FERC 2101 Facilities Management Plan

Total Page:16

File Type:pdf, Size:1020Kb

FERC 2101 Facilities Management Plan Facilities Management Plan June 2015 Facilities Management Plan Sacramento Municipal Utility District Hydro License Implementation • June 2015 Upper American River Project FERC Project No. 2101 Sacramento Municipal Utility District Upper American River Project i FERC Project No. 2101 Facilities Management Plan June 2015 Table of Contents 1.0 Introduction ............................................................................................................ 1 1.1 Scope and Content of the Plan .............................................................................. 1 1.2 Connection to other FERC License Conditions ...................................................... 2 1.2.1 Condition 53 - Visual Resource Protection ...................................................... 3 1.2.2 Conditions 39 and 59 - Vegetation Management ............................................. 3 1.2.3 Condition 60 - Fire Prevention and Response Plan ......................................... 3 1.2.4 Other License Conditions................................................................................ 4 2.0 Existing Conditions................................................................................................ 4 2.1 Project Description ................................................................................................ 4 2.2 Facilities at each Development ............................................................................. 5 2.2.1 Loon Lake Development ................................................................................. 6 The development includes: ....................................................................................... 6 2.2.2 Robbs Peak Development .............................................................................. 7 2.2.3 Jones Fork Development ................................................................................ 8 2.2.4 Union Valley Development .............................................................................. 9 2.2.5 Jaybird Development .................................................................................... 10 2.2.6 Camino Development ................................................................................... 10 2.2.7 Slab Creek/White Rock Development ........................................................... 11 2.2.8 Hydrologic and Meteorlogic Monitoring Stations .......................................... 12 3.0 UARP Maintenance Program ............................................................................... 28 3.1 Regular, Preventative and Scheduled Maintenance .......................................... 28 3.1.1 Dams, Penstocks, Gate Houses, Valve Houses ........................................ 28 3.1.2 Powerhouse ............................................................................................... 28 3.1.3 Tunnels ...................................................................................................... 28 3.2 Agency Consultation and Environmental Review ................................................ 30 3.3 Unscheduled Emergency Repairs ....................................................................... 30 4.0 Five-year Planned Maintenance Schedule ......................................................... 31 Sacramento Municipal Utility District Upper American River Project i FERC Project No. 2101 Facilities Management Plan June 2015 5.0 Summary ............................................................................................................ 35 6.0 Plan Revisions ...................................................................................................... 35 Sacramento Municipal Utility District Upper American River Project ii FERC Project No. 2101 Facilities Management Plan June 2015 Tables, Figures and Appendices Table 1. UARP Facilities Data. ................................................................................................ 14 Figure 1. SMUD UARP Overview ............................................................................................ 18 Figure 1A-1H. SMUD UARP Facilities. .................................................................................... 19 Figure 2. UARP Hydro-met and Communication Facilities ...................................................... 27 Table 2. 5-year UARP Facility Maintenance Plan .................................................................... 32 Appendix A. Photographic Guide to SMUD’s UARP Facilities ................................................. 