Conc Pub 17 Nov 2017 21.11.2017

Total Page:16

File Type:pdf, Size:1020Kb

Conc Pub 17 Nov 2017 21.11.2017 APPELS D’OFFRES INTERNATIONAUX / NATIONAUX CONCURSOS PÚBLICOS INTERNACIONALES / NACIONALES 17 novembre 2017 / 17 de noviembre 2017 N° 01/2017 ORGANISME/ORGANISMO : MINISTERE DE L'EQUIPEMENT ET DES TRANSPORTS ET LOGISTIQUE OBJET: Etude de reconstruction d’un Ouvrage d’art au PK 116+100 de la RR 307 sur Oued Fadghat dans la Province d’Azilal. ASUNTO: Estudio para la reconstrucción de una obra civil en el PK 116 + 100 del RR 307 en Oued Fadghat en la Provincia de Azilal. VILLE D’EXECUTION : AZILAL / LUGAR DE EJECUCIÓN : AZILAL DATE LIMITE: 28/11/2017 / FECHA LÍMITE : 28/11/2017 N° 02/2017 ORGANISME/ORGANISMO : MINISTERE DE L'AGRICULTURE ET DE LA PECHE MARITIME OBJET: Travaux d'exécution de forage d'exploitation dans la préfecture Oujda Angad ASUNTO: Trabajos para ejecutar la perforación de explotación en la prefectura de Oujda Angad VILLE D’EXECUTION : OUJDA / LUGAR DE EJECUCIÓN : OUJDA DATE LIMITE: 29/11/2017 / FECHA LÍMITE : 29/11/2017 N° 03/2017 ORGANISME/ORGANISMO : ABHOER : AGENCE DU BASSIN HYDRAULIQUE DE L' OUM ER RABIA OBJET: La tenue de la comptabilité générale de l’Agence du Bassin Hydraulique de l’Oum Er-Rbia – Exercice 2018 ASUNTO: Realizar la contabilidad general de la Agencia de la Cuenca Hidráulica del Oum Er-Rbia - Ejercicio 2018 VILLE D’EXECUTION : BENI MELLAL / LUGAR DE EJECUCIÓN : BENI MELLAL DATE LIMITE: 30/11/2017 / FECHA LÍMITE : 30/11/2017 N° 04/2017 ORGANISME/ORGANISMO : AREF TANGER-TETOUAN -AL HOCEIMA OBJET: Externalisation des tâches de cuisson aux internats des établissements scolaires, relevant de la Direction Provinciale de l’AREFTTH à Larache - Au titre de l’exercice 2018 ASUNTO: Externalización de las tareas de cocina en los internados escolares, dependientes de la Dirección Provincial de AREFTTH en Larache - Para el año fiscal 2018 VILLE D’EXECUTION : LARACHE / LUGAR DE EJECUCIÓN : LARACHE DATE LIMITE: 28/11/2017 / FECHA LÍMITE : 28/11/2017 N° 05/2017 ORGANISME/ORGANISMO : MINISTERE DE L'URBANISME ET DE L'AMENAGEMENT DU TERRITOIRE OBJET: Organisation du deuxième Forum Ministériel Arabe de l’Habitat et du Développement Durable du 21 au 23 Décembre 2017 ASUNTO: Organización del segundo Foro Ministerial Árabe sobre la Vivienda y el Desarrollo Sostenible del 21 al 23 de diciembre de 2017 VILLE D’EXECUTION : RABAT / LUGAR DE EJECUCIÓN : RABAT DATE LIMITE: 27/11/2017 / FECHA LÍMITE : 27/11/2017 N° 06/2017 ORGANISME/ORGANISMO : PREFECTURES DE POLICE OBJET: Travaux de construction du bâtiment siège 1er arrondissement de police à Jerada (province de Jerada) ASUNTO: Obras de construcción de un edificio, sede central del 1° distrito de la policía en Jerada (provincia de Jerada) VILLE D’EXECUTION : OUJDA / LUGAR DE EJECUCIÓN : OUJDA DATE LIMITE: 30/11/2017 / FECHA LÍMITE : 30/11/2017 N° 07/2017 ORGANISME/ORGANISMO : MINISTERE DE L'EQUIPEMENT ET DES TRANSPORTS ET LOGISTIQUE OBJET: Travaux d'ouverture d'une piste reliant Tizi et Ighergher sur 5.6 Km (province de Béni Mellal) ASUNTO: Obras de realización de una pista que una Tizi a Ighergher de una longitud de 5,6 km (provincia de Beni Mellal) VILLE D’EXECUTION : BENI MELLAL / LUGAR DE EJECUCIÓN : BENI