System Test Implementers Forum

DanDan FroelichFroelich Platform Compliance Operation System Tests Impact USB Vendors

l Device Behavior Affects Overall System – Bandwidth Consumption – Power Usage – Ease of installation l System Bios USB Support – Keyboards – Hubs l Specification Minimums – 1.1 or 2.0 starting in 2001

System Test Provides Tests To WHQL G-Number Agenda

l Successful System Design l System Test IF in Review l USB Tests – PC99 – PC01 l Resources

G-Number Design for Requirements

Intel and Microsoft recognize that – consistent, objective PCxx tests are needed – earlier in the design process in order to – design-in the ability to – meet the PCxx requirements – prevent last minute redesigns

G-Number Designing-In to Meet Requirements

Windows ® Logo Tests

PCXX Test Suites

System Design Guide and PASS Test Specifications co-authored by Intel and Microsoft FAIL G-Number System Test IF Process

l PC XX System Design Guide testing criteria are derived from published specs: PCxx System Design Guide (SDG), l Test Specification then provides a set of objective, non- arbitrary test criteria (Assertions) l Test algorithms are derived from the Assertions. – Method and process defined l Test Tools Pass/Fail results mapped to Assertions.

G-Number System Test IF Process Milestones

0.3 0.5 0.7 1.0 Final PCxx SDG PCxx PCxx PCxx Industry Review SDG SDG SDG

Windows® Logo Tests 0.3 Test Spec 0.5 0.7 1.0 Final Test Test Test Industry Review Specs Specs Specs

System IF Alpha IF Beta WHQL WHQL Test IF Tools Tools Beta Required Available Available Preview Test Session

G-Number Available PC 99 Tests

l Video Input l PCIPCI l PC Cards l ACPIACPI l Remote Boot l StillStill ImageImage l Audio l Graphics l TVTV OutOut l USB l VideoVideo TelephonyTelephony l ATAPI l AGPAGP l Speech Input

G-Number Future PC 2001 Tests

l USB l ATAATA l Docking l ACPIACPI Stations l GraphicsGraphics l Remote Boot l DVI l VideoVideo l Monitors l AGPAGP l 1394

G-Number PC 99 USB Test Areas

l USB System Port Presence l USB Keyboard Bios Support l USB Isochronous Alternate Interface Presence l USB Device Class Compliance l USB Hub Specification Compliance

G-Number PC 2001 USB Test Areas

l USBUSB SystemSystem PortPort PresencePresence l USBUSB 1.1/2.01.1/2.0 SpecSpec ComplianceCompliance l USBUSB HostHost ControllerController ComplianceCompliance l USBUSB SystemSystem WakeWake CapabilitiesCapabilities l USBUSB SelfSelf PoweredPowered HubsHubs l USBUSB PowerPower UsageUsage l USBUSB DeviceDevice InstallationInstallation l USBUSB HubHub BiosBios SupportSupport

G-Number Resources l PC 99 H/W verification tests – Run at this Conference – Available at www.systemtest.org l Draft 0.5 PC ‘01 H/W Test Spec – Available 4/00 on IF Web site: www.systemtest.org – 30-day review for industry comments – Participate in IF industry reviews l Send us your test feedback and/or issues – IF Web site: www.systemtest.org l System Test Events – Test Spec Reviews (7/00) – TestFests (Members) We Welcome Your Support and Input!

G-Number QUESTIONS?

G-Number System Test-IF Members

3COM Corporation Hewlett-Packard Co. S3, Inc. 3Dlabs, Inc. IBM Corporation Electronics Co. Adaptec, Inc. Intermec Technologies Siemens Advanced Micro Devices Matrox Graphics, Inc. Silicon Motion, Inc. ATI Technologies, Inc. Micro Design Resources SGI ASUSTeK Computer, Inc. Micron PC Sonnetech, Ltd. B-Tree Systems, Inc. Micron Semiconductor Corporation Compaq Computer Corp. Micro-Star Int’l Co. Texas Instruments Conexant Systems, Inc. Mitsubishi Electric Toshiba Corporation Creative Labs, Inc. NEC Computer Systems Trident Microsystems, Inc. Dell Computer NeoMagic Corporation Videologic, Ltd. Elonex PLC nVidia Corporation Viewsonic Corporation Fujitsu, Ltd. Components Xircom Gateway 2000, Inc. Phoenix Technologies, Ltd. Yamaha Corporation Thank You for Your Support! G-Number