Environmental Monitoring Report
Semi-annual Environmental Monitoring Report No. 1 March 2020
PHI: Malolos-Clark Railway Project – Tranche 1 Volume III
September 2019 – March 2020
Prepared by the Project Management Office (PMO) of the Department of Transportation (DOTr) for the Government of the Republic of the Philippines and the Asian Development Bank.
CURRENCY EQUIVALENTS (as of 30 March 2020)
Currency unit – Philippine Peso (PHP) PHP1.00 = $0.02 $1.00 = PHP50.96
ABBREVIATIONS ADB – Asian Development Bank BMB – Biodiversity Management Bureau Brgy – Barangay CCA – Climate Change Adaptation CCC – Climate Change Commission CDC – Clark Development Corporation CEMP – Contractor’s Environmental Management Plan CENRO – City/Community Environment and Natural Resources Office CIA – Clark International Airport CIAC – Clark International Airport Corporation CLLEx – Central Luzon Link Expressway CLUP – Comprehensive Land Use Plan CMR – Compliance Monitoring Report CMVR – Compliance Monitoring and Validation Report CNO – Certificate of No Objection CPDO – City Planning and Development Office DAO – DENR Administrative Order DD / DED – Detailed Design Stage / Detailed Engineering Design Stage DENR – Department of Environment and Natural Resources DepEd – Department of Education DIA – Direct Impact Area DILG – Department of Interior and Local Government DOH – Department of Health DOST – Department of Science and Technology DOTr – Department of Transportation DPWH – Department of Public Works and Highways DSWD – Department of Social Welfare and Development DTI – Department of Trade and Industry EA – Executing Agency ECA – Environmentally Critical Area ECC – Environmental Compliance Certificate ECP – Environmentally Critical Project EGF – Environmental Guarantee Fund EHS – Environmental Health and Safety EIA – Environmental Impact Assessment EIS – Environmental Impact Statement EISR – Environmental Impact Statement Report EMB – Environmental Management Bureau EMF – Environmental Monitoring Fund EMoP – Environmental Monitoring Plan EMP – Environmental Management Plan
ENRO – Environment and Natural Resources Officer EQPL – Environmental Quality Performance Level ERA – Environmental Risk Assessment ERP – Emergency Response Plan ESRD – Environment, Social and ROW Division EU – Environmental Unit FAM – Facility Administration Manual FMB – Forest Management Bureau GAF – Grievance Action Form GCR – Greater Capital Region GPS – Global Positioning System GRM – Grievance Redress Mechanism IEC – Information Education and Communication IEE – Initial Environmental Examination IFC – International Finance Corporation IIA – Indirect Impact Area IRR – Implementing Rules and Regulations ISF – Informal Settler Families JDT – JICA Design Team JICA – Japan International Cooperation Agency LGU – Local Government Unit LIAC – Local Inter-Agency Committee LRT – Light Rail Transit LRTA – Light Rail Transit Authority MCLUPZO – Manila City Comprehensive Land Use Plan and Zoning Ordinance MCRP – Malolos Clark Railway Project MCRRS – Manila-Clark Rapid Railways System MENRO – Municipal Environment and Natural Resources Office MGB – Mines and Geosciences Bureau MMDA – Metro Manila Development Authority MMSP – Metro Manila Subway Project MMT – Multipartite Monitoring Team MNTC – Manila North Tollways Corporation MOA – Memorandum of Agreement MPDO – Municipal Planning and Development Office MRT – Metro Rail Transit NAMRIA – National Mapping and Resource Information Authority NCCA – National Commission for Culture and the Arts NCR – National Capital Region NECP – Non-Environmentally Critical Project NGO – Non-Government Organization NHA – National Housing Authority NHCP – National Historical Commission of the Philippines NLEX – North Luzon Expressway NLRC – North Luzon Railways Corporation NM – National Museum NSCR – North South Commuter Railway Project NSCR EX – North South Commuter Railway Extension Project
NSRP – North South Railway Project NTP – Notice to Proceed ODA – Overseas Development Assistance OSH – Occupational Safety and Health PAF – Project Affected Families PAP – Project Affected Persons PD – Presidential Decree PEISS – Philippine Environmental Impact Statement System PEMAPS – Project Environmental Monitoring and Audit Prioritization Scheme PENRO – Provincial Environment and Natural Resources Office PEPRMP – Programmatic Environmental Performance Report and Management Plan PH – Public Hearing PMO – Project Management Office PNP – Philippine National Police PNR – Philippine National Railways PNSC – Philippine National Structural Code PO – People Organizations PPE – Personal Protective Equipment PRI – Philippine Railway Institute RA – Republic Act RAP – Resettlement Action Plan RHU – Rural Health Unit RIC – RAP Implementation Committee ROW – Right-of-Way SB – Sangguniang Bayan SCPW – Society for the Conservation of Philippine Wetlands Inc. SCTEX – Subic-Clark-Tarlac Expressway SDP – Social Development Plan SMR – Self-Monitoring Report SPS – Safeguard Policy Statement STPP – Sucat Thermal Power Plant SWMP – Solid Waste Management Plan TIA – Traffic Impact Assessment TMS – Train Management System TOR – Terms of Reference UNDP – United Nations Development Program UNESCO – United Nations Educational, Scientific and Cultural Organization
NOTE{S} (i) In this report, "$" refers to United States dollars