MELLAL DATE LIMITE: 27/11/2017 / FECHA LÍMITE : 27/11/2017 N° 08/2017 ORGANISME/ORGANISMO : ABHL : AGENCE DU BASSIN HYDRAULIQUE DU LOUKOUS OBJET: Gardiennage et surveillance des stations hydrologiques au niveau de la zone d’action de l’Agence du Bassin Hydraulique du Loukkos ASUNTO: Protección y vigilancia de las estaciones hidrológicas en la zona de acción de la Agencia de la Cuenca Hidráulica de Loukkos VILLE D’EXECUTION : TETOUAN / LUGAR DE EJECUCIÓN : TETOUAN DATE LIMITE: 27/11/2017 / FECHA LÍMITE : 27/11/2017 N° 09/2017 ORGANISME/ORGANISMO : HAUT COMMISSARIAT AUX EAUX ET FORETS ET A LA LUTTE CONTRE LA DESERTIFICATION OBJET: Travaux de réhabilitation et d'entretien du chemin dit Tizi N'Ikaa sur 1.7 Km, CR Tataout, province de Taroudant ASUNTO: Obras de rehabilitación y mantenimiento del camino llamado Tizi N'Ikaa de 1,7 km, CR Tataout, provincia de Taroudant VILLE D’EXECUTION : TAROUDANT / LUGAR DE EJECUCIÓN : TAROUDANT DATE LIMITE: 28/11/2017 / FECHA LÍMITE : 28/11/2017 N° 10/2017 ORGANISME/ORGANISMO : MINISTERE DE L'EQUIPEMENT ET DES TRANSPORTS ET LOGISTIQUE OBJET: Réalisation des essais de contrôle et suivi de la qualité des travaux de renforcement de la RP 3431 du PK 11+100 au PK 22+400 sur 11,300 km (Province de Sidi Bennour) ASUNTO: Realización de pruebas de control y seguimiento de la calidad de las obras de refuerzo de la RP 3431 desde el PK 11 + 100 hasta el PK 22 + 400 de una distancia de 11,300 km (Provincia de Sidi Bennour) VILLE D’EXECUTION : EL JADIDA / LUGAR DE EJECUCIÓN : EL JADIDA DATE LIMITE: 28/11/2017 / FECHA LÍMITE : 28/11/2017 N° 11/2017 ORGANISME/ORGANISMO : AREF ORIENTAL :ACADEMIE REGIONALE D' EDUCATION ET DE FORMATION OBJET: Travaux d'extension de l 'école Essalame C.U Berkane par 02 salles de classe relevant de la direction provinciale de berkane, AREFOR programme 2017 ASUNTO: Obras de ampliación de la escuela Essalame C.U Berkane consistente en 02 aulas bajo la dirección provincial de berkane, programa AREFOR 2017 VILLE D’EXECUTION : BERKANE / LUGAR DE EJECUCIÓN : BERKANE DATE LIMITE: 30/11/2017 / FECHA LÍMITE : 30/11/2017 N° 12/2017 ORGANISME/ORGANISMO : AREF SOUSS –MASSA OBJET: Travaux de remplacement des salles de classe en préfabriqué dans les établissements scolaires relevant de la commune urbaine d’Agadir et les communes rurales Amskroud – Imouzzer – Tiqqi, préfecture d’Agadir idaoutanane ASUNTO: Obras para reemplazar las aulas prefabricadas en las escuelas en la comuna urbana de Agadir y las comunas rurales Amskroud - Imouzzer - Tiqqi, prefectura de Agadir Idautanane VILLE D’EXECUTION : AGADIR / LUGAR DE EJECUCIÓN : AGADIR DATE LIMITE: 28/11/2017 / FECHA LÍMITE : 28/11/2017 N° 13/2017 ORGANISME/ORGANISMO : AMEE: AGENCE MAROCAINE POUR L'EFFICACITE ENERGETIQUE OBJET: Achat des équipements techniques pour le laboratoire de l'AMEE à Marrakech, rue El Machaar El Haram, Issil en 3 lots distincts ASUNTO: Compra de equipo técnico para el laboratorio de AMEE en Marrakech, calle El Machaar El Haram, Issil en 3 lotes separados VILLE D’EXECUTION : RABAT / LUGAR DE EJECUCIÓN : RABAT DATE LIMITE: 28/11/2017 / FECHA LÍMITE : 28/11/2017 N° 14/2017 ORGANISME/ORGANISMO : SAPT : SOCIETE D' AMENAGEMENT POUR LA RECONVERSION DE LA ZONE PORTUAIRE DE TANGER VILLE