FERC 2101 Streamflow and Reservoir Elevation Gaging Plan

Total Page:16

File Type:pdf, Size:1020Kb

FERC 2101 Streamflow and Reservoir Elevation Gaging Plan Streamflow and Reservoir Elevation Gaging Plan May 2015 Streamflow and Reservoir Elevation Gaging Plan Sacramento Municipal Utility District Hydro License Implementation • May 2015 Upper American River Project FERC Project No. 2101 Sacramento Municipal Utility District Upper American River Project i FERC Project No. 2101 Streamflow and Reservoir Elevation Gaging Plan May 2015 Table of Contents 1.0 Background and Introduction ................................................................................. 1 2.0 Monitoring Plan Objectives ..................................................................................... 2 3.0 Study Area and Gaging Locations .......................................................................... 2 4.0 Methods….. ............................................................................................................... 5 4.1 Streamflow Gaging .................................................................................................... 6 4.1.1 Rubicon River below Rubicon Reservoir Dam ...................................... 7 4.1.2 Little Rubicon River below Buck Island Reservoir Dam ....................... 9 4.1.3 Gerle Creek below Loon Lake Reservoir Dam .................................... 10 4.1.4 Gerle Creek below Gerle Creek Reservoir Dam ................................. 12 4.1.5 South Fork Rubicon River below Robbs Peak Reservoir Dam ........ 13 4.1.6 South Fork Silver Creek below Ice House Reservoir Dam ................ 14 4.1.7 Silver Creek below Junction Reservoir Dam ....................................... 15 4.1.8 Silver Creek below Camino Reservoir Dam ........................................ 16 4.1.9 Brush Creek below Brush Creek Reservoir Dam ................................ 17 4.1.10 SF American River below Slab Creek Reservoir Dam (sufficient to record spills) .................................................................................................................... 18 4.2 Reservoir Elevation Gaging ................................................................................... 21 4.2.1 Loon Lake Reservoir ................................................................................ 22 4.2.2 Ice House Reservoir ................................................................................ 23 4.2.3 Union Valley Reservoir ............................................................................ 24 4.2.4 Rubicon Reservoir .................................................................................... 25 4.2.5 Buck Island Reservoir .............................................................................. 25 4.2.6 Gerle Creek Reservoir ............................................................................. 26 4.2.7 Junction Reservoir ................................................................................... 26 4.2.8 Camino Reservoir..................................................................................... 27 4.2.9 Brush Creek Reservoir ............................................................................ 27 4.2.10 Slab Creek Reservoir ............................................................................ 28 4.3 Recreational Boating Flow Gaging ....................................................................... 28 5.0 Quality Assurance and Quality Control ................................................................ 29 6.0 Analysis….. ............................................................................................................. 32 7.0 Reporting… ............................................................................................................. 32 8.0 Literature Cited ....................................................................................................... 34 Sacramento Municipal Utility District Upper American River Project i FERC Project No. 2101 Streamflow and Reservoir Elevation Gaging Plan May 2015 Table of Tables, Attachments, and Figures Table 1. UARP streamflow gaging site locations and existing parameters. ............ 3 Table 2. UARP Reservoir gaging site locations and existing parameters. ............... 4 Table 3. Additional management streamflow gaging sites ........................................ 5 Table 4. Rubicon River below Rubicon Reservoir Dam ............................................. 