Royal Oak Portal (1)

Total Page:16

File Type:pdf, Size:1020Kb

Royal Oak Portal (1) 5393_C01.R3.1_RoyalOak 1/2/05 5:27 PM Page 1 C1.R3.1 Royal Oak Portal (1) Crossrail’s tunnels through central London will surface near Royal Oak. The tracks will rise to join the existing railway at ground level before continuing west. A temporary worksite will be located wholly within the railway corridor and enclosed by hoardings and safety barriers during the construction period. When the portal works are complete, excavated material and tunnel linings will be transported by rail rather than road. New portal – Architect’s impression Existing area Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_C02.R3.1_RoyalOak 1/2/05 5:28 PM Page 1 C2.R3.1 Royal Oak Portal (2) Traffic and Access Westbourne Park Reversing Facility The worksite will be accessed via an east and a At the start of Crossrail services, westbound west entrance. Access to the west entrance will trains will terminate at Paddington. be via Harrow Road, Chippenham Road, Elgin As there is insufficient space to provide Avenue and Great Western Road. Lorries will reversing facilities at Paddington, trains would use the existing ramp off the Great Western continue empty to Westbourne Park where Road (A420T) to enter the site. Access to via the a purpose built reversing facility is proposed. east entrance will be from Harrow Road under Westbourne Bridge. During the construction of the reversing facility, provision would be made for future through A new access road will be constructed to services towards Heathrow and Maidenhead. the Paddington Central development to enable the Westbourne Bridge shaft to be maintained. Taxi Area Parking space for maintenance and emergency The existing buildings on the taxi area will be vehicles will be provided between the ventilation demolished to make way for the portal worksite. terminal and the shaft. THIS MAP IS BASED UPON ORDNANCE SURVEY MATERIAL WITH THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY’S STATIONERY OFFICE © CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. (GLA - 100032379) (2005). Royal Oak portal Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected]@crossrail.co.uk Connecting the UK 24 hours a day, 7 days a week wwwwww.crossrail.co.uk.crossrail.co.uk 5393_C03.R3.1_RoyalOak 1/2/05 5:29 PM Page 1 C3.R3.1 Royal Oak Portal (3) The Royal Oak/Westbourne Bridge Portal will Emergency escape stairs will also be provided consist of three elements. at the tunnel portal. ■ A ramp to take the Crossrail tracks down When tunnelling commences, it is anticipated from ground level to the tunnel portal that the excavated material will be brought out ■ A 270 metre long cut-and-cover box section of the shaft by hoist and transferred by road, or possibly conveyor, to the railhead to be ■ A shaft at the tunnel entrance loaded onto trains for onward disposal. On completion of the tunnelling, the shaft will be fitted out as a ventilation and emergency intervention shaft in accordance with London Fire and Emergency Planning Authority requirements. Emergency Escape Stair at portal Westway approach ramp Portal cut and cover tunnel ventilation shaft access stair Site Section Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected]@crossrail.co.uk Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.ukwww.crossrail.co.uk 5393_C04.R3.1_RoyalOak_Wstb 1/2/05 5:42 PM Page 1 C4.R3.1 Royal Oak Portal (4) The shallow cut-and-cover tunnels will occupy the space between Lord Hills Bridge and Ranelagh Bridge north of Royal Oak Station. A road to the escape stairs at the tunnel portal will provide access to this space. Following completion of work the area will be landscaped. The surface structures associated with the ventilation outlet and the emergency access stairs will be constructed in the area between Projection of new site Ranelagh Bridge and Westbourne Bridge and accessed from Harrow Road under Westbourne Bridge. The lightweight metal buildings are designed as sculptural objects to be seen from passing trains on the approach to Paddington Station and from overlooking properties to the south. Existing Site Existing Site Cross Section Projection of new site Section of Portal Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_C05.R3.1_Paddington 1/2/05 5:46 PM Page 1 C5.R3.1 Paddington (1) Building Crossrail Paddington Station Traffic and Access Paddington Station is a Grade I listed building. Two-way traffic and access to buildings The wall and the railings on Eastbourne in Eastbourne Terrace will be maintained Terrace and the departures road canopy throughout construction. Eastbourne Terrace (which form part of the listed structure) will will be reduced to one lane of traffic in each