Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- , by M/s Winsome Infrastructure.

APPENDIX -I (See Paragraph – 6) FORM-1 (I) Basic Information S. No. Item Details 1. Name of the project Proposed Residential Building “Winsome Empire” at Plot No.- 531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna., Bihar 2. S. No. in the Schedule 8 (a) 3. Proposed capacity/area/length/tonnage Total Plot Area: 7,516.32 m2 2 to be handled/command area/lease area/ Total Built up Area: 24,121 m number of wells to be drilled. 4. New/Expansion/Modernization New Project 5. Existing Capacity/Area etc. Not Applicable 6. Category of Project i.e. ‘A’ or ‘B’ B

7. Does it Attract the general condition? If No yes, please specify. 8. Does it attract the specific condition? If No yes, please specify. 9. Location Plot/Survey/Khasra No Plot No.-531, 613 & 614 Village ---- Tehsil Mauza - Sikandarpur, Thana- Danapur District Patna State Bihar 10. Nearest railway station/airport along Nearest railway station is Patliputra Junction with distance in kms. Railway Station at an aerial distance of 774.65 m towards South. Nearest Airport is Jai Prakash Narayan International Airport at an aerial distance of 2.03 km towards South West.

11. Nearest Town, , District Nearest City: Danapur Headquarters along with distance in District Headquarters: Danapur at an aerial kms. distance of 2.03 km towards South West. 12. Village Panchayats, Zilla Parishad, Muncipal Corporation, Local body (Complete postal addresses with telephone nos. to be given) 13. Name of the applicant M/s Winsome Infrastructure

Consultant-Ascenso Enviro Pvt. Ltd. Page 1 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

14. Registered Address Rajeev Kumar New Baeilly Road, P.S- Danapur, District- Patna, State- Bihar, 801503 15. Address for correspondence: Name Winsome Infrastructure Designation(Owner/Partner/CEO) (Company Name) Address 101, Suksha Presidency, Ramjaipal Road, West of Ambedkar Dental College, Near Kala Kriti Dance Class, Bailey Road, Thana- Danapur, Patna, Bihar Pin Code 801503 E-mail [email protected] Telephone No. 8873121555 Fax No. -

16. Details of Alternative Sites Examined, if The land is allotted for the Residential purpose and any, Location of these sites should be it will be developed as per the building Byelaws of shown on a topo sheet. Bihar. So, there is no requirement to examine the alternative site. The copy of Jamabandi and Khatiyan are attached as Annexure No. – I. 17. Interlinked Projects Not Applicable

18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable

20. If no, reason Not Applicable

21. Whether the proposal involves approval/clearance under: If yes, detail of the same and their status to be given (a) The Forests (Conservation) Act, a) Since no land protected under The Forests 1980? (Conservation) Act, 1980 is involved in the project. (b) The Wild Life (Protection) Act, b) No protected area under Wild Life (Protection)

Consultant-Ascenso Enviro Pvt. Ltd. Page 2 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

1972? Act, 1972 is available within 15 Km Radius, hence not applicable. (c) The C.R.Z. Notification, 1990? The C.R.Z. Notification, 1990 is not applicable as no coastal zone is coming within 10 km of the project site. 22. Whether there is any Government Not Applicable order/policy relevant/relating to the site? 23. Forests Land Involved (Hectares) No Forest Land is involved and no tree cutting will be done during the construction phase and same will be followed during operational phase of the project. 24. Whether there is any litigation pending No litigation is pending against the project and/or against the project and/or land in which land in which the project is proposed. the project is proposed to be setup? (a) Name of the Court Not Applicable. (b) Case NO. (c) Orders/ directions of the Court, if any and its relevance with the proposed project.

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 1.1 Permanent or temporary change Yes M/s Winsome Infrastructure has proposed in land use, land cover or to construct Residential Building topography including increase in “Winsome Empire” at Plot No. – 531, 613 intensity of land use (with & 614, Mauza- Sikandarpur, Thana- respect to local land use plan) Danapur, District Patna of Bihar state. Copy of Jamabandi and Khatiyan are attached as Annexure-I.

The land cover of project site is a fallow crop land and depicts plain topography (relative relief is less than 5m) the

Consultant-Ascenso Enviro Pvt. Ltd. Page 3 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

construction activities of the project will be per the Bihar building bye laws and will help in increasing the aesthetic beauty.