9 Table 5. Little Rubicon River below Buck Island Reservoir Dam ............................ 10 Table 6. Gerle Creek below Loon Lake Reservoir Dam ............................................ 11 Table 7. Gerle Creek below Gerle Creek Reservoir Dam ......................................... 12 Table 8. South Fork Rubicon River below Robbs Peak Reservoir Dam ................. 13 Table 9. South Fork Silver Creek below Ice House Reservoir Dam ........................ 15 Table 10. Silver Creek below Junction Reservoir Dam ............................................ 16 Table 11. Silver Creek below Camino Reservoir Dam .............................................. 17 Table 12. Brush Creek below Brush Creek Reservoir Dam ..................................... 18 Table 13. South Fork American River below Slab Creek Reservoir Dam ............... 20 Table 14. South Fork American River below Slab Creek Reservoir Dam ............... 21 Table 15. General Information on Project Reservoirs .............................................. 22 Table 16. Loon Lake Reservoir Level by Water Year ................................................ 23 Table 17. Ice House Reservoir Level by Water Year ................................................. 24 Table 18. Union Valley Reservoir Level by Water Year ............................................ 24 Table 19. UARP Recreational Staff Gages ................................................................ 29 Table 20. Specifications for the various monitoring equipment. ............................ 30 Table 21. Summary of UARP Gaging Station Improvements .................................. 31 ATTACHMENT 1. ......................................................................................................... 35 Figure 1. Streamflow Gaging Locations…………………………….……………………42 Figure 2. Reservoir Gaging Locations……………………………………………………43 Sacramento Municipal Utility District Upper American River Project ii FERC Project No. 2101 Streamflow and Reservoir Elevation Gaging Plan May 2015 1.0 Background and Introduction This Streamflow and Reservoir Elevation Gaging Plan (Gaging Plan or Plan) was prepared by the Sacramento Municipal Utility District (SMUD) in response to the State Water Resources Control Board (SWRCB) 401 Water Quality Certification Condition 6 (SWRCB 2014) and Condition 36 of the United States Forest Service (USFS) 4(e) as described in the FERC Order Issuing New License (License or new License) of July 23rd, 2014 for the Upper American River Project (UARP), FERC Project No. 2101(FERC 2014). Attachment 1 consists of the conditions contained in the various documents which are applicable to this monitoring plan. The UARP lies within El Dorado and Sacramento counties, primarily within lands of the Eldorado National Forest. The UARP consists of three major storage reservoirs—Loon Lake, Union Valley and Ice House (with a combined capacity of 379,622 acre-feet), eight smaller regulating or diversion reservoirs, and eight powerhouses. The UARP began operations in 1961 and has a generating capacity of approximately 688 megawatts. The UARP also includes recreation facilities containing over 700 campsites, five boat ramps, and hiking and bicycling trails at the reservoirs. SMUD owns and maintains the various dams of the UARP. The original designs of the outlet works and the gaging sites for these dams were engineered for the streamflows that SMUD released pursuant to the original License issued by FERC in 1957. The new License requires SMUD to increase the minimum streamflow releases at all the UARP dams. It also requires SMUD to make special releases at certain dams for stream channel maintenance (referred to as pulse flows), whitewater boating, and water temperature control. Ramping rates are also required during periods when SMUD increases and decreases releases for boating and pulse flow purposes. SMUD will monitor the volume of releases from these dams to assure compliance with release requirements contained in the License. This will require SMUD to modify the outlet works and/or gaging facilities at certain dams. Additionally, as part of the License, SMUD is required to maintain minimum water surface elevations at some UARP reservoirs (SWRCB 401 Water Quality Certification Condition 5, SWRCB 2014). This Gaging Plan describes SMUD’s existing gaging facilities and the proposed modifications necessary to demonstrate compliance with all reservoir release aspects of the License. In keeping with License requirements, SMUD is releasing this Plan with the objective of achieving United States Geological Survey (USGS) and State Water Resources Control Board (SWRCB) review and approval, followed by FERC approval, within one year of License issuance. However, the License also allows up to 3 years after License issuance for SMUD to complete needed facility modifications. Sacramento Municipal Utility District Upper American River Project 1 FERC Project No. 2101 Streamflow and Reservoir Elevation Gaging Plan May 2015 2.0 Monitoring Plan Objectives The primary objective and rationale for the streamflow and reservoir elevation gaging program is to ensure compliance with Settlement Agreement Articles 1-1: Minimum Streamflows and 1-23: Reservoir
