Rwanda Transport Development Agency (RTDA)

Total Page:16

File Type:pdf, Size:1020Kb

Rwanda Transport Development Agency (RTDA) SFG3193 Rwanda Transport Development Agency (RTDA) Public Disclosure Authorized Environmental and Social Impact Assessment (ESIA) For the Upgrading project of Ngoma‐Nyanza Road Public Disclosure Authorized Public Disclosure Authorized Prepared by Richard Ngendahayo PO Box: 3735 Kigali ‐ Rwanda Public Disclosure Authorized Tel: +250 78 8306105 E‐mail: [email protected] /[email protected] Web site: www.ecodesignprotect.com March, 2017 RWANDA TRANSPORT DEVELOPMENT AGENCY (RTDA) Acronyms and abbreviations AIDS: Acquired Immune Deficiency Syndrome ARVs: Anti-Retro Viral BP: Bank Procedures CBOs: Community Based Organizations CC: Construction Contractor CITES: Convention on International Trade of Endangered Species CSO: Civil Society Organizations DDP: District Development Plan ED&P: Eco Design &Protection Ltd EDPRS: Economic Development and Poverty Reduction Strategy EHS: Environment, Health and Safety EIA: Environmental Impact Assessment EICV3: Enquête Intégrale sur les Conditions de vie des Ménages EMP: Environmental Management Plan ESIA: Environmental and Social Impact Assessment ESMP: Environmental and Social Management Plan ESO: Environmental and Safety Officer ESU: Environmental and Social Unit FONERWA: Fond National pour l’Environnement au Rwanda FRAP: Full Resettlement Action Plan GRC: Grievance Redress Committee HGV: Heavy Goods Vehicles HIMO: Haute Intensité de Main d’Oeuvre HIV: Human Immune Deficiency Virus HSE: Health, Safety and Environment I&A: Interested and Affected Parties ICT: Information and Communication Technology IESIA: Integrated Environmental and Social Impact Assessment IUCN: International Union for Conservation of Nature JICA: Japaneese International Corporation Agency MDGs: Millenium Development Goals MINAGRI: Ministry of Agriculture and Animal Resources MINEAC: Ministry of East African Community MINECOFIN: Ministry of Economy and Planning MININFRA: Ministry of Infrastructure MINIRENA: Ministry of Natural Resources MOU: Memorendum of understanding MSDS: Material Safety Data Sheets MTN: Microbicide Trials Network MTPM: Monitoring Team and Project Management MUPI: Monitoring Unit and Project Implementation NGO: Non-Governmental Organization OP: Operation Procedures OS: Operational Safeguards PAPs: Persons Affected by the Project PPE: Personal Protective Equipment ESIA UPGRADING PROJECT OF NGOMA-NYAZA ROAD i RWANDA TRANSPORT DEVELOPMENT AGENCY (RTDA) RAP: Resettlement Action Plan RAW: Rapid Appraisal Work RDB: Rwanda Development Board RE: Resident Engineer REMA: Rwanda Environmental Management Authority ROW: Right of Way RSB: Rwanda Standard Board RTDA: Rwanda Transport Development Agency RURA: Rwanda Utilities Regulatory Agency SEC: Supervising and Engineering Consultant SFP: Supplementary Feeding Programme SME’s: Small & Medium Enterprises STD: Sexual Transmitted Disease SWAP: Sector Wide Approach UNDP: Unites Nations Development Programme UNEP: Unites Nations Environment Programme WHO: World Health Organization ESIA UPGRADING PROJECT OF NGOMA-NYAZA ROAD ii RWANDA TRANSPORT DEVELOPMENT AGENCY (RTDA) Table of contents EXECUTIVE SUMMARY .................................................................................................................................... X 1. INTRODUCTION ...................................................................................................................................... 1 1.1 OBJECTIVES OF THE PROJECT ........................................................................................................................... 1 1.2 THE PURPOSES AND OBJECTIVES OF THE STUDY .................................................................................................... 1 1.3 PROJECT DEVELOPER ...................................................................................................................................... 2 1.4 THE AUTHOR ................................................................................................................................................ 3 1.5 PROJECT LOCATION ........................................................................................................................................ 3 1.6 SCOPE AND METHODOLOGY OF ESIA ................................................................................................................. 4 1.6.1 Project influence area .......................................................................................................................... 4 1.6.2 Temporal boundaries .......................................................................................................................... 4 1.6.3 Scope of EIA ...................................................................................................................................... 4 1.6.4 Methodology of EIA ............................................................................................................................ 5 2. POLICY, LEGAL AND INSTITUTIONAL FRAMEWORK ................................................................................. 8 2.1 RELEVANT LEGISLATIONS ................................................................................................................................. 8 2.1.1 Constitution of Rwanda ...................................................................................................................... 8 2.1.2 Other relevant laws ............................................................................................................................ 8 2.2 RELEVANT POLICIES ...................................................................................................................................... 