As the project site was a vacant land, no Clearance of existing land, 1.2 No clearance of existing land, vegetation and vegetation and building? building has been done. The land has been designated for the development of Residential Building and will be developed as per Bye laws of 1.3 Creation of new land uses? Yes Bihar. Therefore, there will be no change in land use. There will be no creation of new land uses on the total land area measuring 7,516.32 sq.m.

1.4 Pre-construction investigations Yes Geo-Technical investigation will be e.g. bore houses, soil testing? carried out before the construction of the project. 1.5 Construction Work? Yes The construction in the proposed project involves the development of dwelling units, Commercial shops, having the built up area of 24,121 m2. Construction work is being done as per Building Bye laws of Bihar. No Construction work has been started yet. The site photographs are attached as Annexure-VII. 1.6 Demolition works? No Not Required

1.7 Temporary sites used for Yes Site office and labour sheds along with construction works or housing of basic needs will be provided to construction workers? construction labour during construction phase. All the construction activities including storage of raw materials will be confined to the project site only. 1.8 Above ground building, Yes As there will be no basement so structures or earthwork including excavation will not be carried out for linear structures, cut and fill or foundation of buildings. excavations

Consultant-Ascenso Enviro Pvt. Ltd. Page 4 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

1.9 Underground works including No As this is the Group Housing project, no mining or tunnelling? mining or tunnelling would be required. 1.10 Reclamation works? No No reclamation work required. 1.11 Dredging? No No dredging required. 1.12 Offshore structures? No No offshore structures required. 1.13 Production and manufacturing No As it is a Group Housing project, so these processes? activities are not associated with the project. 1.14 Facilities for storage of goods or Yes During construction stage, the following materials? raw material handling methods are be ing adopted: • Cement will separately stored under cover in bales • Sand & aggregates will be stacked neatly under tarpaulin cover • Bricks and steel will be laid in open • Finishing materials like tiles, sanitary fixtures, etc are will stored in closed rooms. Material storage yard will be developed for storage of construction materials. 1.15 Facilities for treatment or Yes 1.) Details regarding the Disposal and disposal of solid waste or liquid treatment of Solid waste: effluents ? i) Solid Waste generated during construction phase: Details of Construction waste is given below: 1. Soil, Sand and Gravel 2. Brick and Masonry 3. Concrete 4. Metal 5. Bitumen 6. Wood 7. Other (Glass, Plastic material, paper etc.) Reuse: The construction waste will be used in back filling, road making and pavement. Metals, tin cans, glass are being sold to

Consultant-Ascenso Enviro Pvt. Ltd. Page 5 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

local recyclers/kabadiwalas.

ii) Solid Waste generated during operational phase: Total quantity of the municipal solid waste during the operational phase will be around 518.25 kg/day. Sludge generation will be 95 kg/day. The municipal solid waste will comprise of biodegradable fraction, non-biodegradable fraction and inert fraction. Disposal: The biodegradable waste will be collected in green coloured bins/containers and will be segregated in collection chamber and will be disposed to MSW site. Non bio- degradable waste will be collected into blue bins/containers and will be segregated in collection chambers and sold to kabadiwala or govt. approved agency or recycling industry. Inert waste will be separately collected and stored in black containers and will be handed over to municipal authority. Sludge will be used for horticulture purposes. Segregation, Collection at site and disposal will be done as per Solid Wastes Management Rules, 2016.

2.)Details regarding the Disposal and treatment of Liquid Effluent: i) During the construction phase, approx. 4-5 KLD sewage is being generated and it is being disposed through Soak pit / septic tank. ii) During the operational phase, sewage generated will be 131 KLD and it will be treated in the STP installed of 157 KLD capacity of FAB technology. The treated water will be recycled and reused for flushing, DG Cooling and horticulture

Consultant-Ascenso Enviro Pvt. Ltd. Page 6 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

purposes and the remaining excess treated water will be discharged to sewer.

