Industrial Land Study the City of Charles Sturt

Total Page:16

File Type:pdf, Size:1020Kb

Industrial Land Study the City of Charles Sturt Quality Endorsed Company ISO 9002 Lic 6350 Standards Australia INDUSTRIAL LAND STUDY VOLUME 1 UNDER INSTRUCTIONS FROM THE CITY OF CHARLES STURT APRIL 2008 OUR REFERENCE: PA1566 R0089 Colliers International Consulting Services (SA) ABN 20 031 866 033 Level 10 Statewide House 99 Gawler Place Adelaide SA 5000 CHARLES STURT INDUSTRIAL LAND STUDY – APRIL 2008 EXECUTIVE SUMMARY The City of Charles Sturt has around 560Ha of Industry zoned land in 22 separate precincts, scatted across much of its domain. It is over a decade since there was a comprehensive review of this zoning. This study is a precursor to such a review. It considers Charles Sturt’s industrial land stock through the prism of:- • its broader economic and development policy settings; • the Rezoning Assessment Framework established by the Metropolitan Adelaide Industrial Land Strategy; and • the development planning and other issues arising from this analysis and assessment. Industry’s economic contribution to the city is clearly important and must be protected. It provides both jobs for the local community and export income for the region, and it has the capacity to remain a vital part of the City’s economic make-up for the next generation and beyond. At the same time however, there are other strategic development planning drivers at work, including population policy and the looming shortage of residential land in metropolitan Adelaide over the next decade, which will result in ongoing pressure for new, higher density models of infill development. Some of this pressure will be on existing industrial land. Addressing both sides of this strategic equation will require that decisions about the ongoing role of industry in Charles Sturt’s economic and social fabric be made “on balance”. That balance will need to reflect a blend of policy objectives, some of which will work in favour of continuing industrial use and some of which will not. Where the decision favours industry, then it needs to do so on the basis that it will be able to operate at optimum levels. Where it does not, then it need be no cause for strategic concern, provided its replacement is economically appropriate. The Metropolitan Adelaide Industrial Land Strategy (MAILS) addresses just this issue and provides a mechanism to guide such decisions. To this end, it defines “Prime Industrial Areas” (PIA’s) against a dozen criteria, and reinforces this by also requiring assessment of rezoning potential. This study refines this approach for application at a regional level. The result is 11 criteria each for determining both whether a particular precinct is a PIA and whether it has rezoning potential. Each of these criteria has then been applied to the 22 separate precincts identified with the Study Area for the purpose. CHARLES STURT INDUSTRIAL LAND STUDY – APRIL 2008 The analysis suggests that there are:- • nine or so PIA’s, being Hindmarsh, Royal Park, Hendon, Port Road/South Road Corner, Woodville North, Athol Park, West Croydon/Kilkenny, Beverley and Arndale, all of which require not only long term protection, but also long term enhancement of their capacity and capability; • a handful of precincts with very high rezoning potential, including West Lakes, Seaton and Devon Park; • several precincts where the long term underlying land use warrants review, including Kidman Park South, Bowden Brompton and portion of Kilkenny; and • a number of opportunities to fine tune zone boundaries, generally to improve the long term management of residential interfaces. From a strategic viewpoint, the key planks to any future industrial land development planning strategy might therefore reflect the broad objectives of:- • preserving the city’s industrial capacity and employment levels in appropriate degree, by – • continuing to providing suitably zoned land with suitable infrastructure connections for an appropriate range of industrial uses; and • enabling industry to operate effectively and efficiently within these zones; and • properly aligning the policy provisions of all its commercial and industrial zones; • facilitating the entry of higher value industrial activities where appropriate; • achieving improved environmental outcomes on a range of fronts within its industrial precincts; and • ensuring that, on strategic