Traffic Advice GMB Services in Pak Shek Kok (Providence Bay)

Total Page:16

File Type:pdf, Size:1020Kb

Traffic Advice GMB Services in Pak Shek Kok (Providence Bay) Traffic Advice GMB Services in Pak Shek Kok (Providence Bay), Tai Po Members of the public are advised that with effect from 16 March 2014 (Sunday), New Territories GMB route nos. 27A and 28S will provide services in Pak Shek Kok (Providence Bay). Their services details are as follows: GMB 27A (Pak Shek Kok (Providence Bay) – Sha Tin (Pai Tau Street)) The service of GMB 27A will be extended from Hong Kong Science Park (Fo Hing Street) to Pak Shek Kok (Providence Bay). The operating hours from Pak Shek Kok (Providence Bay) is from 6.40 am to 10.00 pm at a frequency of 15 to 20 minutes daily. The fare is $7.8 per single journey. GMB 28S (Pak Shek Kok (Providence Bay) – Sha Tin (Pak Hok Ting Street) (Circular)) Routeing PAK SHEK KOK (PROVIDENCE BAY) to SHA TIN (PAK HOK TING STREET) (CIRCULAR) (SPECIAL SERVICE ROUTE NO. 28S): via Fo Shing Road, Chong San Road, Fo Chun Road, Pok Yin Road, roundabout, Cheung Tai Road, unnamed access road, Cheung Tai Road, roundabout, Yau King Lane, Lookout Link, Tai Po Road, Tsun King Road, Lok Shun Path, Lok King Street, Fo Tan Road, Tai Po Road, Sha Tin Rural Committee Road, Yuen Wo Road, Tam Kon Po Street, Sha Tin Centre Street, Pak Hok Ting Street, Sha Tin Centre Street, Wang Pok Street, Yuen Wo Road, Sha Tin Rural Committee Road, Tai Po Road, Fo Tan Road, Lok King Street, Lok Shun Path, Tsun King Road, Tai Po Road, Lookout Link, Yau King Lane, roundabout, Cheung Tai Road, unnamed access road, Cheung Tai Road, roundabout, Pok Yin Road, Fo Chun Road, Chong San Road and Fo Shing Road. Timetable Mondays to Saturdays (except public holidays) From Pak Shek Kok (Providence Bay) Headway (minutes) 7.00 am to 9.00 pm 30 Sundays and public holidays From Pak Shek Kok (Providence Bay) Headway (minutes) 9.00 am to 9.00 pm 30 Fare From Pak Shek Kok (Providence Bay) to Sha Tin (Pak Hok Ting Street) Pak Shek Kok (Providence Bay) Villa Castell/Deerhill Bay/Villa Costa/Cheung Shue Tan/Chek Nai $6.50 Ping/The Chinese University of Hong Kong $8.50 $6.50 Kau To Shan/Lok Lo Ha/Royal Ascot/Jubilee Garden $8.50 $6.50 $4.30 Sha Tin (Pak Hok Ting Street) From Sha Tin (Pak Hok Ting Street) to Pak Shek Kok (Providence Bay) Sha Tin (Pak Hok Ting Street) $4.30 Kau To Shan/Lok Lo Ha/Royal Ascot/Jubilee Garden Villa Castell/Deerhill Bay/Villa Costa/Cheung Shue Tan/Chek Nai $6.50 $6.50 Ping/The Chinese University of Hong Kong $8.50 $8.50 $6.50 Pak Shek Kok (Providence Bay) The GMB operators will put up notices at terminal points and inside vehicles in advance to inform the passengers of the above arrangements. .