Recommended publications
  • Upper American River Hydroelectric Project (P-2101)
    Hydropower Project Summary UPPER AMERICAN RIVER, CALIFORNIA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) South Fork of the American River Slab Creek Dam Canyon Photo Credit: Sacramento Municipal Utility District This summary was produced by the Hydropower Reform Coalition and River Management Society Upper American, CA UPPER AMERICAN RIVER, CA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) DESCRIPTION: The Upper American River Project consists of seven developments located on the Rubicon River, Silver Creek, and South Fork American River in El Dorado and Sacramento Counties in central California. These seven developments occupy 6,190 acres of federal land within the Eldorado National Forest and 54 acres of federal land administered by the Bureau of Land Management (BLM). The proposed The Iowa Hill Development will be located in El Dorado County and will occupy 185 acres of federal land within the Eldorado National Forest. Due to the proximity of the Chili Bar Hydroelectric Project (FERC No. 2155) under licensee Pacific Gas & Electric Company(PG&E) located immediately downstream of the Upper American Project on the South Fork American River (and also under-going re-licensing), both projects were the subject of a collaborative proceeding and settlement negotiations. The current seven developments include Loon Lake, Robbs Peak, Jones Fork, Union Valley, Jaybird, Camino, and Slab Creek/White Rock. White Rock Powerhouse discharges into the South Fork American River just upstream of Chili Bar Reservoir. In addition to generation-related facilities, the project also includes 47 recreation areas that include campgrounds, day use facilities, boat launches, trails, and a scenic overlook. The 19 signatories to the Settlement are: American Whitewater, American River Recreation Association, BLM, California Parks and Recreation, California Fish and Wildlife, California Outdoors, California Sportfishing Protection Alliance, Camp Lotus, Foothill Conservancy, Forest Service, Friends of the River, FWS, Interior, U.S.
    [Show full text]
  • 11441001 Union Valley Reservoir Near Riverton, CA Sacramento River Basin
    Water-Data Report 2011 11441001 Union Valley Reservoir near Riverton, CA Sacramento River Basin LOCATION.--Lat 38°51′49″, long 120°26′15″ referenced to North American Datum of 1927, in NW ¼ NW ¼ sec.29, T.12 N., R.14 E., El Dorado County, CA, Hydrologic Unit 18020129, Eldorado National Forest, in valve control house near left bank at Union Valley Dam on Silver Creek, 0.7 mi upstream from Little Silver Creek, and 6.6 mi north of Riverton. DRAINAGE AREA.--83.7 mi². SURFACE-WATER RECORDS PERIOD OF RECORD.--October 1962 to current year. CHEMICAL ANALYSES: Water year 1996. GAGE.--Water-stage recorder. Datum of gage is NGVD of 1929 (levels by Sacramento Municipal Utility District). COOPERATION.--Records, including diversion to Union Valley Powerplant (station 11441002) were collected by Sacramento Municipal Utility District, under general supervision of the U.S. Geological Survey, in connection with Federal Energy Regulatory Commission project no. 2101. REMARKS.--Reservoir is formed by earthfill dam completed in December 1962; storage began May 1962. Usable capacity, 261,500 acre-ft, between elevations 4,645.0 ft, minimum operating level, and 4,870.0 ft, top of radial spillway gates. Dead storage, 4,883 ft. Reservoir receives water from the South Fork Rubicon River via Robbs Peak Powerplant (station 11429300) and from South Fork Silver Creek, since April 1985, via Jones Fork Powerplant (station 11440900). Water is used for power development in the South Fork American River Basin. Discharge to Union Valley Powerplant is shown as a line item below this table. Records, including extremes, represent total contents.