balance (ie on a triple bottom line basis), land in Charles Sturt is able to be put to its highest and best use, probably including rationalization of some Industry zones – which will mean anticipating and planning for the advent of alternative uses, including both bulky goods and high density housing, in selected and appropriate locations. The study gives rise to a number of particular planning policy issues, including:- • the need to provide for the many faces of industry but, at the same time, to lean towards the most economically appropriate industries; • the substantially low impact nature of much of the City’s Industry zoning and the strategic implications and opportunities this gives rise to; • the inappropriateness of Bulky Goods retailing in Industry zones, and the question of how and where to provide for this still emergent use; • the failure of Home Industry Policy Areas to produce worthwhile development or economic outcomes – and, in some cases, their tendency to inhibit broader industrial land use outcomes; CHARLES STURT INDUSTRIAL LAND STUDY – APRIL 2008 • the incongruity of the Industry zone umbrella for dealing with most heritage precincts; • the degree of mis-alignment between current zoning and the situation on the ground – especially along arterial roads, where non-industrial uses tend to predominate; • the commonality of land uses between zones, especially between Industry and Mixed Use zones, and the need for a more integrated policy approach; • the opportunity for the wider application of a more nuanced Mixed Use zone; • the extent to which community uses are causing industrial capacity to be bled off and the best policy approach to dealing with such uses in the future; and • the need to address residential interfaces in some areas, either to ameliorate the harshness of existing situations or to avoid repeat performances in the future. These issues and opportunities are illustrated schematically in the summary maps included at the end of Section 6.3. Beyond policy, there are infrastructure and programme needs embedded in these findings, including:- • the need to take decisive action to upgrade transport infrastructure in selected precincts – often to sustain their long term PIA designation; • the need to develop “strategies for change” to address economic development initiatives, including the attraction of new industry; • the need to actively intervene in priority precincts so as to catalyse and facilitate industrial renewal on a scale, in a manner and at a rate that might not otherwise be achieved – which will entail masterplanning and case management in some precincts; and • the need to improve the amenity of many precincts, especially where higher value activities are desired. For Council, the implications of the report’s findings include that:- • from an industrial viewpoint, there is no need for any fundamental shift in Charles Sturt’s underlying economic settings, but there is a need (and an opportunity) to modernize its economy in order to sustain current levels of economic activity; • via this path, there is an opportunity to achieve either increased economic output from the same industrial footprint or the same output from a smaller footprint – with the latter suggesting a consequent opportunity for non-industrial renewal in some sectors; • more change should be anticipated in desired land use and development patterns over the next decade for both industrial and non-industrial uses, and Council needs to respond accordingly now; • there will be a need for capital expenditure in a number of industrial precincts, especially if there is to be enhanced transport infrastructure; and • there will be a need for resources to be applied to pro-actively work on the renewal of priority precincts. CHARLES STURT INDUSTRIAL LAND STUDY – APRIL 2008 It is recommended that this report be endorsed by Council and that the team engaged to prepare the Section 30 Development Plan Review be instructed to:- • firstly, regard it as the foundation of its work on this aspect of the Development Plan; and • secondly, closely consider each and every need and opportunity identified herein because, notwithstanding the need for clear strategic direction, in development planning the devil is ultimately in the detail. Finally, it is recommended that Council begin a conversation about the non-policy initiatives required to facilitate industrial renewal and modernization, and