14 2.3 CONVENTIONS AND TREATIES RATIFIED OR SIGNED BY THE GOR ............................................................................ 17 2.4 INSTITUTIONAL FRAMEWORK ......................................................................................................................... 20 2.4.1 Ministry of Infrastructure and RTDA ................................................................................................. 20 2.4.2 MINIRENA, REMA and RNRA ...................................................................................................... 21 2.4.3 RDB ............................................................................................................................................... 21 2.4.4 Institutions in charge of implementing the ESMP ................................................................................. 22 2.4.5 Capacity assessment on implementing and monitoring ESMP ................................................................ 23 2.4.6 Province and District ........................................................................................................................ 25 2.5 INTERNATIONAL LEGISLATIONS ....................................................................................................................... 25 2.5.1 World Bank Safeguards Policies ......................................................................................................... 26 2.5.2 Japanese International Cooperation Agency (JICA) Guidelines for Environmental and Social Considerations 30 3. PROJECT DESCRIPTION AND JUSTIFICATION ......................................................................................... 35 3.1 DESCRIPTION OF THE PROJECT AREA ................................................................................................................ 35 3.2 PROJECT OBJECTIVES AND JUSTIFICATION .......................................................................................................... 37 3.2.1 National perspectives ........................................................................................................................ 37 3.2.2 Regional perspectives ......................................................................................................................... 38 3.3 CURRENT FEATURES OF NGOMA - NYANZA ROAD............................................................................................... 38 3.4 STAFFING AND WORKING CONDITIONS ............................................................................................................. 40 3.5 DURATION OF CONSTRUCTION WORK ACTIVITIES ................................................................................................ 40 3.6 PROJECT INTERVENTIONS .............................................................................................................................. 41 3.6.1 Proposed Design Modifications ........................................................................................................... 41 3.7 PROPOSED ACTIVITIES................................................................................................................................... 41 3.8 PROPOSED PROJECT WORKS ........................................................................................................................... 42 3.8.1 Land clearing and Excavations .......................................................................................................... 42 3.8.2 Drainage Works ............................................................................................................................... 42 3.8.3 Surface Drainage .............................................................................................................................. 42 3.8.4 Sub-Surface Drainage .......................................................................................................................
Recommended publications
  • Report Summary for the Kigali Bulk Water Project Rwanda 0Ctober 2015
    Language: English Original: English AFRICAN DEVELOPMENT BANK GROUP ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) REPORT SUMMARY FOR THE KIGALI BULK WATER PROJECT RWANDA 0CTOBER 2015 E&S Team: Kelello NTOAMPE, Environmental Scientist, ONEC3 Sector Director: K. DIALLO Regional Director: G. NEGATU Resident Representative: M. NEGATU Division Manager: A. NALIKKA ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN 1. General Information Project Title: Kigali Bulk Water Project SAP Code: P-RW-E00-008 Country: Rwanda Division OPSD3 Project Category 2 1.1 Introduction: Rwanda is undergoing massive economic development and it is imperative to have infrastructure that can support the country’s ambitions. The Government of Rwanda through Water and Sanitation Corporation (WASAC Ltd) signed a Public- Private- Partnership (PPP) water project with Metito. Metito was established in the Middle East in 1958. Metito has built more than 3,000 water desalination and wastewater treatment plants since its inception. Metito’s current global project portfolio is in excess of USD 1 billion and over 2,200 employees. It provides water management solutions in emerging markets including Middle East, Africa and Asia (provided water treatment plants and desalination plants in Egypt, Sudan and Algeria). The Project company, Kigali Water Limited, has been established in Rwanda, owned by an investment vehicle, Kigali Water Mauritius Ltd (“InvestCo”) incorporated in Mauritius. The proposed Kigali Bulk Water Project Supply is designed to be a 40,000m3/day groundwater extraction from the Nyabarongo River near Kanzenze Bridge in Kanzenze Cell of Ntarama sector, Bugesera District. This scheme comprises a wellfield, water treatment plant (WTP) and associated infrastructure (transmission lines) to convey the water to new storage reservoirs.
