CPES Report-32Nd Rel

CPES Report-32Nd Rel

PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines On-going and Completed Projects For the period 1 January 2018 to 31 December 2020 CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Flood Management Program - Construction/Maintenance of Flood Control Mitigation Structures and Drainage Systems - Construction/Maintenance of Flood Mitigation Structures and 91.8% 11 Diamond Eagle Construction 33328 09/05/2019 Laguna 3rd DEO 19.061 240 C 0.49 0.13 0.30 - - - 91.80% Very Satisfactory Drainage Systems - Construction/Rehabilitation of Flood Structures along Right Side Downstream of Gating-Gating River at Gating-Gating Bridge Local Infrastructure Program - Flood Control and Drainage - 11 Diamond Eagle Construction / Bhenllabien Flood Control Structures/Facilities - Construction/Rehabilitation 90.9% JV-17-2349 09/06/2019 Laguna 2nd DEO 38.090 360 C 0.48 0.13 0.30 - - - 90.90% Very Satisfactory Builders Construction of a Grouted Slope Protection along Petang Creek from RSBS up to Roseville Subd. Asset Preservation-Preventive Maintenance - Tertiary Roads- Ilocos Sur 2nd 115 Construction & Development 38309 08/28/2019 8.697 74 O 0.36 0.24 0.15 0.03 0.05 0.05 88.00% - On-going Jct. Candon-Salcedo-Del Pilar Road, K0349+580 - K0350+454 DEO Repair/Rehabilitation of Multi-Purpose Building (Health Center Metro Manila 1st 92.7% 121 Construction Corporation 21686 08/30/2019 4.798 120 C 0.49 0.13 0.30 - - - 92.70% Very Satisfactory and Lying Inn) Barangay Mauway DEO Network Development-Road Widening-Primary Roads Daang Camarines Norte 128 Dragon Construction And Supplies 35408 11/10/2019 43.757 189 O 0.37 0.23 0.15 0.03 0.06 0.05 88.60% - On-going Maharlika (LZ) K0352+229 - K0353+805 DEO Improvement/ Construction/ Concreting of Labasan - Camanga Zamboanga 2M Construction & Enterprises 33331 05/29/2018 28.649 133 O 0.39 0.24 0.15 0.03 0.07 0.05 92.10 - On-going Road Sibugay 2nd DEO Road Widening Including Drainage along Ipil-Magdaup Wharf Zamboanga 2M Construction & Enterprises 33331 03/13/2018 16.187 177 C 0.49 0.20 0.28 - - - 96.60 92.92% Very Satisfactory Road (S01143MN) (K2014+800 - K2015+297) Sibugay 2nd DEO Road Widening on Secondary Roads along Villasis - Malasiqui - Pangasinan 4th 2-R Construction & Supply 15304 San Carlos Road, K0190+660 - K0192+018, K0192+700 - 08/22/2019 19.781 120 O 0.39 0.24 0.15 0.03 0.06 0.05 91.80% - On-going DEO K0192+729 Road Widening Of Secondary Roads along Villasis-Malasiqui- Pangasinan 4th 2-R Construction & Supply 15304 San Carlos Road, K0190+660-K0192+018, K0192+700- 11/06/2019 14.549 150 O 0.39 0.24 0.15 0.03 0.05 0.05 90.80% - On-going DEO K0192+729 Organizational Outcome 1: Ensure Safe and Reliable National Camarines Sur 93.3% 301 Engineers 38364 Road System Bridge Program-Retrofitting/Strengthening of 08/24/2019 2.790 72 C 0.50 0.13 0.30 - - - 93.30% Very Satisfactory 3rd DEO Permanent Bridge-San Isidro Bridge Construction of Concrete Road - Purok 3 Afga-Anahawan- Kauswagan-San Vicente Road Connecting Coconut and Agusan del Sur 3C Sl Construction And Supply 36393 11/11/2019 19.599 170 O 0.39 0.24 0.15 0.03 0.04 0.03 89.00% - On-going Falcata Plantation Sittes and National Road Junction in Support 1st DEO to Coconut and Wood Industries Improvement of Multi-Purpose Building at Pinyahan Elementary Quezon City 2nd 3Fj Construction 37156 11/26/2019 2.965 93 O 0.39 0.24 0.11 0.03 0.05 0.03 85.00% - On-going School DEO Road Upgrading (Unpaved to Paved) based on Gravel Roads Strategies, Traffic Benchmark for Uprading to Paved Road Apayao 1st DEO, 3K Rock Engineering 27908 06/05/2018 96.499 417 O 0.363 0.255 0.112 0.03 0.055 0.033 84.80 - On-going Standards (HDM-4) Project Analysis)- Tertiary Roads+ Apayao- CAR Ilocos Norte Road Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads: Reconstruction to Concrete Pavement - Specific 3K Rock Engineering 27908 11/20/2019 Benguet 1st DEO 48.534 203 O 0.37 0.30 0.10 0.03 0.06 0.03 88.70% - On-going Locations Along Kennon Road (S00393LZ) , K0234+000 to K0237+011 3K'S Industrial Maintenance And Services, Cotabato 2nd Inc. 40070 Construction of Capanican Bridge 08/22/2019 12.992 199 O 0.39 0.24 0.15 0.03 0.06 0.05 92.20% - On-going DEO Concreting of Barangay Moto Norte to Tubodio Road, Barangay 3N Construction & Supply 37872 11/05/2019 Bohol 1st DEO 1.960 30 C 0.48 0.13 0.30 - - - 91.10% 91.1% Very Satisfactory Napo