how it should go about planning both their scoping and their implementation. CHARLES STURT INDUSTRIAL LAND STUDY – APRIL 2008 Contents VOLUME 1 1 INTRODUCTION .....................................................................................1 1.1 PREAMBLE.............................................................................................................1 1.2 THE STUDY AREA...................................................................................................3 2 BACKGROUND ....................................................................................12 2.1 STRATEGIC CONTEXT...........................................................................................12 2.2 REFERENCE POINTS.............................................................................................15 2.3 CURRENT ZONING................................................................................................20
Recommended publications
  • 167 Bus Time Schedule & Line Route
    167 bus time schedule & line map 167 City View In Website Mode The 167 bus line (City) has 2 routes. For regular weekdays, their operation hours are: (1) City: 5:31 AM - 11:10 PM (2) Glenelg: 6:17 AM - 11:54 PM Use the Moovit App to ƒnd the closest 167 bus station near you and ƒnd out when is the next 167 bus arriving. Direction: City 167 bus Time Schedule 42 stops City Route Timetable: VIEW LINE SCHEDULE Sunday 9:00 AM - 11:01 PM Monday 5:31 AM - 11:10 PM Zone B Colley Tce - West side 15 Colley Terrace, Glenelg Tuesday 5:31 AM - 11:10 PM Stop 21B Anzac Hwy - North side Wednesday 5:31 AM - 11:10 PM 615 Anzac Highway, Glenelg Thursday 5:31 AM - 11:10 PM Stop 21A Anzac Hwy - North side Friday 5:31 AM - 11:10 PM 595 Anzac Highway, Glenelg Saturday 8:00 AM - 11:01 PM Stop 30 Tapleys Hill Rd - South West side 8 Fulton Street, Glenelg Stop 29T Tapleys Hill Rd - West side 61 Tapleys Hill Road, Glenelg North 167 bus Info Direction: City Stop 28T Tapleys Hill Rd - West side Stops: 42 81 Tapleys Hill Road, Glenelg North Trip Duration: 28 min Line Summary: Zone B Colley Tce - West side, Stop Stop 27T Tapleys Hill Rd - West side 21B Anzac Hwy - North side, Stop 21A Anzac Hwy - 2A Clovelly Avenue, Glenelg North North side, Stop 30 Tapleys Hill Rd - South West side, Stop 29T Tapleys Hill Rd - West side, Stop 28T Stop 26 Blackburn Rd - North side Tapleys Hill Rd - West side, Stop 27T Tapleys Hill Rd - 8 Leak Avenue, Glenelg North West side, Stop 26 Blackburn Rd - North side, Stop 25 Blackburn Ave - North East side, Stop 24 Blackburn Stop 25 Blackburn
    [Show full text]
  • SA Speed Survey Results 2008 Road Type Speed Limit Street Suburb
    SA Speed Survey Results 2008 Percentage Number of all of Percentage vehicles Vehicles Average of all exceeding Passing Speed of vehicles the speed during the all exceeding limit by Speed week of vehicles the speed more than Road Type Limit Street Suburb/Town sampling (km/h) limit 10km/h Adelaide local 50 Gilbertson Road Seacliff Park 3227 51.9 62.8 17.5 Adelaide local 50 Coorara Avenue Payneham South 18229 51.2 58.3 10.7 Adelaide local 50 Bermudez Crescent Paralowie 8342 49.8 50.5 10.1 Adelaide local 50 Hambledon Road Campbelltown 13400 49.8 49.4 8.9 Adelaide local 50 Main Street Beverley 6332 48.1 44.1 10.3 Adelaide local 50 Vincent Road Smithfield Plains 1541 46.1 36.1 9.3 Adelaide local 50 Northcote Street Kilburn 7988 45.1 29.0 5.1 Adelaide local 50 Charles Road Beverley 5462 41.8 20.9 4.3 Adelaide local 50 Adelaide Street Maylands 2873 42.1 20.8 2.2 Adelaide local 50 London Drive Salisbury East 7469 37.6 20.0 3.7 Adelaide local 50 Commercial Street Marleston 5349 38.6 19.1 3.2 Adelaide local 50 Archer Street North Adelaide 15525 43.2 18.6 1.5 Adelaide local 50 North Esplanade Glenelg North 11603 40.7 14.7 1.8 Adelaide local 50 Olive Avenue Broadview 2604 39.5 9.2 1.1 Adelaide local 50 Bowyer Street Rosewater 3375 37.4 5.6 0.7 Adelaide local 50 Andrew Avenue Salisbury East 1541 36.9 2.3 0.1 Adelaide local 50 Farrell Street Glenelg South 2231 33.5 2.2 0.2 Adelaide local 50 George Street Adelaide 6372 28.4 0.6 0.0 Adelaide collector 50 Scenic Way Hackham 7665 53.7 68.5 23.6 Adelaide collector 50 Perry Barr Road Hallett Cove 13996 51.3
    [Show full text]
  • South Road Upgrade (Torrens Road to River Torrens) Project Report
