Windsor Pipeline Replacement Project Information Session

Welcome Our commitment Please view the display boards, speak to members Enbridge Gas is committed to involving community of Enbridge Gas Inc. (Enbridge Gas) and/or members in this proposed project. We are dedicated Stantec Consulting Ltd. (Stantec), and complete a to providing you with up-to-date information in an questionnaire providing your feedback. open, honest and respectful manner and will carefully consider your input. Sign up at the front desk to have your attendance recorded as part of the environmental study and to Enbridge Gas provides safe and reliable delivery receive future project updates. (Note: As of Jan. 1, of natural gas to more than 3.5 million residential, 2019, Union Gas and Enbridge Gas Distribution have commercial, and industrial customers across amalgamated into one utility with the legal name . Enbridge Gas is committed to environmental Enbridge Gas Inc.) stewardship and conducts all of its operations in an environmentally responsible manner. Windsor Pipeline Replacement Project Information Session

Project overview

Michigan

The proposed project involves replacing approximately 60 km Lake St. Clair Pain Court Line of the existing Windsor natural gas pipeline, an 8 to 10-inch Tecumseh diameter pipeline, with a new 6-inch diameter pipeline to be Windsor y sswa Merlin Road Expre Row E C UV401 County Road 42 constructed in the vicinity of the existing pipeline. Sandwich Manning Road Compressor Station Lakeshore K Municipality Of i Puce Road n ! Comber Sideroad g Chatham-Kent 401 & UV W h i County Road 46 t Port Road The proposed project will occur between the existing Enbridge Gracey Sideroad t UV3 le R Lakeshore Road 309 o ! a Comber d Gas Sandwich Station (located in the Town of Tecumseh) and Transmission Goodreau Line Essex County Road 8 Station UV77 !

Naylor Sideroad Port Alma County Of il Gate Station the existing Enbridge Gas Port Alma Transmission Station Walker Road a r HowardAvenue Essex t T lbo Ta County Road 14 Wheatley Road (located in the Municipality of Chatham-Kent). County Road 12 County Road 31

If approved by the Ontario Energy Board (OEB), construction County Road 23 Talbot Road Marsh Road UV3 Kingsville Leamington of the proposed pipeline project is planned to begin as early as Windsor Line Replacement Project ! Existing Enbridge Gas Station spring/summer 2020. Lake Erie Preliminary Preferred Route 0 5 10 km Windsor Pipeline Replacement Project Information Session

Why is Enbridge Gas undertaking this project?

Enbridge Gas is undertaking the proposed project as part of our continual pipeline monitoring and integrity program. Windsor Pipeline Replacement Project Information Session

Environmental study process

The environmental study and subsequent Environmental Report for the project will be completed as per the OEB’s “Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario (2016).” The study will:

• Undertake consultation to understand the views • Identify potential impacts of the project. of interested and potentially affected parties. • Develop environmental mitigation and protective • Consult with Indigenous Communities to measures to avoid or minimize potential impacts. understand interests and potential impacts. • Develop an appropriate environmental inspection, • Be conducted during the earliest phase monitoring and follow-up program. of the project. Windsor Pipeline Replacement Project Information Session

Study Development Public Consultation Program

Delineate Study Area

Gather information on the Study Area

Circulate Notice of Commencement and Information Session

We Are Information Session Here

Respond to comments and questions from interested and potentially affected parties

Develop mitigation and monitoring recommendations

Prepare Environmental Report Windsor Pipeline Replacement Project Information Session

Ontario Energy Board (OEB) review and approval process

The OEB is the body that regulates the natural gas industry • Environmental mitigation measures. in Ontario, in the public interest. • Land requirements. Enbridge Gas plans to submit an application for this project to the OEB. This application will include comprehensive • Consultation with Indigenous Communities. information on the project including: The OEB will then hold a public hearing to review the project. • The need for the project. If after this review the OEB determines that the project is in • Facility alternatives. the public interest it will approve construction of the project. • Project costs and economics. Additional information about the OEB process can be found on the project newsletter and at: • Pipeline design and construction. www.ontarioenergyboard.ca

Submit Application Public Hearing Approval Construction Windsor Pipeline Replacement Project Information Session

Preliminary preferred alternative

Following a detailed review, Enbridge Gas determined the optimal approach was to replace the existing 8 to 10-inch diameter pipeline with a new 6-inch diameter pipeline. The benefits of replacing the existing 8 to 10-inch diameter pipeline in a new alignment within the existing road allowance include:

• Maintaining gas service to existing customers throughout construction.

• Less disturbance to private lands related to pipeline maintenance.

• Improved safety for both the public and workers during construction.

• Minimizing environmental impacts by:

-- Reducing the footprint by remaining primarily within the existing road allowances.

-- Reducing impacts by minimizing disturbance to adjacent natural features and agricultural land. Windsor Pipeline Replacement Project Information Session

Access and land requirements

Representives from Enbridge Gas will meet with directly affected landowners along the pipeline route to discuss land rights which are necessary for the removal of the existing pipeline and construction of the new pipeline.

