Infrastructure Strategies

Total Page:16

File Type:pdf, Size:1020Kb

Infrastructure Strategies INFRASTRUCTURE STRATEGIES COMMUNITY FACILITIES UTILITIES SUSTAINABILITY RESILIENCY TRANSPORTATION 113 114 MAINTAIN AND ENHANCE COMMUNITY FACILITIES 12 Overview Community facili‐ ties provide for Community facilities support functions such as education, public works, public desired services safety, and recreation, all of which are important to maintaining the character and enhance the and quality of life in Darien. quality of life in The POCD does not get involved in the day‐to‐day operations of individual the community … departments. Rather, the POCD seeks to identify potential community facility needs (buildings and sites) so that they can be anticipated and planned for. The POCD also serves as a useful guide for referrals of proposed municipal im‐ provements (as required by CGS Section 8‐24) for review by the Planning and Zoning Commission. Education Recreation Safety Emergency 115 Legend Address Community Facility Needs Generally expected to be EDUCATION FACILITIES Assessment adequate for community Education Darien public schools are consistently ranked among needs to 2025 Darien High School the best public schools in Connecticut Darien residents are firmly committed to neighbor‐ Middlesex Middle School hood schools and new residents often purchase May have some based on school districts issues to Hindley Elementary consider Holmes Elementary Some elementary schools have been using portable Ox Ridge Elementary classrooms since the late 1980s Attention Royle Elementary None of these 14 classroom spaces are directly appears to be Tokeneke Elementary attached to the main buildings and so students must needed to meet leave the building each time they go to a portable. community These are in fair condition and should be phased out needs to 2025 for security and other purposes Not expected to (diverse projections / Significant HVAC issues exist at Ox Ridge, Holmes and be adequate for capacity not clear) Royle community All schools will be examined thoroughly as part of a needs to 2025 proposed building facilities review Growth in early childhood education programs (HVAC issues / building systems) (kindergarten and the Early Learning Program) and possible future legislative requirements have an ef‐ fect on school facilities and complicate facility plan‐ ning Darien High School cafeteria has been identified as needing expansion in the near term Enrollments have been increasing which is counter to the recent State‐wide trend of declining enrollment BOE has three enrollment projections: o In‐house o NE School Development Council o Milone and MacBroom Projections hinge on in‐migration patterns BOE using the highest projections (in‐house) while other projections suggest a decline in enrollments The number of children that might result from new developments could add strain on school facilities Milone and MacBroom is continuing to refine the Facilities Plan Darien does not have a possible future school site to help address potential current or future needs Education facilities also support community meeting, recreation, performance, and art activities 116 Darien High School Middlesex Middle School Hindley Elementary School Holmes Elementary School Ox Ridge Elementary School Royle Elementary School Portable Classrooms At Tokeneke Elementary School Royle Elementary School 117 Legend GENERAL GOVERNMENT Assessment Generally expected to be Town Hall Town Hall moved into the former Darien High School adequate for building in the mid‐1980s community Public spaces tend to be generously sized but needs to 2025 department spaces tend to be cramped / inefficient Lack of storage / meeting rooms can be an issue (investigate renovation / Interest in improving safety and access amenities May have some expansion options) issues to consider Attention PUBLIC WORKS Assessment appears to be Public Works Garage Site used by public works, schools, parks, facilities needed to meet Recycling / Refuse Center maintenance, transfer station community Sewer Pump Locations Public Works garage is inadequate for repair and needs to 2025 storage of equipment On‐site storage of materials is challenging Not expected to Addition is being planned to address needs be adequate for Recycling/refuse operations appear to work well (expand public works garage) community needs to 2025 Long term expansion potential