Federal Register/Vol. 70, No. 150/Friday, August 5, 2005/Notices

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 70, No. 150/Friday, August 5, 2005/Notices 45384 Federal Register / Vol. 70, No. 150 / Friday, August 5, 2005 / Notices Commission (Commission or FERC) DEPARTMENT OF ENERGY be filed electronically via the Internet in regulations contained in the Code of lieu of paper; see 18 CFR Federal Regulations (CFR) (18 CFR part Federal Energy Regulatory 385.2001(a)(1)(iii) and the instructions 380 (FERC Order No. 486, 52 FR Commission on the Commission’s Web site (http:// 47897)), the Office of Energy Projects [Project No. 2101] www.ferc.gov) under the ‘‘e-Filing’’ link. staff (staff) has reviewed the application After logging into the e-Filing system, for a subsequent license for the City of Sacramento Municipal Utility District; select ‘‘Comment on Filing’’ from the Marshall Hydroelectric Project, located Notice of Application and Preliminary Filing Type Selection screen and on the Kalamazoo River near the City of Draft Environmental Assessment continue with the filing and process. The Commission strongly encourages Marshall, in Calhoun County, Michigan. Tendered for Filing with the electronic filing. The project does not affect federal lands. Commission, and Establishing Procedural Schedule for Relicensing l. Status: This application has not Staff has prepared an Environmental been accepted for filing. We are not Assessment (EA) for the project. In this and Deadline for Submission of Final Amendments soliciting motions to intervene, protests, EA, the staff has analyzed the potential or final terms and conditions at this environmental effects of the proposed July 28, 2005. time. project and has concluded that Take notice that the following m. Description of project: The project relicensing the project, with staff’s hydroelectric application has been filed is located on the west slope of the Sierra recommended measures, would not with the Commission and is available Nevada Mountain Range, in El Dorado constitute a major Federal action for public inspection. and Sacramento counties. The proposed significantly affecting the quality of the a. Type of Application: New—major project would be comprised of eight human environment. modified license. developments; seven of which are b. Project No.: 2101. existing developments (Loon Lake, Copies of the EA are available for c. Date Filed: July 15, 2005. Robbs Peak, Jones Fork, Union Valley, review in the Public Reference Branch, d. Applicant: Sacramento Municipal Jaybird, Camino, and Slab Creek/White Room 2–A, of the Commission’s offices Utility District. Rock) constructed by SMUD from 1959 at 888 First Street, NE., Washington, DC e. Name of Project: Upper American through 1985 under the initial FERC 20426. This EA may also be viewed on River Project. license, and one of which would be a the Web at http://www.ferc.gov. Using f. Location: On the Rubicon River, new pumped storage development (Iowa the ‘‘e-Library’’ link, enter the docket Silver Creek, and South Fork of the Hill) proposed by SMUD to be number excluding the last three digits in American River near Placerville, constructed by 2015. Nearly all of the the document field to access the California. The project affects 6,375 land surrounding the project reservoirs document. For assistance, please contact acres of Federal land administered by within the FERC Project Boundary is FERC Online Support at the El Dorado National Forest and 54 owned by the United States and [email protected], call toll free (866) acres of Federal land administered by administered by the Forest Service as 208-3676, or TTY (202) 502–8659. the Bureau of Land Management. part of the Eldorado National Forest g. Filed Pursuant to: Federal Power Any comments should be filed within (ENF). There are also several project- Act, 16 U.S.C. 791 (a)-825(r). related recreation facilities, which are 30 days from the date of this notice and h. Applicant Contact: David Hanson, owned and operated by the ENF, at should be addressed to Magalie Roman Project