State Controlled Roads Attachment A

Total Page:16

File Type:pdf, Size:1020Kb

State Controlled Roads Attachment A STATE CONTROLLED ROADS ATTACHMENT A If the works/event are being conducted on a State Controlled Road a road permit from Ipswich City Council is only required where the works/event/or associated Traffic Management impacts on the Council road network. • Aberdare Street (Dinmore) • Limestone Street (Ipswich) (from East Street to Queen • Brisbane Road (Riverview/Dinmore/Ebbw Vale/Bundamba/ Victoria Parade) Booval/East Ipswich/Newtown/Ipswich) (from Ipswich • McEwan Street (Riverview) Motorway to East Street) • Moggill Ferry Road (Riverview) • Brisbane Road (Goodna) (from Bertha Street West to • Mount Crosby Road (Tivoli/North Tivoli/Chuwar/Karalee) Ipswich Motorway) (from Tantivy Street to ICC Boundary at Colleges Crossing) • Brisbane Road (Redbank) (from Bridge Street East to • Pine Mountain Road (Pine Mountain/Muirlea/Brassall/ Ipswich Motorway) North Ipswich) (from Downs Street to Fernvale Road) • Brisbane Valley Highway • Pine Street (Ipswich) • Centenary Highway • Queen Street (Marburg) (from the Warrego Highway to • Churchill Street (Ipswich) Rosewood Marburg Road) • Cunningham Highway • Queen Street (Walloon) • Delacy Street (North Ipswich) (from Downs Street to • Queen Victoria Parade (Ipswich) Tantivy Street) • Rosewood Laidley Road (Rosewood/Ashwell/Lanefield/ • Downs Street (North Ipswich) (from The Terrace to Pine Calvert/Grandchester) Mountain Road) • Rosewood Marburg Road (Rosewood/Tallegalla/Marburg) • East Street (Ipswich) • Rosewood Warrill View Road (Rosewood/Ebenezer/Lower • Endeavour Road (Riverview) (from Moggill Ferry Road to Mount Walker) McEwan Street) • School Street (Rosewood) • Fernvale Road (Brassall) (from Pine Mountain Road to the • Swanbank Road (Swanbank/Flinders View/Raceview) (from Warrego Highway) South Station Road to Memorial Drive) • Haigslea Amberley Road (Amberley/Walloon/Haigslea) • Symes Street (Grandchester) • Ipswich Boonah Road (Peak Crossing/Purga/Goolman) • Tantivy Street (Tivoli) (from Delacy Street to Mount Crosby • Ipswich Motorway Road) • Ipswich Rosewood Road (Amberley/Willowbank/ • The Terrace (North Ipswich) (from Pine Street to Downs Jeebropilly/Rosewood/Thagoona) Street) • John Street (Rosewood) (from Waight Street to School • Waight Street (Rosewood) Street) • Walloon Road (Rosewood) • Karrabin Rosewood Road (Karrabin/Walloon/Thagoona/ • Warrego Highway (Ipswich/Raceview/Churchill/Yamanto) Rosewood) • Warwick Road (Ipswich/Raceview/Churchill/Yamanto) • Lanefield Road (Rosewood).
Recommended publications
  • Warrego Highway, Helidon Spa TOOWOOMBA SECOND RANGE CROSSING
    Gowrie Junction Murphys Creek Mt Cranley Kynoch Ballard Charlton Harlaxton Postmans Ridge Wellcamp Withcott Helidon Spa Warrego Highway, Helidon Spa TOOWOOMBA SECOND RANGE CROSSING Athol As part of work on the Toowoomba Second Range Crossing (TSRC), an Stay in touch interchange will be constructed at the eastern entry to the TSRC on the Residents can visit the TSRC Visitor Warrego Highway at Helidon Spa. Information Centre located at the Traffic impacts project’s site office on Bedford Street, Cranley. Opening hours This involves: In early 2017, east and westbound lane are Monday to Friday, 9:00am to • constructing a bridge from the closures will commence on the Warrego 5:00pm. The centre is also open Warrego Highway at Helidon Highway for bridge construction outside these times by appointment. Spa, with two eastbound lanes (approximately 4.3km west of the Visitor Information Booths are open and two westbound lanes, Lockyer Creek Bridge at Helidon). at the Lockyer Valley Cultural Centre enabling motorists to enter and and Toowoomba City Library. These exit the TSRC Intermittent hold and release traffic displays are open as per each centre’s opening hours and will be regularly • closing the Warrego Highway control measures and temporary lane median break between Postmans updated with the latest project closures will allow for construction information. For employment and Ridge Road and Twidales Road materials to be delivered safely. at Helidon Spa (due to the safety procurement enquiries, please visit the website for further information. impacts of merging and weaving In late 2018, the Warrego Highway traffic at the Warrego Highway median break between Postmans Ridge 1800 198 878 East interchange and right-turning Road and Twidales Road at Helidon Spa [email protected] traffic at the intersection).
