National Water Resources Board

Total Page:16

File Type:pdf, Size:1020Kb

National Water Resources Board Republic of the Philippines Department of Environment and Natural Resources NATIONAL WATER RESOURCES BOARD January L7,20L8 NOTICE TO THE DENR WATER REGULATORY UNIT AND ALL GOVERNMENT UNITS We have the following list of old publications which we intend to dispose to DENR-WRUS and other attached agencies, who may be interested to use them as base hydrologic data or reference. All other interested government units can also avail these publications FREE OF CHARGE. All you need is a letter request addressed to Executive Director, DR. SEVILLO D. DAVID, JR., CESO III. You can emailfax your request at nwrb.gov.ph or at telefaxd.- no. 920-2834, respectively. DR. SEVILLdil. OeVrO, JR., CESO III Executive Director RAPID ASSESSMENT: (1982) 1. Abra 2. Agusan Del Norte 3. Agusan Del Sur 4. Aklan 5. Albay 6. Antique 7. Aurora 8. Basilan 9. Bataan 1O. Batanes 11. Benguet 12. Bohol 13. Bukidnon 14. Bulacan 15. Cagayan 16. Camarines Norte 17. Camaries Sur 18. Camiguin 19. Capiz 20. Catanduanes 21. Cebu 22. Davao Dbl Norte 23. Davao Del Sur 24. Davao Oriental 25. Eastern Samar B"Floor NIA Bldg., EDSA, Diliman, Quezon City, PHILIPPINES 1100 Tel. (63.2)9282365, (63.2)9202775, (63.2)9202693, Fax (63.2)9202641,(63.2)9202834 www.nwrb.gov.ph Republic of the Philippines Department of Environment and Natural Resources NATIONAL WATER RESOURCES BOARD 26. Ifugao 27.Ilocos Nofte 28.Ilocos Sur 29.Iloilo 30.Isabela 31. Kalinga Apayao 32. La Union 33. Lanao Del Nofte 34. Lanao Del Sur 35. Maguindanao 36. Marinduque 37. Masbate 38. Mindoro Occidental 39. Mindoro Oriental 40. Misamis Occidental 41. Misamis Oriental 42. Mountain Province 43. Negros Occidental 44. Negros Oriental 45. Nodh Cotabato 46. Northern Leyte 47. Nofthern Samar 48. Nueva Ecija 49. Nueva Viscaya 50. Palawan 51. Pampanga 52. Quezon 53. Quirino 54. Romblon 55. Siquijor 56. Sorsogon 57. South Cotabato 58. Southern Leyte 59. Sultan Kudarat 6O. Sulu 61. Surigao Del Norte 62. Surigao Del Sur 63. Tarlac 64. Tawi-Tawi 55. Western Samar 66. Zambales iT.Zamboanga Del Norte 68. Zamboanga Del Sur RIVER BASIN /FRAMEWORK PLAN: (1983) 1. Abra River Basin 2. Agus River Basin 8t'Floor NIA Bldg., EDSA, Diliman, Quezon City, PHILIPPINES 1100 Tel. (63.2)9282365, (63.2)9202775, (63.2)9202693, Fax (63.2)5202641,(63.2)9202834 www.nwrb.gov.ph Republic of the Philippines Department of Environment and Natural Resources NATIONAL WATER RESOURCES BOARD 3. Agusan River Basin 4. Aklan River Basin 5. Albay Sorsogon River Basin 6. Bago Binalbagan River Basin 7. Bauang Amburayan River Basin 8. Bohol River Basin 9. Cebu River Basin 10. Chico River Basin 11. Davao Oriental River Basin 12.IIigan River Basin 13.Ilog Hilabangan River Basin 14. Jalaur River Basin 15. Laguna Lake River Basin 16. Laoag River Basin 17. Leyte River Basin 18. Magat River Basin 19. Mapangui-Dipolog River Basin 20. Masbate Island River Basin 21. Mindanao Allah River Basin 22. Negros Oriental River Basin 23. Palawan River Basin Z4.Panay River Basin 25. Pulangui River Basin 26. Quezon River Basin 27. Samar River Basin 28. Sibalom Guimbal River Basin 29. Sibuguey Ingin River Basin 30. Siocon, Quipit, Taguite, Tumaga Basin 31. South Cotabato River Basin 32. Taal Lake River Basin 33. Upper Cagayan River Basin 34. Groundwater of the Philippines 35. Manual of Water Data Standard I - Streamflow and Lake or River Stage 36. Manual of Water Data Standard II - Rainfall and Evaporation 37. Manual of Water Data Standard III - Soil Moisture and Groundwater 38. Manual of Water Data Standard IV - Water Quality and Sediment Yield 39. Manual of Water Data Standard V - Glossary of Water Res. Terms & Conversion Table 40. Philippine Flood Control 1977 41. Philippine Irrigation Inventory 42. Philippine Water Data 197O 43. Philippine Water Data 1971 a4. Philippine Water Data L972 45. Philippine Water Resources Summary Data I 46. Principal River Basin of the Philippines 47. Rural Water Supply Vol.l- Design Manua! 48. Rural Water Supply Vol. II - Construction and Installation 49. Rural Water Supply Vol. III - Operation and Maintenance 50. Survey Inventory on Water/Impounding Reservoir 51. Water Availability in the Philippine River x-x-x-x-x-x-x-x- nothi n g fol !ows-x-x-x-x-x-x-x-x-x-x-x Br*Floor NIA Bldg., EDSA, Diliman, Quezon City, PHILIPPINES 1100 Tel. (63.2)9282365, (63.2)9202775, (63.2)9202693, Fax (63.2)9202641, (63.2)9202834 www.nwrb.gov.ph.