be removed for construction of the Crossrail direction and subject to a number of phased Ticket Hall. The railings will be carefully diversions. Praed Street will have short-term dismantled and carefully examined to see closures at its intersection with Eastbourne how the railings will be reused. The canopy Terrace. Vehicle access to the properties on would be dismantled. the southern side of Eastbourne Terrace will be from Eastbourne Mews or Chilworth Mews. Crossrail recognises the architectural and historic importance of the existing Main New pedestrian links will be provided line station and will create a design that between the existing Main line station, across is appropriate to the location. Eastbourne Terrace, through to a “light spine”. The departures road would be reinstated, The main worksite will be on Eastbourne accommodating taxis and general traffic Terrace, including the departures road. as required by the long term proposals A box structure for the station will be for the area. excavated from within this worksite. Taxis and Buses Site offices, storage and delivery areas will To enable the station to be built, it will be be established within the car park behind the necessary to temporarily relocate taxis Great Western Railway parcels office, off currently using Eastbourne Terrace Departures Bishops Bridge Road. Smaller worksites would Road to the site of a parcels depot to the north be located during the construction period at of the station. Buses will need to be relocated Praed Street and on the London Underground during the period of the Crossrail works. District and Circle line platforms. Crossrail will continue to develop proposals in consultation with Westminster City Council, Network Rail, the local community and other stakeholders. Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected]@crossrail.co.uk Connecting the UK 24 hours a day, 7 days a week wwwwww.crossrail.co.uk.crossrail.co.uk 5393_C06.R3.2_Paddington 07/02/05 14:06 Page 1 C6.R3.2 Paddington (2) Ticket Halls The Crossrail station will be located in a large basement level. This passage will provide level box beneath Eastbourne Terrace. It will contain access to the northbound District & Circle two ticket halls with links to the existing lines, with access to the southbound District station. A predominantly glazed “light spine” and Circle lines from a new footbridge and lifts. will run the length of the box allowing natural Provision will be made to enable future light into the station. Escalators and lifts will interchange with the Hammersmith and City provide access to the Crossrail platforms. line to be provided from the Crossrail western Interchange with the Bakerloo line will be ticket hall. provided by a new passageway between the Ventilation will be incorporated within the Crossrail and Bakerloo line platforms. Access station box at both ends of Eastbourne to this passage will be provided by a staircase Terrace. The station ventilation will provide at the Bakerloo line end. draught relief and assist in maintaining Interchange with the District & Circle line will passenger comfort within the station. be provided from the eastern end of the Crossrail station by a short passage at THIS MAP IS BASED UPON ORDNANCE SURVEY MATERIAL WITH THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY’S STATIONERY OFFICE © CROWN COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS. (GLA - 100032379) (2005). Paddington Station Crossing the Capital Helpdesk 0845 602 3813 Email: [email protected] Connecting the UK 24 hours a day, 7 days a week www.crossrail.co.uk 5393_C07.R3.1_HydePark 1/2/05 6:02 PM Page 1 C7.R3.1 Hyde Park Shaft (1) To ensure the safe running of the railway, the London Fire and Emergency Planning Authority require tunnel access shafts to be provided at no more than 1 kilometre apart. Hyde Park Shaft will be used for ventilation as well as emergency intervention. The shaft will be located between the Existing Site Crossrail tunnels where they pass beneath North Carriage Drive. This location will reduce disturbance to the park and the nearby residential neighbourhood. Ventilation and access shaft The shaft will be connected to a ventilation Ventilation North Carriage Drive Terminal Victoria outlet by a duct under North Carriage Drive. Gate The ventilation outlet will be at ground level underground duct and equipment rooms in a duct behind the Pet Cemetery at Victoria Eastbound Tunnel Westbound Tunnel Lodge. It will be protected by a grille, fence and Duct and Shaft Section Looking North shallow ditch to prevent unauthorised access. THIS MAP IS BASED UPON ORDNANCE SURVEY MATERIAL WITH THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY’S STATIONERY OFFICE © CROWN COPYRIGHT.
