Royal Oak Portal (1)
Total Page:16
File Type:pdf, Size:1020Kb
5393_C01.R3.1_RoyalOak 1/2/05 5:27 PM Page 1 C1.R3.1 Royal Oak Portal (1) Crossrail’s tunnels through central London will surface near Royal Oak. The tracks will rise to join the existing railway at ground level before continuing west. A temporary worksite will be located wholly within the railway corridor and enclosed by hoardings and safety barriers during the construction period. When the portal works are complete, excavated material and tunnel linings will be transported by rail rather than road. New portal – Architect’s impression Existing area Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_C02.R3.1_RoyalOak 1/2/05 5:28 PM Page 1 C2.R3.1 Royal Oak Portal (2) Traffic and Access Westbourne Park Reversing Facility The worksite will be accessed via an east and a At the start of Crossrail services, westbound west entrance. Access to the west entrance will trains will terminate at Paddington. be via Harrow Road, Chippenham Road, Elgin As there is insufficient space to provide Avenue and Great Western Road. Lorries will reversing facilities at Paddington, trains would use the existing ramp off the Great Western continue empty to Westbourne Park where Road (A420T) to enter the site. Access to via the a purpose built reversing facility is proposed. east entrance will be from Harrow Road under Westbourne Bridge. During the construction of the reversing facility, provision would be made for future through A new access road will be constructed to services towards Heathrow and Maidenhead. the Paddington Central development to enable the Westbourne Bridge shaft to be maintained. Taxi Area Parking space for maintenance and emergency The existing buildings on the taxi area will be vehicles will be provided between the ventilation demolished to make way for the portal worksite. terminal and the shaft. THIS MAP IS BASED UPON ORDNANCE SURVEY MATERIAL WITH THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY’S STATIONERY OFFICE © CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. (GLA - 100032379) (2005). Royal Oak portal Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected]@crossrail.co.uk Connecting the UK 24 hours a day, 7 days a week wwwwww.crossrail.co.uk.crossrail.co.uk 5393_C03.R3.1_RoyalOak 1/2/05 5:29 PM Page 1 C3.R3.1 Royal Oak Portal (3) The Royal Oak/Westbourne Bridge Portal will Emergency escape stairs will also be provided consist of three elements. at the tunnel portal. ■ A ramp to take the Crossrail tracks down When tunnelling commences, it is anticipated from ground level to the tunnel portal that the excavated material will be brought out ■ A 270 metre long cut-and-cover box section of the shaft by hoist and transferred by road, or possibly conveyor, to the railhead to be ■ A shaft at the tunnel entrance loaded onto trains for onward disposal. On completion of the tunnelling, the shaft will be fitted out as a ventilation and emergency intervention shaft in accordance with London Fire and Emergency Planning Authority requirements. Emergency Escape Stair at portal Westway approach ramp Portal cut and cover tunnel ventilation shaft access stair Site Section Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected]@crossrail.co.uk Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.ukwww.crossrail.co.uk 5393_C04.R3.1_RoyalOak_Wstb 1/2/05 5:42 PM Page 1 C4.R3.1 Royal Oak Portal (4) The shallow cut-and-cover tunnels will occupy the space between Lord Hills Bridge and Ranelagh Bridge north of Royal Oak Station. A road to the escape stairs at the tunnel portal will provide access to this space. Following completion of work the area will be landscaped. The surface structures associated with the ventilation outlet and the emergency access stairs will be constructed in the area between Projection of new site Ranelagh Bridge and Westbourne Bridge and accessed from Harrow Road under Westbourne Bridge. The lightweight metal buildings are designed as sculptural objects to be seen from passing trains on the approach to Paddington Station and from overlooking properties to the south. Existing Site Existing Site Cross Section Projection of new site Section of Portal Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_C05.R3.1_Paddington 1/2/05 5:46 PM Page 1 C5.R3.1 Paddington (1) Building Crossrail Paddington Station Traffic and Access Paddington Station is a Grade I listed building. Two-way traffic and access to buildings The wall and the railings on Eastbourne in Eastbourne Terrace will be maintained Terrace and the departures road canopy throughout construction. Eastbourne Terrace (which form part of the listed structure) will will be