Malolos-Clark Railway Project – Tranche 1 Volume III

Total Page:16

File Type:pdf, Size:1020Kb

Malolos-Clark Railway Project – Tranche 1 Volume III Environmental Monitoring Report Semi-annual Environmental Monitoring Report No. 1 March 2020 PHI: Malolos-Clark Railway Project – Tranche 1 Volume III September 2019 – March 2020 Prepared by the Project Management Office (PMO) of the Department of Transportation (DOTr) for the Government of the Republic of the Philippines and the Asian Development Bank. CURRENCY EQUIVALENTS (as of 30 March 2020) Currency unit – Philippine Peso (PHP) PHP1.00 = $0.02 $1.00 = PHP50.96 ABBREVIATIONS ADB – Asian Development Bank BMB – Biodiversity Management Bureau Brgy – Barangay CCA – Climate Change Adaptation CCC – Climate Change Commission CDC – Clark Development Corporation CEMP – Contractor’s Environmental Management Plan CENRO – City/Community Environment and Natural Resources Office CIA – Clark International Airport CIAC – Clark International Airport Corporation CLLEx – Central Luzon Link Expressway CLUP – Comprehensive Land Use Plan CMR – Compliance Monitoring Report CMVR – Compliance Monitoring and Validation Report CNO – Certificate of No Objection CPDO – City Planning and Development Office DAO – DENR Administrative Order DD / DED – Detailed Design Stage / Detailed Engineering Design Stage DENR – Department of Environment and Natural Resources DepEd – Department of Education DIA – Direct Impact Area DILG – Department of Interior and Local Government DOH – Department of Health DOST – Department of Science and Technology DOTr – Department of Transportation DPWH – Department of Public Works and Highways DSWD – Department of Social Welfare and Development DTI – Department of Trade and Industry EA – Executing Agency ECA – Environmentally Critical Area ECC – Environmental Compliance Certificate ECP – Environmentally Critical Project EGF – Environmental Guarantee Fund EHS – Environmental Health and Safety EIA – Environmental Impact Assessment EIS – Environmental Impact Statement EISR – Environmental Impact Statement Report EMB – Environmental Management Bureau EMF – Environmental Monitoring Fund EMoP – Environmental Monitoring Plan EMP – Environmental Management Plan ENRO – Environment and Natural Resources Officer EQPL – Environmental Quality Performance Level ERA – Environmental Risk Assessment ERP – Emergency Response Plan ESRD – Environment, Social and ROW Division EU – Environmental Unit FAM – Facility Administration Manual FMB – Forest Management Bureau GAF – Grievance Action Form GCR – Greater Capital Region GPS – Global Positioning System GRM – Grievance Redress Mechanism IEC – Information Education and Communication IEE – Initial Environmental Examination IFC – International Finance Corporation IIA – Indirect Impact Area IRR – Implementing Rules and Regulations ISF – Informal Settler Families JDT – JICA Design Team JICA – Japan International Cooperation Agency LGU – Local Government Unit LIAC – Local Inter-Agency Committee LRT – Light Rail Transit LRTA – Light Rail Transit Authority MCLUPZO – Manila City Comprehensive Land Use Plan and Zoning Ordinance MCRP – Malolos Clark Railway Project MCRRS – Manila-Clark Rapid Railways System MENRO – Municipal Environment and Natural Resources Office MGB – Mines and Geosciences Bureau MMDA – Metro Manila Development Authority MMSP – Metro Manila Subway Project MMT – Multipartite Monitoring Team MNTC – Manila North Tollways Corporation MOA – Memorandum of Agreement MPDO – Municipal Planning and Development Office MRT – Metro Rail Transit NAMRIA – National Mapping and Resource Information Authority NCCA – National Commission for Culture and the Arts NCR – National