Residential Property and Development Land

Total Page:16

File Type:pdf, Size:1020Kb

Residential Property and Development Land RESIDENTIAL PROPERTY AND DEVELOPMENT LAND PATCHES FARM, GALLEY HILL ROAD, WALTHAM ABBEY, ESSEX 0 LOCATION & LOTTING PLANS 2 VENDOR’S AGENT RESIDENTIAL PROPERTY AND DEVELOPMENT LAND PATCHES FARM, GALLEY HILL ROAD, WALTHAM ABBEY, ESSEX, EN9 2AG Patches Farm offers approximately 0.85 hectares (2.10 acres) of development land with outline planning permission for four dwellings and an existing detached bungalow set within 0.27 hectares (0.67 acres), located off Galley Hill, Waltham Abbey. SWORDERS The Gatehouse, Hadham Hall, Little Hadham, Ware, • Edge of Settlement location Hertfordshire SG11 2EB T: 01279 77 11 88 • Outline planning permission granted for four dwellings with all matters reserved F: 01279 77 11 87 [email protected] • Approximately 13,773 sq ft (GEA) of consented residential development • Approximately 1.5 miles to Waltham Abbey, 2 miles to Junction 26 of the M25, VENDOR’S SOLICITOR 5 miles to Epping, 9 miles to Harlow and 23 miles to central London • Waltham Cross mainline station 2.5 miles (travel time to London Liverpool Street approximately 30 minutes). Central line stations at Theydon Bois and Loughton approximately 5 miles. GISBY HARRISON LOT 1: 0.85 hectares (2.10 acres) residential development site for 4 dwellings Goffs Oak House, Goffs Lane, Goffs Oak, LOT 2: 0.27 hectares (0.67 acres) existing detached six bedroom bungalow Hertfordshire, EN7 5HG T: 01707 878300 [email protected] AVAILABLE AS A WHOLE OR IN UP TO 2 LOTS VIEWING STRICTLY BY APPOINTMENT ONLY 3 HEADERLOT 1: RESIDENTIAL ON PAGE DEVELOPMENT LAND The land extends to approximately 0.85 hectares (2.10 acres) and is located within the Metropolitan Green Belt of Epping Forest District. This sale offers an opportunity to acquire a site with outline planning permission for the redevelopment of existing industrial estate and land to provide four new dwellings. RESIDENTIAL DEVELOPMENT Please see additional information pack for details of the land. The land is offered subject to and with the Lot 1, Patches Farm, currently comprises a range the planning permission and drawings. benefit of all existing rights of way, wayleaves and of industrial buildings, two modest residential easements, whether or not specifically referred to in units and garden land with planning permission ACCESS these particulars. for redevelopment. Access to the land is available from Galley Hill Road. In the event that Lots 1 and 2 are sold separately, a right BOUNDARIES LOCATION of access will be granted across Lot 2. The purchaser will be deemed to have full knowledge of The site is located on Galley Hill Road, to the north of the boundaries and neither the Vendors nor their Agent Waltham Abbey, with a rural outlook. Patches Farm SERVICES will be responsible for defining any other boundaries. is located approximately 1.5 miles from Waltham The existing site benefits from mains electricity and Abbey, which offers local amenity services, primary BT supplies. ADDITIONAL INFORMATION PACK and secondary schools, leisure facilities, various retail An additional information pack is available including TENURE & OCCUPATION and restaurant establishments. Waltham Cross Train copies of the planning documents and plans, and The land is available freehold, subject to agreements for Station (2.5 miles) and Epping Tube Station (5 miles) details of third party rights. occupation by third parties existing at the date of sale. offer direct connections into London and the City of GENERAL INFORMATION London, via Greater Anglia or the Central Underground EASEMENTS, WAYLEAVES AND RIGHTS OF WAY Epping Forest District Council – 01992 564000 Line. Waltham Abbey has excellent connections to the There are no known public rights of way affecting Essex County Council Tel: 01245 430430. M25, M11, A1 and A10, making the location ideal for commuting to local centres. PLANNING Outline planning permission was granted on 23rd November 2015 by Epping Forest District Council under application reference EPF/2416/15, this provides for the redevelopment of existing industrial estate to provide two replacement dwellings and two new dwellings. The planning permission allows approximately 13,773 sq ft (1,280 sq m) (GEA) of residential development and includes pre-implementation conditions. The new dwellings will be located to the northern side of the site and arranged in an informal courtyard layout with many existing trees to be retained. The southern part will be reinstated to provide garden and landscaping. 