Stage 4. Hampton Court Bridge to West Byfleet (Via Thames Path, Streets, Then Wey Navigation) -- Detailed Instructions

Total Page:16

File Type:pdf, Size:1020Kb

Stage 4. Hampton Court Bridge to West Byfleet (Via Thames Path, Streets, Then Wey Navigation) -- Detailed Instructions Stage 4. Hampton Court Bridge to West Byfleet (via Thames Path, streets, then Wey Navigation) -- detailed instructions -- 0.0mi :: Thames Path crosses Hampton Court Bridge . Stage starts on the bridge. 0.0mi :: Leave Hampton Court Bridge on SOUTH bank of River Thames. Head WEST on Thames Path . Follow THAMES PATH on SOUTH bank for 4.8mi. The river will be on your right. 4.8mi :: You will arrive at Walton Bridge . Note that the bridge is being rebuilt, and there may be Thames Path diversions in operation. For the next mile the Thames Path makes use of both banks of the Thames. DO NOT cross the river -- Stay on the SOUTH bank with the river on your RIGHT. (in the absence of any bridge works you just pass under Walton Bridge and continue ) Fig A: Walton Bridge (@ 4.8mi) 4.9mi :: After passing Walton Bridge, remain on riverside path on SOUTH bank. The river will be to your right, and the (busy) Walton Lane to your left. Fig B: Walton Lane (@ 4.9mi) 6.2mi :: riverside path emerges through car park onto Thames Street . Follow Thames Street south for 0.2mi. Fig C: riverside-path / Walton Lane / Thames Street junction (@ 6.2mi) 6.4mi :: Turn RIGHT onto Portmore Park Road , passing between a fine set of "gate posts"! Follow Portmore Park Road for 0.6mi. Note the road wiggles and goes up/down a bit. Fig D: Thames Street / Portmore Park Rd junction (@ 6.4mi) 7.0mi :: Go straight over roundabout, through "No Entry" signs and onto Old Wharf Way . Follow Old Wharf Way (~0.1mi) to arrive at Bridge Road T-junction. Fig E: Portmore Park Rd / Weybridge Rd / Old Wharf Way roundabout (@ 7.0mi) 7.1mi :: At the end of Old Wharf Way , turn RIGHT onto Bridge Road . Follow Bridge Road (becomes Addlestone Road ) for 0.1mi. Fig E: Old Wharf Way / Bridge Rd junction (@ 7.1mi) 7.1mi :: Follow Bridge Road over bridge to become Addlestone Road . Fig F: Bridge Rd becomes Addlestone Rd after bridge (@ 7.1mi) 7.2mi :: Proceed along Addlestone Rd. The first lock of the River Wey Navigation canal to your left. Use either Addlestone Rd or the path between the road and the canal, for 0.2mi. The canal will be on your LEFT side for this 0.2mi stretch. Fig G: Addlestone Rd (@ 7.2mi) 7.4mi :: As Addlestone Rd bends right, turn left to take road bridge over Wey Navigation canal. Immediately after crossing canal turn RIGHT and follow tow-path with canal on your RIGHT. Follow tow-path for 1.3mi, always keeping the canal to your RIGHT. Fig H: Turn off Addlestone Rd, over canal and follow tow path (@ 7.4mi) 8.7mi :: FINISH where Wey Navigation canal tow-path crosses Byfleet Road (A318) Fig I: Overview of Weybridge section of Stage 5. Linking Thames Path (top-right) with River Wey Navigation (lower-left) .
Recommended publications
  • River Thames Kingston
    MIN. 1 MIN. MIN. MIN. MIN. 4 MIN T ASE 1 CAUTION COMING BACK TO THE PONTOON Be aware of boat traffic. 2 40 MIN TO BASE RED MARKING 1. Keep an eye out for GoBoat crew. If It is prohibited to sail in areas there is a space free on the pontoon, a marked with red. crew member will wave to you signal- ling to make your way towards them. DOWN STREAM TRAFFIC MIN. Keep to the right and give way 2. If there is not a space, go around to all river users. the bridge and keep an eye out for the GoBoat crew’s signal for you 2 UP STREAM TRAFFIC to come in. Follow instructions at bridges. 3. Keep to the right hand side of the BOAT MOORINGS river until it is safe to cross. If you are The brown areas along the river. coming from Hampton Court Palace Keep a distance. you will not have to cross. If you are 3 coming from Teddington, go through HIGH WIND both bridges. Please do not stop near Use power and steer into the the arches. Keep going beyond the 3 wind to keep control. bridge and only start to cross when MIN. you have space and it is safe to do so. CONGESTED AREAS MIN. Be aware of more boats around. 4. Slowly approach the pontoon head-on, DO NOT attempt HORN SIGNALS to reverse in. ?#!Be aware of sound signals on the River Thames. 5. Once you are within a few meters turn off the motor and pass the front Short: I am altering my course to STARBOARD.
