Moving Southeast Asia's Cities Forward

Total Page:16

File Type:pdf, Size:1020Kb

Moving Southeast Asia's Cities Forward THE FUTURE OF INFRASTRUCTURE CREATING OPPORTUNITY FOR EVERYONE GOING THE EXTRA KILOMETRE MOVING SOUTHEAST ASIA'S CITIES FORWARD Air pollution was greatly reduced Traffic congestion is a major pain point for Southeast as stay at home measures were Asia’s growing economies, affecting economic gain implemented across the region due to the coronavirus pandemic. However, and the environment, as well as quality of life. With only a major shift towards remote working would help ease congestion more people moving into urban areas, the need to given that the major regional cities are improve public transportation infrastructure is critical, densely populated, have limited road right of way and are underserved by particularly the problematic ‘last kilometre’, says public transport systems. As workers return, roadway traffic volumes have AECOM’s Scott Dunn. started to return to pre-pandemic levels and in some cases use of low ollowing the release of our only going to get worse in the face occupancy private vehicles may 2019 Future of Infrastructure of continuing rapid urbanisation. even increase due to the demands of report, we held a series of So, what role can infrastructure play social distancing. conversations in Jakarta, in helping to make cities in Southeast The economic cost of congestion Kuala Lumpur and Singapore Asia more liveable before it’s too late? is significant. Studies estimate that with clients, planners and the region loses approximately two stakeholders to better understand what to five per cent of gross domestic F The cost of congestion people really want and expect from the Most major cities in the region with product (GDP) due to heavy traffic. infrastructure in their cities. the exception of Singapore have not Metro Manila is considered to have During each forum a survey was prioritised the development of a the worst traffic, which is equivalent conducted and while the findings well-connected public transportation to an estimated daily economic loss represent a small sample, the primary network. As a result, heavy traffic leaves of 3.5 billion (US$67 million). With grievance among them was unanimous: citizens facing extremely long commutes the rising number of vehicles in the congestion and traffic are putting leading to a massive amount of economic region, the situation could worsen a major strain on their cities. And productivity loss and some of the worst to 5.4 billion a day by 2035 if no if we don’t act now, that strain is air pollution levels in the world. 1 intervening steps are taken. THE FUTURE OF INFRASTRUCTURE CREATING OPPORTUNITY FOR EVERYONE Meanwhile, it is estimated that congestion in Greater Jakarta is costing THE COST OF the country 65 trillion rupiah (US$4.6 CONGESTION billion) annually 2 — but the true impact could be higher. ASIA-PACIFIC REGION GREATER JAKARTA MANILA METRO AREA The costs of environmental deterioration, cancelled transactions, REDUCTION IN GDP ANNUAL COST DAILY ECONOMIC LOSS lower productivity and competitive advantage relative to other major big 2–5% $4.6BN $67M $106M cities are not accounted for in that figure. NOW 2035 PREDICTED Beyond the economic cost is the toll that being stuck in traffic takes on the average commuter. In Manila, it’s not uncommon for a 30-kilometre commute to take two hours on a good day and THE BENEFITS OF three hours on a particularly bad day, INFRASTRUCTURE taking away time — one of our most precious resources — from a host of INVESTMENT other activities. The last 'kilometre' problem The journey from metro station to SINGAPORE KUALA LUMPUR final destination — the so-called ‘last INVESTMENT IN SUNGAI BULOH-KAJANG MASS kilometre’ — is one of the key reasons INFRASTRUCTURE RAPID TRANSIT (SBK MRT) LINE commuters are not satisfied with their public transportation, according to our survey results. Respondents said that essential integration between rail INCREASED USAGE INCREASED systems and other modes of transport DECREASE IN PUBLIC GROSS NATIONAL was underdeveloped. TRAFFIC TRANSPORT INCOME Public rail systems have historically developed from inter-urban networks. While Tokyo and Shanghai have highly -40% +20% MYR3-4BN interconnected networks (700 km and 590 km respectively), Jakarta and Manila’s combined urban rail network amounts to just 100 kilometres. Recent INCREASE IN SIGNIFICANT GENERATION OF moves to close this gap are starting to TRAFFIC SPEED REDUCTION NEW JOBS provide options for daily commuters — KVMRT Line 1 in Malaysia and PT Phase 1 in Jakarta are good examples of Mass +16KPH CO2 +130K Rapid Transport networks — but the region is undersupplied. Across tropical Southeast Asia, long distances between transport hubs can be a challenge as commuters are exposed to heat, humidity, rain, flooding and other elements. One respondent shared how her father often has to walk through serious rain and flooding along an unpaved road to get from the train station to