4 MASTERPLAN EXTRACT AND INDICATIVE FLOOR PLANS GROUND FLOOR FIRST FLOOR SECOND FLOOR 5 HEADERLOT 2 – PATCHES ON PAGE FARM BUNGALOW An attractive six bedroom detached chalet style bungalow set within a plot of 0.27 hectares (0.67 acres), with a rural outlook to the north of Waltham Abbey. The accommodation is spacious and offers well-proportioned rooms throughout. Excellent access to London via rail or road network. The accommodation is as follows: BASEMENT Cellar Room 1 (12.8m x 6.0m) GROUND FLOOR Kitchen / Breakfasting Room (6.4m x 4.2m) Cellar Room 2 (6.1m x 3.3m) comprising a range of fitted units with granite work surfaces and electric oven OUTSIDE The property benefits from a large spacious garden, Reception Room (6.4m x 4.2m) with open which has ample parking and a patio/veranda inglenook fireplace surrounding the eastern elevations of the property. Entrance Hall (8.2m x 7.5m) SERVICES The property benefits from mains electricity, oil fired Family Bathroom (3.7m x 2.2m) comprising bath, underfloor heating systems and a BT connection. shower unit, WC and hand basin COUNCIL TAX Bedroom 1 (4.6m x 3.7m) double bedroom with Council Tax: Band G walk in wardrobe EPC RATING Bedroom 2 (4.3m x 4.0m) double bedroom EPC Rating: E Bedroom 3 (3.6m x 3.4m) double bedroom TENURE The property is subject to an Assured Shorthold Bedroom 4 (3.9m x 2.7m) double bedroom Tenancy (AST). Vacant possession could be made FIRST FLOOR available upon completion. Master Bedroom (9.3m x 4.1m) double bedroom with walk in wardrobe and ensuite, comprising a walk in shower, WC and hand basin Bedroom 6 (6.1m x 3.8m) double bedroom Hallway (5.5m x 4.5m) 06 ACCESS TO PATCHES FARM No employee of Sworders has any authority to make The frontage of the site is owned by the City or give any representations or warranty whatever of London Corporation. An existing lease is in in relation to the property. No responsibility can place providing access to the existing bungalow. be accepted for the expenses incurred by any Additional rights will be required to provide access intending Purchasers in this matter. All plans to the developed site. Initial discussions have been included are not to scale and are based upon the made with City of London Corporation with regard Ordnance Survey Map with the sanction of the to installing new rights. Additional information is Controller of H M Stationery Office for reference available on request. purposes only and are not to be relied upon in any contract. Crown Copyright Reserved. Unless DIRECTIONS specifically mentioned all fixtures and fittings are From junction 26 of the M25 take the northern excluded from the sale. exit onto Honey Lane, following signs for Waltham Abbey. Continue along Honey Lane for 1 mile and Particulars prepared February 2016. turn right at the roundabout onto Broomstick Photos taken in 2012. Hall Road. Continue for ½ mile and turn left Get mapping aerial image taken in 2014. onto Ninefields and then immediately left onto Parklands. After approximately 150 metres, VIEWING turn right onto Galley Hill Road, continue for Strictly by appointment only with the approximately 500 metres and the site is located Vendor’s Agent. on the right hand side, indicated by a Sworders T: 01279 771188 ‘For Sale’ board. The nearest postcode is EN9 2AG. E: [email protected] or IMPORTANT NOTICE [email protected] Sworders for itself and the Owners of this property give notice that the particulars are a general outline only for the guidance of intending Purchasers and do not constitute an offer or contract. All descriptions and any other details are given without responsibility and any intending Purchaser should not rely on them as statements or representations of fact but must satisfy themselves by inspection or otherwise as to the correctness of them. Any measurements, areas or distances referred to herein are approximate only. 07 HEADER ON PAGE SURVEYORS | PLANNERS | ARCHITECTS The Gatehouse, Hadham Hall, Little Hadham, Ware, Hertfordshire SG11 2EB T: 01279 77 11 88 The Stables, Bourton Hall, Bourton on Dunsmore, Warwickshire CV23 9SD T: 01788 435 435 [email protected] or [email protected] www.sworders.com 0.
