City of Memphis Master Plan Black Drainage Study October 2015 Meeng Agenda

• Introducon of the Team Members

• City of Memphis Drainage Master Plan Program Objecves

• What is Included in the Black Bayou Drainage Study

• Breakout Into Work Groups

• Wrap Up

2 City of Memphis Drainage Master Plan

• A City-Wide Review of the Storm System

• Idenfy Areas that are Prone to Flooding

• Idenfy the Cause of the Flooding

• Develop Public Improvement Projects that Limit Future Flooding

3 4 5 Black Bayou Area

The Approximate Drainage Basin Limits are:

Just West of Highland and Presco Streets

I-240 Along the South

Poplar Avenue to the North

East of Goodle Street and Getwell

6 Black Bayou Drainage Basin Study Objecves

• Develop a Storm Water Computer Model of the Black Bayou Drainage Basin

• Idenfy Issues in the System that Could Cause Flooding

• Develop Potenal Public Improvement Concepts that Will Limit Potenal Future Flooding

7 8 Black Bayou

9 Public Involvement

• If You Have Noced Blocked Storm Water Inlets or Pipes

• If You Have Noced Debris in the Black Bayou Channel

10 Public Involvement (cont.)

• If You Have Experienced Flooding in Your Yard , House, and/or Business

• If You Have Noced Streets Flooding

11 Black Bayou Basin Study Work Groups

Breakout Work Session

12 Black Bayou Basin Study Addional Feedback

Contact Joe Lawson (BWSC) at:

Phone Number: 901-755-7166

Email: [email protected]

13 Black Bayou Basin Study

Thank You!! Any More Quesons?

14 Black Bayou Drainage Basin Master Plan Study Thank you!