Train Technical Specification

Total Page:16

File Type:pdf, Size:1020Kb

Train Technical Specification Train Technical Specification Document no.: HS2-HS2-RR-SPE-000-000007 Revision Date Reason for revision P07 26/07/2018 Version at Invitation to Tender P11 15/03/2019 Final version for Tender updated to address Clarification Questions from Tenderers Train Technical Specification Document no.: HS2-HS2-RR-SPE-000-000007 Revision: P11 Contents Contents 1 1 Introduction 8 1.1 Document structure and content 8 1.2 Document format 9 1.2.1 Document format for ITT version of TTS 10 1.3 Collaboration in the design process 10 1.4 Tender Evaluation 11 2 Abbreviations, definitions and defined terms 11 2.1 System definitions 11 2.2 Network and route definitions 17 2.3 People 17 2.4 Layouts and payloads 18 2.5 Other defined terms and abbreviations 20 3 Strategic goals and objectives 26 4 Operational Duty 27 5 Unit and Train formation 28 6 Relevant Approvals 29 6.1 Authorisation and standards 29 6.2 Compatibility 30 6.3 Safety 30 6.4 Assurance 30 7 Performance 30 7.1 Journey times 31 7.2 Traction 31 7.3 Braking 32 7.4 EMC 34 7.4.1 Overall EMC 34 7.4.2 Mobile telephone use 35 7.5 Energy collection 35 7.5.1 Electrical power supply 35 7.5.2 Pantograph 36 7.6 Energy consumption 38 7.7 Auxiliary Power Supply 39 7.8 Structural integrity and Carbody 41 7.9 Gauging 43 7.9.1 Vehicle gauge 43 7.9.2 Compatibility with train detection systems 45 7.9.3 Electrical clearance 45 7.10 Mass and static loads 46 Page 1 Train Technical Specification Document no.: HS2-HS2-RR-SPE-000-000007 Revision: P11 7.11 Track interaction 47 7.11.1 Track damage 47 7.11.2 Track curvature 48 7.12 Running behaviour 49 7.13 Ride quality 50 7.14 Aerodynamics 51 7.15 Access and egress 53 7.15.1 High-level goals 53 7.15.2 Moveable Step 54 7.15.3 Platform to Moveable Step interface (HS2) 55 7.15.4 Platform to Moveable Step interface (CRN) 56 7.15.5 Doorway clearway width 57 7.15.6 Dwell Time 57 7.15.7 Evacuation 57 7.15.8 Doorway positions 59 7.16 Internal climate 59 7.16.1 Saloon climate 59 7.16.2 Cab climate 64 7.16.3 Air filtration 65 7.17 Heat output 65 7.18 Acoustics 66 7.18.1 External noise 66 7.18.2 Internal noise - Saloon and Vestibule 67 7.18.3 Internal noise - Cab 69 7.18.4 General noise requirements 69 7.18.5 Communication audibility 70 7.19 Operational environment 70 7.19.1 Temperature and altitude 70 7.19.2 Precipitation and fluids 71 7.19.3 Other elements of the operational environment 72 7.20 Environmental impact 73 7.21 Fire 73 7.22 Reliability 75 7.23 Maintenance and servicing 76 7.23.1 Durations and times 76 7.23.2 Cleanability 78 7.23.3 Access for servicing tasks 79 7.23.4 Damage and vandalism 80 8 Protection and driving 82 8.1 Standards and documentation 83 8.2 General requirements 83 8.2.1 Data entry 83 8.2.2 Driver Machine Interface (DMI) 84 8.2.3 Wheel calibration 85 8.2.4 Communication requirements 85 8.2.5 Future capability 86 8.2.6 On-board CCS Performance 86 Page 2 Train Technical Specification Document no.: HS2-HS2-RR-SPE-000-000007 Revision: P11 8.3 ETCS 87 8.3.1 ETCS functions 87 8.3.2 ETCS performance 87 8.3.3 Key management 88 8.4 AWS / TPWS 88 8.5 Protection during HS2-CRN transition 89 8.6 ATO 89 8.6.1 ATO functions 89 8.6.2 ATO Stop and Safe Location 90 8.6.3 Transitions between networks 