    South Road Upgrade (Torrens Road to River Torrens) Project Report Introduction What is this report? This document has been prepared to provide an overview of the findings of the South Road Planning Study to upgrade the section from Torrens Road to the River Torrens. The planning study has investigated a broad range of possible options. It has developed and assessed a concept design for the preferred option for this project as the next step in delivering Adelaide’s non‐stop north‐south corridor. This document is intended to inform residents, property owners and businesses, along with the general public, of the State Government’s plans for this significant piece of transport infrastructure. If you have further questions after reading this document, please contact the South Road Planning Study Team via the contact details provided on the last page of this booklet. Why does Adelaide need a North‐South Corridor? Through its Seven Strategic Priorities the South Australian Government has detailed its economic, social and environmental goals. They include creating a vibrant city, safe communities and healthy neighbourhoods, affordable places to live and growing advanced manufacturing. The transport system plays a critical role in achieving these goals. Adelaide’s transport system is, however, facing major challenges over the next 30 years, the most critical of these being the provision of safe and efficient transport options for Adelaide’s residents and businesses. Due to the projected growth of South Australia’s North‐South Corridor economy and population, additional demands will be placed on infrastructure, especially transport infrastructure. South Road is part of the National Land Transport Network through urban Adelaide and is the major north‐south traffic and freight route through Adelaide’s west.
    [Show full text]
  • Westlink MCA Detail Report
    i © InfraPlan (Aust) Pty Ltd. 2016 The information contained in this document produced by InfraPlan (Aust) Pty Ltd is solely for the use of the Client for the purposes for which it has been prepared and InfraPlan (Aust) Pty Ltd undertakes no duty or accepts any responsibility to any third party who may rely on this document. All rights reserved. No sections or elements of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the written permission of InfraPlan (Aust) Pty Ltd. i Contents Report Structure .......................................................................................................................... 2 Introduction ................................................................................................................................ 3 1 Theme 1: Place-making and a vibrant city ......................................................................... 5 1.1 Corridor ability to support the 30 Year Plan vision for infill and corridor development ............ 6 1.1.1 Number of properties within the 600m corridor that have a ‘Capital Value: Site Value’ ratio of less than 1.3 ........................................................................................................ 6 1.1.2 Cubic metres of transit supportive zones and policy areas (urban corridor, regeneration and so on) that support increased development potential within 600m of the corridor .....................................................................................................................
    [Show full text]
  • Master Plan Chapter 11
    11 Services Infrastructure ADELAIDE AIRPORT / MASTER PLAN 2019 189 11.1. Introduction 11.2. Overview Services infrastructure is a key component of Adelaide Airport’s operations both now and into • Services infrastructure at Adelaide the future. It comprises the power, water, sewer, Airport will continue to expand to telecommunications and stormwater networks that service aviation and non-aviation related meet increases in demand across developments across the Airport Business District. the airport, arising from increased The reliability, efficiency and sustainability of these passenger movements and new networks and supply arrangements are the key developments. objectives for Adelaide Airport when planning for services infrastructure. AAL works closely with • Augmentation of the existing utility external utilities providers to ensure these essential networks will likely include: services are available to support the operation and – growth of the airport. Potential relocation of the 750 millimetre water main which transects the airport site – Expansion of networks to supply new areas of development – New services infrastructure to the Airport East Precinct Figure 11-1: Installed Solar Photovoltaics on Multi-Storey Car Park Roof 190 ADELAIDE AIRPORT / MASTER PLAN 2019 11.3. Recent Developments Improvements to the services infrastructure that have • Connection to the underground aquifers located been implemented since Master Plan 2014 include: along the southern boundary of the airport for use by the Terminal 1 cooling towers • Installation