    [Show full text]
  • Getting to Know Your River
    Would you like to find out more about us, or about your environment? Then call us on 08708 506 506 (Mon-Fri 8-6) A user’s guide to the email River Thames enquiries@environment- agency.gov.uk or visit our website www.environment-agency.gov.uk incident hotline getting to know 0800 80 70 60 (24hrs) floodline 0845 988 1188 your river Environment first: This publication is printed on paper made from 100 per cent previously used waste. By-products from making the pulp and paper are used for composting and fertiliser, for making cement and for generating energy. GETH0309BPGK-E-P Welcome to the River Thames safe for the millions of people who use it, from anglers and naturalists to boaters, We are the Environment Agency, navigation authority for the River Thames walkers and cyclists. This leaflet is an essential guide to helping the wide variety from Lechlade to Teddington. We care for the river, keeping it clean, healthy and of users enjoy their activities in harmony. To help us maintain this harmony, please To encourage better understanding amongst river users, there are nine River User Groups (RUGs) read about activities other than your own covering the length of the river from Cricklade to to help you appreciate the needs of others. Tower Bridge. Members represent various river users, from clubs and sporting associations to commercial businesses. If you belong to a club that uses the river, encourage it to join the appropriate group. Contact your local waterway office for details. Find out more about the River Thames at www.visitthames.co.uk Before you go..
    [Show full text]
  • Autumn 2014 Hon
    Autumn 2014 Hon. Patron – Michael Aspel OBE Would you like to join the PRUDENTIAL RIDE Weybridge Society? LONDON ROAD RACE Please contact any This year’s Prudential RideLondon- Surrey Road Race took place on Sunday 10 August 2014, and the route followed was a Committee member- see similar one to those (including the Olympic cycle race) in previous years. The Prudential Page 8 Ride London-Surrey 100 comprised 20,000+ amateur cyclists who took on a 100 mile (this was reduced to 86 on the day due to heavy rainfall) cycle challenge through closed roads of London and Surrey before returning to The Mall. In addition 150 of the world’s top cyclists from 25 teams competed in the Prudential RideLondon-Surrey Classic, the world’s class one day race over 200 km, starting from Queen Elizabeth Olympic Park, before heading into Surrey and returning to London to finish on The Mall. The date for next year’s event has been announced as Sunday August 2nd when it is estimated that some 30,000 amateur cyclists will take part. See Page 7 for more pictures. Weybridge Rowing - Past and Present The Weybridge Society is pleased to announce that John Turnball, Vice-President of Weybridge Rowing Club and Chairman of Weyfarers Rowing Club, will be giving an illustrated talk on Thursday 9 October, 2014 at 8pm at St James’ Church main hall. The title of his John Turnball talk will be ‘Weybridge Rowing - Past and Present’. Members free; guests £3.” MEMBERSHIP The strength of any organisation is in its membership, and we urge all members to recruit at least one new member this year.
    [Show full text]
  • TLS Review 2008 Part 3
    FLOODPLAIN RESTORATION Potential Project Outcomes It is proposed that the ‘Restoration of the Lost Floodplain’ will: • Optimise the use of the floodplain for water to go during a flood event. • Identify ways to restore and reconnect the natural rhythms of the river corridor to create a ‘living landscape’ – a mosaic of habitats (created at a landscape scale) allowing wildlife to flourish and move about in as climate changes. • Create a network of sluices, controls and channels linked to a real-time flood forecasting model to enable flooding to be carefully controlled across a large area, reducing the risk of disruption to people. • Put in place a network of sustainable footpaths, cycle routes, informal trails, signage, and dry routes to allow visitors and locals to navigate through the landscape even in times of flood and drought. • Restore the historic landscape framework of fields, avenues, creeks, ponds, woodland, grazed wet meadows and native hedges. • Put in place a long-term management plan to carry out the day-to-day maintenance of the riverside that will include an active volunteer programme. • Establish an education and outreach programme to connect people with their environment. Project Scope – By Area Below is a list of possible project locations. Considerable consultation and funding will be needed before any agreement is reached. Syon Flood Meadows , Kew Gardens, Kew Haha, The Royal Mid-Surrey Golf Course, River Crane, The Old Deer Park, Petersham Meadows, Ham Towpath & Radnor Gardens, Ham Lands, Marble Hill Park and the Warren Footpath, Home Park at Hampton Court Palace, Canbury Gardens Kingston, Thames Ditton, River Mole & Cigarette Island, Hurst Park, Broom Road Recreation Ground, and other riverside settlements & town centres.
