Transportation Cabinet Department of Highways Division of Construction Procurement Frankfort, Kentucky 1/25
Total Page:16
File Type:pdf, Size:1020Kb
TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT FRANKFORT, KENTUCKY 1/25 POSTED: 5/5/17 FRIDAY, MAY 26, 2017 NOTICE TO CONTRACTORS BIDS WILL BE RECEIVED ELECTRONICALLY THROUGH THE BID EXPRESS BIDDING SERVICE UNTIL 10:00 AM FRIDAY, MAY 26, 2017 THEREAFTER, BIDS WILL BE CHECKED IN THE DIVISION OF CONSTRUCTION PROCUREMENT AND POSTED ALONG WITH THE ENGINEER'S ESTIMATE ON THE FOLLOWING WEBSITES: WWW.TRANSPORTATION.KY.GOV AND WWW.BIDX.COM. THE PROJECTS ARE FOR THE IMPROVEMENT OF : CALL 100 CONTRACT ID 171019 PIKE COUNTY NHPP 0806(044) : POND CREEK BRIDGE(US-460) POND CREEK BRIDGE, US-460/KY-80 FROM KY-195 TO EAST OF POND CREEK, SECTION 6A-2., A DISTANCE OF 2.18 MILES. BRIDGE WITH GRADE & DRAIN. SYP NO. 12-00263.63. THE DBE PARTICIPATION GOAL IS 6.00%. A MANDATORY PRE-BID MEETING WILL BE HELD ON MAY 10, 2017 AT 10:00 A.M. PREVAILING TIME, AT THE DEPARTMENT OF HIGHWAYS, TRANSPORTATION OFFICE BUILDING, ROOM C-109, 200 MERO STREET, FRANKFORT, KY 40622. ANY COMPANY THAT IS INTERESTED IN BIDDING ON THE SUBJECT PROJECT OR BEING PART OF A JOINT VENTURE MUST BE REPRESENTED AT THE PRE-BID MEETING, BY AT LEAST ONE PERSON OF SUFFICIENT AUTHORITY TO BIND THE COMPANY. NO INDIVIDUAL CAN REPRESENT MORE THAN ONE COMPANY. AT THE MEETING, A ROSTER WILL BE TAKEN OF THE REPRESENTATIVES PRESENT. ONLY COMPANIES REPRESENTED AT THE MEETING WILL BE ELIGIBLE TO HAVE THEIR BIDS OPENED AT THE DATE OF LETTING. CALL 101 CONTRACT ID 171216 HARDIN COUNTY NHPP IM 0654 (054) : I-65 (HARDIN COUNTY) ASPHALT OVERLAY (MP 90.530) MILL AND INTERMEDIATE ASPHALT OVERLAY ON I-65 NORTH AND SOUTHBOUND LANES BEGINNING 0.556 MI S OF WESTERN KENTUCKY PARKWAY (9001) IN HARDIN COUNTY (MP 97.500), A DISTANCE OF 6.97 MILES. ASPHALT REHAB INTERSTATE/ PARKWAY. SYP NO. 04-02060.00. THE DBE PARTICIPATION GOAL IS 11.00%. CALL 102 CONTRACT ID 172026 NELSON COUNTY NHPP 0022 013 : BLUEGRASS PARKWAY (BG 9002) (MP 10.176) FROM EAST END OF CSX RAILROAD BRIDGE EXTENDING EAST TO 0.340 MILES WEST OF US 150 OVERPASS (MP 24.095), A DISTANCE OF 13.92 MILES. PAVEMENT (WITH ALTERNATES). SYP NO. 04-02065.00. THE DBE PARTICIPATION GOAL IS 4.00%. CALL 103 CONTRACT ID 172027 PULASKI COUNTY NHPP 0802 008 : LOUIE NUNN PARKWAY (LN 9008) (MP 84.633) FROM EAST END OF FISHING CREEK BRIDGE EXTENDING EAST TO WEST END OF US 27 BRIDGE (MP 88.215), A DISTANCE OF 3.58 MILES. PAVEMENT (WITH ALTERNATES). SYP NO. 08-02029.00. THE DBE PARTICIPATION GOAL IS 4.00%. TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT FRANKFORT, KENTUCKY 2/25 POSTED: 5/5/17 FRIDAY, MAY 26, 2017 NOTICE TO CONTRACTORS CALL 104 CONTRACT ID 172028 LAUREL COUNTY NHPP 0804 018 : HAL ROGERS PARKWAY (HR 9006) (MP 4.037) FROM 845 FEET EAST OF KY 192 EXTENDING EAST TO 1940 FEET WEST OF KY 1305 OVERHEAD BRIDGE (MP 8.800), A DISTANCE OF 4.76 MILES. PAVEMENT (WITH ALTERNATES). SYP NO. 11-02052.00. THE DBE PARTICIPATION GOAL IS 