OBJET: Travaux de démolition (4ème tranche) des bâtiments et constructions dans le cadre du projet de reconversion de la zone portuaire de Tanger Ville ASUNTO: Obras de demolición (4 ° tramo) de edificios y construcciones en el marco del proyecto de reconversión de la zona portuaria de Tánger Ville. VILLE D’EXECUTION : TANGER / LUGAR DE EJECUCIÓN : TANGER DATE LIMITE: 28/11/2017 / FECHA LÍMITE : 28/11/2017 N° 15/2017 ORGANISME/ORGANISMO : AREF ORIENTAL :ACADEMIE REGIONALE D' EDUCATION ET DE FORMATION OBJET: Travaux de Remplacement de Huit (8) salles de classe en préfabriqué à l'école ETTALE CU Akim, relevant de la direction provinciale de Berkane, AREFOR -Programme 2017 ASUNTO: Obras para remplazar Ocho (8) aulas prefabricadas en la escuela ETTALE CU Akim, dependiente de la Dirección Provincial de Berkane, AREFOR -Programa 2017 VILLE D’EXECUTION : BERKANE / LUGAR DE EJECUCIÓN : BERKANE DATE LIMITE: 30/11/2017 / FECHA LÍMITE : 30/11/2017 N° 16/2017 ORGANISME/ORGANISMO : CENTRE HOSPITALIER OBJET: Traitement des déchets hospitaliers des hôpitaux composant le centre hospitalier provincial de Larache. (hôpital princesse Lalla Meriem et hôpital de proximité de Ksar Kebir) ASUNTO: Tratamiento de residuos hospitalarios de los hospitales que componen el centro hospitalario provincial de Larache. (Hospital Princesa Lalla Meriem y hospital de cercanía Ksar Kebir Outreach Hospital) VILLE D’EXECUTION : LARACHE / LUGAR DE EJECUCIÓN : LARACHE DATE LIMITE: 30/11/2017 / FECHA LÍMITE : 30/11/2017 N° 17/2017 ORGANISME/ORGANISMO : PREFECTURE TANGER – ASILAH OBJET: Construction d'un nouveau centre de secours de la protection civile d'Assilah ASUNTO: Construcción de un nuevo centro de emergencias de la protección civil de Assilah VILLE D’EXECUTION : TANGER / LUGAR DE EJECUCIÓN : TANGER DATE LIMITE: 28/11/2017 / FECHA LÍMITE : 28/11/2017 N° 18/2017 ORGANISME/ORGANISMO : PROVINCE CHEFCHAOUEN OBJET: Acquisition d’un pulvérisateur à canon porté sur pick-up 4x4 double cabines pour le compte du groupement ASUNTO: Adquisición de un pulverizador de proyección por cañón instalado en vehículos 4x4 de doble cabina, a cargo de la agrupación. VILLE D’EXECUTION : CHEFCHAOUEN / LUGAR DE EJECUCIÓN : CHEFCHAOUEN DATE LIMITE: 30/11/2017 / FECHA LÍMITE : 30/11/2017 N° 19/2017 ORGANISME/ORGANISMO : MINISTERE DE LA SANTE OBJET: Achat et installation du rayonnage et de matériel de manutention destiné au dépôt régional de medicament relevant de la Direction Régional de la Sante Rabat Sale Kenitra ASUNTO: Compra e instalación de estanterías y material de manutención destinados al depósito almacén regional de medicamentos Que depende de la Dirección Regional de Salud Rabat Sale Kenitra VILLE D’EXECUTION : RABAT / LUGAR DE EJECUCIÓN : RABAT DATE LIMITE: 29/11/2017 / FECHA LÍMITE : 29/11/2017 N° 20/2017 ORGANISME/ORGANISMO : PROVINCE TATA OBJET: Travaux de renforcement de système d’alimentation en eau potable au douar Tadakouste à la commune Aït Ouabelli à la province de Tata ASUNTO: Obras de refuerzo del sistema de suministro de agua potable en el Douar Tadakouste en la comuna de Aït Ouabelli de la provincia de Tata VILLE D’EXECUTION : TATA / LUGAR DE EJECUCIÓN : TATA DATE LIMITE: 30/11/2017 / FECHA LÍMITE : 30/11/2017 .