Recommended publications
  • First Phase of Anti-Rodent Campaign 2017 in Tai Po District
    Tai Po District Council Discussion Paper No. EHW 6/2017 For Environment, Housing and Works Committee Meeting on 11 January 2017 Food and Environmental Hygiene Department First Phase of Anti-rodent Campaign 2017 in Tai Po District Purpose To brief Members of the arrangements and details of the First Phase of Anti-rodent Campaign 2017 to be launched by the Food and Environmental Hygiene Department (FEHD) in Tai Po District. Background 2. The Second Phase of Anti-rodent Campaign 2016 organized by FEHD was launched from 4.7.2016 to 9.9.2016. Actions taken in the district and the results of the Campaign are detailed at Annex I. 3. With a view to sustaining anti-rodent control measures, FEHD is going to launch the Anti-rodent Campaign 2017, under the slogan “Prevent Disease Eliminate Rodent Nuisance”, in two phases as follows - (a) First Phase : 2.1.2017 to 10.3.2017 (b) Second Phase : 3.7.2017 to 8.9.2017 (Tentatively) First Phase of Anti-rodent Campaign 4. The First Phase of Anti-rodent Campaign is to be launched from 2.1.2017 to 10.3.2017 targeting at markets/ municipal services buildings, hawker bazaars, typhoon shelters, lanes adjacent to food premises and other problematic spots as well as their surroundings. The objectives of this phase are – (a) To arouse public awareness on the significance of rodent prevention and control in the community; (b) To promote participation of the public in rodent prevention and control work in their premises; and (c) To reduce the rodent population in the territory, particularly in the - 1 - target areas and their peripheries.
    [Show full text]
  • Expert Evaluation Report Is Based on the Following Materials Given by the Pland to the Consultant
    Planning Department Agreement No. PLNQ 56/2012 Category A1 - Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment Pak Shek Kok (East) Central Area, Tai Po Expert Evaluation – Final Report February 2014 Name Signature Prepared & Checked: Karl An Reviewed & Approved: Anna Chung Version: Final Date: 19 February 2014 Disclaimer This Expert Evaluation – Final Report is prepared for Planning Department and is given for its sole benefit in relation to and pursuant to Pak Shek Kok (East) Central Area, Tai Po Development and may not be disclosed to, quoted to or relied upon by any person other than Planning Department / identified recipient as requested under the Agreement with Planning Department without our prior written consent. No person (other than Planning Department) into whose possession a copy of this Expert Evaluation – Draft Report comes may rely on this Expert Evaluation – Draft Report without our express written consent and Planning Department may not rely on it for any purpose other than as described above. AECOM Asia Co. Ltd. 11/F, Grand Central Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin, NT, Hong Kong Tel: (852) 3105 8686 Fax: (852) 2317 7609 www.aecom.com QF001 – Submission Checking Record 3.0/10 Expert Evaluation and Advisory Services on Air Ventilation Assessment Pak Shek Kok (East) Central Area, Tai Po Planning Department, HKSAR Expert Evaluation – Final Report Table of Contents Page 1 INTRODUCTION .......................................................................................................................
    [Show full text]
  • Highways Department Territory Development Department
    FORECAST OF INVITATIONS TO TENDER JANUARY 2002 TO JUNE 2002 2002 1 R 2002 666 RRR Probable Date Works Category PWP of Gazettal/ & Lowest Group Range of Item No. Inviting Permitted to Estimate of Name and Tel. No. of If Contract No. & Title of Contract Tenders Tender Cost Contact Person *� i**�»i*1m Y¥0- 1 If�3» 1H �*Jt1»ma 1t!5 {�Ht �� B- m1*3 Highways Department 736TH Deep Bay Link – Detailed ground Mar 2002 GROU M1 Mr. C.M. CHAN investigation 2002 � 3 J :)W�If ���%: Fwl�m®� – 1*:)W� 2762 3610 738TH Site investigation for direct connections with May 2002 GROU M1 Mr. P.K. LEE Tsing Lung Bridge at Tsing Lung Tau and 2002 � 5 J :)W�If :jt%: North Lantau 2762 3632 ����E*MW�m��*���m� m�ItW�If 759TH Shenzhen Western Corridor – Detailed ground May 2002 GROU M1 Mr. S.M. LI investigation 2002 � 5 J :)W�If :;�%: {mE'®� - 1*:)W� 2762 3998 - Resurfacing of Red Routes on Hong Kong May 2002 R&D M1 Mr. T.K. CHEUNG Island 2002 � 5 J Group A&B 5rf%: m��-:*:��TIf ��E�� 2231 5724 r*Ez* - Footpath reconstruction and associated May 2002 R&D M1 Mr K.W. YEUNG improvement works for King’s Road 2002 � 5 J Group A&B i�1%: ���1A�:�IfET�2�If ��E�� 2231 5720 r*Ez* 755TH Reconstruction and improvement of Tuen Jun 2002 GROU M1 Mr. H.T. MOK Mun Road – Ground Investigation 2002 � 6 J :)W�If �-�%: 4F0�:�E2�If - :)W� 2762 3641 - Reconstruction of Shek Pai Wan Road and Jun 2002 R&D M1 Mr.