37 Appendix B. License Condition Text........................................................................................ 81 Appendix C. Geographic Coordinates of Facilities ................................................................... 91 Sacramento Municipal Utility District Upper American River Project iii FERC Project No. 2101 Facilities Management Plan June 2015 1.0 Introduction As a condition of the new License to operate a hydroelectric project issued by the Federal Energy Regulatory Commission (FERC) for the Upper American River Project (UARP), FERC Project No. 2101, the Sacramento Municipal Utility District (SMUD) has prepared this Facility Management Plan (Plan). The Plan has been prepared in accordance with the terms and conditions of the Relicensing Settlement Agreement for the UARP (2007) and the new FERC License issued on July 23, 2014. See Appendix B for applicable License language. 1.1 Scope and Content of the Plan The Plan has been prepared in consultation with the United States Forest Service (USFS) and other agencies and interested parties, as required by the FERC License. The Plan must be approved by the USFS and subsequently implemented by SMUD. The sections below describe the consultation process and the content of the Plan. 1.1.1 Consultation In September 2014 SMUD presented the approach to completing the Plan to the Settlement Agreement Consultation Group, which includes the Eldorado National Forest (ENF). At the meeting SMUD solicited feedback from the group on the approach. Discussion items included the USFS desire to include photos of all facilities; whether recreation-related facilities should be included; whether quarries and stockpile sites should be included; and tying visual resource protection measures to this Plan. Based on the language in Condition 58, the plan is for Project facilities only, not recreation facilities; therefore, the Plan does not cover recreation facilities because they are addressed by other License conditions related to recreation projects (Conditions 41, 42, 44 and 45). In addition, Section 5.3.8 of the License application describes in detail the existing recreation facilities associated with the Project. Also, since SMUD does not directly manage or maintain the recreation facilities associated with the UARP, including them in this Facilities Management Plan is not appropriate. The USFS agreed with this approach. SMUD agreed to provide construction as-built drawings for the recreation facilities it has built over the years if requested by the USFS. SMUD also met with the USFS on January 20, 2015 to discuss the plan and solicit additional feedback. Notes from this meeting are capture in an email and included in the consultation record. Sacramento Municipal Utility District Upper American River Project 1 FERC Project No. 2101 Facilities Management Plan June 2015 1.1.2 Content of Plan Section 1 of the Plan begins with an introduction that describes the purpose and scope of the plan. Important elements of the introduction include the 4(e) Condition language, an overview description of the Project and summary of consultations with USFS. Section 2, Existing Conditions, contains an overview of SMUD’s facilities, following the basic outline and structure of Exhibit A of the License Application (SMUD 2005). Pertinent information about SMUD’s UARP facilities is summarized in Table 1 in Section 2. Section 3, describes SMUD’s commitment to maintenance and repair of facilities and the current condition of facilities. Section 4 summarizes (Table 2) planned maintenance or removal/replacement of existing structures and facilities in the first 5 years from the date of approval of this Plan. Section 5 summarizes the Plan and describes the process of updating the plan every 5 years, as required, including a process to inform the USFS of planned facility maintenance. Based on consultation with the USFS, a photographic guide to SMUD facilities has been prepared and is contained in Appendix A at the end of this plan. Photographs of most of SMUD’s facilities have been captured in this guide; however, in some cases only representative photos are shown for a type of facility. These include facilities like transmission towers and meteorological stations, which are numerous and similar looking. Table 1 includes a column identifying the photo number for each facility. Condition 58 requires this Plan to include a map of all Project facilities on USFS or Bureau of Land Management (BLM) lands. Figure 1A-1H is a map of all Project facilities on USFS or BLM lands as required by the License condition. The condition also requires the Plan to identify the type and season of use of each facility, as well as the condition of each structure and any planned maintenance or removal of facilities. Tables 1 and 2 summarize all of the required 4(e) information. Quarries and stockpile sites will be shown on maps but management of these sites will be discussed more thoroughly in the Vegetation Management Plan since controlling