Manager, Sacramento Municipal Loon Lake, Gerle Creek, Union Valley, Salas, Secretary, Federal Energy Utility District, 6301 S Street, and Ice House reservoirs. These Regulatory Commission, 888 First Sacramento, California 95817–1899. recreation facilities are not project Street, NE., Washington, DC 20426. Phone: 916–732–6703 or e-mail: features. Please affix ‘‘City of Marshall Project [email protected]. • Loon Lake Development—(1) No. 6514–009’’ to all comments. For i. FERC Contact: Jim Fargo at (202) Rubicon Dam—A 36-foot-high by 644- further information, please contact Peter 502–6095, or e-mail: foot-long, concrete gravity main Leitzke at (202) 502-6059 or e-mail at [email protected]. diversion dam located on the Rubicon [email protected]. j. Cooperating Agencies: We are River, and a concrete gravity auxiliary Comments may be filed electronically asking federal, state, local, and tribal dam that is 29-foot-high by 553-foot- via the Internet in lieu of paper. See 18 agencies with jurisdiction and/or long. These structures create the special expertise with respect to CFR 385.2001(a)(1)(iii) and the Rubicon Reservoir; (2) Rockbound environmental issues to cooperate with Tunnel—A 0.2-mile-long, 13-foot- instructions on the Commission’s web us in the preparation of the diameter unlined horseshoe tunnel that site at http://www.ferc.gov under the ‘‘e- environmental document. Agencies who diverts water from Rubicon Reservoir to Filing’’ link. would like to request cooperating status Buck Island Reservoir via Rockbound Linda Mitry, should follow the instructions for filing Lake (a non-project facility) located on Deputy Secretary. comments described in item k below. Highland Creek; (3) Buck Island Dam— Agencies granted cooperating status will A concrete gravity diversion dam [FR Doc. E5–4203 Filed 8–4–05; 8:45 am] be precluded from being an intervenor located on the Little Rubicon River that BILLING CODE 6717–01–P in this proceeding consistent with the is 23-feet-high by 293-feet-long, and a Commission’s regulations. 15-foot-high by 244-foot-long concrete k. Deadline for requests for gravity auxiliary dam. These structures cooperating agency status: 60 days from create Buck Island Reservoir; (4) Buck- the date of this notice. All documents Loon Tunnel—A 1.6-mile-long, 13-foot- (original and eight copies) should be diameter unlined modified horseshoe filed with: Magalie Roman Salas, tunnel that diverts water from Buck Secretary, Federal Energy Regulatory Island Reservoir to Loon Lake Reservoir; Commission, 888 First Street, NE., (5) Loon Lake Dam—A rockfill dam on Washington, DC 20426. Comments may Gerle Creek that is 0.4-mile-long by 108- VerDate jul<14>2003 15:34 Aug 04, 2005 Jkt 205001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\05AUN1.SGM 05AUN1 Federal Register / Vol. 70, No. 150 / Friday, August 5, 2005 / Notices 45385 feet-high, with a 250-foot-long side Valley Transmission Line—A 6.8-mile- Reservoir and the Jaybird Penstock; (3) channel spillway on the right bank, and long, 69 kV overhead line that connects Jaybird Penstock—A 6- to 10-foot- a 910-footlong by 95-foot-high rockfill the Robbs Peak switchyard to the Union diameter steel penstock with a surge auxiliary dam, and an earthfill dike. Valley switchyard. tank that is 0.5-mile-long, connecting These create Loon Lake Reservoir; (6) • Jones Fork Development—(1) Ice Jaybird Tunnel and Jaybird Powerhouse; Loon Lake Penstock—A 0.3-mile-long, House Dam—A rockfill dam located on (4) Jaybird Powerhouse—The 14-foot-diameter concrete-lined the South Fork Silver Creek, 0.3-mile- powerhouse is equipped with two horseshoe tunnel; 10-foot-diameter long and 150-foot-high, incorporating a Pelton turbines, one with a rated concrete lined vertical shaft; and 8.5- concrete ogee spillway with radial gates, capacity of 61,607 kW and the other foot-diameter steel lined tunnel that and two auxiliary earthfill dikes; these 61,574 kW at best gate opening, and two extends from Loon Lake Reservoir to create the Ice House Reservoir; (2) Jones generators, each rated at 84,450 