    [Show full text]
  • Section 3.7 – Local Area Frameworks
    Draft Ipswich Planning Scheme 2019 Statement of Proposals 3.7 Local Area Frameworks 3.7.1 Preliminary (1) The Ipswich Local Government Area has been divided into thirty local area strategic planning units based on geographically identifiable communities of interest (areas with identifiable boundaries and within which there are broad land use and planning commonalities) to which individual Local Area Frameworks apply. (2) The thirty Local Area Frameworks provide a more detailed spatial expression of the policies included in the Whole of City Strategic Framework (refer to sections 3.1 to 3.6) for each of the local area strategic planning units by: (a) including a description of the geographic extent of the strategic planning unit to which the Local Area Framework applies; (b) identifying the Valuable Features in the area that are of significance and are to be protected; (c) identifying the most significant Development Constraints that impact on development in the area and that need to be considered and addressed in allocating precincts and for development assessment; (d) setting out the Growth Management outcomes that are to be delivered in the area; (e) identifying the key Infrastructure that needs to be delivered to support growth and development in the area; (f) showing the preferred use of land in the area by including each property in a land use precinct designation; and (g) where there are different development options (including for example building heights, lot sizes, dwelling densities or different land uses) for an area or individual
    [Show full text]
  • RACQ Ipswich Motorway Policy Analysis
    Policy Analysis 9/05 Economic & Public Policy Ipswich Motorway Introduction The Ipswich Motorway is a vital link between Brisbane and Ipswich. It connects Ipswich and Granard Roads at Rocklea to the Warrego and Cunningham Highways and Brisbane Road at Dinmore. For many years, it formed part of the National Highway System (NHS), which was a Commonwealth Government funding responsibility. Since the release of the Commonwealth’s AusLink land transport policy in June 2004, the Ipswich Motorway has been part of a broader National Network. The AusLink policy decreed that the states must share costs of the National Network, particularly in urban areas. The Ipswich Motorway is one of Queensland’s most congested roads, with stop-start conditions during morning and afternoon peak periods. It also has one of the highest vehicle accident rates in Queensland. Yet, the upgrading of this hopelessly inadequate and dangerous road has been subjected to extraordinary delays because of political bickering and dithering. This document summarises the history of recent proposals to upgrade the Ipswich Motorway, analyses Commonwealth and State Government policies regarding the road, and outlines RACQ’s position. Background The Ipswich Motorway upgrade project has been dogged by delays, conflict between governments, and political manoeuvring. In the meantime, road trauma and congestion continue to worsen on this very sub-standard stretch of the National Network. The following brief chronology highlights key events in this sad, sorry saga. 1997 The Integrated Regional Transport Plan for South East Queensland, which was released in 1997, proposed commencement in 1997-98 of a major investigation in respect of an Ipswich Motorway upgrade.