The compensation offered for both the construction of the new pipeline and removal of the existing pipeline where applicable will include a component for land rights, disturbance and a payment for crop loss. Windsor Pipeline Replacement Project Information Session

Pipeline removal and abandonment

Pipeline removal and abandonment will be completed in accordance with Canadian Standards Association (CSA) Z662 Standards. Enbridge Gas intends to remove the existing pipeline from private lands, where practicable. Where removal is not practicable, the existing pipe will be abandoned in place. Determination between pipeline removal and abandonment will consider the following: • Landowner preference.

• Road crossings.

• Stream crossings.

• Depth of cover.

• Environmental considerations.

• Landscaping, driveways, etc. Windsor Pipeline Replacement Project Information Session

Your Enbridge Gas system connection and this project

This project will see an existing pipeline decommissioned to ensure a smooth transition of your service to the new and a new pipeline installed. Decommissioning will be pipeline, which will involve a temporary gas service outage completed in accordance with CSA Z662 Standards. and subsequent appliance re-light. Currently there are approximately 450 properties along Other property impacts during construction, such as the the proposed project route that are directly connected to need to cross driveways, will be managed with you to the existing pipeline. If you are one of these properties, ensure you maintain access to your property. representatives from Enbridge Gas will work with you !

!! ! !

! ! ! ! !

! Windsor Pipeline Replacement Project ! ! !

!!

!

!

!

!

!

!

! !

!

!

!

!

!

! !

!

! !

! ! !

! !

!

! !

! ! !

! !

! !

Information Session!

! !

!

!

! !

!

! !

! ! ! !

! ! !

! ! !

! ! !

! ! ! !

! !

! !

!

! ! !

! Existing features along the preliminary! preferred route

! !

! ! ! !

! ! ! !

! 340000 345000 ! 350000 355000

er ! !

! ! v

e Ri !

! Belle !

n ! d

i ! ! 7th Concession & Lappan Drain

! n

i

!

a ! i ! !

!

! B !

r

! a a

! u

S e

! r r-

! Ra

! n

! ch D ! u ! t

Baseline Road ! k

D D !

! rain ! !!

r s ! !

!

! ! !

6th Concession Road Drain ! ! ! a

e e !

! !

w ! v d E !

i o !

- ! t !

a

! !

! R n ! Lavin Drain ! Schoolhouse Road

n S ! o i i Roath Drain

ra 7th ! !

Quick Drain

D Co ! $$ !

e n

ces a ! s ! l i

on R k r ! t C ! e ! ! t in Fairplay e n r ! D Ray Road Drainage System i Reicher Drain a r re te ! ¯e ! ! ! L D C Scott Sideroad r ! l v d ( i ! n n i ! Ray Road va n a ! ! Beausoleil Drain

o Arnald Lane e ! R i L i ll o ! ! s n

u D n o ! s S R i ! i e ! L ! ! r a

e w l ! a a e l a r r ! n r c Girard Drain ! g i c e e e ! D

! ! D n n n l r ! u o B v i r ! ! is o i ! e City Of P MacKenzie P a ! ! e !

4680000 t 4680000

r D C l ! n R ! i a s Cronmiller Drain !

r Kerr Drain h D Windsor h l r e !

! a e t r t ! !

l r ! i 0 e l Lakeshore Road113 o ! n t W e ! 1 Pfa e ! ! f ! v n B ! Puce Road i ! Hayes Drain Emeryville B e !

r !

R

! ! C ow Jobin Drain Poisson Drain n !

e ! n Clay Plain i

! l ! i n ! ! Centerline 6th Concession Drain a l Lakeshore Road 105 ! n a r ! o

LakeshoreRoad 111 e r i Woods ! ! D Beauchene Drain Branch

s ! s B ! ! D ! s ! p C Little River Lakeshore Road 103 !

e t ! d a ! ! 8th Concession Road s ! r a l Rogers Road ! c e E County Road 17 ! T e ! ! o Hurle n k D !

y Drain ! ! ! n o n g ! 8th Concession Drain ! r i

n n Hicks Drain C ! i Lakeshore Road115 ! i r ! a ! a ! ! A r 10th Concession Road Drain 16-17 Sideroad Drain r a !

D h K i !

Hurley Relief t D n ! !

! 8 ! Powers Drain s d ! ! Lakeshore Road 101 r ! n ! Walls Road e ! ! ! a Sandwich City Of Windsor w ! Lakeshore Road 107 o Town Of Tecumseh 9th Concession Drain P Dahl Drain B ! ! th au n !

r e ! ! Compressor o rB n o i ! N ra ! i ! n South Branch of Browns Creek a ! s ! ! Battersby Drain r Upper Part of SandishDrain ! ! Station c s ! h ! e D !

! ! *# Tru c ! c o k Ins e Watson Drain pe ! ! cc n ! c A ess f n ! ! t ! Lan io n Puce Road Drain East n e o ! i d 4 !

C a a n t !

M

r h ! ! Concession Road 11 i ! e Highway 401 d ! Washbrook Drain 7th Conc. Road South End a uche o h C r ! r ! l D ! Manning Road ! D 3 o n

l Maho o ! w ea ! a

n ! n a

Washbrooke Drain B ! ! h e c L Dunn's ! s ! ! y e Granger Girard D&W r ! ! !

n s ! i a a in C County Woodlot s !

r a r i G r !