    [Show full text]
  • Physicochemical Quality of Water and Health Risks
    Preprints (www.preprints.org) | NOT PEER-REVIEWED | Posted: 10 December 2019 doi:10.20944/preprints201912.0136.v1 Peer-reviewed version available at BMC Research Notes 2020, 13; doi:10.1186/s13104-020-4939-z Physicochemical Quality of Water and Health Risks Associated with the Consumption of the Extant African Lung Fish (Protopterus annectens) from Nyabarongo and Nyabugogo Rivers, Rwanda Timothy Omara,1,2* Papias Nteziyaremye,1,3 Solomon Akaganyira4, Dickens Waswa Opio5, Lucy Nyambura Karanja,1 Decrah Moraa Nyangena,1 Betty Jematia Kiptui1, Remish Ogwang5,6, Stephen Mark Epiaka5,7, Abigael Jepchirchir1 and Alfayo Maiyo1 *Correspondence: Timothy Omara; [email protected], [email protected], [email protected] 1 Department of Chemistry and Biochemistry, School of Biological and Physical Sciences, Moi University, Uasin Gishu County, P.O. Box 3900-30100, Eldoret, Kenya. 2 Department of Quality Control and Quality Assurance, Product Development Directory, AgroWays Uganda Limited, plot 34-60, Kyabazinga Way, P.O. Box 1924, Jinja, Uganda. (Full list of author information is available at the end of the article). Abstract Water is an indispensable natural resource that is often prodigiously threatened by anthropomorphic activities. This study evaluated the physicochemical properties of water and selected heavy metals in edible muscles of a piscivorous fish (Protopterus annectens) from Nyabarongo and Nyabugogo rivers of Rwanda. Edibility health risk was evaluated using the target hazard quotient method. Water samples were taken in triplicate from Ruliba station and Kirinda bridge on Nyabarongo river and Giticyinyoni on Nyabugogo river. Fish samples were obtained from the sampling stations on Nyabarongo river. All samples were analyzed following standard methods and analytical results indicated that the average temperature, pH, total dissolved solids and electrolytic conductivity of water from the rivers were within WHO acceptable limits.
    [Show full text]
  • USLE-Based Assessment of Soil Erosion by Water in the Nyabarongo River Catchment, Rwanda
    International Journal of Environmental Research and Public Health Article USLE-Based Assessment of Soil Erosion by Water in the Nyabarongo River Catchment, Rwanda Fidele Karamage 1,2,3, Chi Zhang 1,4,*, Alphonse Kayiranga 1,2,3, Hua Shao 1,2, Xia Fang 1,2, Felix Ndayisaba 1,2,3, Lamek Nahayo 1,2,3, Christophe Mupenzi 1,2,3 and Guangjin Tian 5 1 State Key Laboratory of Desert and Oasis Ecology, Xinjiang Institute of Ecology and Geography, Chinese Academy of Sciences, Urumqi 830011, China; fi[email protected] (F.K.); [email protected] (A.K.); [email protected] (H.S.); [email protected] (X.F.); [email protected] (F.N.); [email protected] (L.N.); [email protected] (C.M.) 2 University of Chinese Academy of Sciences, Beijing 100049, China 3 Faculty of Environmental Studies, University of Lay Adventists of Kigali (UNILAK), P.O. 6392, Kigali, Rwanda 4 School of Resources Environment Science and Engineering, Hubei University of Science and Technology, Xianning 437000, China 5 State Key Laboratory of Water Environment Simulation, School of Environment, Beijing Normal University, Beijing 100875, China; [email protected] * Correspondence: [email protected]; Tel.: +86-991-7823127 Academic Editor: Yu-Pin Lin Received: 12 July 2016; Accepted: 12 August 2016; Published: 20 August 2016 Abstract: Soil erosion has become a serious problem in recent decades due to unhalted trends of unsustainable land use practices. Assessment of soil erosion is a prominent tool in planning and conservation of soil and water resource ecosystems. The Universal Soil Loss Equation (USLE) was applied to Nyabarongo River Catchment that drains about 8413.75 km2 (33%) of the total Rwanda coverage and a small part of the Southern Uganda (about 64.50 km2) using Geographic Information Systems (GIS) and Remote Sensing technologies.
