Construction 33230 Rehabilitation of Flood Control Wall along Bahay Creek, Brgy. 11/13/2019 Leyte 1st DEO 70.332 284 C 0.46 0.18 0.30 - - - 94.10% 94.1% Very Satisfactory Guindapunan Construction of Flood Mitigation Structure - Construction of Tacloban City Jelm Construction 33230 11/13/2019 9.309 90 C 0.47 0.13 0.30 - - - 90.20% 89.01% Very Satisfactory Revetment along Sagkahan Waterway DEO Construction of Flood Mitigation Structure-Construction of Tacloban City Jelm Construction 33230 08/30/2019 9.309 90 O 0.36 0.30 0.14 0.02 0.04 0.03 90.30% - On-going Revetment DEO Jemak Construction & Supply 32056 Construction of Lateral A 04/06/2018 NIA 17.892 300 O 0.33 0.30 0.02 0.02 0.05 0.05 77.08 - On - Going

MFO-1: National Road Network Services 1. Asset Preservation of National Roads D. Construction/ Upgrading/ Rehabilitation of Jemak Construction & Supply 32056 Drainage along National Roads 1. Secondary Roads B. MSR 03/14/2018 Quezon 4th DEO 53.538 285 C 0.50 0.13 0.30 - - - 93.10 *93.10% Very Satisfactory Jct. Lopez-Hondagua Port Road, K0221+000 - K0221+500, K0221+(-678) - K0221+(-078), Lopez, Quezon Retrofitting/Strengthening of Permanent Bridges, Dumoloc Br. Regional Office Jemak Construction & Supply 32056 11/14/2019 22.195 120 C 0.50 0.13 0.30 - - - 93.30% 91.74% Very Satisfactory (B00682LZ) No. I Retrofitting/Strengthening of Permanent Bridges, Olo Br. Regional Office Jemak Construction & Supply 32056 11/14/2019 23.160 90 C 0.50 0.13 0.30 - - - 93.30% 92.76% Very Satisfactory (B00675LZ) No. I Retrofitting/Strenghening of Permanent Bridges, Olo Bridge Regional Office Jemak Construction & Supply 32056 08/24/2019 22.457 90 O 0.40 0.24 0.15 0.03 0.05 0.05 92.40% - On-going (B00675LZ) along Tarlac - Pangasinan No. I

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 86 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Retrofitting/Strenghtening of Permanent Bridges - Dumoloc Regional Office Jemak Construction & Supply 32056 08/24/2019 21.543 120 O 0.40 0.24 0.15 0.03 0.05 0.03 90.70% - On-going Bridge (B00682LZ) along Pangasinan - Tarlac Road No. I Preventive Maintenance - Tertiary Roads - Balanga - Cadre Jepa Construction & Supplies 30375 08/23/2019 Bataan 2nd DEO 7.187 68 O 0.40 0.24 0.15 0.03 0.04 0.05 91.00% - On-going Road - K0125+530 - K0126+526 Preventive Maintenance -Tertiary Road- Balanga - Cadre Road - Jepa Construction And Supplies 30375 11/12/2019 Bataan 2nd DEO 7.187 68 C 0.45 0.13 0.30 - - - 88.00% 89.8% Very Satisfactory K0125+530 - K0126+526 Construction / Maintenance of Flood Mitigation Structures and Jepa Construction And Supplies 30375 11/12/2019 Bataan 2nd DEO 14.700 140 C 0.44 0.13 0.30 - - - 87.40% 87.4% Satisfactory Drainage Systems, Construction of Dike, Tuyo River NIA / Pangasinan Irrigation Jeros Construction And Supply 34039 Construction of Bolo Dam Small Irrigation Project 11/07/2020 14.132 300 C 0.44 0.10 0.30 - - - - 83.80% Satisfactory Management Office Jeros Construction and Supply 34039 Bolo Small Irrigation Project - SIP CY 2019 07/11/2020 NIA 14.135 300 C 0.44 0.10 0.30 - - - 8380.00% *83.77% Satisfactory Nueva Ecija 2nd Jerry R. Santiago Construction 18453 Concreting of Brgy. Cruz FMR, Brgy. Cruz 11/22/2019 4.925 60 C 0.47 0.13 0.30 - - - 90.20% 90.2% Very Satisfactory DEO Construction of Flood Mitigation Structure - Construction/Maintenance of Flood Mitigation Structures and Nueva Ecija 2nd Jerry R. Santiago Construction 18453 08/24/2019 18.262 90 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Drainage Systems, Digmala River Flood Control Calaanan DEO Section Construction of Protection Works along Agno River, Telbang Pangasinan 4th Jeusmack Builders & Construction Supply 42334 06/07/2018 4.668 101 C 0.36 0.20 0.30 - - - 85.90 85.90% Satisfactory Section DEO Construction (Completion) 0f Waig-Tobor Bridge and Pangasinan 4th Jeusmack Builders & Construction Supply 42334 11/07/2019 19.110 158 O 0.37 0.24 0.15 0.03 0.04 0.05 87.90% - On-going Apporaches DEO JFA Electrical Construction and General Design and Build Scheme Infrastructure Project: Construction of 28428 05/31/2019 DOST 9.929 300 O 0.40 0.30 0.12 0.02 0.07 0.05 94.50 - On-going Services, Inc. Electrical Disctribution System with Genset and 2 Transformers Construction of Flood Control Mitigation Structure - Jfalmazan Construction And Supply 36384 Construction/Rehabilitation of Flood Control Mitigation 09/06/2019 Baguio City DEO 22.475 220 O 0.35 0.24 0.15 0.03 0.06 0.05 88.00% - On-going Facilities/Drainage System along Crystal Cave to Asin Jfap Construction 21706 Construction of Passenger Terminal Building 11/30/2018 PPA 14.466 280 O 0.40 0.30 0.06 0.03 0.05 0.03 87.27 - On - Going JFAP Construction 21706 Construction of Passenger Terminal Building 7/26/19 PPA 14.466 326 C 0.48 0.20 0.30 - - - 97.71 0.903 Very Satisfactory 002: Construction of Flood Control Structures along Panlayahan Jfr Construction 35890 08/25/2019 Samar 1st DEO 19.514 152 C 0.46 0.20 0.30 - - - 95.70% 95.7% Very Satisfactory Creek 002: Construction of Flood Control Structures along Jibatang Jfr Construction 35890 08/24/2019 Samar 1st DEO 27.195 151 O 0.35 0.30 0.15 0.02 0.03 0.03 88.20% - On-going River Jfr Construction 35890 Local Program: Construction of Road, Barangay Pagbalican 11/08/2019 Samar 1st DEO 27.048 176 O 0.38 0.23 0.15 0.03 0.06 0.05 89.40% - On-going NIA/Pangasinan Don Vergara Communal Irrigation System / Construction of Irrigation J-Franz Construction & Supply 32464 CheckStructure, Canal Structure and Canal Lining of Existing 12/05/2020 4.691 300 C 0.46 0.13 0.30 - - - - 89.40% Very Satisfactory Management Communal Irrigation System Office Construction of Adris Lateral E (Sta. 2+ 287 - Sta. 2+781 ) & J-Franz Construction & Supply 32464 10/27/2018 NIA 2.689 150 O 0.36 0.30 0.15 0.03 0.05 0.05 93.72 - On - Going Appurtenant Structure Preventive Maintenance of Road: Asphalt Overlay Tacloban Tacloban City Jgo Builders 42627 Baybay South Rd-K0915+-164-K0915+647, K0916+036- 08/30/2019 21.008 60 C 0.47 0.13 0.30 - - - 90.10% 90.1% Very Satisfactory DEO K0916+568 Preventive Maintenance of Road: Asphalt Overlay Tacloban- Tacloban City Jgo Builders 42627 Baybay South Road, K0915+-(164) - K0915+647, K0916+036 - 11/13/2019 21.009 60 C 0.47 0.13 0.30 - - - 90.30% 88.2% Satisfactory DEO K0916+568 Construction of Flood Mitigation Structure - Construction of Tacloban City Jgo Builders 42627 11/03/2019 27.917 150 C 0.48 0.13 0.30 - - - 91.70% 91.7% Very Satisfactory Revetment along Tigbao River DEO Road Widening of Iloilo East Coast-Capiz Road, KO214+077 - Jhall Marketing & Services 15760 11/10/2019 Iloilo 3rd DEO 24.196 236 O 0.38 0.24 0.15 0.03 0.04 0.05 89.10% - On-going KO214+900, Ajuy, Iloilo Pangasinan 3rd Jhi Construction And Supply 19317 Construction of Flood Control Structures along Sabangan River 11/05/2019 37.946 170 O 0.37 0.24 0.15 0.03 0.04 0.03 86.30% - On-going DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 87 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Concrete Road Brgy. Potrido to Brgy. Alimodias Road Leading to various Tourism Sites Including Bugsukan and Jhj Construction 3781 11/15/2019 Iloilo 1st DEO 18.600 153 O 0.39 0.30 0.05 0.03 0.04 0.00 81.10% - On-going Banogon Falls and the 500Hectares Rice Terraces At Miagao, Iloilo Jian Armel Richard Christerson (Jarc) Const. Concreting of Barangay Road, Langub to Mangulao, Asturias, 33057 11/09/2019 Cebu 3rd DEO 9.899 67 C 0.47 0.15 0.30 - - - 91.80% 86.52% Satisfactory And Marine Services Corporation Cebu Jian Armel Richard Christerson (Jarc) 33057 Concreting of Barangay Road, Langub to Manguiao, 08/23/2019 Cebu 3rd DEO 9.400 62 O 0.40 0.23 0.10 0.02 0.05 0.03 83.00% - On-going Construction & Marine Services Corporation Construction of Flood Control Structure Along the Left Bank of Zamboanga del Jimwen Construction & General Merchandise 33066 Disacan River (Upstream), Manukan, Zamboanga del Norte 05/30/2018 7.559 132 C 0.49 0.13 0.30 - - - 92.30 92.30% Very Satisfactory Norte 1st DEO (Phase I). Construction/Maintenance of Flood Control Mitigation Structures Zamboanga del Jimwen Construction & General Merchandise 33066 and Drainage System, Construction of Flood Control Structure 03/14/2018 19.600 277 C 0.49 0.13 0.30 - - - 91.80 88.38% Satisfactory Norte 1st DEO along Piao River Cagayan de Oro Jimwen Construction & General Merchandise 33066 Concreting of Brgy. Baikingon to Brgy. San Simon FMR 03/21/2018 10.950 160 C 0.48 0.13 0.30 - - - 91.60 *91.60% Very Satisfactory City 1st DEO Rehabilitation / Reconstruction of National Roads with Slips Zamboanga del Jimwen Construction & General Merchandise 33066 Slope Collapse and Landslide along Jct. Dumalinao - 08/27/2019 2.337 42 C 0.39 0.20 0.30 - - - 89.20% 89.2% Very Satisfactory Sur 2nd DEO Margosatubig Road (Camanga), K1678+393 to K1678+502 Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Drainage Line at Apovel, Cagayan de Oro Jimwen Construction & General Merchandise 33066 11/11/2019 41.799 245 O 0.40 0.30 0.13 0.03 0.06 0.02 93.30% - On-going Bulua Section from Apovel to Bulua Bridge along Carmen - City 1st DEO Patag Road Road Widening and Reconstruction to Concrete Pavement - Jimwen Construction & General Merchandise 33066 along Jct SH - Casisang - Airport Rd - (S00629MN) 11/07/2019 Bukidnon 1st DEO 31.028 240 O 0.40 0.23 0.15 0.03 0.05 0.05 90.10% - On-going Ch. 0 - Ch. 446 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction / Upgrading / Jj & J Construction & General Supply 30231 Rehabilitation of Drainage along National Roads - Secondary 11/14/2019 Cebu 6th DEO 2.940 90 C 0.36 0.20 0.30 - - - 86.10% 81.48% Unsatisfactory Roads - Construction of Drainage Structure along Road - along Mactan Airport (S00026LP) Chainage 000 to Chainage 100 Preventive Maintenance - Secondary Roads - Mactan Jj & J Construction And General Supply 30231 Circumferential Road - K0030+365-K0030+587, K0034+731- 04/04/2018 Cebu 6th DEO 6.048 38 C 0.47 0.13 0.30 - - - 90.40 *90.40% Very Satisfactory K0034+859 Ensure Safe and Reliable National Road System- Asset Preservation Program- Construction/Upgrading/Rehabilitation of Jj &J Construction & General Supply 30231 Drainage along National Road- Secondary Roads- Construction 08/28/2019 Cebu 6th DEO 2.940 90 O 0.34 0.29 0.07 0.02 0.05 0.02 78.40% - On-going of Drainage Structure along Road- Mactan Airport Rd (S00026LF) Chainage 000 to Chainage 100

Local Program - Local Roads and Bridges - Local Infrastructure Mt. Province 2nd Jja Construction And Supply 22676 11/26/2019 9.900 90 C 0.49 0.13 0.30 - - - 92.30% 92.3% Very Satisfactory Program - Construction of Cassag - Camparadi Road DEO ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System - Network Development Program - Off- Carriageway - Improvement Secondary Roads - Abbut - Conner Jja Construction And Supply 22676 09/09/2019 Apayao 1st DEO 59.854 228 O 0.37 0.24 0.15 0.03 0.06 0.05 89.60% - On-going Road, K0542+370 to K0545+378, K0551+215 to K0552+015, K0551+745 to K0551+785, K0551+870 to K0551+898 CW1, CW2 Continuation of Liplipoken, Malagnat Flood Control along Lower Kalinga Jja Construction And Supply 22676 11/20/2019 23.849 155 O 0.38 0.24 0.15 0.03 0.06 0.05 90.70% - On-going Saltan River DEO Construction of Multi-Purpose Building (Open Court) Sports Davao Occidental Jjhak Construction 36947 11/25/2019 2.947 90 C 0.49 0.14 0.30 - - - 92.90% 92.9% Very Satisfactory Facilities DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 88 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) 17LB0153 - Construction of Local Road, Package 53: Construction of Local Road, a) Brgy. Bago Gallera, b) Brgy. Davao City 1st Jlace Builders Corporation 24503 03/23/2018 12.834 150 C 0.50 0.13 0.30 - - - 93.10 *93.10% Very Satisfactory Gallera, Davao City, c) Brgy. Dumoy, and d) Brgy. Baliok, DEO Davao City Road Widening including Drainage at Bayabas-Eden Road, Davao City 2nd Jlace Builders Corporation 24503 Toril District City, K1526+(-)320 - K1526+035, Toril District, 03/12/2018 14.700 210 C 0.48 0.13 0.30 - - - 90.90 *90.90% Very Satisfactory DEO Davao City Construction of Flood Mitigation Structure - Construction of Cagayan 2nd Jll Pulsar Construction 24422 08/21/2019 24.500 249 O 0.40 0.21 0.15 0.03 0.06 0.05 90.30% - On-going Zinundungan River Control DEO Construction of Drainage Structure along Road- Kaykulot Road Jlorenz Construction And Trading 41290 connecting Tagaytay-Calamba Road to Sta. Rosa- Ulat- 12/26/2019 Cavite 2nd DEO 17.999 220 O 0.37 0.30 0.10 0.02 0.04 0.03 87.00% - On-going Tagaytay Road Construction of Road Leading to Pimentel Dam, Barangay Ilocos Norte 2nd Jlp Construction & Supply 26983 05/30/2018 0.969 31 C 0.37 0.20 0.30 - - - 87.10 87.10% Satisfactory Pimentel DEO Construction/Improvement of Access Road Leading to Tourism Ilocos Norte 2nd Jlp Construction & Supply 26983 Destinations, Road from Leading to Suba 4x4 and 08/24/2019 14.244 110 O 0.31 0.28 0.15 0.03 0.05 0.05 87.00% - On-going DEO Sand Boarding Adventure and Diving Sites, Brgy. Suba Ilocos Norte 1st Jlp Construction & Supply 26983 Construction of 4 STY 20 CL S/B Sarrat National H/S 08/22/2019 47.789 330 O 0.40 0.24 0.15 0.03 0.05 0.03 90.00% - On-going DEO Construction/Improvement of Access Road leading to Tourism Ilocos Norte 2nd Jlp Construction & Supply 26983 Destinations, Road from Paoay Lake Leading to Suba 4x4 and 11/08/2019 14.695 150 C 0.48 0.13 0.30 - - - 91.30% 88.72% Satisfactory DEO Sand Boarding Adventure and Diving Sites Jlp Construction & Supply / North Tech Builders And Construction Supply (Joint JV-17-2164 Construction of Flood Control along Bungo River 08/22/2019 Aurora DEO 24.500 389 C 0.48 0.20 0.19 - - - 87.40% 84.46% Satisfactory Venture) Construction of 3 Storey 6 Classroom School Building at Zamboanga City Jm2K Construction 34430 06/07/2018 13.586 315 O 0.395 0.239 0.150 0.030 0.070 0.050 93.40 - On-going Recodo National High School DEO Construction of Two (2) Storey, Six (6) Classrooms, School Camarines Sur J-Marbela Construction & Supply 24268 Building (Under DepEd BEFF CY-2018), Ratay Elementary 08/24/2019 22.997 215 O 0.36 0.23 0.00 0.03 0.04 0.00 66.00% - On-going 3rd DEO School Construction of Two (2) Storey Six (6) Classroom School Camarines Sur J-Marbela Construction And Supply 24268 Building (Under Deped CY-2018BEFF) Ratay Elementary 11/07/2019 22.947 215 C 0.49 0.13 0.00 - - - 62.60% 65.89% Poor 3rd DEO School NIA / La Union Irrigation Jmbm Construction 32955 Canalization and Repair of Amburayan River Irrigation System 11/13/2020 3.607 300 O 0.28 0.30 0.15 0.03 0.04 0.05 85.26% - On-going Management Office JMBM Construction 32955 Repair of AMBURAYAN RIS 11/13/2020 NIA 3.607 300 O 0.28 0.30 0.15 0.03 0.04 0.05 8526.00% - On-going ANAK 2 Communal Irrigation System - Construction of Canal JMD-68 Builders 36943 11/30/19 NIA 5.551 180 O 0.35 0.24 0.15 0.02 0.01 0.05 82.90 - On-going Lining and Canal Structures Ganano 1 Communal Irrigation System - Restoration / JMD-68 Builders 36943 11/30/19 NIA 1.781 180 C 0.34 0.20 0.30 - - - 84.40 *84.40% Satisfactory Rehabilitation of Canal Lining and Canal Structures Construction (Completion) of Multi-Purpose Building, Barangay Jmd-68 Builders 36943 08/20/2019 Quirino DEO 0.485 45 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Guinalbin Jmd-68 Builders 36943 Construction of Multi-Purpose Building (Senior Citizen Hall) 11/05/2019 Quirino DEO 2.880 120 O 0.38 0.22 0.15 0.02 0.04 0.05 86.70% - On-going Construction/Maintenance of Flood Mitigation Structure and Drainage Systems-Drainage Improvement along Local Road F. South Manila Jmk Builders Construction 36417 03/13/2018 12.471 269 C 0.42 0.13 0.30 - - - 85.40 *85.40% Satisfactory Reyes St. Pres. Quirino Ave. Leading to Estero De Maytubig, DEO 5th District Construction/ Improvement of Brgy. Bagbaguin Road Pandi, Jmk Builders Construction 36417 03/19/2018 Bulacan 1st DEO 4.681 30 C 0.44 0.13 0.30 - - - 87.60 *87.60% Satisfactory Bulacan Camarines Sur 1st Jmld Construction 22679 Concreting of Barangay Road 11/09/2019 2.829 60 C 0.47 0.13 0.30 - - - 90.00% 81.66% Unsatisfactory DEO Buildings and other Structures-MultiPurpose/Facilities - Construction of Multi-Purpose Building (Covered Court), A.) Camarines Sur Jmld Construction 22679 11/08/2019 4.321 120 C 0.36 0.13 0.30 - - - 79.20% 79.2% Unsatisfactory Brgy.Del Pilar, San Fernando, Camarines Sur and B.) Brgy. 2nd DEO Alianza, San Fernando, Camarines Sur

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 89 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Camarines Sur 1st Jmld Construction 22679 Concreting of Barangay Road 08/21/2019 2.280 60 O 0.32 0.21 0.12 0.03 0.03 0.05 76.10% - On-going DEO Rehabilitation/Reconstruction/Upgrading of Damaged Paved Surigao del Norte Jmt Construction 14186 Roads Tertiary Road Surigao- Davao Coastal Road, Placer By- 06/04/2018 18.792 100 O 0.369 0.289 0.150 0.030 0.035 0.033 90.60 - On-going 1st DEO Pass Road (S00341MN) Chainage 000- Chainage 758 Dinagat Islands Jmt Construction 14186 Construction of DPWH Building, Dinagat Island DEO 03/14/2018 17.107 359 OG 0.399 0.273 0.15 0.03 0.038 0.05 94.00 - On - Going DEO Dinagat Islands Jmt Construction 14186 Construction of DPWH Building, Dinagat Island DEO 06/04/2018 17.107 359 C 0.50 0.13 0.30 - - - 93.20 94.46% Very Satisfatory DEO Construction/Improvement of Access Road Leading to Airports, Seaports and Declared Tourism Destinations to Seaports, NRJ Surigao del Norte Jmt Construction 14186 03/13/2018 47.530 208 C 0.48 0.17 0.30 - - - 94.90 96.11% Outstanding City Motorpool-Sitio Tumanday - Sabang Access Road to Lipata 1st DEO Ferry Terminal Construction of Flood Mitigation Structures, Campo River Surigao del Norte Jmt Construction 14186 11/06/2019 19.582 106 C 0.48 0.13 0.30 - - - 91.70% 89.78% Very Satisfactory Control 2nd DEO Widening of Permanent Bridges, Tugbongon Bridge Surigao del Norte Jmt Construction 14186 (B00867MN) along Daang Maharlika (Surigao-Agusan Section) 10/10/2019 33.319 320 C 0.50 0.16 0.30 - - - 95.80% 95.8% Very Satisfactory 2nd DEO K1163+501.80 -K1163+522.65 Construction of Flood Mitigation Structures, Campo River Surigao del Norte Jmt Construction 14186 08/19/2019 18.620 101 O 0.38 0.23 0.15 0.03 0.04 0.05 88.50% - On-going Control, Sta. 0+532.00 - Sta. 0+638.18 2nd DEO Surigao del Sur Jmt Construction 14186 Construction of Revetment along Tago River Basin Package -1 08/22/2019 37.989 207 O 0.39 0.24 0.15 0.03 0.04 0.05 89.60% - On-going 1st DEO Surigao del Norte Jmt Construction 14186 Construction of Kinabutan Flood Control 11/04/2019 37.744 182 O 0.38 0.24 0.15 0.03 0.05 0.05 89.30% - On-going 2nd DEO Jmt Construction / Ffjj Construction (Joint Dinagat Islands JV-17-2895 Completion of Specialty Hospital 08/20/2019 74.250 470 O 0.40 0.24 0.06 0.03 0.04 0.03 80.10% - On-going Venture) DEO Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including Drainage Based on PMS/HDM-4 Jmt Construction/ Ctb Engineering Surigao del Norte JV-17-1257 Surigao- Davao Coastal Road (K1154+107-K1155+262; 11/10/2019 80.215 307 C 0.47 0.20 0.30 - - - 96.70% 96.7% Outstanding Construction (Joint Venture) 2nd DEO K1157+534-K1157+957; K1158+428-K1159+000; K1161+000- K1161+893 & K1181+883-K1182+000 Off-Carriageway Improvement Secondary Roads Surigao- Jmt Construction/Ctb Engineering Surigao del Norte Davao Coastal Road: K1166+000- K1166+255; K1166+332- 06/04/2018 43.352 123 O 0.378 0.268 0.150 0.030 0.030 0.033 88.90 - On-going Construction 1st DEO K1167+205; K1167+227-K1167+820 Local Infrastructure Program: local Roads and Bridges - Repair / Mt. Province 1st Jmty Construction 43987 11/26/2019 1.935 80 C 0.50 0.13 0.30 - - - 93.30% 89.22% Very Satisfactory Rehabilitation of Footbridge DEO Local Infrastructure Program - Local Roads and Bridges, Mt. Province 1st Jmty Construction 43987 Repair/Rehabilitation of Footbridge, Brgy. Tocucan, Bontoc, 09/09/2019 1.935 80 O 0.39 0.24 0.14 0.03 0.05 0.02 86.50% - On-going DEO Mountain Province Local Infrastructure Program-Buildings and Other Structure- Mt. Province 1st Jmty Construction 43987 09/10/2019 3.920 109 O 0.40 0.24 0.13 0.03 0.07 0.03 89.80% - On-going Multipurpose/Facilities, Construction of Multipurpose Building DEO Ensure Safe and Reliable National Road System, Bridge Program, Retrofitting/Strengthening of Permanent Bridges, Jo Builders 34470 08/21/2019 Cebu 4th DEO 4.274 72 C 0.44 0.13 0.30 - - - 87.10% 87.1% Satisfactory Bridge (B00443CB) along Santander-Barili- Toledo Road Construction/Rehabilitation/Improvement of Level III Water Zamboanga del Joan Construction 13840 11/09/2019 16.800 120 C 0.50 0.13 0.30 - - - 93.00% 93% Very Satisfactory Supply System Sur 1st DEO Concreting of Barangay Road in Sulib, Brgy. Sulib, , Jobel Enterprises 19799 03/15/2018 Laguna 1st DEO 3.856 75 C 0.48 0.13 0.30 - - - 90.90 *90.90% Very Satisfactory Laguna Provincial Government of Joema Trading And Construction 2865 Concreting of Poblacion to Wharf 10/05/2018 3.000 68 C 0.49 0.20 0.30 - - - 98.90 *98.90% Outstanding Zamboanga Sibugay Construction of 1 Storey 2 Classroom with CR, Taggao Cagayan 2nd John 6:51 Builders 37996 05/30/2018 2.656 145 O 0.392 0.239 0.100 0.015 0.023 0.033 80.20 - On-going Elementary School DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 90 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Repair/Maintenance of National Road along Penablanca Callao John 6:51 Builders 37996 08/23/2019 Cagayan 3rd DEO 11.438 150 C 0.38 0.20 0.30 - - - 88.40% 88.4% Satisfactory Cave Road, K0484+027 - K0484+177, Quibal Section John Arne Construction 24621 Construction of Concrete Road- Concreting of Road 08/27/2019 Siquijor DEO 1.882 37 C 0.48 0.13 0.30 - - - 91.50% 91.5% Very Satisfactory

John Ray Developer and Supplies 20795 Construction of Mitima Intake Structure 08/10/2019 DA 8.211 130 O 0.34 0.28 0.00 0.03 0.06 0.05 76.50 - On-going

John Ray Developer And Supplies 20795 Malitubog Maridagao Irrigation Project Stage II 05/12/2018 NIA 11.784 250 O 0.40 0.30 0.00 0.03 0.06 0.05 84.07 - On - Going

Local Program, Local Roads and Bridges - Local Roads - Local Jolac'S Construction 19901 Infrastructure Program, Construction of Concrete Road - 08/23/2019 Masbate 3rd DEO 18.613 102 O 0.39 0.24 0.15 0.03 0.07 0.05 93.30% - On-going Concreting of Poblacion, Maihao Road Construction of Barangay Road, Brgy. Liangan East to Brgy. Lanao del Norte Jomara Konstruckt Corporation 39805 11/06/2019 24.749 131 C 0.48 0.20 0.30 - - - 97.70% 90.56% Very Satisfactory Babalaya 2nd DEO Construction of Barangay Road, Brgy. Liangan East to Brgy. Lanao del Norte Jomara Konstruckt Corporation 39805 08/25/2019 23.485 131 O 0.27 0.30 0.15 0.03 0.06 0.05 85.80% - On-going Babalaya 2nd DEO Basic Educational Facilities Fund Bagiuo City, National High Jomarcann General Construction 30599 School, Completion of School Building under the Department of 06/07/2018 Baguio City DEO 1.863 30 C 0.48 0.14 0.30 - - - 92.30 92.30% Very Satisfactory Eduction's Basic Education Facilities Fund BEFF - Batch 3 Network Development-Construction of By-Passes/ Diversion Roads, including ROW, (Construction of Concrete Road) Jomarcann General Construction 30599 04/12/2018 Baguio City DEO 48.902 287 C 0.47 0.13 0.30 - - - 90.10 *90.10% Very Satisfactory Marcos Highway to Quirino Highway (Baguio- Bauang Road) By- Pass Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Jomarcann General Construction 30599 11/21/2019 Benguet 2nd DEO 70.317 210 O 0.40 0.25 0.15 0.03 0.03 0.05 91.20% - On-going Slope Collapse and Lanslide - Secondary Roads Baguio - Bontod Road, K0269+240 to K0269+270, K0282+850 to K0282+920, K0305+950 to K0306+050 Construction of Concrete Road - Road at Fort Del Pilar, Camp Jomarcann General Construction 30599 11/22/2019 Baguio City DEO 39.200 317 O 0.36 0.30 0.09 0.03 0.04 0.03 85.30% - On-going Allen and Navy Base Construction of Concrete Road and Construction of Road Slope Jomarcann General Construction / Great JV-18-1047 Protection Structure - Marcos Highway to Western Link 11/19/2019 Baguio City DEO 41.894 285 O 0.39 0.24 0.15 0.03 0.03 0.05 88.70% - On-going Zone Enterprise (Joint Venture) Circumferential Road Bypass Jomarcann General Construction / Kalahan Construction of Infrastructure Including L:ocal Road Projects General Construction And Supplies Joint JV-16-2015 04/03/2018 Benguet 2nd DEO 23.520 222 C 0.48 0.13 0.30 - - - 91.40 *91.40% Very Satisfactory Construction of Kapangan SWIP, Kelong, Creek Venture Jomarcann General Construction / Kalahan Construction / Maintenance of Flood Control Mitigation General Construction And Supplies Joint JV-16-917 Strcutures and Drainage System: Construction of Amburayan 04/03/2018 Benguet 2nd DEO 28.027 222 C 0.48 0.13 0.30 - - - 91.10 *91.10% Very Satisfactory Venture flood Control Concreting of Sitio Coot I-Sitio Ahag-Sitio Mang-mang, Brgy. Southern Leyte Jonathan B. Bautista Enterprises 33868 04/10/2018 4.975 230 OG 0.375 0.24 0.108 0.022 0.042 0.033 82.00 - On - Going Salvador Farm to Market Road DEO

Concreting of Sitio Coot I - Sitio Ahag - Sitio Mang-mang, Brgy. Southern Leyte Jonathan B. Bautista Enterprises 33868 05/28/2018 4.975 230 C 0.47 0.13 0.30 - - - 90.70 90.70% Very Satisfactory Salvador FMR DEO Construction/ Improvement of Access Roads Leading to Trades Industries and Economic Zones/ Icjon - Sindangan - Southern Leyte Jonathan B. Bautista Enterprises 33868 Guinabonan - Maningning Road Connecting to SC Global 08/20/2019 19.532 240 O 0.39 0.23 0.15 0.03 0.04 0.05 88.70% - On-going DEO Manufacturers, Sogod Bay Coco Active Carbon and Kennemer Foods International, Macrohon and Malitbog Local Infrastructure Program- Local Roads and Bridges- Local Southern leyte Jonathan B. Bautista Enterprises 33868 Roads, Construction of Ichon-Sindangan Road (Bypass), 11/04/2019 9.900 210 O 0.39 0.24 0.15 0.03 0.06 0.05 91.60% - On-going DEO Barangays Ichon-Sindangan J-One Builders 32509 Concreting of Sitio New Leon Road, Brgy. Dado 11/26/2019 Cotabato 1st DEO 2.825 31 C 0.49 0.20 0.16 - - - 84.70% 84.7% Satisfactory

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 91 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Standard 2-Storey 6-Classroom School building Pangasinan 1st Jonik Trading & Construction 20612 08/27/2019 11.796 140 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory at Zaragoza National High School (9.5m x 32m) DEO Preventive Maintenance, Secondary Road, Pangasina- Zambales Rd.- K0284+000-K0285+000, K02+0399+000 - Regional Office Jonik Trading & Construction 20612 K0300+000, K0321+000 - K0323+000, K0325+088 - 11/14/2019 61.754 120 C 0.50 0.13 0.30 - - - 93.30% 92.1% Very Satisfactory No. I K0325+300, K0326+400 -K0327+034, K0327+228 - K0328+000, K0329+000 - K0329+240.90 Preventive Maintenance, Secondary Road, Pangasinan - Zambales Road, K0284+400 - K0285+000, K0299+000 - Regional Office Jonik Trading & Construction 20612 K0300+000, K0321+000 - K0323+000, K0325+088 - 08/18/2019 59.292 120 O 0.40 0.24 0.15 0.03 0.05 0.05 91.30% - On-going No. I K0325+300, K0326+400 - K0327+034, K0327+228 - K0328+000, K0329+000 - K0329+240.9 Preventive Maintenance - Tertiary Roads along Junction Santiago - Banayoyo - Lididda - San Emilio - Quirino Road, K0337+000 to K0379+010, K0352+(-126) to K0352+374, Ilocos Sur 2nd Jonik Trading & Construction 20612 11/12/2019 37.122 143 O 0.37 0.30 0.01 0.03 0.05 0.03 76.70% - On-going K0353+609 to K0353+939, K0355+293 to K0355+478, DEO K0363+000 to K0363+592, K0366+095 to K0367+000, K0368+000 to K0368+611 Concreting of 3.0 Lane km. Buangan - Bayakbakin Road, Brgy. Jorenz Builders Ddevelopment Corp. 41066 08/28/2019 Marinduque DEO 14.183 260 C 0.47 0.13 0.30 - - - 90.00% 90% Very Satisfactory Bayakbakin Jorenz Builders Development Corp. 41066 Construction of Flood Mitigation Structures along Samil River 11/21/2019 Quezon 1st DEO 19.600 182 O 0.39 0.30 0.12 0.03 0.06 0.03 93.10% - On-going Provincial Concreting of Jct. (Alae-Libona) Laturan-Lapinigan Pongol Jorvivs Construction Corporation 6527 05/30/2018 Government of 69.268 262 O 0.32 0.30 0.15 0.03 0.07 0.05 92.23 - On - Going Road Bukidnon Provincial Concreting of Jct. Sayre H'way (Impasug-ong) San Juan - Jorvivs Construction Corporation 6527 05/31/2018 Government of 41.297 285 O 0.35 0.30 0.15 0.03 0.07 0.05 94.50 - On - Going Intavas Road Bukidnon Jorvivs Construction Corporation 6527 Lumbia Heights Phase 1 09/22/2018 NHA 106.810 1,149 O 0.32 0.27 0.15 0.03 0.07 0.05 88.09 - On - Going Jorvivs Construction Corporation (Formerly: Land Development and Housing Construction of NHA - Lumbia 6527 02/08/2019 NHA 106.810 1,149 C 0.41 0.17 0.00 - - - 58.72 79.28% Unsatisfactory Jorvivs Construction) Heights Phase 1 Provincial Jorvivs Corp. / Mikkil Construction JV-17-2997 Concreting of Dagumbaan-Cosina Road 10/24/2019 Government of 53.979 204 O 0.32 0.29 0.15 0.03 0.07 0.05 91.53 - On - Going Bukidnon Provincial Jorvivs Corp. / Mikkil Construction JV-17-2997 Concreting of Dagumbaan-Cosina Road 01/11/2019 Government of 53.979 204 O 0.28 0.30 0.15 0.03 0.07 0.05 87.76 - On - Going Bukidnon Organizational Outcome 2: Protect Lives and Properties against Major Flood -Flood Management Program- Nueva Vizcaya 1st Jovic Construction And Supply 35703 Construction/Maintenance of Flood Mitigation Structures and 03/22/2018 9.406 86 OG 0.257 0.3 0.15 0.03 0.04 0.05 82.70 - On - Going DEO Drainage Systems - Construction of Flood Control Structures, Busilac Section along Magat River Jovic Construction And Supply 35703 Construction of Local Road, Barangay Sanafe 09/05/2019 Ifugao 1st DEO 1.933 47 C 0.32 0.13 0.30 - - - 75.50% 75.5% Unsatisfactory Zambales 2nd Joynieltin Construction And Trading 41858 Construction of Road at East Bajac-Bajac 08/22/2019 1.834 50 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory DEO Construction of One (1) Storey Unique Workshop Building at Southern Leyte Jqd Construction & General Services 18852 08/21/2019 5.272 125 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory Liloan National Technical Vocational High School DEO Rehabilitation of DPWH Building, Southern Leyte District Southern Leyte Jqd Construction & General Services 18852 Engineering Office, Including Other Facilities and Site 08/21/2019 35.439 175 O 0.40 0.22 0.15 0.03 0.05 0.05 89.70% - On-going DEO Development Jqd Construction & General Services / Construction of Two (2) Storey Office Building (DPWH Standard Eastern Samar JV-16-1187 04/10/2018 34.410 270 C 0.50 0.15 0.30 - - - 94.50 *94.50% Very Satisfactory Tubigan Builders Design) Eastern Samar District Engineering Office DEO Rehabilitation of DPWH Building Southern Leyte District Southern Leyte Jqd Construction And General Services 18852 Engineering Office Including Other Facilities and Site 11/05/2019 36.151 175 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory DEO Development

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 92 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of One (1) Storey Three (3) CL w/Toilet, Masalasa Jqm Construction And Trading 36354 04/27/2018 Tarlac 1st DEO 3.885 120 C 0.47 0.12 0.30 - - - 89.00 89.00% Very Satisfactory ES Provision of Techvoc Workshop Building West Prosperidad Agusan del Sur J-R3 Construction And Supply 36440 03/21/2018 2.848 135 C 0.49 0.15 0.30 - - - 93.40 87.45% Satisfactory National High School 1st DEO Jrd Construction And Supply 37218 Construction of Local Road, Sitio Lana 09/05/2019 Ifugao 1st DEO 1.914 54 C 0.47 0.13 0.30 - - - 63.60% 63.6% Poor Rehabilitation/Restoration of Road Slip along Mountain Mt. Province 1st Jrd Construction And Supply 37318 09/09/2019 6.125 120 C 0.32 0.20 0.00 - - - 52.00% 52% Poor Province - Nueva Viscaya Road. K0364+500 - K036+530 DEO Nueva Ecija 1st Jrwizard Construction Co. 43945 Construction of Concrete Slope Protection along Talavera River 11/26/2019 29.400 180 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory DEO Jsp Builders And General Merchandise 37249 Extension of R.C. Wharf 11/27/2018 PPA 23.871 270 O 0.35 0.30 0.15 0.02 0.05 0.05 93.01 - On - Going

Network Development: Off-Carriageway Improvement including Drainage - Tertiary - Surallah - Lake Sebu - Maitum Rd. K1744+300 to K1745+000 Modified to: MFO-1 National Road South Cotabato Jta Builders 18401 03/14/2018 14.766 140 C 0.47 0.13 0.17 - - - 76.50 *76.50% Unsatisfactory Network Service: Network Development - Off-Carriageway 1st DEO Improvement including Drainage Tertiary - Surallah - Lake Sebu - Maitum Rd ( S01454MN), K1743+932 - K1745+180

Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads, Primary Roads, Santiago - Tuguegarao Road (Jct. Kalinga - Tuguegarao Road), K0437+(-031) - K0437+100, Jta Builders / D.J.D. Construction 18401 K0437+900 - K0438+100, K0438+700 - K0439+000, 08/23/2019 Cagayan 3rd DEO 84.903 260 O 0.39 0.30 0.00 0.03 0.06 0.00 78.00% - On-going K0441+200 - K0442+000, K0442+000 -K0442+168, K0442+252- K0443+047, K0443+305- K0443+565, K0444+000- K0445+000, K0445+000- K0446+150, K0447+000- K0448+296

Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads (Jct. Kalinga- Jta Builders / D.J.D. Construction Joint JV-17-2097 Tuguegarao Section) K0437+(-031)-K0437+100, K0437+900- 11/08/2019 Cagayan 3rd DEO 84.903 260 O 0.38 0.24 0.12 0.03 0.05 0.00 81.70% - On-going Venture K0438+100, K0438+700-K0439+000, K0441+200-K0442+168, K0442+252-K0443+047, K0443+305-K0443+565, K0444+000- K0446+150, K0447+000-K0448+296

Asset Preservation Program, Preventive Maintenance of Road (Asphalt Overlay) along Rizal Bdry. - Famy - Quezon Bdry. Jtc Cruz Construction Co., Inc. 32479 09/04/2019 Laguna 1st DEO 47.527 81 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory Road, K0067+(-340) to K0067+485 and K0067+6568 to K0069+018 Rehabilitation/Major Repair of Permanent Bridges, Ableg Bridge Upper Kalinga Jtm Construction 41136 06/04/2018 8.335 210 C 0.47 0.16 0.23 - - - 86.70 89.82% Very Satisfactory along Kalinga-Abra Road, Pasil, Kalinga DEO, CAR Juan Tong And Sons Builder Corporation 38821 Antique Airport Development Project 09/26/2018 DOTr 8.231 90 C 0.48 0.20 0.30 97.60 97.60% Outstanding Juan Tong And Sons Builder Corporation 38821 Antique Airport Development Project 09/26/2018 DOTC 8.231 90 C 0.48 0.20 0.30 - - - 97.60 97.60% Outstanding Retrofitting/Strengthening of Permanent Bridges Oquendo Juf Construction 17987 04/06/2018 Samar 1st DEO 18.328 90 C 0.43 0.13 0.30 - - - 86.30 *86.30% Satisfactory Bridge along Calbayog - Catarman Road Camarines Sur Jukar Construction And Supply 39356 Construction (Completion) of Multi-Purpose Building 11/04/2019 1.910 60 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory 5th DEO Camarines Sur Jukar Construction And Supply 39356 Construction of Multi-Purpose Building, (Senior Citizen) 11/05/2019 1.911 130 O 0.40 0.21 0.15 0.03 0.05 0.05 88.90% - On-going 5th DEO Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading Julita Builders 13936 of Damaged Paved Roads- Tertiary Roads, Dulag-Julita- 11/12/2019 Leyte 2nd DEO 24.500 152 O 0.39 0.24 0.15 0.03 0.06 0.05 91.70% - On-going Burauen Road D. Local Program 1. National Building Program A. Buildings and Juncan Enterprises 23299 Other Structures 1. Multi-Purpose/Facilities A. Construction of 09/11/2019 Quezon 4th DEO 33.785 270 O 0.37 0.22 0.15 0.02 0.04 0.03 84.30% - On-going Academic Building Southern Luzon State University (SLSU) Quipot Irrigation Project - Construction of 3,032 Meters Service Jundes Construction & Supply 35082 12/11/2019 NIA 8.731 180 O 0.34 0.27 0.10 0.02 0.05 0.05 82.31 - On-going Road and Two (2) Units Spillway

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 93 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Quipot Irrigation Project - Construction of Canal Lining and Jundes Construction & Supply 35082 12/11/2019 NIA 7.287 180 O 0.36 0.24 0.10 0.02 0.05 0.05 82.50 - On-going Canal Structures of Main Canal Provincial Junjing Construction And General 32636 Construction of (Box Type) Spillway 10/23/2018 Government of 6.271 228 O 0.27 0.30 0.13 0.03 0.06 0.05 84.50 - On - Going Merchandise Bukidnon Junrams Construction And Construction Construction of Standard 2STY-4CL School Building (Batch 3), Mindoro 44451 08/20/2019 9.497 240 O 0.40 0.23 0.10 0.03 0.03 0.03 82.20% - On-going Supplies San Jose NAIHS Occidental DEO Junrams Construction And Construction Construction of Concrete Road-Access Road Leading to Devil's Mindoro 44451 11/09/2019 20.058 187 O 0.39 0.26 0.15 0.03 0.06 0.05 92.80% - On-going Supplies Mountain and Farm, Brgy. Batasan Occidental DEO Junrams Construction And Construction Construction of Standard 2STY-4CL School Building (Batch 3), Mindoro 44451 11/08/2019 9.497 240 O 0.39 0.27 0.12 0.03 0.06 0.03 89.80% - On-going Supplies San Jose NAIHS Occidental DEO Road Widening, Secondary Roads, Pangpang - Palapag - Northern Samar Jupa Construction 23577 11/05/2019 39.423 180 O 0.38 0.24 0.15 0.03 0.04 0.03 87.50% - On-going Mapanas - Gamay - Lapinig Road 2nd DEO Rehabilitation/Reconstruction of Roads with Slips, Slope Jupa Construction / Ezjones Construction Inc. Collapse and Landslide Secondary Roads, Pangpang - Northern Samar JV-17-2808 11/04/2019 91.653 210 C 0.48 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory (Joint Venture) Palapag - Mapanas - Gamay - Lapinig Road, K0809+600 - 2nd DEO K0809+983 Contract Package – XXXIII (1-2) Construction of Senior High Camarines Sur Jurassic Construction & Supplies 32218 04/04/2018 6.480 95 C 0.49 0.13 0.30 - - - 92.20 *92.20% Very Satisfactory School Unique Workshop Building 4th DEO Construction of Two (2) Storey ICT Laboratory Building Payak Camarines Sur Jurassic Construction & Supplies 32218 08/28/2019 9.363 120 C 0.48 0.13 0.30 - - - 91.50% 91.5% Very Satisfactory High School 5th DEO Concreting of Brgy. Kanluran Lazaan FMR, Phase I Brgy. Just Bilt Builders 39754 03/18/2018 Laguna 3rd DEO 9.552 135 C 0.50 0.13 0.30 - - - 92.90 *92.90% Very Satisfactory Kanluran, Nagcarlan, Laguna Construction/Improvement of Access Roads leading to Airport, Sultan Kudarat Jv Constech 35974 Seaports, and declared Tourism Destination, Kalamansig, 03/19/2018 1.094 60 C 0.50 0.13 0.30 - - - 93.30 *93.30% Very Satisfactory 2nd DEO Access Road Leading to Kalamansig Port Construction (Completion) of Manangle National High School Camarines Sur 1st Jvm Construction & Supply 39322 11/09/2019 1.920 120 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory Multi-Purpose Building DEO K.M. Golong Construction 39667 Road Concreting of Brgy. Hubang Road 06/07/2018 Leyte 1st DEO 4.653 30 C 0.41 0.20 0.30 - - - 90.60 90.60% Very Satisfactory

Network Development Program - Road Widening - Primary Regional Office Kairo Konstrak, Inc. 35985 08/09/2019 85.665 420 O 0.35 0.30 0.09 0.03 0.05 0.03 85.90% - On-going Roads, Daang Maharlika (LZ), K0169+112.96 to K0206+887 No.III Network Development - Construction of By-Pass and Diversion Nueva Ecija 1st Kairo Konstrak, Inc. 35985 Roads San Roque-Bacayao Road, Guimba By-Pass (Package 11/25/2019 94.478 270 O 0.40 0.24 0.15 0.03 0.06 0.05 91.90% - On-going DEO 1) Kalahan General Construction And Supply 38324 Clustered Construction of MPB Project, Bokod, Benguet 05/29/2018 Benguet 1st DEO 5.773 120 C 0.41 0.11 0.15 - - - 66.70 66.70% Poor

Asset Preservation-Rehabilitation of National Roads- Rehabilitation/ Reconstruction of National Roads with Slips Slope Collapse and Landslide Along Mt. Province Boundary- Calanan-Pinikpuk-Abbut Road (Cagalunan-Calanan Section Upper Kalinga Kalinga Builders 16046 06/04/2018 23.350 181 C 0.43 0.14 0.27 - - - 83.10 86.82% Satisfactory SO060LZ) Roads (Cagalunan-Calanan Section SO 001 LZ) DEO, CAR Pasil, Kalinga (Chainage 2640-2692) Chainage 2790 - Chainage 2890, Chainage 4759 - Chainage 4789, Chainage 5285 - Chainage 5333, Chainage 5535 - Chainage 5585