    [Show full text]
  • Analysis of Infringement Data from Fixed Red Light and Speed Cameras at Signalised Intersections in South Australia
    Analysis of infringement data from fixed red light and speed cameras at signalised intersections in South Australia Mackenzie JRR, Kloeden CN, Hutchinson TP CASR REPORT SERIES CASR071 June 2012 Report documentation REPORT NO. DATE PAGES ISBN ISSN CASR071 June 2012 20 978 1 921645 08 2 1449-2237 TITLE Analysis of infringement data from fixed red light and speed cameras at signalised intersections in South Australia AUTHORS Mackenzie JRR, Kloeden CN, Hutchinson TP PERFORMING ORGANISATION Centre for Automotive Safety Research The University of Adelaide South Australia 5005 AUSTRALIA SPONSORED BY Department of Planning, Transport and Infrastructure GPO Box 1533 Adelaide SA 5001 AUSTRALIA AVAILABLE FROM Centre for Automotive Safety Research http://casr.adelaide.edu.au/reports ABSTRACT Safety cameras are installed at some signalised intersections in South Australia. They photograph vehicles that enter the intersection after the signal has changed to red, or that exceed the speed limit by more than a selected amount. Infringement data at 21 safety camera sites in metropolitan Adelaide was used to track how disobey red light and speeding infringements changed during the first year of operation. It was found that both speeding and red light running decreased over time after the installation of a safety camera. Red light running decreased slowly over time, while speeding fell more rapidly. For the more serious levels of speeding, there was a more rapid fall in infringements during the first few weeks and a slower decline thereafter. Based on this, safety cameras appear to generate a worthwhile improvement in driver behaviour. The fact that continued reductions are seen during the first year of operation suggests that some learning on the part of drivers is occurring.
    [Show full text]
  • North-South Corridor Regency Road to Pym Street
    North-South Corridor Regency Road to Pym Street Graphical representation: North-South Corridor (Regency Road to Pym Street) looking south along the non-stop motorway above Regency Road. Project Report Road to Pym Street). What is a project report? The Project Report explains the need for the project and summarises the environmental, social, economic and engineering assessments undertaken during design for the Regency Road to Pym Street Project, part of Adelaide’s North-South Corridor. The report outlines the measures proposed to avoid or minimise the effects of the project identified during design. The Project Report is the next stage of the North–South Corridor (Regency Road to Pym Street) project’s 2 Project Report North-South Corridor The North–South Corridor is one of Adelaide’s most important transport corridors (Figure 1). It is the major route for north and south bound traffic including freight vehicles running between Gawler and Old Noarlunga, a distance of 78 kilometres, and currently comprises seven road links: • Northern Expressway, from Gawler to Port Wakefield Road (opened in 2010); • Northern Connector, from Northern Expressway to Port River Expressway (opening late 2019); • South Road Superway (completed 2014); • Torrens Road to River Torrens (completed 2019); • Torrens River to Darlington; • Darlington Upgrade Project (due for completion 2020); • Southern Expressway, from Darlington to Old Noarlunga (completed 2014). By late 2019, approximately 63 kilometres of the 78 kilometre North–South Corridor will be constructed. With completion of the Darlington Upgrade Project in 2020 this extent will increase by about 3 kilometres to approximately 66 kilometres. The Australian Government continued its decision to support the upgrade the North–South Corridor over the next decade and together with the South Australian Government has committed $354 million to construct the 1.8 kilometre section between Regency Road to Pym Street.