    [Show full text]
  • B50 12 Walton Bridge to Shepperton Ferry North
    Walton Bridge to B50 Shepperton Ferry North 12 Start Walton Bridge — KT12 1BH Finish Shepperton Ferry North — TW17 9LQ Distance 3.06km Duration 38 minutes Ascent 16.1m Access Walton-upon-Thames station (South Western Railway) near start of section. Shepperton station (South Western Railway) north of Russell Road en route. Facilities All facilities in Walton-on-Thames near start of section. Pub and shop in Shepperton en route. 12.1 Walton Bridge, at Reception Centree 0m 12.2 .L to bridge level; cross bridge; ahead on Walton Lane; L on Russell Road; L at rbt 3060m on Church Road then Chertsey Road to Ferry Lane, where L to ferry slip entrance. © 2016-20 IG Liddell Brunel50 Path 11 – 1 This section starts at the south side of Walton Bridge 12.1 on the riverside path, opposite the Reception Centre and car park. Walton-on-Thames is one of the most ancient sett lements in the area, and is a likely site for Julius Caesar’s fording of the river. The place- name indicates that there was in Roman times an existing sett lement of pre-Roman inhabitants, coming from the same root as ‘Welsh’. Like many communities in this quarter, the railway brought the impetus for expansion, and today Walton has many commuters into London. It is also a popular location for corporate headquarters. To reach the north bank of the river at Shepperton, climb up to Walton Bridge. Cross the bridge, and go 12.2 left into Walton Lane; follow this round its bends to reach a T-junction with a mini-roundabout.
    [Show full text]
  • West Byfleet to Hampton Court Walk
    Saturday Walkers Club www.walkingclub.org.uk West Byfleet to Hampton Court walk The Wey Navigation and the Thames Path via several pubs. Length 10.7 miles / 17.2 km (with no ascent) The Extension to Kingston adds 2.5 miles / 4.1 km (with no ascent) Toughness 1 out of 10 (easy walking along tarmaced paths) Maps OS Explorers: 160 and 161 Features This easy walk is very close to London. It follows the Wey Navigation (a canal), and then joins the Thames, which it follows it to Hampton Court. Navigation is simple, and there are many pubs along the walk. The entire route is marked with red chevrons on OS maps, though waymarking along the canal is poor. While the walk is flat, the path along the Wey Navigation is a bit rough in spots. While it is passable for bikes, it is narrow in places, and so not really suitable for wheelchairs or baby buggies. The Thames Path is wide, paved, and suitable for both Hampton Court Palace gardens are no longer free, but there is free access to the deer park from the Thames (just past the Palace), and also through an unassuming gate just opposite the entrance to Busy Park. Between Walton and Hampton Court is a place where you can feed Swans (its marked) - bring stale bread - although not normally recommended, it encourages them to stay in a specific area. https://www.walkingclub.org.uk/walk/west-byfleet-to-hampton-court/ 1/6 Swimming Use extreme caution, and take local advise. Although the river seems calm, there are drownings in the Thames each year.