1.16 Facilities for long term housing There will be no facility for long term Yes of operational workers? housing for operational workers. 1.17 New road, rail or sea traffic Poita- Bhaura- Kapasia road will be used during construction or in construction stage at the site for operation? construction work and transport of No construction materials. During operational phase, traffic will increase to some extent. But there will be no rail or sea traffic. 1.18 New road, rail, air waterborne or Existing transportation routes are being other transport infrastructure used for transportation: including new or altered routes Transportation sources exiting near the and stations, ports, airports etc? project site:- Nearest railway station is Patliputra Junction Railway Station at an aerial No distance of 774.65 m towards South. Nearest Airport is Jai Prakash Narayan International Airport at an aerial distance of 4.31 km towards SSE.

FCI- Store Road is at an aerial distance of 344.61 m towards West direction. 1.19 Closure or diversion of existing No The project is not affecting the existing transport routes or infrastructure traffic status during the construction phase leading to changes in traffic and the same will continue during the movements? operational phase. 1.20 New or diverted transmission No No new or diversion of transmission lines lines or pipelines? or pipelines will be done. 1.21 Impoundment, damming, No No impoundment, damming, culverting, culverting, realignment or other realignment or other changes to the changes to the hydrology of hydrology of surface watercourses is watercourses or aquifers? proposed. 1.22 Stream crossings? No No stream is crossing in the project site. 1.23 Abstraction or transfers of water No No ground water is being abstracted for from ground or surface waters? any purpose during the construction phase water supply is being met through private water tankers and Water requirement during the operational phase will be met from bore well after the permission from Consultant-Ascenso Enviro Pvt. Ltd. Page 7 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

Minor Water Resources Department, Govt. of Bihar.

1.24 Changes in water bodies or the No Beli Road Canal at distance of approx. land surface affecting drainage 300 m from project site in direction of or run-off? East. Son River is 2 km towards North direction. Ganga River is located at the distance of 2.30 Km towards North Direction. Patna Canal is located at distance of 2.38 Km towards SSW. The waste water generated will be treated in the STP and the treated water will be used for flushing and landscaping. Hence, it is expected that drainage or run off will not be affected and change in water body or the land surface will not occur. 1.25 Transport of Personnel or Yes There is transport of construction materials for construction, materials by trucks or trolleys etc. operation or decommissioning? Precautions will be taken to reduce the impact of the vehicular movement by trying to avoid the vehicular trips during peak hours. 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Construction phase: either temporarily or Workers from nearby area have been permanently? hired in the construction phase. (Temporarily). Operation Phase: Persons in Residential complex. Visitors will be on the temporary basis. 1.29 Introduction of alien species? No Native/Local species will be planted. Loss of native species or genetic 1.30 No No diversity? 1.31 Any other actions? No No

Consultant-Ascenso Enviro Pvt. Ltd. Page 8 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S. No. Information/ Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible with source of information data) 2.1. Land especially Yes The land will be developed as per the undeveloped/agricultural Building Byelaws of Bihar. The copy of Jamabandi and Khatiyan are attached as Annexure- I.

2.2. Water (expected source & Yes The total water requirement for the competing users) Unit: KLD proposed project has been estimated to be 255 KLD. Fresh Water Supply: 106 KLD Flushing: 46 KLD Horticulture: 3 KLD DG Sets: 1 KLD Fire Fighting: 100 KLD (one time requirement) Water requirement during the operational phase will be met from bore well after the permission from Minor Water Resources Department, Govt. of Bihar. 2.3. Minerals (MT) No Not Applicable

2.4. Construction material – stone, Yes List of building materials being used at aggregates, sand/soil ( expected site: source – MT) 1. Coarse sand 2. Fine sand 3. Stone aggregate 4. Stone for masonry work 5. Cement 6. Reinforcement steel 7. Plywood & steel shuttering 8. Pipe scaffolding (cup lock system) 9. Bricks 10. Marble 11. P.V.C. conduit 12. MCBs/DBs

Consultant-Ascenso Enviro Pvt. Ltd. Page 9 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