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
Waste Management Plan North-South Commuter Railway Clark Extension Project
APPENDICES
Page 1
Waste Management Plan North-South Commuter Railway Clark Extension Project
APPENDIX A. LIST OF ACCREDITED HAZARDOUS WASTE TRANSPORTERS IN METRO MANILA & REGION 3
Registration Date Expiry of LGU operating in / Name Contact Details Waste Streams Covered Number Checked License accepting from Lot 7 West Los Angeles Street, D407 D G703, G704 D H802 D I101-I103 D I104, J201 D I101 Eco Safe Hazmat California Village, San Bartolome, TR-NCR-74- From CAR, Region 1, 2,3 8/8/2019 D M506, M507 D A101, B201-B299, C301- C399, D401-D499, Treatment Inc Novaliches, Quezon City 00006 NCR, 4 and 5 F601, F699, M503. M501 632-4178888
Lot 9, Block 4, Joy Street, Pearl G703, G704, I101, I102, I103, I104. J201 E A101, B201, B202, Green Planet Island Industrial Compound, TR-NCR-75- 06/14/19 B203, B204, B205, B206, B207, B208, B299, C301, C302, From CAR, Region 1, 2,3 Management, C303, C304, C305, C399, D401, D402, D403, D404, D405, Punturin, Valenzuela City 00006 NCR and 4 Inc. D406, D407, D408, D499, F601, F602, F603, F604, F699, 632-9848647 K301, K302, K303, M503, M507
Victoria Wave Industrial Complex Petromine(M) TR-NCR-75- 06/14/19 B201, B202, B203, B204, B205, B206, B207, B208, B299, From CAR, Region 1, 2,3 SDN BHD Branch SEPZ Malaria Tala Caloocan City C301, C302, C303, C304, C305, C399, D401, D402, D403, 00096 NCR, 4 and 5 Office (02)9844882 D404, D405, D406, D407, D408, D499 397 M.H. DEL PILAR ST. BRGY. Clean Leaf TR-NCR-75- H802, M501-M507 B D407 D G03-G704 D I101-I104 D A101, From CAR, Region 1, 2,3 International MAYSILO, MALABON CITY 08/15/19 B201-B299, C301- C399, D401-D499, E501- E599, F601- 00161 NCR, 4 and 5 Corporation 632- 990-6607 F699, G703- G704, I101-I104, J201, L401, L402, M501-M507 168 Gen Luis St. Brgy. Kaybiga JM Ecotech TR-NCR-75- D407, F601-F699, G703- G704, I101 D B201-B299, C301- From CAR, Region 1, 2,3 Caloocan City 08/31/19 Solutions Co 00028 C399, D401-D499, F601-F699, I104, J201, K301-K303, M503 NCR, 4 and 5 632-936 4632 D407 D F601, F602, F603, F604, F699 D G703, G704 D H802 Trame Oil & L2 B2 Pearl Island Compound, TR-NCR-75- D I101, I102, I103 D M506 D ------B201, B202, B203, B204, From CAR, Region 1, 2,3 Environmental Punturin, Valenzuela 11/06/19 B205, B206, B207, B208, B299, C301, C302, C303, C304, 00007 NCR, 4 and 5 Specialist Inc 632- 959-8590 C305, C399 E I104, J201 E K301, K302, K303 E D401, D402, D403, D404, D405, D406, D408, D499, M503
Waste Management Plan North-South Commuter Railway Clark Extension Project
Registration Date Expiry of LGU operating in / Name Contact Details Waste Streams Covered Number Checked License accepting from Sitio Binasak, Brgy. Mabiga, ADL Enviro TR-R3-08- J201 E M506, M507, G703, G704, D407 D B201, B202, B203, From CAR, Region 1, 2,3 Hermosa, Bataan 02/28/2020 B204, B205, B206, B207, B208, B299, C301, C302, C303, Technology 00061 NCR, 4 and 5 6347- 250-0385 C304, C305, C399, H802, I101, I102, I103, I101, I102, I103 Brgy. Mambog, Hermosa, Bataan TR-NCR-76- M501 E L401, L402, K301, K302, K303 H802, I101, I102, Udenna 004 Sta. Maria Drive, Sta. Maria 00379 I103,I104, J201, H802, B201, B202, B203,B204,B205, B206, 12/06/19 B207, B208,B299, C301, C302, C303,C304, C305, C399, From CAR, Region 1, 2,3 Environmental Industrial Estate, Bagumbayan, TR-R3-08- D401,D402, D403, D404, D405,D406, D407, D408, NCR, 4 and 5 Services, Inc. 00081 Taguig D499,E501, E502, E503, E599,F601, F602, F603, F604,F699, 632 551-7235 G703, G704, M503, M504, M505, M506, M507 D401, D402, D403, D404, D405, D406, D407, D408, D499, Muralla Cmpd. Brgy. Iba, Asia United Oil TR-R3-08- M503 B F601, F602, F603, F604, F699, G703, G704, I101 D From CAR, Region 1, 2,3 Industry Meycauyan, Bulacan 12/19/19 H802, I102 D I104, J201 E D406, B201, B202, B203, B204, 00061 NCR, 4 and 5 Corporation 632-263-31-31 B205, B206, B207, B208, B299, C301, C302, C303, C304,C305, C399 M58 Cagayan Valley Road, Brgy San Roque San Rafael Bulacan Ecology TR-R3-14- J201 E D407, M507, I101, I102, I103, I104 632- 736918 02/28/2020 Regions: 3 NCR, 4 Specialist, Inc. 00092 632-9127242 G703, G704
888 Purok 5, Irabagon St., Brgy. B201, B202, B203, B204, B205, B206, B207, B208, B299, Far East Fuel 1/10/19 Anyatam, San Ildefonso TR-R3-14- C301, C302, C303, C304, C305, C399, D401, D402, D403, From CAR, Region 1, 2,3 Corporation Bulacan 00070 12/30/19 D404, D405, D406, D407, D408, D499, F601, F602, F603, NCR, 4 and 5 F604, F699, G703, G704, H802, I101, I102, I103, I104, J201, 632-366-9072 K301, K302, K303, M501, M506 425 Tubaw Street, Barangay C301, C302, C303, C304, C305, C399, F601, F602, F603, Genetron Sulucan, Angat, Bulacan TR-R3-14- F604, F699, G704, H802, I104, L402 G704 I101, I102, I103 D From CAR, Region 1, 2,3 International 11/19/19 Marketing 632- 372-3715; 00005 C301, C302, C303, C304, C305, C399, D499, F601, F602, NCR, 4 632-373-3970 F603, F604, F699, J201 Holcim Norzagaray, Bulacan TR-R3-14- D406, D499, F601, F602, F603, F604, F699, G704, H802, From CAR, Region 1, 2,3 06/18/19 Philippines, Inc. 632- 732 2230 00020 I101, I102, I103, I104, J201, K301, M503, M504, M505 NCR, 4 and 5
Waste Management Plan North-South Commuter Railway Clark Extension Project