Capital Region NECP – Non-Environmentally Critical Project NGO – Non-Government Organization NHA – National Housing Authority NHCP – National Historical Commission of the Philippines NLEX – North Luzon Expressway NLRC – North Luzon Railways Corporation NM – National Museum NSCR – North South Commuter Railway Project NSCR EX – North South Commuter Railway Extension Project NSRP – North South Railway Project NTP – Notice to Proceed ODA – Overseas Development Assistance OSH – Occupational Safety and Health PAF – Project Affected Families PAP – Project Affected Persons PD – Presidential Decree PEISS – Philippine Environmental Impact Statement System PEMAPS – Project Environmental Monitoring and Audit Prioritization Scheme PENRO – Provincial Environment and Natural Resources Office PEPRMP – Programmatic Environmental Performance Report and Management Plan PH – Public Hearing PMO – Project Management Office PNP – Philippine National Police PNR – Philippine National Railways PNSC – Philippine National Structural Code PO – People Organizations PPE – Personal Protective Equipment PRI – Philippine Railway Institute RA – Republic Act RAP – Resettlement Action Plan RHU – Rural Health Unit RIC – RAP Implementation Committee ROW – Right-of-Way SB – Sangguniang Bayan SCPW – Society for the Conservation of Philippine Wetlands Inc. SCTEX – Subic-Clark-Tarlac Expressway SDP – Social Development Plan SMR – Self-Monitoring Report SPS – Safeguard Policy Statement STPP – Sucat Thermal Power Plant SWMP – Solid Waste Management Plan TIA – Traffic Impact Assessment TMS – Train Management System TOR – Terms of Reference UNDP – United Nations Development Program UNESCO – United Nations Educational, Scientific and Cultural Organization NOTE{S} (i) In this report, "$" refers to United States dollars This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Waste Management Plan North-South Commuter Railway Clark Extension Project APPENDICES Page 1 Waste Management Plan North-South Commuter Railway Clark Extension Project APPENDIX A. LIST OF ACCREDITED HAZARDOUS WASTE TRANSPORTERS IN METRO MANILA & REGION 3 Registration Date Expiry of LGU operating in / Name Contact Details Waste Streams Covered Number Checked License accepting from Lot 7 West Los Angeles Street, D407 D G703, G704 D H802 D I101-I103 D I104, J201 D I101 Eco Safe Hazmat California Village, San Bartolome, TR-NCR-74- From CAR, Region 1, 2,3 8/8/2019 D M506, M507 D A101, B201-B299, C301- C399, D401-D499, Treatment Inc Novaliches, Quezon City 00006 NCR, 4 and 5 F601, F699, M503. M501 632-4178888 Lot 9, Block 4, Joy Street, Pearl G703, G704, I101, I102, I103, I104. J201 E A101, B201, B202, Green Planet Island Industrial Compound, TR-NCR-75- 06/14/19 B203, B204, B205, B206, B207, B208, B299, C301, C302, From CAR, Region 1, 2,3 Management, C303, C304, C305, C399, D401, D402, D403, D404, D405, Punturin, Valenzuela City 00006 NCR and 4 Inc. D406, D407, D408, D499, F601, F602, F603, F604, F699, 632-9848647 K301, K302, K303, M503, M507 Victoria Wave Industrial Complex Petromine(M) TR-NCR-75- 06/14/19 B201, B202, B203, B204, B205, B206, B207, B208, B299, From CAR, Region 1, 2,3 SDN BHD Branch SEPZ Malaria Tala Caloocan City C301, C302, C303, C304, C305, C399, D401, D402, D403, 00096 NCR, 4 and 5 Office (02)9844882 D404, D405, D406, D407, D408, D499 397 M.H. DEL PILAR ST. BRGY. Clean Leaf TR-NCR-75- H802, M501-M507 B D407 D G03-G704 D I101-I104 D A101, From CAR, Region 1, 2,3 International MAYSILO, MALABON CITY 08/15/19 B201-B299, C301- C399, D401-D499, E501- E599, F601- 00161 NCR, 4 and 5 Corporation 632- 990-6607 F699, G703- G704, I101-I104, J201, L401, L402, M501-M507 168 Gen Luis St. Brgy. Kaybiga JM Ecotech