Recommended publications
  • Islington U3A Longer Walking Group
    Islington U3A Longer Walking Group Walk Title Epping Forest Walk No. 198 Area Essex Type Linear Date Friday, 3rd July, 2018 Distance 8 miles (13 km) Timing 3.5 hours walking time + travel + lunch stop. Allow approx 6 hours in total. Therefore expect to be back in Islington before 16.00 pm Meeting up Meet at 10.20 latest, at the entrance of Highbury & Islington, ready & travel to catch the Victoria line to Walthamstow central (or meet there – please indicate this on sign up form). Then we catch the 10.48 Overground train to Chingford (or meet there – please indicate this on sign up form). Overall it’s about a 35 mins journey. We return from Epping tube station on the Central line toward Liverpool Street station. But we can change at Stratford to the Overground and hence get back to H&I. The Freedom Pass/ 60+ Travel card area extends to Chingford and Epping is on the tube system, so no extra tickets required. For any younger members – you’ll need a single ticket to Chingford from Walthamstow. Route (0km, 11.00) From Chingford station we just cross the road and are into Epping Forest (following London Loop sign). From there we take a grassy path onto the ‘Green Ride’. After 1km we veer left (black arrow) on to the gravel ‘Centenary Walk’. Ignore side branches, always keeping straight ahead. On reaching the ‘Cross Roads’ road, we cross straight over (5km, 11.45). After about another couple of kilometres instead of turning right at the Y junction (blue arrow), we take a slight detour to the left to the Conservation Centre where we take a break for lunch (6.5km, 12.00).
    [Show full text]
  • Transport Statement Insigniacorp Ltd Wintry Park, Thornwood Road, Epping
    Transport Statement Insigniacorp Ltd Wintry Park, Thornwood Road, Epping April 2008 Insigniacorp Ltd Wintry Park, Thornwood Road, Epping Quality Assurance Site name: Wintry Park, Thornwood Road, Epping, Essex Client name: Insigniacorp Ltd Type of report: Transport Statement Prepared by: James Lomas BA(Hons), MIHT, MCILT Signed Date 07/04/2008 Reviewed by: Steve Amann BSc(Hons), MSc (Eng), MCILT Signed Date 07/04/2008 Insigniacorp Ltd Wintry Park, Thornwood Road, Epping Table of Contents 1 INTRODUCTION............................................................................................................. 1 1.1 Brief...................................................................................................................... 1 1.2 Background.......................................................................................................... 1 2 EXISTING CONDITIONS................................................................................................ 2 2.1 Existing Site Information ...................................................................................... 2 2.2 Baseline Transport Data ...................................................................................... 3 2.3 Existing Traffic Impact.......................................................................................... 4 3 PROPOSED DEVELOPMENT........................................................................................ 6 3.1 Description of Development ................................................................................
    [Show full text]
  • Strategic Sites Delivery Study
    East Herts Strategic Sites Delivery Study Final Report September 2015 Peter Brett Associates With : On behalf of East Hertfordshire District Council Project Ref: 31122 Date: September 2015 Office Address: St George’s House, 6 St George’s Way, Leicester, LE1 1SH E: [email protected] East Hertfordshire Strategic Sites Delivery Study – Final Report 2015 Document Control Sheet Project Name: East Herts District Council Local Plan Project Ref: 311002-002 Report Title: East Hertfordshire Strategic Sites Delivery Study – Final Report Date: September 2015 Name Position Signature Date Prepared by: Shilpa Rasaiah Senior Associate SR 14/09/2015 Reviewed by: Elliot Page Senior Associate EP 14/09/2015 Approved by: John Baker Partner JB 15/09/2015 For and on behalf of Peter Brett Associates LLP Revision Date Description Prepared Reviewed Approved Appendix E Transport Chris 1 29/09/2015 EP 29/09/2015 Assessment added Heaney Peter Brett Associates LLP disclaims any responsibility to the Client and others in respect of any matters outside the scope of this report. This report has been prepared with reasonable skill, care and diligence within the terms of the Contract with the Client and generally in accordance with the appropriate ACE Agreement and taking account of the manpower, resources, investigations and testing devoted to it by agreement with the Client. This report is confidential to the Client and Peter Brett Associates LLP accepts no responsibility of whatsoever nature to third parties to whom this report or any part thereof is made known. Any such party relies upon the report at their own risk. © Peter Brett Associates LLP 2015 September 2015 ii East Hertfordshire Strategic Sites Delivery Study – Final Report 2015 Contents EXECUTIVE SUMMARY ........................................................................................................................