kW; Loon Lake Powerhouse; (7) Loon Lake Fork Tunnel—A 0.3-mile-long, 8-foot- with total powerhouse maximum Powerhouse—An underground diameter horseshoe concrete- and steel- capability of 144,000 kW; and (5) powerhouse, located over 1,100 feet lined tunnel from Ice House Reservoir to Jaybird-White Rock Transmission below the surface of the Loon Lake the Jones Fork Penstock; (3) Jones Fork Line—A 15.9-mile-long, 230 kV Reservoir, consisting of one turbine with Penstock—A 1.6-mile-long, 6-foot- overhead transmission line connecting a rated capacity of 70,479 kW at best diameter steel and concrete penstock the Jaybird and White Rock gate opening and one generator rated at from Jones Fork Tunnel to the Jones switchyards. • 85,215 kW, with powerhouse maximum Fork Powerhouse; (4) Jones Fork Camino Development—(1) Camino capability of 82,000 kW; (8) Loon Lake Powerhouse—Contains a turbine with a Dam—A concrete double curvature arch Tailrace Tunnel—A 3.8-mile-long, 18- rated capacity at best gate opening of dam located on Silver Creek that is 470- foot diameter unlined horseshoe tunnel 10,400 kW, and one generator rated at foot-long and 133-foot-high, and has that runs from Loon Lake Powerhouse 11,495 kW, located on the southeast three integral bulkhead gates. These and discharges into Gerle Creek shore of Union Valley Reservoir; with structures create Camino Reservoir; (2) Reservoir; and (9) Transmission Lines— maximum capability of 11,500 kW; and Camino Tunnel—A 5-mile-long power Two 69 kV overhead transmission lines: (5) Jones Fork-Union Valley tunnel with a diameter ranging from 13 one extending to the Robbs Peak Transmission Line—A 69 kV, 4.0-mile- feet to 14 feet; and including a surge switchyard via the 7.9-mile-long Loon long overhead transmission line from tank that connects Camino Reservoir Lake-Robbs Peak Transmission Line, the Jones Fork switchyard to the Union with the Camino Penstock; (3) Brush Valley switchyard.
Recommended publications
  • Upper American River Hydroelectric Project (P-2101)
    Hydropower Project Summary UPPER AMERICAN RIVER, CALIFORNIA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) South Fork of the American River Slab Creek Dam Canyon Photo Credit: Sacramento Municipal Utility District This summary was produced by the Hydropower Reform Coalition and River Management Society Upper American, CA UPPER AMERICAN RIVER, CA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) DESCRIPTION: The Upper American River Project consists of seven developments located on the Rubicon River, Silver Creek, and South Fork American River in El Dorado and Sacramento Counties in central California. These seven developments occupy 6,190 acres of federal land within the Eldorado National Forest and 54 acres of federal land administered by the Bureau of Land Management (BLM). The proposed The Iowa Hill Development will be located in El Dorado County and will occupy 185 acres of federal land within the Eldorado National Forest. Due to the proximity of the Chili Bar Hydroelectric Project (FERC No. 2155) under licensee Pacific Gas & Electric Company(PG&E) located immediately downstream of the Upper American Project on the South Fork American River (and also under-going re-licensing), both projects were the subject of a collaborative proceeding and settlement negotiations. The current seven developments include Loon Lake, Robbs Peak, Jones Fork, Union Valley, Jaybird, Camino, and Slab Creek/White Rock. White Rock Powerhouse discharges into the South Fork American River just upstream of Chili Bar Reservoir. In addition to generation-related facilities, the project also includes 47 recreation areas that include campgrounds, day use facilities, boat launches, trails, and a scenic overlook. The 19 signatories to the Settlement are: American Whitewater, American River Recreation Association, BLM, California Parks and Recreation, California Fish and Wildlife, California Outdoors, California Sportfishing Protection Alliance, Camp Lotus, Foothill Conservancy, Forest Service, Friends of the River, FWS, Interior, U.S.