might be created by relocating commuter parking from the Leroy West lot and making a “back door” connection along the rail‐ road tracks to the Public Works site Town Hall Public Works 118 Private Facilities PARKS AND RECREATION Assessment Darien also has a number of Beaches The two beaches are considered to be the “jewels” of private recreation facilities Pear Tree Point the Darien parks and recreation programs which help meet community Weed Beach An expansion project at Weed Beach is currently needs and desires: underway Country Club of Darien Active Outdoor Recreation Wee Burn Country Club Baker Park Community participation in recreational activities is Woodway Country Club Cherry Lawn Park high so demand for facilities is high YMCA Holahan Fields Ox Ridge Hunt Club McGuane Park Since Darien is mostly built out, the challenge will be Middlesex Club to make the most effective use of the active outdoor Noroton Yacht Club Passive Outdoor Recreation recreation facilities the Town currently has: Darien Boat Club o Resting grass fields (challenging due to use) Frate Park Tokeneke Club o Artificial turf to withstand use / extend seasons Selleck’s Woods Stony Brook Park o Lighting to extend daily use / extend seasons Tilley Pond Park o Irrigation to withstand use Woodland Park Would like to acquire land with a priority placed on land adjacent to existing facilities Indoor Programs School facilities also provide for recreational use Town / School Buildings Cherry St. property provides connection to Town Hall Other Properties and Holahan Fields Cherry St. Diller Property is adjacent to the High School Diller Property Parks And Recreation Master Plan has not been updated since 1996 Master Plan is in the process of being updated (update Master Plan / Interest has been expressed in a community pool consider needs) facility (indoor or outdoor) Weed Beach McGuane Park Cherry Lawn Park Woodland Park Nature Preserve 119 Legend SAFETY / EMERGENCY SERVICES Assessment Generally expected to be Police Department Facility is expected to be adequate to the year 2025 adequate for Animal Control Parking is the biggest challenge on site community Animal shelter appears adequate needs to 2025 May have some issues to Fire Department Three fire stations staffed with volunteer personnel consider Have good array of equipment to handle local needs Excellent training facilities available Use mutual aid / coordination Attention Public water supply available to many areas although appears to be (maintaining volunteer staffing) some areas have poor flow needed to meet Equipment storage can be an issue community needs to 2025 Maintaining adequate volunteer staffing has been an Not expected to issue in other communities be adequate for Fire response can be challenged by few routes community over/under railroad / I‐95 needs to 2025 Emergency Medical Emergency response provided by police / Post 53 / Medical Transport fire department Paramedics from Stamford and Norwalk, if needed Facilities adequate for community needs State land lease for Post 53 has expired Increased training requirements may complicate the (lease has expired) use of volunteers Police Department Post 53 Darien Fire Department Noroton Fire Department 120 HOUSING AUTHORITY Assessment Old Town Hall Houses Currently have 138 units The Heights at Darien o 30 units at Old Town Hall Houses West Avenue Houses o 106 units at The Heights at Darien o 2 units on West Avenue Heights was recently expanded DHA intends to redevelop Old Town Hall site Waiting lists are closed (demand expected to increase There may be demand for additional units based on due to aging population) projected growth of senior population OTHER FACILITIES Assessment Darien Library New facility opened in 2009 Ranked as one of the top 10 public libraries in the country for its size Parking area can be inadequate due to heavy use (seek to expand parking options) Mather Center Facility opened in 2014 Helps Darien residents, age 55 and over, fulfill their social, physical, emotional and intellectual needs Desire has been expressed for parking more conven‐ ient to the entrance Demand may increase due to aging population Darien Youth Center Former train station building repurposed into a teen (The Depot) center State land lease has expired Activities programmed by a student governing board Includes a “Safe Rides” service (lease has expired) Edgerton Street Property Site once