Working BB.Indd
Total Page:16
File Type:pdf, Size:1020Kb
Builders Bulletin BidBidding Date Bid Time Location This Week...Project Name January 01,2018 1/3/18 2:00 PM South San Francisco Magnolia Senior Center & Siebecker Preschool Parking Lot Resurfacing (Online) * 1/4/18 2:00 PM San Jose Rfp Track & Field Renovation Pioneer High School, Gunderson High School, Lincoln High School - Sjusd (Online) 2:00 PM Marina New Gymnasium At Marina High School 1/4/18 4:00 PM 1/4/18 San Jose Calaveras Fault Trail Improvements Project Sierra Vista Open Space Preserve (Online) 2:00 PM Pismo Beach Downtown Sidewalk Replacement With Pavers 1/4/18 11:00 AM Atascadero Painting Services At The Atascadero Parole Office 1/4/18 11:00 AM 1/4/18 Watsonville Lab Packing, Collection, Recycling & Disposal Of Hazardous Waste Materials 1:00 PM 1/5/18 Palo Alto Webster Residences (Online) 5:00 PM Seaside Boys & Girls Club Repair Roof & Install Domed Skylights 1/5/18 CONSTRUCTION CLEAN USED & BUILDING BRICK - PAVERS SUPPLIES CARMEL STONE ROOF TILES GRANITE ROCKS BARN WOOD FIREWOOD NEW & USED TIMBERS LUMBER CYPRESS METAL GATES ADOBE BLOCKS FIXTURES APPLIANCES CABINETS We Build Futures ~ Communities ~ Confidence ~ We Build Your Business Page 1 of 1 Central Coast Builders Association 242 East Romie Lane (831) 758-1624 Salinas Salinas, CA 93901 (831) 423-5900 Santa Cruz Mon-Thurs 8-5 Fri 8-3 (831) 883-3933 Monterey (831) 758-6203 Fax [email protected] Board of Directors President: Clifford Fasnacht, Dougherty Pump & Drill Vice President: Anka Hepper, WM. B Saleh Painting Secretary/Treasurer: Kevin McIntosh, Blach Constuction Kate Rueter, AON Risk Services Past President: Kristine O’Dell, Absolute HR Edwin Sargenti, PSC Gabriel Torres, CCRB/CHISPA John Vorwerck, Otto Construction CCBA STAFF Christie Cromeenes Executive Director Amanda Young FInance/Office Mgr Shelly Verba SR. Planroom Coordinator Rikki Montejano Public Relations Coordinator Disclaimer All information provided by CCBA is obtained from sources deemed to be reliable. It is the user’s responsibility to confirm the accuracy of all facts. We assume no responsibility for errors and/or omissions. All information included is for the intended recipient only, we ask that you do not share this information CCBA Holiday Office Hours We will close at 12pm noon on Friday, December 22nd and re-open at 7:30am on Tuesday, January 2nd. For deliveries or emergencies please call (831)594-6404 This month we celebrate the below companies as dedicated members of the Central Coast Builders Exchange! ACCENT CLEAN & SWEEP AJ FENCE COMPANY ASSOCIATED PLUMBING, INC. AUSONIO INC. BERNARDS CALIFORNIA ELIECTRICAL & CONSTRUCTION CALIFORNIA PREMIER RESTORATION CHISPA COAST BUILDING PRODUCTS COAST COUNTIES GLASS CONKLIN BROS OF SAN JOSE CRAFORD BENEFIT CONSULTANTS CRAVEN LANDSCAPING CYCLONE FENCE AND IRON DELLA MORA HVAC DIETRICH IRON WORKS INC. EMERSTILE FRISCO PAINT GRANITE CONSTRUCTION J.G.P.G. CORPORATION JR & SONS CONCRETE SPECIALISTS JAMES M. SOMMERVILLE INC. JT CONCRETE PUMPING SERVICE KENT CONSTRUCTION MARK A WRIGHT CONSTRUCTION NOBLE PRIDE ROOFING COMPANY INC. PACIFIC VALLEY BANK PALMER ELECTRIC PAPE RENTS QUALITY PLUMBING ROSSI & CARR ELECTRICAL INC. SPIESS CONSTRUCTION COMPANY INC. We thank you for your continued support and dedication to our Exchange and the Construction Industry! JANUARY 17, 