Recommended publications
  • The Operator's Story Appendix
    Railway and Transport Strategy Centre The Operator’s Story Appendix: London’s Story © World Bank / Imperial College London Property of the World Bank and the RTSC at Imperial College London Community of Metros CoMET The Operator’s Story: Notes from London Case Study Interviews February 2017 Purpose The purpose of this document is to provide a permanent record for the researchers of what was said by people interviewed for ‘The Operator’s Story’ in London. These notes are based upon 14 meetings between 6th-9th October 2015, plus one further meeting in January 2016. This document will ultimately form an appendix to the final report for ‘The Operator’s Story’ piece Although the findings have been arranged and structured by Imperial College London, they remain a collation of thoughts and statements from interviewees, and continue to be the opinions of those interviewed, rather than of Imperial College London. Prefacing the notes is a summary of Imperial College’s key findings based on comments made, which will be drawn out further in the final report for ‘The Operator’s Story’. Method This content is a collation in note form of views expressed in the interviews that were conducted for this study. Comments are not attributed to specific individuals, as agreed with the interviewees and TfL. However, in some cases it is noted that a comment was made by an individual external not employed by TfL (‘external commentator’), where it is appropriate to draw a distinction between views expressed by TfL themselves and those expressed about their organisation.
    [Show full text]
  • Uncovering the Underground's Role in the Formation of Modern London, 1855-1945
    University of Kentucky UKnowledge Theses and Dissertations--History History 2016 Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945 Danielle K. Dodson University of Kentucky, [email protected] Digital Object Identifier: http://dx.doi.org/10.13023/ETD.2016.339 Right click to open a feedback form in a new tab to let us know how this document benefits ou.y Recommended Citation Dodson, Danielle K., "Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945" (2016). Theses and Dissertations--History. 40. https://uknowledge.uky.edu/history_etds/40 This Doctoral Dissertation is brought to you for free and open access by the History at UKnowledge. It has been accepted for inclusion in Theses and Dissertations--History by an authorized administrator of UKnowledge. For more information, please contact [email protected]. STUDENT AGREEMENT: I represent that my thesis or dissertation and abstract are my original work. Proper attribution has been given to all outside sources. I understand that I am solely responsible for obtaining any needed copyright permissions. I have obtained needed written permission statement(s) from the owner(s) of each third-party copyrighted matter to be included in my work, allowing electronic distribution (if such use is not permitted by the fair use doctrine) which will be submitted to UKnowledge as Additional File. I hereby grant to The University of Kentucky and its agents the irrevocable, non-exclusive, and royalty-free license to archive and make accessible my work in whole or in part in all forms of media, now or hereafter known.
