Implementation Plan
PREPARED FOR: Red Rock Corridor Commission
PREPARED BY:
SEPTEMBER 2016 This page is intentionally left blank TABLE OF CONTENTS
1 Executive Summary x4
2 Project Background 10
3 Stakeholder Engagement 14
4 Preferred Alternative 18
5 Financial Plan 28
6 Phasing Plan 36
7 Recommendations and Next Steps 40
8 Appendix 42
Red Rock Implementation Plan TABLE OF CONTENTS 3 Chapter 1: Executive Summary
Red Rock Implementation Plan EXECUTIVE SUMMARY 4 1 EXECUTIVE SUMMARY
1. Executive Summary 1.1 Introduction The Washington, Dakota, Ramsey, and Hennepin Stakeholder Engagement Engagement at Park & Rides County Regional Railroad Authorities completed an Alternative Evaluation Implementation Plan for the Red Rock Corridor. The Red Rock Corridor is a proposed 30-mile transitway that runs Preferred Alternative along Highway 61 and Interstate 94 between Hastings Financial Plan and Union Depot in Saint Paul with connecting service to Phasing Plan Minneapolis (see Figure 1-1). Figure 1-1: Project Area
N 1.3 Project Goals M O E R T T R H O S B T A E R
R E R The following project goals were adopted by the Red I A RAMSEY N I S E H E