Recommended publications
  • Morocco and United States Combined Government Procurement Annexes
    Draft Subject to Legal Review for Accuracy, Clarity, and Consistency March 31, 2004 MOROCCO AND UNITED STATES COMBINED GOVERNMENT PROCUREMENT ANNEXES ANNEX 9-A-1 CENTRAL LEVEL GOVERNMENT ENTITIES This Chapter applies to procurement by the Central Level Government Entities listed in this Annex where the value of procurement is estimated, in accordance with Article 1:4 - Valuation, to equal or exceed the following relevant threshold. Unless otherwise specified within this Annex, all agencies subordinate to those listed are covered by this Chapter. Thresholds: (To be adjusted according to the formula in Annex 9-E) For procurement of goods and services: $175,000 [Dirham SDR conversion] For procurement of construction services: $ 6,725,000 [Dirham SDR conversion] Schedule of Morocco 1. PRIME MINISTER (1) 2. NATIONAL DEFENSE ADMINISTRATION (2) 3. GENERAL SECRETARIAT OF THE GOVERNMENT 4. MINISTRY OF JUSTICE 5. MINISTRY OF FOREIGN AFFAIRS AND COOPERATION 6. MINISTRY OF THE INTERIOR (3) 7. MINISTRY OF COMMUNICATION 8. MINISTRY OF HIGHER EDUCATION, EXECUTIVE TRAINING AND SCIENTIFIC RESEARCH 9. MINISTRY OF NATIONAL EDUCATION AND YOUTH 10. MINISTRYOF HEALTH 11. MINISTRY OF FINANCE AND PRIVATIZATION 12. MINISTRY OF TOURISM 13. MINISTRY OF MARITIME FISHERIES 14. MINISTRY OF INFRASTRUCTURE AND TRANSPORTATION 15. MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT (4) 16. MINISTRY OF SPORT 17. MINISTRY REPORTING TO THE PRIME MINISTER AND CHARGED WITH ECONOMIC AND GENERAL AFFAIRS AND WITH RAISING THE STATUS 1 Draft Subject to Legal Review for Accuracy, Clarity, and Consistency March 31, 2004 OF THE ECONOMY 18. MINISTRY OF HANDICRAFTS AND SOCIAL ECONOMY 19. MINISTRY OF ENERGY AND MINING (5) 20.
    [Show full text]
  • Liste Des Auditions, Contributions Et Activités De La Commission Spéciale Sur Le Modèle De Développement
    Liste des auditions, contributions et activités de la Commission Spéciale sur le Modèle de Développement ANNEXE 3 AVRIL 2021 Liste des auditions, contributions et activités de la Commission Spéciale sur le Modèle de Développement ANNEXE 3 AVRIL 2021 SOMMAIRE PARTIE I - AUDITIONS ET CONTRIBUTIONS ...............................................................7 INSTITUTIONS CONSTITUTIONNELLES .........................................................................9 ACTEURS PUBLICS ......................................................................................................10 PARTIS POLITIQUES ....................................................................................................13 MONDE PROFESSIONNEL ET PARTENAIRES SOCIAUX ...............................................16 TIERS SECTEUR ...........................................................................................................19 AMBASSADEURS ET ACTEURS INTERNATIONAUX ....................................................26 CONFÉRENCES LABELLISÉES .....................................................................................27 ÉCOUTES CITOYENNES ET VISITES DE TERRAIN ......................................................29 Les écoutes citoyennes : 3 formats ...............................................................................29 Table ronde ...............................................................................................................30 Cycle de Rencontres Régionales ..................................................................................30
    [Show full text]
  • Checklist of Amphibians and Reptiles of Morocco: a Taxonomic Update and Standard Arabic Names
    Herpetology Notes, volume 14: 1-14 (2021) (published online on 08 January 2021) Checklist of amphibians and reptiles of Morocco: A taxonomic update and standard Arabic names Abdellah Bouazza1,*, El Hassan El Mouden2, and Abdeslam Rihane3,4 Abstract. Morocco has one of the highest levels of biodiversity and endemism in the Western Palaearctic, which is mainly attributable to the country’s complex topographic and climatic patterns that favoured allopatric speciation. Taxonomic studies of Moroccan amphibians and reptiles have increased noticeably during the last few decades, including the recognition of new species and the revision of other taxa. In this study, we provide a taxonomically updated checklist and notes on nomenclatural changes based on studies published before April 2020. The updated checklist includes 130 extant species (i.e., 14 amphibians and 116 reptiles, including six sea turtles), increasing considerably the number of species compared to previous recent assessments. Arabic names of the species are also provided as a response to the demands of many Moroccan naturalists. Keywords. North Africa, Morocco, Herpetofauna, Species list, Nomenclature Introduction mya) led to a major faunal exchange (e.g., Blain et al., 2013; Mendes et al., 2017) and the climatic events that Morocco has one of the most varied herpetofauna occurred since Miocene and during Plio-Pleistocene in the Western Palearctic and the highest diversities (i.e., shift from tropical to arid environments) promoted of endemism and European relict species among allopatric speciation (e.g., Escoriza et al., 2006; Salvi North African reptiles (Bons and Geniez, 1996; et al., 2018). Pleguezuelos et al., 2010; del Mármol et al., 2019).