his home. Figure 1: Diagram showing transit infrastructure disparity between major cities in the Asia Pacific region. The red lines show the transit networks in each city. Maps are not to scale. TOKYO JAKARTA SEOUL SHANGHAI MANILA THE FUTURE OF INFRASTRUCTURE CREATING OPPORTUNITY FOR EVERYONE SPOTLIGHT ON SINGAPORE Singapore is leading the way also relieve crowding on the East- when it comes to advanced West and North-South Lines and public transport infrastructure is expected to benefit one million and policy planning within the commuters daily. region and much of the world. Transport policies 3 support To date, Singapore’s policy has national economic development resulted in a 40 per cent decrease and a high quality of life for its in traffic, a 20 per cent increase in residents, giving them mobility public transport usage, an average and efficiency at affordable 16 km per hour traffic speed In Indonesia, an overwhelming prices. The country’s strategy improvement, and a significant 90 per cent of survey respondents 6 is based on limiting private car reduction in CO2 emissions. showed dissatisfaction with their 4 ridership while providing public current transit system. They noted transit to meet the needs of most In addition to such large-scale that while the capital’s new MRT has of its population. investment in network expansion, encouraged more people to take mass 90% Singapore continues to focus transportation, commuters still find it In Indonesia, 90 Today, the island nation has more on improving ‘last kilometre’ difficult to bridge the MRT with their per cent of survey 5 than 130 stations across five connectivity. Its goal is to ensure ‘last kilometre’ destinations. such as respondents showed dissatisfaction MRT lines that span the city- that the rush-hour commute parking spaces near stations, which with their current state, serving over three million shouldn’t take more than 20 minutes could help further reduce the number transit system. passengers daily across 200 for any citizen, and for roughly 80 of vehicles on the road. kilometres of track. In addition, percent of all households to live In Kuala Lumpur, many residents there are light rail lines that connect within a 10-minute walk of an MRT still prefer to use cars out of habit 7 commuters to their homes and station. To make ‘last kilometre’ and for efficiency’s sake. 60 per cent workplaces and more networks connections safer, more inclusive of respondents said they use public are being built to further expand and easier to use, measures such as transportation, but maintain concerns rail coverage. For example, we barrier-free access to stations and about safety, especially for women, are working with the Singaporean interchanges, more pedestrian and along walking routes to the stations government to provide detailed cycle-friendly sidewalks and well-lit that can be difficult to navigate. 60% design and engineering consultancy covered walkways are planned. In In Kuala Lumpur, services for several MRT lines, addition, the city intends to harness 60 per cent of Public policy partnership including the Thomson-East Coast technology, ride-sharing and multi- Investing in an efficient transportation respondents said they use public Line (TEL). Once completed, the modal transportation services to system is proven to lift the transportation. TEL will shorten the journey from realise this ambitious goal, as well economic potential of cities and Woodlands South to Orchard/city as improvements to the physical regions. By connecting people with from 50 minutes to 35 minutes. It will connection to rail stations. more job opportunities, a reliable, comprehensive public transport system promotes greater productivity. of between RM3 billion and RM4 commute: it’s also about having more It can also serve as a draw for talent, billion per annum. The new line has time to do the things we love with private investment and businesses, spurred growth in new areas such as those we value most — something as well as providing employment the Forest Research Institute Malaysia most people would sign up for. Given opportunities in building and (FRIM) in Sungai Buloh and the Tun the varying levels of maturity in public maintaining the network. 130K Razak Exchange, as well as generating transportation infrastructure across Kuala Lumpur’s Sungai Buloh- around 130,000 new jobs. 8 Southeast Asia, there isn’t a one-size- Kuala Lumpur’s Kajang Mass Rapid Transit (SBK Sungai Buloh-Kajang fits-all solution. But as more people go MRT) line, which was completed in Mass Rapid Transit to live and work in cities, the already The value of good connectivity 2017, is estimated to have contributed (SBK MRT) line has Of course, good connectivity is not chronic congestion is only likely to generated around to the rise in gross national income 130,000 new jobs. just about economics or having a faster worsen unless action is taken. Investment in infrastructure has the power to alleviate today’s economic distress and create opportunities for tomorrow.
