Western Select Products Pty Ltd (In Liquidation)

Total Page:16

File Type:pdf, Size:1020Kb

Western Select Products Pty Ltd (In Liquidation) Western Select Products Pty Ltd (In Liquidation) ACN 109 030 846 List of Creditors of the Company to Accompany Statement of Affairs Pursuant to Section 497(1)(a)(ii) List of creditors Creditor is a related party of the company Estimated amount of Creditor Name Creditor address in liquidation (Yes/No) creditor's claim ($) Abrasiflex P/L 260 Welshpool Road, Welshpool WA 6106 No 991.55 Air Liquide Australia LTD PO Box 1226, Booragoon WA 6954 No 64.62 Aldi Stores Locked Bag 1, Canningvale DC WA 6970 No 140.01 All Tool Sharpening Service Unit 17/30 Peel Road, Malaga WA 6090 No 675.15 Altitude Paint Supplies PO Box 3586, Success WA 6964 No 326.70 Amanda Energy Solutions Unit 11/100 Stirling Highway North Fremantle WA 6911 No 1,109.75 ANZ 833 Collins Street, Docklands VIC 3008 No 65,669.08 Arena Wood Machining and Joinery PO Box 5274, Falcon WA 6210 No 412.50 ATO GPO Box 9990, Sydney NSW 2001 No 94,816.00 Biemels 5/2 Witternberg Drive, Canningvale WA 6155 No 880.60 Bunnings Level 3, 25 Rowe Avenue, Rivervale WA 6103 No 80.36 Castella 26 Station Street, Moonah TAS 7009 No 685.75 Cooling Brothers Glass Company 961 Abernethy Road, High Wycombe WA 6017 No 1,116.31 Department of Transport PO Box R1290, Perth WA 6844 No 463.05 Esi Tech Services 1/13 Blackly Row, Cockburn Central WA 6164 No 8,818.71 Eurostyle 12/40 Port Pirie Street, Bibra Lake 6163 No 43.45 FIFO Capital Level 16, 390 St Kilda Road, Melbourne VIC 3004 No 14,980.00 Frichot & Frichot 6 Norfolk Street, Fremantle WA 6959 No 3,825.00 Government of WA TAFE Locked Bag 6, Northbridge WA 6865 No 820.00 Hafele PO Box 1066, Dandenong VIC 3175 No 466.10 Homag Australia 9 Ormsby Place, Wetherill Park NSW 2164 No 787.93 Initial 4 Aitken Way, Kewdale WA 6105 No 343.75 Instant Waste Management PO Box 419, Morley WA 6943 No 330.00 IQC Italian Quality Coatins 2 Marion Street, Coburg North VIC 3058 No 8,448.83 Lincoln Sentry 121 Beringarra Avenue, Malaga WA 6090 No 5,314.31 MG Creations 33 Discovery Drive, Bibra Lake WA 6163 No 45,202.84 Microvellum Pty Ltd Ophelia Court, Sunnybank QLD 4109 No 3,426.72 Optus 43 Great Eastern Highway, Rivervale WA 6103 No 228.00 Porter Commercial House PO Box 89, Victoria Park WA 6979 No 509.79 PowerPak Packaging PO Box 690, Bentley WA 6982 No 521.16 Prospera Partners Unit B9, 431 Roberts Road, Subiaco WA 6008 No 5,830.00 Rag Sales Unit 3/85 Kew Street, Welshpool WA 6106 No 72.67 Robayne 119 Ewing Street, Welshpool WA 6106 No 8,317.51 Rubio Monocoat Australia Pty Ltd PO Box 5057, Burnley VIC 3121 No 10,314.09 S & S Industries 25 Rothschild Place, Midvale WA 6056 No 50.79 Sage Doors Ltd 2 Tait Place, Albany, Auckland 0632, New Zealand No 2,050.00 SEEK Limited Level 6, 541 St Kidla Road, Melbourne VIC 3004 No 0.82 Shacks Holden 64 Queen Victoria Street, Fremantle WA 6160 No 284.90 Sico Inc. 3 Blade Close, Berkeley Vale NSW 2261 No 114,189.46 Surteco Australia Pty Ltd 7/11 Penelope Crescent, Arndell Park NSW 2148 No 407.36 The Laminex Group Corner Orrong Road and Pilbara Street, Welshpool WA 6106 No 9,778.55 TMS Suite 701, Level 7 225 Clarence St, Sydney NSW 2000 No 77.00 Tony Reppucci Unknown No 3,950.00 Westcoast Panels and Veneers PO Box 235, Cannington WA 6987 No 22,059.59 Western Supply 19 Love Street, Cloverdale WA 6105 No 993.31 Westpac Equipment Finance 275 Kent Street, Sydney NSW 2000 No 200,474.24 Westpac Overdraft 275 Kent Street, Sydney NSW 2000 No 115,389.00 Wilson & Bradley Pty Ltd 43 Prosperity Avenue, Wangara WA 6065 No 1,528.42 Woodos Australia Pty Ltd 7/37 O'Riordan Street, Alexandria NSW 2015 No 85.18 Worldwide Timber Traders Pty Ltd 179-193 Barrington Street, Bibra Lake WA 6163 No 3,903.13 Total 761,254.04 Employee Claims (per the Director's ROCAP) Estimated Long Service Retrenchment Superannuation Employee Unpaid Wages ($) Annual Leave ($) Leave ($) Payments ($) ($) Entitlements ($) 11,731 6,801 3,957 Unknown 61,938 84,427 .