    [Show full text]
  • Scheme Area Ma Liu Shui 馬
    TOLO HARBOUR гsгs ¥¥¥ PakPak ShekShek KokKok �…��…� CheungCheung ShueShue CheungCheung ShueShue CHONGCHONG SANSAN ROADROAD TanTan »›»› ·�·� HongHong KongKong ScienceScience ParkPark ¤¤¤ ˘˘˘ MAMA LIULIU SHUISHUI h¶h¶ ⁄⁄ MAMA LIULIU SHUISHUI RƒS¯RƒS¯ ShawShaw CollegeCollege ShawShaw CollegeCollege pÁX¦pÁX¦ s·È¨s·È¨ UnitedUnited CollegeCollege NewNew AsiaAsia CollegeCollege ª¨dª¨d ChekChek NaiNai PingPing ¤¤¡¤¤¡ CENTRALCENTRAL AVENUEAVENUE ¤¤¡¤¤¡ CENTRALCENTRAL AVENUEAVENUE ¤¤¡¤¤¡ CENTRALCENTRAL AVENUEAVENUE »›»›»› ·⁄⁄·⁄⁄·⁄⁄ TheThe ChineseChinese UniversityUniversity j⁄Hfi‰⁄�‚wj⁄Hfi‰⁄�‚wofof HongHong KongKong ¤¤ ˘fi�⁄�˘fi�⁄� Ma Liu Shui Ferry Pier R–�R–� TAITAI POPO ROADROAD -- MAMAChungChung LIULIU SHUISHUI ChiChi CollegeCollege j⁄˙j⁄˙j⁄˙ UniversityUniversityUniversity Station StationStation TOLOTOLOTOLO HIGHWAY HIGHWAY HIGHWAY TOLOTOLOTOLO HIGHWAY HIGHWAY HIGHWAY SHASHA TINTIN HOIHOI RÄW LAILAI PINGPING ROADROAD E¤{E¤{ KauKau ToTo VillageVillage _ÄQ_ÄQ @´o@´o Windsor ShatinShatin KnollKnoll HeightsHeights SCALE 1 : 15 000 METRES 300 0 300 600 METRES PLAN No. M / SP / 08 / 62 Scheme Area BASE PLANS No. 7-NE & SE Ma Liu Shui DATE 6. 6. 2008.
