Assessment of Market Conditions for Outdoor Recreation Facilities and Services at Lake Berryessa

Total Page:16

File Type:pdf, Size:1020Kb

Assessment of Market Conditions for Outdoor Recreation Facilities and Services at Lake Berryessa Draft Final Report Assessment of Market Conditions for Outdoor Recreation Facilities and Services at Lake Berryessa Napa County, California U.S. Department of the Interior Bureau of Reclamation Napa, California May 2014 Mission Statements The mission of the Department of the Interior is to protect and provide access to our Nation’s natural and cultural heritage and honor our trust responsibilities to Indian Tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public. Draft Assessment of Market Conditions for Outdoor Recreation Facilities and Services Draft Final Report Prepared by United States Department of the Interior Bureau of Reclamation Mid-Pacific Region Central California Area Office Draft U.S. Department of the Interior Bureau of Reclamation Napa, California May 2014 This page left blank intentionally. Draft Executive Summary Executive Summary ES.1 Introduction Lake Berryessa is part of a federally-owned water project owned by the Department of the Interior Bureau of Reclamation (Reclamation). The reservoir is in Napa County, which is 70 miles northeast of San Francisco, 65 miles west of Sacramento, and approximately 20 miles from the center of Napa Valley’s wine country. In the spring of 2013, Reclamation began planning for the future long-term management of the concession areas by commercial businesses as called for in the 2005 Visitor Services Plan (VSP) and 2006 Record of Decision (ROD), with the goal of providing a diverse range of sustainable, short-term recreation opportunities for the public in the seven concession areas. To achieve a successful solicitation and economically sound business ventures, these recreation services will be designed using a combined approach consisting of a comprehensive market assessment, conceptual site planning and financial feasibility evaluation along with infrastructure design and environmental analyses. ES.2 Purpose and Need The purpose of this Market Assessment is to evaluate the potential market conditions to determine the feasibility of providing new public use facilities and services at five separate and distinct recreation areas at Lake Berryessa (Steele Canyon, Spanish Flat, Berryessa Point, Monticello Shores, and Putah Canyon). There is a need to determine the number of concessions necessary to meet public needs, types of facilities and services to be provided, financial feasibility of the concession(s),Draft appropriate location(s) for commercial activities, and the appropriate quantity of facilities and services that will offer diverse recreation opportunities to the public (Reclamation, 2002). ES.3 Methodology for Preparation of the Market Assessment A database (i.e., quantitative) and non-database approach (i.e., qualitative) methodology was used to prepare this Market Assessment. Qualitative assessment is the non-database methodology that relies on interviews, expert opinion, archival records, existing information and observations. Professional judgment is considered useful for long-term ES-1 DRAFT FINAL – May 2014 Lake Berryessa Concession Concept Plans Market Assessment Report estimations where there are many factors that may influence future actions. Quantitative assessment (i.e., collecting and analyzing data/information) is the database methodology that was used. This methodology consists of collecting and analyzing a sufficient amount of recreation demand, trend, demographic, and population information. The information is used to estimate what types of facilities and services would be provided in the future to accommodate a particular type of activity and user. The recommended facilities and services are those that could satisfy future demand predictions and potentially allow a concessionaire an opportunity to make a reasonable profit. ES.4 Project Limitations There are several factors that will likely affect the level of accuracy and precision of the recommendations regarding the types, quantities and locations of new facilities and services at Lake Berryessa. Following are the main factors: • The Market Assessment is based upon an analysis of existing information and data available from Reclamation, campground and marina operators, county and state plans and websites, and other readily available public documents. • There was no original data collection completed using community or market area surveys, focus groups, interviews, or other traditional public input/measurement tools. • Historical Lake Berryessa recreation visitation data and