Recommended publications
  • Construction and Emplacement of Cretaceous Plutons in the Crystal Range, Southwest of Lake Tahoe, California
    San Jose State University SJSU ScholarWorks Master's Theses Master's Theses and Graduate Research Summer 2017 Construction and Emplacement of Cretaceous Plutons in the Crystal Range, Southwest of Lake Tahoe, California Brad Buerer San Jose State University Follow this and additional works at: https://scholarworks.sjsu.edu/etd_theses Recommended Citation Buerer, Brad, "Construction and Emplacement of Cretaceous Plutons in the Crystal Range, Southwest of Lake Tahoe, California" (2017). Master's Theses. 4837. DOI: https://doi.org/10.31979/etd.eyj9-3w7m https://scholarworks.sjsu.edu/etd_theses/4837 This Thesis is brought to you for free and open access by the Master's Theses and Graduate Research at SJSU ScholarWorks. It has been accepted for inclusion in Master's Theses by an authorized administrator of SJSU ScholarWorks. For more information, please contact [email protected]. CONSTRUCTION AND EMPLACEMENT OF CRETACEOUS PLUTONS IN THE CRYSTAL RANGE, SOUTHWEST OF LAKE TAHOE, CALIFORNIA A Thesis Presented to The Faculty of the Department of Geology San José State University In Partial Fulfillment of the Requirements for the Degree Master of Science by Brad Buerer August 2017 © 2017 Brad Buerer ALL RIGHTS RESERVED The Designated Thesis Committee Approves the Thesis Titled CONSTRUCTION AND EMPLACEMENT OF CRETACEOUS PLUTONS IN THE CRYSTAL RANGE, SOUTHWEST OF LAKE TAHOE, CALIFORNIA by Brad Buerer APPROVED FOR THE DEPARTMENT OF GEOLOGY SAN JOSÉ STATE UNIVERSITY August 2017 Dr. Robert Miller Department of Geology Dr. Jonathan Miller Department of Geology Dr. Dave Andersen Department of Geology ABSTRACT CONSTRUCTION AND EMPLACEMENT OF CRETACEOUS PLUTONS IN THE CRYSTAL RANGE, SOUTHWEST OF LAKE TAHOE, CALIFORNIA by Brad Buerer Three Cretaceous plutons are investigated to determine their construction and emplacement histories, focusing on magmatic foliation patterns and contact relationships with each other and with the Jurassic metasedimentary host rocks of the Sailor Canyon Formation.
    [Show full text]
  • Upper American River Hydroelectric Project (P-2101)
    Hydropower Project Summary UPPER AMERICAN RIVER, CALIFORNIA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) South Fork of the American River Slab Creek Dam Canyon Photo Credit: Sacramento Municipal Utility District This summary was produced by the Hydropower Reform Coalition and River Management Society Upper American, CA UPPER AMERICAN RIVER, CA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) DESCRIPTION: The Upper American River Project consists of seven developments located on the Rubicon River, Silver Creek, and South Fork American River in El Dorado and Sacramento Counties in central California. These seven developments occupy 6,190 acres of federal land within the Eldorado National Forest and 54 acres of federal land administered by the Bureau of Land Management (BLM). The proposed The Iowa Hill Development will be located in El Dorado County and will occupy 185 acres of federal land within the Eldorado National Forest. Due to the proximity of the Chili Bar Hydroelectric Project (FERC No. 2155) under licensee Pacific Gas & Electric Company(PG&E) located immediately downstream of the Upper American Project on the South Fork American River (and also under-going re-licensing), both projects were the subject of a collaborative proceeding and settlement negotiations. The current seven developments include Loon Lake, Robbs Peak, Jones Fork, Union Valley, Jaybird, Camino, and Slab Creek/White Rock. White Rock Powerhouse discharges into the South Fork American River just upstream of Chili Bar Reservoir. In addition to generation-related facilities, the project also includes 47 recreation areas that include campgrounds, day use facilities, boat launches, trails, and a scenic overlook. The 19 signatories to the Settlement are: American Whitewater, American River Recreation Association, BLM, California Parks and Recreation, California Fish and Wildlife, California Outdoors, California Sportfishing Protection Alliance, Camp Lotus, Foothill Conservancy, Forest Service, Friends of the River, FWS, Interior, U.S.