    [Show full text]
  • Federal Register/Vol. 70, No. 150/Friday, August 5, 2005/Notices
    45384 Federal Register / Vol. 70, No. 150 / Friday, August 5, 2005 / Notices Commission (Commission or FERC) DEPARTMENT OF ENERGY be filed electronically via the Internet in regulations contained in the Code of lieu of paper; see 18 CFR Federal Regulations (CFR) (18 CFR part Federal Energy Regulatory 385.2001(a)(1)(iii) and the instructions 380 (FERC Order No. 486, 52 FR Commission on the Commission’s Web site (http:// 47897)), the Office of Energy Projects [Project No. 2101] www.ferc.gov) under the ‘‘e-Filing’’ link. staff (staff) has reviewed the application After logging into the e-Filing system, for a subsequent license for the City of Sacramento Municipal Utility District; select ‘‘Comment on Filing’’ from the Marshall Hydroelectric Project, located Notice of Application and Preliminary Filing Type Selection screen and on the Kalamazoo River near the City of Draft Environmental Assessment continue with the filing and process. The Commission strongly encourages Marshall, in Calhoun County, Michigan. Tendered for Filing with the electronic filing. The project does not affect federal lands. Commission, and Establishing Procedural Schedule for Relicensing l. Status: This application has not Staff has prepared an Environmental been accepted for filing. We are not Assessment (EA) for the project. In this and Deadline for Submission of Final Amendments soliciting motions to intervene, protests, EA, the staff has analyzed the potential or final terms and conditions at this environmental effects of the proposed July 28, 2005. time. project and has concluded that Take notice that the following m. Description of project: The project relicensing the project, with staff’s hydroelectric application has been filed is located on the west slope of the Sierra recommended measures, would not with the Commission and is available Nevada Mountain Range, in El Dorado constitute a major Federal action for public inspection.
    [Show full text]
  • Report Template 20120228
    New Slab Creek Powerhouse and Boating Flow Release Valve Project Final Initial Study and Mitigated Negative Declaration • September 2015 New Slab Creek Powerhouse and Boating Flow Release Valve Project Final Initial Study and Mitigated Negative Declaration • September 2015 Lead Agency: SMUD–Environmental Management 6201 S Street, MS B203 Sacramento, CA 95817-1899 or P.O. Box 15830 MS B203 Sacramento, CA 95852-1830 Attn: Jose Bodipo-Memba (916) 732-6493 or [email protected] Prepared by: AECOM 2020 L Street, Suite 400 Sacramento, CA 95811 Contact: Petra Unger [email protected] New Slab Creek Powerhouse and Boating Flow Release Valve Project September 2015 Introduction This draft initial study (IS) and mitigated negative declaration (MND) have been prepared to evaluate Sacramento Municipal Utility District’s (SMUD’s) New Slab Creek Powerhouse and Boating Flows Release Valve (proposed project) for compliance with the California Environmental Quality Act (CEQA). SMUD is the lead agency responsible for complying with CEQA. In addition to this Initial Study, the potential environmental impacts of the proposed project were addressed under the National Environmental Policy Act (NEPA). On April 29, 2015, the Federal Energy Regulatory Commission (FERC) published a NEPA EA evaluating the environmental effects of the proposed project. The following CEQA evaluation incorporates FERC’s environmental analysis and provides additional information specific to the CEQA checklist questions. This Initial Study also incorporates information provided by FERC/U.S. Forest Service (USFS) in the 2008 Upper American River Project (UARP) 2008 EIS and SMUD’s 2008 CEQA Supplemental Analysis for the UARP. Project Description SMUD proposes to construct and operate the proposed project as part of the existing Upper American River Project (UARP) hydroelectric facilities in El Dorado County, California.
    [Show full text]
  • Riparian Vegetation Mapping
    RIPARIAN VEGETATION MAPPING IN THE SOUTH FORK AMERICAN RIVER AND LOWER IOWA CANYON CREEK 2010 April 2011 Prepared For: Sacramento Municipal Utility District Power Generation Department 6201 S Street, Mail Stop B355 Sacramento, CA 95817 Prepared By: ECORP Consulting, Inc. 2525 Warren Drive Rocklin, California 95677 TABLE OF CONTENTS 1.0 INTRODUCTION .............................................................................................................. 1 1.1 Site Location ........................................................................................................... 2 1.2 Existing Site Conditions ......................................................................................... 2 2.0 METHODS ......................................................................................................................... 2 3.0 RESULTS AND DISCUSSION ......................................................................................... 3 3.1 Upland Communities .............................................................................................. 3 3.2 Riparian Communities ............................................................................................ 6 3.3 Riparian Vegetation Comparison: 2004-2010 ........................................................ 7 4.0 CONCLUSION ................................................................................................................... 9 5.0 REFERENCES ................................................................................................................