reports showing past user satisfaction levels, trends, seasonal use patterns, or profiles of visitors are minimal. • The major transformation over the past 10 years at Lake Berryessa in the type, amount, availability of traditional recreation opportunities, and the cessation of several marinas disrupts the ability to forecast the future demandDraft and preference for certain facilities and services. ES.5 Guidance Documents Affecting Lake Berryessa Recreation and Commercial Services Management Recreation and land management activities at Lake Berryessa are governed by a variety of laws, internal policies, directives and standards, planning and guidance documents, and studies. As much as possible, this Market Assessment must be consistent with the following: • Solano Project Authorization and Public Law 93-493. ES-2 DRAFT FINAL – May 2014 Executive Summary • 1959 Public Use Plan. • 1992 Reservoir Area Management Plan for Lake Berryessa and 1993 Record of Decision. • 2005 Visitor Services Plan and 2006 Record of Decision. • Reclamation Directives and Standard, and Guidelines. ES.6 Recreation Demand The majority of people that visit Lake Berryessa reside in the San Francisco and Sacramento areas. About 75 percent of the historical visitors to the lake were from the San Francisco Bay Area and approximately 20 percent were from the Sacramento area (Fletcher et al, 1997). The market area for this Market Assessment encompasses an area within a100- mile radius of Lake Berryessa. The market area Recreation demand is the includes the 9 counties that make up the Bay estimated number of people Area (i.e., Santa Clara, Alameda, Contra Costa, who are projected to participate in a particular Marin, Napa, San Francisco, San Mateo, recreation opportunity at Solano, and Sonoma) and an additional16 some predetermined future representative counties that are within the time and location (Haas, et market area and a reasonable driving distance al, 2007). from the lake (i.e., Amador, Butte, Calaveras, Colusa, El Dorado, Glenn, Lake, Mendocino, Nevada, Placer, Sacramento, San Joaquin, Stanislaus, Sutter, Yolo, and Yuba). To understand what future facilities and services are appropriate and necessary at Lake Berryessa, it is necessary to collect an appropriate level of data and information about the recreation environment from within market area as well as outside the market area (e.g., national and the rest of the State of California). ES.7 Qualitative ConsiderationsDraft Recreation-related trends can influence future demand for creation of new or different types of public outdoor recreation opportunities. A lack of understanding of current and anticipated water-related recreation use trends can hamper the ability to effectively manage recreation. Following are examples of key trends related to participation levels that could influence future water recreation management and demand. ES.7.1 Urban Recreation Activities As society becomes more urbanized, travel patterns (including length of stay, repeat visitation, and distance traveled) will be increasingly dependent on the quality of the recreation opportunities and the recreation settings provided (Tarrant, et al, 1999). Urban residents typically have fewer outdoor recreation ES-3 DRAFT FINAL – May 2014 Lake Berryessa Concession Concept Plans Market Assessment Report opportunities than rural residents, which results in increased demand for outdoor recreation opportunities and activities closer to urban areas. Recreation Market Trends Markets for outdoor activities are changing as new forms of participation are discovered, as the backgrounds, perspectives, and tastes of recreationists change, and as constraints and opportunities shift. In that these changes are in part determined by the opportunities that are available, public land management policies will be under increased scrutiny to determine how well they meet the needs of Americans across all social strata, while at the same time providing private section business opportunities (Cordell et al, 1999). Recreation Activity Trends Recreation use patterns continue to evolve. Basic recreation activities are generally constant, but trends occur within the activity. In boating, there are two trends where large craft are increasing faster than small craft, and participation in non-motorized boating is increasing at a faster rate than motorized. Other trends involve the provision of high-end camping, recreation- oriented urban redevelopment and development centers, and increased interest in rural communities (Delta Protection Commission, 2012). Water-Based Recreation Activities Projections for many water-based activities, such as visiting beaches or water areas, canoeing, motorboating, non-pool swimming, and rafting, show increases over projected population growth through the year 2050 (Bowker, et al. 1999). Water-Based Facilities A proliferation since 1990 of personal