91 8.6.4 ATO stopping accuracy 91 8.6.5 Other ATO functions 92 8.7 Manual driving (GoA1) 94 8.8 Shunting 94 8.9 Independent C-DAS 95 8.10 Voice radio 96 8.11 Other protection systems 97 9 Functionality and systems 98 9.1 Operator Settings and Software Updates 99 9.2 Diagram allocation 99 9.3 On-board controls 101 9.4 Train to Wayside and passenger communications 102 9.4.1 Non-Passenger communications 102 9.4.2 Passenger mobile communications 103 9.4.3 Passenger WiFi communications 104 9.4.4 Additional Data Communications System Provision 105 9.5 Monitoring and recording 106 9.5.1 Events 106 9.5.2 Data recording 107 9.5.3 Data recording for testing 109 9.5.4 Reset and isolation 110 9.6 Location-based functions 110 9.7 Login, states and activation times 111 9.7.1 Log-in and security 111 9.7.2 Operational states 112 9.7.3 Activation times 114 9.7.4 Train Captain settings 115 9.8 Interworking and coupling 116 9.8.1 Interworking and rescue 116 9.8.2 Coupling process 118 9.9 Traction control 122 9.10 Brake control 122 9.11 Jerk rate 124 9.12 Sanding and adhesion control 125 9.13 Power supply control 126 9.14 Energy metering 128 9.15 Pantograph control 129 Page 3 Train Technical Specification Document no.: HS2-HS2-RR-SPE-000-000007 Revision: P11 9.16 Running Gear monitoring 130 9.17 Payload management 130 9.18 Exterior Doors 131 9.18.1 Standards 131 9.18.2 Train-wide door control 131 9.18.3 Automatic Selective Door Operation (ASDO) 134 9.18.4 Exterior Door system 136 9.18.5 Auto-close 137 9.18.6 Door obstacle detection 138 9.18.7 Door status 139 9.18.8 Emergency Egress Device 140 9.18.9 Moveable Step 141 9.19 PEP system 143 9.19.1 PEP-to-Unit Communication 143 9.19.2 Door and PEP control 144 9.20 HVAC 146 9.20.1 HVAC control 146 9.21 Heat management 148 9.22 Fire and smoke detection 149 9.22.1 Internal fire detection 149 9.22.2 External smoke control 152 9.23 Security 153 9.23.1 Physical security 153 9.23.2 Cyber security 154 9.24 Passenger Alarms and Call For Aids 154 9.24.1 Passenger Alarms 154 9.24.2 Call For Aid 155 9.25 Passenger Information System (PIS) 157 9.25.1 Visual displays 157 9.25.2 Audio information 159 9.25.3 Automatic Information Programme (AIP) 160 9.25.4 Wayfinding beacon system 163 9.25.5 Reservation and occupancy detection 163 9.26 On-board CCTV 165 9.26.1 Requirements applicable to all CCTV Systems 165 9.26.2 FFRF CCTV 168 9.26.3 Pantograph CCTV 168 9.26.4 Interior CCTV 169 9.26.5 Cab CCTV 171 9.27 Infrastructure Monitoring 172 9.27.1 Monitoring equipment to be fitted to all Units 172 9.27.2 Equipment fitted to IM Units 173 9.27.3 Unattended Geometry Measurement System (UGMS) 174 9.27.4 Unattended Overhead Measurement System (UOMS) 175 9.27.5 Signalling and Radio Frequency Monitoring System 176 9.28 Automatic vehicle identification tag 177 9.29 Maintenance and servicing 177 Page 4 Train Technical Specification Document no.: HS2-HS2-RR-SPE-000-000007 Revision: P11 9.29.1 Train preparation 177 9.29.2 Consumable / waste monitoring 177 9.29.3 Software update 178 9.29.4 Maintenance laptop access 178 9.30 Horns 179 9.31 Exterior lights 179 9.32 Toilets and Sanitary Systems 180 9.33 Interior lighting 181 9.33.1 Lighting states and levels 181 9.33.2 Reading lights 185 9.33.3 Cab lighting control 185 9.34 Interior Doors 186 9.35 Cleaning sockets 189 9.36 Clocks / time 189 9.37 Staff communication 190 10 Interior Design and Components 190 10.1 Human factors 190 10.2 Industrial design 192 10.3 Passenger Seats 193 10.3.1 General seat design 193 10.3.2 HS2 Seats 195 10.3.3 Tip-up Seats 196 10.3.4 Premium Seats 196 10.3.5 At-seat facilities 197 10.3.6 Vestibule Seat 200 10.4 Tables 200 10.4.1 Bay tables 200 10.4.2 Seat back tables 201 10.5 Multi-Purpose Areas 201 10.6 Luggage storage 202 10.6.1 Overhead luggage racks 202 10.6.2 Luggage stacks 203 10.6.3 Bulk Luggage Storage Area 203 10.7 Wheelchair Spaces 204 10.8 Catering 205 10.8.1 Catering Trolley Stowage Point 205 10.8.2 Catering Café-Shop 205 10.8.3 Catering Kiosk 207 10.8.4 Catering flexibility 208 10.9 Train Captain and Train Crew facilities 209 10.9.1 Cab design 209 10.9.2 Cab sightlines 211 10.9.3 Train Crew facilities 212 10.10 Evacuation equipment 212 10.11 Equipment and storage 214 10.12 Gangway 216 10.13 Interior panelling and glazing 216 Page 5 Train Technical Specification Document no.: HS2-HS2-RR-SPE-000-000007 Revision: P11 10.14 Interior partitions 217 10.14.1 Full-width Partitions 217 10.14.2 Partial Partitions 218 10.15 Interior flooring 219 10.16 Toilets 219 10.16.1 General Toilet requirements 219 10.16.2 Toilet Facilities 220 10.16.3 Toilet Controls 223 10.17 Litter collection 224 10.18 Colours and signage 225 10.19 PIS display integration 226 10.20 Interior lighting 226 10.20.1 Lighting standards 226 10.20.2 Luminaire specification and design 226 10.20.3 Illuminance levels 227 10.20.4 Reduced lighting 230 10.20.5 Emergency lighting 230 10.21 Fire extinguishers 232 11 Interior Layout 232 11.1 One-Space Layout 233 11.1.1 Passenger Seats 233 11.1.2 Wheelchair Spaces 234 11.1.3 Window size and alignment 235 11.1.4 Toilets 236 11.1.5 Luggage 237 11.1.6 Catering 238 11.1.7 PIS display position 239 11.1.8 Other equipment 239 11.2 Two-Space Layout 239 11.3 Contractually Protected Area 239 11.4 High Density Layout 239 12 Wayside Data System 242 12.1 Access and interfaces 242 12.2 WDS functions 243 12.2.1 General functions 243 12.2.2 Diagram allocation (§9.2) 244 12.2.3 Train to Wayside and passenger communications (§9.4) 244 12.2.4 Monitoring and recording (§9.5) 245 12.2.5 Location-based functions (§9.6) 247 12.2.6 Login, states and activation times (§9.7) 247 12.2.7 Traction control (§9.9) 248 12.2.8 Brake control (§9.10) 248 12.2.9 Power supply control (§9.13) 248 12.2.10 Energy metering (§9.14) 248 12.2.11 Payload management (§9.17) 249 12.2.12 Exterior Doors and PEP system (§9.18/9.19) 249 12.2.13 HVAC (§9.20) 249 Page 6 Train Technical Specification Document no.: HS2-HS2-RR-SPE-000-000007 Revision: P11 12.2.14 Heat and smoke detection (§9.22) 250 12.2.15 Passenger Information System (§9.25) 250 12.2.16 On-board CCTV (§9.26) 252 12.2.17 Infrastructure Monitoring (§9.27) 253 12.2.18 Maintenance and servicing (§9.29) 254 12.2.19 Interior Lighting (§9.33) 254 12.2.20 Interior Doors (§9.34) 255 12.2.21 Staff communication (§9.37) 255 12.3 Timing and prioritisation 256 13 References 257 Page 7 Train Technical Specification Document no.: HS2-HS2-RR-SPE-000-000007 Revision: P11 1 Introduction 1.0.1 This Train Technical Specification (TTS) contains the technical requirements for the 'conventional compatible' Units being procured as part of the High Speed 2 Project.