Recommended publications
  • Risky Roads Survey Results 2014 Metropolitan Local Government Areas: Risky Roads Survey Results 2014 2014
    Metropolitan Regional Local Government Areas: Risky Roads Survey Local Results 2014 Government Areas 2014 Risky Roads Survey Results 2014 Metropolitan Local Government Areas: Risky Roads Survey Results 2014 2014 in those areas. Alarmingly in regions like the Wheatbelt two out of three road deaths were local Executive Summary residents on local roads. While we can all do our part to improve the attitudes of drivers we must also work towards The RAC represents over 800,000 Western Australian members and advocates on their behalf on improving the road environment to meet the needs of road users now and into the future. matters including affordable motoring, environmental sustainability, public transport and safe road The results from the Risky Roads campaign are publicly available at www.rac.com.au/riskyroads use. The RAC represents all road users on the WA Road Safety Council and has strong alliances with local government, Main Roads WA (MRWA) and community road safety organisations. Having a safe road environment is important for all road users because the right infrastructure can be the difference between a fatal crash and a minor collision. Last year on average one person died on WA roads nearly every two days. The RAC’s Risky Roads campaign is WA’s biggest public infrastructure survey and is undertaken to provide a snapshot of community perceptions, insight for road authorities and assist in identifying trends in traffic flow, infrastructure and safety. The 2014 campaign ran during April and May, providing Western Australians’ the opportunity to express their views and nominate sub-standard roads and intersections throughout the state.
    [Show full text]
  • Mr Dean Nalder GATEWAY WA PROJECT G
    Extract from Hansard [ASSEMBLY — Thursday, 16 June 2016] p3582b-3583a Mrs Glenys Godfrey; Mr Dean Nalder GATEWAY WA PROJECT — TRAFFIC NOISE Grievance MRS G.J. GODFREY (Belmont) [9.29 am]: My grievance this morning is to the Minister for Transport. Gateway WA was designed to cater for an expected doubling by 2030 of both passenger air travel and freight and container transport in the Kewdale area. The project also helped by addressing some of the state’s most accident-prone intersections. The Gateway WA project began in 2013 and was funded with $676 million in federal government funds and $310 million from the state government. The Gateway WA project is to date the largest road project undertaken by Main Roads and I was pleased to attend the official opening in April this year along with the Prime Minister, Hon Malcom Turnbull, MP; the federal Minister for Infrastructure and Transport, Hon Darren Chester, MP; the state Minister for Transport, Hon Dean Nalder, MLA; and the federal member for Swan, Steve Irons, MP. The Gateway project has produced some impressive statistics—165 lane kilometres of road constructed, 460 000 tonnes of asphalt laid, 21 kilometres of principal shared path built for cyclists and pedestrians, the planting of over one million plants, approximately 1 000 people working on the project at its peak, 11 bridges built, four new interchanges constructed, seven intersection upgrades, the widening of Tonkin Highway to six lanes between Great Eastern Highway and Roe Highway, and the upgrade of Leach Highway to an expressway standard from Orrong Road to Perth Airport.