    [Show full text]
  • Epping Forest District Council Representations to the Draft Local Plan Consultation 2016 (Regulation 18)
    Epping Forest District Council Representations to the Draft Local Plan Consultation 2016 (Regulation 18) Stakeholder ID 3377 Name Graham Bloomfield Pigeon Management Method Letter Date 19/1/2017 This document has been created using information from the Council’s database of responses to the Draft Local Plan Consultation 2016. Some elements of the full response such as formatting and images may not appear accurately. Should you wish to review the original response, please contact the Planning Policy team: [email protected] Letter or Email Response: Epping Forest District Draft Local Plan Consultation – October 2016 Pigeon Land Limited East Epping Introduction 1. This Representations Report has been prepared by Carter Jonas LLP on behalf of Pigeon Investment Management Limited (‘the Promoter’), and is a response to the Epping Forest District Draft Local Plan Consultation (October 2016) (‘the Draft Plan’). The Promoter has secured a promotion agreement with the Gaynes Park Estate (‘the Landowner’), which owns the freehold to the Land North of Steward’s Green Road, Epping. The site boundary is outlined in red in Annex 1 and will be referred to as ‘the Site’ from here on in. Additional land within the Landowner’s ownership is also shown outlined in blue (‘the Blue Land’). A third parcel of land is shown outlined in pink, which is in the ownership of Epping and Theydon Garnon Charities (‘the Third Party Land’). 2. A second plan incorporating the Site, the Third Party Land and part of the Blue Land is shown outlined in red in Annex 2. This will be referred to as ‘the Promotion Site’.
    [Show full text]
  • EB504-Epping-Forest-District-Cycling-Action-Plan-Essex-Highways-March-2018.Pdf
    EB504 Epping Forest District Cycling Action Plan Highways/Transport Planning March 2018 Title Sub title (inc Bridge no.) Date i EB504 Contents Contents ......................................................................................... ii Executive Summary ...................................................................... v 1 Introduction .............................................................................. 1 2 Policy Review ........................................................................... 5 3 Data Analysis ......................................................................... 13 4 Existing Network Provision and Barriers ............................. 27 5 Epping Forest’s Cycling Potential ........................................ 42 6 Potential Infrastructure Improvements ................................ 59 7 Prioritisation and Costings of Potential Schemes ............... 65 8 Flagship Routes ..................................................................... 77 9 Smarter Travel Measures ...................................................... 81 10 Delivery and Funding ............................................................. 83 11 Key Recommendations ......................................................... 85 ii EB504 Figures Figure 1-1 Epping Forest District Map ................................................................ 3 Figure 3-1: 2001 and 2011 Census Cycling to Work by District ....................... 13 Figure 3-2 Percentage of People Cycling to Work by Origin in Epping ............ 15
    [Show full text]
  • Sustainable Travel Pack Livingstone Gardens, Chipping Ongar Contents
    sustainable travel pack Livingstone Gardens, Chipping Ongar contents Welcome 1 Walking 2 Cycling 4 why make fewer Local bus services 6 trips by car? it saves you money!!!! Rail services 10 The fewer trips you make, the more money Taxis 12 you save on fuel and car maintenance costs. Car sharing 14 Reducing your annual mileage reduces your private vehicle insurance premium. Shopping 16 Walking and cycling on a regular basis is Bovis Homes 18 good for your heart and lungs, burns calories and is a good way to a healthier, active life. Contacts & links 20 When travelling by bus or train you don’t Useful documents need to find a parking space, or worry about parking tickets. You also get to avoid the stresses of driving. Fewer car journeys will reduce local CO2 emissions creating a cleaner environment. welcome... Welcome to your Residents Travel Information why make fewer Pack. One of the reasons your development trips by car? was granted planning permission is because it saves you money!!!! your developer has committed to delivering a sustainable development. Part of this commitment requires the preparation and There’s an easier way from A...B implementation of a Resident Travel Plan, which is This Travel Pack provides information to help you plan focussed on encouraging sustainable travel modes such your day to day journey hopefully by alternative means as walking, cycling, public transport and to the car. By providing a range of travel information car share and FREE vouchers we hope this will encourage you to consider other ways to travel than by car.