Construction / Improvement of Poblacion Tinglayan Tulgao East Upper Kalinga Kalinga Builders 16046 - Tulgao West in Support of Processed Food Indusrty, 11/21/2019 33.417 341 C 0.49 0.13 0.30 - - - 80.80% 84.8% Satisfactory DEO Blacksmith Industry and Rattan/ Bamboo Weaving Industry Construction / Improvement of Poblacion Tinglayan - Tulgao Upper Kalinga Kalinga Builders 16046 East - Tulgao West in Support of Processed Food Industry, 09/08/2019 33.417 341 O 0.40 0.24 0.11 0.02 0.06 0.03 85.80% - On-going DEO Blacksmith Industry and Rattan / Bamboo Weaving Industry

Kan Kon Chi Construction 33442 Extension of Breakwater 03/16/2018 PPA 46.689 240 O 0.40 0.30 0.15 0.02 0.07 0.05 99.00 - On - Going

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 94 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Kan Kon Chi Construction 33442 Extension of Breakwater 08/17/2018 PPA 46.689 240 O 0.36 0.20 0.30 - - - 86.25 93.90% Very Satisfactory

Construction of Flood Control and River Control Protection, La Union 2nd Kane Construction, Inc. 2888 06/06/2018 44.885 244 C 0.34 0.20 0.30 - - - 84.10 84.10% Satisfactory Barangay Dalipaoen, Naguilian, La Union DEO Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems : Kane Construction, Inc. 2888 Construction/Rehabilitation of Flood Control Mitigation 09/06/2019 Baguio City DEO 28.740 420 C 0.48 0.13 0.30 - - - 90.90% 87.81% Satisfactory Facilities/Drainage System along City Camp Lagoon Drain Tunnel NIA / Pangasinan Irrigation Kane Construction, Inc. 2888 Repair of Pinalpal Communal Irrigation System CY 2019 11/07/2020 18.529 300 C 0.43 0.10 0.30 - - - - 83.20% Satisfactory Management Office Kane Construction, Inc. 2888 Pinalpal Communal Irrigation System 07/11/2020 NIA 18.531 360 C 0.43 0.10 0.30 - - - 8320.00% *83.20% Satisfactory Construction of Flood Control Mitigation Structure - Construction Kane Construction, Inc. 2888 /Rehabilitation of Flood Control Mitigation Facilities/Drainage 09/06/2019 Baguio City DEO 19.190 220 O 0.37 0.24 0.15 0.03 0.06 0.05 89.40% - On-going System along City Camp Lagoon Drain Tunnel

MF01: National Road Network Services - Construction and Maintenance of Bridges along National Roads/Widening of Permanent Bridges to more than 2 lanes, Widening of Bridge - Katha Builders & Supplies 34651 Burgos Br. (B01183LZ) Along Daang Maharlika (LZ), Bridge 03/20/2018 Isabela 3rd DEO 27.418 272 OG 0.36 0.246 0.13 0.03 0.04 0.033 83.90 - On - Going Proper: K0354+971 (Sta. 0+384)-K0354+992.80 (Sta. 0+405.80), App. A: K0354+587 (Sta. 0+000)-K0354+971, App B: K0354+992.80 (Sta. 0+405.80-K0355+18.80 (Sta. 0+431.80) Construction/ Maintenance of Flood Mitigation Structure and Katha Builders & Supplies 34651 08/29/2019 Marinduque DEO 55.581 300 O 0.40 0.24 0.15 0.03 0.04 0.05 91.10% - On-going Drainage System, Construction of Boton Flood Control Construction of Pakiling Flood Control Project, Sta. 65+500 to Katha Builders & Supplies 34651 11/27/2019 Abra DEO 47.276 183 O 0.32 0.30 0.15 0.03 0.04 0.03 87.30% - On-going Sta. 65+909.2 Katha Builders & Supplies 34651 Concreting of Barangagy Cabisera 7 to Barangay Paliueg Road 11/14/2019 Isabela 1st DEO 47.023 283 O 0.39 0.24 0.15 0.03 0.06 0.05 91.50% - On-going

Convergence and Special Support Program - Construction/Improvement of Access Roads Leading to trades, Industries and Economic Zones - San Julian - Tayak Barangay Cagayan 2nd Katha Builders & Supplies 34651 11/06/2019 9.800 178 O 0.39 0.24 0.15 0.03 0.06 0.03 89.90% - On-going Road Leading to Manila North Road (MNR) Connecting to Agri - DEO Business Industry Resources, Vegetables, Rice and Nipa by Products (Nipa, Wine and Vinegar) Katha Builders & Supplies / Alphatec Retrofitting/Strengthening of Permanent Bridge (B01320LZ) Pangasinan 2nd JV-18-0330 08/23/2019 49.889 164 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Chemical Corporation along Mangaldan - Manaoag - Binalonan Road DEO MFO 1: National Road Network Services-Construction and Katha Builders & Supplies / Dragon Twelve Maintenance of Bridges along National Roads-Widening of JV-16-1691 03/16/2018 Isabela 1st DEO 18.806 264 C 0.42 0.17 0.30 - - - 88.90 *88.90% Satisfactory Builders & Construction Supp Permanent Bridges, including ROW-To More Than 2 Lanes Marana Br. 2 (B01123LZ) Organizational Outcome 1: Ensure Safe and Reliable National Katha Builders/ Egb Construction Joint Road System: Bridge Program: Replacement Weak Bridges - Regional Office JV-17-430 08/30/2019 111.125 519 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory Venture Bintacan Bridge (B01148LZ) along Ilagan - Bigao - Palanan No. II Road Davao City 1st Katniss Everdeen Construction And Supply 37864 Construction (Completion) of Multi-Purpose Building Package 4 06/07/2018 2.909 120 O 0.37 0.24 0.15 0.03 0.052 0.033 87.50 - On-going DEO Kauie Builders And Construction Supplies 33841 Construction of Road, Barangay Hinabuyan, Villaba, Leyte 08/23/2019 Leyte 3rd DEO 1.871 30 C 0.48 0.13 0.30 - - - 91.10% 91.1% Very Satisfactory Keascia Construction & Supply / Sandstorm Construction of Three (3) Storey Twelve (12) Classroom School Batangas 1st 06/21/2018 28.869 279 O 0.374 0.240 0.150 0.03 0.056 0.05 90.00 - On-going Construction Building at Calaca Central School DEO Kejamarenik Construction & Construction Construction of Standard 2STY-6CL School Building (Batch 3), Mindoro 33742 11/09/2019 11.729 260 C 0.48 0.20 0.27 - - - 95.20% 88.55% Satisfactory Supplies Buenavista ES Occidental DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 95 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Kejamarenik Construction & Construction Construction of Standard 2STY-6CL School Building (Batch 3), Mindoro 33742 08/20/2019 11.729 260 O 0.39 0.30 0.08 0.03 0.03 0.03 85.70% - On-going Supplies Buenavista ES, Sablayan, Occidental Mindoro Occidental DEO Kejamarenik Construction And Construction 33742 Batasan Communal Irrigation System 10/09/2018 NIA 4.548 180 C 0.37 0.20 0.30 87.00 *87.00% Satisfactory Supplies Negros Occidental Kenbe Construction & Supply 34290 Construction of Multi-Purpose Building, Brgy, Talotog 03/20/2018 1.319 90 C 0.49 0.13 0.30 - - - 92.80 *92.80% Very Satisfactory 1st DEO

Construction of 1-Unit 2-Storey 6 Classroom (9.5m x 36.0m) Negros Occidental Kenbe Construction & Supply 34290 08/23/2019 11.450 200 C 0.45 0.20 0.24 - - - 88.90% 88.9% Satisfactory School Building at Negros Occidental 2nd DEO Retrofitting/Strengthening of Bridge-Candaguit Bridge Negros Occidental Kenbe Construction & Supply 34290 (B00349NR) along Jct. San Enrique-Pontevedra By-Pass Road, 08/24/2019 9.310 90 O 0.39 0.30 0.09 0.03 0.06 0.03 89.30% - On-going 4th DEO KO041+236 Construction of Slope Protection Works along Agno River, Pangasinan 4th Kenwood Construction Enterprises 22186 11/07/2019 19.110 174 C 0.49 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory Barangay Bongato West DEO Construction of Protection Works along Agno River, Bacnono Pangasinan 4th Kenwood Construction Enterprises 22186 11/06/2019 53.097 215 C 0.50 0.13 0.30 - - - 93.40% 89.08% Very Satisfactory Section DEO Pangasinan 2nd Kenwood Construction Enterprises 22186 Construction of Riverbank Protection at Barangay Oraan West 11/11/2019 42.136 202 O 0.38 0.24 0.15 0.03 0.04 0.03 87.70% - On-going DEO Kenwood Construction Enterprises Pangasinan 2nd 22186 Construction of Riverbank Protection 08/23/2019 13.965 112 O 0.40 0.30 0.00 0.03 0.06 0.00 78.60% - On-going Corporation DEO Kenwood Construction Enterprises Construction of Protection Works along Agno, River, Bacnono Pangasinan 4th 22186 08/22/2019 22.011 163 O 0.33 0.24 0.15 0.03 0.06 0.05 86.20% - On-going Corporation Section DEO Widening of Permanent Bridges to more Than Two (2) Lanes Kenwood Construction Enterprises/ W.J.P. Pangasinan 3rd 22186 with RROW Acquisition at Udiao Bridege along Pangasinan - 03/19/2018 17.640 227 C 0.48 0.13 0.30 - - - 91.50 *91.50% Very Satisfactory Construction And Supply DEO Nueva Ecija Road. 19MB0031 - Completion of Multi-Purpose Building, Engracia South Cotabato Kevin Yoshi Builders 32216 11/20/2019 2.940 105 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Valdomar National High School (Bleachers) 2nd DEO Rehabilitation/Reconstruction of Roads with Slips, Slope Kgd Builders 21960 Collapse and Landslide, K1739+665 - K1739+785, Sarangani - 11/21/2019 Sarangani DEO 10.204 180 O 0.40 0.24 0.15 0.03 0.05 0.05 91.50% - On-going Davao del Sur Coastal Road Khadeem Construction 32211 Ipil Airport Development Project 01/23/19 DOTC 14.524 248 C 0.46 0.20 0.30 - - - 95.90 *95.90% Very Satisfactory Southern Mindoro King'S Builders & Development Corp. 29199 Concreting of Sagana - Luna - San Juan - Hagupit Road 06/05/2018 46.379 240 C 0.48 0.15 0.30 - - - 92.70 92.70% Very Satisfactory DEO Construction/Repair/Rehabilitation/Improvement of Various King'S Builders & Development Corp. 29199 Infrastructure including Local Projects - Local Roads - 09/07/2019 Cavite 2nd DEO 19.600 150 C 0.49 0.20 0.19 - - - 87.90% 87.9% Satisfactory Rehabilitation of Brgy. Road, Brgy. Guinhawa South Construction/ Improvement of Access Roads leadingg to Southern Mindoro King'S Builders & Development Corp. 29199 08/27/2019 35.782 330 C 0.48 0.13 0.30 - - - 91.10% 91.1% Very Satisfactory Declared Tourism Destinations, NRJ leading to Buktot Beach DEO Southern Mindoro King'S Builders & Development Corporation 29199 Concreting of Sagana-Luna-Hagupit Road 03/21/2018 46.379 240 C 0.47 0.20 0.30 - - - 97.40 *97.40% Outstanding DEO Widening/Improvement of Junction National Road Naray to Regional Office Kirskat Venture 32042 03/15/2018 81.969 288 C 0.44 0.13 0.30 - - - 87.30 *87.30% Satisfactory Duyoc to Calaan to Panit-an Road No. VI Kirskat Venture 32042 Concreting of Roads, Brgy. Dinginan (Sitio Ilawood) 08/23/2019 Capiz 1st DEO 4.749 40 C 0.46 0.13 0.30 - - - 89.20% 89.2% Very Satisfactory Construction of Flood Mitigation Structure- Construction of River Kirskat Venture 32042 11/12/2019 Guimaras DEO 6.721 132 C 0.49 0.13 0.30 - - - 92.30% 88.222% Satisfactory Control along Mantasic River Construction of Flood Mitigation Structure-Construction of River Kirskat Venture 32042 08/27/2019 Guimaras DEO 6.721 132 O 0.38 0.24 0.11 0.03 0.05 0.05 85.50% - On-going control along Mantasic River Road Widening - on Specific Locations along Capiz-Aklan Rd. Kirskat Venture 32042 11/09/2019 Capiz 2nd DEO 48.534 221 O 0.37 0.24 0.15 0.03 0.02 0.05 86.30% - On-going (S00298PN) KO324+588 to KO327+402 Construction of Concrete Road- Ravina-Buluangan-Lawi Road Access leading to Valle Verde Mountain Resort and Ocean Kirskat Venture 32042 11/12/2019 Guimaras DEO 29.377 157 O 0.39 0.24 0.15 0.02 0.05 0.05 90.10% - On-going View Miniature Golf Course, Turtle Sanctuary, Baras Beach and Sunset View in Brgy. Ravina, Sibunag to Lawi Kirskat Venture / Edly Construction (Joint JV-18-1558 Construction of Bridge, Brgy. Lomboy, Panay, capiz 11/08/2019 Capiz 1st DEO 22.548 210 O 0.38 0.25 0.08 0.03 0.05 0.00 80.10% - On-going Venture)

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 96 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Lower Agno River Construction and Rehabilitation/Upgrading of Trapezoidal Irrigation System Kjrs Construction Enterprises 35153 12/19/2020 8.300 240 C 0.37 0.20 0.30 - - - - 86.60% Satisfactory Concretre Lining and Appurtenant Structures Improvement Project KKT Construction and Supply 36852 Maragondon Port Development Project 03/21/19 DOTC 8.669 120 C 0.48 0.20 0.30 - - - 97.50 *97.50% Outstanding Construction of One (1) Storey Two (2) Classroom School Kkt Construction And Supply 36852 09/12/2019 Quezon 1st DEO 4.368 102 C 0.49 0.13 0.30 - - - 91.90% 91.9% Very Satisfactory Building at Kalumpang Elementary School Cotabato City Kld Engineering Construction 40577 Road Construction Concreting of Brgy. Making 11/25/2019 2.939 42 C 0.49 0.20 0.30 - - - 98.60% 86.6% Satisfactory DEO Road Construction Concreting of Brgy. Making, Parang, Cotabato City Kld Engineering Construction 40577 08/23/2019 2.939 42 O 0.39 0.30 0.00 0.03 0.07 0.00 78.60% - On-going Maguindanao DEO Organizational Outcome 2: Protect Lives and Properties Against Major Floods- Flood Management Program- Klds Trading & Construction 2891 Construction/Rehabilitation of Flood Mitigation Facilities within 11/28/2019 Cavite 3rd DEO 48.745 330 O 0.39 0.24 0.15 0.02 0.05 0.05 89.40% - On-going Major River basins and Principal Rivers- Construction of Revetment along Imus River, Phase I, East Side Kmd Builders And Construction Supply 33971 Concreting of Paredes-Gulac Barangay Road 08/20/2019 Quirino DEO 4.890 80 C 0.45 0.13 0.30 - - - 88.50% 88.5% Satisfactory Kmd Builders And Construction Supply 33971 Construction of Footbridge at Barangay Anak 08/20/2019 Quirino DEO 3.465 83 O 0.40 0.21 0.15 0.00 0.05 0.05 86.50% - On-going Concreting of Cabantingan Road, Barangay 62-B, Navotas Ilocos Norte 1st Knov Builders And Supplies 41051 11/06/2019 9.900 173 O 0.38 0.24 0.15 0.03 0.05 0.05 89.90% - On-going South DEO Local Program - Buildings and Other Structures - Multi- Purpose / Facilities Construction/ Repair / Rehabilitation/ Improvement of Mt. Province 2nd Komichov General Constructiion 42292 Various Infrastructure Including Local Projects - Construction of 11/22/2019 3.960 120 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory DEO Multi-Purpose Building, Anonat National Agriculture and Vocational High School National Disaster Risk Reduction and Management Program Fund (NDRRMF) (Calamity Fund) - Flood Control Mt. Province 1st Komichov General Construction 42292 Structures/Facilities: Rehabilitation/Reconstruction/Repair of 09/09/2019 7.720 160 C 0.49 0.13 0.30 - - - 92.00% 92% Very Satisfactory DEO Chico River Flood Control, Pangpang Section, Sta.0+000 - Sta.0+200(I.S.) Negros Oriental Kouken Construction 26573 Construction of Level II Water System 11/13/2019 5.761 60 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory 1st DEO Improvement/ Widening of National Roads - Ormoc - Baybay - Southern Leyte, Bdry. Rd. K1029+460 - K1031+710, Kouzbary Builders 36446 05/31/2018 Leyte 4th DEO 119.173 310 C 0.44 0.18 0.30 - - - 92.60 92.60% Very Satisfactory K1031+785 - K1032+000, K1034+516 - K1035+486, K1035+509 - K1037+142 Improvement/Widening of National Roads - Palo - Carigara - Ormoc Rd. K0990+332 - K990+725, K0995+004 - K0996+318, Kouzbary Builders 36446 06/01/2018 Leyte DEO 108.504 305 C 0.46 0.18 0.30 - - - 93.90 93.90% Very Satisfactory K0996+318-K0996+616, K0996+691 - K0998+490, K0998+490 - K0998+916 Network Development - Road Widening - Primary Roads along Kouzbary Builders / Fiat Construction Daang Maharlika including RROW, KO982+200-KO983+143; Regional Office JV-17-314 11/07/2019 192.852 668 O 0.38 0.23 0.14 0.03 0.06 0.03 88.30% - On-going Services KO983+216-KO983+321; KO987+000-KO989+000; No. VIII KO991+000-KO991+900; KO993+400-KO994+600 Kouzbary Builders / Fiat Construction Network Development - Road Widening - Primary Roads along Regional Office JV-17-314 08/21/2019 192.809 568 O 0.37 0.26 0.15 0.03 0.04 0.03 90.70% - On-going Services (Joint Venture) Daang Maharlika Including RROW, K0982+200 to K0983+143; No. VIII Preventive Maintenance - Calanipawan Road, K0913+(-424) to Tacloban City Krc Construction And Supply 39122 04/11/2018 6.296 139 C 0.45 0.13 0.30 - - - 88.60 *88.60% Satisfactory K0913+076 DEO Netwrok Development - Paving of Unpaved Roads (tertiary Kvc Construction 28959 Roads) Ayaga - Sta. Marcela - Flora - Lasam Roads, Sta. 11/23/2019 Apayao 2nd DEO 41.729 265 O 0.39 0.24 0.15 0.03 0.06 0.05 91.50% - On-going 0+000 - Sta. 0+996 Asset Preservation of National Roads Kvc Construction/E.T. Latawan Construction JV-16-1718 Rehabilitation/Reconstruction/Upgrading Paved National Roads 04/04/2018 Mt. Province DEO 79.410 295 C 0.47 0.13 0.30 - - - 90.60 87.72% Satisfactory Joint Venture including Drainage based on Pavement Management Kwa Construction 43185 Construction of Multi-Purpose Building (Covered Court) 11/13/2019 Isabela 1st DEO 1.900 90 O 0.36 0.26 0.13 0.02 0.04 0.03 84.20% - On-going Nueva Ecija 1st Kyro Builder, Inc. 19567 Construction of San Roque-Bacayao Road 11/26/2019 76.499 270 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 97 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Network Development Program - Road Widening - Primary Regional Office Kyro Builders Inc. 19567 Roads - Daang Maharlika (LZ), Nueva Ecija 1st Legislative 08/23/2019 122.051 468 O 0.39 0.30 0.06 0.02 0.05 0.33 85.00% - On-going No.III District

Kyro Builders, Inc. 19567 Umayam River Irrigation Project 02/02/2018 NIA 258.14 935 O 0.329 0.293 0.080 0.021 0.065 0.035 82.26 - On-going

Kyro Builders, Inc. 19567 Umayam River Irrigation Project 02/03/2018 NIA 173.04 1,141 O 0.348 0.288 0.063 0.021 0.054 0.035 80.79 - On-going

Asset Preservation of National Roads - Rehabilitation/Reconstruction of Damaged Paved National Regional Office Kyro Builders, Inc. 19567 Roads including Drainage based on Pavement Management 06/22/2018 115.423 360 C 0.48 0.13 0.30 - - - 91.40 91.40% Very Satisfactory No. III System/Highway Development Management-4 (HDM-4); Secondary Roads, Nueva Ecija-Pangasinan Road Construction of Super Diversion Canal (SDC) (Sta. 46+080-Sta. 50+540) Laterals and Sub Laterals including Related Structures Kyro Builders, Inc. 19567 02/23/2018 NIA 186.74 603 C 0.46 0.20 0.17 - - - 83.20 *83.20% Satisfactory and Supply, Delivery, Installation and Commissioning of Steel Gates Kyro Builders, Incorporated 19567 Casecnan Multipurpose Irrigation & Power Project II - IC 05/26/2018 NIA 72.700 958 O 0.34 0.30 0.15 0.01 0.04 0.03 87.00 - On - Going

Misamis Oriental L & L Construction 15108 Construction of New Villanueva Municipal Hall 11/04/2019 49.500 292 O 0.39 0.24 0.15 0.03 0.06 0.05 91.80% - On-going 2nd DEO Road from National Highway Junction to Sitio Luha of Brgy. Luha of Brgy. Poblacion Connecting Boston Public Terminal to Bamboo and Driftwood Crafts and Furniture Manufacturing, Davao Oriental 1st L.A. Arizola Construction & Supply 31060 08/22/2019 38.024 157 O 0.40 0.24 0.15 0.02 0.05 0.05 90.10% - On-going Abaca Processing, Fish Processing and Coconut Processing in DEO Support to Agribusiness: Bamboo, Driftwood, Abaca, Fish and Coconut Industry Construction/Maintenance of Flood Mitigation Structure and L.A. Clamor Construction 26413 Drainage System, Construction of Revetment Wall along 06/19/2018 Quezon 2nd DEO 34.300 310 C 0.47 0.13 0.30 - - - 90.10 90.10% Very Satisfactory Morong River Construction of Gate Keepers Quarter, Enclosure at Mechanism L.A. Parada Construction Corporation 41442 and Railings - Fabrication, Installation and Construction of 08/06/2019 NIA 2.833 60 C 0.43 0.16 0.30 - - - 88.54 *88.54% Satisfactory Structures Improvement/Construction of Flood Control Mitigation Structure L.B. Leoncio Trading & Construction 31587 and Drainage System along Puerto Princesa North Road, 03/14/2018 Palawan 3rd DEO 48.603 382 OG 0.37 0.201 0.127 0.03 0.061 0.033 82.20 - On - Going K0005+(-100)- K0006+900 Improvement/Construction of Flood Control Mitigation Structure L.B. Leoncio Trading & Construction 31587 and Drainage System along Puerto Princesa North Road, 06/01/2018 Palawan 3rd DEO 48.603 412 C 0.49 0.14 0.30 - - - 92.40 87.66% Satisfactory K0005+(-100) - K0006+900 Construction/Improvement of Latungay-Sta. Teresita Road, Sta. L.B. Leoncio Trading & Construction 31587 11/10/2019 Palawan 1st DEO 36.792 200 O 0.40 0.30 0.10 0.03 0.04 0.03 90.30% - On-going 0+000-Sta. 1+720 Construction/Improvement of Paratungon Road Leading to Sir Palawan 2nd L.B. Leoncio Trading & Construction 31587 11/06/2019 19.474 150 O 0.38 0.30 0.10 0.03 0.05 0.03 89.30% - On-going Brooke's and Tanaki Beach Resorts DEO Rehabilitation/Reconstruction/Upgrading of Damaged Paved Surigao del Sur L.C Ting Construction 2366 National Road Including Drainage along Surigao- Davao 03/17/2018 17.441 220 C 0.48 0.14 0.30 - - - 92.40 *92.40% Very Satisfactory 1st Coastal Road K1272+336 to K1272+931 Asset Preservation - Preventive Maintenance - Primary Roads: Zamboanga L.C. Construction Corporation 7024 Asphalt Overlay along Lanao - Pagadian - Zamboanga CIty 08/28/2019 7.238 96 O 0.40 0.24 0.15 0.03 0.05 0.05 91.70% - On-going Sibugay 1st DEO Road (S01112MN) K1724+591 to K1724+331 Road Upgrading (Gravel to Concrete) from Jct. National Zamboanga del L.C. Construction Corporation 7024 06/04/2018 9.377 119 C 0.48 0.13 0.30 - - - 91.50 91.50% Very Satisfactory Highway Leading to Tukuran Beach Resort Sur 1st DEO Asset Preservation - Preventive Maintenance - Primary Roads: Zamboanga L.C. Construction Corporation 7024 Asphalt Overlay along Lanao - Pagadian - Zamboanga City 11/11/2019 7.461 96 C 0.49 0.13 0.30 - - - 91.80% 91.74% Very Satisfactory Sibugay 1st DEO Road (S01112MN), K1724+(-591) to K1724+(-331)

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 98 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction (Completion) of Multi-Purpose Building L.C. Talon Construction 19644 08/26/2019 Isabela 2nd DEO 1.409 60 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory (Community Center) Brgy. Palatao Construction of Access Roads leading to Trades, Industries and Economic Zones - Poblacion Magsaysay to Osmena to Surigao del Sur L.C. Ting Construction 23666 11/10/2019 48.999 185 O 0.38 0.24 0.15 0.03 0.06 0.03 89.00% - On-going Villaverde to SSF Kahayagan in Support to Agrisbusiness 2nd DEO Industry, Sitio Mabuhay, Kahayagan Widening of Permanent Bridge - Looc Bridge (B00035BR) L.M. Baltonado Construction 30238 08/26/2019 Biliran DEO 23.007 265 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory along Biliran Circumferential Road Retrofittin/Stregthening of Permanent Bridges: Palublub Bridge L.M.G. Construction 5719 (B03434LZ) along Capas - San Jose - Mayantoc - Malacampa 06/19/2018 Tarlac 2nd DEO 50.362 190 O 0.354 0.247 0.15 0.03 0.035 0.05 86.60 - On-going Road L.M.G. Construction 5719 Casecnan Multipurpose Irrigation & Power Project - IC PH II 05/21/2018 NIA 7.440 261 O 0.31 0.30 0.15 0.03 0.07 0.05 91.13 - On - Going

Las Piñas- L.M.G. Construction 5719 Constuction of Reinforced Concrete Wall Including Bridge 05/28/2018 22.793 90 C 0.42 0.13 0.30 - - - 85.10 85.10% Satisfactory Muntinlupa DEO

L.M.G. Construction 5719 Casecnan Multipurpose Irrigation & Power Project - IC PH II 05/21/2018 NIA 7.926 453 C 0.42 0.20 0.30 - - - 91.89 91.89% Very Satisfactory Quezon City 2nd L.M.G. Construction 5719 Improvement/Construction of Road network at 08/27/2019 48.999 255 C 0.47 0.14 0.30 - - - 90.80% 90.8% Very Satisfactory DEO Bank Protection/Protection along Pateros River, Barangay Metro Manila 1st L.M.G. Construction 5719 08/29/2019 45.644 240 O 0.32 0.24 0.15 0.03 0.05 0.05 84.00% - On-going Martirez DEO Bank Improvement/Protection along Pateros River, Barangay Metro Manila 1st L.M.G. Construction 5719 08/30/2019 27.329 210 O 0.32 0.24 0.15 0.03 0.05 0.05 84.00% - On-going Martirez (Phase III) DEO Off-Carriageway Improvement Including Drainage SCR Jct. Mindoro Oriental L.N. Salvador Construction 16661 03/20/2018 30.100 256 C 0.30 0.20 0.30 - - - 80.20 *80.20% Unsatisfactory Pola Road, K0062+559- K0064+187.5 DEO Off-Carriageway Improvement along Calapan South Road Jct. Mindoro Oriental L.N. Salvador Construction Corp. 16661 Pola Rd. K0063+550 - K0064+186, K0064+615 - K0064+993, 11/05/2019 51.474 274 O 0.35 0.25 0.15 0.03 0.06 0.05 88.60% - On-going DEO K0066+220 - K0066+490, K0067+470 - K0067+868.5 Villaba Port Development Project - Extension of Reinforced L.N.R. Construction 14148 6/26/19 DOTR 47.002 330 C 0.47 0.20 0.30 - - - 96.70 0.964 Outstanding Concrete Pier

L.P.E.S & Construction 36717 Marikit Irrigation Project 10/19/2018 NIA 1.600 308 C 0.40 0.20 0.30 90.00 *90.00% Very Satisfactory

Supply Delivery and Installation of Intake Gates for Marikit L.P.E.S & Construction 36717 10/19/2018 NIA 0.518 252 C 0.38 0.20 0.30 87.50 *87.50% Satisfactory Diversion Dam Construction of Multi-Purpose Building at Rose Marie Lane, Metro Manila 1st L.P.O. Enterprises 20730 03/16/2018 6.629 150 C 0.49 0.13 0.30 - - - 92.30 *92.30% Very Satisfactory Brgy. Kapitolyo, Pasig City DEO Construction of Two (2) Storey Six (6) Classroom at G. L.P.O. Enterprises 20730 09/05/2019 Laguna 3rd DEO 13.030 230 C 0.50 0.13 0.30 - - - 93.00% 93% Very Satisfactory Herradura ES (Nanhaya ES) L.P.O. Enterprises 20730 Local Infrastructure Program-Concreting of Road 11/19/2019 Laguna 3rd DEO 2.351 60 C 0.47 0.13 0.30 - - - 90.70% 90.7% Very Satisfactory Construction of Flood Control Structure along Bocaue River L.R. Tiqui Builders, Inc. 13810 03/19/2018 Bulacan 1st DEO 27.887 180 C 0.44 0.15 0.30 - - - 89.30 *89.30% Very Satisfactory Binang 2nd Section Bocaue, Bulacan Ensure Safe and Reliable National Road System (MFO-1), Network Development-Construction of L.R. Tiqui Builders, Inc. 13810 Flyovers/Interchanges/Underpasses/Long Span Bridges, 09/09/2019 Quezon 2nd DEO 139.925 510 C 0.47 0.13 0.30 - - - 89.29% 89.29% Very Satisfactory Construction of Underpass along MSR Diversion Road, K0129+260 - K0129+563.8 Construction of Slope Protection of , Sta.17+915 - Quezon City 1st L.R. Tiqui Builders, Inc. 13810 08/22/2019 93.096 440 C 0.48 0.15 0.30 - - - 93.10% 88.12% Satisfactory Sta.18+058 DEO Preventive Maintenance along EDSA, K0011+(-400) - Quezon City 1st L.R. Tiqui Builders, Inc. 13810 08/22/2019 72.771 240 O 0.37 0.25 0.15 0.03 0.05 0.05 90.30% - On-going K0011+000, K0012+272.01 - K0013+969 DEO L.R. Tiqui Builders, Inc. 13810 Construction of Flood Control Structures Ilog Bayan River 11/21/2019 Bulacan 2nd DEO 95.534 240 O 0.40 0.24 0.15 0.03 0.06 0.05 92.10% - On-going

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 99 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Local Roads and Bridges - Local Bridges - Construction/Repair/Rehabilitation/Improvement of Various Regional Office L.R. Tiqui Builders, Inc. 13810 11/21/2019 260.819 300 O 0.40 0.27 0.13 0.03 0.06 0.03 91.30% - On-going Infrastructure including of Local Projects - Construction of No. III Ciudad de Victoria Overpass Bridge Metro Manila 1st L.R. Tiqui Builders, Inc. 13810 Improvement of Nangka River 06/01/2018 41.236 180 O 0.387 0.240 0.150 0.022 0.040 0.050 88.90 - On-going DEO Construction/Repair/Rehabilitation/Improvement of Various Infrastructures including Local Projects, Local Roads and Regional Office L.S.D. Construction & Supplies 8980 Bridges, Local Roads UPGRADING OF EXISTING ROAD 09/11/2019 40.866 285 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory No. IV-A LEADING TO TUNNEL OUTLET PORTAL (MARCOS HIGHWAY TO PANTAY - BUHANGIN SECTION) Rehabilitation/Improvement of Flood Control Structures in L.S.D. Construction & Supplies 8980 Tarlac 2nd along Moriones River, Right Side, Balanti Section, 06/21/2018 Tarlac 1st DEO 43.111 175 C 0.40 0.20 0.30 - - - 89.50 89.50% Very Satisfactory Sta. 0+000 to Sta. 0+222 Ensure Safe and Reliable National Road System – Bridge Program – Rehabilitation / Major Repair of Permanent Bridges, La Prueba Construction 9923 11/04/2019 Cebu City DEO 12.298 175 O 0.40 0.30 0.02 0.03 0.05 0.03 90.70% - On-going (B00602CB) along N. Bacalso Ave., (Cebu South Road) Network Development-Improvement/Widening of National Roads-Primary Roads-other Primary Roads Ormoc-Baybay- Labb Construction 13524 04/11/2018 Leyte 5th DEO 136.572 300 OG 0.391 0.240 0.150 0.022 0.037 0.050 89.03 - On - Going Southern Leyte Boundary Road, K1043+100 to K1039+100 (Intermittent Sections) Off-Carriageway Improvement including Drainage, Secondary Roads, Tagbilaran North Road (Tagbilaran to Jetafe Section) Regional Office Labb Construction 13524 Section 1: K0080+465 - K0082+811, Section 2: K0113+531 - 06/04/2018 80.990 272 C 0.47 0.13 0.30 - - - 90.70 90.70% Very Satisfactory No. VII K0115+016 Section 3: K0117+000-K0118+980. Section 4: K0118+957 - K0120+000, Section 5: K0120+880-K0121+605

001: Ensure Safe and Reliable National Road System-Asset Preservation-Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads-Secondary Roads, Tagbilaran North Labb Construction 13524 Road (Tagbilaran-Jetafe Section), K0062+000-K0062+266, 08/27/2019 Bohol 2nd DEO 21.475 145 O 0.37 0.24 0.15 0.03 0.04 0.03 86.30% - On-going K0062+535-K0062+591, K0062+710-K0062+824, K0075+740- K0075+797, K0075+838.45-K0075+875 and K0101+199.14- K0101+291 Network Development Program - Road Widening - Primary Labb Construction 13524 Roads - Ormoc - Baybay - Southern Leyte Boundary Road - 08/22/2019 Leyte 5th DEO 41.490 150 O 0.40 0.24 0.15 0.03 0.03 0.05 90.00% - On-going K1049+962 to K1051+127 Construction/Improvement of Access Roads Leading to Declared Tourism Destinations – Montaña-San Juan- Labb Construction 13524 11/05/2019 Bohol 1st DEO 86.633 181 O 0.39 0.30 0.15 0.03 0.06 0.03 95.90% - On-going Buenaventura Road Leading to Edith Grand Garden Resort and Adventure Park Network Development Program- Road Widening -Primary Labb Construction 13524 Roads-Ormoc-Baybay-Southern Leyte Boundary Road- 11/07/2019 Leyte 5th DEO 44.589 150 O 0.34 0.24 0.15 0.03 0.06 0.05 87.50% - On-going K1094+962-K1051+127 Provincial Labb Construction 13524 Concreting of Alburqueque - Sikatuna Road (CMGP Program) 4/30/19 Government of 76.077 263 O 0.35 0.27 0.13 0.03 0.06 0.02 85.10 - On-going Bohol Network Development - Improvement/Widening of National Roads - Primary Roads - other Primary Roads Ormoc-Baybay- Southern Leyte Boundary Road - K1043+120 - K1043+325, K1043+341 - K01043+809, K1043+838 - K1044+870, Labb Construction 13524 05/30/2018 Leyte 5th DEO 144.750 330 C 0.45 0.13 0.30 - - - 88.70 88.70% Satisfactory K1046+835 - K1047+147, K1047+824 - K1048+091, K1048+105 - K1049+651, K1049+963 - K1050+349, K1038+000 - K1038+254, K1038+266 - K1038+632, K1038+660 - K1039+000

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 100 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of By Passes/Diversion Roads along Baybay City Lady Of Assumption Enterprises 25360 05/30/2018 Leyte 5th DEO 2.788 240 C 0.47 0.13 0.30 - - - 90.30 90.30% Very Satisfactory Diversion Road incl. Slope Protection Rehabilitation/Reconstruction of National Roads with Slips, Lady Of Assumption Enterprises 25360 Slope Collapse and Landslide along Tacloban-Baybay South 04/11/2018 Leyte 5th DEO 45.220 210 C 0.46 0.13 0.30 - - - 89.40 *89.40% Very Satisfactory Road, K0988+100 to K1003+800 ( Intermittent Section)

Construction/ Improvement of Access Road Leading to Lady Of Assumption Enterprises 25360 Declared Tourism Destinations Junction Abuyog - Silago Road - 08/21/2019 Leyte 5th DEO 46.378 179 O 0.40 0.28 0.15 0.03 0.03 0.05 94.00% - On-going Cadac-an - Malaguicay Road Leading to Malaguicay Falls Camarines Sur Lahdeth Construction And Supply 34833 Reblocking / Widening of barangay Road 06/02/2018 1.879 45 C 0.45 0.13 0.30 - - - 88.30 88.30% Satisfactory 5th DEO Construction of Two (2) Storey, Two (2) Science Laboratory and Camarines Sur 1st Lahdeth Construction And Supply 34833 08/21/2019 26.860 205 C 0.49 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory Two (2) ICT Building DEO Misamis Oriental Laj Trucking And Builders Incorporated 36350 Construction of Road from Crossing Sta. Cruz to Sitio Tuganay 08/27/2019 9.900 45 C 0.35 0.20 0.30 - - - 84.50% 84.5% Satisfactory 2nd DEO Asset Preservation of National Roads - Construction/ Upgrading/ Rehab. of Drainage along National Tertiary Zamboanga Lakewood Construction Company 5294 05/29/2018 9.645 140 C 0.48 0.13 0.28 - - - 89.50 89.50% Very Satisfactory (S001143MN) - Ipil - Magdaup Wharf Road K2014+(-483) - Sibugay 2nd DEO K2014+640 Zamboanga Lakewood Construction Company 5294 Concreting of Brangay Dalangin - Bangco Road (Phase III) 08/29/2019 24.055 165 C 0.41 0.13 0.30 - - - 84.60% 84.6% Satisfactory Sibugay 2nd DEO

Construction of Provincial Road Connecting Brgy. Canacan, Zamboanga Lakewood Construction Company 5294 11/05/2019 29.379 189 O 0.39 0.24 0.15 0.03 0.04 0.05 90.60% - On-going Sininan, Banker Tampilisan, Diampak and Siolan Sibugay 2nd DEO

LAK-K Builders Co. 34362 Barbaza Residence 1 04/12/2019 NHA 197.479 430 O 0.34 0.29 0.12 0.03 0.03 0.03 84.38 - On-going

LAK-K Builders Co. 34362 Patnongon Vista Residences 12/07/2019 NHA 280.990 598 O 0.35 0.28 0.00 0.03 0.07 0.03 76.37 - On-going

Procurement of Fully Developed Lots and Completed Housing LAK-K Builders Co. 34362 9/27/19 NHA 197.479 617 O 0.32 0.28 0.15 0.03 0.07 0.03 87.29 - On-going Units (Barbaza Residence 1) Lak-K Builders Co. 34362 Bugasong Paradise Ville Site 1 04/06/2018 NHA 126.302 508 O 0.33 0.30 0.15 0.03 0.07 0.05 93.12 - On - Going

Lak-K Builders Co. 34362 Bugasong Paradise Ville Site 2 04/06/2018 NHA 82.592 458 O 0.33 0.30 0.15 0.03 0.07 0.05 92.90 - On - Going

LAK-K Builders Co. 34362 Bugasong Paradise Ville Site 1 2/23/19 NHA 98.575 594 C 0.41 0.20 0.15 - - - 76.35 87.01% Satisfactory

LAK-K Builders Co. 34362 Bugasong Paradise Ville 2 2/22/19 NHA 64.065 586 C 0.40 0.20 0.20 - - - 80.50 89.46% Very Satisfactory

Lak-K Builders Co. 34362 Olympus Residences Site 1 06/22/2018 NHA 98.590 350 C 0.36 0.18 0.30 - - - 83.45 82.41% Satisfactory

Lak-K Builders Co. 34362 Olympus Residences Site 2 06/22/2018 NHA 99.460 350 C 0.34 0.18 0.30 - - - 82.03 82.08% Satisfactory Zamboanga City Lamitan Vj'S Construction And Supplies 40240 Road Upgrading Gravel to Paved at Barangay Lamisahan 03/19/2018 2.882 108 C 0.46 0.13 0.30 - - - 89.10 *89.10% Very Satisfactory DEO Network Development, Off-Carriageway Improvement Including Lanao del Norte Lanao Builder And Enterprises 15982 Drainage, Tertiary: Balo-I - Matungao-Linamon Road, 06/06/2018 46.388 265 C 0.47 0.13 0.30 - - - 90.60 90.60% Very Satisfactory 1st DEO K1549+730-K1555+120 Off-Carriegeway Improvement including Drainage along Lanao Lanao del Norte Lanao Builder And Enterprises 15982 del Norte Interior Circumferential Road (LDNICR) KO1588+(- 03/22/2018 45.705 116 C 0.48 0.13 0.30 - - - 91.10 *91.10% Very Satisfactory 2nd DEO 480)-KO1591+000 Network Development, Off-Carriageway Improvement Including Lanao del Norte Lanao Builder And Enterprises 15982 Drainage, Primary Road: Flaring of Intersection along Iligan City- 03/22/2018 19.478 271 C 0.44 0.13 0.30 - - - 87.10 *87.10% Satisfactory 1st DEO Marawi City Road, K1544+258