Registration Date Expiry of LGU operating in / Name Contact Details Waste Streams Covered Number Checked License accepting from A101, B201, B202, B203, B204, B205, B206, B207, B208, 138 provincial road., brgy. 4/24/19 B299, C301, C302, C303, C304, C305, C399, D401, D402, Tambubong,Bocaue, Bulacan TR-R3-14- From CAR, Region 1, 2,3 Recytechphil, Inc. 00106 04/24/19 D403, D404, D405, D406, D407, D408, D499, E501, E502, NCR, 4 and 5 6344-893-6688 E503, E599, F601, F602, F603, F604, F699, G703, G704, J201, M503 Km 32 McArthur Highway, 8/15/19 All Waste Tuktukan, Guiguinto, Bulacan TR-R3-14- A101, B201-B299, C301- C399, D401-D499 E F601-F699, From CAR, Region 1, 2,3 08/15/19 H802, K301- K303, L402 E J201 E G703-G704 D H802, I101- Services, Inc. 632-794-2669; 00076 I104, I104 M504 M503 NCR, 4 and 5 63917- 9509278 Iglesia Ng Diyos Street, Barangay M506, I101, I102, A101 E B201, B202, B203, B204, B205, Green Theme Sta. Rosa Ii, Marilao, Bulacan TR-R3-14- B206, B207, B208, B299, C301, C302, C303, C304, C305, From CAR, Region 1, 2,3 Environment 09/19/19 C399, D401, D402, D403, D404, D405, D406, D407, D408, Experts, Inc 63-9258601065 00140 D499, F601, F602, F603, F604, F699, G703, G704, I104, NCR, 4 and 5 J201 E M503, M506 Brgy. Gutad, Floridablanca, D407 D M503, C301, C302, C303, C304, C305, C399, J201 VAG General TR-R3-54- From CAR, Region 1, 2,3 Pampanga 12/30/19 B201, B202, B203, B204, B205, B206, B207, B208, B299, Merchandise 00033 F601, F602, F603, F604, F605, G703, G704, I101, I102, I103, and NCR 63- 9178148846 I104, M503 D407, M507 D A101, B201, B202, B203, B204, B205, B206, Angeles Industrial Park, Inc., B207, B208, B299, C301, C302, C303, C304, C305, C399, Dolomatrix TR-R3-54- D401, D402, D403, D404, D405, D406, D408, D499, F601, From CAR, Region 1, 2,3 Calibutbut, Bacolor, Pampanga 10/08/19 Philippines, Inc. 00028 F602, F603, F604, F699, G703, G704, I104, J201, K301, NCR, 4 and 5 632-671-4060 K302, K303, L401, L402, L404, M502, M503, M504, M506, M507 E D406, G703, G704, I101, M507 9801 A-C Technology Resource SafeWaste Center, Paralayunan, Mabalacat TR-R3-54- From CAR, Region 1, 2,3 11/19/19 M501 Incorporated City, Pampanga 00032 and NCR 6345-4366008
Metro Clark CZF Sub-zone D, Sitio Kalangitan, TR-R3-69- D407 F D401, D402, D403, D404, D405, D406, D407, D408, From CAR, Region 1, 2,3 Waste Cutcut II, Capas, Tarlac 05/08/19 Management 00052 D499, K301, K302, K303, M501, M502, M503 NCR, 4 and 5 Corporation 6345-925 00 44
Waste Management Plan North-South Commuter Railway Clark Extension Project
APPENDIX B. RESIDUAL WASTE TRANSPORTERS AND SANITARY LANDFILLS IN REGION 3
Site / Capacity LGU Province Category Operational Tons per day Metro Clark Waste Capas Tarlac Cat 4 1000 Management Corporation Sulipan, Apalit Apalit Pampanga Cat 2 70 Land fill Wacuman, Norzagaray Bulacan Cat 4 2000 Incorporated
Module 4: RA 8749 (Air Pollution)
page ____ of ___
Waste Management Plan North-South Commuter Railway Clark Extension Project
APPENDIX C. EXAMPLE SELF-MONITORING FORMS
Department of Environment and Natural Resources Environmental Management Bureau
GENERAL INFORMATION SHEET
Name of the Establishment/Facilit y
Establishment/Facilit Street # & Street Name: ___ y Address Barangay: City/Municipality: ___ (NOT the company of head office) Province: Name of
Owner/Company Street # & Street Name: ___ Address (if address is not the same as Barangay: City/Municipality: ___ previous address) Province:
Phone Number Fax Number e-mail address
Philippine Standard Industry Classification Code No. ___ Type of Business/ Industry Philippine Standard Industry Descriptor: ___ Classification ___
CEO/President. ___ Tel #: Fax #: ___ Responsible e-mail address: ___ Officer/s: Plant Manager: ___ Tel #: Fax #: ___ e-mail address: ___
Name. ___ Pollution Control Tel #: Fax #: ___ Officer e-mail address: ___
single proprietorship partnership Legal Classification private domestic corporation government corporation Multi-national ___
Module 4: RA 8749 (Air Pollution)
page ____ of ___
Waste Management Plan North-South Commuter Railway Clark Extension Project
We hereby certify that the above information are true and correct.
Name/Signature of CEO/President Name/Signature of PCO Department of Environment and Natural Resources Environmental Management Bureau
QUARTERLY SELF-MONITORING REPORT
MODULE 1: GENERAL INFORMATION Name of the Plant Please provide the necessary revised, corrected or updated information not contained in your General Information Sheet
(use additional sheet/s if necessary)
DENR Permits/Licenses/Clearances Environmental Permits Date of Issue Expiry Date Laws A/C No. P.D. 984 PO No. ECC 1 PD 1586 ECC 2 ECC 3
Module 4: RA 8749 (Air Pollution)
page ____ of ___
DENR Registry ID CCO Registry RA 6969 Importer Clearance No Permit to Transport A/C No. RA 8749 PO No.
Operation Operating hours/day Operating days/week # of shift/day Average Maximum
Operation/Production/Capacity: Average Daily Total Output this
Production Output Quarter Total Water Total Electric Consumption this Consumption this Quarter (cubic meters) Quarter (KwH) Please use additional sheet/s if necessary
MODULE 2: RA 6969
A. CCO Report (please accomplish this section for each chemical/substance)
Common Name/IUPAC/CAS Index Name. ___ CAS No.: ___ Trade Name: ___
For importers only: Import Quantity Date of Quantity Port of Country of Country of Clearance Requested Arrival Received* Entry Origin Manufacture No.