    [Show full text]
  • Go Zone Network Map
    Go Zone network map Waterloo Corner Rd Nurlutta Harry Bowey Salisbury Reserve Paralowie Central Districts Park Hospital Parabanks R ifle Ponton St R ange Salisbury R ben Fenden Rd d eu Richard Greenwith R son R Outer d Park Tce Ta Salisbury rget H Harbor ill R Spains Rd d rove Rd Heights G Salisbury n e d Salisbury l o EAST WEST Barker Plain G Th Inlet e G Green obe Main North Rd V in R r Outer Harbor Salisbury r all apt a t o e ve C s Chidda y A d o v D n n e r v o y A B W Cobbler Creek c B l Downs a v u T k H e a c Recreation Park s h h o y Cross Keys Rd o t m s r d i l n n l North s a t d Smith Rd S S o R Parafield Frost Rd t n Dr e Haven v North Haven Gardens ro Salisbury G Golden n Parafield e Stop 45 ld East o Grove G 500 502 r D J tis o hn n ay Rd la W t en A ld OUTER NORTH EAST e o Osborne v G r A e D i h l Salisbury Hwy Parafield r T ia Parafield Gardens b n Golden Grove n t h te or n N Interchange e c Osborne Bridge Rd i B Main North Rd B Gulfview Green OUTER NORTH McIntyre Rd M44 Midlunga Heights Fields 541 Yatala Wynn S Wy ur Greenfields nn Vale Dr rey Stop 59 Vale F Rd Hancock K Vale arm Angus A Dr Surrey Taperoo e v i Inlet t a M44 l h o Downs c n Fairview G o D Gulf Taperoo Kesters Rd ood t r r r al Para F D D Mawson l Rd ar ardson Park St Vincent m D e h r l ic Interchange Mawson Lakes Rd Nelson a R d Hills d rie Ave R n G r e l r d a Wynn Vale l e Elde n i n R ly 222 r S a f Il mith Gullies H ell ve R m R ro d 500 r d G Grenfell Rd e ay n UniSA 502 ib W Rd Ladywood e L n d Grenfell Rd Mawson Lakes de l vd Maxwell Rd l o r Draper
    [Show full text]
  • Aircraft Noise
    13 Aircraft Noise ADELAIDE AIRPORT / MASTER PLAN 2019 221 13.1. Introduction 13.2. Overview The Airports Act requires a master plan to specify the following noise-related matters: • A curfew currently operates at • An Australian Noise Exposure Forecast (ANEF) for Adelaide Airport between 11:00pm the areas surrounding Adelaide Airport and 6:00am. Some aircraft are • Flight paths at Adelaide Airport permitted to operate during • Adelaide Airport’s plans (developed following consultation with the airlines that use the airport curfew hours (mainly for medical and Local Government bodies in the vicinity of emergency flights and delivery of the airport) for managing aircraft-noise intrusion in freight and mail). areas forecast to be subject to exposure above the significant ANEF levels (i.e. 30 ANEF levels) • A new Australian Noise Exposure Additional information is provided to Forecast has been technically ensure stakeholders are informed about endorsed by Airservices. aircraft-noise management. • Adelaide Airport has a broad range of programs in place to manage aircraft noise exposure around the airport. These include: – Working with stakeholders to observe the existing curfew arrangements – Consulting and engaging with the local community – Working closely with the Commonwealth, State and Local Governments – Consulting with the airlines that use the airport – Investing in airport infrastructure to support new-generation quieter aircraft – Noise abatement procedures 222 ADELAIDE AIRPORT / MASTER PLAN 2019 13.3. Aircraft Noise Management Aircraft noise is an unavoidable impact of aircraft operations. Roles and responsibilities regarding aircraft-noise management vary across a range of organisations, as shown in Table 13-1. Management ORGANISATION RESPONSIBILITY Airlines Airlines purchase particular types of aircraft which are suitable for the routes they wish to fly or are currently flying.
    [Show full text]
  • Live, Work, Visit and Invest Investment Prospectus City of Holdfast Bay – Live, Work, Visit and Invest
    LIVE, WORK, VISIT AND INVEST INVESTMENT PROSPECTUS CITY OF HOLDFAST BAY – LIVE, WORK, VISIT AND INVEST WELCOME TO HOLDFAST BAY While our climate enables us to enjoy all that our beach-front lifestyle offers, our people strive to make the best of this beautiful place, and to welcome others to share it. Right now, the world is shining a spotlight on Adelaide. Our capital city is consistently topping lists: lists of the world’s most liveable cities; most affordable housing; most notable tourism destinations. Lists of best wines, foods and festivals. Lists of unique experiences, one-off finds and quirky offerings. And on Adelaide’s own lists, Holdfast Bay is a consistent chart-topper – most sustainable city; highest day-tripper tourism visitations; and fastest growing real estate values. If Adelaide is one of the most liveable cities, Holdfast Bay undeniably offers some of the most liveable suburbs. Glenelg, Brighton, Somerton Park, Seacliff and Kingston Park; these well-serviced, conveniently located Holdfast Bay suburbs all hug our 11-kilometre strip of premier, metropolitan beach. They each bask in South Australia’s enviable Mediterranean climate. And they each boast their own distinctive history, character and qualities. This prospectus shines the spotlight specifically on those defining qualities. It details the features that persuade people to live here, and convince them to stay. It outlines the many reasons people choose to work, and invest in doing business here. And it highlights the attractions that entice people to visit and to return. I invite you to explore these pages and find out why Holdfast Bay is the ideal place to live, work and visit.