Recommended publications
  • Enhancing Environmental Flows of Putah Creek for Chinook Salmon Reproductive Requirements
    Enhancing environmental flows of Putah Creek for Chinook salmon reproductive requirements Written by: Chan, Brian; Jasper, Chris Reynolds; Stott, Haley Kathryn UC Davis, California ESM 122, Water Science and Management, Section: A02 Abstract: Putah creek, like many of California’s rivers and streams, is highly altered by anthropogenic actions and historically supported large populations of resident and anadromous native fish species. Now its ecosystem dynamics have changed drastically with the Monticello dam, the Solano diversion canal and the leveeing of its banks. Over time the creek has found a balance of habitats for native and non-native fish species that is mainly dictated by species-preferred temperature tolerances (Keirman et. al. 2012). Cooler temperatures and faster flows upstream from Davis prove to be ideal habitats for native species, in particular, the federally endangered Chinook salmon, which is the most widely distributed and most numerous run occurring in the Sacramento and San Joaquin rivers and their tributaries. As water moves downstream, it becomes shallower and warmer, resulting in ideal conditions for non-native species (Winters, 2005). This report analyzes the environmental flows released into putah creek and how much salmon preferred breeding habitat is available from this flow regime based on temperature. Introduction: Figure 1: Teale GIS Solutions Group (1999), US Census Bureau (2002), USGS (1993) [within Winters, 2005] The Putah Creek watershed is an important aspect in the natural, social, and economic livelihoods of the people of Yolo and Solano counties. The Putah Creek watershed begins at the highest point in Lake County, Cobb Mountain, and flows down to the Central Valley where it empties into the Yolo Bypass at near sea level.
    [Show full text]
  • Geologic Features and Ground-Water Storage Capacity of the Sacramento Valley California
    Geologic Features and Ground-Water Storage Capacity of the Sacramento Valley California By F. H. OLMSTED and G. H. DAVIS GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1497 Prepared in cooperation with the California Department of ff^ater Resources UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON : 1961 UNITED STATES DEPARTMENT OF THE INTERIOR FRED A. SEATON, Secretary GEOLOGICAL SURVEY Thomas B. Nolan, Director Tlie TT.S. Geological Survey Library catalog card for this publication appears after page 241. For sale by the Superintendent of Documents, U.S. Government Printing Office Washington 25, D.C. CONTENTS Page Abstract___________________________________________________ -_ 1 Introduction.-.--- .___-___________-___._--.______-----_ 5 Purpose and scope of the investigation.__________________ ______ 5 Location of area__-__-________-____________-_-___-_-__--____-_- 6 Development of ground water___________________-___-__ ___ __ 7 Acknowledgments....-------- ____________ _________________ 8 Well-numbering system..________________________________ _ 9 Geology--__--_--_--__----_--_-----____----_ --_ ___-__-- 10 Geomorphology_____________________________________________ 10 General features _______________________________________ 10 Mountainous region east of the Sacramento Valley...__________ 11 Sierra Nevada_______________________________________ 11 Cascade Range.._____________________-__--_-__-_---- 13 Plains and foothill region on the east side of the Sacramento Valley..__-_________-_.-____.___________ 14 Dissected alluvial uplands west of the Sierra
    [Show full text]
  • Sacramento River Flood Control System
    A p pp pr ro x im a te ly 5 0 M il Sacramento River le es Shasta Dam and Lake ek s rre N Operating Agency: USBR C o rt rr reek th Dam Elevation: 1,077.5 ft llde Cre 70 I E eer GrossMoulton Pool Area: 29,500 Weir ac AB D Gross Pool Capacity: 4,552,000 ac-ft Flood Control System Medford !( OREGON IDAHOIDAHO l l a a n n a a C C !( Redding kk ee PLUMAS CO a e a s rr s u C u s l l Reno s o !( ome o 99 h C AB Th C NEVADA - - ^_ a a Sacramento m TEHAMA CO aa hh ee !( TT San Francisco !( Fresno Las Vegas !( kk ee e e !( rr Bakersfield 5 CC %&'( PACIFIC oo 5 ! Los Angeles cc !( S ii OCEAN a hh c CC r a S to m San Diego on gg !