TR-NCR-75- D407, F601-F699, G703- G704, I101 D B201-B299, C301- From CAR, Region 1, 2,3 Caloocan City 08/31/19 Solutions Co 00028 C399, D401-D499, F601-F699, I104, J201, K301-K303, M503 NCR, 4 and 5 632-936 4632 D407 D F601, F602, F603, F604, F699 D G703, G704 D H802 Trame Oil & L2 B2 Pearl Island Compound, TR-NCR-75- D I101, I102, I103 D M506 D ---- ---- B201, B202, B203, B204, From CAR, Region 1, 2,3 Environmental Punturin, Valenzuela 11/06/19 B205, B206, B207, B208, B299, C301, C302, C303, C304, 00007 NCR, 4 and 5 Specialist Inc 632- 959-8590 C305, C399 E I104, J201 E K301, K302, K303 E D401, D402, D403, D404, D405, D406, D408, D499, M503 Waste Management Plan North-South Commuter Railway Clark Extension Project Registration Date Expiry of LGU operating in / Name Contact Details Waste Streams Covered Number Checked License accepting from Sitio Binasak, Brgy. Mabiga, ADL Enviro TR-R3-08- J201 E M506, M507, G703, G704, D407 D B201, B202, B203, From CAR, Region 1, 2,3 Hermosa, Bataan 02/28/2020 B204, B205, B206, B207, B208, B299, C301, C302, C303, Technology 00061 NCR, 4 and 5 6347- 250-0385 C304, C305, C399, H802, I101, I102, I103, I101, I102, I103 Brgy. Mambog, Hermosa, Bataan TR-NCR-76- M501 E L401, L402, K301, K302, K303 H802, I101, I102, Udenna 004 Sta. Maria Drive, Sta. Maria 00379 I103,I104, J201, H802, B201, B202, B203,B204,B205, B206, 12/06/19 B207, B208,B299, C301, C302, C303,C304, C305, C399, From CAR, Region 1, 2,3 Environmental Industrial Estate, Bagumbayan, TR-R3-08- D401,D402, D403, D404, D405,D406, D407, D408, NCR, 4 and 5 Services, Inc. 00081 Taguig D499,E501, E502, E503, E599,F601, F602, F603, F604,F699, 632 551-7235 G703, G704, M503, M504, M505, M506, M507 D401, D402, D403, D404, D405, D406, D407, D408, D499, Muralla Cmpd. Brgy. Iba, Asia United Oil TR-R3-08- M503 B F601, F602, F603, F604, F699, G703, G704, I101 D From CAR, Region
Recommended publications
  • Public Health Reprts
    PUBLIC HEALTH REPRTS VOL. 29. JANUARY 30, 1914. No. 5. PIORKOWSKI LABORATORIES NOT LICENSED. Information has recently becn received from various sources to the effect that, through agents and printed circulars, the statement is being circulated that the Bacteriol. physiolog. Institut (Piorkowski Laboratories), Berlin, Germany, has been licensed by the Treasury Department for the importation and sale in interstate traffic of "turtle tuberculin." These statements seem to emanate from so- called Piorkowski Laboratories, located, or represented as about to be located, in various cities in this country. This statement is contrary to fact. After an inspection of the establishment by a representative of the Treasury Department and an examination of samples of the products at the Hygienic Labora- tory of the Public I-lealth Service, the Bacteriol. physiolog. Institut (Piorkowski Laboratories), Berlin, Germany, was refused a license by the Treasury Department for the importation and sale of their products in interstate traffic. Under the act approved July 1, 1902, regulating the sale of viruses, serums, toxins, and analogous products in interstate traffic, such preparations applicable to the prevention an(d cure of diseases of man may be imported without license, provi(led they are not sold or intended for sale but for scientific experiments. The above-mentioned act requires that each package of virus, seruni, toxin, antitoxin, or analogous product must be plainly marked- with the proper name of the article contained therein, and the name, address, and license number of the manufacturer. Since this provision is strictly enforced, no difficulty should be experienced by anyone in determining whether a particular product has been propagated in a licensed establishment.