    [Show full text]
  • 2017 Civil Society Organization Sustainability Index
    STRENGTHENING STRENGTHENING CIVIL SOCIETY CIVIL SOCIETY GLOBALLY GLOBALLY 2017 CIVIL SOCIETY ORGANIZATION SUSTAINABILITY INDEX FOR THE MIDDLE EAST AND NORTH AFRICA 6th EDITION - DECEMBER 2018 2017 CIVIL SOCIETY ORGANIZATION SUSTAINABILITY INDEX FOR THE MIDDLE EAST AND NORTH AFRICA 6th EDITION - DECEMBER 2018 Developed By: United States Agency for International Development Bureau for Democracy, Conflict and Humanitarian Assistance Center of Excellence on Democracy, Human Rights and Governance In Partnership With: FHI 360 International Center for Not-for-Profit Law (ICNL) Acknowledgment: This publication was made possible through support provided by the United States Agency for International Development (USAID) under Cooperative Agreement No. AID-OAA-LA-17-00003. Disclaimer: The opinions expressed herein are those of the panelists and other project researchers and do not necessarily reflect the views of USAID or FHI 360. Cover Photo: Girls from Al Dhulail Municipality in Jordan gather for the opening ceremony of the USAID- supported “Al Dhulail Gathers Us” Festival. Like many Jordanian cities, the structure of Al Dhulail’s community has been progressively altered due to regional conflicts. A “first” for this diverse community, this three-day festival fostered community cohesion, featured awareness-raising sessions on combating extremism and drugs, and explored how to better integrate all members of society—particularly refugees and people with disabilities. Photo Credit: Albatool Ali, USAID Jordan Cities Implementing Transparent, Innovative,
    [Show full text]
  • Rapport D'établissement
    ROYAUME DU MAROC MINISTÈRE DE L’INTERIEUR WILAYA DE LA REGION DE L’ORIENTAL REGION DE L’ORIENTAL Rapport d’établissement Marché 76/ 2018 Relatif à L’Étude du Schéma Régional d’Aménagement du Territoire de la Région de l’Oriental Version provisoire Janvier 2019 Table des matières Introduction ........................................................................................................................................... 4 I- Présentation ........................................................................................................................................ 5 • Rappel .......................................................................................................................................... 5 • Commentaires sur le CPS ............................................................................................................. 5 • Phasage, démarche et livrables de l’étude ...................................................................................... 5 • Gouvernance de la mission ........................................................................................................... 5 • Présentation de l’équipe de travail ................................................................................................. 5 • Planning global ............................................................................................................................. 5 • Conclusion/ références institutionelles (discours royal ,loi, decret) ................................................ 5 II-
    [Show full text]
  • Homo Sapiens Occupations and Territory Exploitation in Eastern Morocco (Jerada Province)