Total Quantity Total Quantity
Requested (annual) Received (annual) * attach copy/ies of Bill of Lading
Module 1: General Information page ____ of ____
For distributors (importers/non-importers) Name of Client License No. Quantity Date of Distribution
Total Quantity Distributed
For non-importer users: Name of Distributor Quantity Date of Purchase
Total Quantity Purchased from Distributor
For producers Average Daily Total Output this
Production Output Quarter Quantity of Stock Quantity of Stock Inventory (Start of Inventory (End of Quarter) Quarter) Name of Buyer Quantity Date of Purchase
Total Quantity Sold
Used in Production (please fill up only if chemical/substance is not main product) Average Daily Total Output this
Production Output Quarter Average Quantity Total Quantity Used Used per month this Quarter
Module 2B: RA 6969 (Hazardous Wastes Generator) page ____ of ____
Describe any changes in Production/Process/Operations:
Stock Inventory/Waste Chemical Generated: Average Quantity of Total Quantity of Waste Chemical Waste Chemical Generated per month Generated this Quarter Quantity of Stock Quantity of Stock Inventory (Start of Inventory (End of Quarter) Quarter) Other Information:
Manner of handling storage on-site Treatment on-site hazardous wastes storage off-site Treatment off-site
Changes in Safety Yes (please attach copy of revised plan) Management System No
Chemical Substitute Yes (please attach copy if not submitted/included in previous report/s or had been revised) Plan No
B. Hazardous Wastes Generator
HW Generation: Remaining HW from HW HW Generated HW No. HW Class HW Nature Previous Report Cataloguing Quantity Unit Quantity Unit
Waste Storage, Treatment and Disposal:(Please fill-up one table per HW) HW No,: ___ HW Details Qty of HW Treated: Unit: ___ TSD Location: ___
Storage Name: ___
Module 2B: RA 6969 (Hazardous Wastes Generator) page ____ of ____
Method: ___
ID: Name: ___ Transporter Date: ___
ID: Name: ___ Treater Method: Date: ___
ID: Name: ___ Disposal Date: Date: ___
HW No,: ___ HW Details Qty of HW Treated: Unit: ___ TSD Location: ___
Name: ___ Storage Method: ___
ID: Name: ___ Transporter Date: ___
ID: Name: ___ Treater Method: Date: ___
ID: Name: ___ Disposal Date: Date: ___
On-Site Self Inspection of Storage Area: Premises/Area Findings & Corrective Action Date Conducted Inspected Observations Taken (if any)
C. Hazardous Wastes Treater/Recycler
HW Stored and/or Untreated as of End of Quarter: Type of Transport Storage Time Table HW Wastes Date of Permit/Date Valid until Quantity Container/ for Number Generator Transport of Issue # of Treatment containers
Module 2B: RA 6969 (Hazardous Wastes Generator) page ____ of ____
HW Treated and/or Recycled as of End of Quarter: Type of Type & Transport Treatment Quantity of Type of HW Wastes Date of Permit/Date Quantity or Recycled or Wastes Number Generator Transport of Issue Recycling Treated Process Product
Residual Wastes Generated from the Treatment and/or Recycling Operation: Process by Type of Type of which the Storage Disposal Time Table HW Number Quantity Wastes Wastes is Container/ Option for Disposal Generated # of containers
MODULE 3: P.D. 984 (Water Pollution)
Water Pollution Data Domestic wastewater Process wastewater
(cubic meters/day) (cubic meters/day) Cooling water Others: ______
(cubic meters/day) (cubic meters/day) Wash water, Wash water, floor equipment (m3/day) (cubic meters/day)
Record of Cost of Treatment (Separate entries for separate facilities) Month 1 Month 2 Month 3 Person employed, (# of employees) Person employed,
(cost) Cost of Chemicals used by WTP Utility Costs of WTP
(electricity & water)
Module 2B: RA 6969 (Hazardous Wastes Generator) page ____ of ____
Administrative and
Overhead Costs Cost of operating in- house laboratory
New/Additional
Investments in WTP
(Description)
Cost of New/Add Investments
WTP Discharge Location Outlet Location of the Outlet Name of Receiving Water Body Number 1 2 3 4 5 Detailed Report of Wastewater Characteristics for Conventional Pollutants Outlet No.
Effluent Oil & ______BOD TSS Temp rise (name) DATE Flow Rate Color pH Grease (mg/L) (mg/L) (ºC) (m3/day) (mg/L) (unit)
Module 3: P.D. 984 (Water Pollution) page ____ of ____
Please fill-up/accomplish separate form/s for other outlet/s.
Detailed Report of Wastewater Characteristics for Other Pollutants Outlet No.
Effluent ______(name) (name) (name) (name) (name) (name) (name) DATE Flow Rate (m3/day) (unit) (unit) (unit) (unit) (unit) (unit) (unit)
Module 3: P.D. 984 (Water Pollution) page ____ of ____
Please fill-up/accomplish separate form/s for other outlet/s. Please use additional sheet/s if necessary.
MODULE 4: R.A. 8749 (Air Pollution)
Summary of APSE/APCF # of hrs of Process Equipment Location operations 1. 2. 3. 4. Fuel Burning Quantity # of hrs of Location Fuel Used Equipment Consumed operations 1. 2. 3. 4. 5. 6.
Module 3: P.D. 984 (Water Pollution) page ____ of ____
# of hrs of Pollution Control Facility Location operations 1. 2. 3. 4.
Cost of Treatment Month 1 Month 2 Month 3 Cost of Person employed, (salary) Total Consumption of
Water (cubic meters) Total Cost of chemicals used (e.g., activated carbon, KMnO4) Total Consumption of
Electricity (KwH) Administrative and
Overhead Costs Cost of operating in- house laboratory, if any
Improvement or modification, if any.
(Description)
Cost of improvement of modification
Module 4: RA 8749 (Air Pollution) page ____ of ____
Detailed Report of Air Emission Characteristics Description/Location
of PCF ______Flow Rate CO NOx Particulates (name) (name) (name) (name) DATE (Ncm/day) (mg/Ncm) (mg/Ncm) (mg/Ncm) (mg/Ncm) (mg/Ncm) (mg/Ncm) (mg/Ncm)
Please fill-up/accomplish separate form/s for other PCF/s. Please use additional sheet/s if necessary.