    [Show full text]
  • Eldorado National Forest Visitor Guide Where to Go - Campgrounds & Picnic Areas
    United States Department of Agriculture Eldorado National Forest South of Little Round Top (Photo by Mark Sandperl) Visitor Guide Thousands of visitors are drawn each year to the Eldorado National Forest’s rivers, Contents What To Do? 2 lakes, and streams alive with fish; mountains and meadows for alpine and nordic skiing; campsites and picnic areas in alpine backcountry and dense forests. Four Where To Go? - Campgrounds 3 hundred- Highway miles 50 and of hikingHighway trails 88 pass- run through through all the kinds Forest, of terrain,making fromit an easygentle drive oak from Where To Go? - Trails 4 foothills on the west to the 10,000-foot crest of the Sierra Nevada. Two major highways Traveling 5 SacramentoThe miners who and thecame San to FranciscoCalifornia Bay in the Area. gold rush of 1849 called the land “el dorado” Where To Go? - Highlights 6 Know Before You Go 7 fortoday! the fabled Spanish “land of gold.” We hope that after you have enjoyed Eldorado Map 8 National Forest’s natural riches you will think the name is even more appropriate The Forest Service is committed to nurturing and managing the National Forests in Quick Facts ♦ Acreage = 615,037 order to ensure the health of the land. As we respectfully use and play in these precious ♦ Elevation = ranges from 1,000 to 10,000 feet publicLocated lands, in the we Central are taking Sierra part Nevada in a shared region, vision the Eldorado for the future. National Forest is considered ♦ Climate = Warm, dry summers and cold wet winters. an urban forest.
    [Show full text]
  • Upper American Projects
    Hydropower Project Summary UPPER AMERICAN RIVER, CALIFORNIA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) South Fork of the American River Slab Creek Dam Canyon Photo Credit: Sacramento Municipal Utility District This summary was produced by the Hydropower Reform Coalition and River Management Society Upper American, CA UPPER AMERICAN RIVER, CA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) DESCRIPTION: The Upper American River Project consists of seven developments located on the Rubicon River, Silver Creek, and South Fork American River in El Dorado and Sacramento Counties in central California. These seven developments occupy 6,190 acres of federal land within the Eldorado National Forest and 54 acres of federal land administered by the Bureau of Land Management (BLM). The proposed The Iowa Hill Development will be located in El Dorado County and will occupy 185 acres of federal land within the Eldorado National Forest. Due to the proximity of the Chili Bar Hydroelectric Project (FERC No. 2155) under licensee Pacific Gas & Electric Company(PG&E) located immediately downstream of the Upper American Project on the South Fork American River (and also under-going re-licensing), both projects were the subject of a collaborative proceeding and settlement negotiations. The current seven developments include Loon Lake, Robbs Peak, Jones Fork, Union Valley, Jaybird, Camino, and Slab Creek/White Rock. White Rock Powerhouse discharges into the South Fork American River just upstream of Chili Bar Reservoir. In addition to generation-related facilities, the project also includes 47 recreation areas that include campgrounds, day use facilities, boat launches, trails, and a scenic overlook. The 19 signatories to the Settlement are: American Whitewater, American River Recreation Association, BLM, California Parks and Recreation, California Fish and Wildlife, California Outdoors, California Sportfishing Protection Alliance, Camp Lotus, Foothill Conservancy, Forest Service, Friends of the River, FWS, Interior, U.S.