    [Show full text]
  • Assessment of Water Pollution Levels in the Nyabugogo Catchment, Rwanda
    40 The Open Environmental Engineering Journal, 2011, 4, 40-53 Open Access Assessment of Water Pollution Levels in the Nyabugogo Catchment, Rwanda I. Nhapi1,2*, U.G. Wali1, B. K. Uwonkunda1, H. Nsengimana3, N. Banadda4 and R. Kimwaga5 1Faculty of Applied Sciences, National University of Rwanda, P.O. Box 117, Butare, Rwanda 2Department of Civil Engineering, University of Zimbabwe, Box MP167, Mt. Pleasant, Harare, Zimbabwe 3Faculty of Sciences, National University of Rwanda, P.O. Box 117, Butare, Rwanda 4College of Agricultural and Environmental Sciences, Makerere University, P.O. Box 7062, Kampala, Uganda 5College of Engineering, University of Dar-es-Salaam, P.O. Box 35131, Dar-es-Salaam, Tanzania Abstract: This study aims to develop a comprehensive system of pollution monitoring and control in the Nyabugogo catchment of Rwanda, which also includes the capital city, Kigali, through locating and highlighting pollution and its sources. Pollution hotspots were identified, covering areas of both anthropogenic and natural pollution. The study focused on water quality assessment especially the identification of the critical points of pollution (hotspots), by measuring selected physico-chemical parameters in the Nyabugogo River system. An extensive monthly water quality monitoring study was conducted from October 2008 to May 2009 and covered nutrients, organic and heavy metal pollutants. The + — — parameters covered are Ammonium-Nitrogen (NH4 -N), Nitric-Nitrogen (NO2 N), Nitrate-Nitrogen (NO3 N), Sulphates (SO4), Phosphates (PO4-P), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD5), Dissolved Oxygen (DO), Total Dissolved Solids (TDS), Chromium (Cr), Iron (Fe), Lead (Pb), Manganese (Mn), Zinc (Zn), Conductivity (EC), pH, and Turbidity. The samples were collected, preserved and analyzed in the laboratory using standard methods whilst TDS, conductivity, turbidity and pH were measured in the field using HACH field kits.
    [Show full text]
  • An Assessment of Farmers' Willingness to Pay for the Protection of Nyabarongo River System, Rwanda U
    \ v AN ASSESSMENT OF FARMERS' WILLINGNESS TO PAY FOR THE PROTECTION OF NYABARONGO RIVER SYSTEM, RWANDA U MSc. THESIS SUBMITTED TO THE BOARD OF POSTGRADUATE STUDIES, UNIVERSITY OF NAIROBI IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF SCIENCE IN AGRICULTURAL AND APPLIED ECONOMICS NIRERE SYLVIE University of NAIROBI Library 0310853 7 NOVEMBER 2 0 1 2 Declaration and Approval uccarrooi. a This thesis is ray original work and has not been presented for examination to any university. Nirere Sylvie Signature: ------- Date: f Approval: This thesis has been submitted for examination with our approval as supervisors: Dr. John Mburu Department of Agricultural Economics University o f Nairobi Sign 1^ ° / ^ Dr. David 0. Jakinda Department of Agricultural Economics University o f Nairobi Signature: Date: DEDICATION This thesis is dedicated to my Mother Seraphine M. KAYOMBYA whose love has always inspired my life, my brother Eric MUNYESHURI, my sister Triphine HIRWA and my aunt Claire M. N Y1RANEZA for their love and everyday encouragements. iii ACKNOWLEDGEMENT With a heart full of gratitude, I hereby thank all the people who made the entire process of undertaking this research and writing this manuscript successful. I am particularly indebted to my supervisors Dr. John Mburu and Dr. David Jakinda for their invaluable advice, constructive criticisms and interest in my study. My heartfelt appreciation also goes to the African Economic Research Consortium (AERC) for offering me a full scholarship to pursue my coursework and my research and the staff at the Rwanda Environment Management Authority, especially in National Environmental Youth Project for their valuable ideas, material and moral support.