Recommended publications
  • Conduct of Feasibility Studies, Master Plans and Project
    The following were identified high-impact projects needing ODA assistance for project implementation, local funding or review and further studies: ProDosed Proiect Remarks 1. Zamboanga-Cotabato-Davao Corridor Project For updating of FS a) Liloy-Labason-Gutalac-Siocon (Zamboanga del Surl Zamboanga del Norte) b) Mati-Maragusan Road (Davao Oriental) c) Jet. Suralfah-Lake Sebu Road (South Cotabato) d) Libungan-Alamada Road and Paco-Pres. Roxas-Antipas Road (North Cotabato) • Above items are remaining road (Mindanao sections) of the RRNDP 2. Metro Manila Interchange Project, Phase VII (MMICP VII) a) Quezon Ave.-Commonwealth Corridor Radial Road-7 (R-7) b) Marcos Highway Corridor Radial Road 6 (R-6) c) Ortigas Avenue Corridor d) Congressional Avenue-Mindanao Avenue Interchange e) Congressional Avenue-Visayas Avenue Interchange 3. Flood Mitigation Project in the East Manggahan Floodway Preliminary FS completed in Area (Stage 1) 2007 4. Aklan River Flood Control Project MP & FS completed 5. Construction and Rehabilitation of Iloilo City Drainage System MP & FS completed 6. panay River Basin Flood Control Project For updating of MP & FS 7. Upper Agusan Dev. Project MP completed undertaken by DENR 8. Davao River Basin Flood Control Project 9. Pampanga Delta Flood Control Project, Phase II 10. Mindanao River Basin Flood Control Project 11. 13 Bridges crossing Pasig River 12. Dalton Bypass Project Submitted letter to NEDA for financing of the study 13. Road Improvement (RI) Projects in Visayas & Mindanao With complete DED prepared a) Improvement of Bacolod-Kabankalan Road, under NRIMP I Negros Occidental 14. Improvement of Malalag-Malita-Jose Abad Santos With complete DED prepared a.) Road (Don Marcelino-Jose Abad Santos section), under NRIMP I Davao Occidental b) Improvement of Don Marcelino-Jose Abad Santos- New proposed project .
    [Show full text]
  • Appendix a Water Pollution in the Philippines: Case Studies
    Foreword CLIMATE CHANGE is undoubtedly the biggest challenge the Philippines faces today, and the vulnerability of our water resources to this phenomenon is a reality that can no longer be ignored. But while water scarcity is perhaps one of the most alarming projected effects of climate change on water resources, two recent typhoons in the Philippines— Ketsana and Parma—have driven home the message that over-abundance can be equally devastating. Both typhoons, along with several others in the past few years, have shown how the country is sorely ill-prepared to handle the impacts brought on by a warming world. Indeed, climate change and the ensuing extreme weather events which have brought too little—or too much—water, have caused periods of water crisis that have destroyed thousands of lives and billions of pesos worth of property and agricultural crops. At the same time, water resources in the country are already confronted with many persistent problems: widespread pollution, over-extraction, and the degradation of watersheds. The present situation, set against the backdrop of climate change, is far from promising. While climate change will affect all sectors, it is its effects on freshwater—society’s, and the Earth’s, life support system—which will be most seriously felt. Water insecurity cuts across all other sectors and will negatively affect agriculture, health, and the economy. But the country’s water systems are still far from being climate-proofed, and current climate change adaptation plans lack the necessary emphasis on addressing impacts on water. This report therefore puts forward the case for the improved management of water resources as a key climate change adaptation strategy.
