Annual Report 2014
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Resettlement Plan PHI: EDSA Greenways Project (Balintawak
Resettlement Plan February 2020 PHI: EDSA Greenways Project (Balintawak Station) Prepared by Department of Transportation for the Asian Development Bank. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area CURRENCY EQUIVALENTS (As of 30 January 2020; Central Bank of the Philippines) Philippine Peso (PhP) (51.010) = US $ 1.00 ABBREVIATIONS ADB Asian Development Bank AH Affected Household AO Administrative Order AP Affected Persons BIR Bureau of Internal Revenue BSP Bangko Sentral ng Pilipinas CA Commonwealth Act CGT Capital Gains Tax CAP Corrective Action Plan COI Corridor of Impact DA Department of Agriculture DAO Department Administrative Order DAR Department of Agrarian Reform DAS Deed of Absolute Sale DBM Department of Budget and Management DDR Due Diligence Report DED Detailed Engineering Design DENR Department of Environment and Natural Resources DILG Department of Interior and Local Government DMS Detailed Measurement Survey DO Department Order DOD Deed of Donation DOTr Department of Transportation DPWH Department of -
1. Introduction
Republic of the Philippines Department of Transportation and Communications and the Light Rail Transit Authority MANILA LRT1 EXTENSION, OPERATIONS AND MAINTENANCE PROJECT Preliminary Information Memorandum June 2012 Transaction Advisors With Assistance From DOTC/LRTA – Manila LRT1 Extension, Operations and Maintenance Project: Preliminary Information Memorandum June 2012 Disclaimer This Preliminary Information Memorandum (PIM) has been prepared by the Development Bank of the Philippines (DBP) and the International Finance Corporation (IFC) on behalf of their clients, the Department of Transportation and Communications (DOTC) and the Light Rail Transit Authority (LRTA), in line with their mandate as Transaction Advisors to the DOTC in the development, structuring and tendering of the Manila LRT1 Extension, Operations and Maintenance Project as a Solicited Transaction under the Philippine Build-Operate-Transfer (BOT) Law or Republic Act (RA) 6957, as amended by RA 7718. This PIM does not purport to be all-inclusive or to contain all of the information that a prospective participant may consider material or desirable in making its decision to participate in the tender. No representation or warranty, express or implied, is made, or responsibility of any kind is or will be accepted by the DBP, IFC, LRTA, the DOTC, or the Government of the Republic of the Philippines (ROP) or any of its agencies, with respect to the accuracy and completeness of this preliminary information. The DOTC and LRTA, by themselves or through their Advisors the DBP and IFC, may amend or replace any of the information contained in this PIM at any time, without giving any prior notice or providing any reason. -
Project Title: Reinsurance of the Industrial All Risk with Business Interruption and Equipment Floater Insurance of the Light Rail Transit Authority
GSIS INSURANCE BIDS AND AWARDS COMMITTEE Project Title: Reinsurance of the Industrial All Risk with Business Interruption and Equipment Floater Insurance of the Light Rail Transit Authority Bid Bulletin No. 1 26 November 2019 This bid bulletin is issued to respond to the bidder’s queries for the Reinsurance of the Industrial All Risk with Business Interruption and Equipment Floater Insurance of the Light Rail Transit Authority. This shall form an integral part of the Bidding Documents. BIDDER’S QUERIES Item Bidder’s Queries GSIS’ Responses No. 1 To calculate the maximum possible loss Pertinent information/documents will be when two trains collide at the station, please available on November 29, 2019. provide a breakdown of sum insured The same will be sent to the bidders who including the BI and EEI of the following: purchased the bidding documents. a. One whole carriage/train b. All the carriage/train at the depot c. Line 2 (11 stations) d. Santolan Station e. Katipunan Station f. Anonas Station g. Araneta Center, Cubao Station h. Betty Go, Belmonte Station i. Gilmore Station j. J. Ruiz Station k. V. Mapa Station l. Pureza Station m. Legarda Station n. Recto Station o. Depot compound at Santolan, Pasig City to Recto Station (vice versa) 2 Survey reports for the top value stations. The Survey Report shall be provided only to bidders who purchased the Bidding Documents. For the guidance and information of all concerned. (Signed Original) ASVP EDUARDO V. FERNANDEZ Chairperson GSIS Insurance Bids and Awards Committee Bid Bulletin No. 1 CM of FM200 and Pre-Action Double Interlock System 30 July 2019 Page 1 of 1 . -