Module 4: RA 8749 (Air Pollution) page ____ of ____
MODULE 5: P.D. 1586 Ambient Air Quality Monitoring (if required as part of ECC conditions) Description/Location
of Monitoring Station Noise ______CO NOx Particulates (name) (name) (name) (name) DATE Level (mg/Ncm) (mg/Ncm) (mg/Ncm) (dB) (mg/Ncm) (mg/Ncm) (mg/Ncm) (mg/Ncm)
(Please accomplish one table per monitoring station.)
Ambient Water Quality Monitoring (if required as part of ECC conditions) Description/Location
of Sampling Station ______(name) (name) (name) (name) (name) (name) (name) (name) DATE (unit) (unit) (unit) (unit) (unit) (unit) (unit) (unit)
(Please accomplish one table per sampling station.)
Other ECC Conditions Status of Compliance ECC Condition/s Actions Taken Yes No 1. 2. 3. 4. 5. 6. Please use additional sheet/s if necessary.
Environmental Management Plan/Program Status of Enhancement/Mitigation Measures Implementation Actions Taken Yes No 1. 2. 3. 4. 5. 6. Please use additional sheet/s if necessary.
Solid Waste Characterization/Information: Average Quantity of Total Quantity of Solid Wastes Solid Wastes Generated per month Generated this Quarter Average Quantity of Total Quantity of Solid Wastes Solid Wastes Collected per month Collected this Quarter Entity in charge of collecting solid Disposal Facility/SLF wastes
Brief Description of Solid Waste Management Plan
(e.g., waste reduction, segregation, recycling)
MODULE 6: OTHERS
Accidents & Emergency Records Findings and Date Area/Location Actions Taken Remarks Observation
Personnel/Staff Training # of Personnel Date Conducted Course/Training Description Trained
I hereby certify that the above information are true and correct.
Done this ______, in ______.
Name/Signature of PCO
Name/Signature of CEO
SUBSCRIBED AND SWORN before me, a Notary Public, this ______day of ______, affiants exhibiting to me their Community Tax Receipts:
Name CTR No. Issued at Issued on ______
Environmental Monitoring Report
Semi-annual Environmental Monitoring Report No. 1 March 2020
Appendix H: Certificates of No Objection
PHI: Malolos-Clark Railway Project – Tranche 1
Prepared by the Project Management Office (PMO) of the Department of Transportation (DOTr) for the Government of the Republic of the Philippines and the Asian Development Bank.
Environmental Monitoring Report
Semi-annual Environmental Monitoring Report No. 1 March 2020
Appendix I: Traffic Impact Assessment (N2)
PHI: Malolos-Clark Railway Project – Tranche 1
Prepared by the Project Management Office (PMO) of the Department of Transportation (DOTr) for the Government of the Republic of the Philippines and the Asian Development Bank. +
on behalf of
Japan International Cooperation Agency
FEBRUARY 2019
Submitted by: SMDI Consultants, Inc. Room 302 Platinum 2000 #7 Annapolis St. Greenhills, 1502 San Juan, Metro Manila
Unit 302 Platinum 2000 SMDI Consultants, Inc. 7 Annapolis Street San Juan, Metro Manila transport/traffic technology partner @34 Telefax: 753-8741 www.smdiconsultants.com
1 February 2019
ORIENTAL CONSULTANTS GLOBAL CO., LTD 8th Floor, Tower 3, Rockwell Business Center Ortigas Avenue, Ugong Pasig City, Philippines
Attention: MR. SATORU SAITOH
Subject: THE DETAILED DESIGN STUDY (INCLUDING SUPPLEMENTARY FEASIBILITY STUDY) OF THE MALOLOS – CLARK RAILWAY PROJECT AND THE NORTH SOUTH RAILWAY PROJECT – SOUTH LINE (COMMUTER) (Malolos - Clark Green City (CGC))
Dear Mr. Saitoh:
We are pleased to submit one hard copy of the Draft Traffic Impact Assessment Report on the above project, for your review and comments.
We shall be glad to discuss the contents of the report at your convenient time.
Very truly yours, SMDI Consultants, Inc. by:
MERCEDITAS V. TUAZON President
SMDI Consultants, Inc. i THE DETAILED DESIGN STUDY (INCLUDING SUPPLEMENTARY FEASIBILITY STUDY) OF THE MALOLOS – CLARK RAILWAY PROJECT AND THE NORTH SOUTH RAILWAY PROJECT – SOUTH LINE (COMMUTER) (Malolos - Clark Green City (CGC)) Draft Traffic Impact Assessment Report TABLE OF CONTENTS
1 INTRODUCTION ...... 1-1 1.1 Project Background ...... 1-1 1.2 Study Objectives ...... 1-1 1.3 Scope of Work ...... 1-1 2 DESCRIPTION OF THE STUDY AREA ...... 2-1 2.1 Location of Study Area ...... 2-2 2.2 Road Inventory ...... 2-10 2.3 Traffic Volumes ...... 2-17 2.3.1 Vehicular Traffic ...... 2-17 2.3.2 Pedestrian Volume ...... 2-29 2.4 Signal Indication Survey (SIS) ...... 2-31 2.5 Travel Time and Delay Survey (TTDS) ...... 2-39 2.6 Roadside Friction ...... 2-45 2.6.1 Jeepney Loading and Unloading ...... 2-45 2.6.2 Traffic Signal/Enforcer ...... 2-45 2.6.3 Uncontrolled Intersection ...... 2-46 2.6.4 Parked Vehicle...... 2-46 2.6.5 Slow Moving Vehicles ...... 2-47 2.6.6 Pedestrians ...... 2-48 2.6.7 Construction/ Maintenance Work ...... 2-48 3 TRAFFIC ANALYSIS METHODOLOGY ...... 3-1 3.1 Study Periods ...... 3-1 3.2 Methodology ...... 3-1 4 CURRENT CAPACITY ANALYSIS SUMMARY ...... 4-1 4.1 Unoptimized Conditions ...... 4-1 4.2 Optimized Conditions...... 4-9 5 CONSTRUCTION PERIOD SUMMARY ...... 5-1 5.1 Level Of Service Analyses ...... 5-1 5.2 Access to Casting Yards ...... 5-9 5.3 Depot Connection ...... 5-15 5.4 Pier at SCTEX During Construction ...... 5-18 5.5 Construction at Clark East Perimeter Road (N29A) ...... 5-21 5.6 Other Considerations During Construction Period ...... 5-22 6 OPERATION PERIOD SUMMARY ...... 6-1 6.1 LOS Analysis Results ...... 6-1 6.2 Vehicle Margin Estimation ...... 6-9 7 SUMMARY AND RECOMMENDATIONS ...... 7-1 7.1 Province of Bulacan ...... 7-2 7.1.1 Capacity Analysis ...... 7-2 7.1.2 Issues for Traffic Management ...... 7-3 7.2 Province of Pampanga ...... 7-6 7.2.1 Capacity Analysis ...... 7-7 7.2.2 Issues for Traffic Management ...... 7-8 7.3 Bamban, Tarlac ...... 7-14 7.4 Subic Bay Freeport Zone ...... 7-14