    [Show full text]
  • Rwanda Investment Benefits from the Nile Basin Cooperation
    RWANDA INVESTMENT BENEFITS FROM THE NILE BASIN COOPERATION ONGOING WORK AT THE 80MW REGIONAL RUSUMO FALLS HYDROELECTRIC PROJECT SHANGO SUB-STATION IN RWANDA NEW KIGINA DISPENSARY, A LOCAL AREA DEVELOPMENT PROJECT AT THE REGIONAL RUSUMO FALLS HYDROELECTRIC PROJECT NBI/NELSAP–CU, FEB 2020 RWANDA-DEMOCRATIC REPUBLIC OF CONGO, DRC TRANSMISSION LINE ABOUT THE NILE EQUATOriAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP) The Nile Equatorial Lakes Subsidiary Action Program of preparation and implementation. NELSAP-CU Coordination Unit (NELSAP-CU) headquartered has mobilized finances for pre-investment and in Kigali, Rwanda, is one of the two investment investment projects cumulatively totaling to USD programs of the Nile Basin Initiative (NBI), the other 1.050 billion (pre-investment USD 557.107 million being the Eastern Nile Subsidiary Action Program and for investment projects USD 493.018 million). (ENSAP) headquartered in Addis Ababa, Ethiopia known as Eastern Nile Technical Regional Office Since 2014, NELSAP-CU has gained regional (ENTRO). experience, strengthened its capacity and emerged as a reliable regional institution for facilitating key NELSAP-CU was established in December 1999 in country and regional investment projects in the by the Council of Ministers for Water Affairs in the Nile Equatorial Lakes Region and beyond. Its key Nile River Basin, with a mission to “contribute to the institutional strength lies in project pre-investment eradication of poverty, promote economic growth, feasibility studies, regional projects coordination and reverse environmental degradation in the Nile support, regional strategic analysis, environmental Equatorial Lakes (NEL) region, within the overall aspects, social economic development, stakeholders’ NBI’s shared Vision of sustainable socioeconomic engagement and development communication, development and the equitable use of and benefit financial and procurement management as well as from Nile Basin water resources”.
    [Show full text]
  • Developing an Odonate-Based Index for Monitoring Freshwater Ecosystems in Rwanda: Towards Linking Policy to Practice Through
    Department of Environmental Studies DISSERTATION COMMITTEE PAGE The undersigned have examined the dissertation entitled: Developing an Odonate-Based Index for Monitoring Freshwater Ecosystems in Rwanda: Towards Linking Policy to Practice through Integrated and Adaptive Management, presented by Erasme Uyizeye, candidate for the degree of Doctor of Philosophy, and hereby certify that it is accepted*. Committee Chair: Beth A. Kaplin, Ph.D. Antioch University New England, USA Committee member: Lisabeth Willey, Ph.D. Antioch University New England, USA Committee member: Viola Clausnitzer, Ph.D. Senckenberg Museum of Natural History Görlitz, Germany. Defense Date: April 17th, 2020. Date Approved by all Committee Members: April 30th, 2020. Date Deposited: April 30th, 2020. *Signatures are on file with the Registrar’s Office at Antioch University New England. Developing an Odonate-Based Index for Monitoring Freshwater Ecosystems in Rwanda: Towards Linking Policy to Practice through Integrated and Adaptive Management By Erasme Uyizeye A dissertation submitted in partial fulfilment of the requirements for the degree of DOCTOR OF PHILOSOPHY in Environmental Studies at Antioch University New England Keene, New Hampshire 2020 ii © 2020 by Erasme Uyizeye All rights reserve iii Dedication I dedicate this dissertation to my daughter who was born in the midst of this doctoral journey, my wife who has stayed by my side, my father for his words of encouragement (1956-1993) & my mother for her unwavering support and love. iv Acknowledgments First and foremost, I would like to express my sincere gratitude to my advisor, Beth A. Kaplin for her invaluable support and patience all along my doctoral studies and research. I am also very thankful to my committee members, Lisabeth Willey and Viola Clausnitzer for their advice and guidance as I grow as a scholar.