M e ra ! o n ! D D e ger Lachapp ! g k n e ! Hicks Road ll ! thy Of Essex! e !

n r Croft Drain i D McCarthy Drain Glowa D&W !

! n a D&W ! C r

w ! !

o c a D North Rear Road ! !

M i n ! ! ! ! t ! ! ! o McLean - Hergott Drain North Rear Road Drain Finn Lane ! ! b !

! l k ! ! North 12th Concession Drain e ! ! a e ! ! v T i e ! ! ! ! r n ! ! r n Hostine Drain Branch ! i i ain ! C Ho e Dr D ! a stin ! Anger Drain a ! !

! r

Beehan East & West Brance & Ext h Grondin Drain r

! n ! e

O'Keefe Drain n ! c i Major Creek ! n D D r ! ! ! ! a k ! r i a Lawson s o ! ! B r r !

P M T h ! & ullins Vick e ! !

D ! ! t t County Road 27 r in Allen Drain ! Highway 3Sexton Sideroad a a Jam n h ! ! P es Mc i ! r e Hu ! gh D a o w Town Of Lakeshore r ! r D m a ! ! i n a ! ! i s Pla H !

k l nt D ! ! ppe s in Town Of Tecumseh rain ! ! ! w e ! -U a r Oriole Park Drive ! ! o r ! t ! ! z D ! ! in Moynahan Drain n a ! ! G n Doyle Drain ! Lakeshore Road 203 r e ! ! ! D ! to P Lawson Drain Outlet Portion ! n C

! s !

k ! i i Town Of !

!

! a u k e ! R ! r ! n re D ! e !

o ! Pleasant Park Sideroad Lakeshore ! C e i ! C Middle Road Drain ! ! l O'Brien Sideroad n s s ! r ! a i s l ! e v ! !

s !

e ! North Talbot Road e 4th Concess ! M io e n Drain Lakeshore Road 217 c County Road 46 ulli D k ! !

Gibbs Drain 18-19 Sideroad Drain

f ! Pleasant Park ! n a South Talbot RoadS Drain-O'conell ! !

D ! Allen Drain Branch l

o o !

! Drain r ! ! d ! a ! ! ! ! C ! n ! ! e S ! h i ! i n ! ! e !

! n gui n h ! c ! ! ! a n

t ! ! i Ruston Road ! ! r ! !

n ! ! a R ! 8 ! ! Wismer Drain a ! ! Totten Drain r

r D ! ! ! ! North Woodslee ! 4675000 o ! ! ! ! Wismer & Arch Taylor Drain 4675000 ! B Maidstone ! ! ! ! D ! n

a ! ! st McCann Drain ! ! ! ! ! Murray C alker Drain ! a W ! ! d e d ! ! ! ! ! r ary ! l ! ! ! ! e ek Dr M ! n ! ! a a

S i ! ! ! ! in W CollinsSmall Drain Drain n ! ! ! B ! Plant Drain! o

Halford Drain a i ! ! ! ! n East Branch of the Deslisler Drain ! ! ! ! r ! R u ! !

a ! ! !

South Talbot Road t D a ! ! ! ke ! ! s Q e ! n ! a ! ! ! ! ! ! E d ! ! ! ! ! c i ! ! ! ! ! ! !! ! ! ! L d h ! ! a Union Drain Along Malden Road S ! ! ! ! ! ! ! ! a o Griffith Drain ! ! ! ! ! R Talbot Road ! ! ! ! ! n South Middle Road Drain ! ! ! ! ! O' Connel Drain Dawson Drain 19 ! ! ! ! n - ! ! e e ! ! ! ! d Brad ! ! ! ! D l y ! ! ! O South Middle Road 18 ! a D u Lake Erie ! ! ! !

r 9th Line Drain M o t ! ! n ! ! ! a o l ! ! ! ! i v e Malden Road Drain ! ! ! ! n t ! ! ! a ! ! ! ! n D ! D Crosson Drain ! S North Talbot Road Drain r Concession Road 8 r t a West Townline Drain (Mooney Creek)

Wilson Sideroad Drain a i ! n Town Of South Talbot Road Drain East n i Essex Region e a n

e ! k Tecumseh r

t

e Conservation S ! Lakeshore Road 201 L n ai a N ! e r h n w A u t h o r i t y D rc n

i t m Newman Drain u e County Road 23 d h a e C ! l a

r Heath Drain y

E.A. Sullvian D t n South o !

u A u Wilson Sideroad South Talbot Road Drain B O x Woodslee

i Lakeshore Road 205 ! ll n East McPherson Drain a i r Lakeshore Road 213 n Drain ! McPherson Drain y iso W Malden Road a e ll eb r D d ste r i A

r D D ai S Legend ! n t d rain South Malden Road Drain H a as oll 40 ! E o i - *# Existing Enbridge Gas Station Waterbody ng Puce River Drain R s n L a k e S t . Chathamwo ! Graham Drain r ai n t

Hyland r h !