    [Show full text]
  • Province, City, Municipality Total and Barangay Population AURORA
    2010 Census of Population and Housing Aurora Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population AURORA 201,233 BALER (Capital) 36,010 Barangay I (Pob.) 717 Barangay II (Pob.) 374 Barangay III (Pob.) 434 Barangay IV (Pob.) 389 Barangay V (Pob.) 1,662 Buhangin 5,057 Calabuanan 3,221 Obligacion 1,135 Pingit 4,989 Reserva 4,064 Sabang 4,829 Suclayin 5,923 Zabali 3,216 CASIGURAN 23,865 Barangay 1 (Pob.) 799 Barangay 2 (Pob.) 665 Barangay 3 (Pob.) 257 Barangay 4 (Pob.) 302 Barangay 5 (Pob.) 432 Barangay 6 (Pob.) 310 Barangay 7 (Pob.) 278 Barangay 8 (Pob.) 601 Calabgan 496 Calangcuasan 1,099 Calantas 1,799 Culat 630 Dibet 971 Esperanza 458 Lual 1,482 Marikit 609 Tabas 1,007 Tinib 765 National Statistics Office 1 2010 Census of Population and Housing Aurora Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population Bianuan 3,440 Cozo 1,618 Dibacong 2,374 Ditinagyan 587 Esteves 1,786 San Ildefonso 1,100 DILASAG 15,683 Diagyan 2,537 Dicabasan 677 Dilaguidi 1,015 Dimaseset 1,408 Diniog 2,331 Lawang 379 Maligaya (Pob.) 1,801 Manggitahan 1,760 Masagana (Pob.) 1,822 Ura 712 Esperanza 1,241 DINALUNGAN 10,988 Abuleg 1,190 Zone I (Pob.) 1,866 Zone II (Pob.) 1,653 Nipoo (Bulo) 896 Dibaraybay 1,283 Ditawini 686 Mapalad 812 Paleg 971 Simbahan 1,631 DINGALAN 23,554 Aplaya 1,619 Butas Na Bato 813 Cabog (Matawe) 3,090 Caragsacan 2,729 National Statistics Office 2 2010 Census of Population and
    [Show full text]
  • Mbsdmp Process and Activities Report
    Republic of the Philippines National Economic and Development Authority Manila Bay Sustainable Development Master Plan FINAL MASTER PLAN, ACTION PLAN + INVESTMENT REPORT ANNEX 8 MBSDMP PROCESS AND ACTIVITIES REPORT December 2020 MBSDMP PROCESS AND ACTIVITIES Table of Contents Inception Stage ..................................................................................................................... 1 Situation Analysis Stage ....................................................................................................... 2 Results Discussion .............................................................................................................................. 2 Stakeholder Involvement Process “Listening”..................................................................................... 4 Situation Analysis Study ...................................................................................................................... 5 Develop Evaluation and Assessment Framework .............................................................................. 5 Agree with Stakeholders on Situation Analysis (Validation) ............................................................... 6 Inclusive Growth and Upgrading Informal Settlements Presentation .............................. 6 DRR and CCA, and Water Quality Improvement Presentation ....................................... 6 Ecosystem Protection Presentation................................................................................ 6 Presentation of 5 Focal Theme
    [Show full text]
  • 2012 Sustainability Report 1 MESSAGES | COMPANY PROFILE | SUSTAINABILITY FRAMEWORK | GRI INDEX COMMENTARIES