    [Show full text]
  • 11441001 Union Valley Reservoir Near Riverton, CA Sacramento River Basin
    Water-Data Report 2011 11441001 Union Valley Reservoir near Riverton, CA Sacramento River Basin LOCATION.--Lat 38°51′49″, long 120°26′15″ referenced to North American Datum of 1927, in NW ¼ NW ¼ sec.29, T.12 N., R.14 E., El Dorado County, CA, Hydrologic Unit 18020129, Eldorado National Forest, in valve control house near left bank at Union Valley Dam on Silver Creek, 0.7 mi upstream from Little Silver Creek, and 6.6 mi north of Riverton. DRAINAGE AREA.--83.7 mi². SURFACE-WATER RECORDS PERIOD OF RECORD.--October 1962 to current year. CHEMICAL ANALYSES: Water year 1996. GAGE.--Water-stage recorder. Datum of gage is NGVD of 1929 (levels by Sacramento Municipal Utility District). COOPERATION.--Records, including diversion to Union Valley Powerplant (station 11441002) were collected by Sacramento Municipal Utility District, under general supervision of the U.S. Geological Survey, in connection with Federal Energy Regulatory Commission project no. 2101. REMARKS.--Reservoir is formed by earthfill dam completed in December 1962; storage began May 1962. Usable capacity, 261,500 acre-ft, between elevations 4,645.0 ft, minimum operating level, and 4,870.0 ft, top of radial spillway gates. Dead storage, 4,883 ft. Reservoir receives water from the South Fork Rubicon River via Robbs Peak Powerplant (station 11429300) and from South Fork Silver Creek, since April 1985, via Jones Fork Powerplant (station 11440900). Water is used for power development in the South Fork American River Basin. Discharge to Union Valley Powerplant is shown as a line item below this table. Records, including extremes, represent total contents.
    [Show full text]
  • Report Template 20120228
    New Slab Creek Powerhouse and Boating Flow Release Valve Project Final Initial Study and Mitigated Negative Declaration • September 2015 New Slab Creek Powerhouse and Boating Flow Release Valve Project Final Initial Study and Mitigated Negative Declaration • September 2015 Lead Agency: SMUD–Environmental Management 6201 S Street, MS B203 Sacramento, CA 95817-1899 or P.O. Box 15830 MS B203 Sacramento, CA 95852-1830 Attn: Jose Bodipo-Memba (916) 732-6493 or [email protected] Prepared by: AECOM 2020 L Street, Suite 400 Sacramento, CA 95811 Contact: Petra Unger [email protected] New Slab Creek Powerhouse and Boating Flow Release Valve Project September 2015 Introduction This draft initial study (IS) and mitigated negative declaration (MND) have been prepared to evaluate Sacramento Municipal Utility District’s (SMUD’s) New Slab Creek Powerhouse and Boating Flows Release Valve (proposed project) for compliance with the California Environmental Quality Act (CEQA). SMUD is the lead agency responsible for complying with CEQA. In addition to this Initial Study, the potential environmental impacts of the proposed project were addressed under the National Environmental Policy Act (NEPA). On April 29, 2015, the Federal Energy Regulatory Commission (FERC) published a NEPA EA evaluating the environmental effects of the proposed project. The following CEQA evaluation incorporates FERC’s environmental analysis and provides additional information specific to the CEQA checklist questions. This Initial Study also incorporates information provided by FERC/U.S. Forest Service (USFS) in the 2008 Upper American River Project (UARP) 2008 EIS and SMUD’s 2008 CEQA Supplemental Analysis for the UARP. Project Description SMUD proposes to construct and operate the proposed project as part of the existing Upper American River Project (UARP) hydroelectric facilities in El Dorado County, California.