    [Show full text]
  • TOLO HARBOUR 史提福樓 Trackside Villas Strafford House 員工會所港鐵 峰林軒 Daisyfield
    TAI PO ROAD - TAI PO KAU 東頭灣徑 策誠軒 I TOLO HARBOUR 史提福樓 Trackside Villas Strafford House 員工會所港鐵 峰林軒 Daisyfield 9 大 埔 滘 8 燕 子 里 Y 7 2 IN 叠翠豪庭 農瑞村 TSE LANE 10 1 9 吐 露 港 公 路 TAI PO KAU! Emerald 海景山莊 20 Palace 20 Seaview Villas 2 1 南苑 Southview Villas YAT YIU AVE 皇御山 The Kingston Hills 4A 逸遙路 松 苑 Tolo Ridge H U 大埔滘老圍 逍遙雋岸 N G L'Utopie L A 白鷺湖 Tai Po Kau M 互動中心 D Lo Wai 41 1 1 50 42 40 R 55 I Lake Egret V 43 E Nature Park 8 3 紅 林 路 35 60 35 44 ! 6 紅 林 居 翡翠花園 滌濤山 65 45 30 The Mangrove 8 Savanna Garden14 Constellation 大埔滘新圍 T 46 KOU LIN O K 10 Cove O 24 L 12 47 25 ! Tai Po Kau 1 19 大 埔 公 路 ─ 大 埔 滘 段 15 San Wai 蔚海山莊 8 48 20 1 10 20 5 Villa Costa 49 23 11 12 15 10 6 15 16 天賦海灣 7 10 白石角配水庫 3 荔枝坑 瞭望里 Pak Shek Kok Providence Bay 1 Ser Res 9 Lai Chi Hang 大埔滘 優 景 里 18 公園 3 墨爾文 20 21 40 19 新翠山莊 8 鹿茵山莊 Malvern 38 ! 10 FO CHUN ROAD Villa Castell 7 DeerHill Bay 7 6 海鑽 18 大 36 16 科 進 路 天賦海灣 32 24 1 10 11 溋玥 1 埔 The Graces 創新 路 9 天賦海灣 公 9 5 8 松仔園 路 22 Providence Peak ! 8 ─ 26 6 5 7 Tsung Tsai Yuen 大 YAU KING LANE 9 3 埔 II 10 逸瓏灣 100 滘 1 1 白石角海濱長廊 段 科城路 街坊婦女會 3 Mayfair by the Sea 15 L I Japanese 孫方中 5 12 3 A 泵房 1 FO CHUN ROAD R Int'l School I T 保良局 香港教育大學 1 碼頭 18 7 16 21 田家炳千禧 運動中心 E FO SHING RD 18 R 博研路 8 18 U The Education 雲滙 T 21 University 3 11 10 16 A 12 H1 A1 N of Hong Kong St Martin A2 U Sports Centre 10 7 海日灣 A 6 H9 段 K 6 鉛 O D1 The Horizon P 8 滘 I 200 嘉熙 D2 ─ A 蕉坑 道 T 5 B2 大埔滘 埔 滘 林 T 5 8 Solaria C1 Pak Shek Kok Promenade 管理站 大 A 徑 I Tsiu Hang 優 景 里 ! 3 C2 育 P East Rail Line 10 教 O 自然 CHONG SAN ROAD 埔滘 R 3 TOLO HIGHWAY1 大 O 碗窰 Wun Yiu Yiu Wun 碗窰 A
    [Show full text]
  • Culture & Heritage Celebration
    2014 Great Outdoors Hong Kong Fact Sheet Background Ride on the success of the event last five years with positive feedbacks from visitors and stakeholders provide greater variety on trails selection to experience on the unique landforms and landscapes in Hong Kong Objectives Enrich the diversity and sophistication of tourism attractions in Hong Kong contributing to arrivals generation and visitor experience Enhance flexibility to tourists on the selection of self-guided and easy accessible routes to natural attractions by providing detailed transportation information Accreditation of Hong Kong Global Geopark of China by UNESCO in September 2011 to lay the foundation for green tourism Attract green lovers through promoting the unique hiking and cycling experience in HK Build HK’s