used for an elementary school and then for the Senior Center (building has been demolished) Site should be retained for possible future school‐ related use or other municipal, community use or (consider how to repurpose the site) open space 701 Boston Post Road Building previously housed Darien Community Fund Building and site should be retained for possible future municipal or community use (consider how to repurpose the site) 121 Darien Community Facilities GENERAL GOVERNMENT SAFETY / EMERGENCY SERVICES 1. Town Hall 22. Police Station / Animal Shelter 23. Darien Fire Department 24. Noroton Fire Department EDUCATION FACILITIES 25. Noroton Heights Fire Department
Recommended publications
  • Stamford and New Haven , V'onh Cos Cob ^ L ^^ , Fairfield County J-"0£Cpb Connecticut
    NEW YORK , NEW HAVEN, AND HARTFORD RAILROAD, HAER No. CT-142-C BRIDGE-TYPE CIRCUIT BREAKERS (Electrification System, Bridge-Type Circuit Breakers) Long Island Sound shoreline between Hf-fc-K-- Stamford and New Haven , V'ONH Cos Cob ^ l ^^ _, Fairfield County j-"0£CPb Connecticut PHOTOGRAPHS WRITTEN HISTORICAL AND DESCRIPTIVE DATA HISTORIC AMERICAN ENGINEERING RECORD National Park Service Northeast Region Philadelphia Support Office U.S. Custom House 200 Chestnut Street Philadelphia, P.A. 19106 Hf\£R CoHH HISTORIC AMERICAN ENGINEERING RECORD ac- NEW YORK, NEW HAVEN & HARTFORD RAILROAD, BRIDGE-TYPE CIRCUIT BREAKERS (Electrification System, Bridge-type Circuit Breakers) HAER No. CT-142-C Locations: Long Island Sound shoreline between Stamford and New Haven. Anchor Bridge #310: Spanning New York, New Haven & Hartford Railroad tracks 820 feet east of Cos Cob Station, Greenwich, Fairfield County, Connecticut. Anchor Bridge #374: Spanning New York, New Haven & Hartford Railroad tracks at Canal Street, Stamford, Fairfield County, Connecticut. Anchor Bridge #465: Spanning New York, New Haven & Hartford Railroad tracks 1000 feet east of Darien Station, Darien, Fairfield County, Connecticut. UTM Coordinates: Bridge Zone Easting Northing 310 18 617940 4542830 374 18 623070 4545020 Quad: Stamford, Connecticut 1:24000 465 18 628640 4548240 Quad: Norwalk South, Connecticut 1:24000 Date of Construction: Anchor Bridge #310, circa March 1907; Anchor Bridges #374 and #465 were added during expansion of service to New Haven in 1914. System Design Engineers: E. H. McHenry, William S. Murray, Calvert Townley Manufacturer: Westinghouse Electric and Manufacturing Company, Switchgear Engineering Department, East Pittsburgh, Pennsylvania Present Owner: Metro-North Commuter Railroad 345 Madison Avenue New York, NY 10017 Present Use: Currently operating and in use.
    [Show full text]
  • AQUIFERPROTECTIONAREA SW Estport , CONNECTICUT
    n M ! R F S o N G o Godfrey Pond C e t Inwood Rd u P u n o d a r u d B W d r n n r t e R L r e t d R d b e r t e R o t t s n R 111 D i l n I o a e l a r o M o t e n l s S1 r R i t t V W w l r A O d n k a l d e K i i R e i S d 1 n M a n n l R W B e l y D H o id g e a a T u a l R t R i Wheelers Pond 1 H L l a a r x d n l B o a g e R d r r a v a d o F d d e d d R n r T t e Nod Hill Pond t e y n l n e R r e R R W d h d o e u d r D e D d i y n u D R v M R e e E w e e d n k d e o S H R u b n d w r r a r r r e Chestnut Hill r c d e o e d d w 7 R H u w o n b L e r D d l R d Mill River h B o d L w t S W n d b n s s s u Plymouth Avenue Pond £ a d s y e ¤ r A u o i R R s o n i b Pipers t o R h d Hill R n d o i n L c S d d e 5 C t a e d r r d d B o U H g Powells Hill k t t o r t 9 d e S k n Spruc u p r l d D o R d c r R R L P e S i a r n s l H r Cristina R 136 i h L Ln e n B l i r T R o d n r d s l L S o n r R V e o H o k L R i r M d t M Killian A H G L a S ve d R e s R y n l g e d Pin 1 i l C r a d w r n M e d d e r a a 1 i R r d c y e D h k h s r S R 1 d o d c E Cricker Brook i t c a k n l 7 r M d r u w a e l o R l n y g a R d r S n d l Dr c e B W od l e F nwo d r Nature Pond o t utt o l S i B t w d C h l S B n y i d r o t l e W ch R e i D R e e o o D p B r M Hill Rd i L d n r H R ey l on r il H P H n L H o ls illa w o d v r w t w a w on La n o s D D d d e O e S e n w r g r R e p i e i W k l n n e d d W t r g L e v e r t l y e l D l r y g l 53 e e T a e o R e l s d y d H n Plum rkw o a D i P a R n l r a S d R L V W i w o u r u Jennings Brook l
    [Show full text]
  • A Q U I F E R P R O T E C T I O N a R E a S N O R W a L K , C O N N E C T I C