Recommended publications
  • NO. BRANCH ADDRESS BRANCH CONTACT NUMBER 1 KUALA LUMPUR MAIN OFFICE Tel : +603-2031 9896 No.10, Ground Floor, Wisma GTK, Jalan Hang Lekiu, 50100 Kuala Lumpur
    NO. BRANCH ADDRESS BRANCH CONTACT NUMBER 1 KUALA LUMPUR MAIN OFFICE Tel : +603-2031 9896 No.10, Ground Floor, Wisma GTK, Jalan Hang Lekiu, 50100 Kuala Lumpur 2 BALAKONG BRANCH Tel : +603-8961 3707 No. 6, Medan Taming Tiga, Taman Taming Jaya, 43300 Balakong, Selangor 3 BANTING BRANCH Tel : +603-3187 8606 No.159, Jalan Sultan Abdul Samad 42700 Banting, Selangor 4 SUNGAI BULOH BRANCH Tel : +603-6150 7606 / No. 4, Jalan Public, Kampung Baru Sungai Buloh 40160, Shah +603-6151 4606 Alam Selangor 5 KAJANG BRANCH Tel : +603-8734 8606 No. 14 Jalan Sulaiman 43000 Kajang, Selangor 6 NILAI BRANCH Tel : +606-799 6100 PT 5794, Taman Semarak 2 71800 Nilai, Negeri Sembilan 7 DENGKIL BRANCH Tel : +603-8768 8500 / No.5, 5A Jalan Deluxe, Pusat Perdagangan Deluxe, 43800 +603-8768 7500 Dengkil, Selangor 8 AMPANG BRANCH Tel : +603-4291 1315 / 29G, Jalan Wawasan Ampang 2/1, Bandar Baru Ampang, +603-4291 1316 68000 Ampang, Selangor 9 TANJUNG MALIM BRANCH Tel : +605-459 7707 No.6, Jalan Taman Bunga Raya, 35900, Tanjong Malim, Perak 10 BATANG BERJUNTAI BRANCH Tel : +603-3271 0403 / A20, Jalan Besar, +603-3271 0399 45600 Batang Berjuntai, Selangor 11 SHAH ALAM BRANCH Tel : +603-5122 4707 No. 5 Jalan Teraju 25/67, Seksyen 25, Taman Sri Muda 40400 Shah Alam, Selangor 12 RAWANG BRANCH Tel : +603-6091 8606 No.1, Jln Bandar Rawang 1 Bandar Baru Rawang 48000 Rawang, Selangor 13 KLANG BRANCH Tel : +603-3343 8707 No. 3 & 5, Lorong Batu 3, 41300 Klang, Selangor 14 MERU BRANCH Tel : +603-3392 3305 / 67, Jalan Muafakat 1, Batu 5 ½ Jalan Meru, Taman Meru +603-3392 3306 Selatan, 41050 Meru, Klang, Selangor 15 KAPAR BRANCH Tel : +603-3250 3606 No.19, Jalan Raja Mokhtar Jalan Kapar, 42200 Klang, Selangor 16 KAMPUNG BARU SUBANG BRANCH Tel : +603-7847 2674 No.2, (1st Floor), Jalan Besar, Pekan Kg.