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 101 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Preventive Maintenance of Road: Iligan City - Marawi City Road, K1544+230 - K1544+382; K1546+186 - K1548+036; Lanao del Norte Lanao Builder And Enterprises 15982 11/07/2019 88.523 186 O 0.39 0.30 0.15 0.03 0.06 0.05 97.60% - On-going K1548+704 - K1549+415; K1553+285 - K1553+955 (Asphalt 1st DEO Overlay) Construction of 2 Storey, 4 Classroom School Building Malasag Cagayan de Oro Lance Construction 41470 08/28/2019 11.816 124 O 0.39 0.24 0.10 0.02 0.05 0.03 82.80% - On-going Elementary School City 2nd DEO Landevtech Construction, Inc. 39999 Access Road to Kinuskusan Hilltop Convention Center 06/20/2019 TIEZA 14.000 155 C 0.46 0.20 0.00 - - - 65.50 77.60% Unsatisfactory Construction/ Rehabilitation of Flood Mitigation Facilities with Lanoy Construction 35289 Major River Basins and Principal Rivers - Construction of 08/27/2019 Leyte 2nd DEO 39.607 163 O 0.40 0.24 0.15 0.03 0.03 0.03 88.10% - On-going Daguitan - Marabong River Flood Control Construction of Flood Control Structures in Bito River, Barangay Lanoy Construction 35289 08/21/2019 Leyte 5th DEO 21.836 90 O 0.40 0.24 0.15 0.03 0.03 0.03 88.10% - On-going Batug and Barangay Picas Metro Manila 3rd Larsen-Dutcher Constractor 29172 Improvement of Tanada Covered Court 06/06/2018 14.007 165 C 0.50 0.13 0.30 - - - 93.40 93.40% Very Satisfactory DEO Pampanga 1st Lato Builders 34243 Construction of Multi-Purpose Covered Court, San Agustin 08/19/2019 4.455 90 O 0.39 0.24 0.15 0.03 0.05 0.03 89.90% - On-going DEO Construction of Multi - Purpose Building Ocvered Court, San Pampanga 1st Lato Builders 34243 11/05/2019 4.455 90 C 0.50 0.13 0.30 - - - 93.30% 90.92% Very Satisfactory Agustin DEO La Union 2nd Lcdc Construction 41131 Construction of Dr. Belen Elementary School 08/19/2019 9.900 150 O 0.40 0.26 0.15 0.02 0.04 0.03 90.20% - On-going DEO La Union 2nd Lcdc Construction 41131 Construction of Dr. Belen Elementary School Building 11/04/2019 49.468 180 O 0.40 0.19 0.15 0.03 0.04 0.05 86.60% - On-going DEO Construction of Roadway and Canal at Zone 3 (Taguytoy) to Camarines Sur Ldn Builders And Construction Supply 39782 Zone 7 (Folkland), Section "A", Sta. 1+000 TO Sta. 1+199.50 08/28/2019 1.881 27 C 0.47 0.13 0.30 - - - 90.30% 90.3% Very Satisfactory 5th DEO and Section "B", Sta. 0+780 to Sta. 0+831 LDV Construction 35684 Design and Build of a Multi - Purpose Gymnasium 06/09/2019 DOST 44.325 508 O 0.39 0.30 0.15 0.03 0.05 0.05 96.90 - On-going Construction of 2 Storey 4 Classroom (2 Units ICT Laboratory Lea & Sons Trading And Corporation 34959 08/23/2019 Palawan 1st DEO 9.010 155 C 0.47 0.14 0.30 - - - 90.20% 90.2% Very Satisfactory Building) Bato National High School Leadway Construction & Development Corp. Bridge Program - Widening of Permanent Bridges - Pulung Bulu Pampanga 3rd 4378 11/08/2019 27.931 280 C 0.49 0.13 0.30 - - - 92.60% 93.08% Very Satisfactory (Lcdc) Bridge (B01645LZ) along Manila North Road DEO Davao del Sur Leamor Construction And Supply 34928 Construction of Multi-Purpose Building (Municipal Hall) 11/24/19 19.816 230 O 0.39 0.21 0.15 0.03 0.05 0.05 87.70% - On-going DEO Construction of Road along Iligan City Circumferential Road Lanao del Norte Lecar Builders 39926 (C3) Extension to Jct. Sta. Felomina-Bonbonon-Digkilaan- 11/06/2019 27.930 129 C 0.48 0.14 0.30 - - - 92.20% 91.84% Very Satisfactory 2nd DEO Rogongon Road Construction of Road along Iligan City Circumferential Road Lanao del Norte Lecar Builders 39926 (C3) Extension to Jc. Sta. Felomina- Bonbonon- Digkilaan- 08/25/2019 27.930 129 O 0.39 0.26 0.15 0.03 0.06 0.03 91.60% - On-going 2nd DEO Rogongon Road Construction/Maintenance of Flood Mitigation Structures and Leda Construction Incorporated / Drainage Systems – Construction of Flood Control along JV-18-983 11/05/2019 Bohol 1st DEO 42.603 229 O 0.39 0.24 0.15 0.03 0.03 0.05 89.30% - On-going C.C.Maluendia Construction Inc. Tagbilaran North Road for Barangays Tultugan, Binogawan, Desamparados, Bentig and Abucayan Norte Rehabilitation/ Reconstruction of National Roads with Slips, Bukidnon 3rd Legacy Construction 22465 03/16/2018 19.800 100 C 0.48 0.13 0.30 - - - 91.70 *91.70% Very Satisfactory Slope Collapse and Landslide Sayre Highway (Maluko Section) DEO Legacy Construction ( Formerly : Legacy La Union 2nd 22465 Construction of Shore Protection (Groins) Brgy. Stsa. Rita West 02/26/2018 45.836 219 C 0.49 0.13 0.30 - - - 92.70 *92.70% Very Satisfactory Construction ) DEO Rehabilitation/Reconstruction/Upgrading of Damaged Paved Legacy Construction (Formerly: Legacy National Roads including Drainage based on PMS/HDM-4 La Union 2nd 22465 06/04/2018 30.253 209 C 0.49 0.13 0.30 - - - 91.90 79.24% Unsatisfactory Construction) Agoo - Baguio City Road, K0237+(-021) to K0237+885, DEO K0237+(-810) to K0237+(-038) Surigao del Sur Legacy Construction Corporation 22465 NRJ Leading to Hubason Spring, Barangay San Vicente 06/01/2018 18.613 112 O 0.351 0.235 0.150 0.030 0.033 0.050 84.90 - On-going 1st DEO Rehabilitation/ Major Repair of Permanent Bridges Napuyan Br. Zamboanga del Legacy Construction Corporation 22465 06/02/2018 4.270 147 O 0.400 0.240 0.150 0.03 0.052 0.033 90.50 - On-going (Cantilever) (B01587MN) Along Piñan - Mutia Road Norte 3rd DEO Legacy Construction Corporation 22465 Tourism District Project Development 05/10/2019 TIEZA 27.000 210 O 0.355 0.3 0.15 0.015 0.018 0.05 88.78 - On - Going La Union 2nd Legacy Construction Corporation 22465 Construction of Four (4) Classroom (BEFF 2018 Batch 3) 08/19/2019 47.421 300 O 0.39 0.24 0.15 0.03 0.05 0.05 90.50% - On-going DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 102 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) La Union 2nd Legacy Construction Corporation 22465 Construction of Farmer's Hall 08/19/2019 47.990 240 O 0.38 0.24 0.15 0.03 0.05 0.05 89.60% - On-going DEO Replacement of Permanent Weak Bridge - Bangon Bridge Legacy Construction Corporation 22465 08/30/2019 Romblon DEO 19.939 200 O 0.40 0.24 0.15 0.03 0.03 0.05 90.10% - On-going (B00045TL) along Tablas Circumferential Road Road Widening on Specific Locations along Compostela - Compostela Legacy Construction Corporation 22465 11/22/2019 47.496 294 O 0.39 0.24 0.15 0.03 0.06 0.03 89.30% - On-going Cateel Road, (Compostela Side) Valley DEO Off-Carriageway Improvement along Daang Maharlika (MN) Davao del Norte Legacy Construction Corporation 22465 11/23/2019 39.590 271 O 0.40 0.24 0.15 0.03 0.06 0.05 92.70% - On-going K1468+000- K1469+488, K1477+665- K0478+355 DEO Provincial Upgrading /Improvement of Gabi - Cabacungan - Sto. Niño Legacy Construction Corporation 22465 3/14/20 Government of 45.912 157 O 0.37 0.24 0.08 0.02 0.06 0.05 8210.00% - On-going Provincial Road with Widening (Gabi - Cabacungan Section ) Davao de Oro Construction of Three (3) Storey Nine (9) Classroom, Agusan del Norte Legacy Construction Corporation 22465 03/12/2018 15.381 240 C 0.49 0.13 0.30 - - - 92.40 86.22% Satisfactory Magallanes National High School DEO Construction/Improvement of Access Roads Leading to Negros Oriental Legacy Construction Corporation 22465 Declared Tourism Destinations: Malabugas Proper-Habhaban- 08/21/2019 50.904 362 C 0.48 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory 3rd DEO San Roque Road Leading to Habhaban Cave Misamis Widening of Permanent Bridge, Maningcol Br. (B01136MN) Legacy Construction Corporation 22465 08/22/2019 Occidental 2nd 13.965 179 O 0.39 0.30 0.00 0.03 0.06 0.00 78.10% - On-going along Ozamiz- Oroquieta Road DEO Construction of Missing Links/ New Roads of Odiongan East- Regional Office Legacy Construction Corporation 22465 11/15/2019 104.495 346 O 0.40 0.30 0.15 0.02 0.05 0.03 95.20% - On-going West Rd. Romblon, Sta. 8+940 - Sta. 9+670 No. IV-B Construction of Control along Brgy. Poblacion Legacy Construction Corporation 22465 11/11/2019 Iloilo 2nd DEO 49.000 175 O 0.38 0.30 0.00 0.03 0.05 0.00 76.40% - On-going Delgado, Calinog, Iloilo Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Surigao del Sur Legacy Construction Corporation 22465 Roads - Secondary Roads - NRJ - Barobo - Agusan del Sur 11/10/2019 28.860 226 O 0.38 0.24 0.15 0.03 0.06 0.03 89.30% - On-going 2nd DEO Bdry. Rd - K1411+542 - K1412+231.20 Legacy Construction Corporation (Formerly: Upper Saug River Irrigation Project - Construction of Main 22465 11/16/19 NIA 55.244 390 C 0.49 0.04 0.30 - - - 82.90 *82.90% Satisfactory Legacy Construction) Canal and Appurtenant Structures and Road Surfacing Maasin Airport Development Project - Construction of VPA with Legacy Construction Corporation (Formerly: 22465 / Access Road, Power House, Construction of Drainage for VPA, Legacy Construction) / Cean Construction 41086 - JV- Installation of Electricity Connection, Supplies of PTB, Runway 8/27/19 DOTR 79.287 323 O 0.40 0.30 0.15 0.02 0.06 0.03 95.60 - On-going (JV) 17-3019 Strip Grade Correction / Embankment on Runway 16 including Slope Correction Provincial Legacy Construction Corporation / J.T Concreting of Jct. Sayre H'way(Kibawe) Natulungan Rad, JV-17-027 02/21/2019 Government of 152.004 580 O 0.37 0.30 0.12 0.03 0.06 0.03 91.10 - On - Going Gamolo Construction - J.V. Kibawe, Bukidnon Bukidnon Provincial Legacy Construction Corporation / J.T JV-17-027 Concreting of Jct. (Valencia-Batangan) Laligan Road 02/22/2019 Government of 176.577 560 O 0.33 0.30 0.12 0.03 0.07 0.05 90.09 - On - Going Gamolo Construction - J.V. Bukidnon Provincial Legacy Construction Corporation / J.T. Concreting of Jct. Sayre H'way (Kibawe) Natulungan Rad. JV-17-027 08/28/2018 Government of 152.001 389 O 0.31 0.30 0.08 0.03 0.06 0.05 82.68 - On - Going Gamolo Construction - J.V. Kibawe Bukidnon Bukidnon Provincial Legacy Construction Corporation / J.T. JV-17-027 Concreting of Jct. (Valencia - Batangan) Laligan Road 08/29/2018 Government of 176.577 370 O 0.351 0.3 0.08 0.03 0.065 0.05 87.60 - On - Going Gamolo Construction - J.V. Bukidnon Paving of Unpaved Roads - Tertiary Roads, Lubi-Binog Roads, Legacy Construction Corporation/ Ground Up JV-17-1777 K0065+836 - K0068+319 (as modified) K0065+836 - 08/29/2019 Romblon DEO 93.549 255 C 0.49 0.13 0.27 - - - 88.80% 88.8% Satisfactory Construction And Supplies Joint Venture K0067+661.87 Legacy Construction/ Settlers Builder Joint Construction of Revetment at Sibalom River along Odiong - 05/29/2018 Antique DEO 37.173 205 C 0.30 0.20 0.30 - - - 80.40 81.24% Unsatisfactory Venture Sibalom - San Remegio - Leon Road Sorsogon 2nd Legazpi Premium Development Corporation 20701 Construction of Ponod Bridge 11/09/2019 38.413 395 C 0.50 0.13 0.30 - - - 93.10% 88.66% Satisfactory DEO Construction of Rockfall Protection System (Soil Protection) Zamboanga del Lexand Construction & Development 39573 along Rizal - Dakak - Dapitan Coastal Loop Road at 11/08/2019 28.808 213 O 0.39 0.24 0.15 0.03 0.05 0.05 90.70% - On-going Norte 3rd DEO Km1853+000 to Km1853+074.90 Construction/Upgrading / Rehabilitation of Drainage along Negros Oriental Leymarc Construction 22094 National Roads at Dumaguete South Road, K0000+674- 04/09/2018 1.846 108 C 0.48 0.13 0.30 - - - 91.80 *91.80% Very Satisfactory 2nd DEO K0001+015

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 103 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Flood Control along Bantaoay River, Barangay Ilocos Sur 1st Leza Construction & Supply 25565 11/11/2019 29.400 226 O 0.39 0.24 0.15 0.03 0.06 0.05 91.70% - On-going San Sebastian DEO Construction of Flood Control along Bantaoay River Brgy. Ilocos Sur 1st Leza Construction And Supply 25565 08/26/2019 23.276 146 O 0.35 0.24 0.15 0.03 0.05 0.05 86.70% - On-going Bayubay Norte DEO Widening of San Carlos-Calasiao Road, K0208+496 to Pangasinan 4th Leza Construction And Supply 25565 06/07/2018 13.026 174 O 0.368 0.24 0.126 0.03 0.05 0.033 84.70 - On-going K0208+956 DEO Retrofitting/Strengthening of Kumaba Bridge (B01065MN) Lhe Construction & Industrial Services, Inc. 34789 07/06/2018 Sarangani DEO 7.438 90 C 0.50 0.13 0.30 - - - 93.30 93.30% Very Satisfactory along Sarangani-Sultan Kudarat Coastal Road Construction of 3 Units 4 Storey 12 Classroom @ Malapatan Lhe Construction & Industrial Services, Inc. 34789 03/21/2018 Sarangani DEO 73.460 390 C 0.46 0.13 0.30 - - - 89.70 *89.70% Very Satisfactory NHS South Cotabato Lhe Construction & Industrial Services, Inc. 34789 Construction of Multi-Purpose Building (MSU GYMNASIUM) 11/20/2019 49.000 249 C 0.48 0.13 0.30 - - - 91.40% 87.24% Satisfactory 2nd DEO Retrofitting/Strengthening of Maligang Bridge (B01072MN) Lhe Construction & Industrial Services, Inc. 34789 11/21/2019 Sarangani DEO 8.850 90 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory along Sarangani-Sultan Kudarat Coastal Road Retrofitting/Strengthening of Maligang Bridge (B01072MN) Lhe Construction & Industrial Services, Inc. 34789 08/27/2019 Sarangani DEO 8.850 90 O 0.40 0.24 0.15 0.03 0.06 0.05 92.70% - On-going along Sarangani-Sultan Kudarat Coastal Road South Cotabato Lhe Construction & Industrial Services, Inc. 34789 Constrution of Multi-Purpose Building (MSU GYMNASIUM) 08/28/2019 49.000 249 O 0.39 0.24 0.10 0.03 0.05 0.02 82.30% - On-going 2nd DEO Lhe Construction & Industrial Services, Inc. 34789 Construction of Lun Masla River Flood Control 08/27/2019 Sarangani DEO 28.813 180 O 0.37 0.24 0.15 0.03 0.06 0.05 89.60% - On-going Lhe Construction & Industrial Services, Inc. / Construction of Four(4)-Storey 24-Classroom School Building at Robeth Gen. Mdse. Const. & Supply (Joint - 08/21/2019 Cotabato 1st DEO 64.370 375 C 0.50 0.19 0.25 - - - 93.60% 93.6% Very Satisfactory Kidapawan City National High School Venture) Replacement of Permanent Weak Bridge, Basud Bridge 2 Lienel Builders And Supply 40023 11/07/2019 Albay 3rd DEO 17.640 240 O 0.39 0.24 0.15 0.01 0.04 0.03 85.30% - On-going (B00284LZ) Along Daang Maharlika (LZ) Cagayan de Oro Light Construction & Supply 37797 Construction of Flood Control Project at Cugman River 11/12/2019 9.405 91 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory City 2nd DEO Local Infrastructure Program - Construction of Local Roads Sta. Camarines Sur Limcore Construction And Supply 40712 08/26/2019 0.940 47 C 0.43 0.13 0.30 - - - 86.50% 86.5% Satisfactory 0+00 - Sta. 0+100 4th DEO Asset Preservation - Preventive Maintenance along Jct. Binalay Camarines Sur Limcore Construction And Supply 40712 11/06/2019 4.043 46 C 0.48 0.13 0.03 - - - 64.80% 64.8% Poor (Tinambac) - Tamban Road K0513+000.00 - K0513+400 4th DEO Construction of 4 Storey- 8 Classroom School Building, Tapilon Lin Construction 40206 08/25/2019 Cebu 1st DEO 16.956 180 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory National High School, Daanbantayan, Cebu Construction of Two (2) Storey Civil Service Commission Field Regional Office Lin Construction 40206 08/29/2019 4.950 211 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory Office Building No. VII Construction of Multi-Purpose Building (Technology Traininga Mindoro Oriental Links Builders And Enterprises 44325 11/05/2019 2.850 134 O 0.37 0.28 0.15 0.03 0.06 0.05 93.70% - On-going Center) in Victoria DEO Off-Carriageway Improvement including Drainage, Bangad-Fort Nueva Ecija 2nd Lisa Construction 24134 03/15/2018 17.895 105 C 0.40 0.13 0.30 - - - 83.10 *83.10% Satisfactory Magsaysay Rod, K0129+405.30 - K0131+760, Nueva Ecija DEO Living Stone Construction & Surveying 32237 Construction of Electrical Powerhouse Phase II 09/27/2018 DOST 6.601 245 C 0.47 0.20 0.30 - - - 97.00 *97.00% Outstanding Rehabilitation of Purok 5, Barangiran-Bayang-Makikilo-Sitio Llaban Construction And Supply 29504 11/26/2019 Cotabato 1st DEO 53.399 259 O 0.40 0.23 0.15 0.03 0.05 0.05 91.10% - On-going Lama FMR 19MD0130 - Construction of Concrete Bridge Lindongan Flat Llaban Construction And Supply 29504 11/26/2019 Cotabato 1st DEO 65.184 246 O 0.40 0.24 0.15 0.03 0.05 0.05 91.40% - On-going Slab Bridge along Davao - Cotabato Road Llaban Construction And Trucking 29504 Malitubog Irrigation Project 03/10/2018 NIA 92.01 1,039 O 0.332 0.287 0.000 0.020 0.033 0.017 68.79 - On-going Construction of 1 Unit, 2 Storey - 10 Classroom School Building Bukidnon 2nd Llm Unified Builders & Trading Corp. 14235 08/20/2019 22.595 204 C 0.50 0.08 0.30 - - - 87.90% 87.9% Satisfactory with Toilet DEO Constructin of Classroom (2 STY - 6 CL), Stand Alone Senior Agusan del Sur Lm Construction And General Marketing 33727 03/21/2018 8.780 260 C 0.49 0.16 0.30 - - - 94.10 89.91% Very Satisfactory High School 1st DEO Construction/Improvement of Access Road Leading to Declared Tourism Destination of NRJ Daang Maharalika-Purok 9- Agusan del Sur Lm Construction And General Marketing 33727 08/24/2019 44.100 279 C 0.45 0.13 0.30 - - - 88.70% 88.7% Satisfactory Masabong-Cossep Road Leading to Dinagitan Cave and Falls 2nd DEO K0+000-K1+450 Construction of By-Pass and Diversion Roads - Barobo Bypass Surigao del Sur Lm Construction And General Marketing 33727 11/09/2019 46.334 185 O 0.39 0.24 0.12 0.03 0.05 0.03 85.80% - On-going Road, Surigao del Sur 2nd DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 104 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Provincial Lm Construction And General Marketing 33727 Concreting of NRJ Pisaan-Del Monte Road 03/28/2018 Government of 71.007 240 O 0.39 0.23 0.12 0.03 0.04 0.05 86.40 - On - Going Agusan del Sur Provincial Lm Construction And General Marketing 33727 Concreting of NRJ Pisaan-Del Monte Road 11/14/2018 Government of 73.277 380 C 0.47 0.20 0.30 - - - 96.90 90.50% Very Satisfactory Agusan del Sur LNR Construction 14148 Villaba Port Development Project 06/26/2019 DOTC 47.002 330 O 0.39 0.30 0.15 0.02 0.053 0.05 96.10 - On-going

Construction of 2 Units 2 Storey 10 Classroom School Building Zamboanga Long Island Builders & Construction 31730 05/29/2018 39.068 180 O 0.397 0.238 0.101 0.03 0.07 0.033 86.90 - On-going at Titay CES Sibugay 2nd DEO Zamboanga Long Island Builders & Construction 31730 Liloy - Sindangan Road, K1999+121 to K1999+616 08/21/2019 8.735 76 O 0.40 0.24 0.14 0.03 0.04 0.03 87.60% - On-going Sibugay 2nd DEO Widening of Permanent Bridge Patalon 2 (B01168MN) along Zamboanga City Long Island Builders & Construction 31730 08/29/2019 19.429 434 O 0.38 0.24 0.01 0.03 0.05 0.03 73.90% - On-going Zamboanga City - Labuan - Limpapa Road DEO

Road Widening (2 to 4 Lanes) along Liloy - Siocon Rd., Zamboanga del Long Island Builders & Construction 31730 11/06/2019 46.502 225 O 0.38 0.30 0.15 0.03 0.05 0.05 95.60% - On-going K1967+115 to K1968+353 Norte 2nd DEO

Road Upgrading (Gravel to Concrete) of Brgy. Kaliantana Road Zamboanga Long Island Builders & Construction 31730 Connecting Brgy, Kaliantana & Junction National Highway in 11/05/2019 17.101 141 O 0.38 0.24 0.13 0.03 0.05 0.03 86.40% - On-going Sibugay 2nd DEO support of Seaweeds & Coconut Industries Lorenzo Construction And Development 4284 Casecnan Multipurpose Irrigation and Power Project II 02/03/2018 NIA 76.62 269 O 0.381 0.300 0.000 0.030 0.070 0.050 83.13 - On-going Corporation Lorenzo Construction And Development 4284 Balog Balog Multipurpose Project II 02/16/2019 NIA 345.258 1,198 O 0.30 0.30 0.15 0.03 0.06 0.05 89.40 - On - Going Corporation Construction of Super Diversion Canal (SDC) (Sta. 42+920-Sta. Lorenzo Construction And Development 4284 46+080) One Lane RCDG Bridges, Laterals and Sub Laterals 02/23/2018 NIA 405.64 662 C 0.47 0.13 0.30 - - - 90.30 *90.30% Very Satisfactory Corporation including Related Structures and Supply, Delivery, Installation Lorenzo Construction And Development 4384 Casecnan Multipurpose Irrigation & Power Project II - IC 05/26/2018 NIA 25.073 120 C 0.42 0.20 0.30 - - - 92.12 *91.12% Very Satisfactory Corporation Construction of Concrete Road-Access Road Leading to Palawan 2nd Louiese Trading And Construction 39193 11/06/2019 19.427 180 O 0.39 0.30 0.07 0.03 0.05 0.03 87.10% - On-going Calasaguen Shore DEO Lourbel Construction And Supply 31370 Construction of Purok 4, Rawis River Flood Mitigation System 08/29/2019 Albay 2nd DEO 28.481 140 C 0.49 0.13 0.30 - - - 91.90% 91.9% Very Satisfactory Construction of TIEZA TES Office and San Vicente Tourist Lourel Development Corporation 17099 01/18/2019 TIEZA 25.000 225 C 0.48 0.20 0.00 68.20 68.20% Poor Information Center Tourism Information Center and Tourist Rest Area (Green Lpes Construction 36717 06/13/2019 TIEZA 4.500 183 C 0.47 0.19 0.30 95.62 95.62% Very Satisfactory Restroom) Marikit Irrigation Project - Phase III - Construction of Main Canal LPM Construction 36223 08/06/2019 NIA 14.286 213 O 0.36 0.30 0.00 0.03 0.07 0.05 80.70 - On-going (Sta. 0+000 - 1+480), Lateral "A" Canal and Related Structures Construction of School Building 1 Storey 2 Classrooms at South Cotabato Ltb Builders & Construction 18752 03/22/2018 2.581 100 C 0.50 0.13 0.30 - - - 92.80 *92.80% Very Satisfactory Bawing Elementary School 2nd DEO Construction of Concrete Road-Jct. Tres de Mayo-Brgy. Goma Davao del Sur Ltb Builders & Construction 18752 08/25/2019 14.703 105 O 0.39 0.24 0.15 0.02 0.05 0.05 90.10% - On-going Road leading to Mahilak Falls DEO Construction of Road in Burgos Street, Poblacion A, Sta 0+000- Ltb Builders And Construction 18752 Sta. 0+104.76; Sta. 0+110.79 to Sta. 0+212.11, Sta. 0+217.98 05/31/2018 Cotabato 1st DEO 3.959 86 C 0.47 0.13 0.30 - - - 90.40 90.40% Very Satisfactory to Sta. 0+426.90 Construction of Concrete Road- Jct. Tres de Mayo - Brgy. Davao del Sur Ltb Builders And Construction 18752 11/24/19 14.703 105 C 0.48 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory Goma Road leading to Mahilak Falls, Brgy. Goma DEO Rehabilitation with Slope Protection of Kamias Creek Brgy. Ltdl Builders 38371 03/12/2018 Rizal 1st DEO 14.629 210 C 0.49 0.13 0.30 - - - 92.10 *92.10% Very Satisfactory Bagong Nayon, Antipolo City Ltdl Builders 38371 Construction (Completion) of Multi-purpose Building 11/27/2019 Rizal 1st DEO 3.960 120 C 0.48 0.17 0.30 - - - 94.80% 94.8% Very Satisfactory Rehabilitation/Major Repair of Permanent Bridges Calaylayan Ltm Builders 35247 06/19/2018 Bataan 1st DEO 13.259 150 C 0.50 0.13 0.30 - - - 93.40 93.40% Very Satisfactory Bridge (BO1705LZ) along Roman Expressway Rehabilitation/ Major Repair of Permanent Bridges, Sallan Ltm Builders 35247 03/15/2018 Bataan 1st DEO 5.880 135 C 0.49 0.13 0.30 - - - 92.50 *92.50% Very Satisfactory Bridge (B01707LZ) Abucay, Bataan

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 105 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Bridge Program - Widening of Permanent Bridges, Bunga Ltz Construction And Supply 37407 08/21/2019 Leyte 5th DEO 18.695 163 O 0.39 0.23 0.15 0.03 0.04 0.03 87.70% - On-going Bridge along Daang Maharlika (LT) Ltz Construction And Supply 37407 Rehab. Of Municipal Streets 06/06/2018 Leyte 1st DEO 9.307 60 C 0.45 0.13 0.30 - - - 88.00 88.00% Satisfactory

Luck - Well Construction 17510 Construction R.C. Pier 05/18/2018 PPA 72.562 420 O 0.40 0.30 0.15 0.03 0.06 0.03 97.00 - On - Going

Luck-Well Construction 17510 Construction of R.C. Pier 08/31/2018 PPA 72.562 420 O 0.39 0.30 0.09 0.03 0.07 0.03 91.60 - On - Going

Provincial Luck-Well Construction 17510 Concreting of Sikatuna-Balilihan via Badiang Road 07/12/2018 Government of 138.403 504 O 0.34 0.30 0.15 0.03 0.04 0.00 85.37 - On - Going Bohol Provincial Luck-Well Construction 17510 Concreting of Sikatuna-Balilihan via Badiang Road 11/26/2018 Government of 138.403 665 C 0.47 0.20 0.00 - - - 67.24 77.28% Unsatisfactory Bohol Luck-Well Construction 17510 Construction of R.C. Pier 8/30/19 PPA 72.562 487 C 0.50 0.20 0.00 - - - 69.60 0.8443 Satisfactory CY 2017 Basic Educational Facilities Fund (BEFF)-Batch 4 Lucky A Construction Corporation 38293 Construction of One (1) Storey Two Classroom School Building- 06/01/2018 Ifugao 2nd DEO 2.584 120 C 0.43 0.13 0.30 - - - 86.20 86.20% Satisfactory Galonogon ES Construction/Improvement of Access Roads Leading to Airports, Lug Konstract 33783 Seaports and Declared Tourism Destinations - Access Road 06/02/2018 Leyte 3rd DEO 9.403 150 C 0.40 0.20 0.30 - - - 90.00 90.00% Very Satisfactory Leading to Calubian Seaport Lug Konstract 33783 Road Concreting of Brgy. Santarin - Balire Road (400 Ln.m) 04/06/2018 Leyte 2nd DEO 4.945 27 C 0.46 0.13 0.30 - - - 89.50 89.50% Very Satisfactory Rehab./Reconst./Upgrading of Damaged Paved National Road Lug Konstract 33783 Including Drainage Based on PMS/HDM-4 along Kiling- 04/02/2018 Leyte 1st DEO 9.006 120 C 0.48 0.13 0.30 - - - 91.50 *91.50% Very Satisfactory Tanauan-Tabon-Tabon-Julita Road Off-Carriageway Improvement Including Drainage CSR. Jct. Minas Road K0035+(-526)-K0035+000, K0040+950- Mindoro Oriental Lumel Glen Construction 26817 03/20/2018 45.799 390 OG 0.377 0.239 0.150 0.030 0.070 0.050 91.60 - On - Going K0041+765, K0042+000- K0042+615, K0042+791- K00656, DEO K0043+740-K0043+756.50 Construction of River Control (Revetment Wall ) Along Aklan Lumel Glenn Construction 26817 08/21/2019 Aklan DEO 41.807 210 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory including other Structure/Facilites Southern Mindoro Lumel Glenn Construction 26817 Construction of Multi-Purpose Building, Brgy. Cantil 11/08/2019 4.733 180 O 0.34 0.24 0.15 0.03 0.06 0.05 86.90% - On-going DEO Concreting of Road, Sitio Barok to Sitio Troso, Brgy. Sta. Southern Mindoro Lumel Glenn Construction 26817 11/08/2019 9.395 133 O 0.33 0.24 0.15 0.03 0.06 0.03 83.90% - On-going Brigida DEO Mindoro Oriental Lumel Glenn Construction 26817 Rehabilitation/Concreting of Pinagsabangan Beach Road 06/02/2018 28.149 250 O 0.376 0.237 0.15 0.03 0.061 0.05 90.40 - On-going DEO Lumel Glenn Construction/ D.M. Maliwanag Construction/ Opening with Spot Concreting of wall Weather Southern Mindoro 85.3% JV-17-1676 07/05/2019 48.663 354 C 0.49 0.19 0.30 - - - 97.30% Satisfactory Builders And Enterprisses Joint Venture Road from Sitio Proper to Sitio Sinariri DEO Network Development Improvement/Widening of National Cagayan de Oro Lvro Construction And Supply 18116 Roads CDO-Airport -Bukidnon Rd K1454+340 + K1454+842, 03/18/2018 17.583 120 C 0.48 0.13 0.30 - - - 90.80 *90.80% Very Satisfactory City 1st DEO K1455+023 - K1455+152 Construction of Hospital Phase III (Out Patient Department) at Lvro Construction And Supply 18116 03/22/2018 Butuan City DEO 19.338 300 C 0.50 0.13 0.30 - - - 93.00 *93.00% Very Satisfactory Butuan Medical Center Construction of One (1) Storey, Two (2) Classroom School Pangasinan 4th Lxs Builders & Supplies 25172 03/20/2018 2.566 85 C 0.50 0.13 0.30 - - - 92.80 *92.80% Very Satisfactory Building at Idolidol E/S DEO Rehabilitation/ Major Repair of Bridge- Dicklum Bridge Bukidnon 3rd Lyd Construction 37342 08/23/2019 3.724 65 C 0.45 0.13 0.30 - - - 88.00% 88% Satisfactory (B01495MN) Along Sayre Highway DEO Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads, Gingoog City - Claveria - Villanueva Misamis Oriental Lyd Construction 37342 Road, K1346+322 to K1346+394, K1346+430 to K1346+492, 11/05/2019 21.462 121 C 0.47 0.14 0.30 - - - 91.50% 93.36% Very Satisfactory 2nd DEO K1346+845 to K1346+922, K1346+958 to K1346+1010, K1363+000 to K1363+365, K1367+668 to K1368+000

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 106 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Rehabilitation/Reconstruction/Upgrading of Damaged Paved roads- Secondary Roads, Gingoog City- Claveria- Villanueva Road, Misamis Oriental, K1346+322- K1346+394, K1346+430- Misamis Oriental Lyd Construction 37342 08/27/2019 21.462 121 O 0.36 0.30 0.15 0.03 0.06 0.05 94.60% - On-going K1346+492, K1346+845- K1346+922, K1346+958- 2nd DEO K1346+1010, K1346+000- K1363+365, K1367+668- K1368+000 Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Primary Roads - Sayre Highway Bukidnon 3rd Lyd Construction 37342 11/05/2019 39.200 158 O 0.39 0.24 0.15 0.03 0.05 0.05 90.70% - On-going K1441+446 - K1441+780, K1465+097 - K1465+127, DEO K1465+220 - K1465+252 Rehabilitation of Multi-Purpose Building (Public Market), Brgy. Zamboanga del M & L Construction & Enterprises 38569 11/11/2019 4.900 124 C 0.50 0.13 0.30 - - - 92.90% 88.49% Satisfactory Pag-asa Sur 2nd DEO Zamboanga del M & L Construction & Enterprises 38569 Rehabilitation of Multi-Purpose Building (Public Market) 08/27/2019 4.900 124 O 0.39 0.21 0.15 0.03 0.05 0.03 86.60% - On-going Sur 2nd DEO Improvement/Construction of Road Network at Camp Aguinaldo Quezon City 2nd M O M Enterprises 12013 11/27/2019 64.438 300 O 0.34 0.25 0.15 0.03 0.05 0.05 86.40% - On-going Phase II DEO Proposed Assets Preservation of National Roads - M. Abubakar Construction And Engineering, Rehabilitation/Reconstruction of National Roads with Slip, Slope Zamboanga del JV-17-543 03/14/2018 35.648 367 C 0.40 0.13 0.30 - - - 83.50 85.84% Satisfactory Inc / Rg Builders Collapse and Landslide - Secondary Liloy-Siocon Road, Norte 2nd DEO Intermittent Sections from K2029+140 to K2039+030 Retrofitting/ Strengthening of Bridge- Malingon Bridge M. Design & Construct 39281 08/21/2019 Bukidnon 1st DEO 9.491 240 O 0.34 0.25 0.15 0.03 0.05 0.05 87.60% - On-going (B01371MN) Along Sayre Highway Preventive Maintenance along Jct Capitol-Hospital Road M. Montecarlos Enterprises, Inc. 6506 05/30/2018 Bukidnon 1st DEO 23.380 120 O 0.391 0.24 0.15 0.03 0.05 0.05 91.10 - On-going (SOO624MN) Chainage 000 - Chainage 806 Implementation of Civil Works for Annual Work Program 3 / Preventive Maintenance - 13 (AWP 3/PM-13) Impasug-ong - Regional Office M. Montesclaros Enterprises, Inc. 6506 Impalutao Section, K1476+(-575) - K1486+000 (with 03/19/2018 171.674 194 c 0.49 0.13 0.30 - - - 91.90 *91.90% Very Satisfactory No. X exceptions) Under Road Upgrading and PreservationProject (RUPP), JICA Loan Agreement No. PH Preventive Maintenace: Asphalt Overlay on Specific Location Bukidnon 2nd M. Montesclaros Enterprises, Inc. 6506 Along Syre Highway, K1555+272-K1556+374, K1559+000- 08/20/2019 73.668 184 O 0.38 0.30 0.15 0.03 0.04 0.05 94.30% - On-going DEO K1559+714 Construction/ Rehabilitation of Flood Control Structures Along Regional Office M. Montesclaros Enterprises, Inc. 6506 Kapalong- Talaingod Road, (Batangan Bridge Section- Left 08/22/2019 91.819 270 O 0.37 0.23 0.15 0.03 0.05 0.05 87.70% - On-going No. X Side) Road Widening Maramag - Maradugao Road K1582+000 to Bukidnon 3rd M. Montesclaros Enterprises, Inc. 6506 11/05/2019 32.379 177 O 0.38 0.23 0.15 0.03 0.05 0.05 88.60% - On-going K1582+893 DEO Preventive Maintenance: Asphalt Overlay on Specific location Bukidnon 2nd M. Montesclaros Enterprises, Inc. 6506 11/06/2019 86.107 190 O 0.40 0.22 0.15 0.03 0.05 0.05 89.30% - On-going along Sayre Highway - K1540+501 - K1542+600 DEO Cluster "44" Paving of Unpaved Roads in Bukidnon: 1) Jct Maradugao- Camp Kibaritan- Dominorog Road - K1622+068- M. Montesclaros Enterprises, Inc. / Rrn K1623+241, K1623+287-K1624+737, K1624+870-K1625+245; Regional Office JV-17-2301 08/28/2019 256.859 233 C 0.47 0.19 0.30 - - - 95.70% 95.7% Very Satisfactory Construction (Joint Venture) 2) Jct Maradugao- Camp Kibaritan- Dominorog Road - No. X K1614+900-K1614+1262, K1617+1345-K1619+614, K1619+660- K1622+068 NIA / La Union Irrigation M. O. Deguzman Builders & Supply 35596 Canalization and Repair of Amburayan River Irrigation System 11/13/2020 1.802 180 C 0.33 0.20 0.30 - - - - 82.67% Satisfactory Management Office Improvement/ Repair/ Rehabilitation of Existing Multi-Purpose M. S. Ramos Construction Inc. 31684 03/19/2018 Bulacan 1st DEO 2.819 60 C 0.48 0.13 0.30 - - - 91.60 *91.60% Very Satisfactory Building (Health Center) Brgy. Santos, Balagtas, Bulacan Improvement of Access Road Leading to Trades, Industrues and Economic Zones, Caray-caray - Cabungaan - Libtong Road M.B. Ang Construction & Supply 25001 08/26/2019 Biliran DEO 18.291 210 O 0.40 0.24 0.15 0.03 0.04 0.03 89.00% - On-going in Support of the Agri-Business: Food and Resource - Based Processing M.C. Taguba Construction 39178 Rehabilitation of Brgy. San Juan - Brgy. San Antonio Road 11/13/2019 Isabela 1st DEO 9.406 134 C 0.46 0.13 0.30 - - - 89.50% 89.5% Very Satisfactory

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 107 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Slope protection/ Flood Control at Gabor Dike Zambales 1st M.C.B Zamora Construction & Supply 32006 11/13/2019 22.758 228 O 0.37 0.20 0.15 0.03 0.05 0.03 83.50% - On-going Phase III, (PMS ID No. P00322193LZ-CWI) DEO

M.C.B. Construction & Supply 12128 Agno River Irrigation System Extension Project (ARISEP) 03/09/2018 NIA 42.59 300 O 0.356 0.300 0.150 0.030 0.065 0.017 91.78 - On-going

Improvement/ Repair/ Rehabilitation of Existing Multi-Purpose M.G. Francisco Construction 29831 03/19/2018 Bulacan 1st DEO 0.760 75 C 0.46 0.13 0.30 - - - 89.10 *89.10% Very Satisfactory Building (Health Center) Brgy. Santos, Balagtas, Bulacan Construction and Maintenance of Bridges along National Orads, M.G. Lualhati Const. Corp./ M.V. Sabalburo Ilocos Sur 2nd JV-16-2042 Replacement of Permanent Weak Bridges, Quinarayan Bridge 03/13/2018 36.144 251 OG 0.384 0.242 0.15 0.018 0.019 0.033 84.60 - On - Going Construction And Supply J.V. DEO along Manila North Road Construction of By-Passes/Diversion Roads, including ROW, Regional Office M.G. Lualhati Construction Corp. 35373 Construction of Laoag City By-Pass Road including Bridge 05/31/2018 190.516 420 C 0.50 0.13 0.30 - - - 92.80 91.48% Very Satisfactory No. 1 (Phase II) Construction/Repair/Rehabilitation/Improvement of Various Regional Office M.G. Lualhati Construction Corp. 35373 Infrastructure including Local Projects, Construction of 11/09/2019 56.810 236 O 0.40 0.24 0.15 0.03 0.06 0.05 92.50% - On-going No. I Calungbayan Bridge along Santa - Rancho Road Construction of Riverwall along South Pinagkabalian River, Malabon-Navotas M.G. Salazar Cons. Corp. 4072 03/22/2018 45.467 343 C 0.42 0.20 0.30 - - - 92.00 *92.00% Very Satisfactory Brgy. Muzon DEO Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - M.G. Salazar Construction Corp. 4072 09/05/2019 Laguna 3rd DEO 19.304 240 C 0.48 0.13 0.30 - - - 91.70% 91.7% Very Satisfactory Construction/Rehabilitation of Flood Control Structures along Dayap River at Dayap Bridge Construction og Four (4) Storey Eight (8) Classroom School Malabon-Navotas M.G. Salazar Construction Corp. 4072 08/30/2019 36.902 334 O 0.34 0.24 0.15 0.03 0.05 0.05 86.20% - On-going Building. Potrero Tanong Elementary School 1 DEO Asset Preservation - Preventive Maintenance - Tertiary Roads, Sorsogon 1st M.G. Salazar Construction Corp. 4072 Ariman - Casiguran Road, K0613+340-K0615+000, K0617+000- 11/10/2019 75.263 165 C 0.48 0.13 0.30 - - - 91.40% 91.4% Very Satisfactory DEO K0619+000 Local Program, Local Infrastructure Program, Building and Other Structures, Multipurpose/Facilities, Batangas 4th M.G. Salazar Construction Corp. 4072 11/21/2019 46.530 300 O 0.39 0.24 0.15 0.02 0.04 0.05 89.50% - On-going Rehabilitation/Improvement of Lipa City Community Park, DEO Phase II, at Barangay 7 Construction of Elementray and Secondary School Buildings under DEPED's CY 2018 Basic Educational Facilities Fund M.G. Villamin Construction 22521 11/25/2019 Quezon 4th DEO 19.445 255 C 0.50 0.19 0.30 - - - 98.90% 98.9% Outstanding (Batch 3), 2STY8CL Lopez National Comprehensive High School Construction of Four (4) Storey - Four (4) Units M.J. Apin Builders 12179 Laboratory/Workshop Building Pedro Alegre Aure Senior High 06/16/2018 Cavite 2nd DEO 29.890 195 O 0.394 0.241 0.150 0.03 0.047 0.033 89.50 - On-going School Construction / Repair / Rehabilitation / Improvement of Various M.J. Apin Builders 12179 Infrastructure including Local Projects, Water Supply - 09/07/2019 Cavite 2nd DEO 27.711 120 C 0.50 0.13 0.29 - - - 92.20% 92.2% Very Satisfactory Construction of Water System (Level II), Brgy. Sungay East Local Program: Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects, M.J. Apin Builders 12179 11/07/2019 Cebu 4th DEO 47.040 186 O 0.40 0.30 0.15 0.03 0.05 0.05 98.20% - On-going Water Management Facilities / Water Supply, Construction of Level III Water Supply System Palawan 2nd M.M. Rodriguez Trading And Construction 37228 Construction of Multi-Purpose Building at Municipal Center 03/12/2018 4.770 120 C 0.49 0.14 0.30 - - - 92.70 *92.70% Very Satisfactory DEO Protect Lives and Properties Against Major Floods- Construction/Maintenance of Flood Mitigation Structures and M.M. Suarez Construction & Supply 41341 11/07/2019 Bohol 2nd DEO 9.310 105 C 0.44 0.13 0.30 - - - 87.10% 87.1% Satisfactory Drainage System: Construction of Wahig River Control (SDR- Cantiwas Bridge) M.O. De Guzman Builders and Supply 35596 Repair of AMBURAYAN RIS 11/13/2020 NIA 1.802 180 C 0.33 0.20 0.30 - - - 8267.00% - Satisfactory Construction of Multi-Purpose Building, New San Dionisio Metro Manila 2nd M.P.Z. Carreon Builders 43369 08/20/2019 4.949 210 O 0.40 0.22 0.15 0.03 0.04 0.05 88.20% - On-going Village DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 108 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of 3 Storey, 9 Classroom (L-Type) Davao City Davao City 1st M.R. Vargas Construction 8215 06/07/2018 25.993 210 O 0.379 0.23 0.15 0.03 0.056 0.05 89.50 - On-going National High School (Annex) DEO Construction of Multi-Purpose Building (Covered Court) Zamboanga M.S.D.L.R. Construction 32266 08/21/2019 1.971 60 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Poblacion Muslim Sibugay 2nd DEO Local Infrastructure Program - Construction and Rehabilitation M.V. Caldo Engineering Construction And 16938 of Multi-Purpose Covered Court at Librada Avelino Elementary 03/23/2018 North Manila DEO 9.869 225 C 0.48 0.19 0.30 - - - 96.90 *96.90% Outstanding Supplies School Local Program-Construction /Repair/Rehabilitation/Improvement of Various Infrastructure M.V. Caldo Engineering Construction And 16938 including Local Projects-Local Roads and Bridges-Loca Roads- 08/27/2019 North Manila DEO 18.948 210 C 0.45 0.13 0.30 - - - 88.70% 88.7% Satisfactory Supplies Concreting of Road with Drainage Improvement along Ipil Street (North Antipolo to T. Bugallion) Provincial M.V. Sabalburo Const'N. & Supply / Mbb 32561 / Upgrading and Improvement of Pantay Daya - Pantay Laud 10/11/2018 Government of 48.493 210 O 0.40 0.30 0.15 0.03 0.07 0.05 99.50 - On - Going Const'N & Supply 11363 Road Ilocos Sur Ilocos Sur 1st M.V. Sabalburo Construction And Supply 32561 Construction of Tay-ac Bridge 11/11/2019 7.840 165 C 0.50 0.13 0.30 - - - 93.30% 86.16 Satisfactory DEO Construction/Rehabilitation of Flood Mitigation Facilities with Ilocos Sur 2nd M.V. Sabalburo Construction And Supply 32561 Major River Basins and Principal Rivers: Construction of Abra 11/12/2019 29.399 190 C 0.47 0.13 0.30 - - - 90.00% 90% Very Satisfactory DEO River Control, Saccuya Norte, Section Ilocos Sur 1st M.V. Sabalburo Construction And Supply 32561 Construction of Tay-ac Bridge 08/26/2019 7.607 165 O 0.23 0.30 0.15 0.03 0.05 0.05 81.40% - On-going DEO Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Camarines Sur M3A Construction 32123 Maintenance of Flood Mitigation Structures and Drainage 11/07/2019 18.443 189 O 0.39 0.23 0.04 0.03 0.06 0.00 75.00% - On-going 3rd DEO Systems - Construction / Rehabilitation / Improvement, Brgy. Mangayawan Flood Control Campamento II Communal Irrigation System - Construction of MA Construction 40584 11/30/19 NIA 2.979 180 O 0.32 0.30 0.15 0.02 0.01 0.03 83.80 - On-going Canal Lining and Canal Structures Implementation of Civil Works for the JICA Assisted Road Upgrading/Improvement (UI) Component of the Road UPMO, RMC I Mac Builders 7249 Upgrading and Preservation Project (RUPP) for CP2: 04/04/2018 95.133 753 OG 0.335 0.3 0.15 0.03 0.051 0.05 91.60 - On - Going (Bilateral) Reconstruction of Damiao Bridge, Hunan Bridge and Bateria Bridge Implementation of Civil Works for the JICA Assisted Road Upgrading/ Improvement (UI) Component of the Road UPMO, RMC I Mac Builders 7249 Upgrading and Preservation Project (RUPP) for CP2: 04/04/2018 139.347 712 OG 0.35 0.3 0.099 0.03 0.042 0.033 85.40 - On - Going (Bilateral) Reconstruction of Anislag Bridge, Hinawanan Bridge and Palo Bridge Asset Preservation of National Roads - Preventive Maintenance Based on Pavement Management System/Highway Regional Office Mac Builders 7249 Development and Management - 4 (HDM-4) Primary Roads 04/07/2018 103.575 290 OG 0.332 0.238 0.146 0.022 0.025 0.033 79.60 - On - Going No. VIII Daang Maharlika (SM) (San Isidro - San Juanico Bridge) K0809+000 - K0809+350; K0817+000 - K0817+

Asset Preservation of National Roads - Preventive Maintenance Based on Pavement Management System/Highway Regional Office Mac Builders 7249 Development and Management - 4 (HDM-4) Primary Roads 04/13/2018 64.638 210 C 0.49 0.13 0.30 - - - 92.20 *92.20% Very Satisfactory No. VIII Daang Maharlika (SM), K0950+761- K0953+098, K0953+098- K0953+572, K0954+247-K0954+776 Bacolod South Road (Kabankalan-Hinoba-an Section) Regional Office Mac Builders 7249 K0140+018-K0141+225, K0142+112-K0145+991, K0147+851- 08/22/2019 137.283 260 C 0.44 0.14 0.30 - - - 87.40% 87.4% Satisfactory No. VI K0148+357 Retrofitting/Strengthening of Permanent Bridges, Pasig Mac Builders 7249 11/23/2019 NCR 135.208 342 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Boulevard- C-5 Flyover (B01876LZ) along C-5 Road

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 109 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Ensure Safe and Reliable National Road System, Asset Preservation Program-Preventive Maintenance, Primary Roads, Regional Office Mac Builders 7249 11/08/2019 166.206 274 C 0.46 0.18 0.30 - - - 94.00% 91.36% Very Satisfactory Daang Maharlika(LZ), K0576+1000 to K0599+751 with No. V exceptions Ensure Safe and Reliable National Road System , Asset Preservation Program, Preventive Maintenance, Primary Regional Office Mac Builders 7249 11/08/2019 183.335 224 C 0.46 0.13 0.30 - - - 89.00% 87.44% Satisfactory Roads, Daang Maharlika, K0556+853 - K0559+000, No. V K0559+813 - K0562+660, K0564+000 - K0565+638.50 Construction of Missing Links/ New Roads, Bukidnon- Davao Regional Office Mac Builders 7249 08/28/2019 97.510 270 O 0.40 0.30 0.15 0.02 0.04 0.03 93.70% - On-going Connector Road, Jct. Panganan- Kiulom, , Package 5 No. X

Asset Preservation of National Roads - Preventive Maintenance Based on Pavement Management System/ Regional Office Mac Builders 7249 08/20/2019 138.854 300 O 0.48 0.30 0.13 0.03 0.04 0.03 90.90% - On-going Highway Development and Management - 4 (HDM-4) - Primary No. VIII Roads - Daang Maharlika (LT) K1008+235 to K1015+687 Bridge Program:Retrofitting/Strengthening of Permanent Mac Builders 7249 Bridges- Pasig Blvd. C-5 Flyover (B01876LZ) along C-5 Road 11/23/2019 NCR 136.247 180 O 0.40 0.30 0.05 0.03 0.05 0.00 83.10% - On-going (Phase II) Concrete Reblocking - Puerto Princesa South Rd K0004+375 - Macasaet Builders And Trading 37440 K0005 + 000, K0007+803-K0008+414, K0071+543- 06/01/2018 Palawan 3rd DEO 16.305 135 O 0.383 0.248 0.150 0.030 0.061 0.050 92.20 - On-going K0071+716, K0071 + 729-K0072+300 Concreting of Brgy. Sta. Cruz, FMR, Sta. 00+000 to Sta. Macasaet Builders And Trading 37440 03/14/2018 Palawan 3rd DEO 9.055 105 C 0.47 0.13 0.30 - - - 90.50 *90.50% Very Satisfactory 00+855 Macro Asia Construction 35242 Construction of Sports Complex (Oval) 11/04/2019 Cagayan 1st DEO 24.379 120 O 0.32 0.30 0.08 0.03 0.06 0.03 81.90% - On-going Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads- Surigao- Surigao del Sur Madyaw Construction & Dev. Corporation 29598 Davao Coastal Road K1444+670 - K1444+710, K1448+420.50 - 11/10/2019 31.965 276 O 0.39 0.24 0.15 0.03 0.05 0.05 91.30% - On-going 2nd DEO K1448+467.5, K1456+936.6 - K1456+986.2, K1476+218.4 - K1476+254.7 Construction of Concrete Road-NHJ Brgy. Matiao connecting to Davao Oriental Maer Summit Konstrukt Co. 25262 Sitio Tua Tua in Support of Coconut, and Coffee 05/29/2018 48.755 179 O 0.369 0.227 0.150 0.030 0.045 0.033 85.40 - On-going 2nd DEO Industries Regional Office Maer Summit Konstrukt Co. 25262 Matiao-Magsaysay Coastal Road, including ROW 11/28/2019 222.816 340 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory No. XI Concreting of Road at National Highways Junction, Brgy. Davao Oriental Maer Summit Konstrukt Co. 25262 03/17/2018 29.403 200 C 0.43 0.13 0.30 - - - 86.60 *86.60% Satisfactory Cocornon 2nd DEO Construction/Upgrading/Rehabilitation of Drainage Structure Mafil Builders, Inc. 35845 along Jct SH Aglayan-Zamboanguita Rd K1533+000 - 05/30/2018 Bukidnon 1st DEO 9.652 240 C 0.46 0.13 0.30 - - - 88.90 88.90% Satisfactory K1534+000 Off- Carriageway Improvement: Shoulder Paving/ Construction- Mafil Builders, Inc. 35845 Along Jct SH- Bangcud- Mailag Road By- Pass Road 08/21/2019 Bukidnon 1st DEO 16.543 270 O 0.39 0.23 0.15 0.02 0.05 0.05 88.50% - On-going (S00635MN) K1525+(-324) to K1525+677 Surigao del Sur Mag Corporation 36929 Renovation / Extension of Hospital, Lingig Community Hospital 03/19/2018 4.673 120 C 0.47 0.13 0.30 - - - 90.50 87.64% Satisfactory 2nd DEO Eastern Samar Maga Construction And Supplies 35891 Construction of Multi-Purpose Building, Purok "A" Poblacion 04/10/2018 2.890 90 C 0.38 0.19 0.30 - - - 87.00 *87.00% Satisfactory DEO Benoni Bridge (B00654MN) along Surigao- Davao Coastal Surigao del Sur Magar Construction And Supply 39012 06/01/2018 9.301 163 O 0.394 0.240 0.150 0.030 0.035 0.050 89.90 - On-going Road 1st DEO Construction of Concrete Road - Access Road leading to Pula Davao del Sur Magar Construction And Supply 39012 11/24/19 9.799 75 C 0.47 0.13 0.30 - - - 90.40% 90.4% Very Satisfactory Tana Viewing Deck DEO Construction of Concrete Road- Access Road leading to Pula Davao del Sur Magar Construction And Supply 39012 08/25/2019 9.799 75 O 0.40 0.24 0.15 0.02 0.05 0.05 90.40% - On-going Tana Viewing Deck DEO Road Concreting from Brgy. Biao Guianga, Tugbok District to Davao City 2nd Magar Construction And Supply 39012 08/28/2019 4.900 73 O 0.37 0.24 0.15 0.02 0.05 0.05 88.30% - On-going Sitio Balentong, Brgy. Riverside DEO Construction of 1 Unit, 3 Storey, Nine Classroom School Magilas Construction Corporation 40134 08/27/2019 Leyte 2nd DEO 24.947 273 O 0.40 0.21 0.15 0.03 0.03 0.05 86.90% - On-going Building, Atty Roque A. Marcos Memorial School