    [Show full text]
  • Riparian Vegetation Mapping
    RIPARIAN VEGETATION MAPPING IN THE SOUTH FORK AMERICAN RIVER AND LOWER IOWA CANYON CREEK 2010 April 2011 Prepared For: Sacramento Municipal Utility District Power Generation Department 6201 S Street, Mail Stop B355 Sacramento, CA 95817 Prepared By: ECORP Consulting, Inc. 2525 Warren Drive Rocklin, California 95677 TABLE OF CONTENTS 1.0 INTRODUCTION .............................................................................................................. 1 1.1 Site Location ........................................................................................................... 2 1.2 Existing Site Conditions ......................................................................................... 2 2.0 METHODS ......................................................................................................................... 2 3.0 RESULTS AND DISCUSSION ......................................................................................... 3 3.1 Upland Communities .............................................................................................. 3 3.2 Riparian Communities ............................................................................................ 6 3.3 Riparian Vegetation Comparison: 2004-2010 ........................................................ 7 4.0 CONCLUSION ................................................................................................................... 9 5.0 REFERENCES ................................................................................................................
    [Show full text]
  • Eldorado National Forest Visitor Guide Where to Go - Campgrounds & Picnic Areas
    United States Department of Agriculture Eldorado National Forest South of Little Round Top (Photo by Mark Sandperl) Visitor Guide Thousands of visitors are drawn each year to the Eldorado National Forest’s rivers, Contents What To Do? 2 lakes, and streams alive with fish; mountains and meadows for alpine and nordic skiing; campsites and picnic areas in alpine backcountry and dense forests. Four Where To Go? - Campgrounds 3 hundred- Highway miles 50 and of hikingHighway trails 88 pass- run through through all the kinds Forest, of terrain,making fromit an easygentle drive oak from Where To Go? - Trails 4 foothills on the west to the 10,000-foot crest of the Sierra Nevada. Two major highways Traveling 5 SacramentoThe miners who and thecame San to FranciscoCalifornia Bay in the Area. gold rush of 1849 called the land “el dorado” Where To Go? - Highlights 6 Know Before You Go 7 fortoday! the fabled Spanish “land of gold.” We hope that after you have enjoyed Eldorado Map 8 National Forest’s natural riches you will think the name is even more appropriate The Forest Service is committed to nurturing and managing the National Forests in Quick Facts ♦ Acreage = 615,037 order to ensure the health of the land. As we respectfully use and play in these precious ♦ Elevation = ranges from 1,000 to 10,000 feet publicLocated lands, in the we Central are taking Sierra part Nevada in a shared region, vision the Eldorado for the future. National Forest is considered ♦ Climate = Warm, dry summers and cold wet winters. an urban forest.
    [Show full text]
  • Upper American Projects
    Hydropower Project Summary UPPER AMERICAN RIVER, CALIFORNIA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) South Fork of the American River Slab Creek Dam Canyon Photo Credit: Sacramento Municipal Utility District This summary was produced by the Hydropower Reform Coalition and River Management Society Upper American, CA UPPER AMERICAN RIVER, CA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) DESCRIPTION: The Upper American River Project consists of seven developments located on the Rubicon River, Silver Creek, and South Fork American River in El Dorado and Sacramento Counties in central California. These seven developments occupy 6,190 acres of federal land within the Eldorado National Forest and 54 acres of federal land administered by the Bureau of Land Management (BLM). The proposed The Iowa Hill Development will be located in El Dorado County and will occupy 185 acres of federal land within the Eldorado National Forest. Due to the proximity of the Chili Bar Hydroelectric Project (FERC No. 2155) under licensee Pacific Gas & Electric Company(PG&E) located immediately downstream of the Upper American Project on the South Fork American River (and also under-going re-licensing), both projects were the subject of a collaborative proceeding and settlement negotiations. The current seven developments include Loon Lake, Robbs Peak, Jones Fork, Union Valley, Jaybird, Camino, and Slab Creek/White Rock. White Rock Powerhouse discharges into the South Fork American River just upstream of Chili Bar Reservoir. In addition to generation-related facilities, the project also includes 47 recreation areas that include campgrounds, day use facilities, boat launches, trails, and a scenic overlook. The 19 signatories to the Settlement are: American Whitewater, American River Recreation Association, BLM, California Parks and Recreation, California Fish and Wildlife, California Outdoors, California Sportfishing Protection Alliance, Camp Lotus, Foothill Conservancy, Forest Service, Friends of the River, FWS, Interior, U.S.