Recommended publications
  • The Report from Passenger Transport Magazine
    MAKinG TRAVEL SiMpLe apps Wide variations in journey planners quality of apps four stars Moovit For the first time, we have researched which apps are currently Combined rating: 4.5 (785k ratings) Operator: Moovit available to public transport users and how highly they are rated Developer: Moovit App Global LtD Why can’t using public which have been consistent table-toppers in CityMApper transport be as easy as Transport Focus’s National Rail Passenger Combined rating: 4.5 (78.6k ratings) ordering pizza? Speaking Survey, have not transferred their passion for Operator: Citymapper at an event in Glasgow customer service to their respective apps. Developer: Citymapper Limited earlier this year (PT208), First UK Bus was also among the 18 four-star robert jack Louise Coward, the acting rated bus operator apps, ahead of rivals Arriva trAinLine Managing Editor head of insight at passenger (which has different apps for information and Combined rating: 4.5 (69.4k ratings) watchdog Transport Focus, revealed research m-tickets) and Stagecoach. The 11 highest Operator: trainline which showed that young people want an rated bus operator apps were all developed Developer: trainline experience that is as easy to navigate as the one by Bournemouth-based Passenger, with provided by other retailers. Blackpool Transport, Warrington’s Own Buses, three stars She explained: “Young people challenged Borders Buses and Nottingham City Transport us with things like, ‘if I want to order a pizza all possessing apps with a 4.8-star rating - a trAveLine SW or I want to go and see a film, all I need to result that exceeds the 4.7-star rating achieved Combined rating: 3.4 (218 ratings) do is get my phone out go into an app’ ..
    [Show full text]
  • Annual Average Daily Traffic Estimation in England and Wales An
    Journal of Transport Geography 83 (2020) 102658 Contents lists available at ScienceDirect Journal of Transport Geography journal homepage: www.elsevier.com/locate/jtrangeo Annual average daily traffic estimation in England and Wales: An T application of clustering and regression modelling ⁎ Alexandros Sfyridis, Paolo Agnolucci Institute for Sustainable Resources, University College London, 14 Upper Woburn Place, WC1H 0NN London, United Kingdom ARTICLE INFO ABSTRACT Keywords: Collection of Annual Average Daily Traffic (AADT) is of major importance for a number of applications inroad Annual Average Daily Traffic (AADT) transport urban and environmental studies. However, traffic measurements are undertaken only for a part ofthe Clustering road network with minor roads usually excluded. This paper suggests a methodology to estimate AADT in K-prototypes England and Wales applicable across the full road network, so that traffic for both major and minor roads canbe Support Vector Regression (SVR) approximated. This is achieved by consolidating clustering and regression modelling and using a comprehensive Random Forest set of variables related to roadway, socioeconomic and land use characteristics. The methodological output GIS reveals traffic patterns across urban and rural areas as well as produces accurate results for all roadclasses. Support Vector Regression (SVR) and Random Forest (RF) are found to outperform the traditional Linear Regression, although the findings suggest that data clustering is key for significant reduction in prediction errors. 1. Introduction boundaries of urban areas (e.g. Doustmohammadi and Anderson, 2016; Kim et al., 2016), or on particular types of roads (e.g. Caceres et al., 2012). Annual average daily traffic (AADT) is a measure of road traffic Secondly, most studies estimate AADT on major roads, while minor roads flow, defined as the average number of vehicles at a given location over are repeatedly excluded, with only a few studies incorporating them (e.g.
    [Show full text]
  • Stakeholder Reopening Update – May 2021
    STAKEHOLDER REOPENING UPDATE | 14 MAY 2021 BIRMINGHAM WESTSIDE METRO EXTENSION Progress photos - May 2021 What businesses can expect when they return on 17 May 2021 From Monday 17 May, indoor hospitality venues and attractions along Broad Street will be welcoming back customers as England enters the next stage of the Government’s Covid-19 roadmap out of lockdown. The Midland Metro Alliance have continued to work closely with partners at Transport for West Midlands (TfWM), Birmingham City Council and Westside BID to ensure the area is ready to accommodate the safe return of customers. A considerable amount of activity took place in the weeks preceding 12 April when venues were planning to open for outdoor service, and, despite inclement weather, finishing works have been ongoing throughout April and May allowing additional outdoor space to be provided to venues who are reopening their doors next Monday to welcome customers again. Just past the edge of Broad Street, on the way to Edgbaston, another milestone for the project was reached last month with the final tracks for the Birmingham Westside Metro extension welded into place signalling that the project is truly entering its final stages (see overleaf). We recognise that every business is different and you may have some specific questions about our activities as you continue to plan your re-opening. You are able to get in touch with Shervorne Brown, your dedicated Stakeholder Liaison Officer, on the details on the last page. Final piece of track is welded into place Marketing support provided for A major milestone was reached on the project recently as businesses in April the last piece of track was welded into place on Hagley In last month’s reopening special, we Road.