Chapter 5 Through Operation Policy
CHAPTER 5 THROUGH OPERATION POLICY 5.1 Through Operation Plan 5.1.1 Advantages of Through Operation Through operation will bring advantages to both railway users and railway enterprises. 1) The advantages for railway users are the alleviation of congestion at terminal stations; and the reduction of transport time by eliminating the necessity of changing trains. 2) The advantages for railway enterprises are the reduction of construction cost and rolling stock cost : and the enhancement of competitive power against other means of transport. 5.1.2 Draft of a Through Operations Plan We will study the possibility of through operations, including the track sections for which construction is already being planned, for the transportation authority responsible for railways for the Manila metropolitan area. A route map of these track sections is shown in Fig. 5.1.1. Of the track sections illustrated, we will study the following tracks, including LRT Line 1 and LRT Line3 that are already in operation, as well as planned tracks. No planning will be carried out for MRT Line 2 and LRT Line 4 because the through operations in the study results will be very complicated. (1) Plan proposal 1) Through operations on LRT Line 1 and LRT Line 3 ① Through operations at the Monumento Station in the north ② Through operations in the vicinity of the EDSA Station in the south Furthermore, LRT Line 6 now being planned is included in LRT Line 1. 2) Improvements and through operations for North Rail Line and MCX Line ① Through operations based on elevation of the track between Tayuman and Vitocruz (use existing track bed) 5 - 1 ② Through operations based on placing the track between Tayuman and Vitocruz underground (shorten by using a separate line) (2) Prerequisites for the comparative study 1) Date for start of through operations will be 2015. -
Technological Evolution of Manila Light Rail Transit System
International Journal of Advanced Science and Technology Vol.89 (2016), pp.9-16 http://dx.doi.org/10.14257/ijast.2016.89.02 Technological Evolution of Manila Light Rail Transit System Tomas U. Ganiron Jr IAENG, Hongkong College of Architecture, Qassim University, Buraidah City [email protected] Abstract This study focuses on the different elements of Manila Light Rail Transit System Line 1 in Metro Manila with the aim of characterizing its technological evolution and putting in context its impact in terms of what it is best designed for and what it can deliver. The study provides the concept of understanding the recent operation and developmental resolutions that the management of LRTA line 1 is providing as a preparation to uplift the socio-economic conditions of the commuters. Through the application of technology and scientific principles by means of transportation engineering for managing the facilities of the LRTA line 1 system, the system can provide safer, more rapid, more convenient, economic and environmental friendly way of transportation for the increasing demand of commuters. However, LRT 1 is best designed to substitute conventional railway services on routes where much higher capacity is required and to reduce travel time, further improving the railway service, also against other modes, therefore leading to mode substitution. Keywords: Highway engineering, railway transit, road engineering, transportation engineering 1. Introduction The traffic jams in Manila are staggering. Only a few traffic lights often disregarded separate the combatants. Every one force his way across the junctions, thus blocking everyone else and so the government decided to find a solution. -