    [Show full text]
  • 2018-Niadigest Vol41.Pdf
    Transforming Challenges into Infinite Opportunities Editorial Board GEN RICARDO R VISAYA (Ret) ADMINISTRATOR BGEN ABRAHAM B BAGASIN (Ret) SENIOR DEPUTY ADMINISTRATOR ENGR. C’ZAR M. SULAIK DEPUTY ADMINISTRATOR FOR About the Cover ENGINEERING AND OPERATIONS SECTOR MGEN ROMEO G GAN (Ret) DEPUTY ADMINISTRATOR FOR ADMINISTRATIVE AND FINANCE SECTOR Editorial Staff PILIPINA P. BERMUDEZ EXECUTIVE EDITOR AND CONSULTANT EDEN VICTORIA C. SELVA EDITOR -IN-CHIEF LUZVIMINDA R. PEÑARANDA ASSOCIATE EDITOR CLARIZZE C. TORIBIO MANAGING EDITOR Copy Editing and Editorial Staff POPS MARIE S. DADEA JOSIAS M. MERCADO FRYA CAMILLE D. BALLESTEROS JAYSON B CABRERA Design and Layout Team REMSTER D. BAUTISTA ILLUSTRATOR/ DESIGN AND LAYOUT ARTIST ANA CRISTEL K. UNTIVERO DESIGN AND LAYOUT ARTIST CHRISTIAN REY E. LUZ DESIGN AND LAYOUT ARTIST ALLAN JOHN O. ZITA SENIOR PHOTOGRAPHER Administrative Support Staff ARNEL M. REVES Stairways to the Sky. Carved into the mountains MARK V. DARADAL by the indigenous people of Ifugao over 2,000 JOHN NEIL O. VILLANUEVA years ago, the Banaue Rice Terraces had truly transformed great challenges of labor into infinite CENTRAL OFFICE EDSA Diliman, 1100 Quezon City Tel: 929-6071 to 79; 9268090 to 91 opportunities of agriculture and tourism. Built and 926-31 69 ● CAR Wangal, La Trinidad, Benguet Tel: (074) 422-5064/2435/5393 with minimal equipment, largely by hand, these ● REGION 1 Brgy. Bayaoas, Urdaneta City, Pangasinan Tel: (075) 632-2776 ● MARIIS so-called “National Cultural Treasure” and the Minante I, Cauayan City, Isabela Tel: (078) 307-0288 ● REGION 2 Minante I, Cauayan “Eighth Wonder of the World” were nurtured by City, Isabela Tel: (078) 307-0265/ (078) 307-0059 ● REGION 3 Tambubong, San Rafael, the ancient irrigation systems from the rainforests Bulacan Tel: (044) 766-2467 ● Maharlika Highway, Cabanatuan City, Nueva UPRIIS above the terraces.
    [Show full text]
  • DENR Memorandum Circular/Order 2008-04
    Republic of the Philippines Department of Environment and Natural Resources Visayas Avenue. Diliman, Quezon City Tel Nos. 9294626to 29; 9294633 to 35 926-7041to 43; 929-6252: 929-1669 Website: http:l/www.denr.gov.phI E-mail: [email protected] MEMORANDUM CIRCULAR SEP 0 9 2008. NO. 2008- 04 SUEUECT : THE 2009 UPLAND DEVELOPMENT PROGRAM (REFORESTATION AND AGROFORESTRY) The resources of the DENR for CY 2009 in forest development and management have been substantially reconfigured in order to accelerate the restoration of the environmental service functions of vital watersheds and protected areas. This, in addition to simultaneously catalyzing the improvement of productivity of the uplands, creating incomes for upland poor, mitigating hunger among highly-vulnerable populations, engaging organized upland communities, civil society and local governments in sustainable upland and forest management, and providing the climate for gainful economic production for poor upland dwellers. Hence, the following guidelines are hereby issued for the guidance, information, and strict implementation of all concerned. Objecffues The investments under the Program aim to attain the following objectives: 1. To create immediate additional incomes for upland households in support of the Hunger Mitigation Program, and supporting the development of sustainable livelihoods; 2. To develop and manage watersheds of irrigation and municipal water systems, headwaters of major river systems, mangrove, coastal zones, protected areas, and protection forestlands; 3. To pump-prime the local economy in the uplands where investments are made; 4. To demonstrate measurable and verifiable positive effects on the environmental se~ces,including water, soil conservation, biodiversity conservation, and climate change mitigation and adaptation.