    [Show full text]
  • Service Disruption on Mrt Kajang Line Due to Signalling Problems
    MEDIA STATEMENT FOR IMMEDIATE RELEASE SERVICE DISRUPTION ON MRT KAJANG LINE DUE TO SIGNALLING PROBLEMS KUALA LUMPUR, 16 August 2021- MRT Kajang Line is experiencing a service disruption due to signalling problems that were detected at 9.15am today that caused all trains that were in operations along the MRT Kajang Line to be held at platforms along its entire alignment starting from MRT Sungai Buloh Station to MRT Kajang Station. “The signalling problems are believed due to a technical issue and Rapid KL’s Engineering Department, together with BT Alstom who is the system’s manufacturer and Mass Rapid Transit Corporation Sdn Bhd (MRT Corp), are working to resolve this so that MRT Kajang Line could operate normally as soon as possible,” said a statement issued by the rail operator today. When the signalling problems were detected, all trains that were in operations switched to manual mode and were driven by Transit Officers to the nearest station, at a speed of not more than 25km/hour. Passengers were advised to disembark and take alternative transport in order to continue with their journey. Then, MRT Kajang Line suspended its operations from 11.15am to 3.45pm to allow for diagnostic work and full system reboot to be performed. It has since resumed operations at 3.45pm in revised service mode. “We deeply regret the inconvenience and would like to apologise to our passengers for this service disruption. For the safety of all involved, MRT Kajang Line is currently operating on revised service mode where trains would be moving slower and dwelling at platforms longer,” it added.
    [Show full text]
  • Pa International Property Consultants (Kl) Sdn
    MONTH: NOVEMBER 2011 ISSUES: 11/2011 Property News PA International Property Consultants is a registered real estate firm committed to providing a comprehensive range of property solutions to meet the needs of investors, occupiers and developers. The Research Division provides core real estate information to clients and internal departments in order to ensure accurate real estate decision-making. Our research team has completed market studies and research work for various ongoing development schemes within Klang Valley, providing comprehensive economic analysis, property PA INTERNATIONAL market information, forecasts and consulting advice based PROPERTY CONSULTANTS (KL) SDN on reliable sources. Phone: 03-7958 5933 Fax: 03BHD-7957 5933 We constantly strive to present the most up-to-date Website: http://www.pa.com.my market knowledge in order to ensure clients are well- Email: [email protected] armed with sufficient data to make the right property decisions. Issues 6: 1-31 November 2011 GENERAL ECONOMIC & PROPERTY MARKET 1. FDI for 2011 likely to be higher than last year (The Star, 29-November-2011) . Malaysia’s foreign direct investment (FDI) rose 42% to RM26.4 billion in the first nine months of 2011 from RM18.6 billion recorded during the same period last year (2010). The FDI inflows for the 1Q 2011 and 2Q 2011 were strong at RM10.1 billion and RM11.07 respectively, it however moderate in the 3Q 2011 to RM5.17 billion . International Trade and Industry Minister Datuk Seri Mustapa Mohamed mention that 2011 FDI was expected to surpass the RM29.3 billion achieved for the whole of 2010.
    [Show full text]
  • Klinik Panel Selangor
    SENARAI KLINIK PANEL (OB) PERKESO YANG BERKELAYAKAN* (SELANGOR) BIL NAMA KLINIK ALAMAT KLINIK NO. TELEFON KOD KLINIK NAMA DOKTOR 20, JALAN 21/11B, SEA PARK, 1 KLINIK LOH 03-78767410 K32010A DR. LOH TAK SENG 46300 PETALING JAYA, SELANGOR. 72, JALAN OTHMAN TIMOR, 46000 PETALING JAYA, 2 KLINIK WU & TANGLIM 03-77859295 03-77859295 DR WU CHIN FOONG SELANGOR. DR.LEELA RATOS DAN RAKAN- 86, JALAN OTHMAN, 46000 PETALING JAYA, 3 03-77822061 K32018V DR. ALBERT A/L S.V.NICKAM RAKAN SELANGOR. 80 A, JALAN OTHMAN, 4 P.J. POLYCLINIC 03-77824487 K32019M DR. TAN WEI WEI 46000 PETALING JAYA, SELANGOR. 6, JALAN SS 3/35 UNIVERSITY GARDENS SUBANG, 5 KELINIK NASIONAL 03-78764808 K32031B DR. CHANDRAKANTHAN MURUGASU 47300 SG WAY PETALING JAYA, SELANGOR. 6 KLINIK NG SENDIRIAN 37, JALAN SULAIMAN, 43000 KAJANG, SELANGOR. 03-87363443 K32053A DR. HEW FEE MIEN 7 KLINIK NG SENDIRIAN 14, JALAN BESAR, 43500 SEMENYIH, SELANGOR. 03-87238218 K32054Y DR. ROSALIND NG AI CHOO 5, JALAN 1/8C, 43650 BANDAR BARU BANGI, 8 KLINIK NG SENDIRIAN 03-89250185 K32057K DR. LIM ANN KOON SELANGOR. NO. 5, MAIN ROAD, TAMAN DENGKIL, 9 KLINIK LINGAM 03-87686260 K32069V DR. RAJ KUMAR A/L S.MAHARAJAH 43800 DENGKIL, SELANGOR. NO. 87, JALAN 1/12, 46000 PETALING JAYA, 10 KLINIK MEIN DAN SURGERI 03-77827073 K32078M DR. MANJIT SINGH A/L SEWA SINGH SELANGOR. 2, JALAN 21/2, SEAPARK, 46300 PETALING JAYA, 11 KLINIK MEDIVIRON SDN BHD 03-78768334 K32101P DR. LIM HENG HUAT SELANGOR. NO. 26, JALAN MJ/1 MEDAN MAJU JAYA, BATU 7 1/2 POLIKLINIK LUDHER BHULLAR 12 JALAN KLANG LAMA, 46000 PETALING JAYA, 03-7781969 K32106V DR.