    !n !n S c Skunk Pond Beaver Brook Davidge Brook e d d k h P O H R R O F p S o i d t n n l c t u i l R a T S d o i ll l t e e lv i d o t R r r d r l h t l l a H r n l t r M b a s b R d H e G L R o r re R B C o o u l e t p o n D o e f L i s Weston Intermediate School y l o s L d r t e Huckleberry Hills Brook e t d W d r e g Upper Stony Brook Pond N L D g i b R o s n Ridgefield Pond a t v d id e g e H r i l Country Club Pond b e a R d r r S n n d a g e L o n tin a d ! R d l H B n t x H e W Still Pond d t n Comstock Knoll u d a R S o C R k R e L H d i p d S n a l l F tt h Town Pond d l T te r D o e t l e s a t u e L e c P n n b a n l R g n i L t m fo D b k H r it to Lower Stony Brook Pond o r A d t P n d s H t F u d g L d d i Harrisons Brook R h e k t R r a e R m D l S S e e G E o n y r f ll H rt R r b i i o e n s l t ld d d o r l ib l a e r R d L r O e H w i Fanton Hill g r l Cider Mill School P y R n a ll F i e s w L R y 136 e a B i M e C H k A s t n d o i S d V l n 3 c k r l t g n n a d R i u g d o r a L 3 ! a l r u p d R d e c L S o s e Hurlbutt Elementary School R d n n d D A i K w T n d o O n D t f R l g d R l t ad L i r e R e e r n d L a S i m a o f g n n n D d n R o t h n Middlebrook School ! l n t w Lo t a 33 i n l n i r E id d D w l i o o W l r N e S a d l e P g n V n a h L C r L o N a r N a S e n e t l e b n l e C s h f ! d L nd g o a F i i M e l k rie r id F C a F r w n P t e r C ld l O e r a l y v f e u e o O n e o a P i O i s R w e t n a e l a n T t b s l d l N l k n t g i d u o e a o R W R Hasen Pond n r r n M W B y t Strong
    [Show full text]
  • Norwalk Pedestrian & Bikeway Transportation Plan
    NORWALK PEDESTRIAN & BIKEWAY TRANSPORTATION PLAN Introduction and Existing Conditions Technical Memorandum DRAFT Submitted by: Fitzgerald & Halliday, Inc. 72 Cedar Street Hartford, CT 06106 Contents Vision..............................................................................................3 Executive Summary...........................................................................4 Key Points Plan Purpose....................................................................................5 Background Study Area The Case for Walking & Cycling Plan Development............................................................................7 Review of Existing Plans 2009 Connecticut Statewide Bicycle and Pedestrian Plan..........9 SWRPA Bicycle and Pedestrian Study......................................10 2008 Plan of Conservation and Development for Norwalk.......11 Existing Conditions Report..............................................................14 Population and Employment................................................14 Land Use...........................................................................15 Transportation Network.......................................................16 Overpasses & Underpasses..................................................17 Sidewalks & Footpaths.........................................................18 Major Pedestrian Routes......................................................19 Connectivity Plan................................................................23 On-Road Bicycling.............................................................26
    [Show full text]
  • Customer Opinion Survey Final Report
    Task 1.2: Customer Opinion Survey Final Report URBITRANR EPORT URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. May 2003 Task 1.2:Technical Memorandum Customer Opinion Survey TABLE OF CONTENTS INTRODUCTION AND SUMMARY OF FINDINGS ............................................................................................1 BACKGROUND AND PURPOSE ....................................................................................................................................1 METHODOLOGY.........................................................................................................................................................1 FINDINGS ..................................................................................................................................................................1 EXHIBIT 1: SURVEY SAMPLE.....................................................................................................................................2 COMPARISON TO METRO-NORTH RAILROAD CUSTOMER OPINION SURVEY ...........................................................10 CHAPTER ONE: GENERAL PROFILE OF SURVEY RESPONDENTS.........................................................12 SYSTEM-WIDE ANALYSIS OF SURVEY QUESTIONS 1, 2, AND 3 .................................................................................13 SYSTEM-WIDE ANALYSIS OF SURVEY QUESTIONS 4, 5, 6, AND 7 .............................................................................15 SYSTEM-WIDE ANALYSIS OF SURVEY