    Les occupations et l'exploitation du territoire par Homo sapiens au Maroc Oriental (Province de Jerada) / Homo sapiens occupations and territory exploitation in Eastern Morocco (Jerada Province). Gema Chac´on∗1,2,3, Hassan Aouraghe4, Juan Ignacio Morales5, Carlos Tornero1,2, Maria Soto6,7, Antonio Rodr´ıguez-Hidalgo9,8,1, Palmira Saladi´e1,2, Diego Lombao1,2, Antoni Canals1,2, Celia D´ıez-Canseco1,2, Gala Garc´ıa-Argudo10, Juan Mar´ın3,2,1, Isabel Exp´osito1,2, Ethel AlluE´ 1,2, Iv´anRam´ırez1,2, Elena Moreno1, Alfonso Benito Calvo11, Lee Arnold12, Martina Demuro12, Mathieu Duval11,13, Josep Pares8, Ra¨ulBartrol´I14, Arturo De Lombera Hermida15, Mourad Farkouch1,2,4, Al Mahdi Aissa1,2,4, Sonja Tomasso16, Mohamed Souhir4, A¨ıcha Oujaa17, Said Bengamra4, Hamdi Haddoumi4, and Robert Sala-Ramos1,2 1Institut Catal`ade Paleoecologia Humana i Evoluci´oSocial (IPHES-CERCA), Tarragona { Espagne 2Universitat Rovira i Virgili, Departament d’Hist`oriai Hist`oriade l'Art, Tarragona { Espagne 3Histoire naturelle de lHomme´ pr´ehistorique{ Museum National d'Histoire Naturelle, Universit´ede Perpignan Via Domitia, Centre National de la Recherche Scientifique : UMR7194 { France 4Facult´ede Sciences, D´epartement de G´eologie(FSO), Universit´eMohamed 1er, Oujda { Maroc 5Dep. Hist`oriai Arqueologia, Seminari d'Estudis i Recerques Prehist`oriques(SERP), Facultat de Geografia i Hist`oria,Universitat de Barcelona, Spain { Espagne 6Madrid Institute for Advanced Study (MIAS) - Universidad Aut´onomade Madrid { Espagne 7Departamento de Prehistoria y Arqueolog´ıa- Universidad Aut´onoma de Madrid { Espagne 9IDEA (Institute of Evolution in Africa), Madrid { Espagne 8Departamento de Prehistoria, Historia Antigua y Arqueolog´ıa,Facultad de Geograf´ıae Historia, Universidad Complutense de Madrid { Espagne 10Dep.
    [Show full text]
  • Sainte-Marie-Aux-Mines Virtual 2021 Carles Manresa I Pla1 1GRADUATE GEOLOGIST SUMMARY RESUMEN
    Sainte-Marie-aux-Mines Virtual 2021 Carles Manresa i Pla1 1GRADUATE GEOLOGIST SUMMARY RESUMEN One year has passed since the first virtual mi- Ha pasado un año desde la primera feria de mine- neral show proposed by Fabre Minerals. At that rales virtual propuesta por Fabre Minerals (FM). time the pandemic caused by Covid-19 was hit- En ese momento, la pandemia provocada por la ting hard, affecting mineral shows too. The pan- Covid-19 golpeaba duramente, afectando también demic issue is still not yet resolved, although va- a las ferias de minerales. Pero la cuestión pandé- ccines are working where they are being used. mica aun no está resuelta, si bien las vacunas están With all this, and despite all their efforts that funcionando allí donde se aplican. Con todo ello y a continued until the last moment, the organizers pesar de los esfuerzos realizados hasta los últimos of the Sainte Marie show had to suspend celebra- momentos, la organización de la Feria de Sainte tion of their long-awaited 2021 event, yet again. Marie ha tenido que suspender, también, la edición de 2021 de su emblemática y esperada celebración. But at Fabre Minerals, backed by a whole year of Pero en Fabre Minerals, con la experiencia de todo experience with this type of virtual show, they put un año con este tipo de ediciones virtuales, han all the meat on the grill, showing a lot of muscle puesto toda la carne en el asador mostrando mu- and effort in delivering us a new virtual edition, cho músculo y esfuerzo en entregarnos una nueva already the fifth in the series, and the second from edición virtual, segunda de Sainte Marie, y quinta Sainte Marie, after SMAM 2020, Munich 2020, Ex- ya en la serie, tras SMAM 2020, Múnich 2020, Ex- pominer 2020 and Tucson 2021.