D e H

Santo Drain Ellis Sideroad d d St. Clair C l a i r l

y Preliminary Preferred Route Wetland, Provincially Significant D

Beattie Drain o ! Klingbile Drain Branch a Windsor Beach l o

Mergl Drain r a g ain p Lakeshore Road211 ! n 12th Line Drain o f M Colchester Townline Drain Branch Center 6th ConcessionRoad Drain d J.C. Smith Drain H Tecumseh o Belle River

Existing Pipeline Proposed for ! Lakeshore Road 215 D Wooded Area Hyland & Seymour Drain

Town Of Tecumseh Lapointe Street h C h a t h a m Ellis Drain B ! r t a Hopgood Sideroad Decommissioning Lakeshore Road 219 e K e n t

County Road 8 i Tilburyl 401 l

n ou e Town Of Essex D i v i s i o n !

S

Town Of Lakeshore Municipal Boundary, Upper R

3 !

Existing Enbridge Gas Transmission n Essex i

i v

a e !

Town Of Essex M Maidsto Pipeline r Essex County 77 r ne Av D enue ! 14th Concession West Drain a idstone A East Municipal Boundary, Lower D venue n West r

o ! i a F nue Constructedt Drain Wheatley in or ve e s A s ! es on nu s Town Of Lakeshore Leamington t ils e a t ANSI,e Life Science A W v E s Naylor Sideroad No n rt v T a h To ! County Road 15 A wn L a k e E r i e i 14th Concession East Drain enue a r E yn Drain line DrHarrowain W Kingsville Walker Sideroad Kerekes Drain !!ue t 5th Concession Drain Town Of Kingsville est o

a l u s f Belle

Rush Drain b Br n Hydro Line Ri ! r h ien Ave e r Colchester ver Hyland Sideroad Drain M o t u u am

D t r n No Name B C e McKee Drain i A Waterbody Thermal Regime, Warmro t R ve n anch !

r R r W Town Of Essex o

h o A B i ad 4th Conc

! Wilton Drain a & g a t w Beneteau Drain d i r t e Constructed Drain D r m ou s S vi nd C e o ir Watercourse Thermal Regime, Warm ! A. Hyla W W u a 0 1 2 t F Town Of ! Earl CourtVictoria Avenue ue h Watercourse (Intermittent) Pinkerton Road n km

Old Malden Road ! Walker Drain CentreLaird Street Avenueve Kingsville

A DFO Aquatic Species at Risk - Fish Butler Drain 4670000 Old Malden Road Drain C n 4670000 i ! Hyland Road Kokovai Drain n 13t n o i a Notes h Conc Batten Road u a r ession West Drain Dooley Drain e n r D

i ! M r Watercoursety (Permanent) D o 1. Coordinate System: NAD 1983 UTM Zone 17N 13th Concession Center Drain B g Wilton Relief Drain Lester Drive R g i W Chesley Sarnes Drain n n Road 2.11 Base features produced under license with the Ontario ! Market Jones Drain c o o o e Pinkerton Drain Iler Avenueh o Town Of Essex a r d d t m Ministry of Natural Resources and Forestry © Queen's Printer for

s a vi Sweet Wigle Drain o !

Barrette Drain e e Conservation3 Area Administrative T Ontario, 2019; © Fisheries and Oceans , 2019.

l w 4 m r ! D D Town Of Kingsville W A Cameron Sideroad East r riv Boundary e iv e s Rose Drain North Malden Road e t County Road 27 East ! Essex Outet Drain TrimbleDrain

! 340000 345000 350000 355000

Disclaimer: Stantec assumes no responsibility for data supplied in electronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data. !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

!

!

! ! !

! !

! !

! !

! !

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

! !

! !

!

! !

! !

! !

! !

! ! !

! ! ! !

! !

! !

! ! !

!

!

! !

!

! ! !

!

! ! !

!

! ! !

!

! ! ! ! ! ! ! Windsor! Pipeline Replacement Project ! ! !

! ! !

! ! ! ! ! ! Information Session ! ! ! ! ! ! ! ! !

! !

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !

! ! Existing! features along the preliminary preferred route ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 360000 365000 370000 375000 ! !

! ! ! n ! n 5 n M ! ! orris ! Lions Club Road Lakeshor Drain Extension ! ! e Road 305 ! !

B ! ! L n Morris Drain ! i ! e a B ! a l m ! ! e Jos Renaud Drain l r ! ! e ll Graham Drain ! ! y e D ! R m !

S ! L a k e s h o r e ! c Dr i h o u !

v Doran Drai k !

r a ! e i ! $$ l Byrne Drain e ! a

e

r l k e ! D e !

i ! e D n

Dupuis Drain r r e

Trepanier Drai Dodson Drain !

!

Byrnedale Road a r ! e r i ¯ !

D Byrnedale No. 27 Drain C r ! a n Morris Road (

Ar !

! g i c !

r h

C

n i ! a ib ! County Road 35 ! i

Rochel ! a B

n k

! n Caza Drain Lanoue-Nossey Drai l Trepanier Road i ! ! d n c Que a ! i Lakeshore Road 12 envi lle-Reau r !

! me D !