    CLARK WATER CORPORATION Depot 1901 Bicentennial Hill, Clark Freeport Zone Clarkfield, Pampanga 2023 Philippines www.clarkwater.com Table of Contents 1 About this Report 2 Message from the President 4 Message from the General Manager 6 Company Profile 12 Sustainability Framework 16 Driving Economic Growth 30 Empowering Employees 40 Preserving and Conserving Natural Resources 48 Mitigating Adverse Operational Impacts 56 Contributing to Social Development of Communities 63 Clark Water and the Future 64 GRI Index 68 Stakeholders’ Commentaries Clark Water 2012 Sustainability Report 1 MESSAGES | COMPANY PROFILE | SUSTAINABILITY FRAMEWORK | GRI INDEX COMMENTARIES FRAMEWORK | SUSTAINABILITY PROFILE | COMPANY MESSAGES About this Report Clark Water Corporation (CWC) presents to you with pride its 2012 Sustainability Report, the first-ever publication of its kind, demonstrating the company’s commitment to social responsibility, environmental sustainability, and economic growth and development. With the overall theme Driving Growth, this Considering the long-term reference of Report focuses on how Clark Water worked the central theme, which is Sustainable its way towards its vision of becoming Development, this report touches on the internationally recognized as a company overall performance of the company in relation providing excellent water and wastewater to meeting future goals, especially with the services, through effective partnerships with business and operational efficiency reinforced the government and businesses, aiming to by its Triple ISO Certifications (ISO 9001, strengthen the economic activity in Clark ISO 14001, & OHSAS 18001), representing for the past 12 years. It also highlights the compliance to internationally recognized Company’s sustainability framework which standards on quality, environmental, health covers other themes including: (1) Empowering and safety management systems.
    [Show full text]
  • Philippines Pampanga Delta Development Project, Flood Control Component (1) External Evaluator: Taro Tsubugo Field Survey: November 2004 1
    Philippines Pampanga Delta Development Project, Flood Control Component (1) External Evaluator: Taro Tsubugo Field Survey: November 2004 1. Project Profile and Japan’s ODA Loan Baguio Manila Project site Cebu City Philippines Davao Project site location map A newly-developed dike road 1.1 Background The Philippines experiences severe damages from flooding and landslides caused by tropical storms. Although the government attaches importance to flood control projects, constraint on the fiscal budget have hampered the implementation of these projects. The lower basin of the Pampanga River is one of the areas most frequently affected by flooding. In the Pampanga Delta, which is consisted of swampy lowland and the mouth areas of the Pampanga River, typhoons frequently resulted in flooding and caused considerable damage to the farming and fishing industry and to public and private property. With the delta being at 0-9m above sea level, the Pampanga River has limited flow capacity. Flood control projects undertaken on the Pampanga River can date back to 1939. As the development potential (such as aquaculture) of the lower basin areas drew attentions in more recent years, the necessity of flood controls at the west of Sulipan, in particular, had increased. 1.2 Objectives This project’s objective was to enhance flood controls on the lower basins of the Pampanga River in Central Luzon, an area prone to perennial flooding, by implementing river improvement works, thereby contributing to improvements in living standards and to regional economic growth. 1.3 Borrower/Executing Agency Government of the Philippine Republic/Department of Public Works and Highways (DPWH) 1 1.4 Outline of Loan Agreement Loan Amount/Disbursed Amount 8,634 million yen/7,537 million yen Exchange of Notes/Loan Agreement October 1989/February 1990 Terms and Conditions Interest Rate 2.7% Repayment Date (Grace Period) 30 years (10 years) Procurement General untied (Consultant component: partially untied) Final Disbursement Date December 2001 Contractors Kawasho Corporation, Hanil Development Co., Ltd.