    [Show full text]
  • The Demand for Public Transport: a Practical Guide
    The demand for public transport: a practical guide R Balcombe, TRL Limited (Editor) R Mackett, Centre for Transport Studies, University College London N Paulley, TRL Limited J Preston, Transport Studies Unit, University of Oxford J Shires, Institute for Transport Studies, University of Leeds H Titheridge, Centre for Transport Studies, University College London M Wardman, Institute for Transport Studies, University of Leeds P White, Transport Studies Group, University of Westminster TRL Report TRL593 First Published 2004 ISSN 0968-4107 Copyright TRL Limited 2004. This report has been produced by the contributory authors and published by TRL Limited as part of a project funded by EPSRC (Grants No GR/R18550/01, GR/R18567/01 and GR/R18574/01) and also supported by a number of other institutions as listed on the acknowledgements page. The views expressed are those of the authors and not necessarily those of the supporting and funding organisations TRL is committed to optimising energy efficiency, reducing waste and promoting recycling and re-use. In support of these environmental goals, this report has been printed on recycled paper, comprising 100% post-consumer waste, manufactured using a TCF (totally chlorine free) process. ii ACKNOWLEDGEMENTS The assistance of the following organisations is gratefully acknowledged: Arriva International Association of Public Transport (UITP) Association of Train Operating Companies (ATOC) Local Government Association (LGA) Confederation of Passenger Transport (CPT) National Express Group plc Department for Transport (DfT) Nexus Engineering and Physical Sciences Research Network Rail Council (EPSRC) Rees Jeffery Road Fund FirstGroup plc Stagecoach Group plc Go-Ahead Group plc Strategic Rail Authority (SRA) Greater Manchester Public Transport Transport for London (TfL) Executive (GMPTE) Travel West Midlands The Working Group coordinating the project consisted of the authors and Jonathan Pugh and Matthew Chivers of ATOC and David Harley, David Walmsley and Mark James of CPT.
    [Show full text]
  • £56 Million Package to Support Light Rail Through Recovery Period
    £56 million package to support light rail through recovery period July 16, 2021 Light rail operators across England will benefit from up to £56 million in government funding to help ensure they continue to run vital services as coronavirus (COVID-19) restrictions are lifted, Transport Minister Baroness Vere has announced today (16 July 2021). The funding will run from 20 July to April 2022, and will support the following operators across the north and the Midlands: Manchester Metrolink Tyne and Wear Metro Sheffield Supertram Nottingham Express Transit West Midlands Metro Blackpool Tramway It comes as the government invests billions of pounds to build back better from the pandemic and improve transport links across the country. Transport Minister Baroness Vere said: “Light rail and tram services provide an essential service in our towns and cities, ensuring people can get to work, school or to see friends and family. “This £56 million funding package will allow operators to keep running these vital services as normal in those initial months, as restrictions are lifted and passengers begin to return in higher numbers.” Chief Secretary to the Treasury Steve Barclay said: “As our economy reopens, we’re continuing to support people and businesses – and making sure people can get to work and use public transport easily is crucial. “Today’s funding means that thousands of people across England can continue to travel on public transport when they need to, and regular services can continue as the country comes out of restrictions.” Andy Street, the Mayor of the West Midlands, said: “Our West Midlands Metro service has operated throughout the pandemic and has seen patronage return very quickly each time restrictions have been lifted.
    [Show full text]
  • 2004 Freight Rail Component of the Florida Rail Plan
    final report 2004 Freight Rail Component of the Florida Rail Plan prepared for Florida Department of Transportation prepared by Cambridge Systematics, Inc. 4445 Willard Avenue, Suite 300 Chevy Chase, Maryland 20815 with Charles River Associates June 2005 final report 2004 Freight Rail Component of the Florida Rail Plan prepared for Florida Department of Transportation prepared by Cambridge Systematics, Inc. 4445 Willard Avenue, Suite 300 Chevy Chase, Maryland 20815 with Charles River Associates Inc. June 2005 2004 Freight Rail Component of the Florida Rail Plan Table of Contents Executive Summary .............................................................................................................. ES-1 Purpose........................................................................................................................... ES-1 Florida’s Rail System.................................................................................................... ES-2 Freight Rail and the Florida Economy ....................................................................... ES-7 Trends and Issues.......................................................................................................... ES-15 Future Rail Investment Needs .................................................................................... ES-17 Strategies and Funding Opportunities ...................................................................... ES-19 Recommendations........................................................................................................