2018 12/28/2017 ProjectsWeekly Projects Out To Bidding Bid Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to be reliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies. Name Bid Date Time OPR# Contract # Location Estimate Monterey County NEW GYMNASIUM AT MARINA HIGH SCHOOL Addenda: 1 1/4/18 2:00 PM 17-02853 Marina $6,600,000 Prebid Conf: MAND 12/14 @ 10:30am- site Project consists of: Aluminum Access Ladders; Thermal and Moisture Protection; Openings; Finishes; Specialties; Roller Shades; Educational Casework; Prefabricated Modular Structures. PREVAILING WAGE Project Contact: Tom Millman Email: [email protected] Phone: (831) 392-3918 Bidders: Meehleis Modular Buildings, Inc. General Contractor Office: 209-334-4637 Fax: 209-334-4726 K & D Landscape Sub-Contractor/Specialty Office: 831-728-4018 Fax: 831-786-9670 Contractor McKim Corporation Sub-Contractor/Specialty Office: 408-848-8700 Fax: 408-848-8778 Contractor BOYS & GIRLS CLUB REPAIR ROOF & INSTALL DOMED SKYLIGHTS Addenda: 0 1/5/18 5:00 PM 17-02683 Seaside Plan Issuer: Boys & Girls Clubs of Monterey Co. [email protected] 831-394-5171 831-394-4898 Prebid Conf: 12/4 @ 2pm- site Roof repairs where indicated and removal and replacement of existing skylights; a total of 7 skylights of various sizes. Roof top areas include: Activity Center, lobby and gym restrooms, kitchen Exercise Center and Weight & Fitness Center. All new skylights must conform aesthetically with the building with no leaks. PREVAILING WAGE Questions: Ron Johnson at 831-394-5171 x249 Bidders: Monterey Environmental Solutions + Asbestos Abatement / Office: 831-333-6431 Services Hazardous Materials Contract Ausonio Incorporated General Contractor Office: 831-633-3371 Fax: 831-633-3389 Pueblo Construction , Inc. General Contractor Office: 831-915-6823 Fax: 831-641-0586 ENGLISH AVENUE 200-300 BLOCK IMPROVEMENTS Addenda: 1 1/9/18 2:00 PM 17-02813 Monterey $490,000 Plan Issuer: City of Monterey-Dept of PW [email protected] 831-646-3877 831-646-3405 Prebid Conf: 12/12 @ 2pm- Intersection of English Ave and Grant Ave, Monterey In general, the work consists of, but is not limited to, clearing and grubbing, earthwork, sawcutting, demolition of existing improvements, grading, construction of curb and gutter, concrete sidewalk, concrete curb ramps, asphalt concrete pavement overlay, catch basin, tree box filter, storm drain pipe, asphalt concrete pavement conforms, and pavement markings. Work also includes temporary traffic control, temporary erosion and sedimentation control, and temporary tree protection. Project Contact: Jeff Krebs Email: [email protected] Bidders: Granite Construction General Contractor Office: 831-763-6100 Fax: 831-761-1042 Granite Rock Company General Contractor Office: 408-574-1400 Fax: 408-365-9548 Teichert Construction General Contractor Office: 925-621-5703 Fax: 925-621-5799 Ruggeri-Jensen-Azar & Associates Professional Services Office: 408-848-0313 Fax: 408-848-0302 River City Building Supply Supplier Office: 408-391-0508 Fax: 408-294-2331 Deadline for submission of materials for our Bulletin is end of day Wednesday each week. Projects Out To Bid Name Bid Date Time OPR# Contract # Location Estimate CITYWIDE ADA RAMPS AND STREET RECONSTRUCTION, PHASE 6 Addenda: 0 1/9/18 2:00 PM 17-02819 Monterey $1,500,000 Plan Issuer: City of Monterey-PW/Engineering [email