D u rain Settler Sideroad a ! r D 3

r ! D r a D ! 2 Frankfurth Drain

! r k e ! i hway e 1 ig 4 n 0 e H 1 ! v re ! ! i v n i C ! d i ! R

a a ! West Townline Drain Tremblay Creek Allyn Drain R r g

! Lakeshore Road 131 ! i o m Rowsom Drain! D ! Henry Brown Drain B Lakeshore Road 129 R o ! ! m in ! c Dra W !

e s o d

Townline Road Rochester u ! r

! a & !

u c en ! o s R -7 Sideroad ! g Drain R D ! ! 2nd Concession Road Drain West Side n h 6 ro u Goatbe Drain ! t e ! s ! S R t !

- k ! e 6th Concession Drain r e ! s u ! o e k n ! n p e e ! ! i a l 5th Concession Outlet Drain a ! v

Turnbull Drain r l ! L n L C ! u Mailloux Drain A Duck Creek i

5th Concession RoadDrain ! ! le ! a County Road 27 r t M ! r ! Mullins Drain o Li it ! l tt D le L ! 4th Concession Baseline Auction Sideroad Cree ! y k Ex ! y Thorton D&W Drain ! Knapp Road te Wylie Drain a ns ! n i ! Ruscom Wetland T on ! ! g ! i Worobetz Drain Branch iday Dra l ! all in Wylie Pearson Drain Branch Myers Road u Complex (ER 39) H ! ! o ! S ! Atkinson Drain ! North Middle Road ! North Rear Road Drain AbbottAvenue ! Desimpel Road

! Halligan Drain !

Countryview Lane ! ! School Drain School ! Caso BranchBo ofnn Bonneau Drain ! 1 eau Dr ! d ain Buchanan Drain ! 4 !

a !

2 ! ! o ! N A.J. Coulter Drain Al ! o. d e 1 Tilbury R xan ! Gov a d e ! r l er Pilllon Drain ! rn l D ! m o e rain en West Wetland e ! v ! t D R ! i h ra Melville Brown Drain ! in Complex (LT 60) c e Brown Drain R !

! Lantin Farm Drain Moison Creek t n r ai i ! n en Dr ! ! o ! i id Desmarais Drain ! ! ! ! ! m a a Lakeshore Road 308 ! Knister Killaire Drain h M r M Kendrick D&W Drain ! ! ! ! Seguin Drain ! Nichol D ast ! ! s ! ! ! ! Ruscom co E ! ! ! ! ! ! e s ! H n ! ! ! ! Masse Drain illm i ! ! Lakeshore Road 231

! ! Station k u a ! ! !

4675000 ! 4675000 ! ! ! ! Bondy Drain ! a r ! ! a ! ! ! ! County Road 46 R n ! ! ! ! ! ! D ! ! ! ! ! L ! D ! ! ! ! ! ! ! ! ! Middle Road Drain Town Of k ! r ! ! ! ! Storey Drain e ! ! ! ! ! a ! ! ! ! ! e ! ! ! ! Knister Drain ! i r ! ! ! ! Lakeshore! n ! ! ! ! Petit Mcqu C ! ! ! ! ! ! ! een Drain ! ! ! n ! County Ke g ! ! rai ith Dr i ! ! ! D a D&W Drain ! !! ! ! n ! in

! ! t B ! ! ! ra! ! ! mo ! f

nn D in ! ! ! ! i e Du ! !S ! o ! ! ! ! ! l Of Essex Reder Drain t

! ! !

Taves Drain ! ! Comber ! ! ! ! h

! ! ! u ! ! ! ! c

! ! ! *# O

! ! ! Transmission! n

! ! ! a

! n ! S r

tionD k ! ! i

! ca ! ! !i ! l B lo r ! ! ! Station a Lathuile Drain e !

Re a v ! ! ! r Government Drain #2 y C ! ! t

h e e !

! rp i ! ! ! u n r ! s

M r ! D Lakeshore Road 309 ou Malden Road Drain a Lakeshore Road 223 C C

d

Mellow Drain Branch E ! r e n a i

ain n Dr n e East 9th Concession Drain x Bellmore D&W Drain a o ! o o t k M

n r c i y l ra s Drain i D i R e l D n o l

! W o o n i Road 3 n 1 w s M e ain Concession 1A Drain Metz-Calder Dr ! s w d

e l D East Malden Road Drain o c a Sova Drain r e

! n a

M K o i

South Middle Road n c ! C n i

Lower Thames M d Olson in a Dra r A ArmstrongBrown Drain ! lex r C & h 3 D evali ! e e Jones Drain Highway 77 Valley Conservation r h f

t f D W Government Drain #3

Rivard Drain

u u ! 4th Concession RoadDrain ra &

o o

D A u t h o r i t y l i ! S Lakeshore Road 310 n n n P i y i

a e a

r r ! Gordon Smith Drain l Willan Drain D D b ! Strang Drain m e

e l Lakeshore Road 233 l ne r

i ! W T & vi n D nl e h a ! c Lake Erie h n

w n a

a

o

! r G en Lakeshore Road 245 T Spence Drain Gamble Drain Lakeshore Road 225 B u

!

h t Trudeau D&W

t Q s

- e

Gordon Smith Drain Branch #3 !

