“ASHIYANA GREEN (PHASE-2)” Residential Building Project Located at - Road at Mauza Mainpur Shankar Tehsil- Phulwari

PROJECT BRIEF

S.No Item Details 1. Project title, location “Ashiyana Green City (Phase-2)” Developed by M/s Ashiyana Creators Pvt. Ltd. (plot no/village/tehsil/district) The project site is located near Saguna More, Danapur – Khagaul Road at Mauza - Mainpur Shankar, Tehsil -Phulwari, Survey Thana- Danapur, Thana – Khagaul, Thana No. 24, Khata No. 104, 134, 35, 232 Plot No. 408, 429, 431, 433, 426, 427, 406, Dist. Patna, 2. Salient feature of the project  Land use pattern/total plot area /built up Land Use pattern- area Residential Area Master Plan- 2031. Total Plot Area- 12787.79 sq.mt. Total Build-up area - 61186.14 Sq. M. Total water requirement during  Total water requirement and its source Operation Phase will be 450 KLD in which fresh water will be 241 KLD. Source of water: Groundwater

 Waste water generation, treatment and 317 KLD sewage shall be generated disposal which will be treated through STP of capacity 350 KLD. The treated water

Page 1 of 3

from the STP of quantity 124 KLD will be reused for Flushing, Green areas, car washing and fire water tanks. Rest treated water (upto secondary Treatment) 76 KLD will be discharge to municipal sewer line.

 Municipal solid waste generated disposal The quantity of municipal solid waste facility generated from the proposed residential apartment is estimated to be 1027 Kg/day.  Greenbelt Development An area of 2590.78 Sq. M. (20.26%) area will be developed and maintained for greenbelt.

 Power requirement and source The source of energy for the proposed project will be from SBPDCL Total Electricity demand 8755.12

KW, Backup power supply-– 2 Nos. of DG Sets (500 KVA and 250 KVA will be installed.)  Proposed energy saving practices 10-20%  RWH 4 nos. of rain water harvesting pits have been proposed for augmentation of ground water. The rainwater collected from the rooftop will be conveyed into the rainwater harvesting system consisting of desilting-cum-filter chamber and bore wells for recharge into the

Page 2 of 3

groundwater. RWH will be done only for the roof top.  Car parking 13733.27 Sq. M. area is allocated for total Parking area. In which 13583.69 Sq. M. area has been provided as a Covered Parking (6566.93 Sq. M. in Lower

Basement floor, 3724.82 Sq. M. in

Basement floor and 3291.94 Sq. M. in

Ground Floor) & 149.58 Sq. M. is Open

Parking Space with Multilevel Parking Facility. Parking provisions has been made as per Modified Building By-laws, Bihar.  Benefits of the project The main purpose and benefit of the

project are as under:

 Increase the infrastructure of the area & will provide better living environment and will increase the livelihood of the people.  The benefits relate to the direct employment associated during the construction of the infrastructure  Additional employment

opportunities will lead to a rise in the income and improve their standard of living. The proposed facility would also generate jobs for the labour during construction phase as well as during operation phase.

 Employment potential 50 persons  Investment/ cost of the project Rs. 125 Crores

Page 3 of 3