    [Show full text]
  • P18-B Panay River Basin Project to Be Funded by China Nation by Louine Hope U
    P18-B Panay River Basin project to be funded by China Nation By Louine Hope U. Conserva Correspondent Business World, Posted on January 10, 2017 ILOILO CITY -- The proposed Panay River Basin Integrated Development Project (PRBIDP), estimated to cost P18 billion, will be bankrolled by a soft loan from China, according to the new National Irrigation Administration (NIA) head. NIA Administrator Peter T. Laviña, who visited Iloilo City this week, said the PRBIDP, considered as the biggest irrigation project within the next three years, was among the big- ticket items presented by President Rodrigo R. Duterte during his official visit to China in October 2016. Mr. Laviña said the Chinese expressed eagerness for the project and the terms of the loan, which will be based on the completed feasibility study, is now being assessed. “But if this will be funded by China, most likely this will be very low interest rates loan or concessional loan,” he told the local media here. NIA-Western Visayas Regional Irrigation Manager Gerardo P. Corsiga said the feasibility study has already been endorsed by the Provincial Development Council of Capiz. “We will elevate it (feasibility study) to the Regional Development Council (and) we will submit it to the National Economic Development Authority central office for further evaluation,” Mr. Corsiga said. The PRBIDP, to be located in the town of Tapaz, will be bigger than the South Korea-funded P11.2 billion Jalaur River Multi-Purpose Project Phase II in Calinog, Iloilo in terms of coverage area. It will have two dams -- the Panay High Dam and Panay Afterbay Dam; a high line canal; and a floodway component.
    [Show full text]
  • DENR-BMB Atlas of Luzon Wetlands 17Sept14.Indd
    Philippine Copyright © 2014 Biodiversity Management Bureau Department of Environment and Natural Resources This publication may be reproduced in whole or in part and in any form for educational or non-profit purposes without special permission from the Copyright holder provided acknowledgement of the source is made. BMB - DENR Ninoy Aquino Parks and Wildlife Center Compound Quezon Avenue, Diliman, Quezon City Philippines 1101 Telefax (+632) 925-8950 [email protected] http://www.bmb.gov.ph ISBN 978-621-95016-2-0 Printed and bound in the Philippines First Printing: September 2014 Project Heads : Marlynn M. Mendoza and Joy M. Navarro GIS Mapping : Rej Winlove M. Bungabong Project Assistant : Patricia May Labitoria Design and Layout : Jerome Bonto Project Support : Ramsar Regional Center-East Asia Inland wetlands boundaries and their geographic locations are subject to actual ground verification and survey/ delineation. Administrative/political boundaries are approximate. If there are other wetland areas you know and are not reflected in this Atlas, please feel free to contact us. Recommended citation: Biodiversity Management Bureau-Department of Environment and Natural Resources. 2014. Atlas of Inland Wetlands in Mainland Luzon, Philippines. Quezon City. Published by: Biodiversity Management Bureau - Department of Environment and Natural Resources Candaba Swamp, Candaba, Pampanga Guiaya Argean Rej Winlove M. Bungabong M. Winlove Rej Dumacaa River, Tayabas, Quezon Jerome P. Bonto P. Jerome Laguna Lake, Laguna Zoisane Geam G. Lumbres G. Geam Zoisane
    [Show full text]
  • Binanog Dance
    Gluck Classroom Fellow: Jemuel Jr. Barrera-Garcia Ph.D. Student in Critical Dance Studies: Designated Emphasis in Southeast Asian Studies Flying Without Wings: The Philippines’ Binanog Dance Binanog is an indigenous dance from the Philippines that features the movement of an eagle/hawk to the symbolic beating of bamboo and gong that synchronizes the pulsating movements of the feet and the hands of the lead and follow dancers. This specific type of Binanog dance comes from the Panay-Bukidnon indigenous community in Panay Island, Western Visayas, Philippines. The Panay Bukidnon, also known as Suludnon, Tumandok or Panayanon Sulud is usually the identified indigenous group associated with the region and whose territory cover the mountains connecting the provinces of Iloilo, Capiz and Aklan in the island of Panay, one of the main Visayan islands of the Philippines. Aside from the Aetas living in Aklan and Capiz, this indigenous group is known to be the only ethnic Visayan language-speaking community in Western Visayas. SMILE. A pair of Binanog dancers take a pose They were once associated culturally as speakers after a performance in a public space. of the island’s languages namely Kinaray-a, Akeanon and Hiligaynon, most speakers of which reside in the lowlands of Panay and their geographical remoteness from Spanish conquest, the US invasion of the country, and the hairline exposure they had with the Japanese attacks resulted in a continuation of a pre-Hispanic culture and tradition. The Suludnon is believed to have descended from the migrating Indonesians coming from Mainland Asia. The women have developed a passion for beauty wearing jewelry made from Spanish coins strung together called biningkit, a waistband of coins called a wakus, and a headdress of coins known as a pundong.