image as a hiking friendly destination Promote the outdoor season in Hong Kong (November to March) with a bundle of recommended hiking trails and cycling routes Duration November 2014 to March 2015 Hiking Promote 7 thematic hiking routes covering different hiking areas in Hong Kong: Hiking The Peak to Pok Fuk Lam Reservoir MacLehose Trail Tung Chung to Tai O Dragon’s Back Tung Ping Chau Tap Mun Po Toi Island 1 Self-Guided Hiking Routes Walking Theme Routing km Difficulty Time * Metropolitan The Peak to Pok Fu Lam 7 ~ 3hrs Easy Woodland Reservoir Lugard Road Lung Fu Shan and Pinewood Battery Harlech Road Pok Fu Lam Reservoir Geological MacLehose Trail Landscapes Route A: Sai Wan Pavilion Route A: Route A Route A: to Pak Tam Au 11 ~ 5.5hrs Difficult
    [Show full text]
  • Pak Shek Kok – Wan Chai (Hong Kong Convention and Exhibition Centre))
    Traffic Advice Introduction of KMB Route No. 900 (Pak Shek Kok – Wan Chai (Hong Kong Convention and Exhibition Centre)) Members of the public are advised that KMB Route No. 900 (Pak Shek Kok – Wan Chai (Hong Kong Convention and Exhibition Centre)) will commence operation with effect from 26 April 2021 (Monday). Details of the route are as follows: I. Routeing From Pak Shek Kok to Wan Chai (Hong Kong Convention and Exhibition Centre): via Fo Shing Road, Fo Chun Road, Fo Shing Road, Chong San Road, Science Park Road, Sui Cheung Street, Tolo Highway, Tai Po Road (Sha Tin), Sha Tin Road, Yuen Wo Road, Sha Tin Rural Committee Road, Tai Po Road (Sha Tin), Tsing Sha Highway, Lai Po Road, Lin Cheung Road, West Kowloon Highway, Western Harbour Crossing, Connaught Road West, Connaught Road Central, Rumsey Street, Des Voeux Road Central, Chater Road, Murray Road, Queensway, Arsenal Street, Gloucestor Road and Fleming Road. From Wan Chai (Hong Kong Convention and Exhibition Centre) to Pak Shek Kok: via Fleming Road, Expo Drive East, roundabout, Expo Drive East, Fleming Road, Hennessey Road, Queensway, Queen’s Road Central, Des Voeux Road Central, Hillier Street, Connaught Road Central, Connaught Road West, Western Harbour Crossing, West Kowloon Highway, Lin Cheung Road, Lai Po Road, Tsing Sha Highway, Shing Mun Tunnel Road, Tai Po Road (Sha Tin), Sha Tin Rural Committee Road, Yuen Wo Road, Sha Tin Road, Tai Po Road (Sha Tin), Tolo Highway, Chak Cheung Street, Science Park Road, Chong San Road and Fo Shing Road. II. Service Hours Mondays to Fridays (except Public Holidays) From Pak Shek Kok: Four departures (7:00 a.m., 7:15 a.m., 7:30 a.m.