Pedestrian Simulation of Metro Rail Transit (Mrt) Line 7 Station 1-North Avenue Station, Quezon City, Philippines
International Journal of GEOMATE, Feb., 2020, Vol.18, Issue 66, pp.156-162 ISSN: 2186-2982 (P), 2186-2990 (O), Japan, DOI: https://doi.org/10.21660/2020.96320 Geotechnique, Construction Materials and Environment PEDESTRIAN SIMULATION OF METRO RAIL TRANSIT (MRT) LINE 7 STATION 1-NORTH AVENUE STATION, QUEZON CITY, PHILIPPINES Romnick P. De Los Reyes1, Marloe B. Sundo2 and *Marish S. Madlangbayan2 1Sustainable Transport & Infrastructure Development Consulting, Inc., Philippines; 2Department of Civil Engineering, University of the Philippines Los Baños, Philippines *Corresponding Author, Received: 26 Sept. 2019, Revised: 14 Dec. 2019, Accepted: 31 Dec. 2019 ABSTRACT: Simulation of pedestrian flow represents an advanced approach in modeling and evaluating train stations. In this study, pedestrian simulation was done using the simulation software Simio to assess the passenger capacity of MRT 7 Station 1-North Avenue Station through level of service (LOS), queuing system, and train facility utilization. This paper presents the actual situation inside the train station while predicting the behavior of queuing pedestrians and provides an accurate estimate of the volume-to-capacity ratio of passengers entering the station. The study’s approach debugged the conventional assignments of pedestrians currently used in the field. The constructed three-dimensional building of the North Avenue Station served as framework for the simulation. Sources, sinks, servers, and paths of the software were the main elements of the simulation. Each library was defined by their time usage based on data gathered. Time usages of 1.21 sec. and 240 sec. for sources and sinks, respectively, were used in the simulation. Servers were defined by the train facilities utilized in the simulation, namely, automatic ticketing machines (TVM) with time usage of 43 seconds, ticketing toll gates with 1.4 seconds, and manual ticketing windows (BOM) with 20 seconds. -
2020 Sustainability Report Contents About the Report
Enabling Infrastructure Development for National Progress 2020 Sustainability Report Contents About the Report This is the fifth sustainability report of Metro Pacific Investments Corporation (MPIC, the Company or the Parent Company) containing information about our economic, environmental, social, and governance (ESG or Sustainability) impacts for the year ending December 2020. This report should be read in conjunction with our SEC Part 1: Form 17A and our 2020 Information Statement. In line with our commitment to transparency and accountability, we have prepared this report in accordance with the Contributing to National Progress and 1 Sustainability Accounting Standards Board (SASB) Industry Standards, United Nations Improving the Quality of Life of Filipinos Global Compact Index (UNGC), and Global Reporting Initiative (GRI) Standards: Core Option. DNV has provided an independent assurance statement for our sustainability or non-financial disclosures. We welcome feedback on this report and any matter concerning the sustainability performance of our business. Part 2: Please contact us at: Our Sustainability Pillars 25 Metro Pacific Investments Corporation Investor Relations 10/F MGO Building, Legaspi corner Dela Rosa Streets, Makati City, 0721, Philippines +63 2 8888 0888 [email protected] Annex The 2020 Sustainability Report was published on 80 April 5, 2021 and is also available for download from the corporate website. Part 1: Contributing to National Progress and Improving the Quality of Life of Filipinos Part 2: Our Sustainability -
The Supplementary Survey on North South Commuter Rail Project (Phase II-A) in the Republic of the Philippines PRE-FINAL REPORT
DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS (DOTC) REPUBLIC OF THE PHILIPPINES THE SUPPLEMENTARY SURVEY ON NORTH SOUTH COMMUTER RAIL PROJECT (PHASE II-A) IN THE REPUBLIC OF THE PHILIPPINES PRE-FINAL REPORT NOVEMBER 2015 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS GLOBAL CO., LTD. ALMEC CORPORATION KATAHIRA & ENGINEERS INTERNATIONAL 1R TOSTEMS, INC. JR(先) 15-049 DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS (DOTC) REPUBLIC OF THE PHILIPPINES THE SUPPLEMENTARY SURVEY ON NORTH SOUTH COMMUTER RAIL PROJECT (PHASE II-A) IN THE REPUBLIC OF THE PHILIPPINES PRE-FINAL REPORT NOVEMBER 2015 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS GLOBAL CO., LTD. ALMEC CORPORATION KATAHIRA & ENGINEERS INTERNATIONAL TOSTEMS, INC. Exchange Rate ( June 2015) 1 Philippine Pesos (PhP) = Japanese Yen (JpY) 2.72 1 US dollar (US$) = JpY 120.7 1 US$ = PhP 44.4 The Supplementary Survey on North South Commuter Rail Project (Phase II-A) in the Republic of the Philippines PRE-FINAL REPORT Republic of the Philippines STUDY LOCATION MAP Basic Data of Philippines Source: Ministry of Foreign Affairs, Japan, National Statistics Office of Philippines (NSO) 2 ■Area: 29.9 Thousand Km (2012), consist of ■Total Amount of Trade (FOB) (NSO, 2014) 7,109 islands. (1) Exports: US$ 61.80 billion ■ Population: 92.34 million (National Population (2) Imports: US$ 63.92 billion Census, 2010) ■Major Items of Trade ■Capital: Manila (Population in Metro Manila: (1) Exports: Electrical and electronic equipments approx. 11.86 million (ditto)) (majority: semiconductors) (2) Imports: Raw materials, intermediates (majority: ■Ethnic: Malayo-Polynesian (the largest group), Chinese, Hispanics, mixed race of them intermediates of chemical goods), capital goods and minorities (2014) (majority: communication and electronic equipments) and fuel (e.g. -
Chapter 9 Comprehensive Recommendation
CHAPTER 9 COMPREHENSIVE RECOMMENDATION CHAPTER 9 COMPREHENSIVE RECOMMENDATION 9.1 Development of the Railway Network 9.1.1 Realization of Planned Lines The objective of the Study is to make railways in Metro Manila more comfortable and convenient for users and in turn to increase the number of people using railways. The most important and effective means of ensuring that citizens use railways is the construction of a railway network. In the Study, it is not intended to propose the planning and construction of new specific rail routes, however, it is hoped that construction of those routes currently being planned is realized at an early stage. Future plans for rail network construction in Metro Manila have already been demonstrated in the following programs: ① JICA development study “Metro Manila Urban Transportation Integrated Study” (MMUTIS) implemented from 1997 through 1999 ② Medium-Term Philippine Development Plan (MTPDP) established by the Philippine Government and having 1999-2004 as the target year The most important thing in order to increase the number of rail users in Metro Manila is to achieve the earliest possible realization of these already proposed rail network plans. In addition to the already operating Line 1, Line 3 and PNR, if construction of Line 2 (currently being built) and the planned Line 3 extension, Line 4, Line 6, North Rail and MCX is realized, dramatic increase in the number of rail users can be anticipated. (See Appendix 3 for the current conditions and plans of railways in Metro Manila). In advancing construction of the railway network, it will be necessary to promote cooperation between related Departments and Agencies such as the DOTC, NEDA, MMDA and DPWH, etc. -
Invitation for Bids
General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C1 – INSTALLATION & TESTING OF TRACK WORK Sheet 1 of 3 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY C1.1 Obtain Notice of No Objection or Notice of No Objection with Comment(s) from the Engineer for Inspectionand Test Plan, Testing and Commissioning Management Plan. C1.2 Completion of installation and site testing of the Trackwork, platform edge and level clearance of the following stations: (a) PRI Area at Depot (b) Depot (c) East Valenzuela (d) Quirino Highway (e) Tandang Sora (f) North Avenue (g) Quezon Avenue (h) East Avenue (i) Anonas (j) Katipunan (k) Ortigas North (l) Ortigas South (m) Kalayaan Avenue (n) Bonifacio Global City Total of Sheet 1 of Schedule C1 carried forward to Sheet 2: Name of Bidder _________________________________________________________ Signature of Bidder ______________________________ Date ___________________ BF-58 General Bid Bulletin No.1 Annex “C” PACKAGE CP106: E&M SYSTEMS AND TRACK WORKS COST CENTRE C –INSTALLATION, TESTING AND COMMISSIONING SCHEDULE C1 – INSTALLATION & TESTING OF TRACK WORK Sheet 2 of 3 AMOUNT ITEM DESCRIPTION FOREIGN PHP CURRENCY Total carried forward from Sheet 1: (o) Lawton (p) Senate (q) Terminal 3 C1.3 Completion of installation and site testing of the Trackwork, switches, turnout, crossovers, scissors, clearance from sidewalks and signal posts and catenary heights for the followings: (a) Depot to East Valenzuela Station (b) East Valenzuela -