    [Show full text]
  • Mile End Park Management Plan 2015-2020
    Mile End Park Management Plan 2015-2020 ‘New Challenges’ 2016-2017 Update London Borough of Tower Hamlets Parks & Opens Spaces Arts, Parks & Events Services Communities, Localities & Culture Directorate 1 Contents Introduction 5 Aims 5 1 Objectives of the park 5 Guidance 5 Site Information 6 The Park Deconstructed 6 The Activity Area 6 The Ecology Park and Ecology Pavilion 7 The Art Park 8 The Green Bridge and Terrace Garden 8 The Adventure Park 10 The Sports Park 11 The Children’s Park 12 2 Transport Links 13 Physical & Geographical Details 13 Area of Site 13 Grid Reference 15 Access 15 Land Tenure 17 Public Rights of Way 17 Planning Authority 17 Electoral Information 17 History and Current Status 18 Historical Context 19 3 Key amenities 20 Interlinking Elements 23 A Welcoming Place 25 Objectives 25 Accessibility 25 4 A visible presence 25 Community Park Rangers 25 Signage 25 A Healthy, Safe and Secure Place 26 Objectives 26 Play equipment 26 Security and the Community Park Rangers 26 5 Police and community safety 27 Byelaws 27 Dog control 28 Risk reduction and management 28 Well Maintained and Clean 29 Objectives 29 Grounds maintenance 29 Litter clearance 29 Repairs and graffiti removal 29 6 Park furniture 30 Cleanliness 30 Park lighting and CCTV 30 Financial Allocation 31 A Sustainable Park 32 7 Objectives 32 2 Quality Audit – Green Flag Awards 32 Carbon management plan 32 Grass maintenance 33 Planting 33 Tree Strategy 33 Green Procurement 34 Recycling 35 Pesticides and Fertilisers 35 Water Conservation 35 Building Management 37 Conservation
    [Show full text]
  • Onetwenty.London
    LONDON EC1 THE BUILDING INTRODUCTION 09: 00 THE WORKING DAY IS WHAT YOU MAKE OF IT Offering a newly designed, distinctive reception, 120 Aldersgate Street allows you to make the very most of every minute. In one of London’s most vibrant and iconic areas, welcome to 10,500 unsquare feet of urban office space just waiting to improve your working day. NO BETTER TIME NO BETTER PLACE 02 03 LONDON EC1 THE BUILDING OVERVIEW 08: 45 11: 29 PREMIUM WORK SPACE WITH A PERSONALITY ALL OF ITS OWN If you’re going to make an entrance, make it memorable. At 120 Aldersgate Street, the striking new reception area is just that. With a design inspired by the building’s history, this characterful building has undergone a transformation. Unique features include striking signage, contemporary furniture and an LED illuminated glass wall. The available office space features concrete finishes and exposed services, creating an urban warehouse flavour. An inviting third floor terrace adds to the working environment. 08: 45 Outdoor Entrance 11: 29 5th Floor Office Space 04 05 LONDON EC1 LOCAL AREA AMENITIES 08: 20 07: 15 Virgin Active 200 Aldersgate 08: 00 Look Mum No Hands 08: 20 Workshop Coffee HUNDREDS OF 13: 4 5 Bonfire AMENITIES... AND COUNTING! The immediate area is spoilt for choice when it comes to retail and leisure. Next door, just past the Virgin Active health club, the Barbican is a world of its own, which houses cinemas, restaurants, art galleries, an auditorium, landscaped outdoor areas and Central London’s 13: 45 19: 30 21: 00 largest public conservatory.
    [Show full text]
  • 100 Bus Time Schedule & Line Route
    100 bus time schedule & line map 100 Shadwell - St Paul's View In Website Mode The 100 bus line (Shadwell - St Paul's) has 2 routes. For regular weekdays, their operation hours are: (1) Shadwell: 12:10 AM - 11:55 PM (2) St Paul's: 12:05 AM - 11:50 PM Use the Moovit App to ƒnd the closest 100 bus station near you and ƒnd out when is the next 100 bus arriving. Direction: Shadwell 100 bus Time Schedule 23 stops Shadwell Route Timetable: VIEW LINE SCHEDULE Sunday 12:10 AM - 11:55 PM Monday 12:10 AM - 11:55 PM King Edward Street / St Pauls Station Queen Isabella Way, London Tuesday 12:10 AM - 11:55 PM London Wall / Museum Of London (BE) Wednesday 12:10 AM - 11:55 PM Bastion Highwalk, London Thursday 12:10 AM - 11:55 PM London Wall / Moorgate Station (A) Friday 12:10 AM - 11:55 PM London Wall, London Saturday 12:10 AM - 11:55 PM All Hallows Church (U) 85 London Wall, London Wormwood Street (P) 27 Wormwood