As Part of Anhui Shaying River Channel Improvement Project
Total Page:16
File Type:pdf, Size:1020Kb
E2520 V4 REV Public Disclosure Authorized GHPZJZD1051H Fenquan River Yangqiao Ship Lock Extension Project (As part of Anhui Shaying River Channel Improvement Project) Environmental Impact Assessment Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Anhui Provincial Port and Shipping Construction Investment Co., Ltd. Beijing Zhongzi-Huayu Environmental Technology Co., Ltd. September 2014 Environmental Impact Report on Extension Engineering of Yangqiao Ship Lock of Fenquan River – Sub-project of Anhui Shaying River Channel Improvement Engineering Content 1. General ............................................................................................................... 1 1.1 Project Overview ...................................................................................... 1 1.2 Project Background ................................................................................... 2 1.3 Environmental Protection Work for This Project ...................................... 4 1.4 Objectives of EIA ..................................................................................... 5 1.5 EIA Preparation Basis ............................................................................... 5 1.6 Work Grade & Scope of Assessment ........................................................ 9 1.7 Assessment Standards ............................................................................. 12 1.8 Environmental Protection Objectives ..................................................... 16 1.9 Type of Assessment ................................................................................. 18 1.10 Partition of Periods of Assessment ....................................................... 18 1.11 Working Procedure of Assessment ........................................................ 19 2. Engineering Overview ..................................................................................... 20 2.1 Current Shipping Status of Fenquan River ............................................. 21 2.2 Necessity of Engineering Construction .................................................. 28 2.3 Proposed Project Overview..................................................................... 30 2.4 Ship Lock Engineering ........................................................................... 33 2.5Bridge and Connection Work ................................................................... 41 2.6 Plans About Land Acquisition & Demolition ......................................... 44 2.7 Excavation-fill Balancing ....................................................................... 45 2.8 Organization & Technology for Construction......................................... 47 3. Engineering Analysis ....................................................................................... 56 Environmental Impact Report on Extension Engineering of Yangqiao Ship Lock of Fenquan River – Sub-project of Anhui Shaying River Channel Improvement Engineering 3.1 Analysis of Environmental Impact Factors ............................................. 56 3.2 Recognition of Environmental Impacts .................................................. 58 3.3 Analysis of Pollution Source ................................................................... 61 4. Regional Environment Overview .................................................................... 76 4.1 Natural Environment Overview .............................................................. 76 4.2 Ecological Environment Quality............................................................. 80 4.3 Social Environment Overview ................................................................ 84 5. Investigation & Assessment of Current Status of Environmental Quality ...... 88 5.1 Assessment of Current Status of Environmental Quality of Air ............. 88 5.2 Assessment of Current Status of Environmental Quality of Surface Water ............................................................................................................................... 92 5.3 Monitoring & Assessment of Current Status of Acoustic Environment . 97 5.4 Assessment of Environmental Quality of Sediment ............................... 99 5.5 Environment Status of Fuyang City ...................................................... 101 6. Scheme Comparison ...................................................................................... 103 7 Environmental Impact Evaluation .................................................................. 107 7.1 Social Environment Impact Evaluation ................................................ 107 7.2 Water Environmental Impact Evaluation .............................................. 112 7.3 Ecological and Environmental Impact and landscape Construction ..... 118 7.4 Evaluation of Impact on Environmental Air ......................................... 125 7.5 Acoustic Environmental Impact Evaluation ......................................... 129 7.6 Analysis on Solid Waste Pollution ........................................................ 137 7.7 Accident Risk Pollution Analysis ......................................................... 138 Environmental Impact Report on Extension Engineering of Yangqiao Ship Lock of Fenquan River – Sub-project of Anhui Shaying River Channel Improvement Engineering 7.8 Analysis of indirect effects and cumulative effects .............................. 145 8 Water and Soil Conservation ........................................................................... 151 8.1 Water and Soil Loss Current Situation in the Project Area ................... 151 8.2 Water and Soil Loss Factor Analysis .................................................... 152 8.3 Water and Soil Loss Features ................................................................ 154 8.4 Water and Soil Loss Prediction Scope and Time Frame ....................... 154 8.5 Water and Soil Loss Prediction ............................................................. 156 8.6 Water and Soil Loss Hazard Prediction ................................................ 166 8.7 Measures to Control Water and Soil Losses ......................................... 168 9 Environmental Management and Monitoring ................................................. 173 9.1 Regulatory Agency and Its Duties ........................................................ 173 9.2 Environmental Supervising Agency and Plan....................................... 178 9.3 Environmental Management Plan ......................................................... 180 9.4 Environmental Supervision ................................................................... 198 9.5 Environmental Monitoring Plan ........................................................... 199 10 Survey Analysis on Public Participation ....................................................... 206 10.1 Objective of Public Participation ........................................................ 206 10.2 Means and Time Period of the Public Participation............................ 207 10.3 Result of Public Participation Study and Its Analysis ........................ 210 11 Conclusion of Assessment ............................................................................ 227 11.1 Project Overview ................................................................................. 227 11.2Current Environment Quality ............................................................... 228 11.3 Environmental Impact Forecast and Assessment ................................ 230 Environmental Impact Report on Extension Engineering of Yangqiao Ship Lock of Fenquan River – Sub-project of Anhui Shaying River Channel Improvement Engineering 11.4 Environmental Protection Measures ................................................... 236 11.5 Public Participation ............................................................................. 239 11.6 Comprehensive Conclusion ................................................................ 242 Appendix: 1. Official reply of domestic EIA 2. Temporary land use agreement 3. Public Participation Questionnaire Figures: 1.The geographical location map of ship lock 2. The total construction floor plan Environmental Impact Report on Extension Engineering of Yangqiao Ship Lock of Fenquan River – Sub-project of Anhui Shaying River Channel Improvement Engineering 1. General 1. General 1.1 Project Overview Project Title: Subproject of Anhui Shaying River Channel Improvement Project - the Expansion Project for the Yangqiao Ship Lock of Fenquan River; Construction Company: Anhui Provincial Port & shipping Construction Investment Group; Nature of construction: extension; River basin: Fenquan River, a branch of Shaying River; Construction location: It is located on the left of the check gate of Fenquan River, Yangqiao Town, Linquan County and its geographic location schematic is shown in Figure 1; Construction Scale: Yangqiao lock shall be expanded as per Grade IV navigation standard and designed by 500t so that the annual one-way shipping capacity of the lock can reach 6.72 million tons; the lock chamber dimension is 200×13.0×3.5m (length×width×threshold water depth) and the lock is a single-line and single-stage lock. The line segment of the upstream approach channel is 344.2m, the line segment of the downstream approach channel is 488.4m and the bottom width of the upstream and downstream approach channels is 40m; one management zone shall be constructed; the connection road is 450m long (including the bridge) and