( ny ii en C BB re kk ee ee k t ee Black Butte o rr C Reservoir R i dd 70 v uu Paradise AB Oroville Dam - Lake Oroville Hamilton e M Operating Agency: CA Dept of Water Resources r Dam Elevation: 922 ft City Chico Gross Pool Area: 15,800 ac Gross Pool Capacity: 3,538,000 ac-ft M & T Overflow Area Black Butte Dam and Lake Operating Agency: USACE Dam Elevation: 515 ft Tisdale Weir Gross Pool Area: 4,378 ac 3 B's GrossMoulton Pool Capacity: 136,193Weir ac-ft Overflow Area BUTTE CO New Bullards Bar Dam and Lake Operating Agency: Yuba County Water Agency Dam Elevation: 1965 ft Gross Pool Area: 4,790 ac Goose Lake Gross Pool Capacity: 966,000 ac-ft Overflow Area Lake AB149 kk ee rree Oroville Tisdale Weir C GLENN CO ee tttt uu BB 5 ! Oroville New Bullards Bar Reservoir AB49 ll Moulton Weir aa nn Constructed: 1932 Butte aa CC Length: 500 feet Thermalito Design capacity of weir: 40,000 cfs Design capacity of river d/s of weir: 110,000 cfs Afterbay Moulton Weir e ke rro he 5 C ! Basin e kk Cre 5 ! tt 5 ! u Butte Basin and Butte Sink oncu H Flow from the 3 overflow areas upstream Colusa Weir of the project levees, from Moulton Weir, Constructed: 1933 and from Colusa Weir flows into the Length: 1,650 feet Butte Basin and Sink.
    [Show full text]
  • Putah Creek Path Envisioning Opportunities for a Community
    Putah Creek Path Envisioning Opportunities for a Community Senior Project by Sophie Sears UC Davis Landscape Architecture June 2010 Putah Creek Path Envisioning Opportunities for a Community Accepted and Approved by A Senior Project Presented to the Faculty of the Landscape Architecture Program University of California, Davis in Fulfillment of the Requirement Mark Francis, Senior Project Faculty Advisor for the Degree of Bachelors of Science in Landscape Architecture Heath Schenker, Faculty Committee Member Eric Larsen, Faculty Committee Member Rich Marovich, Committee Member Cheryl Sullivan, Committee Member Abstract This project focuses on a section of Putah Creek between In- terstate 505 and the Yolo Housing Authority. It examines the possibility of creating a path near the creek along this stretch of the waterway. Current plans for a Winters Putah Creek Nature Park are in the process of being implemented to the west of the trail site. This trail represents an extension of the current Nature Park project which is located between Railroad Avenue and Interstate 505. However, there is a major concern over the safety of pedestrian travel from Yolo Housing to Winters. This project aims to evaluate safe and enjoyable solutions to address this problem while instilling environmental stewardship and providing educational opportunities. Restoration of chan- nel morphology and native vegetation are included in the plan. The restoration of the channel form will additionally mitigate an erosion site that is threatening Putah Creek Road. In addi- tion to the linear path, the project aims to redevelop an area at the west end of the site that is located on the Yolo Hous- ing Property.
    [Show full text]
  • Audit Report
    U.S. Department of the Interior Office of Inspector General AUDIT REPORT CONCESSIONS MANAGED BY THE BUREAU OF RECLAMATION REPORT NO. 00-I-376 MAY 2000 U.S. Department of the Interior Office of the Inspector General EXECUTIVE SUMMARY Concessions Managed by the Bureau of Reclamation Report No. 00-I-376 May 2000 BACKGROUND The Bureau of Reclamation (BOR) is responsible for overseeing or managing 310 recreation areas established on BOR project lands that are visited each year by about 90 million people for camping, swimming, boating, picnicking, and other recreational activities. The Congress has enacted legislation that requires BOR to "ensure the protection, comfort, and well-being of the public (including the protection of public safety) with respect to the use of Reclamation lands" and "ensure the protection of resource values." Historically, BOR sought Federal partners such as the National Park Service and non-Federal partners such as state and local governments to develop, operate, and maintain recreational sites and facilities for the visiting public. In 1998, approximately 218 concessions provided commercial services and facilities for the public on BOR project lands, consisting of 110 concessions operated by Federal partners, 87 concessions operated by non-Federal partners, and 21 concessions managed directly by BOR. Prior to 1995, BOR-managed concessions were not covered by BOR-wide policies, standards, and directives. However, in 1995, BOR issued interim guidance for concessions management and, in 1998, formally issued policies and standards and directives to guide BOR officials in planning, developing, and managing concessions operations. OBJECTIVE The objective of our audit was to determine whether BOR had adequate policies and procedures for managing its concessions operations and protecting the public with respect to its use of public lands.