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 110 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Flood Control Structure along Maharlika Magna Rich Trading & Construction 29108 06/16/2018 DEO 18.479 240 C 0.44 0.13 0.30 - - - 87.60 87.60% Satisfactory Highway Magna Rich Trading & Construction 29108 Construction of Flood Control Structure along River 11/18/2019 Laguna 2nd DEO 43.582 222 O 0.38 0.22 0.15 0.03 0.06 0.05 88.40% - On-going

Protect Lives and Properties against Major Floods: Mai Construction & Supply 30839 Construction/Maintenance of Flood Mitigation Structures and 11/06/2019 Bohol 2nd DEO 10.579 130 O 0.38 0.30 0.15 0.03 0.06 0.05 96.20% - On-going Drainage Systems, Construction of Maubid River Control

Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Including Negros Oriental Mai Construction & Supply 30839 Drainage based on Pavement Management System/Highway 04/11/2018 3.452 60 C 0.48 0.13 0.30 - - - 91.70 *91.70% Very Satisfactory 1st DEO Development Management-4 (HDM-4) Secondary along Vellehermoso-Canlaon City-La Castellana Road Construction/Improvement of Access Roads Leading to Declared Tourism Destinations NRJ Brgy. 1-Bitag-agan - Das- Agusan del Sur Mair Construction And General Merchandise 41232 11/12/2019 14.700 115 C 0.46 0.13 0.30 - - - 89.30% 90.62% Very Satisfactory agan Road Leading to Cave City/Aningaw Cave, Brgy. Das- 2nd DEO agan Construction/Improvement of Access Roads Leading to Declared Tourism Destinations NRJ Brgy. 1- Bitan-agan-Das- Agusan del Sur Mair Construction And General Merchandise 41232 08/24/2019 13.954 110 O 0.40 0.24 0.15 0.03 0.05 0.05 91.50% - On-going agan Road Leading to Cave City/Aningaw Cave , Brgy.Das- 2nd DEO agan Makana Builders & Supply 39826 Construction of Multi-Purpose Building 06/02/2018 Iloilo 4th DEO 2.351 90 C 0.42 0.14 0.30 - - - 86.50 86.50% Satisfactory

Makana Builders And Supply 39826 Construction of Multi- Purpose Building (Municipal Hall) 03/21/2018 Iloilo 4th DEO 9.603 255 C 0.46 0.20 0.30 - - - 96.20 *96.20% Outstanding

Makapa Corp. / E.U. Jingco Construction - Jv 30029/31486 Construction of Back up Area with Roro Ramp on Fill Project 05/30/2018 PPA 157.200 798 C 0.49 0.20 0.30 - - - 99.42 89.15% Very Satisfactory

Makapa Corporation 30029 Villahermosa Port Development Project 05/22/19 DOTC 9.336 120 C 0.39 0.20 0.30 - - - 89.00 *89.00% Satisfactory Construction/ Improvement of Cabilogan River Course (Cavasi- Makapa Corporation 30029 05/29/2018 Albay 3rd DEO 20.894 210 C 0.41 0.20 0.30 - - - 91.20 91.20% Very Satisfactory Tagpo Section, Downstream) Makapa Corporation 30029 Tinocawan Port Development Project - Extension of Port 12/11/2019 DOTR 9.464 120 C 0.46 0.20 0.30 - - - 95.80 *95.80% Very Satisfactory Rehabilitation/Reconstruction of Roads, Albay West Coast Makapa Corporation 30029 08/27/2019 Albay 3rd DEO 28.483 240 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory Slope Protection, Talin - Talin, K0516+916 to K0517+081 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems- Construction / Regional Office Makapa Corporation 30029 Improvement / Rehabilitation of Nasisi River Flood Control 11/08/2019 112.301 282 O 0.34 0.24 0.15 0.03 0.07 0.05 88.00% - On-going No. V System (Brgy. Tomolin, Guilid and Bagumbayan), Sta. 1+340.50 - Sta. 1+650.68; Sta. 1+655.00 - Sta. 2+123.00 (Right Side); Sta. 2+780.00 - Sta. 2-932.65 (Left Side)

30029 / Mati Port Development Project - 1) General Expenses 2) Makapa Corporation / KXBG Construction 43528 - JV- Enclosure of Breather Area 3) Construction of Breasting Dolphin 10/25/19 PPA 76.385 360 O 0.39 0.29 0.15 0.03 0.05 0.05 96.09 - On-going and Development Corporation (JV) 18-1466 4) Paving of Existing Back-Up Area 5) Reimbursable Items CY 2017 Basic Educational Facilities Fund (Construction of Batangas 3rd Mak-Jay Construction 19057 Classrooms) Batch 7, Construction of 2STY 4CL Paaralang 06/19/2018 8.925 150 C 0.48 0.13 0.30 - - - 91.70 91.70% Very Satisfactory DEO Sentral ng Talaga Off-Carriageway Improvement: Construction of Laybys on Makk Builders 36414 Specific Locations Along Marcos Hi-way (S00432LZ), K0280+(- 11/20/2019 Baguio City DEO 6.595 140 O 0.38 0.30 0.15 0.03 0.05 0.05 95.70% - On-going 475) + K0281+755 Balog-Balog Malta Construction & Supply 29173 Improvement of Service Road along Lateral B-2 12/19/2020 Multipurpose 8.003 99 C 0.33 0.20 0.30 - - - - 82.70% Satisfactory Project Phase II

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 111 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Mamsar Construction And Industrial Regional Office 15885 Standard (HDM-4 Project Analysis) (Intermittent Sections), 03/22/2018 121.682 284 c 0.49 0.13 0.30 - - - 91.80 *91.80% Very Satisfactory Corporation No. X Tubod-Ganassi Road, K1607+375-K1607+428, K1607+451- K1609+949, K1610+049-K1610+703, Construction of Slope Protection along Linamon Bridge Mamsar Construction And Industrial Lanao del Norte 15885 (BOO940MN), Phase II, Linamon, Lanao del Norte 1st LD, KO. 03/22/2018 22.792 178 C 0.49 0.13 0.30 - - - 92.40 *92.40% Very Satisfactory Corporation 2nd DEO 0+-030-KO.0+240.00 Mamsar Construction And Industrial Completion of Revetment along Maigo Bridge, K 0+000 - Lanao del Norte 15885 03/22/2018 43.309 271 C 0.50 0.13 0.30 - - - 93.30 91.00% Very Satisfactory Corporation K0+380 2nd DEO Mamsar Construction and Industrial Provincial Corporation (Formerly: Mamsar Enterprises 15885 Concreting of Brgy. Sering "Triple R" Jct. to Montag Road 11/18/19 Government of 22.242 240 O 0.38 0.30 0.02 0.03 0.07 0.05 84.91 - On-going Agro-Industrial Corporation) Surigao del Norte Mamsar Construction and Industrial Corporation (Formerly: Mamsar Enterprises Banago Port Expansion Project - General Expenses, 15885 / Agro-Industrial Corporation) / Silver Dragon Construction of Back-Up Area with Roro Ramp on Piles, 30835 - N-18- 10/25/19 PPA 362.699 660 O 0.39 0.30 0.15 0.02 0.07 0.05 97.14 - On-going Construction & Lumber & Glass Supply Inc. Widening of Access Road on Piles, Port Lighting System and 0355 (Formerly: Silver Dragon Construction & Reimbursable Items Lumber & Glass Supply) (JV) Mamsar Construction And Industrial Construction of Flood Control at Labuan River, Labuan Section, Zamboanga City Corporation / Aej Hardware Construction & JV-16-459 03/20/2018 26.910 379 OG 0.302 0.3 0.14 0.03 0.047 0.033 85.17 - On - Going (Including Right of Way Acquisition) DEO Enterprises Joint Venture Construction of Adris Lateral L - Extra (Sta. 0+ 000 -Sta. Mañalac Construction & Supply 36210 10/27/2018 NIA 4.989 150 O 0.33 0.30 0.15 0.03 0.05 0.05 91.20 - On - Going 2+762.10) & Appurtenant Structures Construction of Roads with Drainage System at University of the Quezon City 2nd Mancol Construction Corporation 44334 11/25/2019 18.451 240 O 0.40 0.26 0.15 0.03 0.05 0.05 93.20% - On-going Philippines Diliman Campus DEO Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Mangen Techno-Builders Inc 39778 Maintenance of Flood Mitigation Structures and Drainage 11/08/2019 North Manila DEO 39.199 150 C 0.48 0.17 0.30 - - - 94.90% 92.98% Very Satisfactory Systems - Bank Improvement, Estero de Sunog Apog Sta. 0+821 to Sta. 0+927.45 Organizational Outcome 2: Protect Lives and Properties Against Major Floods-Flood Management Program- Mangen Techno-Builders Inc. 39778 Construction/Maintenance of Flood Mitigation Structures and 08/27/2019 North Manila DEO 37.219 150 O 0.40 0.24 0.15 0.03 0.05 0.05 91.70% - On-going Drainage Systems-Bank Improvement, Estero de Sunog Apo Sta. 0+821.85 to Sta. 0+927.45 Design and Build Services of Power Distribution, Street Light Maqueserg Construction 31903 06/25/2019 DOST 9.892 180 O 0.37 0.30 0.15 0.03 0.06 0.05 95.80 - On-going and Water Systems Design and Build Services of Power Distribution, Street Light Maqueserg Construction 31903 02/14/2020 PSHS-ZRC 9.892 180 C 0.47 0.20 0.30 - - - 96.99% 96.16% Outstanding and Water Systems Construction of Two (2) Storey - Four (4) Classroom School Marabe General Construction & Supply 40326 08/25/2019 Masbate 1st DEO 10.038 120 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory Building at Andres Clemente Jr. National High School Construction of Concrete Road - Concreting of Road, Jct. Marabe General Construction & Supply 40326 11/12/2019 Masbate 2nd DEO 24.480 143 O 0.38 0.24 0.15 0.03 0.06 0.03 88.80% - On-going National Road - Brgy. Looc Road Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Mindoro Oriental Marc Jill Construction 39585 Roads along Calapan South Road Jct Pola Rd. K0062+-500 - 11/05/2019 22.881 144 O 0.35 0.25 0.15 0.03 0.06 0.05 89.80% - On-going DEO K0062+093, K0070+990 - K0071+674 Marcarp Engineering Developers And Bridge-Retrofitting/ Strengthening of Permanent Bridges-Hibuga 43985 11/13/2019 Leyte 2nd DEO 12.990 91 C 0.50 0.13 0.30 - - - 93.30% 88.86% Satisfactory Supplies Br. (B0049LT) Bridge - Retrofitting/ Strengthening of Permanent Bridges Marcarp Engineering Developers And 43985 Hibuga Bridge (B0049LT), along Mayorga - La Paz Road, 08/27/2019 Leyte 2nd DEO 12.990 91 O 0.40 0.20 0.15 0.03 0.03 0.05 85.90% - On-going Supplies K0950+280 Asset Preservation of National Roads-Preventive Maintenance based on Pavement Management System/Highway Batangas 4th Marcbilt Construction, Inc. 21844 06/19/2018 39.100 180 C 0.46 0.13 0.30 - - - 89.10 89.10% Very Satisfactory Development and Management- 4 (HDM-4), Secondary Roads, DEO Batangas-Lobo Road

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 112 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Preventive Batangas 4th Marcbilt Construction, Inc. 21844 09/05/2019 60.079 136 C 0.48 0.13 0.30 - - - 91.40% 91.4% Very Satisfactory Maintenance, Primary Roads, Manila - Batangas Rd, K0073+ (- DEO 700) - K0074+850 Asset Preservation Program - Preventive Maintenance - Primary Marcbilt Construction, Inc. 21844 11/18/2019 Laguna 2nd DEO 22.012 90 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory Roads - Manila South Road - K0046+414-K0047+000 Asset Preservation of National Roads - Preventive Maintenance Based on Pavement Management System/ Highway Marcbilt Construction, Inc./ Waycon Builders Development and Maintenance-4 (HDM-4) Secondary Along JV-16-1389 03/13/2018 Quezon 3rd DEO 57.900 225 C 0.48 0.13 0.30 - - - 91.60 *91.60% Very Satisfactory & Construction Supply Joint Venture Padre Burgos - Pototanin Jct. Road, K0184+110 to K198+000 (Intermittent Sections), Brgy. Ibabang Kalilayan, Unisan, Quezon Protect Lives and Properties Against Major Floods Construction/Maintenance of Flood Mitigation Structures and Camarines Sur Marcivan Construction And Supply 36958 11/04/2019 27.920 177 C 0.48 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory Drainage System Desilting/Channel Improvement/Revetment at 5th DEO Cristo Rey River

Marcphil Construction Corporation 10949 Expansion and Renovation of Gym 10/04/2019 BSP 4.432 148 C 0.43 0.20 0.30 - - - 92.80 *92.80% Very Satisfactory

Road Widening of Davao-Cotabato Road (Jct. Digos-Cotabato Section), K1635+140-K1637+840 (Chainage 42144-Chainage Regional Office Marcus Construction & Supply 12601 06/08/2018 144.543 293 C 0.46 0.13 0.30 - - - 89.50 89.50% Very Satisfactory 44850), K1638+050-K1640+174 (Chainage 45063-Chainage No. XII 47194) Rehabilitation/Improvement of Various Flood Control Projects in Mardeb Construction & Development 06442 Isabela Flood Control, Sta. 0+000-Sta. 0+259.725 and Sta. 03/19/2018 Isabela 4th DEO 44.165 235 C 0.42 0.20 0.30 - - - 92.20 *92.20% Very Satisfactory 0+000-Sta. 0+432.645 Network Development, Improvement/Widening of National Mar-Deb Construction & Development 6715 03/20/2018 Isabela 3rd DEO 47.059 239 C 0.46 0.17 0.30 - - - 93.20 *93.20% Very Satisfactory Roads, Cauayan-Cabatuan Road, K0373+472-K0375+549 Construction/Maintenance of Flood Mitigation Structures and Mar-Deb Construction & Development 6715 Drainage Systems, Construction of Camarag Flood Control 06/05/2018 Isabela 4th DEO 44.831 235 O 0.393 0.24 0.15 0.015 0.025 0.05 87.30 - On-going Project Construction/Maintenance of Flood Mitigation Structures and Mar-Deb Construction & Development / Ilocos Norte 2nd Drainage Systems, Construction of Flood Control Structure 05/31/2018 49.000 262 C 0.27 0.20 0.30 - - - 76.40 83.72% Satisfactory Gacutan Construction (Joint Venture) DEO along Dongdong River Mar-Deb Construction & Development / Jc Rehabilitation/Improvement of Various Drainage Structures in Palomo Construction & Construction Supply Isabela-Drainage Structure (Sta. 0+000 to Sta. 0+259 and Sta. 06/05/2018 Isabela 4th DEO 46.320 263 C 0.50 0.13 0.30 - - - 93.10 93.10% Very Satisfactory Joint Venture 0+000 to Sta. 0+432.645 Rehab./Improvement of Various Flood Control Structures in Mar-Deb Construction & Development Corp. 6715 11/07/2019 Isabela 4th DEO 44.335 280 C 0.48 0.20 0.00 - - - 68.70% 77.88% Unsatisfactory Isabela - Tupax Section (Sta. 0+000 - Sta. 0+469) Rehab/Improvement of Various Flood Control Structures in Mar-Deb Construction & Development Corp. 6715 08/22/2019 Isabela 4th DEO 44.519 280 O 0.38 0.24 0.05 0.03 0.05 0.03 78.70% - On-going Isabela Rehab/Improvement of Various Flood Control Structures in Mar-Deb Construction & Development Corp. 6715 08/22/2019 Isabela 4th DEO 44.335 280 O 0.38 0.24 0.11 0.03 0.04 0.03 84.00% - On-going Isabela - Tupax Section (Sta.0+000 to Sta.0+469) Protect Lives and Properties against Major Floods: Construction/Rehabilitation of Flood Mitigation Facilities within Mar-Deb Construction & Development Corp. 6715 08/24/2019 Isabela 3rd DEO 43.750 167 O 0.38 0.24 0.15 0.03 0.05 0.05 90.00% - On-going Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project OO2: Protect Lives and Properties Against Major Floods: Construction/Rehabilitation of Flood Mitigation Facilities within Mar-Deb Construction & Development Corp. 6715 11/09/2019 Isabela 3rd DEO 43.422 167 O 0.40 0.30 0.05 0.03 0.05 0.00 82.30% - On-going Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project Mar-Deb Construction & Development Corp. Isabela Irrigation Management Office - Repair of Canal Lining, (Formerly: Mar-Deb Construction & 6715 CHB Canal Lining, Protection Dike, Sub - Lateral and Drainage 5/25/19 NIA 21.707 405 O 0.32 0.25 0.15 0.02 0.05 0.05 84.00 - On-going Development) Canal Mardi Infra Builders 39713 Construction of Material Recovery Facility 7/22/19 DOST 4.800 168 C 0.48 0.14 0.30 - - - 91.81 *91.81% Very Satisfactory Construction of Flood Control Structure along Angat River Margarita Construction 20201 03/19/2018 Bulacan 1st DEO 19.588 180 C 0.26 0.13 0.30 - - - 69.00 83.94% Satisfactory Poblacion, Bustos, Bulacan

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 113 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Metro Manila 1st Margarita Construction 20201 Construction of Revetment Wall along San Juan River 11/19/2019 27.923 150 O 0.31 0.30 0.15 0.03 0.05 0.05 89.50% - On-going DEO Construction of Two (2) Storey-Regular Workshop, Felisberto Surigao del Sur Mark Anthony Construction & Supply 34057 11/09/2019 16.769 210 C 0.49 0.20 0.30 - - - 84.40% 90.14% Very Satisfactory Verano National High School (School ID - 304886) 1st DEO

Construction of Multi-Purpose Building ( Traning Center) for Compostela Mark Anthony Construction & Supply 34057 03/20/2018 3.465 90 C 0.50 0.13 0.30 - - - 92.70 *92.70% Very Satisfactory DepEd Division of Compostela Valley Valley DEO

Markbilt Construction 12522 Barbar Earthfill Dam and its Appurtenant Structures 04/20/2018 NIA 273.142 1,622 O 0.40 0.29 0.05 0.02 0.03 0.02 80.30 - On - Going Raising of Grade Maculcol Dike (Downstream), Sta. 1+650 - Zambales 1st Markbilt Construction 12522 03/13/2018 25.138 180 C 0.48 0.13 0.30 - - - 91.00 *91.00% Very Satisfactory Sta. 2+160, San Narciso, Zambales DEO Markbilt Construction Trading & Development 12522 / Corp. (Formerly: Markbilt Construction) / Vermatthew Heights 1 6/28/19 NHA 164.829 462 O 0.30 0.30 0.00 0.03 0.07 0.03 73.70 - On-going 33415 Verlin Konstrukt Inc. (JV) Restoration/Rehabilitation/Improvement of Various Road Slips/Scouring, Backslope Protections and Damaged PCCP Markbilt Construction Trading & Development JV-18-1124 along Banaue - Hungduan - Benguet Boundary Road, Nueva 09/05/2019 Ifugao 1st DEO 36.563 120 C 0.48 0.13 0.30 - - - 91.30% 91.6% Very Satisfactory Corp. / C-Bros Construction (Joint Venture) Viscaya - Mt. Province Boundary Road and Kiangan - Tinoc - Bugulas Boundary Road, Intermittent Section Markbilt Construction Trading and Development Corporation / Verlin Konstruct, Vergabriel Heights Subdivision 05/25/19 NHA 285.747 1,063 C 0.44 0.20 0.23 - - - 87.01 81.72% Unsatisfactory Inc. - JV Marra Builders 8784 Tacloban Port Expansion and Improvement Project Phase 4 02/23/2018 PPA 434.06 690 O 0.397 0.300 0.150 0.030 0.070 0.050 99.71 - On-going

Marra Builders 8784 Tacloban Port Expansion and Improvement Project Phase 4 04/26/2019 PPA 445.996 690 C 0.49 0.20 0.30 - - - 99.46 99.41% Outstanding Organizational Outcome 1: Ensure Safe and Reliable National Road System-Network Development-Road Widening-Tertiary Mar-Vel Construction & Supply 23722 09/07/2019 Cavite 2nd DEO 21.709 262 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory Roads-Crisanto M. Delos Reyes Avenue, K0068+495 - K0068+998 Construction of Three (3) Storey Nine (9) Classroom at Platon Mar-Vel Construction & Supply 23722 11/19/2019 Laguna 3rd DEO 27.108 330 O 0.40 0.23 0.11 0.03 0.05 0.03 85.50% - On-going Elementary School Cotabato City Mash Builder'S And Construction 37305 Concreting of Road Brgy. RH VII 11/25/2019 4.918 51 C 0.48 0.20 0.24 - - - 92.10% 84.12% Satisfactory DEO Cotabato City Mash Builder'S And Construction 37305 Concreting of Road 08/23/2019 4.918 51 O 0.39 0.30 0.00 0.03 0.07 0.00 78.80% - On-going DEO Construction/Improvement of Access Road Leading to Various Davao Occidental Masulot Construction 10716 08/26/2019 19.506 172 O 0.40 0.30 0.15 0.02 0.04 0.05 95.90% - On-going Beaches DEO Construction of 4-Storey, 20-Classroom School Building at Masulot Construction / Minrock Multi-Builders Cotabato City JV-18-560 Cotabato City National High School Datu Sema Kalantungan 08/23/2019 71.742 225 O 0.39 0.30 0.00 0.03 0.07 0.00 78.90% - On-going (Joint Venture) DEO Site Provincial Road Upgrading (Gravel to Concrete) of NHJ-Dahican-Bobon Maverick Builders 14466 07/16/2018 Government of 104.771 286 C 0.47 0.20 0.30 - - - 96.80 95.70% Very Satisfactory Road Davao Oriental Brgy. Maragatas to Brgy. Langka Road connecting Lupon Davao Oriental Maverick Builders Incorporated 14466 Public Terminal in support of Agribusiness: Coconut, Corn and 11/18/2019 45.363 234 O 0.39 0.24 0.15 0.03 0.06 0.03 89.30% - On-going 2nd DEO Rice Industries Maverick Builders Incorporated / J.H. Pajara Widening (2 into 6 lanes) of Buay Bridge (B00065MN) Including Regional Office JV-16-1024 03/20/2018 162.443 328 C 0.44 0.13 0.30 - - - 87.50 *87.50% Satisfactory Construction Joint Venture Approaches and RROW along Daang Maharlika (MN) No. XI Widening (2 into 4 lanes) of Kingking Bridge (B00197MN) and Maverick Builders Incorporated/J.H. Pajara Regional Office JV-17-2670 Approaches along Surigao-Davao Coastal Road Including 11/28/2019 251.452 398 C 0.50 0.13 0.30 - - - 93.20% 91.64% Very Satisfactory Construction Corporation (Joint Venture) No. XI ROW Construction/Maintenance of Flood Mitigation Structures and Ilocos Sur 2nd Mbb Construction 11363 11/12/2019 18.718 215 O 0.39 0.24 0.12 0.03 0.05 0.03 86.70% - On-going Drainage System: Construction of Sta. Maria Flood Control DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 114 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Ilocos Sur 1st Mbb Construction & Supply 11363 Construction of Boardwalk along Govantes River, Barangay 1 05/31/2018 46.599 201 C 0.43 0.20 0.15 - - - 77.90 77.90% Unsatisfactory DEO Rehabilitation/Reconstruction of Roads with Slips, Slope Ilocos Sur 2nd Mbb Construction & Supply 11363 Collapse, and Landslide - Primary Roads along Manila North 08/28/2019 14.259 180 O 0.33 0.24 0.15 0.02 0.05 0.05 83.90% - On-going DEO Road - K0382+050 - K0382+263 Cotabato City Mbe Construction And Supply 44568 Road Construction/Concreting of Brgy. RH 5 11/25/2019 1.840 26 C 0.49 0.13 0.24 - - - 85.90% 85.9% Satisfactory DEO Mbm Construction 37891 Concreting of Mainit FMR, Brgy. Mainit 06/01/2018 Capiz 2nd DEO 14.178 92 C 0.41 0.20 0.30 - - - 90.70 90.70% Very Satisfactory CY 2018 BEFF (Batch-3) Const. & Completion of School Buildings in the Elementary & Secondary Classrooms in Capiz, Mbm Construction 37891 08/23/2019 Capiz 1st DEO 21.451 150 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Casanayan National High School, 2 Storey 4 Classroom Lab (2 Science Lab & ICT Lab) Mbm Construction 37891 Construction of Multi-Purpose Building, Brgy. Lanot 11/08/2019 Capiz 1st DEO 2.970 96 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory Construction of Multi-Purpose Building (St. joseph Vocational Mbm Construction 37891 11/08/2019 Capiz 1st DEO 4.852 140 O 0.39 0.24 0.15 0.03 0.04 0.05 89.70% - On-going Technical Training & Assessment Center) Provincial Mcb Constructin And Supply 12128 Rehabilitation of Urbiztondo-Basista Road 01/22/2018 Government of 37.338 237 O 0.40 0.14 0.15 0.03 0.064 0.05 83.60 - On - Going Pangasinan Provincial Mcb Construction & Supply 12128 Rehabilitation of Urbiztondo - Basista Road 01/22/2018 Government of 37.338 237 O 0.40 0.30 0.15 0.03 0.06 0.05 99.40 - On - Going Pangasinan Construction of Protection Works along Ingalera River, Macabito Pangasinan 4th Mcb Construction & Supply 12128 11/07/2019 23.160 162 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Section DEO NIA / Pangasinan Construction of Irrigation Facilities, Canal Lining and Canal Irrigation Mcb Construction & Supply 12128 11/07/2020 11.139 300 C 0.44 0.10 0.30 - - - - 83.70% Satisfactory Structures Management Office MCB Construction & Supply 12128 SINOCALAN RIS-RRENIS 07/11/2020 NIA 11.136 300 C 0.44 0.10 0.30 - - - 8370.00% *83.70% Satisfactory Construction of Protection Works along Ingalera River, Macabito Pangasinan 4th Mcb Construction And Supply 12128 08/22/2019 18.994 162 O 0.31 0.30 0.15 0.03 0.06 0.03 88.20% - On-going Section DEO Construction of Slope Protection/Flood Control at Gabor Dike, Zambales 1st Mcb Zamora Construction & Supply 32006 08/20/2019 22.758 190 O 0.40 0.24 0.15 0.03 0.05 0.03 89.70% - On-going Phase III DEO Zambales 2nd Mcb Zamora Construction & Supply 32006 Construction of Multi-Purpose Building, Lucero (Covered Court) 11/14/2019 2.352 120 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory DEO Local Program; Construction / Repair / Rehabilitation/ Pampanga 3rd Mcb Zamora Construction & Supply 32006 Improvement of Various Infrastructure Including Local Projects; 11/08/2019 32.751 180 O 0.36 0.24 0.15 0.03 0.06 0.03 86.90% - On-going DEO Local Roads and Bridges; Local Roads: Concreting of Roads MCEE Construction Corporation 10951 Construction of Academic Building IV (Other Facilities) 03/10/2019 DOST 31.853 277 C 0.49 0.20 0.30 - - - 99.20 0.975 Outstanding MCJV (Montano Construction / Concha Design and Build Services for the Construction of Dormitory JV 172297 06/25/2019 DOST 33.206 495 O 0.39 0.30 0.11 0.03 0.06 0.05 92.90 - On-going Construction) Building 1 MCJV (Montano Construction / Concha Design and Build Services for the Construction of Dormitory 19473 / 8206 06/25/2019 DOST 40.000 430 O 0.34 0.30 0.15 0.03 0.05 0.05 92.40 - On-going Construction) Building 2 Rehabilitation/Reconstruction of National Roads with Slip, Slope Northern Samar Mcu Construction 43739 11/04/2019 15.527 120 C 0.49 0.13 0.30 - - - 92.20% 88.84% Satisfactory Collapse and Landslide along Catarman - Laoang Road 2nd DEO Construction of Road, Camp Juan Ponce Sumoroy, Barangay Northern Samar Mcu Construction 43739 11/06/2019 2.880 90 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory Dalakit 1st DEO Rehabilitation/Reconstruction of National Roads with Slips, Northern Samar Mcu Construction 43739 Slope Collapse, and Landslide along Catarman - Laoang Rd - 08/20/2019 15.527 120 O 0.38 0.28 0.15 0.02 0.05 0.05 92.50% - On-going 2nd DEO K0770+189-K0770+295 Buildings and other Structures-MultiPurpose/ Facilities - Construction of MultiPurpose Building. (Covered Court), A.) Camarines Sur Mdqr Construction & Supply 32491 11/08/2019 4.893 120 C 0.50 0.13 0.30 - - - 93.20% 87.53% Satisfactory Brgy. Borongborongan, Milaor, Camarines Sur and B.) Brgy. 2nd DEO Veneracion, Pamplona, Camarines Sur

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 115 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Cluster -LP: Buildings and other Structures - Multi-purpose/ Facilities - Construction of Multi-Purpose Building (Covered Camarines Sur Mdqr Construction & Supply 32491 08/22/2019 4.893 120 O 0.27 0.30 0.15 0.03 0.05 0.05 85.10% - On-going Court), A) Barangay Borong borongan Milaor, Camarines Sur 2nd DEO and B) Barangay Veneracion Construction of Bank Protection along Butuan City-Malaybalay Me 3 Construction 31364 08/28/2019 Butuan City DEO 37.788 177 O 0.40 0.30 0.15 0.01 0.04 0.05 94.60% - On-going Road (Dankias Section) Construction/Improvement of Acces Road Leading to Lawaan Me 3 Construction 31364 11/14/2019 Butuan City DEO 29.368 171 O 0.39 0.24 0.15 0.03 0.06 0.03 90.30% - On-going Park, Brgy. Tungao Provincial Me3 Construction/Jm Lacorte Construction JV-17-016-B Concreting of NRJ Cagbas-Saguma-Labao Road 02/21/2018 Government of 59.553 220 O 0.39 0.24 0.15 0.03 0.05 0.05 90.90 - On - Going Joint Venture Agusan del Sur Provincial Me3 Construction/Jm Lacorte Construction JV-17-016-B Concreting of NRJ Cagbas-Saguma-Labao Road 08/15/2018 Government of 59.614 310 C 0.50 0.20 0.30 - - - 99.60 94.50% Very Satisfactory Joint Venture Agusan del Sur Mecel Construction & Electrical Inc. 29864 Construction of Dormitory Building II 05/31/2019 DOST 33.275 O 0.40 0.28 0.15 0.02 0.07 0.05 96.70 - On-going Network Development Program - Off-Carriageway Improvement of Primary Roads along San Pablo - Calauan Rd. K0079+358 - Mega M Builders 20515 06/16/2018 Laguna 3rd DEO 38.612 240 O 0.391 0.24 0.15 0.03 0.055 0.05 91.60 - On-going K0079+500, K0079+588 - K0080+476, K0080+500 - K00+535, K0081+000 - K0081+095 Off-Carriageway Improvement including Drainage, Tertiary Mega M Builders 20515 Roads, San Juan-Candelaria Jct.- Candelaria-Bolboc 06/19/2018 Quezon 2nd DEO 48.902 330 C 0.46 0.17 0.30 - - - 92.90 92.90% Very Satisfactory (S02002LZ), K0153+520-K0155+225 Improvement/ Widening of National Roads, Tertiary Roads, San Mega M Builders 20515 Juan-Candelaria Jct.-Candelaria-Bolboc Road, K0146+(-440) - 03/14/2018 Quezon 2nd DEO 48.510 270 C 0.47 0.13 0.30 - - - 90.30 *90.30% Very Satisfactory K0146+670, Candelaria, Quezon Asset Preservation Program - Preventive Maintenance - Tertiary Mega M Builders / Marcbilt Construction, Inc. JV-18-1100 Roads - Calaunan - Nagcarlan Boundary Road K0079+910- 11/19/2019 Laguna 3rd DEO 63.833 105 C 0.49 0.20 0.30 - - - 98.80% 98.8% Outstanding Joint Venture K0080+072, K0081+251-K0084+000, K0085+000-K0087+500 Metro Manila 1st Mega Mykon Builders 40106 Completion of Quartering Building "E", Camp Bagong Diwa 11/19/2019 29.399 210 O 0.39 0.30 0.15 0.03 0.04 0.05 95.20% - On-going DEO Widening of Bridge- Kinilayan Bridge (B01440MN) Along Bukidnon 3rd Megakonstruk Development Corp. 38666 08/23/2019 18.869 220 O 0.37 0.24 0.13 0.02 0.05 0.03 83.20% - On-going Maranamag- Maradugao Road DEO Megay Construction 34354 Rehabilitation and Improvement of Cagsawa Ruins Park 07/05/2018 TIEZA 21.500 345 C 0.48 0.20 0.22 90.20 78.55% Unsatisfactory Ensure Safe and Reliable National Road System-Network Megay Construction And Supply 34354 Development Program- Road Widening-Primary Roads, 05/31/2018 Cagayan 3rd DEO 28.503 150 O 0.398 0.3 0.15 0.015 0.025 0.033 92.10 - On-going Santiago-Tuguegarao Road, K0435+144-K0436+226 Megila Construction Development And Construction of Multi-Purpose Building at Minta (Gymnasium Davao City 2nd 19262 03/13/2018 4.445 240 C 0.44 0.13 0.30 - - - 86.80 87.83% Satisfactory Supply Phase II), Tugbok District DEO Megila Construction Development And Construction of 4 Storey 1 Classroom School Building @ SHS Davao City 1st 19262 03/23/2018 21.887 360 C 0.39 0.13 0.30 - - - 82.30 *82.30% Satisfactory Supply within C.P. Garcia Elementary School DEO National Disaster Risk Reduction and Management Fund (NDRRMF), Rehabilitation/Restoration of Road Slip along Mt. Mt. Province 1st Melecio Construction 35275 09/10/2019 7.672 120 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Province-Nueva Viscaya Road, K0363+(-180) - K0367+618, DEO Intermittent Sections Davao Oriental Melrobe Builders & Construction Supplies 29752 Construction of Graduate School Building, Main Campus 08/20/2019 19.437 300 C 0.50 0.13 0.30 - - - 93.30% 89.45% Very Satisfactory 2nd DEO Lupon Coastal Road From Purok San Roque, Brgy. Poblacion Davao Oriental Melrobe Builders & Construction Supplies 29752 to Purok Bundas, Brgy. Bagumbayan leading to Diving Site, 11/19/2019 26.255 211 O 0.39 0.24 0.15 0.03 0.06 0.05 91.50% - On-going 2nd DEO Wenceslao Resort, & Arigid Ai Beach Resort Concreting of Road at National Highway Junction, Brgy. Davao Oriental Melrobe Builders & Construction Supplies 29752 03/17/2018 19.600 211 C 0.38 0.13 0.30 - - - 81.10 *81.10% Unsatisfactory Pintatagan 2nd DEO Construction/Maintenance of Flood Mitigation Structure and Meta Construction 2882 Drainage Systems Construction of Dumawing Flood Control 11/07/2019 Isabela 4th DEO 41.237 198 O 0.37 0.30 0.01 0.02 0.04 0.00 74.70% - On-going Project

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 116 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Rehabilitation of 2 Storey, 6 Classroom School Building, Quezon City 2nd Metrics Construction & Trading 18223 11/27/2019 2.455 90 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Sumolong High School, Brgy. San Roque DEO Rehabilitation of Multi-Purpose Building (Jacinto Building), AFP Quezon City 2nd Metrics Construction And Trading 18223 Education, Training and Doctrine Command, Camp General 08/28/2019 0.980 60 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory DEO Emilio Aguinaldo Construction of Elementary and Secondary Classrooms 3 South Cotabato Mfn Builders 36402 06/09/2018 27.878 205 O 0.391 0.239 0.150 0.030 0.056 0.050 91.60 - On-going Storey 12 Classrooms 2nd DEO Provincial Construction of Sports Learning Center at Glamang National Mfn Builders 36402 02/15/2019 Government of 3.175 130 O 0.29 0.30 0.15 0.03 0.05 0.05 87.20 - On - Going high School South Cotabato Provincial Construction of Sports Learning Center at Glamang National Mfn Builders 36402 03/28/2019 Government of 3.175 130 O 0.311 0.3 0.15 0.03 0.07 0.05 91.10 - On - Going high School South Cotabato Mfn Builders 36402 Construction of Glan River Flood Control 11/21/2019 Sarangani DEO 9.799 101 C 0.48 0.13 0.30 - - - 90.80% 90.2% Very Satisfactory Road Concreting at Purok 3 Saging St. from Tapel Avenue to South Cotabato Mfn Builders 36402 11/20/2019 12.250 95 C 0.50 0.14 0.30 - - - 93.00% 93% Very Satisfactory NIA Road 2nd DEO Mfn Builders 36402 Construction of Glan River Flood Control 08/27/2019 Sarangani DEO 9.310 90 O 0.37 0.24 0.15 0.03 0.06 0.05 89.80% - On-going Rehabilitation/Reconstrucion/Upgrading of Damaged Paved Lanao del Norte Mg & M Construction And Supplies 40052 Road along Sta. Felomina- Bonbonon- Digkilaan- Rogongon 08/25/2019 14.662 189 O 0.39 0.30 0.15 0.03 0.06 0.05 97.10% - On-going 2nd DEO Road, K1519+950- K1520+333 Rehabilitation/Reconstruction/Upgrading of Damaged Paved Lanao del Norte Mg & M Construction And Supplies 40052 Road along Sta. Felomina - Bonbonon - Digkilaan - Rogongon 11/06/2019 14.662 189 O 0.39 0.24 0.15 0.03 0.04 0.03 88.30% - On-going 2nd DEO Road, K1519+950 - K1520+333 Road Upgrading (Unpaved to Paved) based on Gravel Road Mg Samidan Construction / Djy Construction Strategies, Traffic Benchmark for Upgrading Road Standards to JV-18-0287 11/24/19 CAR 114.294 246 O 0.38 0.30 0.15 0.03 0.05 0.05 95.20% - On-going (Jv) Paved (HDm - 4 Project Analysis Acop - Kapangan - Kibungan - Bakun Road, K0333+401 to K0336+226 MGS Builders and General Contractor 33824 Design and Build of Guardhouse and Waiting Area 06/09/2019 DOST 2.433 165 C 0.49 0.20 0.30 - - - 98.50 *98.50% Outstanding MGS Builders and General Contractor 33824 Construction of Dormitory Building 1 Phase 3 06/09/2019 DOST 8.842 245 C 0.50 0.20 0.30 - - - 99.70 *99.70% Outstanding MGS Builders and General Contractor 33824 Design and Build of Motorpool and Warehouse 06/09/2019 DOST 4.931 210 C 0.50 0.20 0.15 - - - 84.60 *84.60% Satisfactory Construction of Road Slope Protection Structure - on Specific Mi Amore Construction Services 43026 Locations along Jct SH- Aglayan - Alanib -Ticalan Rd (Aglayan - 11/07/2019 Bukidnon 1st DEO 13.485 135 C 0.49 0.13 0.30 - - - 92.10% 93.24% Very Satisfactory Basak) (S00633MN) K1546 + 824 to K1556+137

Construction of Road Slope Protection Structure- on Specific Mi Amore Construction Services 43026 Locations Along Jct SH- Aglayan-Alanib- Ticalaan Road 08/21/2019 Bukidnon 1st DEO 12.809 135 O 0.38 0.30 0.15 0.02 0.04 0.05 94.00% - On-going (Aglayan-Basak) (S00633MN) K1546+824 to K1556+137 Davao del Norte Micah Construction & Supply Construction of 1 STY-2 CL School Bldg. at New Corella NHS 06/02/2018 2.788 85 C 0.48 0.13 0.30 - - - 91.20 91.20% Very Satisfactory 1st DEO Complete Construction of 2 - Storey 4 - Classroom School Pampanga 3rd Mickajette Construction And Trading 35239 08/28/2019 8.876 120 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory Building Sto. Nino Elementary School DEO Asset Preservation Program -Construction / Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Zambales 2nd Mickajette Construction And Trading 35239 08/22/2019 17.728 210 O 0.39 0.24 0.15 0.03 0.06 0.05 91.60% - On-going Roads, San Marcelino - San Antonio - San Narciso Road, DEO K0153+596 - K0154+550, K0156+178 - K0156+505 Completion of Work-Construction of 2nd Floor (OR and DR Miclover General Construction & Iron Works 31527 Complex, Wards and Doctor's Quarters Area) at Ospital ng Imus 06/15/2018 Cavite 1st DEO 44.775 240 C 0.50 0.13 0.30 - - - 93.20 93.20% Very Satisfactory (Imus City Hospital) Construction of Four (4) Storey, Sixteen (16) Classroom School Batangas 1st Miclover General Construction & Iron Works 31527 09/03/2019 54.282 270 C 0.50 0.13 0.30 - - - 93.00% 93% Very Satisfactory Building at SHS in Calatagan DEO Construction of Four (4) Storey, Sixteen (16) Classroom School Miclover General Construction & Iron Works 31527 11/20/2019 Laguna 1st DEO 37.270 285 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Building, Santa Cruz Elementary School Construction of 4-Storey 20-Classroom (L-Type) School Miclover General Construction & Iron Works 31527 09/09/2019 Cavite 1st DEO 60.070 265 O 0.37 0.27 0.12 0.03 0.05 0.03 86.60% - On-going Building at Toclong Elementary School Micro-Asia Builders Corporation 26286 Development of Sunburst Park 09/13/2018 TIEZA 19.000 150 O 0.33 0.30 0.15 0.03 0.04 0.05 90.80 - On - Going

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 117 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Micro-Asia Builders Corporation 26286 Dalaguete Public Beach 03/08/2019 TIEZA 3.500 90 O 0.379 0.3 0.15 0.03 0.07 0.05 97.90 - On - Going Micro-Asia Builders Corporation 26286 Development of Sunburst Park 03/01/2019 TIEZA 19.000 225 C 0.50 0.20 0.30 - - - 99.60 94.90% Very Satisfactory Nueva Vizcaya Mighty Construction & Supplies 34278 Construction of Multi Purpose Building Brgy. Lamo 08/26/2019 2.087 90 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory 2nd DEO Local Program - Buildings and Other Structures - Nueva Vizcaya 1st Mighty Construction & Supply 34278 Multipurpose/Facilities - Local Infrastructure Program - 11/11/2019 4.950 161 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory DEO Construction of Multi-Purpose Building, (Public Market) Construction of Standard 2-Storey *-Classroom School Building Pangasinan 1st Mightyway 40895 08/28/2019 17.348 170 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory at Amangbangan ES (9.5m x 46m) DEO Construction of Multi-Purpose Building, Beleng National High Pangasinan 4th Mightyway Construction & Supply 40895 11/06/2019 17.870 218 O 0.40 0.18 0.15 0.03 0.05 0.05 86.20% - On-going School DEO Construction of New Barangay Gym, San Antonio, Brgy. Sta. South Cotabato Migo Construction 34663 05/29/2018 2.473 105 O 0.357 0.24 0.15 0.03 0.047 0.05 87.40 - On-going Cruz 1st DEO Construction of 1 Unit - 1 Storey 2 Classroom at Talisay South Cotabato Migo Construction 34663 03/14/2018 2.361 85 C 0.50 0.13 0.30 - - - 92.80 *92.80% Very Satisfactory Integrated HS 1st DEO Construction of 2-Storey (6-CLR) School Building Bad-as Surigao del Norte Migo Construction 34663 08/19/2019 13.483 190 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory Elementary School 2nd DEO Construction of Bank Protection along Banga River, Sta. 1+590 - South Cotabato Migo Construction 34663 11/19/2019 9.785 105 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory Sta. 1+760, Brgy. Punong Grande 1st DEO Provincial Mikkil Construction 37020 Concreting of Dagumbaan - Cosina Road 08/10/2020 Government of 35.479 176 O 0.29 0.30 0.15 0.03 0.06 0.05 8822.00% - On-going Bukidnon Milestone 888 Construction Inc. 31224 Construction of Multi-Purpose Building (Gymnasium) 11/05/2019 Cagayan 1st DEO 2.970 125 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory Mindanao Const. Services & Land Devt. Construction of Concrete Road Jct. National Road to Hagimit Davao del Norte 34147 08/23/2019 15.495 94 O 0.40 0.24 0.15 0.02 0.05 0.05 91.20% - On-going Corp. Falls DEO Provincial Government of Mindanao Rock 23479 Concreting of Lauan - Lumbayao - Caputol Provincial Road 04/26/2018 49.654 291 O 0.34 0.30 0.15 0.03 0.07 0.05 94.10 - On - Going Misamis Occidental Mindanao Rock 23479 Construction of Liloan River Control 11/09/2019 Camiguin DEO 27.946 141 C 0.49 0.13 0.30 - - - 92.30% 92.3% Very Satisfactory Road Widening- Primary Roads, Oroquieta City- Plaridel- Misamis Mindanao Rock 23479 Calamaba- Sapang Dalaga Road, K1785+000- K1785+339, 08/20/2019 Occidental 1st 54.985 210 O 0.38 0.26 0.15 0.03 0.05 0.05 91.00% - On-going K1785+402- K1785+547, K1785+796- K1787+101 DEO Rehabilitation of Flood Control Structure along Sibuguey River, Zamboanga Mindanao Rock 23479 Sta. 0+513 to Sta. 1+122 and Sta. 0+000 to Sta. 0+088, Brgy. 11/11/2019 75.519 239 O 0.39 0.24 0.15 0.03 0.06 0.05 91.50% - On-going Sibugay 1st DEO Pilar Construction of Flood Mitigation Structure and Drainage Zamboanga del Mindanao Rock 23479 System, Construction of Flood Control, Lower Landing Bridge 11/09/2019 19.878 140 O 0.38 0.24 0.15 0.03 0.05 0.05 90.10% - On-going Sur 1st DEO (Downstream) along Mahayag - Dumingag Road Construction/ Improvement of Access Roads leading to Trades, Mindanao Rock / Lt Power Builders Industries and Economic Zones, Lunao -Agay-ayan Misamis Oriental JV-18-1032 11/11/2019 28.038 240 O 0.39 0.24 0.15 0.03 0.06 0.05 92.00% - On-going Development Corporation (Joint Venture) Circumferential Road Connecting to Proposed Lunao Seaport in 1st DEO Support of Transport and Logistics Construction of 2 Storey 6 CL at Datu Usman Elementary Cotabato City Minrock Multi-Builders 04/06/2018 11.937 170 O 0.400 0.240 0.150 0.030 0.056 0.050 92.60 - On-going School DEO Surigao del Sur Bdry.-Davao Oriental Coastal Road, k1514+107-k1514+131, k1514+970-k1515+000, k1516+018- Davao Oriental 1st Mitz Construction And Supply 41045 k1516+041, k1636+126-k1636+189, k1637+048-k1637+077, 11/20/2019 29.198 138 O 0.40 0.21 0.11 0.03 0.06 0.03 83.50% - On-going DEO k1637+087-k0637+100, k1637+217-k1637+240, k1692+320- k1692+338 Construction/Rehabilitation of Flood Control Structures along Nueva Ecija 1st Mivico Builders And Developers 20551 11/25/2019 18.761 150 C 0.50 0.13 0.30 - - - 93.10% 90.74% Very Satisfactory Casongsong River DEO Construction/Rehabilitation of Flood Control Structures along Nueva Ecija 1st Mivico Builders And Developers 20551 08/20/2019 18.761 150 O 0.40 0.24 0.15 0.03 0.05 0.03 89.10% - On-going Casongsong River DEO Mj Tiongson Construction 24202 Construction (Phase II) of Municipal Hall, Brgy. Poblacion 06/07/2018 Sarangani DEO 6.583 120 O 0.367 0.24 0.15 0.024 0.047 0.033 86.10 - On-going