13. PVC overhead water tanks 14. Pave tiles 15. GI pipe 16. Wastewater lines 17. S.W. sewer line up to main sewer 18. PVC rain water down take 19. Stainless steel sink in kitchen 20. Insulated glass on external facade with ACP 21. Joinery hardware 2.5. Forests and timber (source – Yes Minimum wood will be used in the MT) project, mainly would be used for doors in the project. Aluminium frames will be used at most of the places. 2.6. Energy including electricity and Yes Electricity Source: fuels (source, competing users) Total Connected Load is around 1110 Unit: fuel (MT), energy (MW) KW. Considering the overall operational diversity at 50%, and considering achieving 0.9 Power Factor, the demand load estimated to be 595 KW or 662 KVA and will be supplied by Bihar State Power Distribution Corporation Limited. Backup power source: In case of power failure, 2 DG sets of total capacity of 100 KVA (1*30+ 1*70 KVA) will be provided as power back-up DG sets will be installed with suitable stack height as per CPCB guidelines and will be enclosed by acoustic enclosure. 2.7. Any other natural resources (use No Not Applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. Information/Checklist Yes/No Details there of (with approximate No. Confirmation quantities/rates, wherever possible) with source of information data

3.1 Use of substances or materials, No There will be no use of the substances or which are hazardous (as per material which are hazardous, as per Consultant-Ascenso Enviro Pvt. Ltd. Page 10 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

MSIHC rules) to human health or Manufacture Storage and Import of the environment (flora, fauna, and Hazardous Chemicals Rules, 1989 and its water supplies) amendments 2008. 3.2 Changes in occurrence of disease of No The solid waste generated both during disease or affect disease vectors construction phase will be properly (e.g. insect or water borne diseases) managed and disposed off during the construction phase and the same will be followed during the operation phase. The sewage generated from the project will be treated in a STP. The cleanliness of the project shall be maintained. Hence, it is expected that there shall be reduction in vectors as well as vector borne diseases. 3.3 Affect the welfare of people e.g. by Yes Due to the proposed project Socio- changing living conditions? Economic condition due to increased employment opportunities provided by the project and aesthetic beauty of the area will improve due to the development of the landscape. The project shall not have any adverse effect on the living condition of the people. 3.4 Vulnerable groups of people who No The project shall not affect any vulnerable could be affected by the project e.g. groups of people in the vicinity. hospital patients, children, the elderly etc., 3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or operation or decommissioning (MT/month)

S. No. Information/Checklist Yes/No Details thereof (With approximate confirmation quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No As this is the proposed Medical college & Hospital project, so no mine spoil and overburden waste will be generated 4.2 Municipal wastes (domestic and or Yes Total waste generated from the project commercial wastes) will be 518.25 kg/day. 4.3 Hazardous wastes (as per Yes Used oil from the DG Sets as per the Hazardous Waste Management Category 5.1, of Schedule-1 of the Rules) Hazardous And Other Wastes,

Consultant-Ascenso Enviro Pvt. Ltd. Page 11 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

(Management & Transboundary Movement) Rules, 2016. Suitable management practice will be adopted for the same. It will be stored in HDPE drums and kept in covered rooms, under lock and key and will be sold to SPCB authorized vendor’s only. Specialized care will be taken to prevent leaks and/or spills 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge Yes The sludge generated from STP is 95 kg from effluent treatment of sludge (wet basis) and it will be dried and used for horticulture purposes. 4.7 Construction or demolition wastes Yes Details of Construction waste is given below: 1. Soil, Sand and Gravel 2.Brick and Masonry 3. Concrete 4. Metal 5. Bitumen 6.Wood 7. Other (Glass, Plastic material, paper etc.) Construction waste shall be used for back filling, road making and pavements. No demolition activities will be required. 4.8 Redundant machinery or equipment No Not Applicable 4.9 Contaminated soils or other No Not Applicable materials 4.10 Agricultural wastes No Negligible waste will be generated from landscape, which will be the bio- degradable waste. 4.11 Other solid wastes Yes Not Applicable 5. Release of pollutant or any hazardous, toxic or noxious substances to air (kg/hr) S. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes The operation of proposed project does fossil fuels from stationary or not envisage any major air pollutant generating sources except DG sets and Consultant-Ascenso Enviro Pvt. Ltd. Page 12 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