    [Show full text]
  • Plenary Session
    Wednesday ursday Friday Saturday 8am Registration and Hospitality Design & Layout by Trees FoundationDesign &Layout by Trees 9am Workshops & Tours 9am - 5pm Workshops & Tours 9am - 5pm Morning Concurrent Sessions Workshops Workshops Reintroduction of Salmon to Plenary Session Historical Habitats: Part 1 West Coast Floodplain Workshop Fish Passage VMC Theater Brunelle Performance Multi-purpose Room from Tidewater to Sierra Courtyard Entrance Multi-purpose Room Arts Theater Visioning Salmon Recovery Multi-purpose Room Evaluating Salmon Habitat State of Beaver Restoration and Watershed Condition in California Hatchery Supplementation Multi-purpose Room Club Room Club Room Lunch 12:15 - 1:15pm Field Tours Field Tours Afternoon Concurrent Sessions Afternoon Concurrent Sessions Stanislaus River Restoration Sites Multi-Use Floodplain Projects in the Lower Sacramento Valley Central Valley Recovery Reintroduction of Salmon to Planning and Restoration Historical Habitats: Part 2 Yolo Bypass and Putah Creek Brunnelle Theater Multi-purpose Room Restoration Projects American River Gravel Augmentation and Floodplain Swirling in Sediment Reviving the San Joaquin River Restoration Tour Multi-puropse Room Club Room Watershed Day at the Capitol Meet in Game Room Using Photogrammetric Protecting, Connecting, and Field Tour participants: and Aerial Vehicle Technology Re-imaging Floodplain Habitat Club Room please pack a lunch and meet VMC Theater outside the front entrance Estimating Juvenile Salmonid Survival VMC Theater 5:30pm Annual Meeting Multi-Purpose
    [Show full text]
  • Hydrology and Water Quality 3.8
    HYDROLOGY AND WATER QUALITY 3.8 This section describes the regulatory setting, regional hydrology and water quality impacts that are likely to result from project implementation, and measures to reduce potential impacts related to stormwater drainage, flooding and water quality. This section is based in part on the following documents, reports and studies: City of Davis General Plan (City of Davis, 2001; as amended through 2007); City of Davis Final 2015 Urban Water Management Plan (Brown Caldwell, 2016); and Rick Engineering Company. Preliminary Drainage Study for Sterling 5th Street Apartments. December 11, 2015. Comments were received during the public review period or scoping meeting for the Notice of Preparation regarding this topic from the following: Rita Kaich (April 18, 2016). Each of the comments related to this topic are addressed within this section. 3.8.1 EXISTING SETTING REGIONAL HYDROLOGY The project site is located in the City of Davis, within Yolo County at the southwestern end of the Sacramento Valley, approximately 30 miles north of the confluence of the San Joaquin and Sacramento Rivers. The Sacramento Valley is bordered by the Coast Ranges and Delta on the west and the foothills of the Sierra Nevada to the east. Water resources in this region include rivers, streams, sloughs, marshes, wetlands, channels, harbors, and underground aquifers. The topography is generally flat, and is drained by the Sacramento River and the Yolo Bypass, which is part of the Sacramento River Flood Control Project. Climate Summers in the city are warm and dry, and winters are cool and mild. The region is subject to wide variations in annual precipitation, and also experiences periodic dry periods and wild fires in the regional watershed and surrounding areas with chaparral and oak lands.