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 118 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Provincial Concreting of NHW-Jct. Maribulan - Domolok Provincial Road Mj Tiongson Construction 24202 12/05/2018 Government of 39.989 188 C 0.42 0.20 0.30 - - - 92.10 93.03% Very Satisfactory Phase II (VO#1) Sarangani Mj Tiongson Construction (Formerly: Mjt Construction of Municipal Hall (Administrative Building), Brgy. 24202 03/21/2018 Sarangani DEO 9.883 124 C 0.50 0.13 0.30 - - - 93.20 *93.20% Very Satisfactory Builders) Poblacion Retroifitting/ Strengthening of Permanent Bridge - Midsalip Zamboanga del Mjmari Builders And Enterprises 36434 Bridge (B01563MN) along Eastern Bobongan - Sominot - 06/04/2018 5.201 75 C 0.50 0.13 0.30 - - - 93.30 93.30% Very Satisfactory Sur 1st DEO Midsalip - Dumingag Road Construction of One (1) Storey, Two (2) Classroom School Zamboanga del Mjmari Builders And Enterprises 36434 03/17/2018 3.301 101 C 0.48 0.13 0.30 - - - 91.00 *91.00% Very Satisfactory Building with Two (2) Seater Toilet Attached at Pinig ES Sur 2nd DEO Pangasinan 3rd Mkm Marketing 15586 Construction of Bank Protection along Lagasit River 08/20/2019 9.318 110 C 0.37 0.20 0.30 - - - 87.20% 87.2% Satisfactory DEO Rehabilitation/Reconstruction/Upgrading of Damaged Paved Mlu Construction / Urban Consolidated National Roads Including Drainage along Allen - Catarman Northern Samar JV-16-671 04/05/2018 36.425 270 OG 0.269 0.24 0 0.022 0.035 0 56.60 - On - Going Constructors Phils. Inc.(For. U Road, K0697+(-141) - K0698+018 and K0706+180 - 1st DEO K00706+390 Construction of Multi-Purpose Building (Covered Court), Camarines Sur Mm Senar Construction And Supply 38370 11/07/2019 3.924 109 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Ponong Integrated School 3rd DEO Camarines Sur Mm Senar Construction And Supply 38370 Construction of Multi-Purpose Building (Covered Court) 11/07/2019 3.751 100 C 0.50 0.13 0.30 - - - 93.30% 78.88% Unsatisfactory 3rd DEO Camarines Sur Mm Senar Construction And Supply 38370 Construction of Multi-Purpose Building (Covered Court) 08/24/2019 3.751 100 O 0.37 0.24 0.03 0.03 0.04 0.02 72.70% - On-going 3rd DEO Retrofitting/Strengthening of Permanent Bridges, Hamindang Surigao del Sur Mn Bayalas Construction 34251 03/19/2018 4.662 200 C 0.50 0.13 0.30 - - - 93.30 *93.30% Very Satisfactory Bridge along Surigao- Davao Coastal Road 2nd DEO Lower Agno River Construction of Trapezoidal Concrete Canal Lining (Sta. Irrigation System Mn Coloma Construction 45225 12/19/2020 4.633 150 O 0.32 0.30 0.15 0.03 0.03 0.03 86.50% - On-going 9+998.00 - Sta. 10+545.00 of LARIS Lateral E) Improvement Project

Construction of One (1) Unit, Three (3) Storey, 15-Classroom Mojar Construction 12930 12/04/2018 NHA 20.800 240 O 0.341 0.161 0.000 0.03 0.049 0.0333 61.45 - On - Going School Building

Construction of One (1) Unit, Three (3) Storey, 15 Classroom Mojar Construction 12930 5/29/19 NHA 20.800 324 O 0.31 0.30 0.08 0.03 0.06 0.02 79.03 - On-going School Building Upgrading of Drainage Structure along San Fernando Airport Molte Aries Construction & Industries 05/28/2018 La Union 1st DEO 5.854 120 O 0.347 0.240 0.150 0.030 0.043 0.033 84.30 - On-going Road, K0266+348 to K0266+586 Monolithic Construction & Concrete Products, Replacement of Macatoc Bridge (B00026MR) along CSR Jct. Mindoro Oriental 5733 06/02/2018 33.309 340 C 0.48 0.13 0.30 - - - 91.40 91.40% Very Satisfactory Inc. Minas Road DEO Monolithic Construction & Concrete Products, Road Widening-Roxas City-Cagay-Sibaguan-Balijuagan- 5733 06/01/2018 Capiz 2nd DEO 44.660 290 C 0.41 0.20 0.22 - - - 82.70 82.70% Satisfactory Inc. Cudian-Ivisan Road including RROW, K0102+390-K0103+818 National Irrigation Sector Rehabilitation and Improvement Monolithic Construction & Concrete Products, Project - Rehabilitation & Improvement of Sta. Barbara River 5733 12/10/2019 NIA 134.868 974 C 0.40 0.11 0.30 - - - 80.90 85.26% Satisfactory Inc. Irrigation System and Construction of Irrigator's Association Support Facilities Monolithic Construction & Concrete Products, Off Carriageway Improvement : Shoulder Paving of Dapa Surigao del Norte 5733 03/15/2018 43.489 176 C 0.42 0.20 0.30 - - - 92.00 *92.00% Very Satisfactory Inc. Junction Cancohoy Road 2nd DEO Local Program: Local Infrastructure Program - National Roads Monolithic Construction & Concrete Products, and Bridges - National Roads Rehabilitation / Improvement with 5733 11/27/2019 CAR 97.416 245 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Inc. Slip, Soil Collapse and Landslide along Abra - Kalinga Road, K0454+396 to K0454+448, K0454+516 to K0454+645 Monolithic Construction & Concrete Products, Construction of River Control along Panay River Basin, Brgy. 5733 08/24/2019 Capiz 2nd DEO 91.574 243 O 0.37 0.24 0.15 0.03 0.06 0.05 89.20% - On-going Inc. Angub

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 119 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) FY 2018 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable Monolithic Construction & Concrete Products, Regional Office 5733 National Road System Network Development Program 09/12/2019 189.245 360 O 0.40 0.24 0.15 0.03 0.05 0.05 91.90% - On-going Inc. No. IV-A Construction of By-Pass and Diversion Roads TAYABAS BYPASS ROAD, PACKAGE A, INCL. BRIDGE Monolithic Construction & Concrete Products, Construction of River Control along Panay River Basin, Brgy. 5733 08/24/2019 Iloilo City DEO 91.574 243 O 0.37 0.24 0.15 0.03 0.06 0.05 89.20% - On-going Inc. Angub Monolithic Construction & Concrete Products, Retrofitting/Strengthening of Bridge-Dungon Br. 4 (B00522PN) 5733 08/19/2019 Iloilo City DEO 75.672 303 O 0.37 0.24 0.15 0.02 0.03 0.05 86.10% - On-going Inc. along Sen. Benigno S. Aquino, Jr. Avenue Monolithic Construction & Concrete Products, Network Development-Construction of By-Pass and Diversion 5733 11/13/2019 Marinduque DEO 74.622 270 O 0.38 0.24 0.15 0.03 0.04 0.03 87.20% - On-going Inc. Roads, Boac-Mogpog By-Pass Road Monolithic Construction & Concrete Products, Network Development-Construction of Missing Links/New 5733 11/14/2019 Marinduque DEO 84.213 270 O 0.40 0.30 0.15 0.03 0.05 0.05 97.70% - On-going Inc. Roads, Dr. Damians Reyes Memorial Road Monolithic Construction & Concrete Products, Retrofitting/Strengthening of Bridge- Dungon Br.4 (B00522PN) 5733 11/13/2019 Iloilo City DEO 75.672 303 O 0.40 0.24 0.15 0.02 0.05 0.05 91.30% - On-going Inc. along Sen. Benigno S. Aquino, Jr. Ave. Monolithic Construction & Concrete Products, Retrofitting/Strengthening of Bridge- Dungon Br. 3 (B00523PN) 5733 11/13/2019 Iloilo City DEO 57.002 268 O 0.40 0.24 0.15 0.02 0.05 0.05 91.30% - On-going Inc. Along Sen. Benigno S. Aquino, Jr. Ave. Monolithic Construction & Concrete Products, Widening of Pasian Bridge (B00062MN) Including Approaches, Compostela 06/01/2018 92.128 355 C 0.47 0.14 0.30 - - - 90.50 90.50% Very Satisfactory Inc. / Alonzo Construction Monkayo along Daang Maharlika Road (MN) Valley DEO Monolithic Construction & Conrete Products, Replacement of Mainao Bridge (B00025MR) along CSR Jct. Mindoro 5733 03/20/2018 13.545 225 C 0.49 0.13 0.30 - - - 92.30 *92.30% Very Satisfactory Inc. Minas Road Occidental DEO Road Upgrading Including Drainage of Dipolog- Oroqueta Montaño Construction & Development National Road, Zamboanga del Norte, 3rd DEO, K1796+480.00- Regional Office 19473 04/21/2018 253.511 484 C 0.45 0.20 0.30 - - - 95.40 95.40% Very Satisfactory Corporation K1801+000.00, K1801+000.00-K1805+214.00 (Net Length : No. IX 8757.00 Ln.m) Construction of Flood Control Structure along Dapitan River, Montaño Construction & Development Regional Office 19473 Tutua-Polo Section along Dipolog-Oroquieta Road, K0+000 - 01/24/2018 96.498 346 C 0.47 0.20 0.30 - - - 96.80 *96.80% Outstanding Corporation No. IX K0+642 Reconstruction to Concrete Pavement - at Specific Location Montaño Construction & Development Zamboanga del 19473 along Dipolog - Oroquieta National Rd (SO1316MN) 11/08/2019 47.513 222 O 0.39 0.24 0.11 0.03 0.05 0.03 85.30% - On-going Corporation Norte 3rd DEO K1820+474 to K1825+784.6 Provincial Montaño Constuction & Development Rehab/Upgrading of Siare-Dinokot-Madalum-Sindangan Government of 19473 07/26/2018 126.846 321 O 0.33 0.25 0.15 0.02 0.05 0.02 82.40 - On - Going Corporation Provincial Road Zamboanga del Norte Design and Build Services for the Construction of Dormitory Montano-Concha Joint Venture 19473 / 8206 02/14/2020 PSHS-ZRC 40.000 430 C 0.44 0.20 0.00 - - - 64.20% 83.94% Satisfactory Building 2 Montano-Concha Joint Venture 172297 Design and Build Services for Dormitory Building 1 02/14/2020 PSHS-ZRC 33.206 443 C 0.46 0.20 0.00 - - - 66.40% 83.83% Satisfactory Organizational Outcome 2: Protect Lives and Properties againts Major Flood-Flood Management Program- Construction/Rehabilitation of Flood Mitigation Facilities Within Nueva Vizcaya 1st Monte Construction & Supply 19474 11/11/2019 19.600 127 C 0.42 0.13 0.30 - - - 85.40% 85.4% Satisfactory Major River Basins and Principal Rivers-Construction of DEO River/Flood Control, Sta.0+413.85 - Sta. 1+060.85, Vista Alegre (Phase 5) Organizational Outcome 2: Protect Lives and Properties against Major Flood - Flood Management Program - Nueva Vizcaya 1st Monte Construction & Supply 19474 Consturction/Rehabilitation of Flood Mitigation Facilities within 08/24/2019 18.793 127 O 0.39 0.24 0.15 0.03 0.05 0.05 91.30% - On-going DEO Major River Basins and Principal Rivers - Construction of River/Flood Control Retrofitting/Strengthening of Sum-ag Br. 2 (B00326NR) along Monteone Construction Corporation 32353 11/05/2019 Bacolod City DEO 9.301 85 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Bacolod South Road Retrofitting/Strengthening of Sum-ag Br. 2 (B00326NR) along Monteone Construction Corporation 32353 08/26/2019 Bacolod City DEO 9.301 145 O 0.38 0.20 0.15 0.02 0.04 0.05 83.40% - On-going Bacolod South Road Morning Steel Construction 30698 Construction of Kinalapan River Control 11/24/19 Aurora DEO 24.500 189 C 0.47 0.13 0.30 - - - 90.20% 90.2% Very Satisfactory Morning Steel Construction 30698 Construction of Kinalapan River Control 08/27/2019 Aurora DEO 23.275 170 O 0.39 0.24 0.15 0.03 0.06 0.03 90.30% - On-going

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 120 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Cluster I - Retrofitting/Strengthening of Permanent Bridges at 1) Colambogon Bridge (B01433MN), Colambogon, Maramag, Bukidnon, 2) Kuya Bridge (B01431MN) Maramag, Bukidnon, 3) Maramag Bridge (B01431MN), Base Camp, Maranmag, Bukidnon 2nd Mortar Masters & Concrete Builders 43228 Bukidnon, 4) Migpajo Bridge (B01435MN), Colambogon, 11/06/2019 17.567 102 C 0.49 0.13 0.30 - - - 91.90% 91.9% Very Satisfactory DEO Maramag, Bukidnon, 5) Musuan Bridge (B01373MN), Musuan, Maramag, Bukidnon, 6) San Miguel Bridge (B01432MN), San Miguel, Maramag, Bukidnon, 7) Sumal-ang Bridge (B01434MN) Colambogon, Maramag Cagayan de Oro Mortar Masters & Concrete Builders 43228 Construction of Road, Brgy. Bugo 11/12/2019 3.770 75 C 0.49 0.13 0.30 - - - 92.60% 89.3% Very Satisfactory City 2nd DEO Cagayan de Oro Mortar Masters & Concrete Builders 43228 Construction of Road 08/28/2019 3.761 75 O 0.38 0.24 0.15 0.02 0.04 0.05 87.10% - On-going City 2nd DEO Retrofitting/Strengthening of Permanent Bridge-Talaban Bridge Negros Occidental Mortar Masters & Concrete Builders 43228 11/09/2019 12.485 151 O 0.40 0.24 0.15 0.02 0.05 0.05 91.30% - On-going (B00367NR) Along Bacolod South Road 2nd DEO Construction of Three (3) Storey Twelve (12) Classroom School Zamboanga City Mother'S Role Construction 32781 06/07/2018 12.514 211 O 0.394 0.240 0.150 0.030 0.070 0.033 91.70 - On-going Building at Talisayan National High School DEO Road Upgrading Gravel to Paved at Barangay Divisoria ( Sta. Zamboanga City Mother'S Role Construction 32781 03/20/2018 2.960 140 C 0.46 0.13 0.30 - - - 89.30 *89.30% Very Satisfactory 0+000 to Sta. 0+240) DEO Construction of Pumping Station and Facilities Barangay Veinte Metro Manila 3rd Mrb11 Construction Corporation 17701 08/19/2019 24.500 300 C 0.50 0.13 0.30 - - - 93.20% 93.2% Very Satisfactory Reales DEO Quezon City 2nd Mrb11 Construction Corporation 17701 Improvement of Roads, at Barangay Paligsahan 06/17/2019 18.390 240 O 0.37 0.25 0.15 0.03 0.05 0.05 89.50% - On-going DEO Construction of Multi-Purpose Building at Barangay J. Dela Metro Manila 1st Mrb11 Construction Corporation 17701 11/19/2019 43.169 465 C 0.49 0.20 0.30 - - - 98.60% 98.6% Outstanding Peña DEO Quezon City 2nd Mrb11 Construction Corporation 17701 Improvement of Roads, Panay Ave. 11/26/2019 27.738 275 C 0.49 0.15 0.30 - - - 93.60% 93.6% Very Satisfactory DEO Improvement of Roads at University of the Philippines Diliman Quezon City 2nd Mrb11 Construction Corporation 17701 11/26/2019 46.059 330 O 0.39 0.25 0.15 0.03 0.06 0.05 91.60% - On-going Campus DEO MRB11 Construction Corporation (Formerly: 17701 Subukin Port Development Project - Improvement of Port 06/09/2019 DOTR 69.664 300 O 0.40 0.30 0.00 0.03 0.06 0.05 84.30 - On-going MRB Construction and Supply) MRB11 Construction Corporation (Formerly: 17701 Port of Basco Expansion Project 9/20/19 PPA 150.393 1151 C 0.46 0.20 0.30 - - - 96.30 0.958 Very Satisfactory MRB Construction and Supply)

Mrbii Construction Corporation 17701 Quezon Ports Cluster Development Project 08/29/2018 DOTr 32.290 246 O 0.39 0.30 0.06 0.02 0.05 0.05 87.80 - On - Going

MRBII Construction Corporation 17710 Brgy. Daykitin Wharf Development Project 02/14/19 DOTC 32.739 269 C 0.47 0.20 0.30 - - - 97.20 *97.20% Outstanding

MRBII Construction Corporation 17701 Quezon Ports Cluster Development Project 05/16/19 DOTC 32.795 285 C 0.49 0.20 0.30 - - - 98.60 92.10% Very Satisfactory

Mrbii Construction Corporation 17701 Castilla Port Development Project 10/18/2018 DOTr 46.792 222 C 0.48 0.20 0.30 97.90 *97.90% Outstanding

Mrrm Trading & Construction 19657 Vista Del Mar 05/11/2018 NHA 150.690 796 C 0.45 0.20 0.17 - - - 82.89 80.92% Unsatisfactory CY 2018 BEFF (Batch-1) Const. & Completion of School Mrrm Trading & Construction 19657 Buildings in the Elementary & Secondary Classrooms, Milibili 08/24/2019 Capiz 1st DEO 7.961 105 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory NHS, 1STY2CL (2 Science Lab) Flood Management Program; Construction/Maintenance of Flood Mitigation Structures and Drainage Systems; Pampanga 3rd Mrrm Trading & Construction 19657 Construction of Reinforced Concrete Slope Protection along 08/28/2019 48.975 300 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory DEO Quitangil Creek, Barangay San Ildefonso, Sitio Balibago - Sitio Balas Impleentation and Monitoring of PAMANA Projects - Sitio Tabk Palawan 2nd Mrrm Trading & Construction 19657 08/20/2019 39.191 299 O 0.40 0.24 0.05 0.03 0.05 0.00 76.50% - On-going Brgy. Salogon from National Highway DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 121 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Local Program: Local Infrastructure Program; Buildings and Pampanga 3rd Mrrm Trading & Construction 19657 Other Structures; Multi-Purpose/ facilities, Construction of Multi - 11/08/2019 3.426 90 C 0.42 0.13 0.30 - - - 85.50% 85.5% Satisfactory DEO Purpose Building Construction/Maintenance of Flood Mitigation Structures and South Cotabato Mrs Builders And Supply 39611 Drainage Systems: Rehabilitation /Maintenance of Bolok River 05/29/2018 11.534 110 C 0.43 0.13 0.30 - - - 86.70 86.70% Satisfactory 1st DEO Bank Protection, Poblacion Section Construction of Multi-Purpose Building (New Gym), Agreville South Cotabato Mrs Builders And Supply 39611 08/20/2019 2.459 105 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory Subdivision Phase I, Brgy. Sto Nino 1st DEO Construction of 2 Units- Two Storey Four Classroom School Surigao del Sur Mrs Builders And Supply 39611 08/24/2019 28.000 210 C 0.50 0.13 0.30 - - - 93.10% 88.97% Satisfactory Building Wakat Elementary School (1325599) 2nd DEO Construction/ Improvement of Access Roads leading to Declared Tourism Destinations-Access Road leading to Tourism Surigao del Sur Mrs Builders And Supply 39611 11/10/2019 23.517 167 O 0.32 0.24 0.15 0.03 0.06 0.05 84.80% - On-going Enterprise Zone (TEZ) - Rizal Prt leading to Turtle Island, 2nd DEO Cabgan & Vanishing Island, Brgy. Sua Construction of Flood Mitigation Facility - Upgrading of Luneta South Manila Msb Vitug Construction 33019 11/14/2019 9.539 180 O 0.39 0.24 0.15 0.03 0.04 0.05 89.60% - On-going Pumping Station (Expansion including Drainage Improvement) DEO Construction Maintenance of Flood Mitigation Structures and Msb Vitug Construction / Megapolitan Drainage Systems, Completion of Flood Mitigation Structures Regional Office Builders And Construction Supply Joint JV-16-1491 01/12/2018 96.499 253 C 0.45 0.16 0.30 - - - 91.50 *91.50% Very Satisfactory along Laoag - Bongo River, laoag City Section San Nicolas No. I Venture Section Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Mt. Guiting-Guiting Construction 17412 Roads along Sibuyan Circumferencial Roads, K0078+633 - 09/28/2019 Romblon DEO 6.735 65 C 0.49 0.15 0.30 - - - 93.80% 93.8% Very Satisfactory K0078+977.50 Preventive Maintenance (Secondary Roads) - Sibuyan Mt. Guiting-Guiting Construction 17412 09/28/2019 Romblon DEO 8.368 83 C 0.49 0.14 0.30 - - - 92.70% 92.7% Very Satisfactory Circumferential Road, K0087+420 - K0087+960 (Actual &RBIA)

Network Development-Off Carriageway Improvement Tertiary Muana Construction And Development Corp. 9354 11/08/2019 Bohol 3rd DEO 23.204 101 C 0.48 0.13 0.30 - - - 91.60% 92.8% Very Satisfactory Roads Jct. (LIR) Dat-an-Carmen S-Bullones-Pilar-Alicia Road

Network Development: Off-carriageway Improvement-Tertiary Roads-Jct. Dat-an-Carmen-Sierra Bullones-Pilar-Alicia Road, Muana Construction And Development Corp. 9354 K0083+000-K0083+316, K0083+346-K0084+109, K0084+134- 08/26/2019 Bohol 3rd DEO 23.204 101 O 0.38 0.29 0.15 0.03 0.04 0.05 93.60% - On-going K0084+135, K0084+160-K0084+386, K0084+396.64- K0085+040 and K0089+065-K0089+428 Construction of By-Pass and Diversion Roads - Daraga - Pilar Muntopar Builders 29800 11/12/2019 Albay 2nd DEO 47.077 226 C 0.49 0.13 0.30 - - - 92.50% 91.96% Very Satisfactory Diversion Road (Airport Access), Albay Sorsogon 2nd Muntopar Builders 29800 Construction of Barcelona Municipal Hall 11/09/2019 38.808 420 C 0.49 0.13 0.30 - - - 92.70% 89.58% Very Satisfactory DEO Construction of By-Pass and Diversion Road – Daraga-Pilar Muntopar Builders 29800 08/29/2019 Albay 2nd DEO 47.077 226 O 0.36 0.27 0.15 0.03 0.06 0.05 91.60% - On-going Diversion Road (Airport Access), Albay Sorsogon 2nd Muntopar Builders 29800 Construction of Barcelona Municipal Hall 08/19/2019 38.808 420 O 0.39 0.24 0.12 0.03 0.07 0.03 88.20% - On-going DEO Cotabato 2nd Must Enterprises 13336 Road Widening-Banisilan-Guiling-Alamada-Libungan Road 06/02/2018 82.127 162 O 0.363 0.24 0.15 0.03 0.051 0.05 88.40 - On-going DEO Construction of Amambahag Flood Control Structures along Mv Quirante Builders 40260 Biliran Circumferential Road (124.52057°, 11.66477° to 08/26/2019 Biliran DEO 18.960 145 O 0.40 0.30 0.06 0.03 0.04 0.00 82.60% - On-going 124.51943°, 11.66414°) Network Development- Improvement/Widening of National Regional Office Mwj Construction 14882 Roads- Primary Roads, Palo-Carigara-Ormoc Road K0980+372- 04/03/2018 83.102 290 OG 0.384 0.227 0.150 0.022 0.047 0.050 87.97 - On - Going No. VIII K0982+186, K0945+654-K0946+766 Network Development - Improvement/Widening of National Regional Office Mwj Construction 14882 Roads - Primary Roads, Palo - Carigara - Ormoc Road, 06/05/2018 83.102 290 C 0.46 0.13 0.30 - - - 88.90 88.90% Satisfactory No. VIII K0980+372 - K0982+186, K0945+654 - K0946+766 Replication of 15 Units Airmen's Apartment, Ancillary Items and My Builders & Construction 22687 06/14/2018 BCDA 50.929 210 O 0.387 0.293 0.150 0.023 0.047 0.017 91.58 - On-going Construction of One Detention Cell with Access Road Replication of 15 Units Airmen's Apartment, Ancillary Items and My Builders & Construction 22687 02/12/2019 BCDA 52.486 256 C 0.49 0.20 0.30 - - - 98.86 93.77% Very Satisfactory Construction of One Detention Cell with Access Road

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 122 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) My Builders and Construction 22687 Site Development Phase 5 (Design and Build) 11/26/19 DOST 4.997 180 C 0.48 0.20 0.30 - - - 98.40 *98.40% Outstanding My Builders and Construction 22687 Site Development Phase 6 (Design and Build) 11/26/19 DOST 4.889 112 C 0.50 0.20 0.30 - - - 99.90 *99.90% Outstanding Construction/Repair/Rehabilitation/Improvement of Various My Builders And Construction 22687 Infrastructure including Local Projects - Construction 11/04/2019 La Union 1st DEO 96.499 354 O 0.40 0.24 0.15 0.03 0.06 0.05 93.30% - On-going (Completion) of La Union Convention Center Rehabilitation/Reconstruction of Natioanal Roads with Slips, My Builders And Construction / Mrrm Trading JV-18-871 Slope Collapse and Landslide - Alilem - Sugpon - Sudipen 11/05/2019 La Union 1st DEO 43.213 240 O 0.40 0.24 0.15 0.03 0.05 0.05 92.40% - On-going & Construction Joint Venture Road, K0317+460 to K0317+540, Barangay Namaltugan

N. Q. Villapando Construction 13338 Cotabato Airport Development Project 06/25/2018 DOTr 4.691 120 C 0.49 0.20 0.00 - - - 68.60 *68.60% Poor

N. Sales Construction 25045 Lumintao Ris Irrigation System 10/09/2018 NIA 12.742 240 C 0.37 0.20 0.30 - - - 87.00 *87.00% Satisfactory

N. Sales Construction 25045 Road Concreting of Villon Road, Sta. 0+000 to Sta. 0+315 11/08/2019 Palawan 3rd DEO 3.910 55 C 0.50 0.15 0.30 - - - 94.50% 94.5% Very Satisfactory Ilocos Sur 1st N.A. Ibarra Construction 24742 Construction of Revetment Wall, Barangay Baliw and Ballaigui 06/01/2018 13.965 140 O 0.387 0.227 0.150 0.03 0.056 0.05 90.00 - On-going DEO Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - N.B. Avila Construction 13751 Construction/Maintenance of Flood Mitigation Structures and 09/10/2019 Cavite Sub DEO 48.750 300 C 0.48 0.13 0.30 - - - 90.80% 90.8% Very Satisfactory Drainage Systems - Construction of Revetment along Baluctot River, Phase IV, East Side, BrGY. Sampaloc IV Concreting of Sitio Bubuyan, Brgy. Dalusag FMR, Brgy. N.B. Avila Construction 13751 09/07/2019 Cavite 2nd DEO 14.925 210 C 0.48 0.13 0.25 - - - 86.70% 86.7% Satisfactory Dalusag Road Widening along Maragondon- Magallanes- Amuyong N.B. Avila Construction 13751 11/26/2019 Cavite 2nd DEO 44.100 339 O 0.40 0.24 0.15 0.02 0.05 0.03 88.90% - On-going Road (S01776LZ) Organizational Outcome 1: Ensure Safe and Reliable National N.B. Avila Construction / Baqprince Road System - Bridge Program - Widening of Permanent JV-17-1515 09/07/2019 Cavite 2nd DEO 37.042 364 C 0.49 0.13 0.30 - - - 92.50% 92.5% Very Satisfactory Construction Joint Veture Bridges - Palanas Bridge (SB02517lZ) along Noveleta - Naic - Tagaytay Road N.B. Avila Construction / Selphar Proposed Construction of (4) Storey (16) Classroom School JV-18-587 06/15/2018 Cavite Sub- DEO 36.119 270 O 0.397 0.240 0.150 0.030 0.047 0.050 91.40 - On-going Construction Building at Senior High School in San Nicolas III N.B. Avila Construction / Selphar Construction of Four (4) Storey Twenty (20) Classroom School JV-18-587 10/09/2019 Cavite 3rd DEO 65.044 322 C 0.50 0.13 0.30 - - - 93.20% 92.15% Very Satisfactory Construction Building at Habay Elementary School N.B. Avila Construction / Selphar Construction of Four (4) Storey Twenty (20) Classroom School JV-18-587 09/10/2019 Cavite Sub DEO 65.044 322 O 0.39 0.24 0.15 0.03 0.05 0.05 91.70% - On-going Construction Joint Venture Building at Habay Elementary School Lanao del Norte N.B. Salbo Construction 6091 Construction of Esplanade Along Mandulog River 08/25/2019 68.324 299 O 0.40 0.24 0.15 0.03 0.06 0.05 92.60% - On-going 2nd DEO Convergence and Special Support Program, N.D.M. Sanchez Builders & Development Construction/Improvement of Access Roads leading to Declared Batangas 3rd 35410 09/03/2019 44.094 330 C 0.49 0.17 0.30 - - - 95.80% 95.8% Very Satisfactory Corporation Tourism Destinations, Dingin Road leading to Binukalan Shrine, DEO Poblacion West Construction/Improvement of Access Roads Leading to N.D.M. Sanchez Builders & Development 35410 Declared Tourism Destinations - Tayak Hills Road Leading to 09/05/2019 Laguna 3rd DEO 48.510 345 C 0.48 0.13 0.30 - - - 91.70% 91.7% Very Satisfactory Corporation Tayak Nature, Adventure and Wildlife Park, Brgy. Tala

Organizational Outcome 1: Ensure Safe and Reliable National Road System, Network Development, Off-Carriageway Improvement, Primary Roads, Daang Maharlika (LZ) - N.D.M. Sanchez Builders & Development K0057+258 - K0057+713, K0058+000-K0058+357, K0058+357- Batangas 3rd Corporation / Keascia Construction & Supply JV-17-761 09/03/2019 330 C 0.50 0.13 0.30 - - - 93.20% 93.2% Very Satisfactory K0058+522, K0058+522-K0059+101, K0063+617 - DEO Joint Venture K0063+722, K0063+746 - K0064+004, K0064+747 - K0065+710, K0066+915 - K0067+173, K0068+126 - K0068+876, K0069+041 - K0069+395

Proposed Asphalt Overlay on Portion of the 250th Presidential South Manila N.M.E. Construction 22984 03/13/2018 9.147 55 C 0.44 0.13 0.30 - - - 87.20 *87.20% Satisfactory Airlift Wing (PAW), Philippine Airforce, City DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 123 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Local Infrastructure Program - Improvement of Multi-Purpose South Manila N.M.E. Construction 22984 08/22/2019 2.799 120 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory Buiding (including pavement) , Zone 96, Sta. Ana, Manila DEO Rehabilitation of Paved Road - Upgrading of Insurance South Manila N.M.E. Construction 22984 Commision Compound with Drainage Improvement, U.N. 11/11/2019 14.513 180 O 0.38 0.30 0.12 0.03 0.04 0.03 90.00% - On-going DEO Avenue cor. Romualdez St. Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Looc (Binlod)-Bil-isan-Crossing N.N. Yu Construction, Inc. 10470 Tangnan leading to Veraneante Resort, Momo Beach and 11/05/2019 Bohol 1st DEO 18.914 95 C 0.47 0.20 0.30 - - - 96.90% 96.9% Outstanding House and Ayacca Condo-Residences Resort, Brgy. Bil-isan and Tangnan, Panglao, Bohol N.N. Yu Construction, Inc. (Formerly: Yu 10470 Concreting of Jct. San Isidro- Binayran-Dampas Road 08/24/2019 Bohol 1st DEO 22.130 113 O 0.40 0.24 0.15 0.03 0.07 0.05 93.50% - On-going Construction) N.N. Yu Construction, Inc. (Formerly: Yu Provincial Construction) / Herbert Malmis General JV-17-2686 Concreting of Baucan (Balilihan) - Cambague (Sevilla) Road 9/19/19 Government of 94.970 400 C 0.43 0.20 0.30 - - - 93.44 92.42% very Satisfactory Merchandise & Contractor, Inc. (JV) Bohol Construction of One (1) Unit Standard Tricycle Terminal Multi - N.Q. Villapando Construction 13338 Purpose / Livelihood and Training Center (small model) and 5/31/19 NHA 5.923 211 O 0.34 0.02 0.00 0.02 0.01 0.03 41.62 - On-going Talipapa Zamboanga Airport Development Project - Rehabilation and N.Q. Villapando Construction 13338 9/19/19 DOTR 42.727 568 O 0.40 0.30 0.03 0.03 0.04 0.03 82.20 - On-going Reconfiguration of Terminal Building Improvement of Pasihagon - Cang-alwang Road leading to Nale Construction 18552 04/07/2018 Siquijor DEO 20.427 155 C 0.45 0.17 0.24 - - - 85.80 84.64% Satisfactory Siquijor Airpor Convergence and Special Support Program - Construction / Nale Construction 18552 Improvement of Access Roads leading to Airports, Caticugan - 11/05/2019 Siquijor DEO 15.691 121 C 0.47 0.20 0.30 - - - 97.30% 97.3% Outstanding Cang-alwang - Pasihagon Road leading to Cang-alwang Airport

Convergence and Special Support Program, Construction / Improvement of Access Roads leading to Declared Tourism Destinations, Nonoc - Cang-allas - Calunusan Road leading to St. Francis of Assisi Church & Belfrym Cantabon Cave, Healing Nale Construction 18552 11/05/2019 Siquijor DEO 19.195 140 C 0.44 0.20 0.30 - - - 93.70% 91.06% Very Satisfactory Festival, Mt. Bandilaan Peak and Watchtower, Tulawog Cave, Dillaab Festival, Capilay Spring Park, Lugnason Falls, Paradise Bay, Cambugahay Falls, Enchanted Balete Tree, Tulapos Marine Sanctuary, St. Vincent Church, Belfry Cangbangag Falls

Construction/Improvement of Access Roads leading to Declared Negros Oriental Nale Construction 18552 Tourism Destinations: Canalum – Narra – Lourdes Falls Road 11/12/2019 13.948 113 C 0.48 0.20 0.30 - - - 98.30% 94.52% Very Satisfactory 3rd DEO Leading to Lourdes Falls, Barangay Narra Construction/Improvement of Access Roads leading to Declared Negros Oriental Nale Construction 18552 Tourism Destinations: Lapay – Dawis – Niludhan Road Leading 11/12/2019 14.700 141 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory 3rd DEO to Niludhan Falls, Barangay Dawis

Convergence and Special Support Program, Construction/Improvement of Access Roads leading to Declared Tourism Destinations, Nonoc-Cang-allas-Calunasan Road leading to St. Francis of Assisi Church & Belfrym Cantabon Nale Construction 18552 Cave, Healing Festival, Mt. Bandilaan Peak & Watchtower, 08/22/2019 Siquijor DEO 18.203 125 O 0.40 0.24 0.15 0.02 0.06 0.03 89.30% - On-going Tulawog Cave, Dilaab Festival, Capilay Spring Park, Lugnason Falls, Paradise Bay, Cambugahay Falls, Enchanted Balete Tree, Tulapos Marine Sanctuary , St. Vincent Church, BElfy Cangbangag Fallss

Construction/Improvement of Access Roads Leading to Negros Oriental Nale Construction 18552 Declared Tourism Destinations: Canalum-Narra-Lourdes Falls 08/21/2019 13.948 83 O 0.40 0.30 0.12 0.03 0.04 0.03 92.00% - On-going 3rd DEO Road Leading to Lourdes Falls Construction of Multi-Purpose Building -Construction Nana Builders 18863 11/08/2019 Capiz 1st DEO 2.125 111 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory (Completion) of Multi-Purpose Building, Brgy. Piña

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 124 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) N-Asiacom Builders Branch 34016 Upgrading of Perimeter Fence and Guard House 01/08/2019 DOST 9.027 135 O 0.39 0.30 0.11 0.02 0.03 0.05 89.90 - On-going N-Asiacom Builders Branch 34016 Repair / Rehabilitation of Dormitory Buildings I and II 01/08/2019 DOST 19.746 250 O 0.38 0.24 0.00 0.02 0.04 0.05 73.10 - On-going N-Asiacom Builders Branch 34016 Repair / Rehabilitation of Academic Buildings I and II 01/08/2019 DOST 8.754 150 O 0.38 0.30 0.00 0.02 0.04 0.05 78.90 - On-going National Builder and Services 33874 Construction of Academic Building 1 (Take Over Contract) 05/31/2019 DOST 28.479 310 O 0.38 0.30 0.07 0.02 0.06 0.05 88.31 - On-going Design and Build Scheme Infrastructure Project for Site National Builder and Services 33874 Development Phase III Construction of Road Network, covered 05/31/2019 DOST 24.905 415 O 0.39 0.30 0.07 0.02 0.06 0.05 89.91 - On-going walkways and slope protection Lanao del Norte Nb Dansal Construction 40359 Construction of Multi-Purpose Building 08/23/2019 1.980 35 C 0.50 0.15 0.30 - - - 94.30% 94.3% Very Satisfactory 1st DEO Construction of One-Storey Two Classroom School Building, Nc Construction 37808 03/21/2018 Quirino DEO 2.643 95 C 0.47 0.14 0.30 - - - 91.20 *91.20% Very Satisfactory Diffun Central School Nd Caranzo Builders And Construction Construction of Multipurpose Building, Catarman I Central Northern Samar 39145 08/23/2019 9.750 180 C 0.46 0.15 0.30 - - - 90.30% 90.3% Very Satisfactory Supply Elementary School 1st DEO Nd Caranzo Builders And Construction 39145 Construction of Flood Control Structures along Tabawan 11/08/2019 Samar 1st DEO 19.444 169 C 0.44 0.13 0.30 - - - 87.40% 87.64% Satisfactory Supply Nd Caranzo Builders And Construction 39145 002: Construction of Flood Control Structures along Tabawan 08/24/2019 Samar 1st DEO 18.150 140 O 0.38 0.29 0.15 0.02 0.04 0.03 90.70% - On-going Supply Construction of Provincial Road, Brgy. Tubaran to Brgy. Lanao del Norte Ndp Construction Development 39524 11/06/2019 23.746 175 C 0.49 0.14 0.30 - - - 92.70% 90.66% Very Satisfactory Kalilangan 2nd DEO Construction of Provincial Road, Brgy. Tubaran to Brgy. Lanao del Norte Ndp Construction Development 39524 08/25/2019 23.746 175 O 0.31 0.30 0.15 0.03 0.06 0.05 89.30% - On-going Kalilangan 2nd DEO Rehabilitation/Improvement of Drainage System of Calabite Quezon City 1st New Arcond Builders Incorporated 9614 08/23/2019 19.110 420 C 0.48 0.13 0.30 - - - 91.60% 92.26% Very Satisfactory Street DEO New C.C. Barcelona Construction Corp. 14489 Contruction, Expansion/Renovation of Out Patient Department 09/27/2018 DOH 30.211 315 O 0.39 0.30 0.09 0.02 0.06 0.05 91.51 - On - Going

New C.C. Barcelona Construction Corp. 14489 Contruction, Expansion/Renovation of Out Patient Department 09/27/2018 DOH 30.211 315 C 0.50 0.07 0.30 - - - 86.99 90.05% Very Satisfactory Concreting of Sitio Tektek FMR, Brgy. Sindol, San Felipe, Zambales 1st New Masinloc Henry'S Construction & Supply 33744 03/13/2018 4.809 90 C 0.47 0.13 0.30 - - - 90.70 *90.70% Very Satisfactory Zambales DEO New Mindorenos Lumber, Hardware And Construction of Standard 2STY-4CL School Building (Batch 3), Mindoro 31745 08/19/2019 10.346 209 C 0.49 0.13 0.30 - - - 92.60% 87.84% Satisfactory Gen Merchandise Cabacao ES Occidental DEO Construction of Flood Mitigation Structure-Construction of Flood New Mindorenos Lumber, Hardware And Mindoro 31745 Control, So. Banakan, Brgy. Tangkalan, Mamburao, Occidental 08/20/2019 9.246 200 O 0.36 0.24 0.15 0.03 0.02 0.05 85.30% - On-going Gen Merchandise Occidental DEO Mindoro Road Widening on National Roads along Secondary Roads Pangasinan 4th New Tbp Construction & Development Corp. 29155 along Camiling-Wawa-Bayambang-Malasiqui-Sta.Barbara 11/07/2019 14.549 140 C 0.49 0.13 0.30 - - - 92.00% 92% Very Satisfactory DEO Road, K0178+300-K0178+703, K0178+961-K0186+770 Construction/Maintenance for Flood Mitigation Structures and Newbig Four J Construction Inc. 15104 Drainage System, Construction of River Control along Santa 06/15/2018 Laguna 1st DEO 95.005 353 O 0.395 0.263 0.15 0.03 0.06 0.05 94.80 - On-going Cruz River Preventive Maintenance of G. Araneta Ave, K0011+(-)1236- Quezon City 1st Newbig Four J Construction Inc. 15104 06/05/2018 27.928 270 O 0.397 0.24 0.15 0.022 0.05 0.033 89.20 - On-going K0011+871, K0011+(-)891-K0011+1216 DEO Locally Funded Projects-Local Infrastructure Program (LIP)- Flood Control and Drainange-Flood Control Structures/Facilities- Newbig Four J Construction Inc. 15104 06/22/2018 Rizal 2nd DEO 38.156 230 C 0.45 0.13 0.30 - - - 88.70 88.70% Satisfactory Construction of Flood Control Structure along Upper Marikina River, Brgy. San Jose to Brgy. Balite Asset Preservation Program - Rehabilitation / Reconsturction of Regional Office Newbig Four J Construction Inc. 15104 National Roads with Slip, Slope Collapse and Landslide, 08/20/2019 289.465 450 C 0.49 0.13 0.30 - - - 92.10% 91.26% Very Satisfactory No.III Primary Roads, Daang Maharlika (LZ) (Phase III) Newbig Four J Construction Inc. 15104 Improvement of Paranaque River System 08/20/2019 NCR 144.748 345 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Primary Regional Office Newbig Four J Construction Inc. 15104 11/26/2019 289.465 450 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory Roads, Daang Maharlika (LZ) (Phase III), Nueva Ecija 2nd No. III Legislative District

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 125 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Local Program- Local Infrastructure Program- National Roads Newbig Four J Construction Inc. 15104 and Bridges- National Roads- Rehabilitation/Improvement of 11/25/2019 Rizal 2nd DEO 86.500 132 O 0.40 0.24 0.15 0.02 0.04 0.03 88.30% - On-going Teresa-Morong Road, K0032+(-372)- K0037+000 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Regional Office Newbig Four J Construction Inc. 15104 11/12/2019 40.739 263 O 0.37 0.24 0.15 0.03 0.05 0.05 89.00% - On-going Roads Daraga Urban Tourism Eco Route (DUTERTE) Project, No. V Albay, Package 2 Construction/Maintenance of Flood Mitigation Structures and Newbig Four J Construction Inc. / Cbc JV-17-756 Drainage Systems – Construction of Flood Mitigation System 04/03/2018 Albay 2nd DEO 94.616 250 OG 0.385 0.284 0.149 0.030 0.050 0.033 93.10 - On - Going Construction & Supply (Jv) along Buyuan River Construction of 2 Storey Workshop Building, Macangao Agri Davao Oriental Newcon Builders Const. & Supply, Inc. 38725 03/17/2018 9.455 120 OG 0.29 0.3 0.15 0.03 0.047 0.05 86.70 - On - Going Vocational High School (Bldg. 1) 2nd DEO Ensure Safe and Reliable National Road System, Network Regional Office Nfh Construction & Supply 16055 Development - Road Widening Primary Roads, Daang 08/20/2019 139.536 373 C 0.44 0.13 0.30 - - - 87.50% 87.5% Satisfactory No. V Maharlika (LZ), Sta. 335+971 - Sta. 345+500 (with exceptions)

Construction / Maintenance of Flood Mitigation Structures and Camarines Sur Nfh Construction & Supply 16055 Drainage Systems Rehabilitation at Barit River, Downstream 11/04/2019 46.519 200 O 0.38 0.24 0.15 0.03 0.06 0.03 88.30% - On-going 5th DEO Mampuag Bridge (Sta. 0+000.00 - Sta. 0+397.00) Construction / Improvement of Access Road Leading to Sorsogon 2nd Nfh Construction & Supply 16055 Declared Tourism Destinations - Matnog - Sta. Magdalena - 11/09/2019 32.778 179 O 0.39 0.24 0.15 0.03 0.06 0.05 92.10% - On-going DEO Bulusan Road Leading to Bulusan National Park Preventive Maintenance along Baao-Iriga City- Nabua Road, Camarines Sur Nfh Construction & Supply 16055 05/30/2018 35.728 84 C 0.40 0.20 0.30 - - - 90.30 90.30% Very Satisfactory K0470+014 - K0470+1075, K0472+000 - K0473+280 4th DEO Construction/Rehabilitation of Flood Mitigation Facilities within Nfh Construction & Supply/ 128 Dragon Camarines Norte JV-18-1223 Major River Basins and Principal Rivers - Flood Control Project 11/10/2019 46.549 194 O 0.40 0.24 0.15 0.03 0.06 0.05 92.20% - On-going Construction And Supplies Joint Venture DEO Daet River, San Isidro Section Preventive Maintenance on Pavement Management System / Ngec-Nestor General Engineering & Ilocos Sur 2nd 34583 Highway Development and Management - 4 (HDM-4) Jct. 06/01/2018 6.798 170 C 0.43 0.14 0.30 - - - 86.60 86.60% Satisfactory Construction DEO Candon - Salcedo - Del Pilar Road, K0358+000 to K0358+916