4.00%. CALL 105 CONTRACT ID 172029 LESLIE COUNTY NHPP 0804 017 : HAL ROGERS PARKWAY (HR 9006) (OMIT MP 41.475-42.101) (MP 35.929) FROM CLAY COUNTY LINE EXTENDING EAST TO PERRY COUNTY LINE (MP 51.026), A DISTANCE OF 15.10 MILES. PAVEMENT (WITH ALTERNATES). SYP NO. 11-02053.00. THE DBE PARTICIPATION GOAL IS 4.00%. CALL 106 CONTRACT ID 171215 LEE COUNTY STP 5262 (062) : WEST MAIN STREET (KY 52) (MP 11.780) CONSTRUCT SIDEWALKS, CURB AND GUTER ON KY 52 FROM DOWNTOWN BEATTYVILLE TOWARD IRVINE (MP 12.260), A DISTANCE OF 0.47 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 10-08852.00. THE DBE PARTICIPATION GOAL IS 7.00%. CALL 107 CONTRACT ID 171018 PERRY COUNTY STP BRO 5375 (045) : BULAN-HINER ROAD (KY-1146) (MP 2.679) REPLACE BRIDGE ON BULAN-HINER ROAD (KY-1146) OVER TRACE FORK AT JCT WITH KY-476. (MP 2.712), A DISTANCE OF 0.05 MILES. BRIDGE REPLACEMENT. SYP NO. 10-01102.00. THE DBE PARTICIPATION GOAL IS 4.00%. CALL 108 CONTRACT ID 171211 OHIO COUNTY STP BRZ 0203 (337) : CLAY LEACH LANE (CR 1194) (MP 0.029) REPLACE BRIDGE ON CR 1194 OVER THREELICK CREEK; 0.15 MI WEST OF JCT CR 5172 (MP 0.129), A DISTANCE OF 0.10 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 02-01077.00. THE DBE PARTICIPATION GOAL IS 7.00%. TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT FRANKFORT, KENTUCKY 3/25 POSTED: 5/5/17 FRIDAY, MAY 26, 2017 NOTICE TO CONTRACTORS CALL 109 CONTRACT ID 171217 JACKSON COUNTY STP BRO 4211 (047) : MANCHESTER TO MCKEE ROAD (US 421) (MP 13.919) REPLACE BRIDGE ON US 421 OVER PIDGEON ROOST CREEK AT INTERSECTION WITH WATER STREET E (CS 1006) (MP 13.959), A DISTANCE OF 0.11 MILES. BRIDGE WITH GRADE, DRAIN & SURFACE. SYP NO. 11-01090.00. THE DBE PARTICIPATION GOAL IS 6.00%. CALL 110 CONTRACT ID 172970 BULLITT COUNTY STP BRZ 0503 (251) : KY 251 (MP 1.60) KY 251 OVER CROOKED CREEK (MP1.60) BRIDGE SCOUR MITIGATION. SYP NO. 05-0108400. THE DBE PARTICIPATION GOAL IS 0.00%. A MANDATORY PRE-BID MEETING WILL BE HELD ON MAY 12, 2017 AT 10:00 A.M. PREVAILING TIME, AT THE DEPARTMENT OF HIGHWAYS, DISTRICT OFFICE 5, 8310 WESTPORT ROAD, LOUISVILLE, KY 40242. ANY COMPANY THAT IS INTERESTED IN BIDDING ON THE SUBJECT PROJECT OR BEING PART OF A JOINT VENTURE MUST BE REPRESENTED AT THE PRE-BID MEETING, BY AT LEAST ONE PERSON OF SUFFICIENT AUTHORITY TO BIND THE COMPANY. NO INDIVIDUAL CAN REPRESENT MORE THAN ONE COMPANY. AT THE MEETING, A ROSTER WILL BE TAKEN OF THE REPRESENTATIVES PRESENT. ONLY COMPANIES REPRESENTED AT THE MEETING WILL BE ELIGIBLE TO HAVE THEIR BIDS OPENED AT THE DATE OF LETTING. CALL 111 CONTRACT ID 174004 MUHLENBERG COUNTY HSIP 5059 (001) : MINOR SHOULDER WIDENING ON KY 189 (MP 0.000) BEGINNING AT THE MUHLENBERG/ CHRISTIAN COUNTY LINE ON THE POND RIVER BRIDGE AND EXTENDING NORTHEAST TO THE INTERSECTION WITH KY 853 (MP 2.431), A DISTANCE OF 2.43 MILES. ASPHALT SHOULDERS. SYP NO. 02-00912.00. THE DBE PARTICIPATION GOAL IS 11.00%. CALL 112 CONTRACT ID 174115 CAMPBELL COUNTY HSIP 9010 (271) : FLAGG SPRINGS PIKE (KY 10) BEGINNING AT KY 1997 (MP 4.42) AND