    [Show full text]
  • Current Status and Prospects of Protected Areas in the Light of the Philippine Biodiversity Conservation Priorities
    Proceedings of IUCN/WCPA-EA-4 Taipei Conference March 18-23, 2002, Taipei, Taiwan CURRENT STATUS AND PROSPECTS OF PROTECTED AREAS IN THE LIGHT OF THE PHILIPPINE BIODIVERSITY CONSERVATION PRIORITIES Perry S. Ong, Ph. D. Fellow, Center for Applied Biodiversity Science, CI Science Director, Conservation International Philippines Associate Professor, Institute of Biology, UP Diliman I. INTRODUCTION The Philippines, the world’s second largest archipelago after Indonesia, covers a land area of about 300,000 km2 [1]. It is one of the 17 megadiversity countries, which between themselves contain 70 to 80 percent of global biodiversity [2]. Philippine rainforest is home to more than 1130 terrestrial wildlife species (Table 1) and between 10,000-13,000 species of plants [3] so far recorded, of which more than half are found nowhere else in the world. As such, the Philippines has also been described as Galapagos times ten [4]. It is also one of 25 global biodiversity hotspots [5, 6] with more than 97 percent of its original forest cover lost [7, 8]. In fact more original forests were lost in the last 50 years of the 20th century than what was lost in the previous 450 years combined [9]. Yet more new species are still being discovered on these islands than any other areas on earth in recent times [e.g., see 10, 11] Table 1. Diversity, endemism and conservation status of Philippine wildlife [11, 12, 13 14, 15, 16, 17, 18, 19, 20] No. of No. of Endemic % No. of No. of Threatened Species Species endemics Endemic Species Threatened Species Amphibians 101+ 79+ 78% 24 24 Reptiles 258+ 170+ 66% 8 4 Birds 5761 195+1 34% 74 59 Mammals 204+1, 2 111+1 54% 51 41 Total 1139+ 555+1 49% 157 128 95 Legend: + includes new species (38 species of amphibians, 35 species of reptiles; 15 species of mammals); 1 includes rediscovered species 2 25 species of dolphins, whales and dugong The country’s marine waters cover 2.21 M km2 with a coastline of 22,450 km and an estimated 27,000 km2 of coral reefs [21].
    [Show full text]
  • DATA BOOK C Flood Potential Area Maps
    DATA BOOK C Flood Potential Area Maps The Study on the Nationwide Flood Risk Assessment and the Flood Data Book C Mitigation Plan for the Selected Areas in the Republic of the Philippines Flood Potential Area Maps THE STUDY ON THE NATIONWIDE FLOOD RISK ASSESSMENT AND THE FLOOD MITIGATION PLAN FOR THE SELECTED AREAS IN THE REPUBLIC OF THE PHILIPPINES FINAL REPORT VOLUME IV DATA BOOK C FLOOD POTENTIAL AREA MAPS Table of Contents Page Estimated Flood Potential Area of the Abra River Basin .................................................................... C-2 Estimated Flood Potential Area of the Amburayan River Basin ......................................................... C-3 Estimated Flood Potential Area of the Sinocalan (Dagupan) River Basin .......................................... C-4 Estimated Flood Potential Area of the Patalan River Basin ................................................................ C-5 Estimated Flood Potential Area of the Aringay River Basin............................................................... C-6 Estimated Flood Potential Area of the Bararo River Basin................................................................. C-7 Estimated Flood Potential Area of the Bacarra-Vintar River Basin .................................................... C-8 Estimated Flood Potential Area of the Balingcuguin River Basin ...................................................... C-9 Estimated Flood Potential Area of the Silag-Santa Maria River Basin............................................. C-10 Estimated Flood Potential
    [Show full text]
  • Abraexecutivesummary.Pdf
    Submitted to: Submitted by: DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES BERKMAN INTERNATIONAL,INC. DENR Main Building, Visayas Avenue 3/F, VAG Building, Ortigas Avenue Diliman, Quezon City Greenhills, San Juan City, Philippines Tel. Nos.: (632) 721-9123; 721-9129 Fax No.: (632) 721-4219 www.berkmaninternational.com JUNE 2015 EXECUTIVE SUMMARY VOLUME I Table of Contents I. Background ................................................................................................................................................ 1 II. Objectives of the Masterplan Project ....................................................................................................... 