    [Show full text]
  • Exploring Home: a Recreational Day Use and Interpretive Trail at Putah Creek Exploring Home: a Recreational Day Use and Interpretive Trail for Putah Creek
    Exploring Home: A Recreational Day Use and Interpretive Trail at Putah Creek Exploring Home: A Recreational Day Use and Interpretive Trail for Putah Creek Sage Millar Senior Project June 2008 University of California, Davis Department of Environmental Sciences Landscape Architecture Program A Senior Project Presented to the Faculty of the Landscape Architecture program University of California,Davis in fulfillment of the Requirement Exploring Home: for the Degree of A Recreational Day Use and Interpretive Bachelors of Science of Landscape Architecture Trail for Putah Creek Rob Thayer, Senior Project Advisor Presented by: Patsy Owens, Senior Project Advisor Sage Millar at University of California, Davis Steve McNeil, Committee Member on the Thirteenth day of June, 2008 This senior project consists of background research and site analysis as well as a final site plan for a recreational day use area and interpretive trail on Putah Creek. This document contains the background research, site analysis, and program develop- Abstract ment I completed before designing the final site plan. The site is 10 miles west of Winters on Hwy 128 at the base of Monticello Dam where Cold Creek enters Putah Creek. The site is in the Pu- tah Creek Wildlife area and is approximately 25 acres. Because of it’s location near the trailhead into Stebbins Reserve, and Putah and Cold Creeks, the site provides and excellent opportunity to create an educational and interpretive experience for visitors to the area. Hiking trails, informational kiosks and signage will highlight the history and various natural processes that are occur- ring on and around the site. A small interpretive center or outdoor teaching area will enhance the experience of visitors, and also provide an outdoor classroom for gatherings such as field trips.
    [Show full text]
  • Putah Creek Corridor Connecting the Pieces
    Putah Creek Corridor Connecting the Pieces Putah Creek Corridor Connecting the Pieces Accepted and Approved by A Senior Project Presented to the Faculty of the Landscape Architecture Program University of California, Davis Steve Greco, Faculty Committee Member in Fulfillment of the Requirement for the Degree of Bachelors of Science in Landscape Architecture Tara Hanlon, Committee Member Rich Marovich, Committee Member Presented by: Claire Napawan, Senior Project Faculty Advisor Kathryn Salfen at University of California, Davis on the Tenth Day of June, 2011 Acknowledgements I would like to thank my senior project committee members for their tremendous help. They all provided me with their knowledge, time and encouragement. THANK YOU! Claire Napawan Steve Greco Rich Marovich Tara Hanlon In addition to my senior project committee members, I would like to thank my parents for all their help not only during this project but for helping through everything! i Abstract This project focuses on Putah Creek as it runs from Lake Berryessa to the Yolo Wildlife Area. It examines the corridor as both a wildlife corridor and as a local trail corridor. With many existing patches of wildlife reserves located along Putah creek, the restoration of riparian forest along the channel will provide full connectivity and functionality to the corridor. On the social scale Putah Creek runs between Winters and Davis. Connecting the existing trails of the UC Davis Riparian Reserve and Winters Putah Creek Nature Park will establish a local trail corridor. This project also examines the need of the design of the trails at Win- ter’s Putah Creek Nature Park to Preserve linear corridors and creating multi-use trails that can allow wildlife movement across the landscape.
    [Show full text]
  • Conflicting Values Complicate Stream Protection
    The case of Putah Creek. As Putah Creek dried out during a recent drought, the people of Davis bought water to save the surviving fish. Conflicting values complicate stream protection Michael P. Marchetti P Peter B. Moyle Increasing human demands for underscore the need for commu- An average of 60% of California’s water in California have led to a nities and irrigation districts to total available water (34 million acre- decline in the diversity and abun- develop long-term water policies feet delivered yearly) comes from sur- dance of native aquatic organ- that recognize environmental face flow and 40% is taken from isms, including valuable salmon needs in the context of groundwater. In 1985 California allo- and steelhead. Declines worsen California’s frequent droughts. cated 80% of this developed water during drought years, a fact dem- Such problem-solving will depend supply to agriculture, 16% to urban ar- onstrated in 1989 when lower on balancing the conflicting value eas and only 2% to wildlife and recre- Putah Creek dried out in the third systems of different groups of wa- ation, according to the California De- year of the state’s most recent ter users. partment of Water Resources. drought That year, the Putah Because water is a limiting resource in California, it is subject to intense Creek Council (a local environ- ater is California’s most limiting competition among users and all too mental group), UC Davis and the resource: Much of the state is often seems to be in short supply. As City of Davis joined forces to pur- semi-arid and 20% of the land receives early as the 1890s, San Joaquin Valley chase more water from the Solano less than 5 inches of rain per year.