Street, London 100 bus Info Direction: Shadwell St Botolph Street (B) Stops: 23 St. Botolph Street, London Trip Duration: 31 min Line Summary: King Edward Street / St Pauls Aldgate (R) Station, London Wall / Museum Of London (BE), 57-60 Aldgate High Street, London London Wall / Moorgate Station (A), All Hallows Church (U), Wormwood Street (P), St Botolph Street Minories (H) (B), Aldgate (R), Minories (H), Tower Hill / Tower 136,138 Minories, London Gateway Station (TE), St Katharine Docks (TS), The Highway (S), Nesham Street (O), Hermitage Wall (A), Tower Hill / Tower Gateway Station (TE) Sampson Street (B), Dundee Street (C), Wapping 3 Royal
    [Show full text]
  • PDU Case Report XXXX/YY Date
    planning report D&P/3147/01 5 March 2014 100 Whitechapel Road Land and Building Fronting Fieldgate Street & Vine Court, London, E1 1JG in the London Borough of Tower Hamlets planning application no. PA/13/03049 Strategic planning application stage 1 referral Town & Country Planning Act 1990 (as amended); Greater London Authority Acts 1999 and 2007; Town & Country Planning (Mayor of London) Order 2008 The proposal Demolition of existing vehicle workshop and erection of extension to the prayer hall at the East London Mosque, residential development comprising 241 open market and affordable housing units including studio, one, two, three and four bedroom apartments in buildings up to 18 storeys, basement parking, public realm improvements, pedestrian link from Fieldgate Street to Whitechapel Road. The applicant The applicant is Alyjiso and Fieldgate Ltd. and the architect is Webb Gray. Strategic issues The development of this mixed-use scheme accommodates both the extension of the East London Mosque and residential uses on a constrained site within the City Fringe Opportunity Area. The proposal is broadly in accordance with strategic planning policy, and is supported. However, further discussion is required regarding housing quality, children’s play space provision, inclusive design, sustainability and transport. Recommendation That Tower Hamlets Council be advised that while the application is generally acceptable in strategic planning terms the application does not comply with the London Plan, for the reasons set out in paragraph 86 of this report; but that the possible remedies set out in this paragraph could address these deficiencies. Context 1 On the 20 January 2014 the Mayor of London received documents from Tower Hamlets Council notifying him of a planning application of potential strategic importance to develop the above site for the above uses.
    [Show full text]
  • The Park Keeper
    The Park Keeper 1 ‘Most of us remember the park keeper of the past. More often than not a man, uniformed, close to retirement age, and – in the mind’s eye at least – carrying a pointed stick for collecting litter. It is almost impossible to find such an individual ...over the last twenty years or so, these individuals have disappeared from our parks and in many circumstances their role has not been replaced.’ [Nick Burton1] CONTENTS training as key factors in any parks rebirth. Despite a consensus that the old-fashioned park keeper and his Overview 2 authoritarian ‘keep off the grass’ image were out of place A note on nomenclature 4 in the 21st century, the matter of his disappearance crept back constantly in discussions.The press have published The work of the park keeper 5 articles4, 5, 6 highlighting the need for safer public open Park keepers and gardening skills 6 spaces, and in particular for a rebirth of the park keeper’s role. The provision of park-keeping services 7 English Heritage, as the government’s advisor on the Uniforms 8 historic environment, has joined forces with other agencies Wages and status 9 to research the skills shortage in public parks.These efforts Staffing levels at London parks 10 have contributed to the government’s ‘Cleaner, Safer, Greener’ agenda,7 with its emphasis on tackling crime and The park keeper and the community 12 safety, vandalism and graffiti, litter, dog fouling and related issues, and on broader targets such as the enhancement of children’s access to culture and sport in our parks The demise of the park keeper 13 and green spaces.