    [Show full text]
  • Queensland Transport and Roads Investment Program (QTRIP) 2016
    Metropolitan Metropolitan | Map and Contact Details Brisbane office 313 Adelaide Street | Brisbane | Qld 4000 PO Box 70 | Spring Hill | Qld 4004 (07) 3066 5499 | [email protected] Divider Image: Moggill Road Cycle Bridge looking north east towards Brisbane central business district (bridge spans Moggill Road, Indooroopilly). Copyright © 2015 Department of Transport and Main Roads, the Queensland Government. Department of Transport and Main Roads Metropolitan Overview • A two-lane bus-only extension road from Warrigal Road • Commence intersection improvements on Mount Crosby through to Logan Road in Eight Mile Plains. Road, at the Delacy Street and Pine Street intersection. The Metropolitan District covers an area of about 2,968km2, or around 0.2% of Queensland1. It straddles the Brisbane In 2016-17 we will: • Continue to seek Australian Government funding River and extends from Mount Glorious in the north to Logan for the Pacific Motorway-Gateway Motorway merge City in the south, and from Point Lookout in the east to west • Continue construction of the Gateway Upgrade North upgrade (southbound lanes), with $42 million provided of Helidon and the major centre of Ipswich. project that will widen the Gateway Motorway to towards this $210 million project by the Queensland six lanes, between Nudgee and Bracken Ridge, jointly Government as part of the State Infrastructure Fund. The district has an estimated residential population of funded by the Australian Government and Queensland about 1,461,733 or around 31.4% of Queensland’s total Government. population1. Future plans • Commence the Ipswich Motorway (Rocklea to Darra) The district looks after about 414km of other state-controlled Stage 1 project, to construct additional lanes between We are continuing to plan for the future transport roads, about 112km of the National Land Transport Network, Oxley Road and Suscatand Street, jointly funded by the requirements of residents in the Metropolitan District.
    [Show full text]
  • Darling Downs 79,530 Km2 Area Covered by Location1
    Darling Downs 79,530 km2 Area covered by location1 5.72% Population of Queensland1 3,846 km Other state-controlled road network 687 km National Land Transport Network2 See references section (notes for map pages) for further details on footnotes. Toowoomba Office 1-5 Phillip Street | Toowoomba | Qld 4350 Locked Bag 1 | Warwick | Qld 4370 (07) 4639 0777 | [email protected] Warwick Office 306 Wood Street | Warwick | Qld 4370 Locked Bag 1 | Warwick | Qld 4370 (07) 4661 6333| [email protected] • continue pavement rehabilitation on the Gore Highway • continue planning for bikeways in Central Toowoomba Darling Downs between Toowoomba and Millmerran, jointly funded and the Warwick principal cycle network by the Australian Government and Queensland Government • commence planning to improve Toowoomba In 2020–21 we completed: Connection Road and Hursley Road intersection • continue bridge replacement on the Rocky Creek • upgrading of the Emu Creek bridge on the New England Bridge on Murphy’s Creek Road, as part of the • continue planning to identify a Toowoomba North Highway, jointly funded by the Australian Government Queensland Government’s COVID-19 economic South Transport Corridor. and Queensland Government recovery response Link for TMR Project Page: • construction of Stage 1 of the New England Highway • continue pavement strengthening and widening on https://www.tmr.qld.gov.au/Projects Cycleway between Highfields and Toowoomba CBD the New England Highway between Yarraman and Toowoomba, as part of the Queensland Government’s