    [Show full text]
  • Construction Aggregate Resources in the Federal Territory and Central Selangor
    Geological Society of Malaysia Annual Geological Conference 2000 September 8-9 2000, Pulau Pinang, Malaysia Construction Aggregate Resources in the Federal Territory and Central Selangor CHEONG KHAI WENG & YEAP EE BENG Department of Geology, University of Malaya, 50603 Kuala Lumpur, Malaysia Abstract The Federal Territory of Kuala Lumpur and Selangor have produced 29% of the total crushed rock production in Malaysia. The average consumption per capita in 1998 was 3.74 tonnes of aggregates. It is estimated that the current rock reserve in this area can only cope with the demands of this region for the next 30 years. Thus, the exploitation of aggregate resources must be planned carefully and integrated with other types of landuse. Sumber Agregat Pembinaan di Wilayah Persekutuan dan Selangor Abstrak Wilayah Persekutuan Kuala Lumpur dan Selangor telah menghasilkan 29% daripada jumlah pengeluaran batu hancur di Malaysia. Jumlah penggunaan agregat per kapita pada tahun 1998 adalah 3.74 ton. Dianggarkan simpanan batuan sedia ada di kawasan ini hanya boleh memenuhi keperluan rantau ini untuk 30 tahun akan datang. Maka, eksploitasi sumber agregat mestilah dirancang dengan teliti dan disepadukan dengan jenis gunatanah yang lain. INTRODUCTION and provide plentiful construction aggregates to the Hulu Langat - Semenyih area. The areas around the Lagong Coarse aggregate is one of the most accessible natural Forest Reserve in the District of Gombak has currently industrial material and a major basic raw material used attracted a lot of quarry operators. One granite quarry in by the construction industry. It consists of crushed stone, Bukit Lanchong is stragetically located in a highly which is defined as "the product resulting from artificial populated area.
    [Show full text]
  • Digital Transformation on the Construction of the MRT Sungai Buloh to Putrajaya (SSP) Line, Klang Valley
    Project focus: Digital transformation on the construction of the MRT Sungai Buloh to Putrajaya (SSP) Line, Klang Valley Kuala Lumpur, like many cities in Asia, is Poh Seng Tiok, experiencing a significant growth in population. Director of planning and design (MRTC). The city itself has a population of 1.8 million which is set to climb to 2.2 million by 2020. Whilst Klang Valley, the greater metropolitan region, has over 6m inhabitants a rising population, rapid urbanization and challenges in city planning have led to transport problems – most clearly visible in the city’s infamous traffic jams. In order to keep the city and the region moving, the government has responded with the Klang Valley Mass Rapid Transit (KVMRT) System, one of the most ambitious transport mega projects ever undertaken in Asia. Approved by the Malaysian Government in December 2010 and launched by Prime Minister Datuk Seri Najib Tun Razak on 8 July 2011, it will help ease traffic congestion and increase the public transport modal share from 18 % in 2009 to 40 % in 2020. The system consists of three new rail lines, each of which will be integrated to current rail systems in Kuala Lumpur. The second of the three lines is the MRT Sungai Buloh to Putrajaya (SSP) Line, which will “One of the key challenges faced with include a total of 37 stations, 11 of which will be constructed on the any mega civil construction project like 13.5-kilometer underground section, and will serve a population of ours is ensuring seamless information around 2 million people along its 52.2-kilometer corridor.