    [Show full text]
  • News Release
    United States Department of Agriculture U.S. Forest Service Pacific Southwest Region News Release Eldorado National Forest For Immediate Release 100 Forni Road May 8, 2018 Placerville, CA 95667 Voice: 530-622-5061 USFS: Jennifer Chapman – 530-957-9660 Web: www.fs.usda.gov/eldorado [email protected] SMUD: Chris Capra – 916-732-5111 [email protected] Twitter: @EldoradoNF Facebook: www.facebook/EldoradoNF Crystal Basin recreation improvements underway, alternative destinations recommended in 2018 PLACERVILLE, Calif. - The popular Crystal Basin Recreation Area in the Eldorado National Forest is undergoing major upgrades which will greatly enhance the visitor experience in the future, but may make other destinations a better choice this year. Sunset Campground is closed for the 2018 season. Although Sunset Campground will be closed, the Sunset Boat Launch and Fashoda Campground / Day Use Area will be open Memorial Day weekend through Labor Day weekend, providing opportunities for water recreation on Union Valley Reservoir. Azalea Cove Campground will be closed over Memorial Day weekend, but may reopen by the July 4 weekend if work goes according to schedule. Temporary closures will occur at other sites throughout the season. Check SMUD’s website for the current construction schedule before visiting the Crystal Basin. Already completed in 2017 are the Loon Lake Boat Launch, new composting toilet facilities at Pleasant Campground, and trail improvements between Loon Lake, Buck Island Reservoir and Rubicon Reservoir. The multi-year comprehensive plan to improve more than 20 campgrounds, as well as multiple day use areas, boat launches, roads, hiking and biking trails, and potable water systems in the Crystal Basin is part of an agreement between Sacramento Municipal Utility District (SMUD) and the USDA Forest Service, in which SMUD will invest up to $150 million in the Crystal Basin Recreation Area over the next 50 years.
    [Show full text]
  • Sierra Nevada, California
    ffiOLOGICAL SURVEY CIRCULAR 85 December 1950 SIERRA NEVADA, CALIFORNIA By F. A. Johnson UNITED STATES DEPARTMENT OF THE INTERIOR Oscar L. Chapman, Secretary GEOLOGICAL SURVEY W. E. Wrather, Director WASHINGTON, D. C. SOME RESERVOIR SITES IN THE SIERRA NEVADA, CALIFORNIA By F. A. Johnson CONTENTS Page Page Introduction............................................... 3 Bear River drainage basin............................ 15 feather River drainage basin........................ 3 Rollins reservoir site, Bear River.............. 15 Greenville (Indian Valley) reservoir site, Garden Bar reservoir site, Bear River........ 16 Indian Creek.......................................... Waldo reservoir site, Dry Creek (Bear River American Valley reservoir site, Spanish drainage)............................................... 16 Creek................................................... American River drainage basin...................... 17 Grizzly Valley reservoir site, Grizzly French Meadows reservoir site, Middle Creek................................................... Fork American River.............................. 17 Clio reservoir site, Middle Fork Feather Rock Bound diversion and Buck Island Lake River................................................... reservoir sites, Rubicon River drainage Nelson Point reservoir site, Middle Fork basin.................................................... 18 Feather River........................................ Loon Lake Reservoir site, Gerle Creek........ 19 Bidwell Bar reservoir site, Middle Fork Gerle Creek reservoir
    [Show full text]
  • FERC Project No 2101 License Amendment Order