    [Show full text]
  • RACQ Unroadworthy Roads Technical Appendix
    RACQ Unroadworthy Roads Technical Appendix Author Public Policy Date March 2016 Title: RACQ Unroadworthy Roads Technical Appendix Issued Date: March 2016 Page: 1 of 104 List of roads with number of responses to identified problems cont’d IDENTIFIED PROBLEMS Tight Vegetation Poor or Slippery / curves / Narrow Narrow Poor Hazardous Poor or or objects Lack of inadequate Rough Loose blind road / bridge / road Poor Poor roadside no guard block overtaking Flood Poor road Steep Road Name # Responses Surface surface crests lanes culvert markings signing shoulders objects rails visibility opportunities prone drainage lighting grade Bruce Highway 67 38 9 10 27 17 14 8 27 8 11 8 30 22 15 11 1 Pacific Motorway 32 8 1 1 6 1 3 - 4 - - 1 4 - 2 - - Mount Lindesay Highway 21 5 - - 5 - 1 2 4 1 1 - 14 4 2 3 1 Captain Cook Highway 19 5 2 2 2 1 2 - 2 2 1 1 1 4 5 - - Rickertt Road 19 18 3 - 8 3 6 1 13 3 2 - 6 16 9 10 - D'Aguilar Highway 16 12 5 4 6 1 4 1 6 2 1 3 12 2 5 1 1 Kennedy Highway 15 2 5 7 6 1 - - 6 1 5 2 13 1 - 1 1 Warrego Highway 14 11 3 3 5 2 3 2 6 2 - 2 3 3 3 2 - New England Highway 11 9 2 2 4 2 1 1 4 2 2 1 5 2 1 - - Telegraph Road 11 4 - - - - - - 2 - - - - 1 1 - - Kingsford Smith Drive 10 8 2 - 4 - 3 - 2 - - - - - 1 - - Maleny-Kenilworth Road 10 10 2 4 10 4 2 1 8 4 - 1 5 - 2 - - Gore Highway 9 8 1 - 5 - - - 5 1 2 - 2 2 - - - Samford Road 9 7 2 3 6 - 1 1 1 2 - - 2 - 2 - - Tinaburra Drive 9 7 3 5 9 2 4 2 6 2 - 1 3 - - 4 - Burnett Highway 8 8 - 3 4 4 2 2 7 2 1 2 5 3 4 1 - Beachmere Road 7 6 1 2 7 6 1 2 7 - 1 2 2 6 3 3 - Beechmont Road 7 1 2 7 7
    [Show full text]
  • F6 Integrated Transport and Movement
    F6 Integrated Transport and Movement Vision Statement and Action Plan Framework - November 2005 IPSWICH2020ANDBEYOND IPSWICH2020ANDBEYOND Integrated Transport and Movement Ipswich City is the Motorway is now up to Ø Cunningham Highway to 6.2 Summary of Ø Identify and align the transport Strategy ITM 1.4 100 000 vehicles a day during the Warrego Highway connection priorities and objectives for well-serviced by busiest days of the week, The (pending Goodna Bypass and Goals and Ipswich of all stakeholders. A Safe Transport Network: Ensure mixture of cars and freight River Road Investigation). that residents feel safe travelling an integrated transport vehicles is problematic. Strategies - throughout Ipswich. Ø Extension of Centenary Strategy ITM 1.2 public transport To address the transport issues in Highway - Springfield to Ripley Integrated Ipswich a number of major Ø Develop and implement Bus and roads system to Yamanto. infrastructure projects have been Transport Connected Centres: Ensure that Stop and Station Design that effectively proposed in the State SEQ centres are connected and enable Guidelines. Infrastructure Plan and Program Ø Centenary Highway four and efficient movement between eliminates (2005) including: lanes - Ipswich Motorway to communities. Ø Provide real time service Springfield. Movement updates at major bus stops. congestion, Ø Ø Ipswich rail line third track Provide a loop bus service that conserves Corinda-Darra and Darra- Ø Western Ipswich Bypass ITM Goal 1 - connects major centres in Ø Identify and implement safety Ipswich. community Redbank. (Haigslea to Amberley). Connected measures around transport interchanges and rail stations. Ø character and Ø Springfield passenger rail line. Ø Cunningham Highway four Communities Investigate and implement lanes - Ripley Road to public transport services to Ø Improve security services on enhances Ebenezer.