SMDI Consultants, Inc. ii THE DETAILED DESIGN STUDY (INCLUDING SUPPLEMENTARY FEASIBILITY STUDY) OF THE MALOLOS – CLARK RAILWAY PROJECT AND THE NORTH SOUTH RAILWAY PROJECT – SOUTH LINE (COMMUTER) (Malolos - Clark Green City (CGC)) Draft Traffic Impact Assessment Report LIST OF FIGURES
Figure 2.1. Study Area ...... 2-1 Figure 2.2. Area 1 Survey Locations ...... 2-4 Figure 2.3. Area 2 Survey Locations ...... 2-5 Figure 2.4. Area 3 Survey Locations ...... 2-6 Figure 2.5. Area 4 Survey Locations ...... 2-7 Figure 2.6. Area 5 Survey Locations ...... 2-8 Figure 2.7. Area 6 Survey Locations ...... 2-9 Figure 2.8. LCIS Results – Number of Lanes (Area 1) ...... 2-11 Figure 2.9. LCIS Results – Number of Lanes (Area 2) ...... 2-12 Figure 2.10. LCIS Results – Number of Lanes (Area 3) ...... 2-13 Figure 2.11. LCIS Results – Number of Lanes (Area 4) ...... 2-14 Figure 2.12. LCIS Results – Number of Lanes (Area 5) ...... 2-15 Figure 2.13. LCIS Results – Number of Lanes (Area 6) ...... 2-16 Figure 2.14. Weekday vs Weekend Hourly Volume Distribution in PCU (6:00 AM to 10:00 PM) ..... 2-20 Figure 2.15. Weekday vs Weekend Hourly Volume Distribution in PCU (10:00 PM to 6:00 AM) ..... 2-21 Figure 2.16. Weekday Hourly Traffic Distribution in Vehicles ...... 2-21 Figure 2.17. Weekday Vehicle Composition ...... 2-22 Figure 2.18. CDVVC Weekday Areal Distribution of 16 Hour Traffic Volumes (Area 1) ...... 2-23 Figure 2.19. CDVVC Weekday Areal Distribution of 16 Hour Traffic Volumes (Area 2) ...... 2-24 Figure 2.20. CDVVC Weekday Areal Distribution of 16 Hour Traffic Volumes (Area 3) ...... 2-25 Figure 2.21. CDVVC Weekday Areal Distribution of 16 Hour Traffic Volumes (Area 4) ...... 2-26 Figure 2.22. CDVVC Weekday Areal Distribution of 16 Hour Traffic Volumes (Area 5) ...... 2-27 Figure 2.23. CDVVC Weekday Areal Distribution of 16 Hour Traffic Volumes (Area 6) ...... 2-28 Figure 2.24. Truck Traffic at the 24-Hour Volume Count Survey Locations ...... 2-29 Figure 2.26. Weekend Total Pedestrian Traffic ...... 2-30 Figure 2.27. Weekday vs Weekend Total Pedestrian Traffic ...... 2-31 Figure 2.28. Survey Location N02 Phasing Diagram ...... 2-32 Figure 2.29. Survey Location N06 Phasing Diagram ...... 2-32 Figure 2.30. Survey Location N10 Phasing Diagram ...... 2-33 Figure 2.31. Survey Location N12 Phasing Diagram ...... 2-33 Figure 2.32. Survey Location N13 Phasing Diagram ...... 2-34 Figure 2.33. Survey Location N18 Phasing Diagram ...... 2-34 Figure 2.34. Survey Location N27 Phasing Diagram ...... 2-35 Figure 2.35. Survey Location N29A Phasing Diagram ...... 2-35 Figure 2.36. Survey Location N29B Phasing Diagram ...... 2-35 Figure 2.37. Survey Location N30 Phasing Diagram ...... 2-36 Figure 2.38. Survey Location N23 Phasing Diagram ...... 2-36 Figure 2.39. Survey Location SU1 Phasing Diagram...... 2-36 Figure 2.40. Survey Location SU2 Phasing Diagram...... 2-37 Figure 2.41. Survey Location SU3 Phasing Diagram...... 2-37 Figure 2.42. SIS Cycle Lengths ...... 2-38 Figure 2.43. Conflicting Movements in a Signal Phase ...... 2-39 Figure 2.44. Travel Time Checkpoints and Route ...... 2-40 Figure 2.45. AM Average Travel Speeds ...... 2-42 Figure 2.46. PM Average Travel Speeds ...... 2-43
SMDI Consultants, Inc. iii THE DETAILED DESIGN STUDY (INCLUDING SUPPLEMENTARY FEASIBILITY STUDY) OF THE MALOLOS – CLARK RAILWAY PROJECT AND THE NORTH SOUTH RAILWAY PROJECT – SOUTH LINE (COMMUTER) (Malolos - Clark Green City (CGC)) Draft Traffic Impact Assessment Report Figure 2.47. Night Average Travel Speeds ...... 2-44 Figure 2.48. Loading and Unloading at N15: MacArthur Hwy/ Santo Entiero St...... 2-45 Figure 2.49. Enforcer Managing the Traffic at N20: MacArthur Hwy/ Sta Ines Access Road ...... 2-46 Figure 2.50. Unsignalized Intersection between N11 ...... 2-46 Figure 2.51. Parked Vehicles at N11: MacArthur Hwy/ San Isidro-Alasas Road ...... 2-47 Figure 2.52. Tricycles at N03: MacArthur Hwy/ Provincial Road ...... 2-47 Figure 2.53. Pedestrians along N16: MacArthur Hwy/ Jake Gonzales Blvd ...... 2-48 Figure 2.54. Road Construction between N03: MacArthur Hwy/ Provincial Road and N04: MacArthur Hwy/ Apalit-Macabebe-Masantol Road ...... 2-48 Figure 3.3. Intersections affected to CY1 ...... 3-5 Figure 3.4. Intersections affected near CY2 ...... 3-6 Figure 3.5. Intersections affected near CY3 ...... 3-6 Figure 3.6. Intersections affected near CY4 ...... 3-7 Figure 3.7. Intersections affected near CY5 and Depot ...... 3-7 Figure 3.8. Projected Turning Volumes for N05 (MacArthur Hwy/ Apalit–Macabebe–Masantol Rd) 3-8 during Construction Period (Year 2020) ...... 3-8 Figure 3.9. Intersections affected during Operation Period (Area 1) ...... 3-10 Figure 3.10. Intersections affected during Operation Period (Area 2) ...... 3-11 Figure 3.11. Intersections affected during Operation Period (Area 4) ...... 3-11 Figure 3.12. Projected Turning Volumes for N02 (MacArthur Hwy/ Pulilan Regional Road) ...... 3-12 during Operation Period (Year 2025) ...... 3-12 Figure 4.1. Area 1 Current Intersection Delays and LOS ...... 4-3 Figure 4.2. Area 2 Current Intersection Delays and LOS ...... 