    [Show full text]
  • Federal Register/Vol. 70, No. 150/Friday, August 5, 2005/Notices
    45384 Federal Register / Vol. 70, No. 150 / Friday, August 5, 2005 / Notices Commission (Commission or FERC) DEPARTMENT OF ENERGY be filed electronically via the Internet in regulations contained in the Code of lieu of paper; see 18 CFR Federal Regulations (CFR) (18 CFR part Federal Energy Regulatory 385.2001(a)(1)(iii) and the instructions 380 (FERC Order No. 486, 52 FR Commission on the Commission’s Web site (http:// 47897)), the Office of Energy Projects [Project No. 2101] www.ferc.gov) under the ‘‘e-Filing’’ link. staff (staff) has reviewed the application After logging into the e-Filing system, for a subsequent license for the City of Sacramento Municipal Utility District; select ‘‘Comment on Filing’’ from the Marshall Hydroelectric Project, located Notice of Application and Preliminary Filing Type Selection screen and on the Kalamazoo River near the City of Draft Environmental Assessment continue with the filing and process. The Commission strongly encourages Marshall, in Calhoun County, Michigan. Tendered for Filing with the electronic filing. The project does not affect federal lands. Commission, and Establishing Procedural Schedule for Relicensing l. Status: This application has not Staff has prepared an Environmental been accepted for filing. We are not Assessment (EA) for the project. In this and Deadline for Submission of Final Amendments soliciting motions to intervene, protests, EA, the staff has analyzed the potential or final terms and conditions at this environmental effects of the proposed July 28, 2005. time. project and has concluded that Take notice that the following m. Description of project: The project relicensing the project, with staff’s hydroelectric application has been filed is located on the west slope of the Sierra recommended measures, would not with the Commission and is available Nevada Mountain Range, in El Dorado constitute a major Federal action for public inspection.
    [Show full text]
  • Report Template 20120228
    New Slab Creek Powerhouse and Boating Flow Release Valve Project Final Initial Study and Mitigated Negative Declaration • September 2015 New Slab Creek Powerhouse and Boating Flow Release Valve Project Final Initial Study and Mitigated Negative Declaration • September 2015 Lead Agency: SMUD–Environmental Management 6201 S Street, MS B203 Sacramento, CA 95817-1899 or P.O. Box 15830 MS B203 Sacramento, CA 95852-1830 Attn: Jose Bodipo-Memba (916) 732-6493 or [email protected] Prepared by: AECOM 2020 L Street, Suite 400 Sacramento, CA 95811 Contact: Petra Unger [email protected] New Slab Creek Powerhouse and Boating Flow Release Valve Project September 2015 Introduction This draft initial study (IS) and mitigated negative declaration (MND) have been prepared to evaluate Sacramento Municipal Utility District’s (SMUD’s) New Slab Creek Powerhouse and Boating Flows Release Valve (proposed project) for compliance with the California Environmental Quality Act (CEQA). SMUD is the lead agency responsible for complying with CEQA. In addition to this Initial Study, the potential environmental impacts of the proposed project were addressed under the National Environmental Policy Act (NEPA). On April 29, 2015, the Federal Energy Regulatory Commission (FERC) published a NEPA EA evaluating the environmental effects of the proposed project. The following CEQA evaluation incorporates FERC’s environmental analysis and provides additional information specific to the CEQA checklist questions. This Initial Study also incorporates information provided by FERC/U.S. Forest Service (USFS) in the 2008 Upper American River Project (UARP) 2008 EIS and SMUD’s 2008 CEQA Supplemental Analysis for the UARP. Project Description SMUD proposes to construct and operate the proposed project as part of the existing Upper American River Project (UARP) hydroelectric facilities in El Dorado County, California.
    [Show full text]
  • Riparian Vegetation Mapping
    RIPARIAN VEGETATION MAPPING IN THE SOUTH FORK AMERICAN RIVER AND LOWER IOWA CANYON CREEK 2010 April 2011 Prepared For: Sacramento Municipal Utility District Power Generation Department 6201 S Street, Mail Stop B355 Sacramento, CA 95817 Prepared By: ECORP Consulting, Inc. 2525 Warren Drive Rocklin, California 95677 TABLE OF CONTENTS 1.0 INTRODUCTION .............................................................................................................. 1 1.1 Site Location ........................................................................................................... 2 1.2 Existing Site Conditions ......................................................................................... 2 2.0 METHODS ......................................................................................................................... 2 3.0 RESULTS AND DISCUSSION ......................................................................................... 3 3.1 Upland Communities .............................................................................................. 3 3.2 Riparian Communities ............................................................................................ 6 3.3 Riparian Vegetation Comparison: 2004-2010 ........................................................ 7 4.0 CONCLUSION ................................................................................................................... 9 5.0 REFERENCES ................................................................................................................