mobile sources vehicular movement. Proper mitigation measures will be adopted for the same. There will be provision of acoustic enclosures as well as adequate stack height and DG sets will be maintained as per CPCB norms. 5.2 Emissions from production No Not applicable as it is Group Housing processes Project. 5.3 Emissions from materials handling Yes Fugitive emissions are envisaged only including storage or transport from material handling and transporting areas, loading/unloading the construction material, transportation and earthwork (levelling etc.) during the construction period. Regular sprinkling of water in the construction area is being done. 5.4 Emissions from construction Yes As most of the construction equipment are activities including construction mobile, the emissions are fugitive in materials, sewage and waste nature. The dust generated is also fugitive in nature, which is being controlled by suitable mitigation measures like sprinkling of water. Sewage generated from labours shed and it is being disposed off by Soak pit /septic tank. The impacts are localized in nature and the areas outside the project boundary are not having any adverse impact with respect to ambient air quality. 5.5 Dust of odours from handling of Yes Dust will be generated during the materials including construction construction phase, water sprinkling and materials, sewage and waste tarpaulin is being provided over stored raw material to reduce dust emission. 5.6 Emissions from incineration of No Not Applicable waste 5.7 Emissions from burning of waste in No Burning of waste will not be done and the open air (e.g. slash materials, waste generated shall be managed as per construction debris) the Solid Waste Management Rules 2016. Construction debris will be used in internal road construction. 5.8 Emissions from any other sources No Not Applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Consultant-Ascenso Enviro Pvt. Ltd. Page 13 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

S. No Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data

6.1 From operation of equipment e.g. Yes During construction the machinery engines, ventilation plant, crushers used for construction will be of highest standard of reputed make and are adhering to international standard. These standards itself take care of noise pollution control/ vibration control and air emission control. Hence insignificant impacts due to construction machinery are envisaged. Apart for this the construction activities will be restricted to day time only. Moderate noise will be generated from Construction Machineries such as Concrete mixer with hopper, JCB/Pockline, Road roller. To avoid this, ear muffs have been provided to the construction worker 6.2 From industrial or similar No Not Applicable processes 6.3 From construction or demolition Yes Moderate noise during construction 6.4 From blasting or piling No No blasting or mechanized piling is being done in the construction phase. 6.5 From construction or operational Yes Noise generated due to traffic traffic movement will be further minimized by plantation on the sides of internal roads, on the open spaces inside the and around the periphery. Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns. 6.6 From lighting or cooling systems No Not Applicable 6.7 From Any other sources No Not Applicable 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data. 7.1 From handling, storage, use or Yes The used oil from DG sets will be spillage of hazardous materials carefully stored in HDPE drums at Consultant-Ascenso Enviro Pvt. Ltd. Page 14 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

isolated storage, and periodically sold to authorized recyclers. All precautions will be taken to avoid spillage from storage as per The Hazardous And Other Wastes (Management and Trans- boundary Movement) Rules, 2016. 7.2 From discharge of sewage or other No Treated sewage from STP will be effluents to water or the land reused for flushing; landscaping and (expected mode and place of DG Cooling and excess treated water discharge) will be discharged into sewer after complying with the standards prescribed by CPCB with permission from authority. 7.3 By deposition of pollutants No Not Applicable emitted to air into the land or into water 7.4 From any other sources No Not Applicable

7.5 Is there a risk of long term build No There is no such risk. up of pollutants in the environment form these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires etc No This is basically a construction project from storage, handling, use or and does not involve major hazardous production of hazardous substances construction activity. Hence, chances of explosions, spillages, fires are minimal.

During construction, all the labourers will be provided with suitable personal protective equipment (PPE) as required under the health and safety norms. Training and awareness about the safety norms will be provided to all supervisors and labourers involved in construction activity.

An agreement will be signed with the contractor, which will clearly deal with Consultant-Ascenso Enviro Pvt. Ltd. Page 15 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

the safety aspects during construction.

No major hazardous waste shall be stored within the project site. No chemical industry or process activity is involved in this project, hence no chemical hazard and accidents due to the envisaged. 8.2 From any other causes No Not Applicable. 8.3 Could the project be affected by Yes The project falls under seismic active natural disasters causing Zone IV indicating High damage risk environmental damage (e.g. floods, zone, according to the Indian Standard earthquakes, landslides, cloudburst Seismic Zoning Map. There are chances etc)? of floods and soil erosion.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 9.1 Lead to development of Yes Appropriate infrastructure like roads, supporting facilities, ancillary power supply, waste management and development or development waste water treatment will be developed stimulated by the project which within the project site. Development of could have impact on the the area will be as per the Bihar building environment e.g.: bye laws. There will be a cumulative • Supporting infrastructure positive impact on the environment in (roads, power supply, waste or terms of better infrastructure. waste water treatment, etc.)