    [Show full text]
  • News Release
    United States Department of Agriculture U.S. Forest Service Pacific Southwest Region News Release Eldorado National Forest For Immediate Release 100 Forni Road May 8, 2018 Placerville, CA 95667 Voice: 530-622-5061 USFS: Jennifer Chapman – 530-957-9660 Web: www.fs.usda.gov/eldorado [email protected] SMUD: Chris Capra – 916-732-5111 [email protected] Twitter: @EldoradoNF Facebook: www.facebook/EldoradoNF Crystal Basin recreation improvements underway, alternative destinations recommended in 2018 PLACERVILLE, Calif. - The popular Crystal Basin Recreation Area in the Eldorado National Forest is undergoing major upgrades which will greatly enhance the visitor experience in the future, but may make other destinations a better choice this year. Sunset Campground is closed for the 2018 season. Although Sunset Campground will be closed, the Sunset Boat Launch and Fashoda Campground / Day Use Area will be open Memorial Day weekend through Labor Day weekend, providing opportunities for water recreation on Union Valley Reservoir. Azalea Cove Campground will be closed over Memorial Day weekend, but may reopen by the July 4 weekend if work goes according to schedule. Temporary closures will occur at other sites throughout the season. Check SMUD’s website for the current construction schedule before visiting the Crystal Basin. Already completed in 2017 are the Loon Lake Boat Launch, new composting toilet facilities at Pleasant Campground, and trail improvements between Loon Lake, Buck Island Reservoir and Rubicon Reservoir. The multi-year comprehensive plan to improve more than 20 campgrounds, as well as multiple day use areas, boat launches, roads, hiking and biking trails, and potable water systems in the Crystal Basin is part of an agreement between Sacramento Municipal Utility District (SMUD) and the USDA Forest Service, in which SMUD will invest up to $150 million in the Crystal Basin Recreation Area over the next 50 years.
    [Show full text]
  • Sierra Nevada, California
    ffiOLOGICAL SURVEY CIRCULAR 85 December 1950 SIERRA NEVADA, CALIFORNIA By F. A. Johnson UNITED STATES DEPARTMENT OF THE INTERIOR Oscar L. Chapman, Secretary GEOLOGICAL SURVEY W. E. Wrather, Director WASHINGTON, D. C. SOME RESERVOIR SITES IN THE SIERRA NEVADA, CALIFORNIA By F. A. Johnson CONTENTS Page Page Introduction............................................... 3 Bear River drainage basin............................ 15 feather River drainage basin........................ 3 Rollins reservoir site, Bear River.............. 15 Greenville (Indian Valley) reservoir site, Garden Bar reservoir site, Bear River........ 16 Indian Creek.......................................... Waldo reservoir site, Dry Creek (Bear River American Valley reservoir site, Spanish drainage)............................................... 16 Creek................................................... American River drainage basin...................... 17 Grizzly Valley reservoir site, Grizzly French Meadows reservoir site, Middle Creek................................................... Fork American River.............................. 17 Clio reservoir site, Middle Fork Feather Rock Bound diversion and Buck Island Lake River................................................... reservoir sites, Rubicon River drainage Nelson Point reservoir site, Middle Fork basin.................................................... 18 Feather River........................................ Loon Lake Reservoir site, Gerle Creek........ 19 Bidwell Bar reservoir site, Middle Fork Gerle Creek reservoir
    [Show full text]
  • FERC Project No 2101 License Amendment Order
    20161109-3051 FERC PDF (Unofficial) 11/09/2016 157 FERC ¶ 62,106 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Sacramento Municipal Utility District Project No. 2101-096 ORDER AMENDING LICENSE, REVISING PROJECT DESCRIPTION, AND APPROVING EXHIBIT F DRAWINGS (Issued November 9, 2016) 1. On August 27, 2014 and supplemented April 20, 2015, and June 11, 2015, the Sacramento Municipal Utility District, licensee for the Upper American River Project No. 2101, filed an application to amend its license in order to install a minimum flow powerhouse and boating flow release valve below the existing Slab Creek dam.1 The project is located on Silver Creek and the Rubicon and South Fork American Rivers in El Dorado and Sacramento counties, California. The project occupies federal lands administered by the U.S. Bureau of Land Management (BLM) and by the U.S. Forest Service (Forest Service) within the Eldorado National Forest. Background 2. The license for the Upper American River Project was issued on July 23, 2014.2 The project consists of seven developments and includes (from upstream to downstream): Loon Lake, Robbs Peak, Jones Fork, Union Valley, Jaybird, Camino, and Slab Creek/White Rock developments.3 Only the Slab Creek/White Rock development is relevant to this application and consists of: (1) the double curvature, variable radius, 250- foot-high, 817-foot-long, concrete arch Slab Creek dam with a central uncontrolled spillway; (2) a 280-acre reservoir with a storage capacity of 16,600 acre-feet; (3) a 24- 1 On August 5, 2016, the licensee filed a request to name its proposed facilities the South Fork powerhouse and boating flow release valve.