    [Show full text]
  • The Covid-19 Funding Gap: the Case for Continuing Support for Urban Public Transport
    Report September 2020 The Covid-19 Funding Gap: The Case for Continuing Support for Urban Public Transport Urban Transport Group Our ref: 23930401 Report September 2020 The Covid-19 Funding Gap: The Case for Continuing Support for Urban Public Transport Prepared by: Prepared for: Steer Urban Transport Group 67 Albion Street Wellington House Leeds LS1 5AA 40-50 Wellington Street Leeds LS1 2DE +44 113 389 6400 www.steergroup.com Our ref: 23930401 Steer has prepared this material for Urban Transport Group. This material may only be used within the context and scope for which Steer has prepared it and may not be relied upon in part or whole by any third party or be used for any other purpose. Any person choosing to use any part of this material without the express and written permission of Steer shall be deemed to confirm their agreement to indemnify Steer for all loss or damage resulting therefrom. Steer has prepared this material using professional practices and procedures using information available to it at the time and as such any new information could alter the validity of the results and conclusions made. The Covid-19 Funding Gap: The Case for Continuing Support for Urban Public Transport | Report Contents Executive Summary ............................................................................................................. i Overview .............................................................................................................................. i Public Transport Pre-Covid .................................................................................................
    [Show full text]
  • Template BR Rec 2005.Dot
    Report ITU-R M.2442-0 (11/2018) Current and future usage of railway radiocommunication systems between train and trackside M Series Mobile, radiodetermination, amateur and related satellite services ii Rep. ITU-R M.2442-0 Foreword The role of the Radiocommunication Sector is to ensure the rational, equitable, efficient and economical use of the radio- frequency spectrum by all radiocommunication services, including satellite services, and carry out studies without limit of frequency range on the basis of which Recommendations are adopted. The regulatory and policy functions of the Radiocommunication Sector are performed by World and Regional Radiocommunication Conferences and Radiocommunication Assemblies supported by Study Groups. Policy on Intellectual Property Right (IPR) ITU-R policy on IPR is described in the Common Patent Policy for ITU-T/ITU-R/ISO/IEC referenced in Resolution ITU-R 1. Forms to be used for the submission of patent statements and licensing declarations by patent holders are available from http://www.itu.int/ITU-R/go/patents/en where the Guidelines for Implementation of the Common Patent Policy for ITU-T/ITU-R/ISO/IEC and the ITU-R patent information database can also be found. Series of ITU-R Reports (Also available online at http://www.itu.int/publ/R-REP/en) Series Title BO Satellite delivery BR Recording for production, archival and play-out; film for television BS Broadcasting service (sound) BT Broadcasting service (television) F Fixed service M Mobile, radiodetermination, amateur and related satellite services P Radiowave propagation RA Radio astronomy RS Remote sensing systems S Fixed-satellite service SA Space applications and meteorology SF Frequency sharing and coordination between fixed-satellite and fixed service systems SM Spectrum management Note: This ITU-R Report was approved in English by the Study Group under the procedure detailed in Resolution ITU-R 1.
    [Show full text]
  • Grade Crossings - Handbook
    GRADE CROSSINGS - HANDBOOK 2016-12-14 RDIMS # 12526323 This document is meant to be used in conjunction with the Grade Crossings Regulations as well as the Grade Crossings Standards. i TABLE OF CONTENTS TABLE OF CONTENTS ........................................................................................................................ II FORWARD ............................................................................................................................................ 1 PART A – PREFACE .................................................................................................................................... 2 BACKGROUND ..................................................................................................................................... 2 OBJECTIVES ........................................................................................................................................ 3 DESCRIPTION ...................................................................................................................................... 4 ARTICLE 1 – INTERPRETATION ......................................................................................................... 7 ARTICLE 1.1 – AREMA INTERPRETATIONS ................................................................................... 13 ARTICLE 2 – CITATIONS ................................................................................................................... 14 ARTICLE 3 – UNITS OF MEASUREMENT .......................................................................................