4-4 Figure 4.3. Area 3 Current Intersection Delays and LOS ...... 4-5 Figure 4.4. Area 4 Current Intersection Delays and LOS ...... 4-6 Figure 4.5. Area 5 Current Intersection Delays and LOS ...... 4-7 Figure 4.6. Area 6 Current Intersection Delays and LOS ...... 4-8 Figure 5.1. 2020 Area 1 Unoptimized and Optimized LOS ...... 5-3 Figure 5.2. 2020 Area 2 Unoptimized and Optimized LOS ...... 5-4 Figure 5.3. 2020 Area 3 LOS ...... 5-5 Figure 5.4. 2020 Area 4 Unoptimized and Optimized LOS ...... 5-6 Figure 5.5. 2020 Area 5 Unoptimized and Optimized LOS ...... 5-7 Figure 5.6. 2020 Area 6 Unoptimized and Optimized LOS ...... 5-8 Figure 5.7. Area 1 Large Truck Margin during 10:00PM to 6:00AM ...... 5-11 Figure 5.8. Area 2 Large Truck Margin during 10:00PM to 6:00AM ...... 5-12 Figure 5.9. Area 3 Large Truck Margin during 10:00PM to 6:00AM ...... 5-13 Figure 5.10. Area 4 Large Truck Margin during 10:00PM to 6:00AM ...... 5-14 Figure 5.11. Area 5 Large Truck Margin during 10:00PM to 6:00AM ...... 5-15 Figure 5.12. Critical Areas for Turning ...... 5-16 Figure 5.13. AutoTurn Simulation at Smart Connect ...... 5-17 Figure 5.14. Alignment crossing at SCTEX ...... 5-18 Figure 5.15. Structure detail of alignment crossing at SCTEX ...... 5-18 Figure 5.16. Scenarios for SCTEX Mainline ...... 5-19 Figure 5.17. Clark East Perimeter Road during Construction ...... 5-21 Figure 5.18. Planned Infrastructure in Pampanga ...... 5-22 Figure 6.1. 2025 Area 1 Unoptimized and Optimized LOS ...... 6-3 Figure 6.2. 2025 Area 2 Unoptimized and Optimized LOS ...... 6-4 Figure 6.3. 2025 Area 3 LOS ...... 6-5
SMDI Consultants, Inc. iv THE DETAILED DESIGN STUDY (INCLUDING SUPPLEMENTARY FEASIBILITY STUDY) OF THE MALOLOS – CLARK RAILWAY PROJECT AND THE NORTH SOUTH RAILWAY PROJECT – SOUTH LINE (COMMUTER) (Malolos - Clark Green City (CGC)) Draft Traffic Impact Assessment Report Figure 6.4. 2025 Area 4 Unoptimized and Optimized LOS ...... 6-6 Figure 6.5. 2025 Area 5 Unoptimized and Optimized LOS ...... 6-7 Figure 6.6. 2025 Area 6 Unoptimized and Optimized LOS ...... 6-8 Figure 6.7. Vehicle Margins – Operation Period ...... 6-10 Figure 7.1. Province of Bulacan ...... 7-2 Figure 7.2. Issues for Traffic Management in Malolos, Bulacan ...... 7-4 Figure 7.3. Issues for Traffic Management in Calumpit, Bulacan ...... 7-5 Figure 7.4. Province of Pampanga ...... 7-6 Figure 7.5. Issues for Traffic Management in Apalit, Pampanga ...... 7-9 Figure 7.6. Issues for Traffic Management in the Towns of Minalin, Santo Tomas and San Simon .. 7-10 Figure 7.7. Issues for Traffic Management in the City of San Fernando...... 7-11 Figure 7.8. Issues for Traffic Management in Angeles City ...... 7-12 Figure 7.9. Issues for Traffic Management in Mabalacat City ...... 7-13
LIST OF TABLES Table 2.1. List of Survey Intersections ...... 2-2 Table 2.2. List of CDVVC Intersections ...... 2-17 Table 2.3. Weekday vs Weekend 16 Hour Traffic (CDVVC) ...... 2-19 Table 2.4. Weekday vs Weekend Pedestrian Traffic per Location ...... 2-29 Table 2.5. Average Travel Time along MacArthur Highway...... 2-41 Table 3.1. LOS Criteria (HCM) ...... 3-3 Table 3.2. Intersections affected during Operation Period ...... 3-9 Table 4.1. Current Capacity Analysis - Unoptimized ...... 4-1 Table 4.2. Current Capacity Analysis - Optimized ...... 4-9 Table 5.1. Growth Rates (Construction Period) ...... 5-1 Table 5.3. Casting Yards and Access Intersection ...... 5-9 Table 5.4. Construction Vehicle Margins ...... 5-10 Table 5.5. Results of the Swept Path Analysis ...... 5-17 Table 5.6. Vertical Clearance Analysis ...... 5-17 Table 5.7. Level of Service for Road Sections ...... 5-19 Table 5.8. LOS Analysis Results (SCTEX Mainline) ...... 5-20 Table 5.9. LOS Analysis Results (Clark East Perimeter Road) ...... 5-21 Table 6.1. Growth Rates (Operation Period) ...... 6-1 Table 6.2. Summary of LOS Analysis for Operation Period (2025) ...... 6-1 Table 6.3. Intersections affected during Operation Period ...... 6-9 Table 6.4. Summary of Vehicle Margins - Operation Period ...... 6-9 Table 7.1. Study Intersections in the Province of Bulacan...... 7-3 Table 7.2. Traffic Management Matrix - Bulacan ...... 7-3 Table 7.3. Study Intersections in Pampanga ...... 7-7 Table 7.4. Traffic Management Matrix - Pampanga ...... 7-8 Table 7.5. Study Intersection in Bamban ...... 7-14 Table 7.6. Study Intersections in Subic Freeport Zone ...... 7-14
SMDI Consultants, Inc. v THE DETAILED DESIGN STUDY (INCLUDING SUPPLEMENTARY FEASIBILITY STUDY) OF THE MALOLOS – CLARK RAILWAY PROJECT AND THE NORTH SOUTH RAILWAY PROJECT – SOUTH LINE (COMMUTER) (Malolos - Clark Green City (CGC)) Draft Traffic Impact Assessment Report CHAPTER 1 1 INTRODUCTION
1.1 PROJECT BACKGROUND
SMDI Consultants, Inc. was engaged by Oriental Consultants on behalf of Japan International Cooperation Agency (JICA) to undertake traffic surveys for the “Traffic Management Plan (TMP) for the Detailed Design Study for the Malolos – Clark Railway Project”. The said project is a planned urban railway project that will utilized the existing PNR’s right of way which is adjacent to MacArthur Highway. It is a 68.7-kilometer alignment that connects the NSCR line from Malolos, Bulacan to New Clark City in Mabalacat, Pampanga. The alignment will pass through different towns of Bulacan (Calumpit, Malolos) and Pampanga (Apalit, San Fernando, Angeles, Mabalacat).