NGP Construction 11369 Construction of Girls Residence Hall Extension (Design & Build) 03/07/2019 DOST 14.333 240 O 0.37 0.30 0.15 0.03 0.01 0.05 90.90 - On-going Construction of Boys' Residence Hall Extension (Design & NGP Construction 11369 03/07/2019 DOST 14.421 240 O 0.37 0.30 0.15 0.03 0.06 0.05 95.70 - On-going Build) Construction of Flood Mitigation Structure, Construction of Catanduanes Nida Builders & Supplies 42320 11/05/2019 19.556 192 O 0.39 0.24 0.15 0.01 0.04 0.05 87.40% - On-going Datag East River Control DEO Division IV Training Center & Car Wash Area CY 2018 COB Nikel Construction & Trading 35132 POW - Construction of NIA MARIIS Division IV Training Center 09/28/2019 NIA 4.826 154 C 0.44 0.10 0.30 - - - 84.00 *84.00% Satisfactory & Car Wash Area Nirvana Construction & Supply 18691 Land Development of Fe Village Phase 1 02/14/2020 NHA 20.864 466 O 0.35 0.30 0.12 0.03 0.04 0.03 8677.00% - On-going Davao del Sur Nirvana Construction And Supplies 18691 Repair/Maintenance of ABELLA Revetment along Digos River 03/15/2018 4.848 92 C 0.44 0.13 0.30 - - - 87.30 *87.30% Satisfactory DEO Rehabilitation (Completion) of Koronadal City National South Cotabato Nirvana Construction And Supplies 18691 08/20/2019 4.339 150 C 0.35 0.20 0.30 - - - 84.60% 84.6% Satisfactory Comprehensive High School 1st DEO Network Development - Off - Carriageway Improvement - Sorsogon 1st Njny Construction And Supply 35973 Secondary Roads Jct. Sorsogon - Bacon - Manito Road, 11/10/2019 23.322 151 O 0.37 0.24 0.15 0.01 0.05 0.05 86.70% - On-going DEO K0584+563 - K0585+000, K0596+181 - K0597+193 Lanao del Norte Njs Construction & Services 43952 Construction of Multi-Purpose Building 08/23/2019 1.919 45 C 0.49 0.13 0.30 - - - 92.30% 92.3% Very Satisfactory 1st DEO Davao del Sur Nlc Construction And Supplies 36704 Concreting of Mabunga to Union FMR, Brgy. Union 03/15/2018 7.961 175 C 0.39 0.13 0.30 - - - 81.70 85.18% Satisfactory DEO Davao del Sur Nlc Construction And Supplies 36704 Construction of Malawanit Bridge 08/25/2019 12.662 190 C 0.49 0.13 0.30 - - - 92.00% 92% Very Satisfactory DEO Construction of Concrete Road - Access Road from Waterfall Davao del Sur Nlc Construction And Supplies 36704 11/24/19 9.799 75 C 0.47 0.13 0.30 - - - 90.50% 89.72% Very Satisfactory Road leading to Pandong Bato Trail DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 126 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Concrete Road-Access Road from Waterfall Davao del Sur Nlc Construction And Supplies 36704 08/25/2019 9.799 75 O 0.39 0.23 0.15 0.02 0.05 0.05 89.20% - On-going Road leading to Pandong Bato Trail DEO Norbano Builders 38654 Rehabilitation of Academic Building 09/07/2019 DOST 6.568 255 O 0.38 0.24 0.13 0.03 0.04 0.05 86.70 - On-going Norbano Builders 38654 Rehabilitation of Multi - Purpose Building 09/07/2019 DOST 3.985 150 O 0.40 0.18 0.15 0.03 0.05 0.05 86.20 - On-going Design and Build for the Construction of Faculty and Staff Norbano Builders 38654 09/07/2019 DOST 9.970 260 C 0.43 0.17 0.30 - - - 90.50 0.926 Very Satisfactory House Typhoon Yolanda Rehabilitation Projects - Marabut Ports Norsam Builders And Construction Supply 21184 02/22/2018 DOTC 9.972 240 O 0.400 0.300 0.058 0.015 0.014 0.050 83.70 - On-going Cluster Development Project Typhoon Yolanda Rehabilitation Projects - Lawaan Port Norsam Builders And Construction Supply 21184 08/15/2018 DOTr 9.972 240 C 0.44 0.20 0.30 93.50 89.40% Satisfactory Development Project Typhoon Yolanda Rehabilitation Projects - Maslog - Bitaog Port Norsam Builders And Construction Supply 21184 02/22/2018 DOTr 11.856 180 C 0.45 0.20 0.30 94.90 *94.90% Very Satisfactory Development Project Typhoon Yolanda Rehabilitation Projects - Marabut Ports Norsam Builders And Construction Supply 21184 02/22/2018 DOTC 6.686 150 C 0.44 0.20 0.30 - - - 93.50 94.80% Very Satisfactory Cluster Development Project Rehabilitation of Damaged Bank Protection and Construction of Ilocos Norte 2nd North Tech Builders And Construction Supply 37062 08/24/2019 47.020 234 O 0.39 0.24 0.15 0.03 0.04 0.05 89.60% - On-going Dike Extension along Bongo River, Brgy. Parado DEO Ilocos Norte 1st North Tech Builders And Construction Supply 37062 Rehabilitation of Piddig District Hospital 08/22/2019 13.629 240 O 0.40 0.19 0.08 0.03 0.04 0.03 77.70% - On-going DEO Ilocos Norte 1st North Tech Builders And Construction Supply 37062 Rehabilitation of District Hospital 11/07/2019 13.629 240 O 0.38 0.24 0.14 0.03 0.05 0.05 88.30% - On-going DEO Rehabilitation/Major Repair of Permanent Bridge, Cauplasan Ilocos Norte 2nd North Tech Builders And Construction Supply 37062 11/08/2019 49.000 202 O 0.40 0.24 0.15 0.03 0.05 0.05 92.20% - On-going Bridge (B02395LZ) along Ilocos Norte - Apayao Road DEO Retrofitting/Strengthening of Permanent Bridges-Malinao Bridge North Tech Builders And Construction Supply 37062 1 (B00194PW) along Jct. Paglaum-Bata Road, K0192+381- 11/10/2019 Palawan 1st DEO 10.061 180 O 0.40 0.30 0.05 0.03 0.05 0.02 84.60% - On-going K0192+406 North Tech Builders And Construction Supply Rehabilitation of Paved National Road - Alilem-Sugpon- 37062 08/20/2019 La Union 1st DEO 61.167 432 C 0.25 0.20 0.30 - - - 75.30% 81.96% Unsatisfactory / E.E. Madayag Construction Joint Venture Sudipen Road K0316+000 - K0318+401

Northbay Construction Services Corporation 33351 Buhatan Port Development Project 05/22/2019 DOTC 17.336 180 O 0.40 0.30 0.00 0.01 0.04 0.02 77.00 - On-going Nueva Vizcaya Northeast Construction 37702 Construction of Multi Purpose Building, Beti Elementary School 08/26/2019 0.474 60 C 0.49 0.13 0.30 - - - 91.80% 91.8% Very Satisfactory 2nd DEO Balog Balog Multipurpose Project II - Construction of Balog Northern Builders 8789 Balog South Main Canal (Sta. 7+438 to 13+102.86) and its 9/14/19 NIA 273.037 531 O 0.28 0.30 0.00 0.03 0.07 0.05 72.70 - On-going related structures Northern Builders 8789 Balog Balog Multipurpose Project II 02/16/2019 NIA 140.064 385 O 0.33 0.26 0.10 0.03 0.06 0.03 81.02 - On - Going Northern Builders 8789 Balog Balog Multipurpose Project II 02/16/2019 NIA 273.037 531 O 0.38 0.30 0.00 0.03 0.07 0.05 82.53 - On - Going Proposed Repair/Restoration of Seawall at the Back of CCP South Manila Northern Builders 8789 03/13/2018 48.360 269 C 0.49 0.13 0.30 - - - 92.40 *92.40% Very Satisfactory Complex and Diokno Blvd. (Phase V), Sta. 0+662 to Sta. 0+832 DEO Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Flood Control Project in Pampanga 2nd Northern Builders 8789 03/20/2018 35.142 201 C 0.48 0.13 0.30 - - - 91.10 *91.10% Very Satisfactory Mancatian Downstream Pasig - Potrero River Sta. 0+000 to Sta. DEO 0+344, Porac, Pampanga Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects, Local Roads - Regional Office Northern Builders 8789 03/23/2018 48.521 583 C 0.46 0.13 0.30 - - - 89.00 89.00% Satisfactory Construction/ Rehabilitation of Road, Mulawin Road, Orani, No. III Bataan 1st Legislative District, Province of Bataan Bridge Program - Widening of Permanent Bridges, Cojuangco Regional Office Northern Builders 8789 Bridge (B01363LZ) along Paniqui - Camiling - Wawa Road 08/29/2019 59.543 560 O 0.37 0.20 0.14 0.02 0.05 0.03 83.90% - On-going No.III (Phase II) Construction/Repair/Rehabilitation/Improvement of Vaious Northern Builders/ 3-Sides Builders & Trading Infrastructure Including Local Projects-Roads and Bridges-Local 06/19/2018 Bataan 1st DEO 29.399 233 C 0.44 0.13 0.30 - - - 87.70 87.70% Satisfactory Corp. (Joint Venture) Roads- Concreting of E. Pascual Sr. Avenue Road going to Roman Expressway

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 127 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction/ Repair/ Rehabilitation/ Improvement of Various Northern Builders/ 3-Sides Builders & Trading Infrastructure including Local Projects - Roads and Bridges - JV-16-2083 03/15/2018 Bataan 1st DEO 29.399 233 C 0.47 0.13 0.30 - - - 90.70 *90.70% Very Satisfactory Corp. Joint Venture Local Roads - Concreting of E. Pascual Sr. Avenue Road going to Roman Expressway Orani, Bataan Northern Builders/ Msv Construction & Construction of Revetment along Angat River 06/18/2018 Bulacan 1st DEO 31.016 300 O 0.398 0.203 0.150 0.030 0.070 0.050 90.10 - On-going Supplies Joint Venture Repair/Rehabilitation/Improvement of Flood Control along Ilocos Norte 1st Northlander Construction 38462 08/22/2019 3.641 90 C 0.38 0.20 0.30 - - - 87.00% 87% Satisfactory Cabacanan, Brgy. Baduang DEO Construction/Improvement of Access Roads leading to Declared Negros Occidental Novanne Ventures Construction Corporation 22107 Tourism Destinations, NRJ leading to Maricalum Port to 11/09/2019 24.500 120 C 0.49 0.13 0.30 - - - 92.20% 92.2% Very Satisfactory 3rd DEO Campomanes Bay Construction/Improvement of Access Roads leading to Declared Negros Occidental Novanne Ventures Construction Corporation 22107 Tourism Destinations, NRJ leading to Maricalum Port to 08/22/2019 23.275 120 O 0.24 0.30 0.15 0.03 0.06 0.03 80.80% - On-going 3rd DEO Campomanes Bay Off-Carriageway Improvement including Drainage, Jct. Bato- Catanduanes Nqa Construction & Supply 22350 04/14/2018 44.100 263 C 0.50 0.13 0.30 - - - 93.00 86.26% Satisfactory Baras Road, K0009+200, K0011+529, K0011+551, K0012+000 DEO Construction of Revetment - Construction of Palnab Seawall, Catanduanes Nqa Construction & Supply 22350 11/05/2019 28.517 176 O 0.39 0.24 0.15 0.01 0.04 0.05 87.60% - On-going Barangay Palnab DEO Zamboanga del Nrmm Construction And Dev'T Corp. 41172 Rehabilitation of Sitog - Bulawan Bridge, Brgy. Sitog 11/07/2019 1.468 41 C 0.47 0.13 0.30 - - - 90.50% 90.5% Very Satisfactory Norte 1st DEO Misamis Construction/Rehabilitation/Improvement of Water Supply Nrmm Construction And Dev'T Corp. 41172 11/08/2019 Occidental 2nd 18.616 90 O 0.40 0.30 0.04 0.03 0.05 0.02 82.90% - On-going System DEO Construction of Two (2) Storey Six (6) Classroom School Zamboanga del Nrmm Construction And Dev'T. Corp. 41172 08/25/2019 9.463 110 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory Building at Ditulan Elementary School Sur 1st DEO Ntl Builders And Developer 33450 Construction/Improvement of San Marcos (Exhibit Center) MPB 03/21/2018 Quirino DEO 5.940 145 C 0.46 0.16 0.30 - - - 92.20 *92.20% Very Satisfactory Quezon City 2nd Nueda Builders Construction & Supply Inc. 39776 Concreting of 11th Jamboree Street 08/27/2019 9.615 120 C 0.44 0.13 0.30 - - - 87.20% 87.2% Satisfactory DEO Quezon City 1st Nueda Builders Construction & Supply Inc. 39776 Rehabilitation of , Barangay Pasong Tamo 11/25/2019 14.700 120 C 0.38 0.20 0.30 - - - 88.00% 88.16% Satisfactory DEO Quezon City 1st Nueda Builders Construction & Supply Inc. 39776 Rehabilitation of Bonifacio Drive, Barangay Pasong Tamo 08/23/2019 14.700 120 O 0.35 0.25 0.15 0.03 0.06 0.05 88.20% - On-going DEO Concreting of Purok Kaingin Anao Farm to Market Road Pampanga 1st Nulas Builders 32172 03/19/2018 5.970 60 C 0.46 0.13 0.30 - - - 89.40 *89.40% Very Satisfactory Barangay Anao, Mexico, Pampanga DEO Concreting of Road at San Nicolas (olivas/Sta Monica) to Pampanga 1st Nulas Builders 32172 11/05/2019 2.970 60 C 0.43 0.13 0.30 - - - 86.70% 90.36% Very Satisfactory McArthur Highway DEO Concreting of Road at San Nicolas (Olivas/Sta. Monica) to Pampanga 1st Nulas Builders 32172 08/19/2019 2.970 60 O 0.40 0.24 0.15 0.03 0.07 0.05 92.80% - On-going McArthur Highway DEO Construction/Rehabilitation of Flood Mitigation Facilities with Numerical Gate Construction & Supply 34122 Major River Basins and Principal Rivers - Construction of brgy. 4 05/28/2018 Albay 2nd DEO 44.100 165 O 0.334 0.300 0.150 0.022 0.038 0.050 89.40 - On-going Cororation Quirangay Flood Control System ( Mayon Sabo Works ) Numerical Gate Construction & Supply 34122 Construction of Multi-Purpose Building 08/29/2019 Albay 2nd DEO 4.772 120 C 0.49 0.13 0.30 - - - 92.40% 92.4% Very Satisfactory Corporation Construction of Flood Mitigation Structure, Construction of Catanduanes Nvr Construction 40278 11/05/2019 5.476 130 O 0.39 0.24 0.11 0.01 0.06 0.03 84.40% - On-going Flood Control System DEO Retrofitting/ Strengthening of Permanent Bridge - Tinotongan Zamboanga del O. G. Santos Construction 2050 Bridge (B01197MN) along Lanao - Pagadian - Zamboanga City 06/02/2018 5.201 75 O 0.392 0.239 0.104 0.03 0.07 0.033 86.80 - On-going Sur 1st DEO Road Provincial Concreting of Brgy. Mayabo, Dalama, San Roque, Labatan Government of O. G. Santos Construction 2050 02/27/2019 89.948 335 O 0.39 0.30 0.14 0.03 0.07 0.05 98.34 - On - Going Road Zamboanga Sibugay Construction of 3 Units 3 Storey 15 CL School Building at Titay Zamboanga O. G. Santos Construction 2050 03/13/2018 62.961 240 C 0.49 0.20 0.30 - - - 98.60 87.47% Satisfactory NHS Sibugay 2nd DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 128 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads - Lanao - Zamboanga O. G. Santos Construction 2050 11/11/2019 74.818 293 O 0.38 0.24 0.15 0.03 0.05 0.05 90.50% - On-going Pagadian - Zamboanga City Road, K1725+923 - K1726+060 Sibugay 1st DEO (LS), K1726+737 - K1726+877 (RS) Intermittent Section Provincial Improvement of NHJ-Libudon-Longcacob-Sanghay-Section with O. G. Santos Construction 2050 03/06/2020 Government of 34.249 254 O 0.34 0.25 0.15 0.02 0.03 0.03 8350.00% - On-going Bridge, Phase II Davao Oriental Construction of Super Diversion Canal (SDC) at selected O. R. Sarmiento Construction Inc. 1411 02/24/2018 NIA 349.46 875 O 0.353 0.300 0.011 0.023 0.056 0.050 79.26 - On-going Stations Davao Oriental 1st O.G. Santos Construction 2050 Construction of Revetment along Casauman River 05/30/2018 31.893 291 O 0.316 0.3 0.15 0.03 0.05 0.033 87.90 - On-going DEO Provincial Road Upgrading (Gravel to Concrete) Brgy. Abejod Section O.G. Santos Construction 2050 05/27/2019 Government of 27.283 207 C 0.44 0.20 0.30 - - - 94.40 87.00% Satisfactory (Phase 1) Davao Oriental Retrofitting/Strengthening of Permanent Bridges – Buacan O.Q Construction & Supply 42767 Bridge (B00023BH) along Jct. (TNR) Cortes-Balilihan-Catigbian- 11/05/2019 Bohol 1st DEO 1.953 31 C 0.44 0.20 0.30 - - - 94.40% 94.4% Very Satisfactory Macaas Road Ensure Safe and Reliable National Road System: Bridge Rehabilitation/Major Repair of Permanent Bridges-Calunasan O.Q Construction & Supply 42767 11/07/2019 Bohol 2nd DEO 11.156 90 C 0.50 0.13 0.30 - - - 93.10% 92.68% Very Satisfactory Br. (B00172BH) along Tagbilaran North Road (Tagbilaran- Jetafe Section) 001: Ensure Safe and Reliable National Road System: Bridge- Rehabilitation/Major Repair of Permanent Bridges-Calunasan O.Q. Construction And Supply 42767 08/27/2019 Bohol 2nd DEO 11.156 90 O 0.40 0.29 0.13 0.03 0.05 0.03 92.40% - On-going Bridge along Tagbilaran North Road (Tagbilaran-Jetafe Section)

Construction of DA-Crop Biotechnology Center Laboratory and OCM Steel Corporation 32421 06/06/2019 DA 138.151 360 O 0.36 0.30 0.08 0.03 0.07 0.05 88.10 - On-going Plenary Building

Construction of Administrative Bldg. / Expansion of Acad / Dorm OCM Steel Corporation 32421 06/11/2019 DOST 77.236 654 O 0.38 0.3 0.15 0.03 0.06 0.05 97.00 - On-going Ph 2 OCM Steel Corporation 32421 Site Development 06/11/2019 DOST 18.232 181 C 0.50 0.20 0.21 - - - 90.93 *90.93% Very Satisfactory

OCM Steel Corporation 32421 Rehabilitation of Residence Halls 06/11/2019 DOST 14.102 134 C 0.48 0.20 0.30 - - - 97.90 *97.90% Outstanding Ocm Steel Corporation 32421 Repair and Improvement -Ext. of Lab Room for MIC 10/01/2018 DOST C 0.40 0.20 0.00 - - - 59.67 *59.67% Poor Cagayan 2nd Ocp Construction 38490 Concreting of Sta. Maria-Bilibigao Farm To-Market Road 03/14/2018 1.990 124 C 0.41 0.20 0.30 - - - 91.30 *91.30% Very Satisfactory DEO Construction/Improvement of Access Roads Leading to Cagayan 2nd Ocp Construction 38490 Declared Tourism Destinations-Access Road Leading to 11/06/2019 9.335 118 C 0.50 0.20 0.12 - - - 82.00% 86.68% Satisfactory DEO Resorts Convergence and Special Support Program - Construction/Improvement of Access Roads Leading to Cagayan 2nd Ocp Construction 38490 08/21/2019 9.335 118 O 0.39 0.24 0.15 0.03 0.06 0.03 89.80% - On-going Declared Tourism Destinations - Access Road Leading to DEO Resorts OFC Construction (Formerly: LC Rehabilitation and Improvement of Adminsitration Building 37640 03/07/2019 DOST 14.687 240 O 0.39 0.30 0.15 0.03 0.04 0.05 96.10 - On-going Construction) (Design & Build) Organizational Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation Program, Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads, Secondary Roads, Banay - Banay - Mojon - Cuenca Batangas 3rd Oic Conztruct And Supply Corporation 23727 09/03/2019 77.194 300 C 0.48 0.13 0.30 - - - 91.40% 91.4% Very Satisfactory Road, K0090+(-861) - K0091+332.40,K0092+089 - DEO K0092+193, K0092+352 - K0093+16-, K0095+049.5 - K0095+128, K0098+000 - K0098+850, K0099+820 - K0100+117, K0102+895

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 129 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Olin Development Engineering & Concreting of Road, Purok 3 to Purok 5 to Purok 6, Brgy. 26271 11/15/2019 Butuan City DEO 1.954 45 C 0.49 0.13 0.30 - - - 92.20% 92.2% Very Satisfactory Construction Mandamo Omengan Construction & Development Construction of Revetment, Embankment of Dike and Lower Kalinga 5119 09/07/2019 95.441 420 C 0.50 0.13 0.30 - - - 93.00% 92.7% Very Satisfactory Corporation Channelling along Chico River DEO Omengan Construction And Development Construction of Revetment and Embankment Dike and Lower Kalinga 5119 06/03/2018 96.387 290 O 0.323 0.25 0.102 0.03 0.035 0.033 77.30 - On-going Corporation Chanelling/Widening of along Chico River, Tabuk City, Kalinga DEO, CAR Omengan Construction And Development Construction of Catabbogan Flood Control along Chico River Lower Kalinga 5119 11/21/2019 24.247 184 O 0.37 0.24 0.14 0.03 0.05 0.03 85.40% - On-going Corporation Sta. 61+754 - Sta. 62+014; Sta. 62+680 - Sta.63+776 DEO Road Upgrading (Unpaved to Paved) Based on Gravel Road Omengan Construction And Development Strategies, Traffc Benchmark for Upgrading to Paved Roads 5119 04/06/2018 Mt. Province DEO 80.404 356 C 0.49 0.13 0.30 - - - 92.30 *92.30% Very Satisfactory Corporation Standards (HDM-4 Projects Analysis), K0454+731 to K0457+069 Asset Preservation of National Roads - Rehabilitation/ Restoration/Upgrading of Damaged Paved National Road Omengan Construction And Development Including Drainage Based on Pavement Management System/ Lower Kalinga 5119 04/07/2018 17.860 112 C 0.48 0.13 0.30 - - - 91.00 *91.00% Very Satisfactory Corporation Highway Development-4 (HDM-4): Kalinga - Cagayan Road DEO (Calanan - Enrile Section) K0509+465 - K0510+000, K0510+000 - K0510+0854 Construction of Four (4) Storey, Eight (8) Classroom School Omicron Construction 9575 11/25/2019 Rizal 2nd DEO 26.714 289 C 0.49 0.13 0.30 - - - 92.60% 91.83% Very Satisfactory Building at San Jose ES MFO2 - Flood Management Services, Omnicon Builders / Almakar Builders & Metal Construction/Maintenance of Flood Mitigation Structures and JV-16-1903 06/14/2018 Cavite 1st DEO 29.400 210 C 0.44 0.13 0.30 - - - 87.70 87.70% Satisfactory Works Drainage Systems: Construction of Revetment along Imus River, Tanzang Luma VI Construction of Drainage Systems with Sidewalk, Brgy. Bulihan, Omnicon Builders/ Almakar Builders & Metal JV-16-1903 Silang, Cavite with Drainage Outfall Connecting to National 03/22/2018 Cavite Sub DEO 29.700 300 C 0.49 0.13 0.30 - - - 92.70 *'92.70% Very Satisfactory Works Joint Venture Road (Phase II) Silang, Cavite On Point Construction / Ukc Builders, Inc. Contstruction/ Mitigation of Flood Control Mitigation Structures JV-17-2401 04/11/2018 Cebu City DEO 49.000 249 C 0.50 0.13 0.30 - - - 93.30 89.55% Very Satisfactory Joint Venture at Brgy. Busay Rehabilitation/Major Repair of Permanent Bridge Geratag Northern Samar On Time Builders Incorporated 40296 04/05/2018 2.373 90 C 0.42 0.13 0.30 - - - 85.50 *85.50% Satisfactory Bridge 2 along Allen - Catarman Road 1st DEO Rehabilitation of 3 Storey, 12 Classroom, Balara Elementary Quezon City 2nd One Euluz Construction Corporation 32080 08/27/2019 4.696 150 O 0.40 0.24 0.15 0.03 0.05 0.05 91.60% - On-going School Building DEO Construction of Two (2) Units Unique Technical Vocational Negros Occidental One Terra Builders And Construction Supply 40848 Laboratory (TVL) Workshop for Senior High School at Valladolid 08/24/2019 6.892 105 C 0.44 0.20 0.30 - - - 94.20% 94.2% Very Satisfactory 4th DEO National High School Optima Builders Corporation 38073 Construction of Concrete Students' Kiosk 01/08/2019 DOST 2.500 142 C 0.48 0.20 0.30 - - - 98.00 *98.00% Outstanding Opusland Inc. / C.A. Betalac Construction & JV-18-032 Construction of Multi-Purpose Building 08/27/2019 Sarangani DEO 96.441 338 O 0.36 0.30 0.10 0.03 0.05 0.03 86.80% - On-going Gen. Mdse. (Joint Venture) Opusland Inc. / R.U. Aquino Construction and 38556 / Procurement of Fully Developed Lots and Completed Housing Development Corporation (Formerly: R.U. 23507 - JV- 7/26/19 NHA 179.957 1,132 C 0.47 0.20 0.21 - - - 87.65 83.93% Satisfactory Units (621 Units), Lizares Village 1 Aquino Construction) (JV) 14-684 Retrofitting/Strengthening of Permanent Bridges, Rayhill Bridge Orani Builders & Supply 5349 08/25/2019 Bataan 1st DEO 17.640 120 O 0.40 0.24 0.15 0.03 0.05 0.05 91.70% - On-going (B01703LZ) along Roman Expressway Off-Carriageway Improvement along Puerto Princesa North Orani Builders & Supply 5349 Road, K0192+681 - K0149+000, K0206+000 - K0207+000, 08/23/2019 Palawan 1st DEO 65.360 328 O 0.38 0.30 0.10 0.03 0.04 0.00 85.20% - On-going K0211+(-667) - K0211+000 Construction/ Maintenance of Flood Mitigation Structure and Pampanga 2nd Orani Builders Supply 5349 Drainage System, Rehabilitation/ Widening/ Deepening with 03/20/2018 17.419 240 C 0.39 0.20 0.30 - - - 89.30 *89.30% Very Satisfactory DEO Slope Protection along Taldawa Creek Sasmuan, Pampanga Widening of Permanent Bridges including ROW, Linoron Bridge Zambales 1st Orani Builders Supply 5349 1 (B02811LZ) along San Marcelino - San Antonio - San Narciso 03/13/2018 9.461 180 C 0.48 0.13 0.30 - - - 91.50 *91.50% Very Satisfactory DEO Road, San Antonio, Zambales

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 130 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Organizational Outcome 1: Ensure Safe and Reliable National Road System-Asset Preservation Program- Orani Builders Supply 5349 Rehabilitation/Reconstruction/Upgrading of Damaged Paved 08/27/2019 North Manila DEO 49.565 408 C 0.45 0.13 0.30 - - - 87.80% 89.18% Very Satisfactory Roads-Tertiary Roads Mendiola St. -(S02231LZ) Chainage 0- Chainage 563 Bridge Program - Retrofitting/ Strengthening of Permanent Orani Builders Supply 5349 11/11/2019 Bataan 1st DEO 17.640 120 C 0.50 0.13 0.30 - - - 93.30% 92.34% Very Satisfactory Bridges , Rayhill Bridge (BO1703LZ) along Roman Expressway Preventive Maintenance - Secondary Road - Roman Orani Builders Supply 5349 Expressway - K0119+-(319) - K0119+000, K0119+200 - 08/23/2019 Bataan 2nd DEO 35.017 92 O 0.40 0.20 0.15 0.03 0.05 0.03 85.50% - On-going K0119+800 Network Development Program - Road Widening - Secondary Zambales 2nd Orani Builders Supply 5349 08/22/2019 62.697 240 O 0.39 0.20 0.15 0.03 0.05 0.05 87.50% - On-going Road - Olongapo Bugallon Road, K0150+090 - K0152+000 DEO

Construction of Concrete Road-Access Road Leading to Sta. Mindoro Orient Star Construction, Inc. 7183 08/20/2019 14.696 180 O 0.39 0.24 0.15 0.02 0.03 0.05 88.40% - On-going Teresa Port, Magsaysay, Occidental, Mindoro Occidental DEO Construction of Concrete Road-Access Road Leading to Sta. Mindoro Orient Star Construction, Inc. 7183 11/09/2019 14.696 178 O 0.36 0.25 0.15 0.03 0.06 0.05 89.40% - On-going Teresa Port Occidental DEO Asset Preservation - Preventive Maintenance (Asphalt Overlay) along Carmen Junction - Bayambang - Manat Road, Pangasinan 2nd Oriental Sales Center And Contractor 33630 06/06/2018 14.687 60 C 0.47 0.14 0.30 - - - 90.40 90.40% Very Satisfactory K0217+773 to K0218+014, K0218+029 to K0218+460, DEO K0197+(-668) to K0197+082 Preventive Maintenance on Secondary Roads, Asphalt Overlay Pangasinan 4th Oriental Sales Center And Contractor 33630 11/06/2019 50.236 95 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory along San Carlos-Calasiao Road, K0205+149-K0207+657 DEO

Preventive Maintenance on Secondary Roads Asphalt Overlay Pangasinan 4th Oriental Sales Center And Contractor 33630 08/22/2019 50.236 95 O 0.40 0.20 0.15 0.03 0.05 0.03 86.10% - On-going along San Carlos- Calasiao Road, K0205+149 - K0207+657 DEO Asset Preservation-Preventive Maintenance, Alaminos - Bolinao Oriental Sales Center And Contractor / Jonik Pangasinan 1st JV-18-617 Road (k0326+000 - K0328+000; K0334+000 - K0336+500; 08/27/2019 63.690 135 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Trading & Construction DEO K0354+000 - K0356+398) Asset Preservation-Preventive Maintenance, Alaminos-Bolinao Oriental Sales Center And Contractor/Jonik Pangasinan 1st JV-18-617 Road (K0326+000-K0328+000; K0334+500-K0336+500; 11/12/2019 14.697 135 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Trading & Construction (Jv) DEO K0354+000-K0356+398) Oscar R. Sarmiento Construction, Inc. 1411 Paglaum Ville 05/11/2018 NHA 32.372 259 O 0.36 0.30 0.00 0.03 0.06 0.00 75.73 - On - Going (Formerly: O.R. Sarmiento Construction)

Oscar R. Sarmiento Construction, Inc. 1411 Mayorga Town Homes 11/16/2018 NHA 81.872 519 C 0.47 0.20 0.00 - - - 66.65 72.47% Poor (Formerly: O.R. Sarmiento Construction)

Oscar R. Sarmiento Construction, Inc. (Formerly: O.R. Sarmiento Construction) / 1411 / 17542 Barotac Viejo SRIP - Construction of Barotac Viejo Earthfill Dam 12/10/2019 NIA 720.607 1,528 C 0.33 0.13 0.30 - - - 76.13 83.94% Satisfactory Newington Builders, Inc. (Formerly: E. - JV-13-521 and its Appurtenant Structure Gardiola Construction) (JV) Construction and Maintenance of Bridges along National Roads- Rehabilitation/ Major Repair of Permanent Bridges at Nahwan P.B. Obial Construction 16784 04/05/2018 Bohol 1st DEO 7.164 169 C 0.49 0.13 0.30 - - - 92.80 *92.80% Very Satisfactory Bridge (B00123BH) along Tagbilaran North Road (Tagbilaran- Getafe Section), Clarin Bohol MFO 3 - Maintenance and Construction Services of Other Infrastructures, Construction/Improvement of Access Roads Regional Office P.B. Obial Construction 16784 leading to Declared Tourism Destinations, Rehabilitation/ 04/13/2018 144.750 361 C 0.49 0.13 0.30 - - - 92.20 *92.20% Very Satisfactory No. VII Improvement of Road at F.E. Zuelig Avenue with Drainage Facilities, City Construction and Maintenance of Bridges along National Roads P.B. Obial Construction 16784 - Rehabilitation/Major Repair of Permanent Bridges at 04/05/2018 Bohol 2nd DEO 8.527 171 C 0.49 0.13 0.30 - - - 91.70 *91.70% Very Satisfactory Cambangay Bridge (B00138BH) along Interior Road

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 131 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Network Development, Improvement/Widening of National Regional Office P.B. Obial Construction 16784 Roads, Primary Roads, Outside N1, Cebu-Toledo Wharf Road 04/13/2018 70.522 237 C 0.48 0.13 0.30 - - - 91.50 *91.50% Very Satisfactory No. VII (Uling-Toledo Wharf)

Construction of 3-Storey, 6-Classroom Building at Casili P.B. Obial Construction 16784 04/03/2018 Cebu 6th DEO 8.910 180 C 0.45 0.13 0.30 - - - 88.30 *88.30% Satisfactory Elementary School, Casili Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads based on PMS/HDM-4, Tertiary Roads, P.B. Obial Construction 16784 04/03/2018 Cebu 6th DEO 14.409 161 C 0.41 0.13 0.30 - - - 84.40 *84.40% Satisfactory Camduman-Cebu North Rd (S00276CB), K0011+071 - K0011+657, K0013+192-K0013+195 Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism P.B. Obial Construction 16784 11/14/2019 Cebu 6th DEO 41.643 313 O 0.39 0.25 0.15 0.03 0.05 0.05 91.50% - On-going Destinations - Reconstruction to Concrete Pavement - NRJ leading to Mantawi International Drive, Hotels and Restaurants P.E.R.R.C. Construction & Development 23869 Sta. Cruz Homes Site 1 04/28/2018 NHA 144.940 427 O 0.34 0.25 0.00 0.03 0.07 0.02 70.69 - On - Going Corp. P.E.R.R.C. Construction And Development 23869 Construction of Port Operation Building 02/01/2019 PPA 54.185 675 C 0.50 0.20 0.00 - - - 69.90 82.97% Satisfactory Corp. Provincial P.L. Sebastian Construction 35840 Conc. Of Kiblawan-Dapok-Bunot-Banate Road 11/21/2019 Government of 92.487 258 O 0.36 0.24 0.09 0.02 0.04 0.02 75.90 - On - Going Davao del Sur Widening (2 into 4 lanes) of Davao-Cotabato road (Jct. Digos- Cotabato Section) including RROW (Brgy. Dolo-Brgy. Regional Office P.L. Sebastian Construction 35840 Kinuskusan section) Davao del Sur Lone District, K1585+241- 03/16/2018 170.383 300 C 0.39 0.20 0.30 - - - 88.80 *88.80% Satisfactory No. XI K1588+852,K1589+390-K1589+606, K1590+005-K1591+634, K1592+274-K1593+057 Preventive Maintenance of Road: Asphalt Overlay - along Davao del Sur P.L. Sebastian Construction, Inc. 35840 Davao-Sarangani Coastal Rd (Malalag - Malita - JAS - G) 11/24/19 29.840 91 C 0.50 0.13 0.30 - - - 93.10% 93.1% Very Satisfactory DEO (S00207MN) K1590+052-K1591+156 Rehabilitation/Major Repair of Permanent Bridge, EDSA - Kalayaan - Fort Bonifacio Flyover Bridge (EB) Buendia to Fort Metro Manila 2nd P.L.G.L. Construction 39062 08/19/2019 4.802 60 C 0.44 0.13 0.30 - - - 87.10% 87.1% Satisfactory Bonifacio (B02321LZ) along EDSA - Kalayaan - Fort Bonifacio DEO Flyover, (East Bound) District II Rehabilitation/Major Repair on Permanent Bridge, EDSA- Metro Manila 2nd P.L.G.L. Construction 39062 Kalayaan-Fort Bonifacio Flyover (Ramp 3) (B04314LZ), along 11/21/2019 4.801 60 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory DEO EDSA-Kalayaan-Fort Bonifacio Flyover, District II Construction of Two (2) Storey Science Laboratory Building San Camarines Sur P.R. Hizo Construction And Supply 7538 08/28/2019 8.573 120 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory Ramon High School 5th DEO Construction/Repair/Rehabilitation/Improvement of Various P.V.B. Construction & Trading / Turquoise Infrastructure including Local projects; Local Roads and Pampanga 3rd Construction And Realty Development (Joint JV-18-0233 08/28/2019 17.937 210 C 0.48 0.13 0.30 - - - 91.20% 91.2% Very Satisfactory Bridges; Local Bridges - Construction of Bridge with Slope DEO Venture) Protection at Barangay Sapang Balen Provincial Concrecting (with Slope Protection on Landslide Portion) of Pablo S. Labasbas Construction 6302 07/05/2019 Government of 79.834 392 O 0.386 0.26 0.051 0.03 0.061 0.033 82.10 - On-going Canmanico-Anonang Valencia Road Bohol Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads Including Drainage Based on Pavement Eastern Samar Pablo S. Labasbas Construction 6302 Management System/ Highway Development Management - 4 04/10/2018 40.239 210 C 0.46 0.13 0.30 - - - 88.80 *88.80% Satisfactory DEO (HDM-4) Tertiary along Junction Arteche-Jipapad - Las Navas - Rawis Road Construction/Improvement of Access Road Leading to Eastern Samar Pablo S. Labasbas Construction 6302 11/11/2019 11.760 65 C 0.50 0.13 0.30 - - - 93.00% 90.72% Very Satisfactory Hilangagan Beach DEO Construction/Improvement of Access Road leading to Ganap Eastern Samar Pablo S. Labasbas Construction 6302 08/28/2019 18.566 81 O 0.38 0.30 0.00 0.02 0.05 0.02 76.80% - On-going Cave DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 132 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Construction of Multi-Purpose Building, DPWH Eastern Samar Eastern Samar Pablo S. Labasbas Construction 6302 08/29/2019 15.768 155 O 0.36 0.30 0.00 0.02 0.05 0.03 77.00% - On-going District Engineering Office DEO Convergence and Special Support Program - Construction/ Improvement of Access Road Leading to Trades, Industries and Pablo S. Labasbas Construction / Jgo Economic Zones, Divisoria - Langit - San Antonio Farm - San JV-18-1344 08/28/2019 Leyte 1st DEO 91.675 198 O 0.40 0.24 0.15 0.03 0.05 0.05 91.00% - On-going Builders (Joint Venture) Diego - Sto. Nino Road Connecting to Tigbao - Sta. Fe - San Miguel Road and Palo- Carigara-Ormoc- Road in Support to the Garment Industry Pablo S. Labasbas Construction / Jgo Road Widening - Leyte-Samar Road (via Guintigui-an), Tacloban City JV-18-1698 11/13/2019 31.791 240 O 0.40 0.24 0.15 0.03 0.06 0.03 90.40% - On-going Builders (Joint Venture) K0900+177 - K0900+476, K0900+856 - K0901+214 DEO Pablo S. Labasbas Construction / Jucons Improvement/Widening of National Roads-Ormoc-Baybay- JV-16-639 04/12/2018 Leyte 5th DEO 39.200 240 C 0.46 0.13 0.30 - - - 89.50 90.22% Very Satisfactory Construction And Supply Southern Leyte Boundary Road, K1061+1956-K1061+189 Cauayan Airport Development Project - Runway Extension with Pacific Concrete Products Inc. 17150 Shoulder Grade Correction, Asphalt Overlay and Re-blocking of 02/10/2019 DOTR 247.293 480 O 0.38 0.30 0.04 0.03 0.06 0.05 86.50 - On-going Runway Pacific Concrete Products Inc. 17150 Virac Airport Development Project - Re-blocking of Apron 11/11/2019 DOTR 28.398 255 C 0.49 0.30 0.20 - - - 98.50 0.955 Very Satisfactory Pacific Concrete Products, Inc. 17150 Virac Airport Development Project 05/20/2019 DOTC 28.398 255 O 0.36 0.30 0.15 0.02 0.05 0.05 93.50 - On-going

Pacific Concrete Products, Inc. 17150 Ozamis Airport Development Project 10/24/2018 DOTr 228.252 300 C 0.46 0.20 0.30 - - - 96.30 *96.30% Outstanding

Pacific Stars Erectors 14224 Tuguegarao LTO Regional Office Building Project 04/11/2018 DOTC 40.634 360 O 0.400 0.300 0.000 0.030 0.054 0.033 81.70 - On-going

Pacipic Concrete Products, Inc. 17150 Airport Development Project 06/15/2018 DOTr 295.758 300 C 0.48 0.20 0.30 - - - 98.00 96.70% Outstanding

Pafj Construction And Supply 36868 Sta. Elena Communal Irrigation System 10/13/2018 NIA 2.834 90 C 0.42 0.20 0.30 - - - 91.90 *91.90% Very Satisfactory Completion of Multipurpose Building (Barangay Hall) in Brgy Pagay Construction 34255 04/06/2018 Cebu 1st DEO 2.327 35 C 0.43 0.13 0.30 - - - 86.30 *86.30% Satisfactory Ilihan Palawan 2nd Palbic Construction And Supply 42744 Construction of Multi-Purpose Building (Covered Court) 11/06/2019 3.590 180 O 0.39 0.30 0.11 0.03 0.04 0.03 90.00% - On-going DEO Road Widening-Midsayap-Marbel Rd K1786+478- South Cotabato Palmares General Merchandise 24657 05/29/2018 27.629 140 O 0.328 0.24 0.15 0.03 0.056 0.05 85.40 - On-going K1787+574.5 1st DEO National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Road: South Cotabato Palmares General Merchandise 24657 03/14/2018 10.119 160 C 0.49 0.13 0.30 - - - 92.60 *92.60% Very Satisfactory Midsayap - Marbel Rd, K1784+748 to K1784+931 Modified to 1st DEO (S00275MN) Midsayap - Marbel Road K1784+526.88 to K1786+394 Palmer Asia Incorporated 22015 Provision of Centralized Fire Fighting Faculty with Cistern 02/01/2018 DOST 7.968 210 C 0.45 0.20 0.27 - - - 92.40 *92.40% Very Satisfactory Road Concreting of Purok Sampaguita Road at Barangay Sta. Panaad Construction 37345 11/08/2019 Palawan 3rd DEO 3.596 93 C 0.46 0.15 0.30 - - - 90.50% 90.5% Very Satisfactory Monica, Sta. 0+000 to Sta. 0+300 NIA / Pangsasinan Pangasinan New Wilson Lumber & Improvement of Service Road for Dumoloc River Irrigation 37225 11/28/2020 Irrigation 4.754 300 C 0.39 0.13 0.30 - - - - 82.60% Satisfactory Construction Supply System Management Office Parpad Builders/B. P. Cruz Builders & JV-17-1886 Development of Pocket Forest Park, Gardens and Playground 08/06/2018 TIEZA 23.000 150 O 0.39 0.30 0.13 0.03 0.07 0.05 96.70 - On - Going Trading (Jv) Network Development - Construction of By Passes and Camarines Norte Partido Construction And Supply 20631 08/20/2019 91.022 340 C 0.40 0.13 0.30 - - - 83.10% 90.24% Very Satisfactory Diversion Roads; Labo by Pass Road, Including ROW DEO Lower Agno River Construction of Rectangular Concrete Canal Lining and Irrigation System Pas Construction And Supplies 32890 Appurtenant Structures (Sta.0+000.00 - Sta.1+484.00 of LARIS 12/19/2020 3.109 180 O 0.31 0.30 0.14 0.01 0.03 0.05 83.40% - On-going Improvement Sub-Lateral D-2) Project Bridge Program - Retrofitting / Strengthening of Permanent Pascal Construction 34168 Bridges, Pagsakian Bridge 1 (BO1575LZ) along Gov. J.J. Linao 11/11/2019 Bataan 1st DEO 8.820 120 C 0.50 0.13 0.30 - - - 93.30% 89.52% Very Satisfactory Road

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 133 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Bridge Program - Retrofitting / Strengthening of Permanent Pascal Construction 34168 Bridge, Pagsakian Bridge 1 (B01575LZ) along Gov. J.J. Linao 08/25/2019 Bataan 1st DEO 8.820 120 O 0.39 0.20 0.15 0.03 0.05 0.05 87.00% - On-going Road Provincial Upgrading of Junction National Highway - Palkan - Cannery - Pase Construction 15849 11/22/2018 Government of 23.929 168 O 0.33 0.30 0.15 0.02 0.06 0.05 90.40 - On - Going Junction Upper Klinan, Polomolok, South Cotabato South Cotabato Provincial Upgrading of Junction National Highway - Palkan - Cannery - Pase Construction 15849 01/24/2019 Government of 17.737 168 O 0.35 0.30 0.13 0.03 0.07 0.05 92.90 - On - Going Junction Upper Klinan, Polomolok, South Cotabato South Cotabato Reconstruction to Concrete Pavement of Iloilo East Coast - Patrila Builders, Inc. 26628 Capiz Road KO251+(-339) - KO251+184, KO282+004 - 11/12/2019 Iloilo 2nd DEO 16.317 133 C 0.48 0.13 0.30 - - - 90.90% 90.9% Very Satisfactory KO282+660 Construction of Drainage along Road - Iloilo-Capiz Road (New Patrila Builders, Inc. 26628 11/14/2019 Iloilo 4th DEO 29.399 180 O 0.38 0.24 0.15 0.03 0.04 0.05 89.00% - On-going Route) KO018+581 - KO020+000 Construction of Concrete Road-NRJ Cabagohan- Bino-an- Patrila Builders, Inc. 26628 08/26/2019 Iloilo 3rd DEO 14.700 127 O 0.38 0.24 0.15 0.03 0.06 0.05 91.00% - On-going Embarcadero- Botongan Road Leading to Gigantes Islands Patrila Builders, Inc. /Makana Builders & Construction of 1 Unit 3 STY 15 CL School Building, Pavia JV-17-3028 08/29/2019 Iloilo 4th DEO 35.581 245 C 0.49 0.20 0.30 - - - 90.30% 90.3% Very Satisfactory Supply National High School Organizational Outcome 1: Ensure Safe and Reliable National Road System - Network Development Program - Road Pbo Construction Company 41870 Widening Secondary Roads, Abbut - Conner Road K0559+060 - 11/22/2019 Apayao 1st DEO 10.567 158 O 0.39 0.24 0.15 0.03 0.05 0.03 89.70% - On-going k0559+240, K0560+167 - K0560+319, K0560+660 - K0560+780, K0560+780 - K0560+890 Construction of One (1) Unit Unique Workshop @ Raja Muda Sultan Kudarat 1st Pearl Construction And Supply 34806 03/13/2018 3.171 120 OG 0.383 0.240 0.028 0.03 0.07 0.033 78.40 - On - Going NHS DEO Construction of 3-Storey 3- Classrooms Laboratory building at Sultan Kudarat 1st Pearl Construction And Supply 34806 08/26/2019 17.721 210 C 0.50 0.20 0.03 - - - 72.70% 72.7% Poor Kalanawi II National High School DEO Construction of Classrooms (2-Storey 8-Classroom School Pedxing Builders 35476 Building Structure, 4 Regular Workshop) at Lower Binogsacan 08/26/2019 Albay 3rd DEO 17.223 185 C 0.49 0.13 0.30 - - - 91.90% 91.9% Very Satisfactory National High School Construction of Four-Storey (8-Classrooms) School Building Pedxing Builders 35476 11/08/2019 Cebu 2nd DEO 22.559 256 C 0.48 0.16 0.30 - - - 94.40% 94.47% Very Satisfactory (9.50m x 23.00m) at Carcar Central Elementary School

Construction of Four-Storey (8-Classrooms) School Building Pedxing Builders 35476 08/19/2019 Cebu 2nd DEO 22.559 286 O 0.38 0.28 0.15 0.03 0.05 0.05 94.50% - On-going (9.5mx23.00m) at Carcar Central Elementary School

Percc Construction & Development Corp. 23869 Construction of Port Operation Building 06/22/2018 PPA 54.185 675 O 0.39 0.30 0.11 0.03 0.07 0.05 93.86 - On - Going

Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures / Facilities, Construction / Mt. Province 1st Perfecto D. Igid Construction 42057 11/25/2019 4.950 146 C 0.50 0.13 0.30 - - - 93.30% 88.2% Satisfactory Rehabilitation / Upgrading / Improvement of Chico River Flood DEO Control (Kimpate Sabangan Section) Local Infrastructure Program - Flood Control and Drainage - Mt. Province 1st Perfecto D. Igid Construction 42057 Flood Control Structures/Facilities, Construction of Chico River 09/10/2019 4.508 100 O 0.38 0.24 0.12 0.03 0.05 0.03 84.80% - On-going DEO Flood Control (Kimpate, Sabangan Section) Barabgay Losad Performance Builders And Developers Procurement of Fully Developed Lots and Housing Construction 5303 03/10/2018 NHA 289.760 1,195 O 0.37 0.29 0.00 0.03 0.05 0.02 75.33 - On - Going Corporation at Knightridge Residences Performance Builders and Developers 5303 Knightsridge Residences 07/09/2019 NHA 289.760 1,439 C 0.44 0.20 0.12 - - - 75.90 74.09% Poor Corporation Procument of Fully Developed Lots and Completed Housing Persan Construction 2852 02/15/18 NHA 288.432 781 E 0.35 0.29 0.07 0.03 0.06 0.03 82.99 - On - Going Units under NHA - YPHP (Banate People's Village Site 1 ) Persan Construction 2852 Conception People's Village 02/02/2018 NHA 289.586 620 EC 0.34 0.30 0.00 0.03 0.07 0.03 77.30 - On - Going

Persan Construction Inc. 2852 Dumangas People's Village Phase II 05/24/2019 NHA 289.200 748 O 0.37 0.30 0.08 0.03 0.07 0.03 88.63 - On-going

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 134 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Persan Construction Inc. (Formerly: Persan 2852 Banate Peoples Village Site 1 05/07/2019 NHA 321.429 781 C 0.43 0.20 0.05 - - - 68.10 77.80% Unsatisfactory Construction) Persan Construction Inc. (Formerly: Persan 2852 Concepcion People's Village 3/23/19 NHA 232.755 620 C 0.46 0.20 0.13 - - - 78.81 82.48% Satisfactory Construction) Persan Construction Inc. (Formerly: Persan 2852 Dumangas People's Village Phase 2 05/05/2018 NHA 289.200 521 O 0.35 0.27 0.15 0.03 0.07 0.05 92.20 - On - Going Construction) Persan Construction Inc. (Formerly: Persan 2852 Dumangas People's Village Phase 2 11/10/2018 NHA 289.200 631 O 0.37 0.27 0.12 0.03 0.07 0.03 89.32 - On - Going Construction) Construction/Sealing/ Improvement of Riverwall along South Malabon-Navotas Persan Construction, Inc. 2852 03/22/2018 46.005 291 C 0.40 0.20 0.30 - - - 90.20 *90.20% Very Satisfactory Pinagkabalian River, Brgy. Dampalit DEO Persan Construction, Inc. 2852 Dumangas People's Village Phase 2 02/08/2020 NHA 289.546 748 C 0.48 0.20 0.08 - - - 7524.00% 85.61% Satisfactory Persan Construction, Inc. 2852 Libertad People's Village 02/24/2020 NHA 245.978 946 O 0.33 0.29 0.00 0.03 0.07 0.03 7416.00% - On-going Construction of Flood Control Wall along the Bank Phase 7, Metro Manila 3rd Persan Construction, Inc. 2852 11/06/2019 27.904 180 O 0.38 0.24 0.15 0.03 0.04 0.05 89.40% - On-going Brgy. 176 DEO Pesom Builders And Construction Supply 39923 Site Development Main Campus Ph 4 05/14/2019 DOST 25.614 300 O 0.26 0.30 0.14 0.03 0.06 0.05 84.70 - On-going Construction of Two (2) Unit One (1) Sstorey Unique Workshop Pesom Builders And Construction Supply 39923 03/19/2018 Iloilo 2nd DEO 5.629 120 OG 0.388 0.240 0.150 0.03 0.064 0.05 92.16 - On - Going Building Construction of 1 Unit 1STY4CL School Building, Talongadian Pesom Builders And Construction Supply 39923 06/02/2018 Iloilo 4th DEO 5.496 125 C 0.40 0.20 0.30 - - - 90.40 90.40% Very Satisfactory ES Pesom Builders And Construction Supply 39923 Improvement of DPWH Iloilo 4th DEO, Compound and Facilities 03/22/2018 Iloilo 4th DEO 11.201 210 C 0.48 0.20 0.30 - - - 98.00 *98.00% Outstanding Construction of One (1) Unit Two (2) Storey Four (4) Pesom Builders And Construction Supply 39923 08/27/2019 Iloilo 2nd DEO 9.716 210 C 0.48 0.16 0.30 - - - 93.80% 93.8% Very Satisfactory Classrooms, Acao National High School (Batch 3) Rehabilitation/ Reconstruction of roads with Slips, slope Phesco Incorporated 145 Collapse and Landslide, Tertiary Roads Abra - Ilocos Norte 11/27/2019 Abra DEO 29.280 132 C 0.50 0.13 0.30 - - - 93.30% 87.36% Satisfactory Road, K0429+927 to K0429+990 Construction of Banglolao Flood Control Project, Sta. 62+400 to Phesco Incorporated 145 11/27/2019 Abra DEO 47.284 183 O 0.37 0.30 0.15 0.03 0.05 0.05 94.80% - On-going Sta. 62+758. Rehabilitation/Reconstruction of Roads with Slips, Slope Phesco, Incorporated 145 Collapse and Landslide-Tertiary Roads-Abra-Ilocos Norte Road, 09/11/2019 Abra DEO 29.280 132 O 0.36 0.20 0.15 0.03 0.04 0.05 83.40% - On-going K0429+927 to K0429+990 Local Infrastructure Program - National Roads - Rehabilitation/ Phesco, Incorporated 145 Improvement with Slip, Soil Collapse and Landslides along Abra 11/29/2019 CAR 97.416 280 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory - Kalinga Road, K0454+274 to K0454+396 Repair/Restoration/Improvement along Jct. Abbag-Guingin Phesco, Incorporated 145 11/05/2019 Quirino DEO 41.107 220 O 0.34 0.28 0.15 0.02 0.05 0.05 88.30% - On-going Bdry. Road (S04752LZ), K0392+770-K0393+350 Preventive Maintenance Based on Pavement Management System/Highway Development and Management-4 (HDM-4), , South Bound-Sta.K0010+(-) 650-Sta. K0010+157, Sta.K0010+471.62 - Sta. K0010+627.19, Sta. Metro Manila 2nd Philippine Chemsteel Industries, Inc. 16965 06/07/2018 55.353 276 C 0.50 0.13 0.30 - - - 93.00 93.00% Very Satisfactory K0011+046- Sta. K0011+450, Sta. K0011+880- Sta. DEO K0012+200, NB-Sta. K0010+018- Sta. K0010+138, Sta. K0010+440- Sta. K0010+486, Sta. K0010+160 - Sta. K0011+320 Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance of Philippine Chemsteel Industries, Inc. 16965 Road: Asphalt Overlay - Noveleta - Naic - Tagaytay Road, 09/07/2019 Cavite 2nd DEO 44.927 120 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory K0051+000 - K0052+584, K0064+000 - K0064+300, K0065+000 - K0066+450 Completion of Dormitory for Boys Annex Building Phase 2 and Philkonstrak Development Corporation 33698 03/10/2019 DOST 15.817 385 O 0.39 0.30 0.12 0.03 0.04 0.05 91.80 - On-going Completion of Dormitory for Girls Annex Building Phase 2 Philkonstrak Development Corporation 33698 Construction of Retaining Wall and Backfilling Works 03/10/2019 DOST 17.728 283 O 0.39 0.30 0.15 0.03 0.04 0.05 95.70 - On-going Design and Construction of the Expansion of Annex Dormitory Philkonstrak Development Corporation 33698 03/10/2019 DOST 29.428 602 O 0.39 0.30 0.15 0.03 0.04 0.05 95.90 - On-going for Boys and Girls Philkonstrak Development Corporation 33698 Rehabilitation & Extension of Administrative Building 03/10/2019 DOST 44.100 360 O 0.40 0.30 0.13 0.03 0.05 0.05 95.30 - On-going

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 135 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Design and Construction of Water Well System and Reservior Philkonstrak Development Corporation 33698 06/28/2018 DOST 8.088 220 C 0.50 0.20 0.30 - - - 99.90 97.81% Outstanding Tank

PhilSouth Builders 21962 Banilad Plains View Housing Project Phase 1 05/31/2019 NHA 19.488 1,049 O 0.39 0.30 0.06 0.03 0.07 0.03 88.45 - On-going

Preventive Maint: Primary Roads, Asphalt Overlay along Bais- Negros Oriental Philsouth Builders 21962 11/11/2019 51.423 226 O 0.39 0.24 0.15 0.03 0.06 0.03 89.80% - On-going Kabankalan K0079+K0080+937, K0080+959-K00082+175 2nd DEO Construction/ Repair/ Rehabilitation/ Improvement of Various Philsouth Builders (Formely: Lotiff Negros Oriental 21962 Infrastructure Including Local Projects: Roads Leading to 04/12/2018 9.310 70 C 0.48 0.13 0.26 - - - 87.30 *87.30% Satisfactory Construction) 3rd DEO Balanan Lake Siation, Negros Oriental

Philsouth Builders (Formerly: Lotiff Network Development Program: Construction of By-Pass and Negros Oriental 21962 08/20/2019 31.210 487 O 0.37 0.30 0.12 0.03 0.06 0.03 90.70% - On-going Construction) Diversion Roads-Metro Dumaguete Diversion Road (Section 1) 2nd DEO

Organizational Outcome 2: Protect Lives and Properties Against Major Floods, Flood Management Program, Philsouth Builders (Formerly: Lotiff Negros Oriental 21962 Construction/Maintenance of Flood Mitigation Structures and 08/20/2019 34.300 210 C 0.50 0.13 0.30 - - - 93.00% 93% Very Satisfactory Construction) 2nd DEO Drainage Systems, Reconstruction/Rehabilitation of Ocoy River Control Provincial Philsouth Builders / A.L. Yu Builders & Rehab/Upgrading of Patawag, Labason-Planon-San Jose- Government of 06/30/2018 244.998 343 O 0.30 0.30 0.15 0.02 0.06 0.05 88.70 - On - Going Enterprises Conception Provincial Road Zamboanga del Norte Philworks Construction And Supply 38963 Construction of Baganga Curtain Falls Eco-Park 07/11/2019 TIEZA 15.500 156 C 0.46 0.20 0.30 - - - 96.20 96.20% Very Satisfactory Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Regional Office Philworks Construction And Supply 32103 08/28/2019 117.605 463 C 0.48 0.13 0.30 - - - 91.30% 90.97% Very Satisfactory Daang Maharlika, (LZ), KO460+020.00 to KO468+516.00 with No. V Equations (with Exceptions) Philworks Construction And Supply 32103 Const. of Revetment Wall/Retaining Wall along Aklan River 08/21/2019 Aklan DEO 41.934 210 C 0.49 0.13 0.30 - - - 92.00% 92% Very Satisfactory Construction/ Improvement of Access Road Leading to Trade, Industries and Economic Zones Minuhang (Baluarte) - Balud Philworks Construction And Supply / Mwj JV-17-1826 and Balud - Duka Road Connecting to Bagahupi -Babatngon - 08/27/2019 Leyte 2nd DEO 142.311 451 O 0.40 0.28 0.15 0.03 0.05 0.05 95.50% - On-going Construction (Joint Venture) Sta. Cruz - Barugo - Carigara National Road in Support of The Barugo Eco-Zone

Phintecstar Construction Inc. 14542 Mont Peak (Green Valley) 11/23/2018 NHA 274.555 546 O 0.37 0.30 0.15 0.03 0.06 0.05 95.75 - On - Going

Phintecstar Construction Incorporated 14542 Ormoc Highland Sites 1 & 2 6/21/19 NHA 257.210 365 O 0.33 0.30 0.15 0.03 0.07 0.05 93.05 - On-going

Phintecstar Construction Incorporated 14542 Land Development and Housing Construction, Magalona Site 1 09/22/18 NHA 193.690 270 E 0.45 0.18 0.24 - - - 87.07 56.63% Poor

Phintecstar Construction Incorporated 14542 Mont Peak Estate (Green Valley) 6/22/19 NHA 274.550 668 C 0.46 0.20 0.30 - - - 95.89 95.79% Very Satisfactory Provincial Phranareti Construction 16878 Improvement of Pinto-Aurora Boundary Road 6/25/20 Government of 49.920 228 O 0.32 0.23 0.15 0.02 0.04 0.05 7983.00% - On-going Ifugao Cluster XXV - Rehabilitation of Multi-Purpose Building (Activity Davao Oriental 1st Phsmb Construcrion And Supply 44454 11/20/2019 4.418 75 C 0.48 0.13 0.30 - - - 84.10% 84.1% Satisfactory Center, Barangay Hall and Covered Court) DEO Asset Preservation - Preventive Maintenance - Tertiary Roads along Jct. Dumalinao - Margosatubig Road, K1694+337 to Zamboanga del Pins Construction 13630 08/27/2019 25.882 71 O 0.40 0.20 0.15 0.02 0.05 0.05 87.20% - On-going K1695+600, K1696+595 to K1696+986, K1697+025 to Sur 2nd DEO K1697+261.23 Construction of One (1) Storey Two (2) Classroom School Zamboanga del Pins Construction 13630 03/17/2018 3.285 90 C 0.49 0.13 0.30 - - - 92.20 *92.20% Very Satisfactory Building with Toilet Attached at Begong E/S Sur 2nd DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 136 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Asset Preservation - Preventive Maintenance - Tertiary Roads along Jct. Dumalinao - Margosatubig Road, K1694+337 to Zamboanga del Pins Construction 13630 11/11/2019 25.882 71 C 0.47 0.13 0.30 - - - 89.90% 88.28% Satisfactory K1695+600, K1696+595 to K1696+986, K1697+025 to Sur 2nd DEO K1697+261.23, Dumalinao - Margosatubig Road Las Piñas- Pistol Construction And Supply 43485 Construction of Road, Barangay Poblacion 08/19/2019 9.751 396 C 0.49 0.13 0.30 - - - 92.20% 87.46% Satisfactory Muntinlupa DEO Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide -Tiolas-Snugbuhan Road Pitong Builders & Construction Supply 39273 11/15/2019 Iloilo 1st DEO 7.446 144 O 0.36 0.24 0.15 0.03 0.04 0.03 85.40% - On-going (KO065+924 - KO066+173, KO066+786 - KO067+000, KO071+112 - KO072+000) PJ Construction and Supply 32305 Canal Improvement of Malacalaca Diversion Dam 09/04/2019 DA 2.995 90 O 0.38 0.30 0.15 0.02 0.05 0.05 93.53 - On-going

Asset Preservation of National Roads, Preventive Maintenance Based on Preventive Management System/Highway and Northern Samar Pj Tan Construction 35677 04/05/2018 5.824 120 C 0.39 0.13 0.30 - - - 82.60 *82.60% Satisfactory Development and Management - 4 (HDM-4) along Catarman - 1st DEO Calbayog Road, K0783+000 - K0784+550 Preventive Maintenance - Primary Roads - Cebu North Pld Construction 1859 Hagnaya Wharf Road K0006+865 to K0006+957, Chainage 0 - 05/28/2018 Cebu 6th DEO 3.911 31 C 0.48 0.07 0.30 - - - 84.60 84.60% Satisfactory Chainage 43 LP: Local Infrastructure Program- Local Road and Bridges- Pld Construction 1859 08/28/2019 Cebu 6th DEO 2.467 25 C 0.46 0.13 0.30 - - - 88.90% 88.9% Satisfactory Local Roads- Asphalting of Road at Brgy. Casuntingan Construction of Drainage Structure along Road, Burgos St., Pld Construction 1859 04/03/2018 Cebu 6th DEO 2.812 60 OG 0.24 0.3 0.15 0.03 0.059 0.05 82.90 - On - Going Brgy Centro Construction of Concrete Parallel Bridge - Pagbahan Bridge Plerm Construction And Development Regional Office 33288 along Mindoro West Coastal Road, Sta. 389+547.38 - Sta. 11/10/2019 151.372 421 O 0.39 0.27 0.15 0.03 0.07 0.05 95.50% - On-going Corporation No. IV-B 390+207.38 Plumbs Engineering and Construction 42043 Construction of Farm Machinery Shed 09/10/2020 DA 2.678 90 O 0.36 0.23 0.00 0.03 0.05 0.00 66.90 - On-going Construction/Completion of Multi-Purpose Building (Province of Compostela Pmmgs Construction Corporation 43121 Compostela Valley Legislative Building) Municipality of 11/22/2019 18.810 240 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Valley DEO Nabunturan Polo Engineering And Construction 34966 DOTr - CAR Cluster Project 10/11/2018 DOTr 4.494 150 C 0.49 0.20 0.30 98.90 *98.90% Outstanding Road Widening - Secondary Road - Gov. J.J. Linao Road Polymer-Vic Construction / Bpq Construction JV-18-1406 K0131+295 - K0132+088, K0132+094 - K0132+420, 11/12/2019 Bataan 2nd DEO 92.640 273 O 0.39 0.24 0.15 0.03 0.04 0.03 88.00% - On-going And Trading (Joint Venture) K0133+390 - K0135+500 Construction/ Maintenance of Flood Mitigation Structures and Polymer-Vic Construction/ E.R. Venzon JV-16-1430 Drainage Systems, Construction of Flood Control Structures/ 03/16/2018 Bataan 2nd DEO 13.869 145 C 0.43 0.18 0.30 - - - 91.00 *91.00% Very Satisfactory Construction Joint Venture Slope Protection along Talisay River, Brgy. Ala-uli, Pilar, Bataan Construction of Four (4) Storey Sixteen (16) Classroom School Power K Construction Supply & Services 31574 06/15/2018 Cavite Sub- DEO 35.729 270 O 0.383 0.24 0.15 0.03 0.055 0.05 90.80 - On-going Building at Senior High School Construction of 4 Storey 20 Classrooms at Los Banos National Power K Construction Supply & Services 31574 09/06/2019 Laguna 2nd DEO 59.082 435 O 0.39 0.24 0.15 0.03 0.04 0.05 90.20% - On-going High School Construction, upgrading and Improvement of Road and Metro Manila 3rd Power K Construction Supply & Services 31574 11/13/2019 28.129 240 O 0.40 0.24 0.14 0.03 0.04 0.03 88.40% - On-going Drainage of Bignay to Punturin Bypass Road DEO Power K Construction Supply & Services 31574 Construction of Tiaong Convention Center (Phase II) 11/23/2019 Quezon 2nd DEO 93.803 360 O 0.40 0.24 0.15 0.03 0.04 0.05 90.70% - On-going

Local Infrastructure Program - Buildings and Other Structures - Power Move Builders & Construction Supply 22894 Multi-Purpose / Facilities - Rehabilitation of Multi-Purpose 11/14/2019 Cebu 6th DEO 2.970 120 C 0.50 0.17 0.30 - - - 97.40% 97.4% Outstanding Building (Covered Court) Eversley Childs Sanitatrium Pragmatic Development & Construction Construction of 1-Storey, 3- Classroom Building (ready for 4- 4846 04/04/2018 Cebu 6th DEO 8.707 225 C 0.44 0.20 0.10 - - - 74.10 *74.10% Poor Corporation Storey), Kalawisan ES, Kalawisan, Lapu-lapu City, Phase 1 Road Upgrading/Concreting of Sta. Cruz-Sigay Road Leading Ilocos Sur 2nd Precious Construction 32995 06/01/2018 8.466 140 O 0.272 0.3 0.15 0.03 0.051 0.05 85.30 - On-going to Kagutungan Falls, Barangay Daligan DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 137 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Widening of Permanent Bridge at Napo Bridge (B02443LZ) Precious Construction 32995 06/18/2018 Quezon 1st DEO 25.509 258 O 0.375 0.241 0.150 0.030 0.035 0.050 88.10 - On-going along Jct. Lucban- Road Construction/Improvement of Access Road Leading to Ilocos Sur 2nd Precious Construction 32995 Declaired Tourism Destinations, Cervantes - Sigay Road 08/29/2019 13.964 117 O 0.30 0.24 0.15 0.03 0.05 0.05 81.50% - On-going DEO Leading to Tirad Pass via Brgy. Libang Camarines Sur 1st Precious Construction 32995 Preventive Maintenance – Tertiary Roads 08/21/2019 21.431 116 O 0.38 0.24 0.15 0.03 0.05 0.03 88.70% - On-going DEO Improvement of Multi-Purpose Building Barangay 839, South Manila Precious Construction 32995 08/22/2019 1.863 120 C 0.49 0.13 0.30 - - - 92.30% 92.3% Very Satisfactory Pandacan DEO Preventive Maintenance - Tertiary Road at Sipocot - Cabusao Camarines Sur 1st Precious Construction 32995 Road - KO399+000 - KO399+443, KO402+421 - KO403+000, 11/09/2019 21.431 116 C 0.49 0.13 0.30 - - - 92.10% 90.06% Very Satisfactory DEO KO408+350 - KO409+000 Ensure Safe and Reliable National Road System, Network Precious Construction 32995 Development-Road Widening-Primary Roads, Daan Maharlika 11/23/2019 Quezon 2nd DEO 57.417 270 O 0.40 0.24 0.15 0.03 0.06 0.03 91.00% - On-going (LZ) S01985LZ, K0100+899-K0101+909 Construction of Flood Control Structures along Bugtong River Precious Construction 32995 11/08/2019 Samar 1st DEO 40.660 143 O 0.39 0.24 0.15 0.03 0.05 0.03 89.30% - On-going (Downstream) Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Regional Office Premium Megastructures Inc. 36079 Slope Collapse and Landslide - Primary Construction of Road 04/09/2018 234.495 450 OG 0.367 0.239 0.15 0.022 0.028 0.033 83.90 - On - Going No. VIII Slope Protection Structure, Daang Maharlika (SM) (San Isidro - San Juanico Bridge) K0691+020 - K Ormoc Port Expansion Project - A) Back-Up Area B) Platform & Premium Megastructures Inc. 36079 11/15/19 PPA 260.182 540 O 0.37 0.29 0.15 0.03 0.07 0.05 95.79 - On-going Roro Ramp Rehabilitation/ Major Repair of Permanent Bridges Carigara Premium Megastructures Inc. 36079 Bridge (B00493LT) along Palo- Carigara- Ormoc- Road, (Phase 08/27/2019 Leyte 2nd DEO 75.087 312 O 0.40 0.21 0.14 0.03 0.04 0.03 84.20% - On-going 1 of 2) Widening of Permanent Bridges, Hic-gop Br. 1 (B00234LT) Premium Megastructures Inc. 36079 05/30/2018 Leyte 5th DEO 33.439 270 C 0.48 0.13 0.30 - - - 90.60 90.60% Very Satisfactory along Ormoc-Baybay-Southern Leyte Boundary Road 36079 / Premium Megastructures Inc. / Leda Small Reservoir Irrigation Project - Construction of Mabini - 12229 - JV- 07/09/2019 NIA 270.367 940 O 0.36 0.25 0.11 0.03 0.04 0.03 81.30 - On-going Construction Incorporated (JV) Cayacay Earthfill Dam & Appurtenant Structures 16-422 Premuim Megastructures, Inc. 36079 General Santos Airport Development Project 04/26/2018 DOTC 54.353 300 O 0.355 0.300 0.150 0.015 0.044 0.050 91.40 - On-going Zamboanga del Presli Deles Construction 22694 Construction of Multi-Purpose Building Barangay Tungawan 08/25/2019 2.470 80 C 0.50 0.13 0.30 - - - 93.40% 93.4% Very Satisfactory Sur 1st DEO Prime Pacific Marine & Industrial Services Construction of Riverwall along South Pinagkabalian River Malabon- Navotas 36171 11/05/2019 46.058 171 O 0.40 0.24 0.15 0.03 0.04 0.05 91.20% - On-going Corp. (Phase V) Brgy. Panghulo DEO Asset Preservation Program-Preventive Maintenance- Prime Pave Construction And Asphalt Pampanga 3rd 36597 Secondary Roads, Arayat-Magalang-Mabalacat roads, 08/28/2019 24.965 90 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory Corporation DEO K0108+1040 - K0110+800, K0112+750 - K0113+850 Asset Preservation - Preventive Maintenance - Secondary Prime Pave Construction And Asphalt Pampanga 3rd 36597 Roads Friendship Circum Road (West Circum Road) K0082+(- 11/08/2019 21.023 150 C 0.46 0.13 0.30 - - - 88.90% 88.9% Satisfactory Corporation DEO 159) - K0082+000, K0082+282 - K0084+305

Prismodial Construction Corporation 28345 Villa Jose 03/16/18 NHA 289.795 1,107 O 0.319 0.277 0.000 0.03 0.0583 0.0333 71.78 - On-going

Protech Construction & Development/ Jobel Construction of River Control along /Balanac River JV-16-441 03/15/2018 Laguna 1st DEO 28.935 250 C 0.47 0.13 0.30 - - - 90.20 91.00% Very Satisfactory Enterprises Joint Venture Brgy. Maulawin, Pagsanjan, Laguna MFO 1: National Road Network Services-Network Development- Improvement/Widening of National Roads-Tertiary, Road Pulsar Construction 24422 03/15/2018 Cagayan 3rd DEO 95.217 304 C 0.36 0.20 0.30 - - - 85.70 88.56% Satisfactory Widening-Cagayan-Apayao Road, K0498+000-K0500+500, K0502+800-K0503+887 (S00741LZ) (Road Widening)

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 138 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) MFO 1: National Road Network Services-Network Development- Improvement/Widening of National Roads-Tertiary, Road Pulsar Construction 24422 Widening-Cagayan-Apayao Road, K503+887-K0505+420 B/S; 03/15/2018 Cagayan 3rd DEO 66.601 279 C 0.36 0.20 0.30 - - - 86.30 86.76% Satisfactory K0505+493 L/S; K0505+493K0506+800 B/S (S00741LZ) (Road Widening) Convergence amd Special Support Program: Construction/Improvement of Access Roads Leading to Regional Office Pulsar Construction 24422 Declared Tourism Destinations: Access Roads Leading to 11/09/2019 250.900 568 O 0.39 0.27 0.15 0.02 0.05 0.03 91.10% - On-going No. II Callao Caves Tourism Zone (Tawi-Callao Road) - Bridge Construction Provincial Puregold Construction & Development Corp. 34258 Concreting of Provincial Road (PAMOQS Section) 11/18/19 Government of 61.289 278 C 0.43 0.20 0.30 - - - 93.41 *93.41% Very Satisfactory Surigao del Norte Puregold Construction & Development Contract for the Coversion of NPC Hangar to CMTSD 34258 02/19/2019 NPC 12.162 180 C 0.50 0.20 0.07 - - - 77.35 *77.35% Unsatisfactory Corporation Warehouse Off-Carriageway Improvement Including Drainage, Secondary Roads, Surigao-Davao Coastal Road, K1148+500 to Surigao del Norte Pyramid Consolidated Builders & Gen. Mdse. 15599 03/13/2018 43.690 287 C 0.48 0.20 0.30 - - - 97.70 97.70% Outstanding K1149+000, K1150+621-K1151+812, K1151+536 to 1st DEO K1154+106 Pyramid Consolidated Builders & Gen. Mdse. Construction/Improvement of Access Roads leading to Misamis Oriental JV-18-697 08/27/2019 40.914 160 O 0.36 0.28 0.15 0.03 0.06 0.05 92.90% - On-going / Cagalawan Enterprises (Joint Venture) Laguindingan Airport, Gitagum- Laguindingan Airport Section 2nd DEO Pyramid Consolidated Builders & Gen. Construction of Concrete Road - Access Road leading to Bukidnon 3rd 15599 05/30/2018 91.015 196 O 0.391 0.236 0.15 0.03 0.055 0.033 89.50 - On-going Merchandise Dahilayan Adventure Park DEO Pyramid Consolidated Builders & Gen. Paving of Unpaved Roads- Jct. SH Manolo Fortich- Libona- Bukidnon 3rd 15599 08/23/2019 10.594 63 O 0.38 0.30 0.15 0.01 0.06 0.05 94.80% - On-going Merchandise Indahag Road K1473+356 - K1473+715 DEO Pyramid Consolidated Builders & Gen. Repair/ Renovation/ Expansion & Upgrading of Bukidnon Bukidnon 3rd 15599 03/17/2018 9.900 160 C 0.49 0.13 0.30 - - - 92.50 *92.50% Very Satisfactory Merchandise Provincial Hospital DEO Pyramid Consolidated Builders & Gen. Road Upgrading (Unpaved to Paved) along Jct. SH Manolo Bukidnon 3rd 15599 03/17/2018 17.135 87 c 0.48 0.13 0.30 - - - 90.90 91.95% Very Satisfactory Merchandise Fortich-Libona-Indahag Rd, K1491+669-K1492+168 DEO Pyramid Consolidated Builders & Gen. Paving of Unpaved Roads - Jct. SH Manolo Fortich - Libona - Bukidnon 3rd 15599 11/04/2019 10.594 63 C 0.49 0.13 0.30 - - - 92.50% 93.88% Very Satisfactory Merchandise Indahag Road K1473+356 - K1473+715 DEO Pyramid Consolidated Builders & Gen. Road Widening, Barandias - Dominorog Road, K1600 + 485 - Regional Office 15599 11/05/2019 147.905 270 O 0.39 0.24 0.15 0.03 0.05 0.05 91.00% - On-going Merchandise K1604 + 970, K1604 +970 - K1605 + 292 No. X Pyramid Consolidated Builders & Gen. Construction / Improvement of Access Road from Cagayan de Bukidnon 3rd 15599 11/04/2019 39.200 165 O 0.39 0.22 0.15 0.03 0.05 0.05 88.40% - On-going Merchandise Oro City leading to Ultra Winds Mountain Resorts DEO Pyramid Consolidated Builders & Gen. Construction/Improvement of Access Roads Leading to Misamis Oriental Merchandise / Cagalawan Enterprises (Joint JV-18-697 11/04/2019 39.200 160 O 0.39 0.21 0.13 0.03 0.05 0.03 84.00% - On-going Laguindingan Airport, Gitagum - Laguindingan Airport Section 2nd DEO Venture) ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable Qm Builders 30743 National Road System-Network Development-Construction of 08/19/2019 Cebu 2nd DEO 49.007 310 O 0.40 0.25 0.15 0.02 0.05 0.05 90.90% - On-going By-pass and Diversion Roads, Carcar Diversion Road

Asset Preservation Of National Roads- Construction/Upgrading/ Rehabilitation of Drainage along National Roads-Secondary Qm Builders 30743 04/10/2018 Cebu 2nd DEO 10.325 283 C 0.49 0.13 0.30 - - - 92.10 92.52% Very Satisfactory Road-Construction of Drainage Structure along Road-Cebu Toledo Wharf Road (Jct. Naga-Uling) K0010+-210-K0010+190 Concreting of Municipal Streets, Brgy. Poblacion, Negros Oriental Qm Builders 30743 04/12/2018 6.510 60 C 0.48 0.13 0.30 - - - 91.10 *91.10% Very Satisfactory Zamboanguita, Negros Oriental 3rd DEO Conostruction/Iprovement of Access Roads leading to Seaports Qm Builders 30743 and Declared Tourism Destinations - To Seaports - Concreting 04/03/2018 Cebu 6th DEO 19.024 196 C 0.48 0.14 0.30 - - - 91.00 *91.00% Very Satisfactory of B.M Dimataga St. with Drainage Facilities

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 139 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Natalio Bacalso Avenue (Cebu South Road), K008+918-K0081+020, K0081+338- Qm Builders 30743 04/09/2018 Cebu 4th DEO 43.942 316 C 0.44 0.13 0.30 - - - 87.30 *87.30% Satisfactory K0081+338-K0081+372, K0081-558-K0081+6673, K0081+772- K0081+965, K0082+045-K0082+067,K0082+089-K0082+298, K0082+319-K0082+472, K0082+605-K0082+719 Asset Preservation-Rehabilitation/Reconstruction of Roads with Qm Builders 30743 Slips, Collapse and Secondary Roads, Cebu-Toledo Wharf 08/20/2019 Cebu 2nd DEO 93.002 333 C 0.49 0.16 0.30 - - - 92.70% 92.7% Very Satisfactory Road (Jct. Naga-Uling) Organizational Outcome 1: Ensure Safe and Reliable National Qm Builders 30743 Road System - Network Development - Construction of By-pass 11/08/2019 Cebu 2nd DEO 49.000 310 O 0.39 0.29 0.15 0.03 0.05 0.05 95.60% - On-going and Diversion Roads, Carcar Diversion Road Organizational Outcome 1: Ensure safe and Reliable Road Negros Oriental Qm Builders 30743 System – Network Development Program – Construction of By- 11/11/2019 54.989 416 O 0.39 0.24 0.15 0.03 0.06 0.05 91.50% - On-going 2nd DEO Pass and Diversion Roads @ Bais By – Pass Road Qm Builders/ Dinah Jane Construction Supply Construction of Seawall, Brgy. Sayao 06/08/2018 Marinduque DEO 16.060 260 C 0.44 0.13 0.30 - - - 87.20 87.20% Satisfactory Joint Venture Strengthening/Retrofitting of Permanent Br. - Pagudpud Br. Quad-R Building Solutions 41479 08/19/2019 La Union 1st DEO 7.450 90 O 0.40 0.30 0.15 0.03 0.04 0.05 97.10% - On-going Along San Fernando Airport Rd. Pagudpud Retrofitting/Strengthening of Permanent Bridges - Pagudpud Quad-R Building Solutions 41479 11/04/2019 La Union 1st DEO 7.450 90 C 0.50 0.13 0.30 - - - 93.30% 95.58% Very Satisfactory Bidge (B00669LZ) along San Fernando Airport Road Quatrix Construction And Supply Inc. 44328 Construction of 4 Storey 8 Classroom Sta. Ana ES 09/03/2019 Rizal 1st DEO 19.355 240 C 0.50 0.13 0.30 - - - 90.45% 90.45% Very Satisfactory Rehabilitation of Drainage, Faraday Street & its Vicinity, Brgy. Metro Manila 2nd Quatrix Construction And Supply Inc. 44328 11/21/2019 23.933 210 O 0.39 0.25 0.15 0.03 0.03 0.05 89.50% - On-going San Isidro (Phase II) DEO Quicksilver Construction Services 33212 Construction of Water System in Brgy. Upper Catamboan 04/07/2018 Siquijor DEO 1.980 180 C 0.50 0.17 0.18 - - - 84.50 *84.50% Satisfactory Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Quicksilver Construction Services 33212 11/05/2019 Siquijor DEO 3.802 45 C 0.48 0.20 0.30 - - - 98.40% 98.4% Outstanding Destinations, Helen Access Road leading to Palingkod Hills and Sto. Niño Shrine Network Development - Improvement of National Roads- Secondary Roads K0013+693-K0014+435; K0014+475- Quirante Construction 32827 04/10/2018 Cebu 2nd DEO 47.873 252 C 0.50 0.13 0.30 - - - 92.90 *92.90% Very Satisfactory K0014+808; K0015+007-K0015+495, K0015+536-K0016+372, Cebu South Coastal Road Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Quirante Construction 32827 Destinations - Pilipog-Gabi (Rock Causeway) Coastal Road 11/14/2019 Cebu 6th DEO 96.500 275 O 0.30 0.30 0.10 0.03 0.04 0.03 79.60% - On-going leading to Gilutongan Marine Sanctuary, Nalusuan Marine Sanctuary, Hotels & Resorts Organizational Outcome 2: Protect Lives and Properties against Major Floods - Flood Management Program - Construction / Quirante Construction 32827 11/08/2019 Cebu 2nd DEO 41.841 181 O 0.40 0.24 0.15 0.03 0.05 0.05 90.80% - On-going Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Abuno River Flood Control Structure

Construction of Drainage Structure along Road - On Specific Quituinan Warriors Construction & Supply 42500 08/25/2019 Masbate 1st DEO 13.436 150 O 0.39 0.24 0.15 0.03 0.07 0.05 92.80% - On-going Locations along San Fernando South Road (S00008TC) Construction of Flood Mitigation Structure- Construction of Quituinan Warriors Construction & Supply 42500 Flood Mitigation Structure at Bito River, Sitio Kaingin, Brgy. 11/11/2019 Masbate 1st DEO 18.995 160 O 0.33 0.24 0.15 0.03 0.05 0.05 84.50% - On-going Bayanihan

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 140 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Asset Preservation of National Roads- Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement R R C Construction 24369 Management System/Highway Development and Management- 03/17/2018 Isabela 2nd DEO 52.761 261 C 0.38 0.20 0.30 - - - 87.60 86.78% Satisfactory 4 (HDM-4)-Primary Roads, Santiago-Tuguegarao Road, K0395+143-K0395+789, K0397+107-K0398+000, K0398+050- K0399+000 Concreting of Circumferential Road, Isabela 2nd District R R C Construction 24369 08/27/2019 Isabela 2nd DEO 1.973 27 C 0.49 0.13 0.30 - - - 92.20% 92.2% Very Satisfactory Engineering Office Ensure Safe and Reliable National Road System: Network Development Program Road Widening - Primary Roads along R R C Construction 24369 Santiago - Tuguegarao Road )S00760LZ) K0372+458 - 11/11/2019 Isabela 2nd DEO 50.670 182 O 0.36 0.24 0.15 0.02 0.05 0.03 84.50% - On-going K0373+000, K0374+000 - K0374+405, K0376+780 - K0377+000, K0379+000 - K0379+712 NIA / Pangasinan Irrigation R. A. Matias Construction And Developers 26346 Construction of Canal Lining & Canal Structures 11/07/2020 9.311 300 C 0.44 0.10 0.30 - - - - 84.20% Satisfactory Management Office R. A. Matias Construction and Developers 26346 San Fabian River Irrigation System PRENIS CY 2019 07/11/2020 NIA 9.311 300 C 0.44 0.10 0.30 - - - 8420.00% *84.20% Satisfactory R. Agullo Construction And Enterprises 33728 Construction of Water System (Level II) 06/02/2018 Leyte 3rd DEO 4.790 118 C 0.49 0.13 0.30 - - - 91.80 91.80% Very Satisfactory Repair/Rehabilitation/ Improvement along Sambulawan- R. Allosa Construction & Trucking Services 12964 04/04/2018 Leyte 3rd DEO 9.457 120 C 0.47 0.13 0.30 - - - 89.80 *89.80% Very Satisfactory Calaguise-Calubian Road, K1004+100-K1004+703 Preventive Maintenance Along Sta. Felomina- Bonbonon- Lanao del Norte R. De Mesa Construction 18770 Digkilaan- Rogongon Road, K1523+000- K1523+707, 08/25/2019 12.814 84 O 0.39 0.24 0.15 0.03 0.07 0.05 93.20% - On-going 2nd DEO K1528+000- K1528+205, K1541+420- K1542+000 Preventive Maintenance Along Sta. Felomina - Bonbonon - Lanao del Norte R. De Mesa Construction 18770 Digkilaan - Rogongon Road, K1523+000 to K1523+707, 11/06/2019 12.814 84 C 0.48 0.13 0.30 - - - 91.00% 92.32% Very Satisfactory 2nd DEO K1528+000 to K1528+205, K1541+420 to K1542+000 R. G. Salanatin Construction, Inc. 32403 Construction of the Multi - Purpose Gymnasium (Phase 1) 7/22/19 DOST 38.376 276 O 0.38 0.24 0.15 0.03 0.04 0.05 88.30 - On-going R. G. Salanatin Construction, Inc. 32403 Construction of Research Hub Agriculture and Allied Sciences 7/22/19 DOST 48.114 330 O 0.38 0.24 0.15 0.03 0.04 0.05 88.50 - On-going R. G. Salanatin Construction, Inc. 32403 Construction of Dormitory Building IV 7/22/19 DOST 38.408 264 O 0.39 0.24 0.15 0.03 0.04 0.05 89.20 - On-going R. L. Lundang Construction 34370 Balog Balog Multipurpose Project II 02/16/2019 NIA 345.258 826 O 0.28 0.27 0.08 0.03 0.07 0.05 78.09 - On - Going R. L. Lundang Construction 34370 Balog Balog Multipurpose Project II 02/16/2019 NIA 140.064 365 C 0.44 0.13 0.30 - - - 87.55 *87.55% Satisfactory Convergence and Special Support Program - Construction/ Imporvement of Access Roads Leading to Trades, Industries Regional Office R. Relato Construction 44072 and Economic Zone; Brgy. 3- Brgy. 4- Brgy. 5 Road Connecting 11/09/2019 9.606 91 C 0.48 0.13 0.30 - - - 91.10% 91.1% Very Satisfactory No. V Ligao - Pioduran Road and Pioduran - Donsol Road in Support to Agribusiness (Food Resource Based Processing) Rehabilitation/Reconstruction of National Road with Slip, Slope Collapse, and Landslide along Surigao del Sur Bdry.-Davao Davao Oriental 1st R. Semilla Construction & Marketing 9263 Oriental Coastal Road, K1531+410-K1531+422, K1531+604- 05/31/2018 15.009 206 O 0.371 0.24 0.15 0.03 0.06 0.05 90.10 - On-going DEO K1531+625, K1532+791, K1532+805, K1533+122, K1533+478- K1533+488, K1534+060-K153 Provincial Road to Upgrading (Gravel to Concrete) of NHJ-Baganga- R. Semilla Construction & Marketing 9263 12/12/2018 Government of 31.088 294 O 0.31 0.22 0.12 0.02 0.05 0.05 77.28 - On-going Batiano Section (Phase I) Davao Oriental Concreting (Gravel to Concrete) including RROW along Compostela R. Semilla Construction & Marketing 9263 08/22/2019 33.479 196 C 0.50 0.13 0.30 - - - 92.90% 92.9% Very Satisfactory Compostela-Cateel Road (Compostela Side) Valley DEO Construction of 4 Storey 20 Classroom @ Lun Padidu National R. Semilla Construction And Marketing 9263 03/21/2018 Sarangani DEO 34.447 330 C 0.49 0.13 0.30 - - - 92.30 *92.30% Very Satisfactory High School Construction of Two (2) Storey Six (6) Classroom School Surigao del Sur R. Semilla Construction And Marketing 9263 03/19/2018 8.821 200 C 0.50 0.20 0.15 - - - 85.00 93.05% Very Satisfactory Building at Barcelona National High School 2nd DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 141 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Provincial Road Upgrading (Gravel to Concrete) of Upper Anitap-Oregon- R. Semilla Construction and Marketing 9263 03/05/2019 Government of 24.747 199 O 0.36 0.27 0.06 0.02 0.05 0.03 79.60 - On-going Magdug Road (Phase 1) Davao Oriental

Provincial Road Upgrading (Gravel to Concrete) of NHJ-Baganga-Batiano R. Semilla Construction and Marketing 9263 05/27/2019 Government of 31.088 294 C 0.44 0.17 0.30 - - - 91.20 84.62% Satisfactory Section (Phase 1) Davao Oriental Construction of Four (4) Storey Twenty (20) Classroom School R.A. Del Rosario Construction 4636 09/10/2019 Cavite Sub DEO 55.256 360 O 0.40 0.24 0.15 0.03 0.05 0.05 92.00% - On-going Building at Vicente P. Villanueva Memorial School Construction of Four (4) Storey Twenty-Four (24) Classroom R.A. Del Rosario Construction 4636 11/21/2019 Cavite 3rd DEO 60.882 345 C 0.50 0.13 0.30 - - - 93.20% 91.73% Very Satisfactory School Building at Dr. Jose P. Rizal Elementary School Construction of Four(4) Storey, Twenty (20) Classroom School R.A. Del Rosario Construction 4636 11/28/2019 Cavite 3rd DEO 55.256 360 O 0.40 0.20 0.15 0.02 0.04 0.03 84.90% - On-going Building Vicente P. Villanueva Memorial School R.A. Fanglayan (Raf) General Construction Construction of San Juan Flood Control, Sta. 72+600 to Sta. 6699 11/27/2019 Abra DEO 40.730 195 C 0.38 0.20 0.30 - - - 87.50% 87.5% Satisfactory Inc. 72+990 Pangasinan 3rd R.A. Matias Construction And Developers 26346 Construction of Flood Control Structure along Agno River 08/20/2019 18.635 159 C 0.44 0.13 0.30 - - - 86.80% 86.8% Satisfactory DEO Pangasinan 3rd R.A. Matias Construction And Developers 26346 Construction of Flood Control Structure along Sabangan River 11/05/2019 18.994 170 O 0.39 0.24 0.15 0.03 0.05 0.03 88.40% - On-going DEO Construction of Dike with Protection Works, Ambayaoan, River Pangasinan 3rd R.A. Matias Construction And Developers 26346 03/19/2018 19.524 167 C 0.47 0.13 0.30 - - - 90.40 *90.40% Very Satisfactory Control, Poblacion DEO R.A. Mendiola Construction & Developer / Construction of Four (4) Storey Twenty (20) Classroom JV-18-527 09/09/2019 Quezon 2nd DEO 47.473 360 O 0.39 0.30 0.15 0.02 0.03 0.05 93.70% - On-going Janming Construction And Supplies Academic School Building at Gulang-gulang Elementary School Asset Preservation Program - Rehabilitation / Reconstruction /Upgrading of Damaged Paved Roads - Tertiary Roads - Sta. Nueva Ecija 2nd R.A. Pahati Const. & Supply, Inc 35843 08/24/2019 47.710 150 O 0.33 0.24 0.15 0.03 0.06 0.05 86.10% - On-going Rosa - Fort Magsaysay Road, K0111+923 to K0112+401, DEO K0120+646 to K0122+580 MFO2-Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage R.A. Pahati Const. & Supply, Inc. 35843 03/12/2018 Rizal 2nd DEO 96.500 360 OG 0.394 0.240 0.150 0.022 0.033 0.033 87.17 - On - Going Systems - Construction of Slope Protection Works for Upper Montalban River Brgy. San Jose, Rodriguez, Rizal MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and R.A. Pahati Const. & Supply, Inc. 35843 06/22/2018 Rizal 2nd DEO 96.500 360 C 0.49 0.13 0.30 - - - 91.90 91.90% Very Satisfactory Drainage Systems - Construction of Slope Protection Works for Upper Montalban River Rehabilitation of Flood Control Structures and Tributaries at Quezon City 1st R.A. Pahati Const. & Supply, Inc. 35843 03/19/2018 24.502 195 C 0.45 0.13 0.30 - - - 88.10 87.14% Satisfactory Brgy. Bagong Silangan DEO Asset Preservation of National Roads - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads R.A. Pahati Const. & Supply, Inc. 35843 Secondary Roads, Manila East Road, K0019+200 - 03/12/2018 Rizal 1st DEO 36.776 210 C 0.50 0.13 0.30 - - - 93.40 *93.40% Very Satisfactory K0020+200, K0026+180 - K0026+700, and Angono, Rizal Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Sta. Nueva Ecija 2nd R.A. Pahati Const. & Supply, Inc. 35843 11/22/2019 47.710 150 C 0.42 0.13 0.30 - - - 85.00% 85% Satisfactory Rosa - Fort Magsaysay Rd - K0111+923 - K0112+401, DEO K0120+646 - K0122+580 R.A. Pahati Const. & Supply, Inc. / Gvdpm Widening of Liboton Bridge (B01687MN) including Approaches Compostela 06/01/2018 83.120 350 C 0.46 0.13 0.30 - - - 89.00 89.00% Satisfactory Construction Corp. (Formerly and RROW Monkayo along Daang Maharlika (MN) Valley DEO Network Development Program-Construction of Bypass and R.A. Pahati Const. & Supply, Inc. / Nueda JV-17-1644 Diversion Road Angono-Antipolo Diversion Road (Angono 09/03/2019 Rizal 1st DEO 96.500 480 C 0.45 0.13 0.30 - - - 87.90% 87.9% Satisfactory Builders Construction & Supply Inc. Section) Including Bridge R.A. Pahati Const. & Supply, Inc. / Nueda Construction/Maintenance of Flood Conrol Structures, Quezon City 1st Builders Construction & Supply Inc. (Joint JV-17-1644 Tributaries Drainage System of Brgy. Bagong Silangan (Phase 06/05/2018 46.062 300 O 0.387 0.240 0.150 0.022 0.050 0.033 88.20 - On-going DEO Venture) 4)