• Housing development Yes Dwelling units • Extractive industries No Not Applicable • Supply industries No Not Applicable • Other No Not Applicable 9.2 Lead to after-use of the site, No Not Applicable which could have an impact on the environment 9.3 Set a precedent for later Yes Infrastructure development of area. development Socio Economic condition will improve. 9.4 Have cumulative effects due to No As it is planned development by the Consultant-Ascenso Enviro Pvt. Ltd. Page 16 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

proximity to other existing or authorities, hence no adverse impacts are planned projects with similar envisaged; however cumulative effects effects will be more health security to society.

(III) Environment Sensitivity Aerial distance (within 15km) S. No. Area Name/ Identity Proposed project location boundary 1. Areas protected under None No area of environmental international conventions, sensitivity of flora and fauna is national or local legislation for nearby the project area. their ecological, landscape, cultural or other related value 2. Areas which are important or Beli Road Canal Approx. 300 m towards East sensitive for ecological reasons Son River 2 km towards North –Wetlands, watercourses or Ganga River 2.30 km towards North 2.38 km towards SSW other water bodies, coastal Patna Canal zone, biospheres, mountains, forests 3. Area used by protected, None No area of environmental important or sensitive species of sensitivity of flora and fauna is flora or fauna for breeding, nearby the project area. nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or Beli Road Canal Approx. 300 m towards East underground waters Son River 2 km towards North Ganga River 2.30 km towards North 2.38 km towards SSW Patna Canal

The ground water table ranges Ground Water Depth from 1.57 -2.97 (mbgl) during pre-monsoon and post monsoon source: : Ground Water Information System, Ministry of Ground Water Resources, Govt. of (Year 2013) 5. State, National boundaries None Not Applicable 6. Routers or facilities used by the None Not Applicable public for access to recreation or other tourist, pilgrim areas 7. Defence installations None No defence installation is

Consultant-Ascenso Enviro Pvt. Ltd. Page 17 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

coming within 15 km radius of project site 8. Densely populated or built-up Danapur 2.03 km towards South West area Takiapar 1.83 km towards North Jamsaut 4.30 km towards South West Jagat Vihar Colony 868.91 m towards ENE Patliputra Colony 3.85 km towards East Vivek Vihar Colony 723.43 m towards SSW Gandhi Nagar 690.14 m towards SSE 9. Areas occupied by sensitive List of Schools: man-made land uses (hospitals, • Don Bosco 1.76 km towards North East schools, places of worship, Academy community facilities) • Radiant 3.95 km towards SSW International School • New Govt. 3.44 km towards East Polytechnic

List of Hospitals:

• Patna IVF & 3.79 km towards North East Endosurgery centre • Chand Memorial 3.55 km towards East Hospital

List of Temples: • ISKON Temple 6.85 km towards South East • Mahavir Mandir 7.41 km towards SSE 10. Areas containing important, Beli Road Canal Approx. 300 m towards East high quality or scarce resources Son River 2 km towards North (ground water resources, Ganga River 2.30 km towards North surface resources, forestry, Patna Canal 2.38 km towards SSW agriculture, fisheries, tourism, minerals) Ground Water Depth The ground water table ranges from 1.57 -2.97 (mbgl) during pre-monsoon and post monsoon source: : Ground Water Information System, Ministry of Ground Water Resources, Govt. of India (Year 2013)

Consultant-Ascenso Enviro Pvt. Ltd. Page 18 of 19

Proposed Residential Building “Winsome Empire” at Plot No.-531 & 613 and 614, Mauza- Sikandarpur, Thana- Danapur, District- Patna, Bihar by M/s Winsome Infrastructure.

11. Areas already subjected to No area subjected to pollution pollution or environmental or environmental damage is damage. (those where existing None coming within 15 Km radius of legal environmental standards project site. are exceeded)

12. Areas susceptible to natural Yes Area is susceptible to hazard which could cause the Earthquake. Project area falls in project to present environmental Zone-IV as High Damage Risk problems (earthquakes, Zone. subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

(IV) Proposed Terms of Reference for EIA studies – Not Applicable