    [Show full text]
  • Crossrail Act 2008 Page 1
    Crossrail Act 2008 Page 1 Crossrail Act 2008 2008 CHAPTER 18 Thomson Reuters (Legal) Limited. UK Statutes Crown Copyright. Reproduced by permission of the Controller of Her Majesty©s Stationery Of®ce. An Act to make provision for a railway transport system running from Maidenhead, in the County of Berkshire, and Heathrow Airport, in the London Borough of Hillingdon, through central London to Shen®eld, in the County of Essex, and Abbey Wood, in the London Borough of Greenwich; and for connected purposes. [22nd July 2008] BE IT ENACTED by the Queen©s most Excellent Majesty, by and with the advice and consent of the Lords Spiritual and Temporal, and Commons, in this present Parliament assembled, and by the authority of the same, as follows:± Extent Preamble: England, Wales, Scotland Works Law In Force 1 Construction and maintenance of scheduled works (1) The nominated undertaker may construct and maintain the works speci®ed in Schedule 1 (ªthe scheduled worksº), being± (a) works for the construction of an underground railway between, in the west, a tunnel portal at Royal Oak in the City of Westminster and, in the east, tunnel portals at Custom House and Pudding Mill Lane in the London Borough of Newham, (b) works for the construction of other railways in the London Boroughs of Barking & Dagenham, Bexley, Ealing, Greenwich, Hammersmith and Fulham, Havering, Hillingdon, Newham, Redbridge and Tower Hamlets, the City of Westminster, the Royal Borough of Kensington & Chelsea, the District of Basildon and the Borough of Brentwood in the County of Essex, the Royal Borough of Windsor & Maidenhead and the Borough of Slough in the County of Berkshire and the District of South Bucks in the County of Buckinghamshire, (c) works consequent on, or incidental to, the construction of the works mentioned in paragraph (a) or (b).
    [Show full text]
  • Davenant Foundation School Foundation School
    DAVENANT DAVENANT FOUNDATION SCHOOL FOUNDATION SCHOOL Chester Road, Loughton, Essex IG10 2LD. Telephone: 020 8508 0404 Facsimile: 020 8508 9301 E-mail: [email protected] Twitter: @DavenantFS @Davenant6thform “a community based firmly on Christian principles” Ofsted “parental commitment and support are significant factors in the school’s success” Ofsted “the school’s extra curricular provision is particularly strong” Ofsted www.davenantschool.co.uk Nurturing Mind, Body and Spirit Produced by: The School Brochure Specialist, FM Litho Design and Print. Tel: 01787 479479 • [email protected] • www.fmlitho.co.uk DAVENANT “a Christian school valuing the past with a vision of the future” It has been over fifty years since Davenant moved from Whitechapel to our present site, here in Loughton. The school has grown to be a highly regarded, Christian ecumenical school achieving excellent results for students of all abilities. Students, staff and the wider community work very hard to make Davenant a successful school. We see ourselves as a community that promotes individual excellence and nurtures the God given potential within each of us. Our ethos is based firmly on the commitment to “nurture mind, body and spirit” and, therefore, we work hard to ensure each student not only achieves their academic potential but also has a range of opportunities to be enriched and to enjoy new experiences away from the classroom. Also, Davenant is highly regarded for the work done in training and developing teachers so that our students receive the high quality teaching they deserve. Our expectations of each other are high. We demand a great deal of our students-hard work, the desire to learn, a determination to succeed and a willingness to contribute fully to the life of the school.
    [Show full text]
  • 1 Giltspur Street
    1 GILTSPUR STREET LONDON EC1 1 GILTSPUR STREET 1 GILTSPUR STREET INVESTMENT HIGHLIGHTS • Occupies a prominent corner position in the heart of Midtown, where the City of London and West End markets converge. • Situated on the west side of Giltspur Street at its junction with West Smithfield and Hosier Lane to the north and Cock Lane to the south. • In close proximity to Smithfield Market and Farringdon Station to the north. • Excellent transport connectivity being only 200m from Farringdon Station which, upon delivery of the Elizabeth Line in autumn 2019, will be the only station in Central London to provide direct access to London Underground, the Elizabeth Line, Thameslink and National Rail services. • 23,805 sq. ft. (2,211.4 sq. m.) of refurbished Grade A office and ancillary accommodation arranged over lower ground, ground and four upper floors. • Held long leasehold from The Mayor and Commonalty of the City of London for a term of 150 years from 24 June 1991 expiring 23 June 2141 (approximately 123 years unexpired) at a head rent equating to 7.50% of rack rental value. • Vacant possession will be provided no later than 31st August 2019. Should completion of the transaction occur prior to this date the vendor will remain in occupation on terms to be agreed. We are instructed to seek offers in excess of£17 million (Seventeen Million Pounds), subject to contract and exclusive of VAT, for the long leasehold interest, reflecting a low capital value of £714 per sq. ft. 2 3 LOCATION & SITUATION 1 Giltspur Street is located in a core Central London location in the heart of Midtown where the City of London and West End markets converge.