reduced to one lane of traffic in each be removed for construction of the Crossrail direction and subject to a number of phased Ticket Hall. The railings will be carefully diversions. Praed Street will have short-term dismantled and carefully examined to see closures at its intersection with Eastbourne how the railings will be reused. The canopy Terrace. Vehicle access to the properties on would be dismantled. the southern side of Eastbourne Terrace will be from Eastbourne Mews or Chilworth Mews. Crossrail recognises the architectural and historic importance of the existing Main New pedestrian links will be provided line station and will create a design that between the existing Main line station, across is appropriate to the location. Eastbourne Terrace, through to a “light spine”. The departures road would be reinstated, The main worksite will be on Eastbourne accommodating taxis and general traffic Terrace, including the departures road. as required by the long term proposals A box structure for the station will be for the area. excavated from within this worksite. Taxis and Buses Site offices, storage and delivery areas will To enable the station to be built, it will be be established within the car park behind the necessary to temporarily relocate taxis Great Western Railway parcels office, off currently using Eastbourne Terrace Departures Bishops Bridge Road. Smaller worksites would Road to the site of a parcels depot to the north be located during the construction period at of the station. Buses will need to be relocated Praed Street and on the London Underground during the period of the Crossrail works. District and Circle line platforms. Crossrail will continue to develop proposals in consultation with Westminster City Council, Network Rail, the local community and other stakeholders. Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected]@crossrail.co.uk Connecting the UK 24 hours a day, 7 days a week wwwwww.crossrail.co.uk.crossrail.co.uk 5393_C06.R3.2_Paddington 07/02/05 14:06 Page 1 C6.R3.2 Paddington (2) Ticket Halls The Crossrail station will be located in a large basement level. This passage will provide level box beneath Eastbourne Terrace. It will contain access to the northbound District & Circle two ticket halls with links to the existing lines, with access to the southbound District station. A predominantly glazed “light spine” and Circle lines from a new footbridge and lifts. will run the length of the box allowing natural Provision will be made to enable future light into the station. Escalators and lifts will interchange with the Hammersmith and City provide access to the Crossrail platforms. line to be provided from the Crossrail western Interchange with the Bakerloo line will be ticket hall. provided by a new passageway between the Ventilation will be incorporated within the Crossrail and Bakerloo line platforms. Access station box at both ends of Eastbourne to this passage will be provided by a staircase Terrace. The station ventilation will provide at the Bakerloo line end. draught relief and assist in maintaining Interchange with the District & Circle line will passenger comfort within the station. be provided from the eastern end of the Crossrail station by a short passage at THIS MAP IS BASED UPON ORDNANCE SURVEY MATERIAL WITH THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY’S STATIONERY OFFICE © CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. (GLA - 100032379) (2005). Paddington Station Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_C07.R3.1_HydePark 1/2/05 6:02 PM Page 1 C7.R3.1 Hyde Park Shaft (1) To ensure the safe running of the railway, the London Fire and Emergency Planning Authority require tunnel access shafts to be provided at no more than 1 kilometre apart. Hyde Park Shaft will be used for ventilation as well as emergency intervention. The shaft will be located between the Existing Site Crossrail tunnels where they pass beneath North Carriage Drive. This location will reduce disturbance to the park and the nearby residential neighbourhood. Ventilation and access shaft The shaft will be connected to a ventilation Ventilation North Carriage Drive Terminal Victoria outlet by a duct under North Carriage Drive. Gate The ventilation outlet will be at ground level underground duct and equipment rooms in a duct behind the Pet Cemetery at Victoria Eastbound Tunnel Westbound Tunnel Lodge. It will be protected by a grille, fence and Duct and Shaft Section Looking North shallow ditch to prevent unauthorised access. THIS MAP IS BASED UPON ORDNANCE SURVEY MATERIAL WITH THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY’S STATIONERY OFFICE © CROWN COPYRIGHT.