    [Show full text]
  • Water Resources
    Intended for Bugesera Airport Company Limited Date January 2018 Project Number UK11-24483 NEW BUGESERA INTERNATIONAL AIRPORT ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT- WATER RESOURCES Environmental and Social Impact Assessment Report-Water Resources New Bugesera International Airport CONTENTS 12. WATER RESOURCES 1 12.1 Introduction 1 12.2 Policy, Legal and Administrative Framework 1 12.3 Assessment Methodology 3 12.4 Assumptions and Limitations 5 12.5 Baseline Conditions 5 12.6 Potential Impacts 10 12.7 Mitigation Measures 17 12.8 Residual Impact Assessment Conclusions 17 12.9 Summary of Mitigation and Residual Impacts 18 LIST OF TABLES Table 12-1: Sensitivity/Value – Surface Water ............................................ 4 Table 12-2: Impact Magnitude – Surface Water ......................................... 5 Table 12-3: Water Bodies Surrounding the Proposed Project Area ................. 7 Table 12-4: Summary of Findings ........................................................... 19 Environmental and Social Impact Assessment Report-Water Resources 12-1 New Bugesera International Airport 12. WATER RESOURCES 12.1 Introduction This chapter of the ESIA Report considers the potential impacts of the Proposed Project on water resources. The assessment includes a review of the existing water environment, including surface and groundwater resources. It predicts and evaluates the potential impacts of the Proposed Project and the associated likely impacts on water resources, arising from the construction works, and operation of the completed Proposed Project. 12.2 Policy, Legal and Administrative Framework 12.2.1 Rwandan Policy 12.2.1.1 The Rwanda Environment Policy, 20031 The Rwanda Environmental Policy aims to conserve, preserve and restore ecosystems and maintain ecological and systems functioning, particularly the conservation of national biological diversity; and to create awareness among the public to understand and appreciate the relationship between environment and development.
    [Show full text]
  • WRM/WBS-2020-03 Rweru-Bugesera Transboundary Wetlands Complex
    NBI Technical Reports: Wetlands and Biodiversity series Rweru -Bugesera Transboundary Wetlands Complex (Rwanda-Burundi) WRM /WBS-2020-03 Document Sheet This Technical Report series publishes results of work that has been commissioned by the member states through the three NBI Centers (Secretariat based in Entebbe- Uganda, the Eastern Nile Technical Regional Office based in Addis Ababa - Ethiopia and the Nile Equatorial Lakes Subsidiary Action Program Coordination Unit based in Kigali - Rwanda. The content there-in has been reviewed and validated by the Member States through the Technical Advisory Committee and/or regional expert working groups appointed by the respective Technical Advisory Committees. The purpose of the technical report series is to support informed stakeholder dialogue and decision making in order to achieve sustainable socio-economic development through equitable utilization of, and benefit from, the shared Nile Basin water resources. Document Citation NBI Technical Reports- WRM 2020-08 Title Rweru-Bugesera Transboundary Wetlands Complex (Rwanda-Burundi) Series Water Resources Management 2020-08 Number Responsible and Review Responsible Nile-Secretariat NBI Center Responsible Dr. Abdulkarim Seid and Mr. Leonard Akwany NBI Document Nile Basin Initiative Wetlands Task Team and Lead Consultant (October 2020) Review Process Final Nile Basin Initiative Wetlands Task Team and Lead Consultant (October 2020) Version endorsed Author / Consultant Consultant Individual Consultant Firm Authors Mr. Herman Musahara Project Funding German Federal Ministry for Environment, Nature Conservation and Nuclear Safety Source (BMU) Project Biodiversity Conservation and Sustainable Utilization of Ecosystem Services of Name Wetlands of Transboundary Relevance in the Nile Basin Project 15_IV_045_Afrika_G_Biodiversitätsschutz Nil-Becken Number Disclaimer The views expressed in this publication are not necessarily those of NBI’s Member States or its development partners.