    [Show full text]
  • Stamford East Main Street Transit Node Feasibility Report & Action Plan
    Stamford East Main Street Transit Node Feasibility Report & Action Plan Stamford East Main Street Transit Node Feasibility Study & Action Plan STAMFORD EAST MAIN STREET Transit Node Feasibility Study & Action Plan Prepared by Parsons Brinckerhoff for the South Western Connecticut Regional Planning Agency and the New York/Connecticut Sustainable Communities Consortium. November 8, 2013. Note: All photographs taken by members of the project team unless otherwise noted. Stamford East Main Street Transit Node Feasibility Study & Action Plan Stamford East Side’s East Main Street corridor. Stamford East Main Street Transit Node Feasibility Study & Action Plan Contents 1. Introduction 5 5. Implementation Strategies 61 Executive Statements 8 Mitigation Strategies 63 Project Partners 9 Interim Bus 64 Long Term Main Line Option 66 2. Community Context 11 Existing Conditions 12 6. Phasing 69 Gauging Community Desire for Change 14 1-CompletionoftheTransitway 70 Quality of Life Goals: Three Main Drivers 18 2-InterimBusShuttle 71 Public Engagement 20 3-DevelopmentNorthofEastMainStreet 72 Elements of a Transit-Supported Main Street 22 4-EastMainStreetBridgeReplacement 73 5-BranchLineStationwithSurfaceParking&Retail 74 3. Alternatives Evaluation 25 6.FullBuild-OutwithDevelopmentEastofTracks 75 Evaluation Process & Criteria 26 Feasibility Analysis by Location 35 7.Conclusion 77 Analysis of Feasible Alternatives 42 Preferred Alternative 48 4. Transit-Oriented Development Scenario 51 Market Analysis 52 Development Program 54 Circulation & Access 56 Traffic 57 Parking 58 Stamford East Main Street Transit Node Feasibility Study & Action Plan A busy bus station along East Main Street. 4 | Stamford East Main Street Transit Node Feasibility Study & Action Plan 1. Introduction 1. Introduction | 5 Stamford East Main Street Transit Node Feasibility Study & Action Plan A aerial view of the intersection of East Main Street and North State Street, the adjacent train tracks and East Main Street Rail Bridge, and the I-95 supoerstructure.
    [Show full text]
  • Annual Report - 2007
    ANNUAL REPORT - 2007 CONNECTICUT METRO NORTH / SHORE LINE EAST RAIL COMMUTER COUNCIL www.trainweb.org/ct CT Rail Commuter Council Page 1 2007 Annual Report 15 January 2008 Governor M. Jodi Rell Interim CDOT Commissioner Emil Frankel Senator Donald DeFronzo Rep. Antonio Guerrera CT Public Transportation Commission NY Metro-North Rail Commuter Council Inspector General – MTA Lee Sander – MTA Exec. Director & CEO Dear Ladies and Gentlemen: Pursuant to Connecticut Public Act 85-239 (now Sections 13b-212b and 13b -212c of the Connecticut General Statutes), The Connecticut Metro-North Rail Commuter Council is pleased to share with you our Annual Report for 2007. As you know, our legislative mandate is to be advocates for the interests of the more than 55,000 daily riders of Metro-North in Connecticut. Toward that end, we meet monthly with railroad officials… testify regularly before the legislature… speak before civic groups and share with the media our work on behalf of riders. Our report’s narrative highlights the important issues of the past year with embedded internet links for further information. Also attached are the Minutes of our meetings and monthly Operational Reports from Metro-North. We hope you find this report useful in understanding the challenges and opportunities facing rail commuters in Connecticut. Respectfully submitted, Jim Cameron Terri Cronin / Jeffrey Steele S. Robert Jelley Jim Cameron Terri Cronin / Jeffrey Steele S. Robert Jelley Chairman Co-Vice Chairmen Secretary CT Rail Commuter Council Page 2 2007 Annual Report COUNCIL VICTORIES ON BEHALF OF COMMUTERS: True to its legislative mandate to represent the interests of rail commuters in Connecticut, the Commuter Council helped change several policy decisions in 2007 for the benefit of commuters: ¾ Halt in plans to require commuters to use “opposite platforms” during winter.