    [Show full text]
  • TO LET Self Contained 2 Parking Spaces 900 Sq
    TO LET Self Contained 2 Parking Spaces 900 sq. ft. Attractive Town Centre Shop Grade II Listed Building Shop 3 Simon Campion Court 232 – 234 High Street Epping CM16 4AU RENT £27,000 per annum 0.6 miles from Epping Tube Station 4 miles from M11 (J7) 4 miles from M25 (J26) Location The property is located in the affluent market town of Epping, Essex 3 miles (5 km) north east of Loughton, 5 miles (8 km) south of Harlow and 11 miles (18 km) north west of Brentwood. The property is situated along the High Street in a busy location, where nearby occupiers in the vicinity include Prezzo, Nat West, Santander, Lloyds and Cafe Nero, as well as Lloyds Pharmacy, hairdressers and estate agents. Description Simon Campion Court is an attractive Grade II Listed building, providing shops at ground floor and offices at first floor, with allocated parking in the rear yard. Shop 3 is regular in shape and provides majority clear retail space, benefitting from glazed frontage, with access to front and rear. Accomodation Shop Width 8.6m (28' 3'') Shop Depth 10.33m (33`10) Retail Area 67.73 m² (730 sq. ft.) Rear Store/Staff Area 15.82 m² (170 sq. ft.) Rent £27,000 per annum exclusive. The property is not elected for VAT, therefore the rent is not subject to VAT. Terms Available to let by way of a new full repairing and insuring lease for a minimum of 3 years, terms to be agreed. Service Charge A service charge is levied towards the upkeep of common areas.
    [Show full text]
  • Zpg Agent Static Agent Profile
    A collection of houses & apartments www.arboretum.co.uk in the medieval market town of Epping Contents 5 Arboretum 22 The Houses 6 Epping 26 Specification 14 Map & Connections 30 About the Developer 16 Arboretum – Aerial View 31 Visiting Arboretum 18 The Apartments 32 Contacts The lichen of Epping Forest In this green & pleasant land Green fields unfold as far as the eye can see. Epping Forest lies just beyond. The undeniable charm of a medieval market town beckons, just moments away. Welcome to Arboretum. 2 Copped Hall to Bell Common, Epping Forest 3 Arboretum: Epping’s newest community Radiating out from a formally landscaped central square, Arboretum is a new community of 149 cosmopolitan apartments and spacious 3, 4 & 5 bedroom houses just moments from Epping village. Arboretum boasts a fantastic range of homes for every lifestyle. For city-style living choose from three different apartment styles, each with its own en suite and balcony or patio. If you’re looking for a more sizeable footprint, Arboretum boasts eleven house designs, each very different in style, aesthetic and material. All interiors have been designed with the same attention to detail, with high specification appliances alongside outstanding finishes and layouts maximising light and space. Take a stroll around the delightful winding streets adorned with plentiful trees, and you’ll see just how diverse the community is. Arboretum has an enviable location on the edge of green fields and wide open space, and just minutes from Epping’s delightful high street and excellent connections. 4 Computer generated image of Arboretum 5 Around & about Some of our local delights Epping: In the market for fresh produce Epping Ongar Railway Lining the high street is a delightful selection of shops, cafes and boutiques, many housed Epping Market within stunning buildings dating back to the 18th century.
    [Show full text]
  • DRAFT Residential Travel Plan Statement Fyfield Business Park
    Residential T ravel Plan Statement Fyfield Business Park, Chipping Ongar, Essex Prepared for Bovis Homes Limited by Stuart Michael Associates Limited February 2017 Coombe House Coombe Square Thatcham Berkshire RG19 4JF T: 01635 867711 F: 01635 861715 SMA Ref: 5595/TPS E: [email protected] W: www.stuartmichael.co.uk Issue Status: DRAFT DOCUMENT CONTROL Project Fyfield Business Park, Chipping Ongar, Essex Job No. 5595 Document Title Residential Travel Plan Statement N:\Admin Project\5500 to 5599\5595 - Chipping Ongar Travel Plan\Reports\5595 - File Location Chipping Ongar TPS.doc Prepared by Claire Harrison Date 09.02.2017 Reviewed by Martin Ohrland Date 22.02.2017 Approved by Martin Ohrland Date 22.02.2017 Document Issue Description / Changes Revised by Date Draft For Clients Consideration 24.02.2017 COPYRIGHT The copyright for this document rests with Stuart Michael Associates Limited. Copyright for documents and other published sources of information prepared by others and used in the document may rest with others. The contents, in whole or in part, of this document are restricted for use by the client and Stuart Michael Associates Limited in connection with the project in accordance with the terms of engagement. Stuart Michael Associates Limited accepts no liability or responsibility for use of this document for purposes other than those originally intended. Third parties relying on the contents of the document do so at their own risk. No part of the contents of this document may be copied from any digital viewing system maintained to provide access for public scrutiny or any other source without written permission from the Company Secretary of Stuart Michael Associates Limited.