    [Show full text]
  • Modelling of Nonpoint Source Pollution in Akagera Transboundary River in Rwanda
    124 The Open Environmental Engineering Journal, 2011, 4, 124-132 Open Access Modelling of Nonpoint Source Pollution in Akagera Transboundary River in Rwanda U.G. Wali1*, I. Nhapi2, A. Ngombwa1, N. Banadda3, H. Nsengimana4, R. J. Kimwaga5 and I. Nan- 6 subuga 1Faculty of Applied Sciences, National University of Rwanda, P.O. Box 117, Butare, Rwanda 2Faculty of Civil Engineering, University of Zimbabwe, BOX MP 167, Harare, Zimbabwe 3College of Agricultural and Environmental Sciences, Makerere University, P.O. Box 7062, Kampala, Uganda 4Faculty of Sciences, National University of Rwanda, P.O. Box 117, Butare, Rwanda 5University of Dar es Salaam, Department of Water Resources Engineering, P. O. Box 35131, Dar es Salaam, Tanzania 6Faculty of Engineering, Kyambogo University, P.O.Box 1, Kyambogo, Uganda Abstract: In this paper, we to assess the level of pollution in the Akagera Transboundary River. The followings parame- ters namely NH4-N, NO3-N, PO4-P, Total Dissolved Solids (TDS), conductivity, pH, Temperature, and Turbidity were identified and quantified. Sampling was conducted a monthly basis from March 2008 to February 2009 at eleven sampling points on the Akagera River system. The landuse and land form characteristics were studied using satellite imagery and ground truthing. From this pollution reduction factors in terms of kg/ha.yr of pollution load were developed for each lan- duse type and used for developing the model. Rainfall and river flow data were obtained from gauging stations in and around the river. Water quality parameters particularly values of NH3-N changed from 0 to 2.36 mg/l, NO3-N from 1.8 mg/l to 314.4 mg/l and PO4-P from 0.02 mg/l to 19.3 mg/l.
    [Show full text]
  • African Dams Briefing 2010
    African Dams Briefing 2010 Dams are often the largest water and energy investments in Africa. Yet, African citizens rarely have access to critical information about these projects. Citizens have the right to hold their governments accountable for decisions they make and the use of public funds. The African Dams Briefing 2010 is intended to assist African and international civil society in holding their government officials accountable by providing greater transparency about dam projects, project decision-making, and companies and donors involved in specific dams. Every large dam poses economic, social, and environmental impacts. Dams can increase a country's debt burden, displace whole communities, destroy livelihoods, alter ecosystems, and increase disease. Dams can also fall far short of achieving their purpose, especially in a warming world. Climate change and increasingly erratic rainfall can reduce energy and water benefits from dams and increase risks of deadly floods. Today, billions of development dollars are earmarked for large dams and associated project infrastructure in Africa. Lucrative construction, power purchase and investment contracts can drive bribery and other corrupt business practices. The lack of transparency and limited legal enforcement to halt these practices allow shady deals to go forward. Funds required by dam projects can also eliminate alternatives that could foster good governance, community participation and decentralized service delivery. This document is meant to provide a basic synopsis of large dams in Africa that have a status of Proposed, Under Construction, Rehabilitation, or Expansion. Dams that have become operational since the last update (2006) are noted as In Operation. Research is conducted by staff, interns and volunteers primarily through news searches on the internet.
    [Show full text]
  • Assessment of Community Participation in Sustainable Management of Nyabugogo and Nyabarongo Wetlands, Kigali City
    ASSESSMENT OF COMMUNITY PARTICIPATION IN SUSTAINABLE MANAGEMENT OF NYABUGOGO AND NYABARONGO WETLANDS, KIGALI CITY BYUKUSENGE SOLVE BSc FST MEM136888/1211DF A Dissertation presented to the College of Higher Degrees and Research Kampala International University, Uganda in Partial Fulfillment of the Requirements for the Award of a Degree of Masters of Science in Environmental Management and Development November, 2013 DECLARATION I, the undersigned, hereby declare that the work contained in this dissertation is my own original work and has not previously, in its entirety or in part, been submitted at any university or institution of higher learning for a degree or any other form of qualification. SOLVE APPROVAL The work reported was carried out under the following supervision Supervisor: PROF. R. ~J.3(ENYA~ ZIRABA Signature L~.°4~ Date Internal Examiner: PR~kBYARUGABA DOMINIC Signature . ~ Date DEDICATION To my Almighty God, beloved Mum, sister and her husband, brother and friends. Ill TABLE OF CONTENTS Page Declaration Approval II Dedication ill Table of Contents iv Acknowledgements vi Abstract VII List of Figures ix List of Plates X List of Tables Xi Chapter One: Introduction 1 1.1 Background 1 1.2 Problem statement 3 1.3 Research objectives 5 1.3.1 General objective 5 1.3.2 Specific objectives 5 1.5 Hypothesis 6 1.6 Scope of the Study 6 1.7 Significance of the Study 6 1.8 Conceptual Framework 6 1.9 Defmition of terms 7 Chapter Two: Literature Review 8 2.1. Stakeholders 8 2.2 Community participation in wetland management 10 2.3 Status of wetlands in Rwanda 12 2.4.
    [Show full text]