ou as 8th Concession RoadDrain

W rak Drain S d - u ! H c Duchanan Drain

i in

o & Lakeshore Road 311 n Lakeshore Road 229 i m C

! l Bissonette P. Drain a l n n n i i er G r i Gracey Sideroad ! n ra o Government Drain #4

i H D a D r g re s s k g s D

k ! w o e o r e e Lakeshore Road 243 th r r e 11th Concession Road Drain s

c e

C y ! D m raha e r G n l

n r

a i a

D Mackenzie Drain Potts Drain a i o C

n

r D

r

! -

C

a Hyatt Drain Plouffe Drain D g

i

b i

! n h

n B b

Town Of Lakeshore t R Legend 6

North Townline West of Ruscom River e o o ! i

d s R Dra l 40 # e T! own Of Kingsville in * Existing Enbridge Gas Station Waterbody County Road 8 Lakeshore Road 235 N Michigan n L a k e S t . Chatham Cameron Curry Drain f Wismer Gahan Drain

i ! Tilson Drain

a o r W ! & St. Clair C l a i r Irwin Drain n D Staples Preliminary Preferred Route Wetland,D Provincially Significant Imeson Drain io an Windsor Beach ! e t m Graham CreekDrain (S. 4thConc. Dr.) r l ranch of Rei o ngs 4670000 b B d Drain P i 4670000 ! o Nelson Drain K Tecumseh East N ower Belle River Ames Drain Existing PipelineL Proposed for Wooded Area Big Creek ! ward D C h a t h a m b A rain Hutchins Drain Decommissioning o Wyatt Drain ! K e n t n Town Of Lakeshore Tilbury c i 401 a

a PillonAvenue D i v i s i o n J r

! Municipal Boundary, Upper Straussland Drain

D Municipality Of Leamington 3 11th Con. Drain West of Ruscom River n Existing Enbridge Gas Transmission Essex Scott Drain ! a W.H. Reid D&W l

l

Pipeline e Municipality Essex County 77 Road 11 m

Norman GreigD&W John Corlett D&W W ! Moon Drain 11th Concession Branch of Irwin Drain B Municipal Boundary, Lower sh & Of Leamington

! u

D

C n Wheatley Bailey Drain n Constructed Drain

i !

a o k Leamington James Wright Drain r e ! Waterbodye Thermal Regime, Warm Frelick

ns r D 11th Concession Branch of the Reid Drain FredAckerman Drain C Harrow Kingsville L a k e E r i e

n Rivest Drain ki g ! !! i l Hydro Line Stevenson Drain B o i Colchester

s

! W West OgleDrain

r Mersea Road 11 County Road 37 Maceyouski Drain W Watercourse Thermal Regime, Warm

& e 11th Concession Drain North t s

t D !

a Hope Drain r Constructed Drain

! ho Graham Sideroad P e

T Town Of y DFO Aquatic Species at Risk - Fish

o

! 0 1 2 Kingsville L ! t Watercourse (Intermittent) r km Town Of Kingsville

McMahon Drain Mersea Road 12

! Road 10 DFO Aquatic Species at Risk - Mussel West Branch (Patterson Drain) Municipality Of Leamington

West Branch of Reid Drain Notes ! Albe Watercourse (Permanent) 1. Coordinate System: NAD 1983 UTM Zone 17N

! ain Essex Region

Adolphus Drain r DFO Aquatic Species at Risk - Critical 2. Base features produced under license with the Ontario

! O D Oakland Jenny Baker Drain Habitat Ministry of Natural Resources and Forestry © Queen's Printer for Conservation J.d. Kimball Drain r e Conservation Area Administrative s ! to Ontario, 2019; © Fisheries and Oceans Canada, 2019. n a MerseaBoundary Road 10 ! D ham Sideroad Drain h A u t h o r i t y Lundy Drain r Bell Drain a a Ogle Drain West Branch in r C Ogle Drain East Branch Vanderbeke Drain

! G

! 360000 365000 370000 375000

Disclaimer: Stantec assumes no responsibility for data supplied in electronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data. !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

! !

!

!

! ! !

! !

! !

! !

! !

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

! !

! !

!

! !

! !

! !

! !

! ! !

! ! ! !

! !

! !

! ! !

!

!

! !

!

! ! ! ! !

! ! !

!

! ! !

!

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Windsor Pipeline Replacement Project! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Information Session ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Existing! features along the preliminary preferred route ! ! ! ! ! ! ! ! ! ! 380000 385000 390000 395000 ! ! n ! e S ! t ! ru ! t ! Bouc h Hunsberge ! her Drain Davis Drai B er in r Drain ! a s ra ! p D t Oak Road ! is ! Rosedale Lin e $$ ! King & Whittle Road C ! Zuyus Drain reek ! D

Tisdelle Drain ¯ ! T ra Moffet Outlet Drain ( ! F ! i urges in ! lb B s i

! Atkinson Drain u D Hickey Road n r n ! Thompson Drain ry a Gray Line ! i ek ! P C n re haneaf re Quinn Drain iste C & ! Dra ek Bapt ! in ! Desimpel Road Quinn Line C ! Payne Drain ! Ma Chalmers Drain o ! yn o ! Tremblay Creek Drain ard p ! Dr er ! ain Chalers Outlet Drain D Badder Drain r ! C a ! a Herman Line in ! n r ! ivait Drai D e ! R enis le D& s Haskell Road ! ! ! W s King And Whittle Drain Grove Road ! ! ! ! D D Quinn Irwin Drain ! ! ! r r B Port Road