    [Show full text]
  • Brisbane – Mt Isa Mt Isa ‐ Brisbane
    E As at 02nd February 2015 BARCALDINE NEWS & TRAVEL For Bookings or Enquires please contact Colleen or Kayla 07 4651 1104 / [email protected] BRISBANE – MT ISA MT ISA ‐ BRISBANE TOWN Departure Time Pick up and Set down point TOWN Departure Pick up and Set down point Brisbane 4.00pm Brisbane Transit Centre, Roma st Time Mt Isa 6.50am Outback at Isa Centre, 19 Marian St Ipswich 4.50pm Bus Bay, Bell Street Cloncurry 8.10am Cloncurry Agencies, 45 Ramsay St Cloncurry Meal 9.00am BP Ausfiel, Ramsey Street Haigslea 5.07pm Sundowner Hotel Stop Mckinlay 10.00 BP Roadhouse, Landsborough H/way Minden/Crossroad 5.15pm Front of Service Station Kynuna 11.00 Kynuna Roadhouse, Landsborough h/way Plainland 5.26pm Bus Stop, Plainlands Hotel Winton Meal Stop 1.20 Waltzing Matilda Centre, Elderslie St Gatton College 5.30pm Bus Shelter Winton 1.25 Newsagents, 75 Elderslie St Lorraine Stn 2.15 Lorraine Station Gatton 5.35pm Bus Stop on Highway Longreach 3.25 Cnr Ealge & Duck Street (Commercial Hotel) Withcott 5.55pm Civic Centre Ilfracombe 3.45 Post Office Toowoomba 6.45pm Toowoomba Bus Interchange, Neil St Barcaldine 5.00 Choice Roadhouse Oakey 7.05pm Railway Station Blackall 6.40 BP Blackall, 10 Shamrock St Jondaryan 7.15pm Cobb & Co Roadhouse Tambo 7.50 Post Office Dalby 7.55pm Shell Roadhouse Augathella 9.10 BP Roadhouse, Warrego H/way Warra 8.20pm Old Service Station Charleville 10.40 Railway Station, Mitchell H/way Brigalow 8.30pm General Store Morven 11.44 Opposite Newsagent, Albert St Chinchilla 8.50pm Bus Shelter Mungallala 12.05 General Store,
    [Show full text]
  • Chapter 13 – Traffic and Transport
    13. Traffic and Transport Contents 13 Traffic and Transport 13-1 13.1 Introduction 13-1 13.2 Regulatory framework 13-1 13.2.1 Guidelines for Assessment of Road Impacts of Development (GARID) 13-1 13.3 Existing traffic and transport environment 13-2 13.3.1 Description of existing infrastructure 13-2 13.3.2 State controlled roads 13-4 13.3.3 Local roads 13-5 13.3.4 School bus routes 13-6 13.3.5 Road crash data 13-8 13.3.6 Scheduled road improvements 13-8 13.3.7 Police and emergency services 13-8 13.3.8 Public transport services 13-8 13.3.9 Rail and Port facilities 13-9 13.3.10 Airport services 13-9 13.3.11 Infrastructure requirements 13-9 13.4 Background traffic 13-10 13.4.1 Existing (2012) traffic volumes 13-10 13.5 Existing road level of service 13-11 13.5.1 Performance criteria 13-11 13.5.2 Existing level of service - 2012 13-11 13.5.3 Existing intersection counts 13-12 13.5.4 Historic traffic growth 13-13 13.5.5 Background traffic growth 13-13 13.5.6 Committed developments 13-13 13.6 Project overview 13-14 13.6.1 Project time frames 13-14 13.6.2 Proposed site access and haul roads 13-14 13.6.3 Proposed road diversions and closures 13-17 13.6.4 Rail transportation 13-22 13.7 Project construction phase 13-27 13.7.1 Construction working hours 13-27 13.7.2 Construction workforce traffic 13-27 13.7.3 Construction equipment and materials 13-28 13.7.4 Heavy vehicles and oversized vehicles 13-30 13.7.5 Hazardous and dangerous materials 13-30 13.7.6 Construction phase traffic 13-30 13.8 Project operation phase 13-34 13.8.1 Operation working hours
    [Show full text]
  • Cunningham Highway/Amberley Intersection Planning Study Newsletter 02 • August 2011
    Cunningham Highway/Amberley Intersection Planning Study Newsletter 02 • August 2011 Draft plan released The Department of Transport and Main Roads is encouraging Get involved the community to get involved and have their say on the draft plan to realign the Cunningham Highway. The draft plan Transport and Main Roads would like your feedback to develop a preferred plan that best caters for details proposed changes between the Yamanto Interchange future traffic growth and addresses the needs of the and Ebenezer Creek and the upgrade of the Cunningham community as well as existing and future road users. Highway/Ipswich-Rosewood Road intersection. To provide your feedback or to contact the project team: The upgrade project aims to reduce congestion and improve safety • visit the project team at one of the staffed along this section of the highway. It will also service additional traffic displays (see the back page for a list of public expected to be generated from the proposed Aerospace Defence display dates and locations) Support Centre, ongoing expansion of the RAAF Airbase at Amberley • e-mail your feedback to and the proposed Ebenezer Regional Industrial Area. [email protected] • freecall 1800 991 879* The Cunningham Highway forms part of the Australian Government’s • Post: National Land Transport Network. This upgrade will provide greater The Department of Transport and Main Roads efficiency in the movement of interstate and interregional freight to the Cunningham Highway/Amberley Intersection Port of Brisbane and the Australia Trade Coast precinct. Planning Study PO Box 70 Detailed investigations including engineering and traffic analysis as Spring Hill Qld 4004 well as flora and fauna surveys have helped develop a draft plan that suits the identified needs and minimises impact to the surrounding environment.