    [Show full text]
  • Planning Workshop for Soc Development And
    INCEPTION WORKSHOP FOR SOC DEVELOPMENT AND IMPLEMENTATION IN PAMPANGA CAPAMPANGAN ISLAND RESTAURANT, SAN FERNANDO CITY, PAMPANGA 29 NOVEMBER 2012 WORKSHOP REPORT 1. The inception workshop for the development and implementation of the SOC reporting system in Pampanga was conducted on 29 November 2012 at Capampangan Island Restaurant in San Fernando City, Pampanga. The workshop specifically aimed to: 1) provide an overview of the ICM framework and process and update the members of the TWG on ICM on the progress made on the development of ICM program in Pampanga; 2) discuss the benefits of SOC in determining baseline conditions and priorities that can be addressed in the ICM program; 3) discuss the processes of establishing the reporting system and development of SOC baseline report; 4) clarify the roles and responsibilities of the SOC Task Team, and 4) show how the SOC reporting is linked to subsequent activities of the ICM program. 2. The workshop was attended by representatives from 7 municipal LGUs (San Luis, Porac, Sasmuan, Minalin, Apalit, Lubao and Florida Blanca), provincial (PHO, PEO and PG-ENRO) and national government agencies (DENR Region 3, PENRO, BFAR, DPWH and DILG). The list of participants is given in Annex 1. 3. The expected outputs from the workshop included: 1) preliminary assessment of data availability and data sources based on the requirements of the SOC, and 2) action plan for the development of SOC baseline report for Pampanga. The programme of activities, including details of the workshop is given in Annex 2. 4. The highlights of the workshop, including required actions are summarized below.
    [Show full text]
  • Xerox University Microfilms 300 North Zeeb Road Ann Arbor, Michigan 48106 I I I I
    INFORMATION TO USERS This material was produced from a microfilm copy of the original document. While the most advanced technological means to photograph and reproduce this document have been used, the quality is heavily dependent upon the quality of the original submitted. The owing explanation of techniques is provided to help you understand markings or patterns which may appear on this reproduction. 1. The sign or "target" for pages apparently lacking from the document photographed is "Missing Page(s)". If it was possible to obtain the missing page(s) or section, they are spliced into the film along with adjacent pages. This may have necessitated cutting thru an image and duplicating adjacent pages to insure you complete continuity. 2. When an image on the film is obliterated with a large round black mark, it is an indication that the photographer suspected that the copy may have moved during exposure and thus cause a blurred image. You will find a good image of the page in the adjacent frame. 3. When a map, drawing or chart, etc., was part of the material being photographed the photographer followed a definite method in "sectioning" the material. It is customary to begin photoing at the upper left hand corner of a large sheet and to continue photoing from left to right in equal sections with a small overlap. If necessary, sectioning is continued again — beginning below the first row and continuing on until complete. 4. The majority of users indicate that the textual content is of greatest value, however, a somewhat higher quality reproduction could be made from "photographs" if essential to the understanding of the dissertation.
    [Show full text]
  • 52083-002: Malolos-Clark Railway Project (PFR 1)
    Environmental Monitoring Report Semi-annual Environmental Monitoring Report No. 1 March 2020 PHI: Malolos-Clark Railway Project – Tranche 1 Volume II September 2019 – March 2020 Prepared by the Project Management Office (PMO) of the Department of Transportation (DOTr) for the Government of the Republic of the Philippines and the Asian Development Bank. CURRENCY EQUIVALENTS (as of 30 March 2020) Currency unit – Philippine Peso (PHP) PHP1.00 = $0.02 $1.00 = PHP50.96 ABBREVIATIONS ADB – Asian Development Bank BMB – Biodiversity Management Bureau Brgy – Barangay CCA – Climate Change Adaptation CCC – Climate Change Commission CDC – Clark Development Corporation CEMP – Contractor’s Environmental Management Plan CENRO – City/Community Environment