    [Show full text]
  • MARINE DEPARTMENT NOTICE NO. 53 of 2017 (Navigational & Seamanship Safety Practices) Marine Sporting Activities for the Year 2017/18
    MARINE DEPARTMENT NOTICE NO. 53 OF 2017 (Navigational & Seamanship Safety Practices) Marine Sporting Activities For The Year 2017/18 NOTICE IS HEREBY GIVEN that the following marine sporting activities under the auspices of various clubs and associations will take place throughout the year in areas listed below. This list is not exhaustive. Races will normally be conducted during weekends and Public Holidays unless otherwise specified. Yacht Races : Beaufort Island, Bluff Head, Cape D’Aguilar, Cheung Chau, Chung Hom Kok, Deep Water Bay, Discovery Bay, Hei Ling Chau, Junk Bay, Lamma Island, the north and south of Lantau Island, Ma Wan Channel, Mirs Bay, and areas off Ninepin Group, Peng Chau, Plover Cove, Po Toi Island, Port Shelter, Repulse Bay, Rocky Harbour, Round Island, Shek Kwu Chau, Siu Kau Yi Chau, Soko Islands, South Bay, Stanley Bay, Steep Island, Sung Kong, Sunshine Island, Tai Long Pai, Tai Tam Bay, Tathong Channel, Tolo Harbour, Eastern Victoria Harbour and Waglan Island. Windsurfing Races : Inner Port Shelter, Long Harbour, Lung Kwu Tan, Plover Cove, Shek O Wan, Sheung Sze Mun, Shui Hau Wan, Stanley Bay, Tai Tam Bay, Tolo Harbour and Tung Wan of Cheung Chau. Canoe Races : Beaufort Island, Cape D’Aguilar, Castle Peak Bay, Cheung Chau, Deep Water Bay, Discovery Bay, east of Lantau Island, Long Harbour, Man Kok Tsui, Peng Chau, Plover Cove, Port Shelter, Repulse Bay, Rocky Harbour, Shing Mun River Channel, South Bay, Siu Kau Yi Chau, Stanley Bay, Tai Lam Chung, Tai Tam Bay, Tai O, Tolo Harbour and Tung Chung. Dragon Boat, Colour
    [Show full text]
  • Appendix II - P Tai Po District Summaries of Written/Oral Representations
    P. Tai Po District - 252 - P. Tai Po District Appendix II - P Tai Po District Summaries of Written/Oral Representations Item No.* DCCAs Representations EAC’s Views No. W O 1 All 1 - (a) Supports the provisional Item (a) DCCAs recommendations on P01 The supporting view is noted. (Tai Po Hui), P02 (Chung Ting), P03 (Tai Po Central), P04 (Tai Yuen), P05 (Fu Heng), P06 (Yee Fu), P07 (Fu Ming Sun), P08 (Kwong Fuk & Plover Cove), P09 (Wang Fuk), P10 (Tai Po Kau), P11 (Wan Tau Tong), P12 (San Fu), P15 (Tai Wo) and P18 (Shuen Wan). (b) Holds reservation on the Item (b) provisional The proposal made in the recommendations on P19 representation involves (Sai Kung North) and alteration of administrative proposes to include P19 district boundaries, which (Sai Kung North) in the Sai does not fall under the Kung DC in 2023 having purview of the EAC. The regard to the development EAC has referred this view to along Sai Sha Road. the Government for consideration. (c) Same as item 5(a). Item (c) Please see item 5(a). 2 P02 – 1 - Given that the aggregate This proposal is not accepted Chung population of P02 (Chung because: Ting Ting), P03 (Tai Po Central), P04 (Tai Yuen), P05 (Fu (i) under the proposal made Heng) and P08 (Kwong Fuk & in the representation, the Plover Cove) is only 70 000, number of DCCAs will * W: Number of written representations. O : Number of oral representations. P. Tai Po District - 253 - P. Tai Po District Item No.* DCCAs Representations EAC’s Views No.
    [Show full text]
  • Last Updated: 1 February 2021 Railway-Related Facilities Under
    Last updated: 1 February 2021 Railway-related Facilities under Settlement Monitoring within Railway Protection Areas The MTR Corporation will upload latest information when there are changes in the railway-related facilities under settlement monitoring, updates in the settlement limit for suspension or when the latest settlement level exceeds the limit for suspension. Total number of facilities currently under settlement monitoring: 70 Number of facilities where settlement monitoring has ceased since last announcement on 1 January 2021: 0 Number of newly-added facilities under settlement monitoring since last announcement on 1 January 2021: 7 Number of facilities under settlement monitoring with relevant works currently suspended: 2 Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) Kwun Tong Line Architectural Building Public 2 East Kowloon Cultural Centre Services Kowloon Bay Station 20 +3 project works Department Civil Engineering Tseung Kwan O – Lam Tin Public 4 Civil works and Development Near Lam Tin Station 20 +11 Tunnel works Department Private Ho Man Tin Station Package 1 Building 6 project (Note 1) Ho Man Tin Station 71 -39 property development project works Footbridge connecting East Public Highways Kowloon Bay Station and 104 Kowloon Cultural Centre and Civil works 20 -1 works Department Kowloon Bay Depot Kowloon Bay Station Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) Public Drainage Services Between Kwun Tong and 128 Revitalisation of Tsui Ping River Civil works 20 +1 works Department Lam Tin stations Tsuen Wan Line Public Housing Development at Building Public Hong Kong Underground water main 91* North West Kowloon 20 -27 project works Housing Authority on Tung Chau Street Reclamation Site 1 (East) Private Redevelopment project at No.