protected] 831-646-3997 831-646-5686 Prebid Conf: 12/6 @ 2pm- 601 Wave Street, Suite 100, 2nd Floor, Monterey In general, the work consists of, but is not limited to, the demolition and construction of concrete curbs, gutters, sidewalks, sidewalk crossings (driveway approach), curb ramps, storm drains, signage and striping, isolated street and driveway surface repairs, pavement grinding, street reconstruction, full depth reclamation, and Hot Mix Asphalt paving. Project Contact: Rose Dickson Email: [email protected] Bidders: DOD Construction General Contractor Office: 661-366-8000 Fax: 661-366-8001 Granite Construction General Contractor Office: 831-763-6100 Fax: 831-761-1042 Granite Rock Company General Contractor Office: 408-574-1400 Fax: 408-365-9548 Teichert Construction General Contractor Office: 925-621-5703 Fax: 925-621-5799 River City Building Supply Supplier Office: 408-391-0508 Fax: 408-294-2331 COLTON HALL & CITY HALL ACCESSIBILITY UPGRADES Addenda: 0 1/9/18 2:00 PM 17-02898 Monterey $660,000 Plan Issuer: City of Monterey [email protected] 831-646-3446 831-646-3467 In general, the work consists of, but is not limited to, improvements to Colton Hall and City Hall buildings to comply with ADA accessibility requirements, including the reconstruction of parking stalls, installation of an elevator at Colton Hall and a lift at City Hall, construction of an access ramp to access the Planning Office (Colton Hall), construction of an ADA-compliant bathroom (Colton Hall), and construction of an ADA-compliant path around both buildings. Project Contact: Richard Llantero Email: [email protected] Bidders: Granite Construction General Contractor Office: 831-763-6100 Fax: 831-761-1042 Thayer, William A. Construction General Contractor Office: 831-641-9147 Fax: 831-641-9148 Epic Land Surveying, Inc. Professional Services Office: 209-845-2594 Fax: 209-845-2555 JOB ORDER CONTRACT AT CSU MONTEREY BAY Addenda: 0 1/11/18 2:00 PM 17-02855 MB-2017005 Seaside $1,000,000 to $3,000,000 Prebid Conf: MAND 12/12 @ 10:30am- 4314 6th Ave, Seaside *** Contact the Central Coast Builders Association for the Construction Task Catalog and the Technical Specs. A Job Order Contract is a competitively bid, firm fixed priced, indefinite quantity contract. The scope of work includes a collection of detailed repair and construction tasks and specifications that have established unit prices. It is placed with the “Contractor” for the accomplishment of repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure, buildings, structures, or other real property. Work is awarded by issuance of a purchase order against the JOC. Under the JOC concept, the Contractor furnishes all management, documentation, labor, materials, and equipment needed to perform the work. Project Contact: Reyola Carlisle - 831-582-3506 Email: [email protected] Projects Out To Bid Name Bid Date Time OPR# Contract # Location Estimate 21 SOLEDAD STREET FOR MID PEN THE FARM INC Addenda: 0 1/12/18 3:00 PM 17-02917 Salinas Plan Issuer: Ausonio, Inc. 831-633-3371 831-633-3389 The project is a new 90 unit 4 four story housing project on Soledad Street in Salinas being constructed for Mid-Pen Housing on Soledad Street in Salinas by Ausonio Incorporated. The project includes 81 SRO; 4 ea. One Bedrooms; 5 ea. Two Bedrooms; Four Artist Studio’s and 7,975 sf Retail Space.