and Natural Resources Office CIA – Clark International Airport CIAC – Clark International Airport Corporation CLLEx – Central Luzon Link Expressway CLUP – Comprehensive Land Use Plan CMR – Compliance Monitoring Report CMVR – Compliance Monitoring and Validation Report CNO – Certificate of No Objection CPDO – City Planning and Development Office DAO – DENR Administrative Order DD / DED – Detailed Design Stage / Detailed Engineering Design Stage DENR – Department of Environment and Natural Resources DepEd – Department of Education DIA – Direct Impact Area DILG – Department of Interior and Local Government DOH – Department of Health DOST – Department of Science and Technology DOTr – Department of Transportation DPWH – Department of Public Works and Highways DSWD – Department of Social Welfare and Development
    [Show full text]
  • Vol 13 No 49
    Health offi ce gives anti-polio vaccines to Fernandino kids CITY OF SAN FERNAN- said the city is targeting DO—About 19, 495 chil- 85 percent of the 36,069 dren from ages zero to eligible population of ze- fi ve years old received ro-to-59-month Fernan- oral polio vaccination dinos in the 35 baran- here four days since gays. the City Health Offi ce “Ito po ay simultane- launched the Sabayang ous campaign kung saan Patak Konta Polyo kumakatok po kami sa www.punto.com.ph (SPKP) campaign. bawat bahay para pa- Dr. Iris Muñoz, Ex- takan ng mOPV2 [mon- 00 panded Program in Im- ovalent type 2 oral po- P 10. munization Manager, P*,& 5 6#&*.& Central V 13 P N 49 unto! BOC-Clark turns over to M - S+ A 3 - 8, 2020 PANANAW NG MALAYANG PILIPINO! Luzon PDEA P1.6M seized kush, marijuana-infused goods CLARK FREEPORT – Some P1.6-million worth Virology center of kush and marijuana-infused products earlier seized by the Bureau of Customs-Port of Clark were turned over Wednesday to the Philippine Drug Enforcement Agency, Region III. In its Facebook page, BOC-Clark said the “strict profi ling of consignees, importation docu- ments, and non-intrusive examination” of ship- to rise at NCC ments by their personnel led to the discovery of the contraband that came in eight shipments from USA, Canada, France, and Germany. B7 B"), Z. L*;.") The agency added that the shipments were also subjected to K9 sniffi ng which indicated LARK FREEPORT – The Duterte administration has approved the the presence of illegal drugs.
    [Show full text]
  • FILIPINOS in HISTORY Published By
    FILIPINOS in HISTORY Published by: NATIONAL HISTORICAL INSTITUTE T.M. Kalaw St., Ermita, Manila Philippines Research and Publications Division: REGINO P. PAULAR Acting Chief CARMINDA R. AREVALO Publication Officer Cover design by: Teodoro S. Atienza First Printing, 1990 Second Printing, 1996 ISBN NO. 971 — 538 — 003 — 4 (Hardbound) ISBN NO. 971 — 538 — 006 — 9 (Softbound) FILIPINOS in HIS TOR Y Volume II NATIONAL HISTORICAL INSTITUTE 1990 Republic of the Philippines Department of Education, Culture and Sports NATIONAL HISTORICAL INSTITUTE FIDEL V. RAMOS President Republic of the Philippines RICARDO T. GLORIA Secretary of Education, Culture and Sports SERAFIN D. QUIASON Chairman and Executive Director ONOFRE D. CORPUZ MARCELINO A. FORONDA Member Member SAMUEL K. TAN HELEN R. TUBANGUI Member Member GABRIEL S. CASAL Ex-OfficioMember EMELITA V. ALMOSARA Deputy Executive/Director III REGINO P. PAULAR AVELINA M. CASTA/CIEDA Acting Chief, Research and Chief, Historical Publications Division Education Division REYNALDO A. INOVERO NIMFA R. MARAVILLA Chief, Historic Acting Chief, Monuments and Preservation Division Heraldry Division JULIETA M. DIZON RHODORA C. INONCILLO Administrative Officer V Auditor This is the second of the volumes of Filipinos in History, a com- pilation of biographies of noted Filipinos whose lives, works, deeds and contributions to the historical development of our country have left lasting influences and inspirations to the present and future generations of Filipinos. NATIONAL HISTORICAL INSTITUTE 1990 MGA ULIRANG PILIPINO TABLE OF CONTENTS Page Lianera, Mariano 1 Llorente, Julio 4 Lopez Jaena, Graciano 5 Lukban, Justo 9 Lukban, Vicente 12 Luna, Antonio 15 Luna, Juan 19 Mabini, Apolinario 23 Magbanua, Pascual 25 Magbanua, Teresa 27 Magsaysay, Ramon 29 Makabulos, Francisco S 31 Malabanan, Valerio 35 Malvar, Miguel 36 Mapa, Victorino M.