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 142 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) FY 2019 DPWH INFRASTRUCTURE PROGRAM, Local R.A. Pahati Const. & Supply, Inc. / Nueda Program, Construction/ Repair/ Rehabilitation/ Improvement of Regional Office Builders Construction & Supply Inc. Joint JV-18-1232 Various Infrastructures Including Local Projects, Local Roads 11/30/2019 144.748 300 O 0.39 0.24 0.15 0.02 0.03 0.05 88.60% - On-going No. IV-A Venture and Bridges, Local Roads Access Road Leading to Sitio Manggahan & Brgy. Daraitan Construction and Maintenance of Bridges along National R.A. Pahati Const. & Supply, Inc./ Gvdpm Roads, Widening of Permanent Bridges, including RROW, to Regional Office JV-16-1944 03/12/2018 185.609 450 OG 0.37 0.3 0.15 0.03 0.051 0.0333 93.43 - On - Going Construction Corp. Joint Venture more than 2 Lanes, Doña Josefa Bridge (B01310LZ) along No. III Daang Maharlika (LZ) R.A. Pahati Const. & Supply, Inc./Triple S Construction of Revetment along Manat River Leading to Compostela JV-18-824 11/22/2019 70.345 246 O 0.39 0.24 0.15 0.03 0.06 0.05 91.70% - On-going Builders Inc. (Joint Venture) Agusan River, Brgy. Olaycon, Monkayo Valley DEO Construction/Improvement of Access Roads leading to Declared R.A.G. Corona Construction And Aggregates Negros Occidental 39473 Tourism Destinations, Jct. Bacolod South Road leading to Daan 11/09/2019 24.500 168 O 0.39 0.24 0.15 0.02 0.05 0.05 90.20% - On-going Supply 3rd DEO Banwa (Bird Watching Area), Brgy. Daan Banua R.B. Alcazar Construction Corp. ( For: R.B. 18967 Construction of Water Supply Project, Solana, Cagayan 05/31/2018 Cagayan 3rd DEO 43.120 390 O 0.400 0.231 0.126 0.020 0.017 0.033 82.70 - On-going Alcazar Const. & Dev'T) R.B. Alcazar Construction Corp. (For: R.B. 18967 Construction of Water Supply Project 03/15/2018 Cagayan 3rd DEO 43.120 390 OG 0.383 0.3 0.1 0.022 0.041 0.033 87.88 - On - Going Alcazar Const. & Dev'T.) Shoulder Paving/Construction along Bantay - San Vicente Road Ilocos Sur 1st R.B. Pano Construction And Supply 43048 08/26/2019 2.683 69 O 0.36 0.24 0.15 0.02 0.05 0.05 86.60% - On-going K0406+500 - K0406+937, Bantay DEO Shoulder Paving/Construction along Bantay-San Vicente Road, Ilocos Sur 1st R.B. Pano Construction And Supply 43048 11/11/2019 2.683 69 C 0.47 0.13 0.30 - - - 90.40% 88.12% Satisfactory K0406+500 to K0406+937 DEO R.B. Soriano Construction 22635 Construction of Academic Building III 09/07/2019 DOST 38.714 380 O 0.39 0.30 0.15 0.03 0.04 0.05 96.10 - On-going R.B. Soriano Construction 22635 Improvement of Dormitory Building for Boys 10/24/2018 DOST 9.989 365 C 0.45 0.20 0.30 - - - 94.50 94.90% Very Satisfactory Construction of Concrete Road: Malabog-Paquibato Road Davao City 1st R.C. Melgazo Builders 35652 08/29/2019 17.107 105 O 0.40 0.24 0.15 0.02 0.05 0.03 89.10% - On-going Leading to Megkawayan Peak Resort DEO Davao City 2nd R.C. Melgazo Builders 35652 Construction of Multi-Purpose Building 08/28/2019 3.396 120 O 0.39 0.24 0.15 0.02 0.05 0.05 90.40% - On-going DEO Construction of Concrete Road: Malabog-Paquibato Road R.C. Melgazo Builders 35652 11/26/2019 Davao City DEO 17.640 135 C 0.43 0.13 0.30 - - - 86.10% 87.9% Satisfactory Leading to Megkawayan Peak Resort, Brgy. Malabog Davao del Sur R.C. Melgazo Builders 35652 Rehabilitation of Multi-Purpose Building (Gymnasium) 11/24/19 2.972 90 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory DEO R.D Policarpio & Company, Inc. / T.G.V. 4414 / 31135 Guinticgan People's Village 10/12/2018 NHA 289.988 887 O 0.36 0.25 0.05 0.03 0.06 0.03 77.57 - On - Going Builders, Inc. - Jv R.D Policarpio And Company Inc. / Tgv Procument of Fully Developed Lots and Completed Housing 4414 / 31135 02/15/18 NHA 289.988 637 O 0.353 0.298 0.000 0.030 0.070 0.033 78.45 - On-going Builders, Inc. - Jv Units under NHA - YPHP (Giunticgan People's Village ) R.D. Interior Junior Construction / Crest JV-16-990 MF02: Construction of Flood Control System 03/15/2018 Cagayan 3rd DEO 72.372 300 C 0.38 0.20 0.30 - - - 88.40 *88.40% Satisfactory Construction 16M00039 - Construction of Pinguiaman Bridge II along R.D. Interior Junior Construction / Gemma Regional Office JV-16-523 Dulawan - Marbel Road, K1744+200 - K1745+168, Exception 11/26/2019 362.019 893 C 0.50 0.13 0.30 - - - 92.80% 92.8% Very Satisfactory Construction (Joint Venture) No. XII K1744+400 - K1745+500 (Bridge) Concreting of Barangay Dasal-Sabang Road Farm to Market R.D. Mandanas Construction 32114 03/22/2018 Guimaras DEO 3.119 33 C 0.44 0.13 0.30 - - - 86.90 *86.90% satisfactory Road Construction of Concrete Road-Magamay-Pandaraonan- Dolores-Guisi Road leading to Guisi Lighthouse, Guisi R.D. Mandanas Construction 32114 08/27/2019 Guimaras DEO 18.630 176 C 0.36 0.20 0.30 - - - 85.90% 85.9% Satisfactory Clearwater Resort & Kenyama Beach resort, Nature's Eye Beach Resort R.D. Policarpio And Company Inc./ Kit JV-14-178 Banate People's Village Phase 2 02/01/2019 NHA 287.347 914 E 0.46 0.20 0.16 - - - 82.13 80.38% Unsatisfactory Properties Malabon-Navotas R.D. Talens Construction And Trading 36817 Rehabilitation of Road, Dalag St., Brgy. NBBS 08/30/2019 17.107 301 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory DEO Construction of Multi-Purpose Building (Two Storey Evacuation Nueva Ecija 2nd R.D. Talens Construction And Trading 36817 11/22/2019 2.911 90 C 0.50 0.13 0.30 - - - 93.20% 93.2% Very Satisfactory Center) at Brgy. Tagumpay DEO Quezon City 2nd R.E. Orlina Construction Corporation 17176 Improvement of Roads, Don Alejandro Roces Avenue 08/27/2019 18.570 231 C 0.36 0.19 0.30 - - - 85.70% 85.7% Satisfactory DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 143 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.)

Contruction of DPWH Staff House for Negros Oriental 2nd Negros Oriental R.E. Singson Construction 24556 04/09/2018 7.080 180 C 0.49 0.13 0.30 - - - 91.90 *91.90% Very Satisfactory DEO, Cangmating, Sibulan, 2nd District, Negros Oriental 1st DEO Off Carriageway Improvement Including Drainage along Dinagat Islands R.F. Varquez Construction 24302 03/14/2018 8.694 160 C 0.48 0.13 0.30 - - - 91.30 *91.30% Very Satisfactory Dinagat - Loreto Road K0087+725 to K0088+445 DEO Construction of One Unit- Storey Three Classroom School Dinagat Islands R.F. Varquez Construction 24302 Building at Tubajon Central Elementary School, School ID: 08/20/2019 5.124 210 C 0.49 0.20 0.30 - - - 79.00% 79% Unsatisfactory DEO 132559 Construction of One Unit One-Storey Three Classroom School Dinagat Islands R.F. Varquez Construction 24302 11/08/2019 5.124 249 C 0.45 0.13 0.30 - - - 58.20% 74.93% Poor Building @ Edera NHS, School ID: 324403 DEO NIA / Pangsasinan Construction of Check Structure and Protection Works for R.G. Benito Construction And Supply Corp. 41018 11/28/2020 Irrigation 5.214 300 C 0.41 0.13 0.30 - - - - 84.20% Satisfactory Dolaoan Small Irrigation Project Management Office Rehabilitation/Major Repair of Permanent Bridge Matalaba Br. Pampanga 2nd R.G. Diaz Builders & Trading 23814 08/27/2019 4.653 60 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory (B00096LZ) along Jose Abad Santos Ave. (JASA) DEO Rehabilitation/Major Repair of Permanent Bridge San Isidro Br. Pampanga 2nd R.G. Diaz Builders & Trading 23814 08/27/2019 4.753 60 C 0.50 0.13 0.30 - - - 93.20% 93.2% Very Satisfactory (B01515LZ) along San Fernando - Road DEO Concreting of San Pedro Saug Purok 2 Palcarangan FMR Pampanga 2nd R.G. Diaz Builders & Trading 23814 03/20/2018 1.880 45 C 0.45 0.13 0.30 - - - 87.80 *87.80% Satisfactory Lubao, Pampanga DEO Local Infrastructure Program: Building and Other Structures - Pampanga 3rd R.G. Diaz Builders & Trading 23814 Construction of Classroom Sto. Domingo Integrated School at 03/21/2018 4.751 150 C 0.50 0.13 0.30 - - - 92.90 *92.90% Very Satisfactory DEO Brgy. Sto. Domingo Angeles City, Pampanga Pampanga 1st R.G. Diaz Builders & Trading 23814 Construction / Rehabilitation of Cabetican Creek 11/05/2019 27.930 180 O 0.35 0.24 0.15 0.03 0.06 0.03 85.90% - On-going DEO Construction of Multi-Purpose Building (Covered R.G. Florentino Const & Trading 18301 08/30/2019 Romblon DEO 4.820 150 O 0.40 0.23 0.15 0.03 0.04 0.05 89.60% - On-going Court/Evacuation Center) R.G. Florentino Const & Trading 18301 Concreting of Sitio Bagolayag Farm to Market Road, Phase II 08/29/2019 Romblon DEO 4.803 60 C 0.48 0.20 0.00 - - - 68.10% 68.1% Poor Construction of Multi-Purpose Building (Covered R.G. Florentino Const & Trading 18301 11/14/2019 Romblon DEO 4.820 150 O 0.37 0.25 0.12 0.03 0.06 0.03 86.40% - On-going Court/Evacuation Center) Construction of One (1) Storey-Two (2) Classroom School R.J.J.L. Construction & Trading 29838 06/19/2018 Bataan 1st DEO 2.722 90 C 0.45 0.13 0.30 - - - 87.90 87.90% Satisfactory Building, Colo Elementary School Construction of Two (2) Storey Four (4) Classroom School R.L. Colico Construction 24914 09/12/2019 Quezon 1st DEO 13.565 178 C 0.50 0.13 0.30 - - - 93.30% 93.44% Very Satisfactory Building at Tayabas West Central School III R.M. Mangubat Construction 34587 Construction of Administration Building Phase 1 8/14/19 DOST 31.047 409 C 0.39 0.12 0.07 0.02 0.03 0.05 68.40 *68.40% Poor PICE-Misamis R.M. Mondares Construction 23173 Supply & Installation of 6-person 3 stops-Elevator 3.872 240 C 0.50 0.20 0.00 - - - 70.00 85.89% Satisfactory Oriental-CDO Las Piñas- R.M. Nunez Construction Corporation 26206 Asphalting of Road, Soldier's Hills 08/20/2019 8.816 90 C 0.49 0.13 0.30 - - - 92.60% 92.6% Very Satisfactory Muntinlupa DEO Construction of Road at Papaya III and Construction of Balog-Balog R.M. Punzal Design Construction & Supplies 41728 Drainage at Papaya, Papaya I, Kamagong, Langka, Main Road 12/19/2020 Multipurpose 8.577 198 O 0.36 0.28 0.04 0.03 0.03 0.05 80.10% - On-going & School Ground Project Phase II Rehabilitation/Reconstruction / Upgrading of Damaged Paved Roads-Secondary Roads Nueva Ecija-Aurora Road - R.N.G.M. Construction 20281 11/23/2019 Aurora DEO 46.707 248 O 0.38 0.24 0.15 0.03 0.06 0.05 90.30% - On-going K0177+439 - K0178+000, K0178+174 - K00178+415, K0204+468 - K0204+491, K024+570 - K0205+580, K0205+592 R.O. Builders & Dev. Corp. / Greco Road Widening - Secondary Roads, Jct. Digos - Buayan Airport South Cotabato 06/08/2018 51.668 160 O 0.366 0.240 0.150 0.030 0.060 0.050 89.60 - On-going Construction And Supply Rd. 2nd DEO Ensure Safe and Reliable National Road System - Bridge Nueva Vizcaya 1st R.O. Builders & Development Corporation 22393 Rehabilitation/Major Repair of Permanent Bridges - Rosario Br. 08/24/2019 6.962 46 C 0.48 0.13 0.30 - - - 91.70% 91.7% Very Satisfactory DEO 1 (B01238LZ) along Daang Maharlika (LZ) Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads Daang Maharlika Nueva Vizcaya R.O. Builders & Development Corporation 22393 11/12/2019 33.535 176 C 0.47 0.13 0.30 - - - 90.70% 90.7% Very Satisfactory K0218+213-K0219+173.5, K0219+228.5-K0219+429 and 2nd DEO K0222+459K0223+400 Mindoro Oriental R.R. Encabo Constructors Incorporated 14716 Consruction of Municipal Hall of Pola 08/22/2019 26.061 390 C 0.49 0.13 0.30 - - - 92.80% 89.51% Very Satisfactory DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 144 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Off-Carriageway Improvement including Drainage Calapan Mindoro Oriental R.R. Encabo Constructors Incorporated 14716 South Road, K0016+121 - K0016+980 and K0017+000 - 07/11/2019 18.153 553 C 0.48 0.20 0.00 - - - 68.30% 71.15% Poor DEO K0017+210 Off-Carriageway Improvement Including Drainage Calapan Mindoro Oriental R.R. Encabo Constructors Incorporated 14716 South Road, K0016+121-K0016+980 & K0017+000 - 03/20/2018 18.153 388 OG 0.387 0.299 0.088 0.03 0.07 0.033 90.70 - On - Going DEO K0017+210 Quezon City 1st R.R. Encabo Constructors Incorporated 14716 Rehabilitation of Roads going to Dumpsite, Barangay Payatas 08/22/2019 19.600 225 O 0.38 0.24 0.15 0.03 0.04 0.05 88.80% - On-going DEO R.R. Encabo Constructors Incorporated 14716 Villa Lugta Nuevo 05/18/2018 NHA 223.200 551 C 0.45 0.20 0.28 - - - 93.44 93.06% Very Satisfactory (Formerly: Rrencabo Constructors & Traders)

LTFRB Central Office Building and NCR LTFRB Regional R.R. Encabo Constructors, Inc. 14716 02/02/2018 DOTC 67.260 540 C 0.48 0.20 0.30 - - - 98.40 94.70% Very Satisfactory Office Building Project

R.R. Encabo Constructors, Inc. / Brostan Construction of Four (4) Five-Storey Low Rise Buildings and 01/23/2019 NHA 153.215 300 C 0.48 0.20 0.00 - - - 68.46 70.75% Poor Construction Land Development

Rehabilitation / Reconstruction of Roads with Slip, Slope Collapse and Landslide (Primary Roads) along Tarlac - Sta. R.R. Ricafort Construction And Supplies 14402 08/28/2019 Tarlac 2nd DEO 35.003 210 O 0.38 0.23 0.15 0.03 0.06 0.05 88.70% - On-going Rosa Road, Sta. K0131+064 - K0131+565, K0132+700 - K0133+305, K0134+000 - K0134+180 Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse R.R. Ricafort Construction And Supplies 14402 03/22/2018 Tarlac 2nd DEO 32.351 229 C 0.46 0.13 0.30 - - - 89.20 *89.20% Very Satisfactory and Landslide (Primary Rehabilitation/Major Repair of Road Slope Protection Structure along Tarlac-Sta. Rosa Road, Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved R.R. Ricafort Construction And Supplies 14402 National Roads inclusing Drainage based on Pavement 06/21/2018 Tarlac 1st DEO 69.565 286 C 0.46 0.20 0.30 - - - 95.60 95.70% Very Satisfactory Management System/Highway Development Management-4 (HDM-4); Tertiary Road, Talac Guimba Rd. via Victoria Network Development - Improvement/Widening of National Regional Office R.R. Ricafort Construction And Supplies 14402 Roads, Primary Roads Outside N1, K152+815 06/22/2018 32.343 405 C 0.49 0.13 0.30 - - - 92.70 92.70% very Satisfactory No. III to K153+750 National Highway Junction Sakuan to Barangay Alvar to Sitio Bantolinao Barangay Palma Gil to Sitio Tubilan, Barangay R.R. Seismundo Construction & Supply / Pichon Road Connecting Caraga Public Terminal to Abaca Davao Oriental 1st Connex 2016 Realty Development, Inc (Joint JV-18-671 Processing and Hand Loom (Dagmay) Weaving Sitio Tubilan, 08/21/2019 38.022 157 O 0.40 0.24 0.15 0.02 0.05 0.05 90.70% - On-going DEO Venture) Barangay Pichon, Caraga, Davao Oriental in Support to Agribusiness: Abaca, Corn, Falcata, Coconut, Rubber, Manggo, Upland Rice, Banana and Cacao R.R. Seismundo Construction & Supply / Rechanneling and Construction of Dike in Kingking River, Compostela Double J Construction And Supply Joint JV-16-948 03/20/2018 44.251 185 C 0.48 0.13 0.30 - - - 90.80 *90.8% Very Satisfactory Mosahamat Section ( Left Side) Valley DEO Venture R.R. Seismundo Construction & Supply / Rechanneling and Construction of Dike in Kingking River at Compostela Pyramid Consolidated Builders & Gen. 10961 01/12/2018 44.703 216 C 0.48 0.19 0.30 - - - 96.80 *96.80% Outstanding Mauswagon Section ( Left Side) Pantukan 2nd LD Valley DEO Merchandise Joint Venture R.R. Seismundo Construction & Davao Oriental 1st Supply"/Jharkha Construction And Supply JV-18-1303 Construction of Revetment along Manurigao River 11/20/2019 74.166 322 O 0.39 0.24 0.15 0.03 0.06 0.05 91.70% - On-going DEO (Joint Venture) R.R. Seismundo Construction & Widening of Tanglaw Bridge 1 (B00188MN) along Tagum - Davao del Norte Supply"/South Ironrock Corporation (Joint JV-18-447 11/23/2019 28.636 173 O 0.39 0.21 0.12 0.03 0.06 0.03 84.10% - On-going Panabo Circum. Road DEO Venture)

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 145 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Davao Oriental 1st R.R. Seismundo Construction And Supply 10961 Construction of Revetment along Manurigao River 05/30/2018 31.713 289 O 0.291 0.300 0.150 0.030 0.050 0.050 87.10 - On-going DEO Constuction/Maintenance of Flood Mitigation of San Antonio - Ilocos Sur 2nd R.S. Sepian Construction And Trucking 20519 03/13/2018 29.400 244 C 0.47 0.13 0.30 - - - 90.10 *90.10% Very Satisfactory San Pedro River Control DEO R.S. Tagala Construction And Equipment Rehabilitation/Improvement of DPWH Marinduque District 42830 11/14/2019 Marinduque DEO 18.050 190 O 0.40 0.24 0.15 0.03 0.05 0.05 92.10% - On-going Rentals Engineering Office Building Including Other Facilities Network Development - Off - Carriageway Improvement - R.T. Morabe Construction 11377 Tertiary Roads - Kiling - Tanauan - Tabontabon - Julita Road, 08/27/2019 Leyte 2nd DEO 33.134 175 O 0.40 0.24 0.15 0.03 0.03 0.05 90.40% - On-going K0932+240 to K0932+270, K0938+870.5 to K0940+749 Repair/Rehabilitation of Flood Control Structure at Tanghas Tacloban City R.T. Morabe Construction 11377 06/07/2018 15.903 201 C 0.47 0.13 0.30 - - - 90.00 90.00% Very Satisfactory Lirang Creek DEO Completion and Upgrading, Dona Marta Memorial District R.T.Y. Construction 10341 11/24/19 Quezon 4th DEO 48.249 400 C 0.50 0.16 0.30 - - - 95.60% 95.6% Very Satisfactory Hospital B. Organizational Outcome 2: Protect Lives and Properties Against Major Floods 1. Flood Management Program A. R.T.Y. Construction / Adad Engineering JV-18-688 Construction/Maintenance of Flood Mitigation Structures and 09/11/2019 Quezon 4th DEO 46.790 150 O 0.38 0.24 0.15 0.02 0.05 0.05 88.20% - On-going Services And Supply Drainage Systems 9. Rehabilitation/Reconstruction of Flood Control and Drainage Structures along Pipisik River R.T.Y. Construction / I.A. Bosque Construction of River Flood Control Project in Barangay Sipa, 06/21/2018 Quezon 3rd DEO 39.200 360 C 0.41 0.20 0.30 - - - 91.10 91.10% Very Satisfactory Construction Corp. Joint Venture Yawe, Walay and San Isidro R.T.Y. Construction 10341 Construction of Libtangin Flood Control 03/16/2018 Marinduque DEO 22.339 413 OG 0.394 0.259 0.122 0.030 0.055 0.033 89.30 - On - Going Construction of By-Passes/ Diversion Roads, including ROW, R.T.Y. Construction 10341 03/14/2018 Quezon 2nd DEO 48.902 240 C 0.49 0.13 0.30 - - - 92.70 *92.70% Very Satisfactory Road Widening-Candelaria By-Pass Road, Candelaria, Quezon R.T.Y. Construction 10341 Construction of Tampus Flood Control Structure 08/28/2019 Marinduque DEO 47.531 324 C 0.44 0.20 0.04 - - - 67.60% 67.6% Poor Road Upgrading (Unpaved to Paved) Based on Gravel Road R.T.Y. Construction/ Waycon Builders & Strategies, Traffic Benchmark for Upgrading to Paved Road JV-16-1388 03/13/2018 Quezon 3rd DEO 63.497 240 C 0.50 0.13 0.30 - - - 93.10 *93.10% Very Satisfactory Construction Supply Joint Venture Standards (HDM-4 Project Analysis) along Catanauan- Buenavista Road, K0275+840 - K0277+487, Buenavista, R.U. Aquino Construction And Development 23507 BSP Baguio Branch Building 08/10/2018 BSP 372.100 421 O 0.32 0.25 0.11 0.03 0.04 0.03 78.40 - On - Going Corporation R.U. Aquino Construction And Development 23507 BSP Baguio Branch Building 04/06/2018 BSP 371.379 390 O 0.28 0.25 0.06 0.02 0.02 0.02 63.40 - On - Going Corporation R.U. Aquino Construction And Development Construction of Flood Control (Revetment) at Sapangdaku 23507 04/06/2018 Cebu 3rd DEO 24.449 186 C 0.50 0.13 0.30 - - - 92.70 *92.70% Very Satisfactory Corporation River Brgy. Ilihan, Sta. 0+000 - Sta. 0+490 Construction of Four (4) Storey Twenty (20) Classrooms R.V. Laborte Builders 20459 11/22/2019 Quezon 2nd DEO 53.830 360 O 0.40 0.21 0.15 0.03 0.06 0.03 86.90% - On-going Academic School Building at Dalahican Elementary School A. Organizational Outcome 1: Ensure Safe and Reliable R.V. Laborte Builders / Rv Laborte National Road System 2. Network Development Program A. JV-18-994 09/11/2019 Quezon 4th DEO 69.066 180 O 0.40 0.24 0.15 0.02 0.05 0.03 88.60% - On-going Development Corporation Construction of By-pass and Diversion Roads 5. Lopez By-Pass Road A. Organizational Outcome 1: Ensure Safe and Reliable R.V. Laborte Builders / Rv Laborte National Road System 2. Network Development Program A. JV-18-994 11/25/2019 Quezon 4th DEO 69.066 180 O 0.40 0.30 0.15 0.03 0.06 0.03 96.90% - On-going Development Corporation Joint Venture Contstruction of By-pass and Diversion Roads 5. Lopez By-pass Road R.V. Construction 6110 Local Program: Rehabilitation of Road Barangay Matobato 11/08/2019 Samar 1st DEO 27.098 135 O 0.38 0.24 0.15 0.03 0.05 0.03 88.50% - On-going I. Operations A. Organizational Outcome 1: Ensure Safe and Reliable National Road System 1. Asset Preservation Program B. Rehabilitation/Reconstruction/Upgrading of Damaged Paved R.V. Laborte Builders 20459 06/20/2018 Quezon 4th DEO 46.950 210 O 0.382 0.24 0.15 0.03 0.05 0.05 90.20 - On-going Roads 1. Primary Roads 1. Quirino H-Way - K0251+(-511) - K0251+000, K0252+000-K0252+400, K0258+974-K0259+200, K0259+767-K260+656 R.V. Rieta Trading And General Contruction 28671 San Jose Airport Development Project 03/14/2018 DOTC 13.107 150 C 0.48 0.20 0.30 - - - 98.40 *98.40% Outstanding Rehabilitation/Major Repair of Permanent Bridges, Valdez Br. R.Z. Tigas Construction And Trading 34198 08/23/2019 Bataan 2nd DEO 11.301 102 O 0.40 0.20 0.15 0.03 0.05 0.05 88.00% - On-going (B03390LZ) along Bagac- Road

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 146 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Misamis Oriental R26 Construction, Inc. 39256 Construction of Flood Control Along Balatukan River 08/26/2019 4.641 60 O 0.39 0.24 0.15 0.02 0.04 0.05 88.60% - On-going 1st DEO Surigao del Norte R26 Construction, Inc. 39256 Construction of Seawall, Brgy. Rizal 08/21/2019 19.006 162 O 0.40 0.24 0.15 0.01 0.05 0.05 88.60% - On-going 1st DEO Misamis Oriental R26 Construction, Inc. 39256 Construction of Flood Control along Balantukan River 11/11/2019 4.641 60 C 0.49 0.13 0.30 - - - 91.80% 89.88% Very Satisfactory 1st DEO Surigao del Norte R26 Construction, Inc. 39256 Construction of Seawall Brgy. Rizal 11/05/2019 19.006 162 C 0.40 0.13 0.30 - - - 82.90% 86.32% Satisfactory 1st DEO Surigao del Norte R26 Construction, Inc. 39256 Construction of River Bank Protection Sta. Monica 11/05/2019 23.292 186 O 0.38 0.30 0.15 0.03 0.04 0.05 94.20% - On-going 1st DEO Mindoro Oriental Ra Ignacio Construction Corporation 29977 Construction of Multi-Purpose Building, Barangay Pachoca 06/03/2018 6.167 270 C 0.48 0.13 0.30 - - - 91.80 91.80% Very Satisfactory DEO Pampanga 2nd Radians Builders And Supply Corporation 43963 Construction of Box Culvert, Sitio Carlos, San Jose 08/27/2019 3.960 90 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory DEO Reconstruction of Damaged Paved National Roads along San Fernando Airport Road, K0265+000 to K0265+891 and Raf General Construction 6699 05/28/2018 La Union 1st DEO 28.420 203 C 0.43 0.13 0.30 - - - 86.10 86.10% Satisfactory K0265+904 to K0266+164, Barangay Pagudpud to Barangay San Vicente Widening of Bayating Bridge, Along Manila North Road, La Union 2nd Raf General Construction 6699 03/22/2018 21.986 195 C 0.49 0.13 0.30 - - - 91.20 *91.20% Very Satisfactory K0241+830 DEO Reconstruction of Damaged Paved National Roads including Drainage along Bacnotan- Luna - Balaoan Road, K0287+498 - Raf General Construction 6699 03/12/2018 La Union 1st DEO 39.062 231 C 0.48 0.13 0.30 - - - 90.90 *90.90% Very Satisfactory K0287+1002; K0287+1002 - K0288+000 ; K0288+000 - K0288+304 Rehabilitation / Improvement of Existing Dike along Bangut Raik Construction 40660 River (Left Bank, Downstream of Bangut Bridge), Sta. 1+ 08/28/2019 Tarlac 2nd DEO 27.913 147 C 0.46 0.13 0.30 - - - 89.00% 89% Satisfactory 587.40 to Sta. 1 +937.80 Local Program, Local Roads and Bridges, Local Roads, Raj Laurente Construction & Development 28719 Construction of Concrete Road - Concreting of Sta. Cruz - 11/07/2019 Cebu 4th DEO 1.881 54 C 0.47 0.20 0.30 - - - 96.70% 91.42% Very Satisfactory Phils. Kambunan Road Local Program, Local Roads and Bridges, Local Roads, Rajlaurente Construction & Development Phil. 28719 Construction of Concrete Road - Concreting of Sta. Cruz - 08/21/2019 Cebu 4th DEO 1.881 54 O 0.39 0.24 0.15 0.03 0.04 0.03 87.90% - On-going Kambunan Road Construction of Typhoon Shelter Hangar for Fixed Wing Aircraft, Rak Trading And Construction 42613 11/08/2019 Palawan 3rd DEO 19.450 330 O 0.38 0.20 0.15 0.03 0.05 0.03 84.80% - On-going Antonio Bautista Air Base Ram Builders 10549 Quipot Irrigation Project (Package 4) 04/06/2018 NIA 27.153 300 O 0.36 0.30 0.02 0.03 0.07 0.05 82.57 - On - Going Construction/Rehabilitation of Padang River Flood Control Regional Office Ramarplus Incorporated 8092 04/12/2018 94.431 203 C 0.49 0.18 0.30 - - - 97.40 *97.40% Outstanding System No. V Construction/ Rehabilitation of Flood Mitigation Structures of Ramarplus Incorporated 8092 11/07/2019 Albay 3rd DEO 47.907 210 C 0.48 0.13 0.30 - - - 91.20% 92.52% Very Satisfactory Magcasili River, Brgy. Balinad Ramarplus Incorporated (Formerly Ramar Construction/Rehabilitation of Flood Mitigation Structures of 8092 08/24/2019 Albay 3rd DEO 47.907 210 O 0.39 0.24 0.15 0.03 0.07 0.05 93.40% - On-going Enterprises) Magcasili River Pangasinan 1st Ramdc Construction And Trading 39252 Road Concreting of Brgy. Liwaliwa to Arnedo 08/28/2019 3.959 75 C 0.49 0.13 0.30 - - - 92.20% 92.2% Very Satisfactory DEO Network Development-Road Widening-Alaminos-Bolinao Road Pangasinan 1st Ramdc Construction And Trading 39252 11/12/2019 7.676 135 C 0.49 0.13 0.30 - - - 92.10% 92.1% Very Satisfactory (K0323+699-K0324+634) DEO Local Infrastructure Program-Local Roads and Bridges-Local Ramijo Construction 10963 08/28/2019 Cebu City DEO 0.950 90 C 0.50 0.13 0.30 - - - 93.30% 93.3% Very Satisfactory Roads-Concreting of Road Retrofitting/Strengthening of South Montilla Bridge (B00885MN) Ramises Construction 17351 06/06/2018 Butuan City DEO 4.900 63 C 0.50 0.14 0.30 - - - 93.50 93.50% Very Satisfatory along Butuan City-Malaybalay Road Ramises Construction 17351 Construction of Lower Agusan Bank Protection, Golden Ribbon 08/28/2019 Butuan City DEO 19.291 134 C 0.50 0.13 0.30 - - - 93.00% 93% Very Satisfactory RAMJEQUO Construction and Supply 41138 NHA - Carmen Dreamville 03/13/2020 NHA 11.303 281 O 0.36 0.30 0.08 0.03 0.05 0.03 8428.00% - On-going Network Development - Road Widening - Primary Roads Lanao Zamboanga del Ramona Construction & Enterprises 14661 - Pagadian - Zamboanga City Road, K1655+359 to 11/09/2019 26.148 120 O 0.39 0.22 0.15 0.03 0.05 0.05 89.40% - On-going Sur 1st DEO K1656+000, K1659+250 to K1659+620 Random Builders 35258 Construction of Multi - Purpose Hall Phase II 09/07/2019 DOST 8.078 370 C 0.49 0.20 0.30 - - - 98.90 0.9634 Outstanding

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 147 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Random Builders 35258 Costruction of Motor Pool and Parking Area 09/07/2019 DOST 4.730 273 C 0.45 0.20 0.30 - - - 95.10 0.9243 Very Satisfactory Road Connecting Sitio Mahayahay to Sitio BukoBuko sa Anay Davao Oriental 1st Rangay Construction And Supply 40117 08/22/2019 23.764 125 O 0.40 0.29 0.15 0.02 0.04 0.03 93.70% - On-going in support to Coffee, Cacao, Abaca and Coconut Industries DEO Davao Oriental 1st Rangay Construction And Supply 40117 Construction of Revetment along Ibobotoc River 05/31/2018 8.596 80 C 0.46 0.13 0.30 - - - 89.70 89.70% Very Satisfactory DEO Macabit Communal Irrigation System - Construction of Temporary Facilities, Embankment Protection, Canal Structures Rania Construction and Supplies 34064 (Left and Right Main Canal), Canal Lining (Left Main Canal, and 01/10/2019 NIA 12.999 300 O 0.29 0.30 0.15 0.03 0.05 0.05 87.00 - On-going Supply and Delivery of Eleven (11) Units - 7Hp Diesel Engine and Water Pump with Complete Accessories Construction of Adris Lateral I & Appurtenant Structures Rania Construction And Supplies 34064 10/27/2018 NIA 9.393 180 O 0.33 0.30 0.15 0.03 0.05 0.05 90.50 - On - Going (Sta. 1+786 - Sta. 2+835) Construction/Improvement of Access Roads Leading to Declaired Tourism Destinations - Access Road Leading to Municipal Tree Park and all Pavilion and Retreat Center Raphaeil Construction 34801 08/20/2019 La Union 1st DEO 18.679 190 O 0.32 0.30 0.15 0.03 0.05 0.03 88.00% - On-going (Poblacion), Sasaba Rice Terraces, Bimmulalakaw and Pimmalangka Waterfalls, Gongo (Native Tomb) and Amburayan River, Brgy. Corrooy Protect Lives and Properties Against Major Floods, Construction/Rehabilitation of Flood Mitigation Facilities within Rapid Foremost Const. Co. 32618 09/09/2019 Quezon 2nd DEO 49.000 365 C 0.48 0.13 0.30 - - - 91.10% 91.1% Very Satisfactory Major River Basins and Principal Rivers, Construction of Iyam River Flood Control/Service Road Off-Carriageway Improvement: Shoulder Paving/Construction - Rapid Foremost Const. Co. 32618 San Francisco - San Andres - San Narciso Road - K0393+175 - 09/05/2019 Quezon 3rd DEO 96.500 300 C 0.49 0.13 0.30 - - - 92.70% 92.7% Very Satisfactory K0401+804, San Narciso Section

Rapid Foremost Const. Co. 32618 Construction of Slope Protection along Morong River 11/22/2019 Quezon 2nd DEO 8.909 150 C 0.46 0.13 0.30 - - - 89.20% 89.2% Very Satisfactory 19MF0042 - Construction of Multi-Purpose Building (New Sultan Kudarat 1st Raqi Builder Construction And Supply 27032 11/22/2019 2.960 166 O 0.34 0.30 0.13 0.03 0.05 0.03 88.30% - On-going Barangay Hall) at Purok 9 DEO Construction of Junction National Road to Upper Kalanganan Lanao del Norte Rarman Construction & Trading 35603 11/07/2019 18.926 137 O 0.39 0.30 0.10 0.03 0.06 0.02 89.40% - On-going Road 1st DEO Proposed Sump Pit Construction & Installation of Pump and its South Manila Rayman Builders Inc. 16023 08/22/2019 83.489 456 O 0.38 0.25 0.14 0.03 0.06 0.03 88.70% - On-going Facilities and Appurtenances at P. Faura Drainage Main Outfall DEO Construction (Completion) of Multi- Purpose Building, Regency Cagayan de Oro Rbt Construction 37230 08/29/2019 1.921 85 C 0.50 0.05 0.30 - - - 84.50% 84.5% Satisfactory Iponan Phase II City 1st DEO Rehabilitation/Reconstruction/Upgrading of Damaged Paved Ilocos Norte 2nd Rcd Gen. Contractor & Construction Supply 21616 Roads - Tertiary Roads, Batac-Paoay Road, K0472+672 - 08/23/2019 9.821 102 O 0.35 0.24 0.15 0.03 0.05 0.05 86.20% - On-going DEO K0473+000 Ilocos Norte 1st Rcd Gen. Contractor & Construction Supply 21616 Concreting of Agaga Road 05/29/2018 14.699 145 C 0.08 0.20 0.30 - - - 57.50 66.30% Poor DEO Construction/Maintenance of Flood Mitigation Structures and Rcdg Construction Corporation / 2M Zamboanga City JV-17-693 Drainage Systems, Construction of Flood Control Structure at 11/13/2019 45.826 602 C 0.50 0.13 0.30 - - - 92.80% 89.32% Very Satisfactory Construction & Enterprises (Joint Venture) DEO Vitali River, Vitali Section Construction of Flood Mitigation Structure along Daywan River Rcdg Construction Corporation / A.T. Dumlao Surigao del Norte JV-18-699 Brgy. Daywan Sta. 0+064.00 - Sta.0+004.20 Revetment: Sta. 08/19/2019 18.620 101 O 0.38 0.24 0.15 0.03 0.04 0.03 87.60% - On-going Construction, Inc. (Joint Venture) 2nd DEO 0+020 - Sta. 0+049.80 Construction of Flood Control at Busugan River, Sinubong Zamboanga City Rcdg Construction Corporation / Rg Builders JV-16-435 03/20/2018 18.030 432 OG 0.320 0.300 0.150 0.030 0.040 0.050 89.00 - On - Going (Including ROW Acquisition) DEO Rcdg Construction Corporation / Rg Builders Construction of Flood Control at Busugan River Sinubong Zamboanga City JV-16-435 06/07/2018 18.030 432 C 0.50 0.13 0.30 - - - 93.40 90.40% Very Satisfactory Jv (Including Right of Way Acquisition) DEO Construction of Flood Mitigation Structure along Dayawan Rcdg Construction Corporation/A.T. Dumlao Surigao del Norte JV-18-699 River, Sta. 0+064 to Sta. 0+004.2; Revetment: Sta. 0+020 to 11/04/2019 19.599 104 C 0.49 0.13 0.30 - - - 92.60% 89.6% Very Satisfactory Construction, Inc. (Joint Venture) 2nd DEO Sta, 0+049.8

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 148 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Cluster 5 - Asphalt Overlay along Tabaco Wharf Road Chainag Rcds Construction & Supply, Inc./ Wcs 32331 0 to 738 and at Ligao - Tabaco Road, K0526+066 to 08/28/2019 Albay 1st DEO 41.408 48 C 0.48 0.13 0.30 - - - 91.10% 91.1% Very Satisfactory Construction, Inc. Joint Venture K0526+239 and K0526+287 to K0526+847 R'Cel General Contractor & Gen. Local Ifrastructure Program-Construction of Multi-Purpose 13385 11/19/2019 Laguna 3rd DEO 1.878 120 C 0.49 0.19 0.30 - - - 98.30% 98.3% Outstanding Merchandise Building Asset Preservation Program - Preventive Maintenance - Primary R'Cel General Contractor & Gen. 13385 Roads - Daan Maharlika (LZ) - K0085+178 - K0085+400, 11/20/2019 Laguna 3rd DEO 72.005 105 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory Merchandise K0086+300 - K0087+300, K0089+250 - K0089+355 Negros Oriental Rcode Builders And Aggregates Supply 44166 Concreting of Road, Brgy. Matobato, Bindoy, Negros Oriental 11/13/2019 4.702 31 C 0.47 0.13 0.30 - - - 90.70% 90.7% Very Satisfactory 1st DEO Network Development - Road Widening - Primary Roads - Rcps Construction & General Trading 17792 08/24/2019 Isabela 3rd DEO 13.747 133 O 0.38 0.24 0.15 0.03 0.04 0.03 87.10% - On-going Daang Maharlika (LZ) - K0372+000 to K0372+426 Network Development - Road Widening - Primary Roads, Rcps Construction & General Trading 17792 11/09/2019 Isabela 3rd DEO 13.747 133 C 0.45 0.13 0.30 - - - 88.30% 87.58% Satisfactory Daang Maharlika (LZ) Construction of Concrete Road-Jct. San Mateo to Upper Cotabato 2nd Rden Construction & Supply 33707 06/01/2018 32.573 131 O 0.376 0.24 0.15 0.03 0.061 0.05 90.70 - On-going Mingading Leading to UK Peak DEO Construction of Concrete Road along Junction San Mateo to Cotabato 2nd Rden Construction & Supply 33707 08/22/2019 18.607 106 C 0.48 0.13 0.30 - - - 91.60% 91.6% Very Satisfactory Upper Mingading Leading to UK Peak DEO Locally Infrastructure Program - Buildings and Other Structures - DAvao Occidental Rdf Construction & Supply 12843 Multi-Purpose/Facilities - Construction of Multi-Purpose Building 06/04/2018 2.958 120 C 0.47 0.13 0.30 - - - 90.00 90.00% Very Satisfactory DEO of Don Marcelino High School, Don Marcelino Misamis Rdt Construction & General Merchandise 38617 Concreting of Mialen - Lupagan Barangay Road 11/08/2019 Occidental 2nd 9.310 52 C 0.48 0.20 0.15 - - - 83.50% 83.02% Satisfactory DEO Misamis Rdt Construction And General Merchandise 38617 Concreting of Mialen-Lupagan Barangay Road 08/21/2019 Occidental 2nd 9.310 52 O 0.30 0.30 0.10 0.03 0.06 0.03 82.70% - On-going DEO Asset Preservation - Rehabilitation / Reconstruction / Upgrading Rebecca Najeeba Construction & 37433 of Damaged Paved Roads - Tertiary Roads, H. Cortez 06/06/2018 Cebu City DEO 7.109 140 O 0.357 0.24 0.15 0.03 0.07 0.05 89.70 - On-going Development Extension (S00043CB) Chainage 000 - Chainage 131 Convergence and Special Support Program- Construction/Improvement of Access Roads Leading to Rebecca Najeeba Construction & 37433 Declared Tourism Destinations, A. Bonifacio St. Leading to 08/28/2019 Cebu City DEO 9.347 90 O 0.39 0.24 0.15 0.03 0.04 0.05 89.50% - On-going Development Cebu Metropolitan Cathedral, the Heritage of Cebu Monument, Colon Street, Cathedral Museum Convergence and Special Support Program - Construction / Improvement of Access Roads Leading to Declared Tourism Rebecca Najeeba Construction & 37433 Destinations, A. Bonifacio St., Leading to Cebu Metropolitan 11/04/2019 Cebu City DEO 9.898 115 C 0.45 0.20 0.30 - - - 95.30% 91.82% Very Satisfactory Development Cathedral, The Heritage of Cebu Monument, Colon Street, Cathedral Museum Asset Preservation Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslides (Tertiary Roads) along Rebtrade International Corporation 36213 09/11/2019 Apayao 2nd DEO 52.072 270 O 0.40 0.24 0.15 0.03 0.05 0.05 91.30% - On-going Apayao (Calanasan) - Ilocos Norte Road, K0621+(015) - K0621+085 Red Axe Builders And Supply 39364 Construction of Foot Bridge, Zone I 08/24/2019 Leyte 4th DEO 1.900 90 O 0.40 0.23 0.15 0.03 0.04 0.03 88.20% - On-going Red Axe Builders And Supply 39364 Construction of Foot Bridge, Zone I 11/07/2019 Leyte 4th DEO 1.900 90 C 0.49 0.13 0.30 - - - 92.00% 89.72% Very Satisfactory Construction of Flood Mitigation Structure Along Iligan River Lanao del Norte Red Construction Technik 38294 08/24/2019 36.930 171 O 0.40 0.29 0.15 0.03 0.06 0.05 97.40% - On-going (Upstream of Panul-Iran Bridge) 2nd DEO Repair and Renovation of PTRI Administration and Laboratory Red Diamond 41878 11/11/2020 DOST-PTRI 8.243 166 C 0.48 0.20 0.30 - - - 98.56% 98.56% Outstanding Building Phase X Metro Manila 1st Red Matrix Builders And Trading 38828 Rehabilitation of Road Network, Brgy. Fortune 06/01/2018 10.345 90 C 0.49 0.13 0.30 - - - 91.80 91.80% Very Satisfactory DEO Completion of Four (4) Storey Eight (8) Classroom School Metro Manila 2nd Redcar Trading & Construction 27368 08/20/2019 9.781 240 O 0.39 0.27 0.15 0.03 0.03 0.05 91.20% - On-going Building at Paranaque Science High School DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 149 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines

On-going and Completed Projects For the period 1 January 2018 to 31 December 2020

CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Rehabilitation of Multi-Purpose Building, Brgy. BF International / Las Piñas- Redcar Trading & Construction 27368 03/15/2018 3.918 120 C 0.48 0.13 0.30 - - - 91.10 *91.10% Very Satisfactory CAA, CAA Brgay. Hall Muntinlupa DEO Redcar Trading & Construction 27368 Construction of Academic Building 2 Phase 2 03/07/2019 DOST 26.256 421 C 0.45 0.20 0.16 - - - 80.80 0.823 Satisfactory Redcar Trading and Construction 27368 Construction of Academic Building 2 Phase 2 01/24/2019 DOST 26.256 418 O 0.38 0.30 0.06 0.03 0.01 0.05 83.10 - On-going

Redcar Trading and Construction 27368 Construction of Academic Building II Phase 1 01/24/2019 DOST 28.677 314 C 0.49 0.20 0.11 - - - 79.10 91.98% Very Satisfactory Construction of Flood Control Structure and Slope Protection of Negros Occidental Redson Construction And Supplies 35128 Minuluan River along bacolod North Road, Talisay City, Negros 03/20/2018 27.928 162 C 0.49 0.13 0.30 - - - 91.90 *91.90% Very Satisfactory 1st DEO Occidental, Sta. 0+000 to Sta. 0+308 Retrofitting/Strengthening of Bridge-Tresfuentes Br. Negros Occidental Redson Construction And Supplies 35128 08/21/2019 4.654 82 C 0.44 0.19 0.30 - - - 93.30% 93.3% Very Satisfactory (B00145NR) along Bacolod North Road 1st DEO

Ree Construction 10342 Construction of Tourism Office Building at Anilao Port 05/23/2019 TIEZA 15.000 180 C 0.45 0.20 0.30 94.54 94.54% Very Satisfactory Construction of Concrete Road - Gravelling of Road from Nato Agusan del Sur Regerys Construction And Supply 44367 08/26/2019 4.677 60 O 0.39 0.23 0.15 0.03 0.03 0.05 87.50% - On-going to Segunda, Brgy. Nato 1st DEO Construction of Concrete Road - Gravelling of Road from Nato Agusan del Sur Regerys Construction And Supply 44367 11/12/2019 4.949 60 C 0.49 0.13 0.30 - - - 91.90% 88% Satisfactory to Segunda 1st DEO

*1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 150 of 150