    [Show full text]
  • Potential Toxicity of Medicinal Plants Inventoried in Northeastern Morocco: an Ethnobotanical Approach
    plants Article Potential Toxicity of Medicinal Plants Inventoried in Northeastern Morocco: An Ethnobotanical Approach Loubna Kharchoufa 1, Mohamed Bouhrim 1, Noureddine Bencheikh 1 , Mohamed Addi 2 , Christophe Hano 3 , Hamza Mechchate 4,* and Mostafa Elachouri 1 1 Laboratory of Bioresources, Biotechnology, Ethnopharmacology and Health, URAC-40, Department of Biology, Faculty of Sciences, Mohammed First University, Oujda 60040, Morocco; [email protected] (L.K.); [email protected] (M.B.); [email protected] (N.B.); [email protected] (M.E.) 2 Laboratoire d’Amélioration des Productions Agricoles, Biotechnologie et Environnement, (LAPABE), Faculté des Sciences, Université Mohammed Premier, Oujda 60000, Morocco; [email protected] 3 Laboratoire de Biologie des Ligneux et des Grandes Cultures, INRAE USC1328, Campus Eure et Loir, Orleans University, 45067 Orleans, France; [email protected] 4 Laboratory of Biotechnology, Environment, Agrifood and Health, Faculté des Sciences Dhar el Mahraz, University of Sidi Mohamed Ben Abdellah, Fez 30050, Morocco * Correspondence: [email protected] Abstract: Herbal medicine and its therapeutic applications are widely practiced in northeastern Morocco, and people are knowledgeable about it. Nonetheless, there is a significant knowledge gap regarding their safety. In this study, we reveal the toxic and potential toxic species used as medicines by people in northeastern Morocco in order to compile and document indigenous knowl- Citation: Kharchoufa, L.; edge of those herbs. Structured and semi-structured interviews were used to collect data, and Bouhrim, M.; Bencheikh, N.; simple random sampling was used as a sampling technique. Based on this information, species Addi, M.; Hano, C.; Mechchate, H.; were collected, identified, and herbarium sheets were created.
    [Show full text]
  • Annual Repport 2009 (PDF)
    His Majesty The King Mohammed VI Message from the Managing Director.......................................... 6 Highlights........................................................................... 8 International Environment and National Situation............................. 9 Petroleum Exploration............................................................. 12 Petroleum Partnerships and Cooperation..................................... 22 Petroleum Drillings and Production............................................. 26 Oil Shale.............................................................................. 28 Mining Exploration................................................................. 29 Mining Partnerships and Cooperation......................................... 40 Mining Drillings...................................................................... 42 Human Resources................................................................... 43 Information System................................................................ 46 MESSAGE FROM THE MANAGING DIRECTOR In the course of the year 2009, mining and petroleum industries worldwide have been impacted by the effects of the global financial crisis and the subsequent economic downturn. At the upstream of the mining business, the budgets devoted to exploration all over the world have registered a decrease of 40% from their level in 2008. This decrease was observed mainly at large companies while the said «juniors» were capable of limiting the decrease to 6% only from one year to the
    [Show full text]
  • GEOLEV2 Label Updated October 2020
    Updated October 2020 GEOLEV2 Label 32002001 City of Buenos Aires [Department: Argentina] 32006001 La Plata [Department: Argentina] 32006002 General Pueyrredón [Department: Argentina] 32006003 Pilar [Department: Argentina] 32006004 Bahía Blanca [Department: Argentina] 32006005 Escobar [Department: Argentina] 32006006 San Nicolás [Department: Argentina] 32006007 Tandil [Department: Argentina] 32006008 Zárate [Department: Argentina] 32006009 Olavarría [Department: Argentina] 32006010 Pergamino [Department: Argentina] 32006011 Luján [Department: Argentina] 32006012 Campana [Department: Argentina] 32006013 Necochea [Department: Argentina] 32006014 Junín [Department: Argentina] 32006015 Berisso [Department: Argentina] 32006016 General Rodríguez [Department: Argentina] 32006017 Presidente Perón, San Vicente [Department: Argentina] 32006018 General Lavalle, La Costa [Department: Argentina] 32006019 Azul [Department: Argentina] 32006020 Chivilcoy [Department: Argentina] 32006021 Mercedes [Department: Argentina] 32006022 Balcarce, Lobería [Department: Argentina] 32006023 Coronel de Marine L. Rosales [Department: Argentina] 32006024 General Viamonte, Lincoln [Department: Argentina] 32006025 Chascomus, Magdalena, Punta Indio [Department: Argentina] 32006026 Alberti, Roque Pérez, 25 de Mayo [Department: Argentina] 32006027 San Pedro [Department: Argentina] 32006028 Tres Arroyos [Department: Argentina] 32006029 Ensenada [Department: Argentina] 32006030 Bolívar, General Alvear, Tapalqué [Department: Argentina] 32006031 Cañuelas [Department: Argentina]