    [Show full text]
  • J8 Bus Time Schedule & Line Route
    J8 bus time schedule & line map J8 Marion View In Website Mode The J8 bus line (Marion) has 2 routes. For regular weekdays, their operation hours are: (1) Marion: 8:40 AM - 4:50 PM (2) West Lakes: 8:00 AM - 3:15 PM Use the Moovit App to ƒnd the closest J8 bus station near you and ƒnd out when is the next J8 bus arriving. Direction: Marion J8 bus Time Schedule 96 stops Marion Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 8:40 AM - 4:50 PM Zone A West Lakes Interchange - North side Tuesday 8:40 AM - 4:50 PM Stop 33C West Lakes Blvd - North side 4 Siesta Court, West Lakes Wednesday 8:40 AM - 4:50 PM Stop 33B West Lakes Blvd - North side Thursday 8:40 AM - 4:50 PM West Lakes Boulevard, West Lakes Friday 8:40 AM - 4:50 PM Stop 33A West Lakes Blvd - North side Saturday Not Operational 9A Marlee Court, West Lakes Stop 33 West Lakes Blvd - North side 29 North Parade, Seaton J8 bus Info Stop 32A West Lakes Blvd - North side Direction: Marion 9 North Parade, Seaton Stops: 96 Trip Duration: 83 min Stop 33 Tapleys Hill Rd - West side Line Summary: Zone A West Lakes Interchange - 160 Tapleys Hill Road, Seaton North side, Stop 33C West Lakes Blvd - North side, Stop 33B West Lakes Blvd - North side, Stop 33A Stop 33A Tapleys Hill Rd - West side West Lakes Blvd - North side, Stop 33 West Lakes 89 Tapleys Hill Road, Cheltenham Blvd - North side, Stop 32A West Lakes Blvd - North side, Stop 33 Tapleys Hill Rd - West side, Stop 33A Stop 33B Tapleys Hill Rd - West side Tapleys Hill Rd - West side, Stop 33B Tapleys Hill Rd - 38-42 Tapleys
    [Show full text]
  • North-South Corridor, the 10 Year Strategy
    North–South Corridor The 10 year Strategy SCOPING a Strategy for the Investment and Implementation of the non-stop North-South Corridor in 10 Years (“The Strategy”) May 2015 K-Net #9526649, V1 Department of Planning, Transport and Infrastructure GPO Box 1533 Adelaide SA 5001 Email: [email protected] PREFACE Background Adelaide's North-South Corridor runs between Gawler and Old Noarlunga and connects the rapidly expanding industrial and residential growth areas in the north and the south, providing new opportunities for economic development. It is one of Adelaide’s most important transport corridors and is the major route for north and south bound traffic (including freight vehicles) running between Gawler and Old Noarlunga at a distance of 78km. The current roadway is not capable of handling projected land use and transport growth and the number of vehicles that need to use the road or the size of freight carriers travelling along it. In response, the Australian and South Australian Governments have indicated their desire to expand the route by creating a dedicated ‘non-stop’ North-South Corridor. Once completed (subject to detailed planning and funding allocations), the 78 kilometre corridor will comprise of the following road links: The Northern Expressway; The Proposed Northern Connector; An upgraded South Road; The Southern Expressway. Currently 44km’s of non-stop motorway on the North-South Corridor is completed. A funded program of works is already underway to eliminate the worst bottlenecks along the remaining 34km’s of the North-South corridor. This currently funded program of works comprises two distinct projects: Torrens Road to River Torrens (to be completed by end of 2018); Darlington Upgrade Project (to be completed by end of 2018).
    [Show full text]