    [Show full text]
  • Teddington Reach Coordination, 2020
    TEDDINGTON REACH COORDINATION, 2020 May 2020 Note that many of the events in the calendar to date have not taken place and others in the future may also be cancelled because of restrictions imposed to protect against the Covid-19 virus. CONTENTS 1 – DEFINITIONS……………………………………………………………………………page 1-2 2 – PROGRAMME 2020..………………………………………………………………….pages 2-7 3 – REGULAR CLUB ACTIVITIES NOT INCLUDED ON REACH PROGRAMME, AND CLUB CONTACT DETAILS………page 8-11 1 – DEFINITIONS Times am events finish by 13.00 hours. pm events start on or after 13.00 hours Reach sections (Map to come in next draft) 1 Molesey Lock to Thames Ditton Island. 2 Thames Ditton Island to Raven’s Ait 3 Raven’s Ait to Kingston Bridge 4 Kingston Bridge to Steven’s Ait 5 Steven’s Ait to the inlet near the Royal Canoe Club 6 The inlet near the Royal Canoe Club to Broom Water 7 Broom Water to Teddington Lock Cut .Priority 1 River Closure means that the event is controlled by the EA ([email protected] ) and other clubs must not organise events at that time. River closures can only be applied between November and March. River Restriction means that the event is controlled by the EA ([email protected] ), the river is restricted and other clubs must not organise events in the restricted section at that time. Exclusive (Excl) means that other clubs participating in this Reach Coordination must not organise events at the same time. (When possible, sailing clubs are expected to offer races for all the classes sailing on the Reach.) Priority (Pri) means that the club has priority for its event and other clubs wishing to organise events on the same day MUST liaise with it prior to the event ON THE DAY OF THE EVENT in order to avoid clashes.
    [Show full text]
  • Surrey. East Molesey
    DlRECTOitY .J SURREY. EAST MOLESEY. 315 EAST MOLESEY (or Moulsey).-The 1\loleseys, named mortuary chapel; it is under the control of the council acting in Domesday Book, derive their name from the river as a burial board. The Conservative Hall, in Walton road. Mole, which runs through the parishes, and falls intD the a. building of galvanized iron, was erected in 1888 and will Thames at EMt Molesey. Ea<!t Molesey is a. rapidly increas- hold 400, and is- used for concerts and meetings. The Con­ ing village, situated opposite Hampton Court, on the south ~ervative Club adjoining it has billiard, reading and refresh­ side of the Thames, which for many years was crossed at this ment rooms. The St. Andrew's Hall, a. large building of point by a wooden bridge; but an iron bridge was constructed red brick, in St. Mary's road, was erected in 1900. The bank and opened in 1865 on the same site ; it is in the Mid division of Barclay & Company Limited (formerly Thomas Ashby of the county, Elmbridge hundred, Kingston petty sessional & Co.) in Wolsey road, was erected in 1889. The London & division, union and county court district, within the juris- South Western Bank Limited also has a branch in Bridge road. diction of the Metropolitan police, and in the rural deanery The drinking fountain in Bridge road, a structure of granite, of Emly, archdeaconry of Surrey and diocese of Winchester. was erected in 1887 in commemoration of the Jubilee of Her The Hampton Court station, a terminus of a branch of the late MajMty Queen Victoria.
    [Show full text]
  • Directions to St Peter's Church Hersham Burwood Road, Hersham KT12 4AA
    Directions to St Peter's Church Hersham Burwood Road, Hersham KT12 4AA By train, the nearest station with a taxi rank is Walton-on-Thames Station. By car, there is usually space to park in the roads near the Church. There is also a large car park behind the shops and Waitrose Supermarket opposite the Green. Access to the car park is from the Molesey Road. Please note the parking charges. From the M25: Either, from Junction 11, take the A317 to Weybridge and then follow the directions, below, from Weybridge, or, from Junction 10, take the A3 north towards Esher and turn left at the first exit, the A245. Then follow the directions, below, from Cobham From Cobham: Take the A245 towards Byfleet and cross over the A3. Immediately after the roundabout over the A3, take the right hand lane and turn right at the traffic lights into Seven Hills Road. Follow this for 1½ miles to a roundabout; turn right into Burwood Road. Follow Burwood Road for 1½ miles. St Peter’s Church is on the right at the junction with Burhill Road. From Esher: Follow the A244 towards Walton, over the river Mole and along the dual carriageway to the Barley Mow roundabout. At the Barley Mow roundabout turn left into the Molesey Road. Follow the Molesey Road for 400 yards. At the mini-roundabout at the Green take the first exit into Burwood Road, keeping the Green on your right. St Peter’s Church is 400 yards on the left at the corner of Burwood Road and Burhill Road.