    [Show full text]
  • Eldorado National Forest Visitor Guide Where to Go - Campgrounds & Picnic Areas
    United States Department of Agriculture Eldorado National Forest South of Little Round Top (Photo by Mark Sandperl) Visitor Guide Thousands of visitors are drawn each year to the Eldorado National Forest’s rivers, Contents What To Do? 2 lakes, and streams alive with fish; mountains and meadows for alpine and nordic skiing; campsites and picnic areas in alpine backcountry and dense forests. Four Where To Go? - Campgrounds 3 hundred- Highway miles 50 and of hikingHighway trails 88 pass- run through through all the kinds Forest, of terrain,making fromit an easygentle drive oak from Where To Go? - Trails 4 foothills on the west to the 10,000-foot crest of the Sierra Nevada. Two major highways Traveling 5 SacramentoThe miners who and thecame San to FranciscoCalifornia Bay in the Area. gold rush of 1849 called the land “el dorado” Where To Go? - Highlights 6 Know Before You Go 7 fortoday! the fabled Spanish “land of gold.” We hope that after you have enjoyed Eldorado Map 8 National Forest’s natural riches you will think the name is even more appropriate The Forest Service is committed to nurturing and managing the National Forests in Quick Facts ♦ Acreage = 615,037 order to ensure the health of the land. As we respectfully use and play in these precious ♦ Elevation = ranges from 1,000 to 10,000 feet publicLocated lands, in the we Central are taking Sierra part Nevada in a shared region, vision the Eldorado for the future. National Forest is considered ♦ Climate = Warm, dry summers and cold wet winters. an urban forest.
    [Show full text]
  • Upper American Projects
    Hydropower Project Summary UPPER AMERICAN RIVER, CALIFORNIA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) South Fork of the American River Slab Creek Dam Canyon Photo Credit: Sacramento Municipal Utility District This summary was produced by the Hydropower Reform Coalition and River Management Society Upper American, CA UPPER AMERICAN RIVER, CA UPPER AMERICAN RIVER HYDROELECTRIC PROJECT (P-2101) DESCRIPTION: The Upper American River Project consists of seven developments located on the Rubicon River, Silver Creek, and South Fork American River in El Dorado and Sacramento Counties in central California. These seven developments occupy 6,190 acres of federal land within the Eldorado National Forest and 54 acres of federal land administered by the Bureau of Land Management (BLM). The proposed The Iowa Hill Development will be located in El Dorado County and will occupy 185 acres of federal land within the Eldorado National Forest. Due to the proximity of the Chili Bar Hydroelectric Project (FERC No. 2155) under licensee Pacific Gas & Electric Company(PG&E) located immediately downstream of the Upper American Project on the South Fork American River (and also under-going re-licensing), both projects were the subject of a collaborative proceeding and settlement negotiations. The current seven developments include Loon Lake, Robbs Peak, Jones Fork, Union Valley, Jaybird, Camino, and Slab Creek/White Rock. White Rock Powerhouse discharges into the South Fork American River just upstream of Chili Bar Reservoir. In addition to generation-related facilities, the project also includes 47 recreation areas that include campgrounds, day use facilities, boat launches, trails, and a scenic overlook. The 19 signatories to the Settlement are: American Whitewater, American River Recreation Association, BLM, California Parks and Recreation, California Fish and Wildlife, California Outdoors, California Sportfishing Protection Alliance, Camp Lotus, Foothill Conservancy, Forest Service, Friends of the River, FWS, Interior, U.S.