4 III. Development Trends and Plans in the basin............................................................................................ 5 The Abra and Tineg Rivers : A Situationer ................................................................................................ 5 Water-related Sectors - present situation .............................................................................................. 11 State of the Basin Watershed ................................................................................................................. 15 Biodiversity ............................................................................................................................................. 16 Climate Change Scenarios ....................................................................................................................... 16 Coastal
    [Show full text]
  • Screening Model Optimization for Panay River Basin Planning in the Philippines
    Screening Model Optimization for Panay River Basin Planning in the Philippines by John Henry Millspaugh B.S., Civil Engineering University of Virginia, 2009 Submitted to the Department of Civil and Environmental Engineering in Partial Fulfillment of the Requirements for the Degree of Master of Engineering in Civil and Environmental Engineering at the Massachusetts Institute of Technology June 2010 © 2010 John Henry Millspaugh All rights reserved The author hereby grants to MIT permission to reproduce and to distribute publicly paper and electronic copies of this thesis document in whole or in part in any medium now known or hereafter created. Signature of Author Department of Civil and Environmental Engineering May 7, 2010 Certified by Dennis B. McLaughlin H.M. King Bhumibol Professor of Water Resource Management Professor of Civil and Environmental Engineering Thesis Supervisor Accepted by Daniele Veneziano Chairman, Departmental Committee for Graduate Students Screening Model Optimization for Panay River Basin Planning in the Philippines by John Henry Millspaugh B.S., Civil Engineering University of Virginia, 2009 Submitted to the Department of Civil and Environmental Engineering on May 7, 2010 in Partial Fulfillment of the Requirements for the Degree of Master of Engineering in Civil and Environmental Engineering ABSTRACT The state of the water resources of the Panay River Basin have motivated studies and initial basin planning to mitigate flood damages, to produce hydroelectricity, and to increase irrigated rice areas. The goal of this study was to provide the optimal design parameters for facilities potentially to be placed in the basin and the water management variables associated with operating these facilities.
    [Show full text]
  • List of Figures Figure 1 Overlay of Wqmas, 19 Priority River Basins
    List of Figures Figure 1 Overlay of WQMAs, 19 priority river basins, and KBAs Figure 2 Ambient water quality management program sites of DENR–EMB Region 5 Figure 3 Location of existing mining tenements, with reference to protected areas and key biodiversity areas Figure 4 Location of illegal logging hotspots and their overlap with protected areas and Key Biodiversity Areas Figure 5 Wildlife crime hotspots in the Philippines Figure 6 Hotspot areas of illegal fishing in 2016 List of Tables Table 1 Number of invasive species documented in six protected areas that were pilot sites for the prevention, control, and management of IAS Table 2 Classification and usage of freshwater water bodies Table 3 Classification and usage of marine water bodies Table 4 Results of the water quality monitoring of the 19 priority rivers as of 2016.* * Values in bold mean that the river complies with DAO No. 34 Table 5 18 priority river basins, their rivers, and classifications Table 6 Number of illegal logging hotspots List of Footnotes 1 DENR-Biodiversity Management Bureau. 2016. The National Invasive Species Management Strategy and Action Plan 2016-2026 (Philippines. Quezon City: Department of Environment and Natural Resources- Biodiversity Management Bureau, pp. i-xix, 1-95. 2 DENR-Biodiversity Management Bureau. Protected Area Management Master Plan (draft). 3 FORIS Project (UNEP/GEF Project on Removing Barriers to Invasive Species Management in Production and Protection Forests in Southeast Asia). Powerpoint. 4 DENR-Biodiversity Management Bureau. 2016. The National Invasive Species Management Strategy and Action Plan 2016-2026 (Philippines. Quezon City: Department of Environment and Natural Resources- Biodiversity Management Bureau, pp.
    [Show full text]