    [Show full text]
  • Tls Review Report September
    3.0 RIVER THAMES INFRASTRUCTURE 3.1 This chapter forms a new section to the TLS Report bringing together new priorities such as ood risk management and River Thames Infrastructure. There is a range of signi cant changes to the strategic policy context for the TLS Hampton to Kew that has been introduced since 1994. The most important of these are: • A range of signi cant changes to the strategic policy context for the TLS Hampton to Kew has been introduced since 1994. The most important of these is The London Plan – in particular policies concerning climate change adaptation (Policies 5.10-5.15), designs on London (Policies 7.1-7.10) and the Blue Ribbon Network (Policies 7.24-7.30); Draft SPG London World Heritage Sites – Guidance on Settings • Thames Estuary 2100 – Consultation Document, Environment Agency, April 2009; • Lower Thames Flood Risk Management Strategy Consultation Document – Environment Agency September 2009; • Strategic Flood Risk Assessments • European Directives • River Basin Management Plan – Thames Basin District, Environment Agency and Defra, December 2009; • The Flood and Water Management Act 2010; • The Disability Discrimination Act 1995 (DDA) was introduced in 1996.- • The original 1995 Act was modi ed and extended by the introduction of the Disability Discrimination Act 2005 in 2006. • Thames Waterway Plan 2006-2011 – River Thames Alliance RIVER FLOW AND TIDAL REGIME The Thames Basin 3.2 The River Thames rises near Kemble in Gloucestershire and drains a catchment of some 3,841 square miles. This large catchment of brooks, canals and rivers combine to form 38 main tributaries feeding the Thames between its source and Teddington Lock, the normal tidal limit.
    [Show full text]
  • TR127246 Richmond Web.Indd
    Travel in Richmond upon Thames will be affected during the Games Olympic Games: 27 July – 12 August 2012 Paralympic Games: 29 August – 9 September 2012 Transport for London Cycling road events Plan ahead for easier journeys Richmond upon Thames will be particularly affected by a number of the This year brings the largest sporting event in the world to the UK – events during the Games. The Cycling Road Races will take place on roads in the Olympic and Paralympic Games. During this time, London will Richmond Park, Richmond, Twickenham, Teddington, Bushy Park, Hampton Court and Hampton Wick on Saturday 28 and Sunday 29 July. The route and become a massive sporting and cultural venue, with up to one million some surrounding roads will be closed to traffic but emergency and local more visitors expected in the Capital each day. Roads and public access will be maintained as far as possible. transport will be much busier than usual and we will be working hard Road closures in the borough will begin from early in the morning with to help host a great Games and to keep London moving. roads re-opening after the race as soon as it is safe to do so. Access will be maintained for local residents and businesses affected by the road closures The information here will help you understand where the transport for as long as possible on either side of the events passing through. network will be busiest and how your journey could be affected. Parking along the route will be suspended from Friday 27 July until after the events on Sunday.
    [Show full text]
  • London Borough of Richmond Upon Thames Air Quality Annual Status Report for 2018 Date of Publication: 1St July 2019
    London Borough of Richmond upon Thames Air Quality Annual Status Report for 2018 Date of publication: 1st July 2019 This report provides a detailed overview of air quality in the London Borough of Richmond Upon Thames during 2018. It has been produced to meet the requirements of the London Local Air Quality Management statutory process1. 1 LLAQM Policy and Technical Guidance 2016 (LLAQM.TG(16)). https://www.london.gov.uk/what-we- do/environment/pollution-and-air-quality/working-boroughs Page 1 Contact details Local Authority Officer Mrs Carol Lee Department Pollution Team Address Civic Centre, York Street, Twickenham, TW1 3BZ Telephone 0208 891 7729 e-mail [email protected] Report Reference Richmond_ASR_2019 number Date 28th June 2019 Page 2 Executive Summary The London Borough of Richmond upon Thames is committed to improving air quality in the Borough. The Council is demonstrating its political leadership; taking action; leading by example; monitoring air quality; using the planning system; integrating air quality into the public health system; and informing the public. This 2019 Annual Status Report reviews recent air quality monitoring in the Borough in accordance with Defra LAQM guidance. In doing so, it fulfils one further aspect of this ongoing commitment. The report identifies that: For carbon monoxide, benzene, 1,3-butadiene, lead and sulphur dioxide there is not a significant risk of the objectives being exceeded in the Council’s area. In December 2000 the Council designated an AQMA across the whole Borough for nitrogen dioxide and particles (specifically PM10). The findings from this report indicate that the AQMA should be maintained.
    [Show full text]