    [Show full text]
  • General Presentation Template
    PROFESSIONAL SERVICES IN SUPPORT OF HYDRO LICENSE IMPLEMENTATION FOR SMUD’S UPPER AMERICAN RIVER PROJECT (UARP) AND OVERLAPPING LICENSE CONDITIONS FOR PACIFIC GAS AND ELECTRIC COMPANY’S CHILI BAR PROJECT Pre-Bid Conference October 29th 2015 UARP Assets Include: • 11 Reservoirs • 8 Power Houses • 17 Dams • 9 Switchyards • 21 miles of tunnels • 48 monitoring stations – Weather, reservoir levels and stream flows 2 SMUD’s Hydro Generation SMUD-Owned Large Hydro [2] 1,656 GWh ( 14% ) Other Net Non-Renewable Purchases 1,485 GWh ( 12% ) Other Large Hydro Purchases 851 GWh ( 7% ) SMUD-Owned Renewable [4] 358 GWh ( 3% ) Other Net Renewable SMUD-Owned Purchases Gas Fired [3] 1,724 GWh 6,018 GWh ( 14% ) ( 50% ) 3 UPPER RESERVOIRS LOON LAKE RESERVOIR UNION VALLEY RESERVOIR ICE HOUSE RESERVOIR SLAB CREEK RESERVOIR GERLE CREEK (LOON LAKE REACH) SOUTH FORK SILVER CREEK SILVER CREEK (JUNCTION REACH) SILVER CREEK (CAMINO REACH) SF AMERICAN RIVER (SLAB REACH) KAYAKING IN SLAB CREEK REACH PG&E’S CHILI BAR PROJECT PROJECT FACILTIES: • Chili Bar Reservoir (1.3 taf storage) • Chili Bar Powerhouse • No Existing Formal Recreation Facilities PROJECT ATTRIBUTES: • 7 MW Capacity • 31 GWh Average Annual Energy CHILI BAR DAM & POWERHOUSE CHILI BAR RESERVOIR SF AMERICAN RIVER, THE REACH BELOW CHILI BAR UARP – Chili Bar Relicensing History 2001 • Initiated UARP ALP (Parallel PG&E TLP) 2002-2004 • Technical Studies 2005 • SMUD/PG&E applications for new License 2007 • Settlement Agreement 2008 • U.S. Forest Service 4(e) Conditions and joint FEIS 2009 • US Fish and Wildlife Service Biological Opinion 2013 • State Water Board 401 Water Quality certifications 2014 • New FERC Licenses for UARP and Chili Bar (50 yrs.) Professional Services in Support of Implementing Ecological, Recreational, and Resource Management Conditions for the Upper American River Project and Overlapping License Conditions for PG&E's Chili Bar Project REQUEST FOR PROPOSAL NO.
    [Show full text]
  • Reservoir Fisheries Technical Report
    SACRAMENTO MUNICIPAL UTILITY DISTRICT UPPER AMERICAN RIVER PROJECT (FERC Project No. 2101) and PACIFIC GAS AND ELECTRIC COMPANY CHILI BAR PROJECT (FERC Project No. 2155) RESERVOIR FISHERIES TECHNICAL REPORT Prepared by: Devine Tarbell & Associates, Inc. Stillwater Sciences Sacramento, California Davis, California Prepared for: Sacramento Municipal Utility District Sacramento, California and Pacific Gas and Electric Company San Francisco, California APRIL 2005 Version 2 Pacific Gas and Electric Company Sacramento Municipal Utility District Chili Bar Project Upper American River Project FERC Project No. 2155 FERC Project No. 2101 TABLE OF CONTENTS Section & Description Page 1.0 INTRODUCTION .............................................................................................................. 1 2.0 BACKGROUND............................................................................................................... 2 2.1 Fish Surveys Study Plan ........................................................................................ 2 2.2 Water Year Type During Study .............................................................................. 4 2.3 Agency Requested Information .............................................................................. 4 3.0 METHODS ......................................................................................................................... 4 3.1 Beach Seining and Gill Netting .............................................................................. 4 3.2 Fish Processing......................................................................................................
    [Show full text]