! a

! ! ! ! ! ai u

! ! n i ! ! ! T n r ! ! ! ! ! ! g ! ! ! ! h e ! ! ! ! s ! ! ! 4675000 i 4675000 ! ! ! b s Kemp Line ! ! Richardson Sideroad e Moffatt Drain ! ! ! ! ! rt ! ! ! ! ! ! ! ! Dra ! ! ! ! ! ! ! in D ! ! ! ! ! ! Duquette ra ! ! ! ! ! ! Lakeshore Road 308 Drain in Vanedie Road ! ! ! ! ! R B ! ! ! o E ! ! ! u Badder Line ! ! ! b a ! ! ! r s ! ! ! ! ! e t ! ! ! ! g B ! ! ! ! ! ! r r ! ! ! ! ! ! ! ! t e a ! ! ! ! ! Wheatley Road Drain Hornick Line n ! ! D s ! ! ! ! ! ! s c ! ! ! ! ! Town Of r Dr h a a ! ! ! ! ! i ! ! ! ! i n

! n ! ! ! ! Lakeshore W King and Whittle Drain ! ! ! ! e ! ! ! ! ! st Moffet Extension Drain ! ! ! ! ! ! B in Driver East Drain ! ! ! ! ! r ra Cox Line ! ! ! an D Glenwood c u Donais Drain h Dene a E Renwick Drain Deary Drain a Carless Road s t Thibert Branch Drain Br anc h Lakeshore Road 309 Cox Drain E o Nelson Drain

a f Keith Drain st B ig 9 C Bowers Line t h r Hill Drain (Doucet Culvert) n e i Municipality Of C e a o r k Chatham-Kent nc D D Plouffe & McKeown Drain e n r ssio a in Town Of Lakeshore Trembley Drain Glenwood Line Municipality Of Chatham-Kent

C McKim Drain West o

n Brosseau Drain

i t Goodreau Line t

a d

i Dawson Drain

r n Lakeshore Road 310 a

D g G o o Broullette-Donais Drain ve Burton Drain h rn Stevenson e m R

f a en f t m D y u rai e n n o

i l R Cooper Drain East n a an P Br ch e r in & Gilbert Extension Drain Radmore Road m a l Dr D i ook o e C f w Phillip Drain R D & r & D a i t n n

n DBW Drain i s

a a

e r Simpson Line n

D a n W Cottingham Drain ai h r Port Alma Horton Drain D W c y t u r Stevenson Road s *# & Hill Drain e B u Campbell Side Road Drain 5th Concession Line Drain Mcgregor Drain W D Lower Thames b Baker Drain n l i

i a n r Port

T D a Valley Conservation er n p Baldwin Road Alma Gate a oo h A u t h o r i t y Merritt Drain C Station c u B Coatsworth Road Lake Erie 4670000 4670000

Cooper Drain Outlet Coatsworth Tunnel Relief Drain

18-19 side road Drain

Regener D&WDrain

Scott Drain County Road 8 Hutchison Drain n i Scott Extension Drain ra D is v a r T Graham Drain Legend Tunnel Drain *# Existing Enbridge Gas Station Municipal Boundary, Upper 40 Michigan L a k e S t . Chatham Mersea Road 11 Preliminary Preferred Route Municipal Boundary, Lower St. Clair C l a i r Municipality Of Leamington Windfall Windsor Beach Gahan Drain East Tecumseh County Existing Pipeline ProposedTalbot for Trail Watercourse Thermal Regime, Warm Belle River Decommissioning C h a t h a m K e n t Of Essex 401 Tilbury DFO Aquatic Species at Risk - Mussel D i v i s i o n Renwick Existing Enbridge Gas Transmission 3 Essex Municipality Pipeline Essex County 77 Liddle Drain Of Leamington Campbell Road Gahan Drain Lake Erie Constructed Drain Wheatley Leamington Mersea Road 10 Zion Road Harrow Kingsville L a k e E r i e Constructed Drain Colchester

Wheatley Road T onD w n ins r Watercourse (Permanent) ai b ai o r Ro n C D - 0 1 2 r n y e o r e s u Conservation Area Administrative k n X Ballard Drain km n i Cedar Road

i b s o Boundary D a R r

r - Notes a D th

i r n 1. Coordinate System: NAD 1983 UTM Zone 17N Adolphus Mills Drain k C o e oa tsw e Waterbody 2. Base features produced under license with the Ontario r Healey Drain C Ministry of Natural Resources and Forestry © Queen's Printer for w Ontario, 2019; © Fisheries and Oceans Canada, 2019.