    [Show full text]
  • Document.Pdf
    LONDON IS EVOLVING A CITY OF COLLIDING FORCES A CULTURAL CITY A CITY FOR CHALLENGERS AND EXPLORERS A CITY TO MOVE FORWARD WELCOME TO GRESHAM ST PAUL’S MOVE FORWARD THIS IS S T PA U L' S B WOW FACTOR Gresham St Paul’s has something a little different — unparalleled proximity to the global icon that is St Paul’s Cathedral. The building has a privileged location between some of London’s most prominent cultural landmarks, vibrant amenity and a global financial centre. An unofficial logo, St Paul’s Cathedral is our compass point for central London, marking the meeting point of cultural and commercial life in the city. Gresham St Paul’s enjoys A GLOBAL exceptional proximity to this icon. ICON A busy streetscape 340 St Paul’s receives over 1.5m visitors each year years as London’s most recognisable centrepiece 3 minute walk from Gresham St Paul’s View of the Cathedral from the 8th floor of Gresham St Paul’s 4 5 Barbican Centre GRESHAM ST PAUL'S Bank of England St Paul's Cathedral Liverpool St / Moorgate St Paul’s CUTTING EDGE Tate Modern The world’s most popular art museum is connected to St Paul’s by the Millennium Bridge CULTURE 8 Some of London’s leading cultural institutions are just a lunch break away. And there is more to come. A number of high-profile new cultural projects are set to open in 8 the immediate area, including the new Museum of London world-class cultural venues form the opening at West Smithfield Market in the coming years Culture Mile, all within and new concert hall for the London Symphony Orchestra.
    [Show full text]
  • Tfl Interchange Signs Standard
    Transport for London Interchange signs standard Issue 5 MAYOR OF LONDON Transport for London 1 Interchange signs standard Contents 1 Introduction 3 Directional signs and wayfinding principles 1.1 Types of interchange sign 3.1 Directional signing at Interchanges 1.2 Core network symbols 3.2 Directional signing to networks 1.3 Totem signs 3.3 Incorporating service information 1.3 Horizontal format 3.4 Wayfinding sequence 1.4 Network identification within interchanges 3.5 Accessible routes 1.5 Pictograms 3.6 Line diagrams – Priciples 3.7 Line diagrams – Line representation 3.8 Line diagrams – Symbology 3.9 Platform finders Specific networks : 2 3.10 Platform confirmation signs National Rail 2.1 3.11 Platform station names London Underground 2.2 3.12 Way out signs Docklands Light Railway 2.3 3.13 Multiple exits London Overground 2.4 3.14 Linking with Legible London London Buses 2.5 3.15 Exit guides 2.6 London Tramlink 3.16 Exit guides – Decision points 2.7 London Coach Stations 3.17 Exit guides on other networks 2.8 London River Services 3.18 Signing to bus services 2.9 Taxis 3.19 Signing to bus services – Route changes 2.10 Cycles 3.20 Viewing distances 3.21 Maintaining clear sightlines 4 References and contacts Interchange signing standard Issue 5 1 Introduction Contents Good signing and information ensure our customers can understand Londons extensive public transport system and can make journeys without undue difficulty and frustruation. At interchanges there may be several networks, operators and line identities which if displayed together without consideration may cause confusion for customers.
    [Show full text]