    [Show full text]
  • Fremantle Inner Harbour Container Movement Study
    Fremantle Inner Harbour Container Movement Study Department for Planning and Infrastructure Fremantle Ports Main Roads Western Australia Sea Freight Council of Western Australia March 2004 Fremantle Inner Harbour Container Movement Study March 2004 Department for Planning and Infrastructure Fremantle Ports Main Roads Western Australia Sea Freight Council of Western Australia Sinclair Knight Merz ABN 37 001 024 095 590 Orrong Road, Armadale 3143 PO Box 2500 Malvern VIC 3144 Australia Tel: +61 3 9248 3100 Fax: +61 3 9248 3631 Web: www.skmconsulting.com COPYRIGHT: The concepts and information contained in this document are the property of Sinclair Knight Merz Pty Ltd. Use or copying of this document in whole or in part without the written permission of Sinclair Knight Merz constitutes an infringement of copyright. Contents 1. Introduction 1 1.1 Context 1 1.2 Background 1 1.3 This report 1 1.4 Acknowledgments 2 2. Executive Summary 3 3. Objectives 6 3.1 Specific objectives 7 3.2 Data targeted 8 4. Approach adopted 9 4.1 Qualitative discussions 9 4.2 Quantitative survey 10 4.2.1 Approach 10 4.2.2 Data capture rates 12 4.2.3 Assessment of survey completeness 13 4.2.4 Data cleansing 17 4.2.5 Annualising findings 18 4.2.6 Sensitivity analyses – road rail market share 22 4.3 Ultimate journey origins and destinations 23 4.4 Video Survey 24 5. Analyses and Discussion 28 5.1 Total land transport task for Fremantle Inner Harbour containers 29 5.2 Movements to and from stevedores 36 5.3 Import related container movements 37 5.4 Export related container moves 39 5.5 Empty container moves 40 5.6 Assessment of port zones 43 6.
    [Show full text]
  • Western Australia the P11arijaceutical Register Western Australia
    [5371 OF WESTERN AUSTRALIA (Published by Authority at 3 .30 p.m .) No, 12] PERTH : TUESDAY, 27th FEBRUARY [1979 THE P11ARIJACEUTICAL REGISTER OF WESTERN AUSTRALIA 82687/2/79 27 February, 1979 .] GOVERNMENT GAZETTE, W .A. 539 THE PHARMACEUTICAL REGISTER OF WESTERN AUSTRALIA THE subjoined Register is published in accordance with the provisions of Clause 25 of the Pharmacy Act, 1964 . E. P. WALSH, Perth, January, 1979. Registrar. Date of No. Name Address Qualification Registra- tion 1808 Abel, Clifford Robert Kalgoorlie c/c Great Brit. 6/6/78 1811 Abel, Veronica Ann Kalgoorlie .. .. .... .... c/c Great Brit. 1/8/78 1817 Abrahams, Susan Lillian 63 Harcourt Drive, Hillarys c/c N.S.W. 5/9/78 1474 Accordino, Tony Joseph .... 16A Manchester Street, Victoria Park Assoc. W.A. 1/2/72 1085 Adams, Michael Thomas 33 Wincanton Road, Karrinyup Final W.A. 4/2/64 966 Adams, Rodney John .... 7 Emberson Street, Morley Final W.A. 7/2/61 341 Adlard, Edith Emma 42 Lyons Street, Cottesloe .... Final W.A. 5/7/27 1469 Aivaliotis, Sylvia .... 51 Robinson Avenue, Perth Assoc. W.A. 10/12/71 1116 Albury, Jill Mary .... 36 Widdicombe Street, Myaree Final W.A. 14/12/64 979 Alford, Cherry 196 Stock Road, Melville ... Assoc. W.A. 10/12/71 472 Allan, Griffith David Tapley 34 Napoleon Street, Cottesloe .... .... Final W.A. 16/2/37 435 Allan, James Thomas .... 44 Gloucester Crescent, Shoalwater Bay .... Final W.A. 2/4/35 1137 Allan, Peter Griffith .... 44 Bay View Terrace, Mosman Park Final W.A. 5/3/65 1497 Allen, Barbara .