    [Show full text]
  • Finished Vehicle Logistics by Rail in Europe
    Finished Vehicle Logistics by Rail in Europe Version 3 December 2017 This publication was prepared by Oleh Shchuryk, Research & Projects Manager, ECG – the Association of European Vehicle Logistics. Foreword The project to produce this book on ‘Finished Vehicle Logistics by Rail in Europe’ was initiated during the ECG Land Transport Working Group meeting in January 2014, Frankfurt am Main. Initially, it was suggested by the members of the group that Oleh Shchuryk prepares a short briefing paper about the current status quo of rail transport and FVLs by rail in Europe. It was to be a concise document explaining the complex nature of rail, its difficulties and challenges, main players, and their roles and responsibilities to be used by ECG’s members. However, it rapidly grew way beyond these simple objectives as you will see. The first draft of the project was presented at the following Land Transport WG meeting which took place in May 2014, Frankfurt am Main. It received further support from the group and in order to gain more knowledge on specific rail technical issues it was decided that ECG should organise site visits with rail technical experts of ECG member companies at their railway operations sites. These were held with DB Schenker Rail Automotive in Frankfurt am Main, BLG Automotive in Bremerhaven, ARS Altmann in Wolnzach, and STVA in Valenton and Paris. As a result of these collaborations, and continuous research on various rail issues, the document was extensively enlarged. The document consists of several parts, namely a historical section that covers railway development in Europe and specific EU countries; a technical section that discusses the different technical issues of the railway (gauges, electrification, controlling and signalling systems, etc.); a section on the liberalisation process in Europe; a section on the key rail players, and a section on logistics services provided by rail.
    [Show full text]
  • Cyber Security Risk Management for Connected Railroads
    U.S. Department of Transportation Office of Research, Federal Railroad Development and Technology Administration Washington , DC 20590 Cyber Security Risk Management for Connected Railroads No aProximate Field Logic Proximatea Access Access Needed Controllers Required _____..._ _________ __, Railroad Radio CPS Local or Carrier Network Communications Base Stations Field Linka es Closed Network Short Range RF Balises Accidentally Cleared Signal (tt.g. C&S Testing or Malicious lnJeCtion) . : 8m Block RelayMtal PLC Vital Radio Code ___J~ IT'll_!_l'~ R92~m~ Extralayerof Line Command '\Y' ; 1~ne 1ze/Ac\rvafif protection I , . Lack of acknowledgement False acknoY,,;edgement (~~the-middle) (dispatcher not able to know the 8Ctual status C&S Testing Signal ol blue block relay) MOWlimil Clearing ' '...====='....""'.""."' False Injection ___ Spoofing _____: 110.--•-I I (Attack) I ____________________ J +Work l im it Misunderstood = Risk DOT/FRA/ORD-20/25 Final Report | June 2020 NOTICE This document is disseminated under the sponsorship of the Department of Transportation in the interest of information exchange. The United States Government assumes no liability for its contents or use thereof. Any opinions, findings and conclusions, or recommendations expressed in this material do not necessarily reflect the views or policies of the United States Government, nor does mention of trade names, commercial products, or organizations imply endorsement by the United States Government. The United States Government assumes no liability for the content or use of the material contained in this document. NOTICE The United States Government does not endorse products or manufacturers. Trade or manufacturers' names appear herein solely because they are considered essential to the objective of this report.
    [Show full text]
  • Highway-Rail Crossing HANDBOOK Third Edition FOREWORD
    Highway-Rail Crossing HANDBOOK Third Edition FOREWORD The Highway-Rail Crossing Handbook, 3rd Edition (Handbook) has been prepared to disseminate current practices and requirements for developing engineering treatments for highway-rail grade crossings (referred to herein as “crossings”). The Handbook is intended to provide practitioners of all levels of knowledge and experience with critical background information and “noteworthy practices” consistent with the 2009 Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) and more recent guidance developed by recognized subject matter experts. This edition constitutes a substantial update to and revision of the 2007 Handbook and efforts have been made to reorganize the contents. This edition includes “hotlinks” to facilitate navigation and access external information available on the web. Notice This document is disseminated under the sponsorship of the U.S. Department of Transportation in the interest of information exchange. The U.S. Government assumes no liability for the use of the information contained in this document. This document does not constitute a standard, specification, or regulation and the contents of this document do not necessarily reflect official policy of the U.S. Department ofransportation. T This document contains images that are shown for illustration purposes only. For specific requirements, please refer to the 2009 edition of the Manual on Uniform Traffic Control Devices for Streets and Highways. The U.S. Government does not endorse products or manufacturers. Trademarks or manufacturers’ names appear in this report only because they are considered essential to the objective of the document. Quality Assurance Statement The Federal Highway Administration (FHWA) and Federal Railroad Administration (FRA) provide high-quality information to serve Government, industry, and the public in a manner that promotes public understanding.
    [Show full text]