    [Show full text]
  • Remaining Engineering Infrastructure Works for Pak Shek Kok Development – Stage 2A
    LC Paper No. CB(1)1830/02-03(01) For information LEGISLATIVE COUNCIL PANEL ON PLANNING, LANDS AND WORKS PWP Item No. 658CL - Remaining Engineering Infrastructure Works for Pak Shek Kok Development – Stage 2A PURPOSE This paper briefs Members on the proposed engineering infrastructure works at Pak Shek Kok to serve the Science Park Phase 2 development which is scheduled for commissioning in early 2006. PROJECT SCOPE AND NATURE 2. The scope of the proposed works (Stage 2A works in Enclosure 1) comprises the construction of the following engineering infrastructure at Pak Shek Kok – (a) 400 metres of local road (Road L4); (b) 2 kilometres of waterfront promenade (including landscape node structures); (c) 600 metres of footpaths, 900 metres of cycle tracks, roadside amenities and landscaping works; (d) drainage and sewerage works; (e) a fire tug pier; (f) a public landing steps; - 1 - (g) ancillary works including fire mains, a public toilet and a refreshment kiosk; and (h) environmental monitoring and audit (EM&A) programme for the works mentioned in items (a) to (g) above. The site plan and section diagrams of the proposed works are at Enclosures 1 and 2 respectively. JUSTIFICATION 3. Science Park Phase 2 is currently scheduled for commissioning in early 2006. To timely support commissioning of Science Park Phase 2, we need to commence construction of Road L4 and the associated drainage and sewerage works in December 2003 for completion in September 2005. 4. The provision of a promenade along the waterfront at Pak Shek Kok will enhance the amenity value of the area and offer a prominent leisure and recreational area with panoramic seaview of the Tolo Harbour and the mountains beyond.
    [Show full text]
  • Expert Evaluation Report of Pak Shek Kok Development Area Phase 2, Site D
    TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A – Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) Final Report - Pak Shek Kok September 2008 ………………………………………. by Professor Edward Ng Department of Architecture, CUHK, Shatin, NT, Hong Kong T: 26096515 F:26035267 E: [email protected] W: www.edwardng.com Final Report Page 1 of 23 27 August 2008 TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) List of Abbreviations ABL – Atmospheric Boundary Layer AVA – Air Ventilation Assessment AWS – Automatic Weather Station B(P)R – Building (Planning) Regulations ETWB – Environment, Transport and Works Bureau G/IC – Government, Institution or Community HKO – Hong Kong Observatory HKUST – Hong Kong University of Science and Technology HPLB – Housing, Planning and Lands Bureau m/s – meters per second NBA – Non-Building Area O – Open Space OU – Other Specified Uses OZP – Oultine Zoning Plan R(B)1 – Residential (Group B) 1 R(B)2 – Residential (Group B) 2 R(B)3 – Residential (Group B) 3 R(B)4 – Residential (Group B) 4 REC – Recreation TPTL – Tai Po Town Lot UCL – Urban Canopy Layer WGL – Waglan Island Final Report Page 2 of 23 27 August 2008 TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) Expert Evaluation Report of Pak Shek Kok Development Area Phase 2, Site D Executive summary Wind Availability: (a) The prevailing summer wind of the Project Area comes from the East and the southerly quarters including South West, South and South East.
    [Show full text]