    [Show full text]
  • Metropolitan Road Fact Sheet
    1. What are Main Roads and Highways in the Perth metropolitan area? Metropolitan In the Perth metropolitan area, the following highways and main roads (whole or part) are under the care and control of Main Roads Road Fact Sheet Western Australia: Albany Highway Albany Highway – starts at Welshpool Road and finishes at Metropolitan Boundary Armadale Road Starts at Albany Highway and finishes at Kwinana Freeway Brearley Avenue Starts at Great Eastern Highway and finishes at Airport boundary Brookton Starts at Albany Highway and finishes at Highway the Metropolitan Boundary Canning Highway Starts at Causeway and finishes at Stirling Highway Causeway Cockburn Road Starts at Hampton Road and finishes at Russell Road Garratt Road Bridge Great Eastern Starts at Causeway into Johnson Street Highway right at James Street into East Street and right at Great Eastern Highway to Roe Highway intersection and then through Greenmount, Mundaring and past the Lakes Turn-off to the Metropolitan Boundary west of Linley Valley Road Great Eastern Starts at Great Eastern Highway and Highway Bypass finishes at Roe Highway Great Southern Starts at Great Eastern Highway to Highway Metropolitan Boundary approx. 2.5 km Graham Farmer Starts at Tunnel and finishes at Freeway Chamberlain Road Great Northern Starts at Roe Highway to Metropolitan Highway Boundary near parking bay 300 metres south of Brand Highway Guildford Road Starts on south side of bridge over Graham Farmer Freeway on East Parade and finishes at Johnson Street, Guildford High Street Starts at Carrington Street
    [Show full text]
  • Transport Impact Assessment State Football Centre
    Transport Impact Assessment State Football Centre Transport Impact Assessment State Football Centre CW1142300 Prepared for Carabiner 8 December 2020 8 December 2020 Cardno i Transport Impact Assessment State Football Centre Contact Information Document Information Cardno (WA) Pty Ltd Prepared for Carabiner ABN 77 009 119 000 Project Name State Football Centre 11 Harvest Terrace File Reference CW1142300-TR-R001-B- West Perth WA 6005 State_Football_Centre_TIA- Australia V3EH-JM.docx www.cardno.com Job Reference CW1142300 Phone +61 8 9273 3888 Fax +61 8 9486 8664 Date 8 December 2020 Version Number B Author(s): Edmond Hoang Effective Date 8/12/2020 Traffic Engineer Approved By: Jacob Martin Date Approved 8/12/2020 Team Leader – Transport Planning Document History Version Effective Date Description of Revision Prepared by Reviewed by A 07/12/2020 For Issue EH DH/JM B 08/12/2020 For Issue EH DH/JM © Cardno. Copyright in the whole and every part of this document belongs to Cardno and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person other than by agreement with Cardno. This document is produced by Cardno solely for the benefit and use by the client in accordance with the terms of the engagement. Cardno does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on the content of this document. Our report is based on information made available by the client.