Funding Transport Infrastructure Development in the Philippines: a Roadmap Toward Land Value Capture
JULY 2018 Funding Transport Infrastructure Development in the Philippines: A Roadmap Toward Land Value Capture Haraya Buensuceso and Cesar Purisima EXECUTIVE SUMMARY Prevailing discussions surrounding transport infrastructure in the Philippines tend to focus on the boons and banes of different financing models. While such discussions are important and worthwhile, the fact remains that the sustainability of a transport service ultimately hinges on the ability to pay for it. Whether publicly or privately financed, adequate and reliable funding underlies every project’s long-term success. This paper examines a class of funding tools that has been underutilized, but which the Philippine government may consider using as it plans for an era of “Build, Build, Build.” Land value capture, or LVC for short, takes a “beneficiary-pays” approach to infrastructure and encompasses a plethora of strategies that leverage the benefits of higher land values typically found around transport infrastructure such as urban transit stations, corridors, integration hubs, and roads. For many years, there have been two conflicting demands on who should take on the burden of paying for transport projects. On the one hand, there are calls to reduce transit subsidies, which impose a large tax burden on the population, including nonusers. On the other hand, there is continual pressure to keep transit fares at an affordable level for the commuting public. LVC provides a way out of this conundrum and offers the prospect of an infrastructure funding mix that is more equitable, efficient, and sustainable. LVC has taken on various forms around the world, but not all may be suitable for the Philippine context. -
Chapter 8 Preliminary Design of Stations and Station Plazas
CHAPTER 8 PRELIMINARY DESIGN OF STATIONS AND STATION PLAZAS 8.1 Selection of Candidate Stations for Case Study 8.1.1 Selection Criteria of Candidate Stations for Case Study The main criteria is whether the five station areas accord with the basic concept of the multi- modal station area development in related to the Standardization for Integrated Railway Network of Metro Manila (SIRNMM); what extent they will contribute to the attainment of the SIRNMM objectives; where are they in line strategy, and particularly whether they are accordance with the development concept presented in the development scenario in Chapter 2. The evaluation criteria are established to select two stations from five candidate station areas shown as follows: - Viability in terms of Land Acquisition - Development Benefit - Transport Development Policy Oriented 8.1.2 Selection of Priority Stations Selection of the priority station is based on three ranks for each of the criteria mentioned in the above and score of 0, 1 or 3 is given for each rank based on the qualitative reasoning. The prioritization is classified as high priority area more than 14 of the total score, medium one with 10 – 13 score and low one less than 10 score. Evaluation results are shown in Table 8.1.1. 8 - 1 Table 8.1.1 Evaluation Result for Priority Areas for Multi-modal Station Development Selection Criteria Priority Name of Station ABCDTotal Score Assessment a) C. M Recto (LRT 1.2 & 4, ***** ***** **** **** 18 A rank PNR) b) EDSA (LRT1 & LRT3) ** **** **** *** 13 B rank c) Monumento (LRT1 & LRT3) *** **** **** **** 15 A rank d) Cubao (MRT3 & -* * * 3 C rank MRT2) e) Magallanes (MRT3 & MCX) **** **** **** *** 15 A rank C.