    [Show full text]
  • View Timetables
    Eective from: 15th June 2020 Eective from: 15th June 2020 Eective from: 15th June 2020 Eective from: 15th June 2020 Brisbane Coach Terminal, Parklands Cres adj to platform 10 Roma St Mount Isa Outback at Isa Centre, 19 Marian Street Ipswich Bus Stop A, Bell Street, Ipswich Cloncurry Flinders Medical Centre, 27 Ramsey Street Haigslea Sundowner Hotel on Service Road Cloncurry (Meal Stop) Puma Service Station, Ramsey Street Minden Crossroads Crossroads on Warrego Highway, near Barbs Kitchen Cloncurry (Meal Stop) Puma Service Station, Ramsey Street Plainlands Plainland Hotel Bus Stop on off ramp to Laidley McKinlay United Roadhouse, Landsborough Highway Gatton College Bus Shelter on Highway, after over pass Kynuna Kynuna Roadhouse, Landsborough Highway Gatton Railway Station, Crescent Street Winton (Meal Stop) Newsagent, 74 Elderslie Street Withcott Bus Shelter on Highway, Opposite Withcott Hotel Winton (Meal Stop) Newsagent, 74 Elderslie Street Toowoomba Bus Interchange (Bay 1), Neil Street Longreach Commercial Hotel, Cnr Eagle St and Duck St Toowoomba Depot Bus Queensland, 308 Taylor Street, Toowoomba Ilfracombe Opposite Ilfracombe Post Office, Landsborough Highway Oakey Railway Station Bus Shelter, Bridge Street Barcaldine Council Bus Stop, Opposite 133 Oak Street Jondaryan Cobb and Co Roadhouse, Duke Street Blackall (Meal Stop) BP Blackall, 10 Shamrock Street Dalby Shell Roadhouse, Cnr Drayton Street and Cunninham Street Blackall (Meal Stop) BP Blackall, 10 Shamrock Street Warra Cnr Warrego Highway and Raff St Tambo Post Office, Cnr Arthur
    [Show full text]
  • Agricultural Needs Analysis (August 2018)
    RDA Ipswich & West Moreton AGRICULTURAL NEEDS ANALYSIS TRANSFORMING A REGION August 2018 Kilcoy Esk Regional Development Australia Ipswich & West Moreton would like to acknowledge the traditional owners of our region – The Jagera, Kitabul, Ugarapul, Yugambeh and Yuggera people. Gatton Ipswich Laidley Springfield Lakes Disclaimer – Whilst all efforts have been made to ensure the content of this Boonah Beaudesert publication is free from error, the Regional Development Australia Ipswich & West Moreton (RDAIWM) Ipswich and West Moreton Agricultural Needs Analysis does not warrant the accuracy or completeness of the information. RDAIWM does not accept any liability for any persons, for any damage or loss whatsoever or howsoever caused in relation to that person taking action (or not taking action as the case may be) in respect of any statement, information or advice given in this publication. 2 RDAIWM Agricultural Needs Analysis AUG 2018 Chair’s Message As there is no single entity to bring together becoming better informed about the food they the various needs and wants for the future are eating and taking a more significant interest development of the agricultural industry of in its provenance and qualities. the four Councils of the West Moreton region Similarly, the increasing pressures of living in a (Ipswich, Somerset, Lockyer Valley and Scenic global city, as Brisbane is becoming, engenders Rim), Regional Development Australia Ipswich & a desire for respite. West Moreton (RDAIWM) has undertaken a high- level review of the vital infrastructure and policy The SEQ Regional Plan categorises most of development needs of the region. the study as: “Regional Landscape and Rural ongoing existing lists of considered, critical Production” for precisely this reason: to provide infrastructure priorities.
    [Show full text]