Stobbs Drain o l Wooded Area County Road 14 l e

Municipality Of Chatham-Kent Y 380000 385000 390000 395000 Disclaimer: Stantec assumes no responsibility for data supplied in electronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data. Windsor Pipeline Replacement Project Information Session

Agricultural land

The preliminary preferred route is primarily in existing • Any agricultural drainage and tiling systems road allowances; however, agricultural lands adjacent impacted by construction will be repaired. to the road right-of-way may be impacted along the route to facilitate the construction process. Tile will be temporarily re-routed where required to Enbridge Gas has established and tested measures to ensure proper drainage during construction. preserve the integrity of agricultural lands throughout Damage and severed drains will be repaired following the construction phase: construction. After repair and prior to backfilling, landowners will be invited to inspect and approve the • Enbridge Gas will implement a wet soil shutdown repair. Any on-going concerns with tile repair will be protocol on agricultural lands to minimize soil addressed by Enbridge Gas. structure damage.

• If work occurs on agricultural lands, Enbridge Gas will implement appropriate cleanup and restoration. Windsor Pipeline Replacement Project Information Session

Socio-economic features The preliminary preferred route is primarily in existing road allowances.

Potential effects Example mitigation measures • Temporary increases in noise, dust and air emissions. • Provide access across the construction area. • Increased construction traffic volumes. • Restrict construction to daylight hours, and adhere to applicable noise by-laws when possible. • Temporary impairment of the use and enjoyment of property. • Develop and implement a Traffic Control Plan. • Vegetation clearing along the pipeline easement (if needed). • Place fencing at appropriate locations for safety. • Temporary traffic restrictions and lane closures. • Implement a water well monitoring program. • Coordination, inspection of natural gas service to customers during the tie-over from the existing Windsor Pipeline to the • Providing you contact to an Enbridge Gas representative new replacement. who is available prior to and throughout construction. • Dust control measures. • Re-vegetation of cleared areas (seeding/planting). Windsor Pipeline Replacement Project Information Session

Aquatic resources

Enbridge Gas understands the importance of protecting wildlife during construction and therefore will implement recognized mitigation measures to minimize possible environmental effects. The pipeline crosses 25 known watercourses.

Potential effects • Limit in-channel construction, where possible, and • Disruption and alteration to aquatic species and habitat conform to fish timing window guidelines. and/or nuisance effects. • For in-channel construction, protect aquatic species • Increased erosion, sedimentation, and turbidity and manage sedimentation and turbidity. resulting from removal of vegetation. • Restore and seed areas to establish habitat and Example mitigation measures reduce erosion.

• Conduct surveys of waterbodies. • Replant riparian vegetation.

• Obtain all agency permits and approvals. Windsor Pipeline Replacement Project Information Session

Cultural heritage resources

During the course of construction, cultural heritage features such as archaeological finds, buildings, fences and landscapes may be encountered. Detailed field surveys will be conducted by independent, third-party archaeologists and cultural heritage professionals.

Potential effects • Cultural heritage assessment (for built heritage • Damage or destruction of archaeological, features and cultural heritage landscapes) of the paleontological or historical resources. construction right-of-way, with review and comment from MTCS. Example mitigation measures • Reporting of any previously unknown archaeological, • Archaeological assessment of the construction paleontological or historical resources uncovered, or right-of-way, with review and comment from the suspected of being uncovered, during excavation. Ministry of Tourism, Culture and Sport (MTCS). Windsor Pipeline Replacement Project Information Session

Terrestrial resources

During the course of construction, natural heritage features such as wildlife habitat and vegetated areas will need to be crossed.

Potential effects • Clearly mark the construction area to avoid • Damage or removal of vegetation and wildlife habitat accidental damage. adjacent to the construction area. • Restore and seed areas to establish habitat and • Disturbance and/or mortality to local wildlife. reduce erosion. Example mitigation measures • Secure any necessary permits, and follow any conditions of approval. • Conduct surveys (including Species at Risk surveys) in advance of construction to determine opportunities for wildlife habitat to exist. Windsor Pipeline Replacement Project Information Session

Next steps

Serving hundreds of communities in Fall 2020/Spring 2021 Site clean up and restoration and post Ontario, we consider ourselves strong Fall 2018 Winter 2019 construction monitoring. Start the environmental Host Information Session. community partners who believe in and planning process. Spring 2020 are committed to public consulation. Begin construction. During the planning stages for this project we have consulted and 2018 2019 2020 2021 will continue to consult with local landowners, Indigenous communities, government agencies and other interested parties that could be impacted Summer/Fall 2019 Fall 2020 Winter 2021 Complete OEB application filing. Pipeline in service. Service change order Complete Environmental Report. Conclude pipeline construction. continues. by the Project. Complete Permitting, Service change over begins (timing to be Pipeline Design, and Construction Plans. developed). After this Information Session, we intend Receive OEB Approval. to pursue the following schedule of activities: Windsor Pipeline Replacement Project Information Session

Thank you!

On behalf of the Project Team, thank you for attending this Information Session. We appreciate your involvement in the consultation process, and we would like to hear from you.

Please fill out the Exit Questionnaire. If you have any further comments or questions, please contact:

Laura Hill, Project Manager Enbridge Gas Stantec Consulting Ltd. Phone: 1-855-381-9138 Phone: 613-784-2286 Email: [email protected] Email: [email protected]

Or visit our project webpage: www.uniongas.com/projects/windsor-line-replacement