    20161109-3051 FERC PDF (Unofficial) 11/09/2016 157 FERC ¶ 62,106 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Sacramento Municipal Utility District Project No. 2101-096 ORDER AMENDING LICENSE, REVISING PROJECT DESCRIPTION, AND APPROVING EXHIBIT F DRAWINGS (Issued November 9, 2016) 1. On August 27, 2014 and supplemented April 20, 2015, and June 11, 2015, the Sacramento Municipal Utility District, licensee for the Upper American River Project No. 2101, filed an application to amend its license in order to install a minimum flow powerhouse and boating flow release valve below the existing Slab Creek dam.1 The project is located on Silver Creek and the Rubicon and South Fork American Rivers in El Dorado and Sacramento counties, California. The project occupies federal lands administered by the U.S. Bureau of Land Management (BLM) and by the U.S. Forest Service (Forest Service) within the Eldorado National Forest. Background 2. The license for the Upper American River Project was issued on July 23, 2014.2 The project consists of seven developments and includes (from upstream to downstream): Loon Lake, Robbs Peak, Jones Fork, Union Valley, Jaybird, Camino, and Slab Creek/White Rock developments.3 Only the Slab Creek/White Rock development is relevant to this application and consists of: (1) the double curvature, variable radius, 250- foot-high, 817-foot-long, concrete arch Slab Creek dam with a central uncontrolled spillway; (2) a 280-acre reservoir with a storage capacity of 16,600 acre-feet; (3) a 24- 1 On August 5, 2016, the licensee filed a request to name its proposed facilities the South Fork powerhouse and boating flow release valve.
    [Show full text]
  • General Presentation Template
    PROFESSIONAL SERVICES IN SUPPORT OF HYDRO LICENSE IMPLEMENTATION FOR SMUD’S UPPER AMERICAN RIVER PROJECT (UARP) AND OVERLAPPING LICENSE CONDITIONS FOR PACIFIC GAS AND ELECTRIC COMPANY’S CHILI BAR PROJECT Pre-Bid Conference October 29th 2015 UARP Assets Include: • 11 Reservoirs • 8 Power Houses • 17 Dams • 9 Switchyards • 21 miles of tunnels • 48 monitoring stations – Weather, reservoir levels and stream flows 2 SMUD’s Hydro Generation SMUD-Owned Large Hydro [2] 1,656 GWh ( 14% ) Other Net Non-Renewable Purchases 1,485 GWh ( 12% ) Other Large Hydro Purchases 851 GWh ( 7% ) SMUD-Owned Renewable [4] 358 GWh ( 3% ) Other Net Renewable SMUD-Owned Purchases Gas Fired [3] 1,724 GWh 6,018 GWh ( 14% ) ( 50% ) 3 UPPER RESERVOIRS LOON LAKE RESERVOIR UNION VALLEY RESERVOIR ICE HOUSE RESERVOIR SLAB CREEK RESERVOIR GERLE CREEK (LOON LAKE REACH) SOUTH FORK SILVER CREEK SILVER CREEK (JUNCTION REACH) SILVER CREEK (CAMINO REACH) SF AMERICAN RIVER (SLAB REACH) KAYAKING IN SLAB CREEK REACH PG&E’S CHILI BAR PROJECT PROJECT FACILTIES: • Chili Bar Reservoir (1.3 taf storage) • Chili Bar Powerhouse • No Existing Formal Recreation Facilities PROJECT ATTRIBUTES: • 7 MW Capacity • 31 GWh Average Annual Energy CHILI BAR DAM & POWERHOUSE CHILI BAR RESERVOIR SF AMERICAN RIVER, THE REACH BELOW CHILI BAR UARP – Chili Bar Relicensing History 2001 • Initiated UARP ALP (Parallel PG&E TLP) 2002-2004 • Technical Studies 2005 • SMUD/PG&E applications for new License 2007 • Settlement Agreement 2008 • U.S. Forest Service 4(e) Conditions and joint FEIS 2009 • US Fish and Wildlife Service Biological Opinion 2013 • State Water Board 401 Water Quality certifications 2014 • New FERC Licenses for UARP and Chili Bar (50 yrs.) Professional Services in Support of Implementing Ecological, Recreational, and Resource Management Conditions for the Upper American River Project and Overlapping License Conditions for PG&E's Chili Bar Project REQUEST FOR PROPOSAL NO.