    [Show full text]
  • FERC Project No 2101 License Amendment Order
    20161109-3051 FERC PDF (Unofficial) 11/09/2016 157 FERC ¶ 62,106 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Sacramento Municipal Utility District Project No. 2101-096 ORDER AMENDING LICENSE, REVISING PROJECT DESCRIPTION, AND APPROVING EXHIBIT F DRAWINGS (Issued November 9, 2016) 1. On August 27, 2014 and supplemented April 20, 2015, and June 11, 2015, the Sacramento Municipal Utility District, licensee for the Upper American River Project No. 2101, filed an application to amend its license in order to install a minimum flow powerhouse and boating flow release valve below the existing Slab Creek dam.1 The project is located on Silver Creek and the Rubicon and South Fork American Rivers in El Dorado and Sacramento counties, California. The project occupies federal lands administered by the U.S. Bureau of Land Management (BLM) and by the U.S. Forest Service (Forest Service) within the Eldorado National Forest. Background 2. The license for the Upper American River Project was issued on July 23, 2014.2 The project consists of seven developments and includes (from upstream to downstream): Loon Lake, Robbs Peak, Jones Fork, Union Valley, Jaybird, Camino, and Slab Creek/White Rock developments.3 Only the Slab Creek/White Rock development is relevant to this application and consists of: (1) the double curvature, variable radius, 250- foot-high, 817-foot-long, concrete arch Slab Creek dam with a central uncontrolled spillway; (2) a 280-acre reservoir with a storage capacity of 16,600 acre-feet; (3) a 24- 1 On August 5, 2016, the licensee filed a request to name its proposed facilities the South Fork powerhouse and boating flow release valve.
    [Show full text]
  • Land and Resource Management Plan
    Eldorado National Forest Land and Resource Management Plan 1989 Pacific Southwest Region USDA Forest Service JERALD N. HUTCHINS Forest Supervisor PAUL F. BARKER Regmnal Forester This is a Plan for managmg the Eldorado National Forest for the next lo-15 years, after which It must be revised. If the need arises, It. will be revised or amended earlier. T \ Preface The Eldorado National Forest lies in the central Sierra Nevada. Forest land is situated entirely on the western slope of the mountain range between the foothills of the Mother Lode and the Sierra crest. Forest vegetation changes from chaparral brush and oak woodland at lower elevations to alplne growth and barren rock near the sumnut. Dense pine, mlxed confer, and red fir tunber stands dominate the mid-elevation landscape. The Eldorado is a highly diversified, productive Forest. Parts of Alpine, Amador, El Dorado and Placer Counties are covered by the Forest Plan. An acreage summary follows: county National Forest Other Total AlpIne 50,278 3.774 54,052 Amador 77,849 12,033 89,882 El Dorado 417.448 140,896 558,344 Placer 51,149 33.567 84,716 596,724 190,270 786,994 m NATIONAL FOREST B OTHER OWNERSHIP El Dorado 1 Placer I COUNTY i Vicinity Map :...%.‘.‘,‘.:. ;. * . : . -. : . .*.’ . .: . ::. a,./,. *:.. .: . ” San Francisco c ii Contents Preface i Vicinity Map ii contents iii List of Tables and Figures vii Chapter I - Introduction A. Purpose of the Plan l-l B. Relationship to Other Plans l-2 C. Implementation l-4 D. Amendment l-4 E. Revision l-4 F.
    [Show full text]
  • Reservoir Fisheries Technical Report
    SACRAMENTO MUNICIPAL UTILITY DISTRICT UPPER AMERICAN RIVER PROJECT (FERC Project No. 2101) and PACIFIC GAS AND ELECTRIC COMPANY CHILI BAR PROJECT (FERC Project No. 2155) RESERVOIR FISHERIES TECHNICAL REPORT Prepared by: Devine Tarbell & Associates, Inc. Stillwater Sciences Sacramento, California Davis, California Prepared for: Sacramento Municipal Utility District Sacramento, California and Pacific Gas and Electric Company San Francisco, California APRIL 2005 Version 2 Pacific Gas and Electric Company Sacramento Municipal Utility District Chili Bar Project Upper American River Project FERC Project No. 2155 FERC Project No. 2101 TABLE OF CONTENTS Section & Description Page 1.0 INTRODUCTION .............................................................................................................. 1 2.0 BACKGROUND............................................................................................................... 2 2.1 Fish Surveys Study Plan ........................................................................................ 2 2.2 Water Year Type During Study .............................................................................. 4 2.3 Agency Requested Information .............................................................................. 4 3.0 METHODS ......................................................................................................................... 4 3.1 Beach Seining and Gill Netting .............................................................................. 4 3.2 Fish Processing......................................................................................................