    [Show full text]
  • South Western Region Long Range Transportation Plan 2007-2035 Update Schedule
    SouthSouth Western RegionRegion LongLong RangeRange TransportationTransportation PlanPlan 20072007--20352035 Endorsed by: South Western Region Metropolitan Planning Organization May 8, 2007 Prepared by: South Western Regional Planning Agency 888 Washington Blvd. 3rd Floor Stamford, CT 06901 203.316.5190 SOUTH WESTERN LONG RANGE TRANSPORTATION PLAN 2007-2035 CONTENTS Guide to the Plan – Frequently Asked Questions………….. FAQ1- FAQ9 Introduction ......................................................................................... 1 The South Western Region ................................................................... 17 Regional Characteristics ....................................................................... 23 Transportation Inventory and Travel Characteristics............................ 28 Long Range Transportation Plan 2007 – 2035 ..................................... 39 Transportation Plan Update Components……………………………... 48 Regional Transportation Plan References……………………………... 50 The Transportation Planning Process ................................................... 51 Goals and Objectives ............................................................................ 53 Highway Systems and Operations ........................................................ 56 Transportation Systems Management and Operations.......................... 62 Safety ................................................................................................... 64 Road Condition....................................................................................
    [Show full text]
  • Mta Property Listing for Nys Reporting
    3/31/2021 3:48 PM MTA PROPERTY LISTING FOR NYS REPORTING COUNTY SECTN BLOCKNO LOTNO Property_Code PROPERTYNAME PROPERTYADDDRESS AGENCY LINE PROPERTYTYPE limaster LIRR Customer Abstract Property LIRR Customer Abstract Property LIR Main Line Station Bronx bbl05200 Bronx Whitestone Bridge Hutchson River parkway BT Block/Lot Bridge Bronx 9 mha04650 ROW b 125th & Melrose XXX St MN Harlem ROW Bronx 9 mha06600 ROW b 125th & Melrose Milepost 5,Sta-Mon# 31.5 MN Harlem ROW Bronx 12 mha09500 FORDHAM STATION Fordham Rd (Fordham U) MN Harlem Station Bronx mhu00343 Perm E'ment at Yankee Stadium Sta-mon 30.5 MN Hudson Payable Easement Bronx mhu06251 Spuyten Duyvil Substation Sta-Mon# 68.5 MN Hudson Payable Easement Bronx 19 mhu06301 Parking at Riverdale Milepost 12 , Sta-Mon# 68.5 MN Hudson Parking Bronx tbl03600 Unionport Shop Unionport Rd. NYCT White Plains Road Shop Bronx tbl65340 Con Edison Ducts East 174 St NYCT Block/Lot Ducts Bronx tbw32500 231ST 231 St-Broadway NYCT Broadway/7th Avenue Station Bronx tbw32600 238 ST 238 St-Broadway NYCT Broadway/7th Avenue Station Bronx tbw32700 242 ST 242 St-Van Cortlandt Pk NYCT Broadway/7th Avenue Station Bronx tco21000 161 ST Yankee Stadium 161 St/River Ave NYCT Concourse Station Bronx tco21100 167 ST 167 St/Grand Concourse NYCT Concourse Station Bronx tco21200 170 ST 170 St/Grand Concourse NYCT Concourse Station Bronx tco21300 174 175 STs 174-175 Sts/Grand Concourse NYCT Concourse Station Bronx tco21400 TREMONT AVE Tremont Ave/Grand Concourse NYCT Concourse Station Bronx tco21500 182 183 STs 183 St/Grand
    [Show full text]
  • Information Packet.Pdf
    Resilient Connecticut Phase II Potential Regional Adaptation/Resilience Opportunity Areas Information Packet for WestCOG and Chief Elected Officials Thank you for following progress of Phase II of the Resilient Connecticut planning process. We have enjoyed presenting Resilient Connecticut to you at the monthly WestCOG meetings of fall 2020 and winter 2021. Now that spring has arrived, we are pleased to present another project milestone. • The information sheets following this page include the following: ✓ The “Terms to Understand” page provides a list of terms and their meanings on the left side, and a list of project resources with hyperlinks on the right side. ✓ Each potential regional adaptation/resilience opportunity area identified in the WestCOG region is described on an individual page. Regional adaptation/resilience opportunity areas are the geographic locations that our team has identified based on overlays of flood vulnerability, heat vulnerability, social vulnerability, zones of shared risk, and regional assets and infrastructure. • Here are some helpful hints when reviewing information sheets: ✓ The numbers associated with the flood, heat, and social vulnerabilities are relative scores between zero and one. This means that a score of “0.9”in one opportunity area demonstrates higher vulnerability than a score of “0.5” in a nearby opportunity area. ✓ The ID numbers for the zones of shared risk include a four-digit watershed identification number developed by the State. For example, “7300” is the Norwalk River watershed. ✓ The “areas of planned development” have been gathered from community plans, but the names that we selected for these information sheets are a work in progress. We plan to revise these as needed.