    [Show full text]
  • Request for Ceo Endorsement/Approval Project Type : Full -Size Project the Gef Trust Fund
    REQUEST FOR CEO ENDORSEMENT/APPROVAL PROJECT TYPE : FULL -SIZE PROJECT THE GEF TRUST FUND Submission Date: 30 June 2008 Re-submission Date: PART I: PROJECT INFORMATION GEFSEC PROJECT ID: 2632 Expected Calendar GEF AGENCY PROJECT ID: not applicable at this time Milestones Dates COUNTRY (IES ): Morocco Work Program (for FSP) April 2008 PROJECT TITLE : Participatory Control of Desertification and GEF Agency Approval Sept. 2008 Poverty Reduction in the Arid and Semi-Arid High Plateau Implementation Start Jan. 2009 Ecosystems of Eastern Morocco GEF AGENCY (IES ): IFAD, UNIDO Mid-term Review ( if planned) June 2011 OTHER EXECUTING PARTNER (S): Haute Commissariat aux Eaux et Implementation Completion Jan. 2014 Forets et a la Lutte Contre la Desertification (HCEFLCD) and MAPM GEF FOCAL AREA (S): Land Degradation, International Waters GEF Fees : Shared, 50% IFAD/50% UNIDO GEF-4 STRATEGIC PROGRAM(S) : LD-SP 1; IW-SP 3 NAME OF PARENT PROGRAM /UMBRELLA PROJECT : MENARID A. PROJECT FRAMEWORK Project Objective : Combat desertification, protect the ecosystem functions and productivity of the pastoral resources, and improve the livelihoods of the rural poor in the Eastern High Plateaus of Morocco Inv, GEF Financing* Co-financing* Project TA,or Expected Outcomes Expected Outputs Total ($) Components STA** ($) % ($) % 1. Mainstreaming TA & • SLM/IWRM • Principles and standards of 377,199 37 631,017 63 1,008,216 SLM/IWRM Inv. mainstreamed SLM/IWRM are mainstreamed principles for through improved and harmonized with sectoral rangeland regulations and programs at regional and ecosystems coordination national levels mechanisms among • ATP is widely disseminated line ministries within line ministries and • Stakeholders have implemented at the regional increased jurisdiction level to safeguard • 45 RUA 1’s have increased ecological integrity, responsibility and authority for functions, and common rangelands use services of rangeland planning and management ecosystems • Policies for basin-scale SLM/IWRM supported 2.
    [Show full text]
  • Mineralogy and Geochemistry of the Guenfouda Clay Deposit, Jerada Province, Northeastern Morocco
    European Journal of Scientific Research ISSN 1450-216X / 1450-202X Vol. 154 No 3 November, 2019, pp.361 -384 http://www. europeanjournalofscientificresearch.com Mineralogy and Geochemistry of the Guenfouda Clay Deposit, Jerada Province, Northeastern Morocco Hafida Dahmani Corresponding Author, Département de Géologie, Faculté des Sciences Université Mohammed 1er, B.P. 524, Oujda, Maroc E-mail: [email protected] Tel: (+212-661690302) Mohamed Jadid Département de Géologie, Faculté des Sciences Université Mohammed 1er, B.P. 524, Oujda, Maroc E-mail: [email protected] Kamal El Hammouti Département de Géologie, Faculté des Sciences Université Mohammed 1er, B.P. 524, Oujda, Maroc E-mail: [email protected] Fouad Talbi Département de Géologie, Faculté des Sciences Université Mohammed 1er, B.P. 524, Oujda, Maroc E-mail: [email protected] Meriam EL Ouahabi Département de Géologie, UR Argile Géochimie et Environnement sédimentaires (AGEs) Université de Liège, B – 4000, Belgique E-mail: [email protected] Abstract The Guenfouda clay deposit is located at about 36km to the southwest of Oujda city and 6km to the south of Guenfouda village. It belongs to the Jerada Province of the northeastern Morocco and hosted within the Upper Visean calc-alkaline dacite lava interbedded within a schisto-volcanic complex. This deposit is mined for more than 15 years and the product being mainly used for refractories and industrial ceramics. This clay deposit is funnel or trough-like in form, narrowing downwards and display a E–W trend, which follows the major dextral strike-slip fault that passes through the south of the deposit. Based on mineral assemblages, four lateral alteration zones were defined from the north to south parts of the deposit: the Illite zone, the Pyrophyllite-illite zone, the Pyrophyllite zone and the Quartz zone.
    [Show full text]