    [Show full text]
  • El Dorado District
    Combined Request for Qualifications / Request for Proposals For Modification of Water Right Permit 21112 - Environmental Impact Report Professional Services RFQ/RFP20-08 Project No. 16003.01 August 25, 2020 In accordance with the Americans with Disabilities Act and California law, it is the policy of the El Dorado Irrigation District to offer its public programs, services and meetings in a manner that is readily accessible to everyone, including individuals with disabilities. If you are a person with a disability and require information or materials in an appropriate alternative format; or if you require any other accommodation, please contact the ADA Coordinator at the number or address below at least 72 hours prior to the meeting or when you desire to receive services. Advance notification within this guideline will enable the District to make reasonable arrangements to ensure accessibility. The District ADA Coordinator can be reached at: Phone: (530) 642-4045; email: [email protected] TABLE OF CONTENTS I. INTRODUCTION 1 II. PROPOSAL SUBMISSION 1 III. BACKGROUND INFORMATION 3 IV. PROJECT SUMMARY 3 V. PURPOSE 4 VI. SCOPE OF WORK 5 VII. QUESTIONS/ADDENDA 5 VIII. INFORMATION TO BE SUBMITTED IN PROPOSAL 5 A. CONTENT 5 B. COST OF SERVICES 7 C. NON-DISCLOSURE AND DISCLOSURE OF PROPOSALS 8 IX. SELECTION CRITERIA 8 A. GENERAL 8 B. FINAL SELECTION 9 C. PROTEST PROCEDURE 9 ATTACHMENTS: EXHIBIT A – SCOPE OF WORK (6 pages) EXHIBIT B – PROFESSIONAL SERVICES AGREEMENT SAMPLE (22 pages) EXHIBIT C – NOTICE OF PREPARATION (32 pages) EXHIBIT D – AGENDA, PRESENTATION AND NOTES FROM APRIL 30, 2020 SCOPING MEETING (37 pages) EXHIBIT E – EXEMPLARY COMMENTS RECEIVED ON NOP (59 pages) EXHIBIT F – ZANJERO SCOPE OF WORK FOR HYDROLOGIC MODELING SUPPORT (12 pages) I.
    [Show full text]
  • El Dorado County Local Hazard Mitigation Plan
    El Dorado County Local Hazard Mitigation Plan July 2018 Adopted by FEMA, March 2019 EDC Board Of Supervisor's Adoption, April 23, 2019 This Page Left Intentionally Blank Executive Summary The purpose of hazard mitigation is to reduce or eliminate long-term risk to people and property from hazards. El Dorado County developed this Local Hazard Mitigation Plan (LHMP) update to make the County and its residents less vulnerable to future hazard events. This plan was prepared pursuant to the requirements of the Disaster Mitigation Act of 2000 so that El Dorado County would be eligible for the Federal Emergency Management Agency’s (FEMA) Pre-Disaster Mitigation and Hazard Mitigation Grant programs. The County followed a planning process prescribed by FEMA, which began with the formation of a hazard mitigation planning committee (HMPC) comprised of key County representatives, and other regional stakeholders. The HMPC conducted a risk assessment that identified and profiled hazards that pose a risk to the County, assessed the County’s vulnerability to these hazards, and examined the capabilities in place to mitigate them. The County is vulnerable to several hazards that are identified, profiled, and analyzed in this plan. Floods, levee failures, wildfires, and severe weather are among the hazards that can have a significant impact on the County. Based on the risk assessment, the HMPC identified goals and objectives for reducing the County’s vulnerability to hazards. The goals and objectives of this multi-hazard mitigation plan are: Goal 1: Minimize risk and vulnerability of El Dorado County to the impacts of natural hazards and protect lives and reduce damages and losses to property, economy, public health and safety, and the environment.
    [Show full text]