    [Show full text]
  • Extract from Hansard [COUNCIL — Tuesday, 10 May 2016] P2484c-2485A Hon Helen Morton
    Extract from Hansard [COUNCIL — Tuesday, 10 May 2016] p2484c-2485a Hon Helen Morton GATEWAY WA PROJECT Statement HON HELEN MORTON (East Metropolitan) [9.47 pm]: I wanted to congratulate everybody involved in the very successful completion of the Perth Airport and freight access project. The project has delivered a really safe and more efficient transport network around Perth Airport and the freight and industrial areas of Kewdale and Forrestfield. The project began in 2013 and the full scope of the works was completed by the end of the first quarter of 2016. It was opened on 12 April 2016 by the Prime Minister, the state transport minister, Hon Dean Nalder, and the federal transport minister, Hon Darren Chester; many other members of Parliament were there to celebrate the very successful project. It was completed ahead of the planned consolidation of the domestic and international Perth Airport terminals, which was an important milestone for that project. The project is valued at around about $1 billion and is the largest road project undertaken to date in Perth. The federal government contributed $676 million and the state government $310 million. The Gateway WA project, as it is referred to, is a stunning success in every respect. I use that road nearly every day and marvel at how easy and safe it is, and at the pure enjoyment of travelling from Kalamunda to the city now that that project has been completed. It will be enjoyed by thousands of people for decades to come. This project is a fantastic asset for Western Australia and for all Western Australians.
    [Show full text]
  • 13.4 in Principle Support of the Orrong Road, Leach Highway to Great
    13.4 In principle support of the Orrong Road, Leach Highway to Great Eastern Highway, Expressway Concept developed by Main Roads Western Australia Location Carlisle Lathlain Welshpool Reporting officer Frank Squadrito Responsible officer John Wong Voting requirement Simple majority Attachments 1. PC A-142- Combined-plans [13.4.1 - 2 pages] 2. D 20 22958 Approval Granted - Planning Control Area - 142 Orrong Road [13.4.2 - 4 pages] 3. Main Roads Western Australia - Community feedback dated March 2020 - Orrong Road Planning Study Up [13.4.3 - 3 pages] 4. Main Roads Western Australia - Orrong Road Planning Design Concept - Revision B [13.4.4 - 1 page] 5. D 20 48721 Orrong Road Planning Study response letter from Main Roads WA dated 16 June 2020 [13.4.5 - 9 pages] 6. Orrong Road schematic diagram [13.4.6 - 1 page] Recommendation That Council provides “in principle” support for the Main Roads Western Australia Orrong Road Planning Design Concept, Revision B subject to: a) Comprehensive detailed traffic impact assessment, considering the local road impacts being submitted to the Town prior to detailed design works being initiated. b) Input and involvement by Council’s representatives on detailed design outcomes. c) Detailed design drawings impacting Council assets shall be submitted and approved by the relevant departments and to the satisfaction of the Town of Victoria Park. Purpose For Council to consider and provide “In Principle” support for the current 2020 Concept design prepared by Main Roads Western Australia for the Orrong Road Planning Study (between Great Eastern Highway and Leach Highway). Background 1. In late May 2019, the Town received formal advice that Main Roads was undertaking a planning study to identify the best solution for upgrading Orrong Road between Great Eastern Highway and Leach Highway.
    [Show full text]
  • Ordinary Council Meeting Agenda – 15 October 2019
    Ordinary Council Meeting Agenda – 15 October 2019 Please be advised that an Ordinary Council Meeting will be held at 6:30 pm on Tuesday 15 October 2019 in the Council Chambers, Administration Centre at 99 Shepperton Road, Victoria Park. Mr Anthony Vuleta – Chief Executive Officer 10 October 2019 Table of contents Item Page no 1 Declaration of opening .................................................................................................................................4 2 Announcements from the Presiding Member .....................................................................................4 3 Attendance.........................................................................................................................................................6 3.1 Apologies..................................................................................................................................................6 3.2 Approved leave of absence ...............................................................................................................6 4 Declarations of interest.................................................................................................................................7 5 Public question time.......................................................................................................................................8 5.1 Response to public questions taken on notice at the Ordinary Council Meeting held on 17 September 2019 ........................................................................................................................8