    [Show full text]
  • CAC) Negeri Selangor NEGERI SELANGOR DIKEMASKINI 9/4/2021 JAM 12.00 TGH PKD PETALING PKD GOMBAK LOKASI CAC WAKTU OPERASI NO
    Senarai COVID-19 Assessment JABATAN KESIHATAN Centre (CAC) Negeri Selangor NEGERI SELANGOR DIKEMASKINI 9/4/2021 JAM 12.00 TGH PKD PETALING PKD GOMBAK LOKASI CAC WAKTU OPERASI NO. TELEFON LOKASI CAC WAKTU OPERASI NO. TELEFON ISNIN-JUMAAT KK KUANG 03-60371092 011-64055718 10.00 PG – 12.00 TGH STADIUM MELAWATI (Telegram) ISNIN – JUMAAT SEKSYEN 13, 011-58814350 KK RAWANG 03-60919055 9.00 PG – 12.00 TGH ISNIN- KHAMIS SHAH ALAM 011-58814280 KK SELAYANG BARU 2.00 – 4.00 PTG 03-61878564 (Hanya waktu operasi sahaja) KK TAMAN EHSAN JUMAAT 03-62727471 2.45 – 4.00 PTG KK SUNGAI BULOH 03-61401293 PKD KLANG ---------------------- LOKASI CAC WAKTU OPERASI NO. TELEFON KK BATU ARANG 03-60352287 NO. TEL. BILIK KK GOMBAK SETIA 03-61770305 ISNIN – KHAMIS GERAKAN CDC 8.30 PG – 12.30 TGH KK AU2 DAERAH 03-42519005 Patient Clinical Assesment ( ) KK BATU 8 03-61207601/7607/ 03-61889704 2.00 – 5.00 PTG 7610 STADIUM HOKI (Home Assessment Monitoring) 010-9797732 KK HULU KELANG 03-41061606 PANDAMARAN (WhatsApp) JUMAAT (Hanya waktu operasi sahaja) 8.30 – 11.30 PG PKD SEPANG (Patient Clinical Assesment) 3.00 – 5.00 PTG LOKASI CAC WAKTU OPERASI NO. TELEFON (Home Assessment Monitoring) ISNIN – KHAMIS 011-11862720 8.00 PG – 1.00 PTG (Hanya waktu operasi sahaja) PKD KUALA LANGAT STADIUM MINI JUMAAT 019-6656998 BANDAR BARU LOKASI CAC WAKTU OPERASI NO. TELEFON 8.00 PG – 12.15 TGH (WhatsApp) SALAK TINGGI (Hanya waktu operasi sahaja) KK TELOK PANGLIMA SABTU & CUTI UMUM Email: GARANG ISNIN – KHAMIS 9.00 PG – 12.00 TGH [email protected] 2.00 PTG – 4.00 PTG KK TELOK DATOK JUMAAT 03-31801036 / PKD HULU SELANGOR 3.00 PTG – 4.30 PTG KK BUKIT 014-3222389 LOKASI CAC WAKTU OPERASI NO.