    [Show full text]
  • Geologic Maps of the Sacramento - San Joaquin Delta, California
    DEPARTMENT OF THE INTERIOR TO ACCOMPANY MAP MF-1401 UNITED STATES GEOLOGICAL SURVEY GEOLOGIC MAPS OF THE SACRAMENTO - SAN JOAQUIN DELTA, CALIFORNIA By Brian F. Atwater INTRODUCTION The Sac ramen to - San Joaquin Delta, the arm of Helley, and W. R. Lettis improved the manuscript with the San Francisco Bay estuary that reaches into the critical reviews, and Faith Dunham, J. R. Le Compte, Central 'valley of California, differs from typical J. B. Pinkerton, N. J. Tamamian, J. A. Thomas, and coastal-plain deltas in three important respects. Natalie Weiskal helped prepare the maps and text for First, rather than meeting the ocean individually and publication. directly, all major waterways of this delta discharge via a single constricted outlet into a chain of estuarine bays and straits. Second, in the most SKETCH OF DEPOSITIONAL HISTORY common vertical sequence of deposits, peat and mud deposited in tidal marshes and swamps (tidal wetlands) The Sacramento - San Joaquin Delta overlies 5-10 directly overlie alluvium or eolian sand, a sequence km of sedimentary deposits. Most of this material, recording a landward spread of tidal environment~ including sources and reservoirs of the Delta's rather than the seaward migration of fluvial natural gas, accumulated in marine environments about environments that is typical of coastal-plain deltas 175 million to 25 million years ago (Burroughs, (Cosby, 1941, p. 43; Thompson, 1957, p. 12; Shlemon 1967). Younger deposits are generally described as and Begg, 1975, p. 259; Atwater and Belknap, 1980). nonmarine (Burroughs, 1967), but some must have formed Finally, intensive human use has led to a peculiar set in shallow seas and estuaries (see maps by C.
    [Show full text]
  • Sediment Transport in the Western Tributaries of the Sacramento River, California
    Sediment Transport in the Western Tributaries of the Sacramento River, California GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1798-J Prepared in cooperation with the California Department of Water Resources Sediment Transport in the Western Tributaries of the Sacramento River, California By B. L. JONES, N. L. HAWLEY, and J. R. CRIPPEN SEDIMENTATION IN SMALL DRAINAGE BASINS GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1798-J Prepared in cooperation with the California Department of Water Resources UNITED STATES GOVERNMENT PRINTING OFFICE, WASHINGTON : 1972 UNITED STATES DEPARTMENT OF THE INTERIOR ROGERS C. B. MORTON, Secretary GEOLOGICAL SURVEY V. E. McKelvey, Director Library of Congress catalog-card No. 72-600254 For sale by the Superintendent of Documents, U.S. Government Printing Office Washington, D.C. 20402 Price 25 cents (paper cover) Stock Number 2401-2163 CONTENTS Page Abstract_________________________________________________________ Jl Introduction._____________________________________________________ 1 Description of the area__--__--_________-___-_-_______---___--___-__ 2 Climate._____________________________________________________ 5 Vegetation and soils__________________________________________ 6 Stream development__.________________________________________ 7 Streamflow.__________________________________________________ 7 Description of individual streams___________________-__-______-__ 8 Clear Creek_______________________________ 8 Cottonwood Creek_______________________________________ 8 Red Bank Creek____________________________ 9 Elder
    [Show full text]