EXTENDING EAST TO THE PENDLETON COUNTY LINE (MP 13.603), A DISTANCE OF 9.18 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 06-09006.00. THE DBE PARTICIPATION GOAL IS 15.00%. CALL 113 CONTRACT ID 174117 BRACKEN COUNTY HSIP 5218 (005) : SHOULDER WIDENING ON KY 22 BEGINNING AT THE PENDLETON COUNTY LINE (0.000) AND EXTENDING TO KY 10 (4.387), A DISTANCE OF 4.38 MILES. ASPHALT SHOULDERS. SYP NO. 06-00935.00. THE DBE PARTICIPATION GOAL IS 8.50%. TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT FRANKFORT, KENTUCKY 4/25 POSTED: 5/5/17 FRIDAY, MAY 26, 2017 NOTICE TO CONTRACTORS CALL 114 CONTRACT ID 174118 LAUREL COUNTY HSIP 0803 (208) : TURN LANES ON KY 80 BEGINNING AT THE INTERSECTION WITH INDUSTRIAL BLVD (6.257) AND CONTINUING TO THE INTERSECTION WITH MITCHELL CREEK ROAD (9.822)., A DISTANCE OF 3.56 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 11-00957.00. THE DBE PARTICIPATION GOAL IS 0.00%. CALL 115 CONTRACT ID 174119 VARIOUS COUNTY HSIP 9010 (273) : SIGNING ON VARIOUS ROUTES IN DISTRICT 6 DISTRICT 6 SIGNS. SYP NO. 06-00936.00. THE DBE PARTICIPATION GOAL IS 0.00%. CALL 116 CONTRACT ID 174120 LEWIS COUNTY HSIP 5236 (012) : HIGH FRICTION SURFACE ON KY 8 0.896 MILES EAST OF BENTON STREET (14.689) EXTENDING EAST TO 1.195 MILES EAST OF BENTON STREET (14.988) HIGH FRICTION SURFACE. SYP NO. 09-00940.00. THE DBE PARTICIPATION GOAL IS 0.00%. CALL 117 CONTRACT ID 174121 BATH COUNTY HSIP 5316 (022) : SHARPSBURG - OWINGSVILLE ROAD (KY 36) (MP 8.000) BEGINNING 0.692 MILES EAST OF POWERS BRANCH ROAD (8.000) AND EXTENDING TO US 60 (11.847) (MP 11.847), A DISTANCE OF 3.84 MILES. ASPHALT SURFACE WITH GRADE & DRAIN. SYP NO. 09-00941.00. THE DBE PARTICIPATION GOAL IS 16.50%. CALL 118 CONTRACT ID 174208 POWELL COUNTY HSIP 0061 (073) : BERT T COMBS-MOUNTAIN PARKWAY (KY 9000) (MP 35.341) INSTALLATION OF HIGH FRICTION SURFACE ON THE EASTBOUND LANES OF THE MOUNTAIN PARKWAY (MP 35.719), A DISTANCE OF 0.38 MILES. HIGH FRICTION SURFACE. SYP NO. 10-00938.00. THE DBE PARTICIPATION GOAL IS 0.00%. CALL 119 CONTRACT ID 174005 VARIOUS COUNTY HSIP 9010 (275) : HORIZONTAL ALIGNMENT SIGNING ON VARIOUS ROUTES IN DISTRICT 7 VARIOUS ROUTES IN DISTRICT 7 SIGNS. SYP NO. 07-00948.00. THE DBE PARTICIPATION GOAL IS 0.00%. TRANSPORTATION CABINET DEPARTMENT OF HIGHWAYS DIVISION OF CONSTRUCTION PROCUREMENT FRANKFORT, KENTUCKY 5/25 POSTED: 5/5/17 FRIDAY, MAY 26, 2017 NOTICE TO CONTRACTORS CALL 120 CONTRACT ID 174006 OHIO COUNTY HSIP 5078 (014) : LOW COST SAFETY IMPROVEMENTS ON KY-54 IN OHIO COUNTY (MP 0.000) FROM THE DAVIESS/OHIO COUNTY LINE ALONG KY-54 EXTENDING SOUTHEAST TO THE INTERSECTION WITH KY-69 (MP 6.018), A DISTANCE OF 6.02 MILES. GRADE & DRAIN. SYP NO. 02-09002.00. THE DBE PARTICIPATION GOAL IS 3.50%. CALL 121 CONTRACT ID 171020 JEFFERSON COUNTY TGR 0311 (037) : DIXIE HIGHWAY(US-31W) FEDERAL TIGER GRANT COMMITMENT (MP 14.488) PEDESTRIAN ACCESS/SAFETY IMPROVEMENT AND ACCESS CONTROL ON US-31W (DIXIE HIGHWAY) FROM HEATON ROAD MP 14.488 NORTHWARD TO HERBERT AVENUE MP 14.969.