    [Show full text]
  • Assessment of Flood Risk Analysis in Selangor
    International Journal of Engineering & Technology, 8 (1.7) (2019) 282-287 International Journal of Engineering & Technology Website: www.sciencepubco.com/index.php/IJET Research paper Assessment of Flood Risk Analysis in Selangor Norazliani Md Lazam1*, Sharifah Nazatul Shima Syed Mohamed Shahruddin1, Muhammad Haris Baharrudin, Hanisah Md Jani, Azyan Farahin Azhari , Nur Farisya Farhani Khairul Nizam 1Actuarial Science Department, Faculty of Computer and Mathematical Sciences, Universiti Teknologi MARA, 40450 Shah Alam, Selangor, Malaysia *Corresponding author E-mail: [email protected] Abstract Flood events occur every year especially during the monsoon season. Although its consequences are not as disastrous as other natural disasters such as earthquakes and tornado storm, but it still gives off a great deal of destruction towards social, operational and financial sectors. Recently, most of the events occurred are not happened at the common marked areas and seasons. It happened anywhere and anytime. Hence, it is not surprise that at any time, any place could be affected by flood incidents. Therefore, an analysis on flood incident is crucial in mitigating the flood risk and at the same developing the flood safety measures. This study aims to analyse the flood frequen- cy and flood magnitude of all nine districts in Selangor. Data is gathered from the Department of Irrigation and Drainage (DID) Selangor, from 2008 to 2017. Petaling Jaya posted the highest number of flood cases at 249 cases out of 1,161 cases in Selangor throughout the period of 2008 to 2017. Poisson distribution was used to estimate the probability of flood occurrence, and the results show that Petaling Jaya has recorded the highest probability of flood occurrence with at least one event in a day.
    [Show full text]
  • The Need to Map Existing Health Care Services for Refugees in Malaysia
    Electronic supplementary material: The online version of this article contains supplementary material. Cite as: Yunus RM, Azme N, Chen XW, Badlishah-Sham, Miptah © 2021 THE AUTHOR(S) HN, Azraai AM. The need to map existing health care services for JOGH © 2021 ISGH refugees in Malaysia. J Glob Health 2021;11:03024. The need to map existing health care services for refugees in Malaysia VIEWPOINTS Raudah Mohd Yunus1, Nasibah Azme2, Xin Wee Chen1, Siti Fatimah Badlishah-Sham3, Hayatul Najaa Miptah3, Awla Mohd Azraai4 1Department of Public Health Medicine, Faculty of Medicine, Universiti Teknologi MARA (UiTM), Sungai Buloh Campus, Malaysia 2Department of Physiology, Faculty of Medicine, Universiti Teknologi MARA (UiTM), Sungai Buloh Campus, Malaysia 3Department of Primary Care Medicine, Faculty of Medicine, Universiti Teknologi MARA (UiTM), Sungai Buloh Campus, Malaysia 4Department of Pathology, Faculty of Medicine, Universiti Teknologi MARA (UiTM), Sungai Buloh Campus, Malaysia espite hosting the largest number of refugees and asylum-seekers (RAS) compared to most other Southeast Asian countries [1], Malaysia is non-signatory to the 1951 UN Refugee Convention and Dlacks a clear socio-legal framework pertaining to RAS. To this date, there are close to 180 000 regis- tered RAS in the country [2]. The vast majority are socio-economically marginalized and have restricted ac- cess to health care services, education and livelihoods. A survey by the UNHCR in 2015 reported that 23.9% of adult refugees in Malaysia had hypertension, 8% had diabetes, and 7% had cardiovascular diseases [3,4] Another study among Rohingya children in Kuala Lumpur found 27.5% to be underweight and 11.5% stunted [5].
    [Show full text]
  • A Gedstatistical Approach to the Mapping Of
    A GEDSTATISTICAL APPROACH TO THE MAPPING OF ACID SULFATE SOILS A THESIS SUBMITTED TO THE GRADUATE DIVISIC»J OF THE UNIYERSITY OF HAWAII IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF SCIENCE IN AGROMOMY AND SOIL SCIENCE MAY 1985 By FaricSah Hj Ahmad Thesis Canmittee: Dr. Russell S. Yost/ Chairman Dr. Goro Uehara Dr. Richard E. Green 11 We certify that we have read this thesis and that/ in our opinian/ it is satisfactory in scope and quality as a thesis for the degree of Master of Science in Agroncxny and Soil Science. THESIS COMMITTEE Ill ACKNOWLEDGEMENT I would like to thank the Government of Malaysia for the financial support and the Director General of the Department of Agriculture, West Malaysia for extending my study leave. I wish to express my sincere gratitude to Dr. Russell Yost, my major advisor for his dedication and encouragement, members of the comittee. Dr. Richard E. Green and Dr. Goro Uehara for their valuable suggestions in the revision of the thesis, the staff of the Department of Agriculture, Northwest Selangor Integrated Project area and Mr. Shahruddin of the Drainage and Irrigation Scheme, West Malaysia for their assistance in soil and foliar sampling and analyses. Appreciation is also extended to the soil survey staff for providing additional data and managers of Northwest Selangor Integrated Project and oil palm estates in the area for their cooperation. I would also like to thank Dr. Bruce Trangmar and Mr. Keith Hayashi for their help in computer progremining and lastly but not least to my family and friends for their moral and emotional support.