    [Show full text]
  • Traffic Signals Safety and Efficiency Project
    Project: Traffic Signals Safety and Reference: 232984 Efficiency Project Prepared for: RAC WA Revision: 2 Transport Analysis Report 9 October 2013 Contents 1. Introduction 5 1.1 Project purpose 5 1.2 Approach 5 2. Perth Context 6 2.1 Governance 6 2.2 Traffic signals system 6 3. Methodology 7 3.1 Stage One – Initial investigations 7 3.2 Stage Two – SCATS options testing 8 4. Site Overviews 9 4.1 Tonkin Highway/ Kelvin Road 9 4.2 Orrong Road 12 5. Model Build and Calibration: Existing Situation 20 5.1 Overview 20 5.2 Data sources 22 5.3 Assumptions 22 5.4 Model calibration and validation 23 6. Option Testing: Tonkin Highway/ Kelvin Road 27 6.1 Option plan 27 6.2 Option testing results 27 6.3 Summary results 29 7. Option Testing: Orrong Road 30 7.1 Option plan 30 7.2 Option testing results 30 7.3 Summary results 34 8. Key Findings and Conclusions 35 9. Recommendations 40 Appendices Appendix A Further Crash Data Project 232984 9 October 2013 Revision 2 Page 1 Appendix B Calibration Details Appendix C Modelling Delay Outputs Appendix D SCATS Counts Comparison Index of Figures Figure 4-1: Tonkin Highway/ Kelvin Road site location map 9 Figure 4-2: Tonkin Highway/ Kelvin Road site location map 9 Figure 4-3: Tonkin Highway/ Kelvin Road intersection layout 10 Figure 4-4: Orrong Road looking northwest to Oats Street 13 Figure 4-5: Orrong Road site location map 13 Figure 4-6: Orrong Road/ Francisco Street intersection layout 14 Figure 4-7: Orrong Road/ Archer Street intersection layout 14 Figure 4-8: Orrong Road/ Wright Street intersection layout
    [Show full text]
  • Agenda Briefing Forum Notes – 6 October 2020
    Agenda Briefing Forum Notes – 6 October 2020 Please be advised that an Agenda Briefing Forum was held at 6:30 pm on Tuesday 6 October 2020 in the Council Chambers, Administration Centre at 99 Shepperton Road, Victoria Park. Her Worship the Mayor Karen Vernon 8 October 2020 Table of contents Item Page no 1 About the Agenda Briefing Forum ............................................................................................................. 4 2 Opening ................................................................................................................................................................. 5 3 Acknowledgement of country ...................................................................................................................... 5 4 Announcements from the Presiding Member ...................................................................................... 5 5 Attendance ........................................................................................................................................................... 7 5.1 Apologies .................................................................................................................................................... 7 5.2 Approved leave of absence ................................................................................................................. 7 6 Declarations of interest ................................................................................................................................... 8 7 Public participation
    [Show full text]
  • Leach Highway and Welshpool Road Interchange Project
    PROJECT UPDATE OCTOBER 2020 Leach Highway and Welshpool Road Interchange Project Jointly funded by the Australian ($46.5 million) and Western Australian ($46.5 million) Governments, the $93 million Leach Highway and Welshpool Road Interchange project will improve safety and reduce congestion at this critical junction in Perth’s major transport network. About the project Key features We are planning construction of the • Construction of a new road bridge Leach Highway and Welshpool Road carrying Leach Highway over with 224 crashes recorded between 2015 interchange to significantly improve Welshpool Road and 2019, of which 204 were rear-end vehicle, cyclist and pedestrian safety at • A shared path along Leach Highway collisions. Overall, the intersection of this critical junction in Perth’s transport from Sevenoaks Street to Orrong Road Leach Highway and Welshpool Road is network. • Construction of a new road bridge currently the worst intersection in Western Australia for crashes and is ranked Perth’s The project will include building a bridge to the east side of the existing Leach second most congested intersection. taking Leach Highway over Welshpool Highway Bridge over the Armadale line Road to create a grade-separated Leach Highway is part of Perth’s Principal interchange and duplicate the existing Why is the project needed? Road Freight Network serving key Leach Highway bridge over the railway The intersection of Leach Highway and commercial activity centres such as Perth line to the south of the intersection. The Welshpool Road is one of Perth’s most Airport and the Kewdale Freight Terminal. interchange will reduce congestion and congested intersections with at least Welshpool Road is a major east-west deliver more consistent and reduced 50,000 vehicles travelling through the arterial route that runs through the journey times.
    [Show full text]