    [Show full text]
  • Epping Forest District Cycling Action Plan Highways/Transport Planning March 2018
    Epping Forest District Cycling Action Plan Highways/Transport Planning March 2018 Title Sub title (inc Bridge no.) Date i Contents Contents ......................................................................................... ii Executive Summary ...................................................................... v 1 Introduction .............................................................................. 1 2 Policy Review ........................................................................... 5 3 Data Analysis ......................................................................... 13 4 Existing Network Provision and Barriers ............................. 27 5 Epping Forest’s Cycling Potential ........................................ 42 6 Potential Infrastructure Improvements ................................ 59 7 Prioritisation and Costings of Potential Schemes ............... 65 8 Flagship Routes ..................................................................... 77 9 Smarter Travel Measures ...................................................... 81 10 Delivery and Funding ............................................................. 83 11 Key Recommendations ......................................................... 85 ii Figures Figure 1-1 Epping Forest District Map ................................................................ 3 Figure 3-1: 2001 and 2011 Census Cycling to Work by District ....................... 13 Figure 3-2 Percentage of People Cycling to Work by Origin in Epping ............ 15 Figure 3-3 Percentage
    [Show full text]
  • Local Air Quality - Vehicle Emissions
    Report to Stronger Place Select Committee Date of meeting: 9 December 2019 Portfolio: Commercial & Regulatory Services (Councillor A. Patel) Subject: Local Air Quality - Vehicle Emissions Officer contact for further information: J. Nolan (01992 564083) Democratic Services Officer: V. Messenger (01992 564265) Recommendations/Decisions Required: That the Committee note the position with regard to the enforcement of current legislation relating to air quality. 1. This report explains the role and responsibilities that officers have in respect of air pollution caused by vehicle emissions as requested by the Overview and Scrutiny Committee at its meeting on 16 July 2019. This covers monitoring, enforcement and education and awareness. 2. Local Air Quality Management (LAQM) places a statutory requirement on local authorities to assess their districts and identify areas of elevated air pollution. This is a staged approach designed to be reviewed yearly to ensure that any changes, such as new developments and changes to traffic are considered and reviewed appropriately. 3. Under Local Air Quality Management, the Public Health Team are responsible for monitoring Air Quality and identifying areas in the district of elevated air pollution. Where elevated concentrations are identified, the Council must declare an Air Quality Management Area (AQMA) and put in place the required actions to bring about a reduction in concentrations to below the objective level in the shortest possible time period. These actions are published in an Air Quality Action Plan document which is submitted to DEFRA for approval and which form the basis of strategic decisions informed by the Local Plan. Whilst the Council will want to improve air quality throughout the district generally, the purpose of the Air Quality Action Plan is to bring about the necessary improvements to air quality within the AQMAs.
    [Show full text]
  • Infrastructure Delivery Plan Part B Report (Infrastructure Delivery Schedule)
    EB1101B Epping Forest District Council Epping Forest District Council Infrastructure Delivery Plan Part B Report (Infrastructure Delivery Schedule) Final | December 2017 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 248921-02 Ove Arup & Partners Ltd 13 Fitzroy Street London W1T 4BQ United Kingdom www.arup.com EB1101B Epping Forest District Council Epping Forest District Council Infrastructure Delivery Plan Part B Report (Infrastructure Delivery Schedule) Contents Page 1 Introduction 1 2 Policy context 2 2.1 National Planning Policy Framework 2 2.2 ECC Developer’s Guide to Infrastructure Contributions (2016) 3 3 Cross boundary working 3 4 Consultation workshops 4 4.1 Developer Forum 5 4.2 Member’s workshop 5 5 Methodology 6 5.1 Infrastructure types and scale of reporting 6 5.2 Identifying infrastructure requirements 8 5.3 Approach to existing capacity surplus and deficits 9 5.4 Rationalisation and Limitations 10 5.5 Prioritisation 11 5.6 Costs 11 5.7 Phasing 12 6 Infrastructure Funding 13 6.1 Pooling restrictions 13 6.2 CIL Charging Schedule and Regulation 123 List 14 6.3 Apportioning costs 14 7 Garden Town Delivery 14 8 Infrastructure Delivery Schedule 16 8.1 IDP as a Live Document 16 8.2 IDP Next Steps 16 8.3 Infrastructure Delivery Schedule: District Wide 17 8.4 Infrastructure Delivery Schedule: Strategic Sites (Combined) 21 8.5 Infrastructure Delivery
    [Show full text]