    [Show full text]
  • 1970 Population Census of Peninsular Malaysia .02 Sample
    1970 POPULATION CENSUS OF PENINSULAR MALAYSIA .02 SAMPLE - MASTER FILE DATA DOCUMENTATION AND CODEBOOK 1970 POPULATION CENSUS OF PENINSULAR MALAYSIA .02 SAMPLE - MASTER FILE CONTENTS Page TECHNICAL INFORMATION ON THE DATA TAPE 1 DESCRIPTION OF THE DATA FILE 2 INDEX OF VARIABLES FOR RECORD TYPE 1: HOUSEHOLD RECORD 4 INDEX OF VARIABLES FOR RECORD TYPE 2: PERSON RECORD (AGE BELOW 10) 5 INDEX OF VARIABLES FOR RECORD TYPE 3: PERSON RECORD (AGE 10 AND ABOVE) 6 CODES AND DESCRIPTIONS OF VARIABLES FOR RECORD TYPE 1 7 CODES AND DESCRIPTIONS OF VARIABLES FOR RECORD TYPE 2 15 CODES AND DESCRIPTIONS OF VARIABLES FOR RECORD TYPE 3 24 APPENDICES: A.1: Household Form for Peninsular Malaysia, Census of Malaysia, 1970 (Form 4) 33 A.2: Individual Form for Peninsular Malaysia, Census of Malaysia, 1970 (Form 5) 34 B.1: List of State and District Codes 35 B.2: List of Codes of Local Authority (Cities and Towns) Codes within States and Districts for States 38 B.3: "Cartographic Frames for Peninsular Malaysia District Statistics, 1947-1982" by P.P. Courtenay and Kate K.Y. Van (Maps of Adminsitrative district boundaries for all postwar censuses). 70 C: Place of Previous Residence Codes 94 D: 1970 Population Census Occupational Classification 97 E: 1970 Population Census Industrial Classification 104 F: Chinese Age Conversion Table 110 G: Educational Equivalents 111 H: R. Chander, D.A. Fernadez and D. Johnson. 1976. "Malaysia: The 1970 Population and Housing Census." Pp. 117-131 in Lee-Jay Cho (ed.) Introduction to Censuses of Asia and the Pacific, 1970-1974. Honolulu, Hawaii: East-West Population Institute.
    [Show full text]
  • Terms of Reference for the Proposed Development On
    Detailed EIA for the Proposed Expansion 130.55 Acres Sanitary Landfill in Mukim Jeram, District of Kuala Selangor, Selangor Darul Ehsan (Rev.01). CHAPTER 5.0: DESCRIPTION OF THE EXISTING ENVIRONMENT 5.1 Introduction This chapter basically highlights the existing baseline scenario of physical, biological and socio-economical environment of the Project Site and its surrounding areas. The existing environment is documented to form a basis for the assessment of potential impacts (either positive or negative) generated from the proposed development onto the surrounding environment. Conversely any existing conditions that are likely to impact upon the proposed development itself will also be discussed in this DEIA Report. The prevalent environment will be an indicator of the existing nature’s carrying capacity to adapt to the potential impacts generated by the proposed development. The existing physical environment is determined for an impact area which extends for five (5) km radius from the boundary of the Project Site. The assessment is profiled according to site surveys and published secondary data (i.e. maps, reports and structure plans) made available by the relevant government agencies. 5.2 Topography General topography of the Project Site is identified by use of the Topography Map of Klang, Selangor published by Director of National Mapping Malaysia (1990) as depicted in Figure 5.1. The specific topography and landform of the Project Site is identified using the Survey Plan generated by the Licensed Surveyor i.e., Geosystem Services Sdn. Bhd. (refer to Figure 5.2). The proposed project site is located at the western portion of the existing Jeram Landfill.
    [Show full text]