    [Show full text]
  • Psa Report Competitive V/S Non Competitive Contracts
    S t a t e o f C o n n e c t i c u t OFFICE OF POLICY AND MANAGEMENT REPORT TO THE GENERAL ASSEMBLY Personal Service Agreements Benjamin Barnes Secr et ar y Office of Policy and Management 450 Capitol Avenue Hartford, Connecticut 06106 Sub mitt ed October 31, 2017 This page is intentionally left blank 2 TABLE OF CONTENTS Page Introduction . 3 A. Purpose . 4 B. Background . 4 C. Scope and Methodology . 5 D. Inquiries . 6 Part I. PSA Data . A. Total Number of PSA 1. Chart Competitive and Noncompetitive Payments All Contracts. 7 2. Chart Competitive and Noncompetitive All Contracts. 8 3. Chart Competitive and Noncompetitive Under 20K . 9 4. Chart Competitive and Noncompetitive 20K and Over . 10 B. Summary Data . 11 C. Detail Data. 13 Part II. Consultant Agreements . A. Summary of Consultant Agreements. 51 B. Detail Data . 52 3 INTRODUCTION A. Purpose This document summarizes information regarding Personal Service Agreements for State fiscal year 2017. B. Background A Personal Service Agreement (PSA) is a duly executed and legally binding contract that defines the services or end products to be delivered by a Personal Service Contractor to a State agency. It is one of the primary mechanisms used by the State for procurement purposes. Typically, a PSA is used to purchase infrequent and non-routine services or end products, such as consulting services, technical assistance, and training. By law, no State agency may hire a Contractor to deliver such services or end products without first executing a PSA. C.G.S. § 4–212 defines who is included and who is not included in the term “Personal Service Contractor.” Included is “any person, firm or corporation not employed by the State, who is hired by a State agency for a fee to provide services to the agency.” Not included in the term “Personal Service Contractor” are the following: (a) a person, firm or corporation providing contractual services to the State, as defined in C.G.S.
    [Show full text]
  • Drainage Report
    ENGINEERING REPORT STORMWATER MANAGEMENT PLAN 132 FLAX HILL ROAD NORWALK, CONNECTICUT September 21, 2020 Revised April 20,2021 Prepared for: Workforce Partners, LLC PO Box 692 South Norwalk, CT 06856 Prepared By: Ricardo Ceballos, P.E. Professional Engineering Consulting Services 245 Sturges Highway Westport, CT 06880 (203)635-0922 STORMWATER MANAGEMENT PLAN 132 Flax Hill Road Norwalk, CT PROJECT DESCRIPTION The descriptions and computations included within this Stormwater Management Plan and Appendix are provided in support of applications submitted by Workforce Partners, LLC to the City of Norwalk for permitting purposes related to site and building improvements at 132 Flax Hill Road in Norwalk. The site's storm water management system shall be sized to accommodate runoff from a 25-year design storm and the system shall be designed so that post development peak discharge rates, and stormwater runoff volumes, do not exceed predevelopment quantities. Per City requirements, the storm water management plan has been prepared by a Connecticut-licensed professional engineer. Location The project site is located at 132 Flax Hill Road, Norwalk, Connecticut (site); As shown in Figure 1 the site is located in South Norwalk. The 0.217-acre site is a fully developed urban area. Project Location Figure 1 Project Location – 132 Flax Hill Road, Norwalk, CT. Page 2 Existing Conditions The site has 1 existing residential building, a detached garage structure, a driveway, and walkways. The site’s open space are landscaped grass areas. The purpose of the proposed project is to demolish the existing garage structure and add additional parking and driveway areas. As shown on Appendix A, there are no stormwater features, catch basins, yard drains or storm pipes.
    [Show full text]