    [Show full text]
  • Scad Corridor Conceptual Land Use Plan
    SCAD CORRIDOR CONCEPTUAL LAND USE PLAN FINAL REPORT JUNE 2009 SUBIC-CLARK ALLIANCE FOR DEVELOPMENT COUNCIL (SCADC) SCAD Corridor Conceptual Land Use Plan (SCoLUP) Final SCoLUP Report June 2009 EXECUTIVE SUMMARY Keenly aware of the pressing need to capitalize on emerging local and international opportunities, the Subic-Clark Alliance for Development Council (the “SCADC“) embarked in late September 2008 on a framework and concept-level land use planning study for the 98,020-hectares (has.) SCAD Corridor (the “Corridor”) i.e. the SCAD Corridor Conceptual Land Use Plan (the “SCoLUP”). The Corridor is an approximately ten kilometer (10.0 km) wide swath with the Subic-Clark- Tarlac Expressway (SCTEx) at its center line. It runs the entire length of the SCTEx and is comprised of productive/ non-productive agricultural lands, minor forests and built-up areas. While the planning horizon considered is 25 years (2009-2033), the concept-level SCoLUP is intended to be dynamic and flexible enough to be modified as changes come about over the next several decades. 1. The Development Framework Z Development Plans Influencing the SCAD Corridor include: a) the Enhanced “W” Growth Corridor strategy for Central Luzon; b) Provincial Physical Framework Plans (“PPFPs”) of the 4 Corridor provinces; and c) Luzon Urban Beltway infrastructure projects; Z Applicable Development Concepts considered to transform the Corridor into a hub: a) expressways and high-speed motorways that improve access, stimulate commerce; b) supply chain management and logistics hubs, citing successful Asian models; c) Smart Growth with compact, self-contained settlements that avoid urban sprawl, preserve green areas and promote accessibility thru mass transport systems; and d) Green Corridors that define, preserve and sustain natural environments.
    [Show full text]
  • Infrastructure In-Depth: Philippines
    Infrastructure In-depth: Philippines 2015 Investment Guide by KPMG in the Philippines In this issue: Philippine Economy and Good Governance Infrastructure Development Plan Insights and Perspectives The information contained herein is of a general nature and is not intended to address the circumstances of any particular individual or entity. Although we endeavor to provide accurate and timely information, there can be no guarantee that such information is accurate as of the date it is received or that it will continue to be accurate in the future. No one should act upon such information without appropriate professional advice and after thoroughly considering the circumstances of a particular situation. The views and opinions The articles do not purport to give advice on any particular issue or situation but are meant to be a general guide to the reader who expressed herein are those of the authors and interviewees and do not necessarily represent the views and opinions of R.G. should seek the advice of qualified professionals on issues specific to his situations. Although we endeavor to provide accurate and Manabat & Co., KPMG International or KPMG member firms. timely information, there can be no guarantee that such information is accurate as of the date it is received or that it will continue to be accurate in the future. © 2015 R.G. Manabat & Co., a Philippine partnership and a member firm of the KPMG network of independent firms affiliated with KPMG International Cooperative ("KPMG International"), a Swiss entity. KPMG International provides no client services. No member © 2014 R.G. Manabat & Co., a Philippine partnership and a member firm of the KPMG network of independent firms affiliated with firm has any authority to obligate or bind KPMG International or any other member firm vis-à-vis third parties, nor does KPMG KPMG International Cooperative ("KPMG International"), a Swiss entity.