and Barangay Tubodio Construction of Drainage Structure Along Road - On Specific 3Rb Consturction & Supply 19541 11/11/2019 Masbate 1st DEO 29.519 210 O 0.38 0.24 0.15 0.01 0.05 0.05 87.20% - On-going Locations Along San Fernando North Road (S00009TC) Misamis 3R'S Builders And Resources 35922 Concreting of Roads, Sinacaban Cluster 11/08/2019 Occidental 2nd 23.401 100 O 0.39 0.30 0.10 0.03 0.05 0.03 90.50% - On-going DEO *1st/Final * For DPWH, only the region and PMO office are listed 32nd Release Page 1 of 150 PHILIPPINE DOMESTIC CONSTRUCTION BOARD Construction Industry Authority of the Philippines On-going and Completed Projects For the period 1 January 2018 to 31 December 2020 CONTRACT LICENSE DATE OF QUALITATIVE NAME OF CONSTRUCTOR PROJECT *IMPL. AGENCY DUR STATUS WMS MTL TIME FAC ESH RDR CPES VISIT RATING FINAL RATING NO. EVALUATION AMOUNT DESCRIPTION (C.D.) Quezon City 1st 4 Doublers Trading & Contractor 35452 Rehabilitation of Dahlia St., Barangay Fairview 11/25/2019 9.800 150 C 0.40 0.14 0.30 - - - 83.90% 87.74% Satisfactory DEO Quezon City 1st 4 Doublers Trading & Contractor 35452 Rehabilitation of Dahlia Street, Barangay Fairview 08/23/2019 9.800 150 O 0.39 0.25 0.15 0.03 0.04 0.05 90.30% - On-going DEO Off-Carriageway Improvement: Construction of Laybys - On 4Rm Construction & Supplies 35767 Specific Locations along Quirino H-Way (baguio- Bauang) 11/22/2019 Baguio City DEO 9.724 160 O 0.39 0.24 0.15 0.03 0.04 0.05 89.40% - On-going S00420LZ), K0299+570 to K0303+790 Lower Agno River Construction of Trapezoidal Concrete Canal Lining and Irrigation System 511 Builders 34324 Declogging of Structures (Sta. 3+926.00 - Sta. 5+528.00 of 12/19/2020 12.408 270 C 0.44 0.20 0.30 - - - - 93.80% Very Satisfactory Improvement LARIS Lateral B, L=1,571.00m) Project ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Network Development Program, Road Batangas 3rd 515 Life Construction Corp. 41520 11/22/2019 44.969 240 O 0.40 0.24 0.15 0.02 0.05 0.05 91.20% - On-going Widening- Tertiary Roads, Talisay-Laurel-Agoncillo Rd.- DEO K0094+332- K0095+530 LOCAL PROGRAM, Construction/Repair/Rehabilitation/Improvement of Various Batangas 3rd 515 Life Construction Corp. 41520 Infrastructure including Local Projects, Local Roads and 11/22/2019 61.409 270 O 0.40 0.24 0.15 0.02 0.05 0.05 90.60% - On-going DEO Bridges, Local Roads, Construction of Natatas- Balete- Wawa- Boot Road Construction / Upgrading / Rehabilitation of drainage along national roads - Tertiary Roads - Baliwag-Candaba Road 525 Construction 28532 11/19/2019 Bulacan 1st DEO 28.704 270 O 0.39 0.24 0.09 0.03 0.06 0.02 82.10% - On-going K0052+150-K0052+800, K0055+137-K0055+470, K0055+800- K0056+808.50 Road Widening of Catarman-Calbayog Road K0755+585- Northern Samar 90.3% 5G Galvez Construction And Supply 34736 08/22/2019 29.479 294 C 0.47 0.13 0.30 - - - 90.30% Very Satisfactory K0755+775, K0759+883-K0759+1472 1st DEO 6 Jewels Construction JV-17-1886 Development of Pocket Forest Park, Gardens and Playground 09/19/19 TIEZA 23.000 195 C 0.40 0.17 0.30 - - - 86.80 92.57% Very Satisfactory Rehabilitation & Improvement of Bustos Dam and Picnic 626 Construction & Trading, Inc. 34990 09/27/2018 TIEZA 7.500 90 O 0.38 0.30 0.13 0.03 0.06 0.05 95.30 - On - Going Grounds Construction of Flood Control Structure along Angat River, San 722 Construction, Inc. 21923 08/25/2019 Bulacan 1st DEO 18.620 147 O 0.39 0.24 0.15 0.03 0.06 0.05 91.60% - On-going Jose Section Construction of Flood Control structures along Angat River San 722 Construction, Inc. 21923 11/19/2019 Bulacan 1st DEO 18.620 147 C 0.48 0.13 0.30 - - - 91.30% 91.3% Very Satisfactory Jose Section Barbar Small River Irrigation Project, Package 9 - Construction 739 Builders 31174 10/26/2019 NIA 10.764 270 O 0.39 0.18 0.13 0.03 0.05 0.05 82.30 - On-going of Main Canal Nagsupotan (Canalization, Sta. 3+000 - 5+000) Barbar Small River Irrigation Project, Package 11 - Construction 739 Builders 31174 10/26/2019 NIA 15.134 270 O 0.31 0.24 0.13 0.03 0.05 0.05 81.00 - On-going of Slope Protection Works at Diversion Ilocos Sur 1st 739 Builders 31174 Construction of Flood Control along Abra River (Phase I) 11/11/2019 18.816 200 O 0.39 0.24 0.15 0.03 0.05 0.05 91.00% - On-going DEO Provincial 31174 / Upgrading and Improvement of Sta.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    150 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us