    [Show full text]
  • Reservoir Fisheries Technical Report
    SACRAMENTO MUNICIPAL UTILITY DISTRICT UPPER AMERICAN RIVER PROJECT (FERC Project No. 2101) and PACIFIC GAS AND ELECTRIC COMPANY CHILI BAR PROJECT (FERC Project No. 2155) RESERVOIR FISHERIES TECHNICAL REPORT Prepared by: Devine Tarbell & Associates, Inc. Stillwater Sciences Sacramento, California Davis, California Prepared for: Sacramento Municipal Utility District Sacramento, California and Pacific Gas and Electric Company San Francisco, California APRIL 2005 Version 2 Pacific Gas and Electric Company Sacramento Municipal Utility District Chili Bar Project Upper American River Project FERC Project No. 2155 FERC Project No. 2101 TABLE OF CONTENTS Section & Description Page 1.0 INTRODUCTION .............................................................................................................. 1 2.0 BACKGROUND............................................................................................................... 2 2.1 Fish Surveys Study Plan ........................................................................................ 2 2.2 Water Year Type During Study .............................................................................. 4 2.3 Agency Requested Information .............................................................................. 4 3.0 METHODS ......................................................................................................................... 4 3.1 Beach Seining and Gill Netting .............................................................................. 4 3.2 Fish Processing......................................................................................................
    [Show full text]
  • El Dorado District
    Combined Request for Qualifications / Request for Proposals For Modification of Water Right Permit 21112 - Environmental Impact Report Professional Services RFQ/RFP20-08 Project No. 16003.01 August 25, 2020 In accordance with the Americans with Disabilities Act and California law, it is the policy of the El Dorado Irrigation District to offer its public programs, services and meetings in a manner that is readily accessible to everyone, including individuals with disabilities. If you are a person with a disability and require information or materials in an appropriate alternative format; or if you require any other accommodation, please contact the ADA Coordinator at the number or address below at least 72 hours prior to the meeting or when you desire to receive services. Advance notification within this guideline will enable the District to make reasonable arrangements to ensure accessibility. The District ADA Coordinator can be reached at: Phone: (530) 642-4045; email: [email protected] TABLE OF CONTENTS I. INTRODUCTION 1 II. PROPOSAL SUBMISSION 1 III. BACKGROUND INFORMATION 3 IV. PROJECT SUMMARY 3 V. PURPOSE 4 VI. SCOPE OF WORK 5 VII. QUESTIONS/ADDENDA 5 VIII. INFORMATION TO BE SUBMITTED IN PROPOSAL 5 A. CONTENT 5 B. COST OF SERVICES 7 C. NON-DISCLOSURE AND DISCLOSURE OF PROPOSALS 8 IX. SELECTION CRITERIA 8 A. GENERAL 8 B. FINAL SELECTION 9 C. PROTEST PROCEDURE 9 ATTACHMENTS: EXHIBIT A – SCOPE OF WORK (6 pages) EXHIBIT B – PROFESSIONAL SERVICES AGREEMENT SAMPLE (22 pages) EXHIBIT C – NOTICE OF PREPARATION (32 pages) EXHIBIT D – AGENDA, PRESENTATION AND NOTES FROM APRIL 30, 2020 SCOPING MEETING (37 pages) EXHIBIT E – EXEMPLARY COMMENTS RECEIVED ON NOP (59 pages) EXHIBIT F – ZANJERO SCOPE OF WORK FOR HYDROLOGIC MODELING SUPPORT (12 pages) I.
    [Show full text]