The output of this study is a draft Traffic Impact Assessment Report which will be serve as a guide for the final Traffic Impact Assessment Report to be completed by the contractor of the project.
1.2 STUDY OBJECTIVES
The objectives of the study are the following: • To assess the existing traffic characteristics at the study area. • To determine the impact of the forecasted traffic on the capacity of the road network. • To recommend appropriate traffic management and improvement measures during the construction and operation period of the project. • To prepare a Traffic Impact Assessment report for the construction and operations of the Malolos – Clark Railway Project
1.3 SCOPE OF WORK
The final output of the study is the formulation of the draft Traffic Impact Assessment report that covers two future periods, namely, construction and operation periods. A separate team is handling the planning of Transit – Oriented Developments (TOD) around the railway stations of the NSCR line and this will not be covered in this report.
The report examines the impact of the railway project to adjacent roads through the analyses of 37 intersections, mid-blocks and roundabouts in the project’s vicinity.
a) Data gathering – site reconnaissance and traffic surveys were conducted. Five types of traffic surveys were conducted, two of which were done for two days, on a weekday and on a week- end as listed:
SMDI CONSULTANTS, INC. | INTRODUCTION 1-1
THE DETAILED DESIGN STUDY (INCLUDING SUPPLEMENTARY FEASIBILITY STUDY) OF THE MALOLOS – CLARK RAILWAY PROJECT AND THE NORTH SOUTH RAILWAY PROJECT – SOUTH LINE (COMMUTER) (Malolos - Clark Green City (CGC)) Draft Traffic Impact Assessment Report • Lane Configuration in Intersection Surveys (LCIS) - prior to survey day • Classified Directional Vehicle Volume Counts (CDVVC) -21-Jun(Thurs) & 23-Jun(Sat), 2018 • Directional Pedestrian Counts (DPC) -21-Jun (Thurs) & 23-Jun (Sat), 2018 • Signal Indication Surveys (SIS) -21-Jun (Thurs), 2018 • Travel Time and Delay Survey (TTDS) -21-Jun (Thurs), 2018
b) Data Analysis – this encompasses three study periods as follows:
• Existing Traffic Conditions – traffic survey results were summarized to determine the peak hours to serve as the baseline data for analysis. The current capacity of the intersections and mid-blocks were then analyzed.
The survey locations were assessed based on their capacity to carry the future general traffic and the traffic volumes generated during the railway construction and operation. Future general traffic is expected to rise due to increase in population, increase in car ownership and development of new offices, commercial facilities and housing, among others. The two future periods are:
• Construction Period – The year of analysis for the construction period is set as 2020. Growth rate for each area were computed using the forecasted PCU provided by JICA Design Team. Each area is estimated to increase in general traffic of about 1.006% to 1.034%. The highest increase in growth rate can be seen in Area 3 and Area 5 where commercial establishments are common while Area 2 is seen at a low increase. Construction vehicles will also pass through the survey intersections towards casting yards and the depot. However, construction management will be handled by the contractor of the project.
• Operation Period – The year of analysis for the operation period is set as 2025. Growth rate for each area were computed using the forecasted PCU for 2025 by JICA Design Team. Each area is estimated to increase in general traffic by a factor of 1.047% to 2.945%. The highest increase in general traffic is observed at Area 6 in Zambales with 2.945% while Area 2 exhibits the lowest increase in general traffic at 1.047%. Traffic conditions during this period will also be affected by the generation of feeder transportation to/from the railway stations and the shift in mode usage from existing public and private modes to the rail mode.
c) Consultations with government bodies – consultation with Local Government Units (LGUs), and Department of Public Works and Highways (DPWH) Region III will be conducted to gather their comments and recommendations regarding the analyzed current and future traffic capacities with the project and possible traffic management measures.
SMDI CONSULTANTS, INC. | INTRODUCTION 1-2
THE DETAILED DESIGN STUDY (INCLUDING SUPPLEMENTARY FEASIBILITY STUDY) OF THE MALOLOS – CLARK RAILWAY PROJECT AND THE NORTH SOUTH RAILWAY PROJECT – SOUTH LINE (COMMUTER) (Malolos - Clark Green City (CGC)) Draft Traffic Impact Assessment Report d) Preparation of reports – the following reports were prepared and submitted at certain stages of the study:
• Preparation Document of Traffic Assessment Survey • Traffic Assessment Survey • Current Capacity Analysis • Future Capacity Analysis • Draft Traffic Impact Assessment Report
SMDI CONSULTANTS, INC. | INTRODUCTION 1-3