Last updated: 1 February 2021

Railway-related Facilities under Settlement Monitoring within Railway Protection Areas

The MTR Corporation will upload latest information when there are changes in the railway-related facilities under settlement monitoring, updates in the settlement limit for suspension or when the latest settlement level exceeds the limit for suspension.

Total number of facilities currently under settlement monitoring: 70

Number of facilities where settlement monitoring has ceased since last announcement on 1 January 2021: 0

Number of newly-added facilities under settlement monitoring since last announcement on 1 January 2021: 7

Number of facilities under settlement monitoring with relevant works currently suspended: 2

Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) Line Architectural Building Public 2 East Cultural Centre Services Station 20 +3 project works Department Civil Engineering Tseung Kwan O – Public 4 Civil works and Development Near 20 +11 Tunnel works Department Private Package 1 Building 6 project (Note 1) Ho Man Tin Station 71 -39 property development project works Footbridge connecting East Public Highways and 104 Kowloon Cultural Centre and Civil works 20 -1 works Department Kowloon Bay Depot Kowloon Bay Station Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) Public Drainage Services Between Kwun Tong and 128 Revitalisation of Tsui Ping River Civil works 20 +1 works Department Lam Tin stations Public Housing Development at Building Public Underground water main 91* North 20 -27 project works Housing Authority on Tung Chau Street Reclamation Site 1 (East) Private Redevelopment project at No. Building Between Central and 101 project (Note 1) 20 -2 10 project Admiralty stations works Island Line Private Redevelopment project at No. 2 Building Between Central and 18 project (Note 1) 20 -2 Murray Road project Admiralty stations works Private Redevelopment project at No.2 Building Between Central and 19 project (Note 1) 20 +7 Murray Road project Admiralty stations works Private Redevelopment project at No. Building Between Wan Chai and 74 project (Note 1) 20 +4 369-371 Hennessy Road project Causeway Bay stations works Private Redevelopment project at No. 2 Building Between Tai Koo and Sai 76 project (Note 1) 20 +5 Tai Cheong Street project Wan Ho stations works Redevelopment project at No. Private 46-56 Queen’s Road East, No. 2- Building Between Admiralty and 90 project (Note 1) 20 -1 12 Anton Street and No. 1-11 project Wan Chai stations works Landale Street Private Hotel development project at Building 97 project (Note 1) Near Station 20 +2 No.3 Finnie Street project works Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) Private Redevelopment project at No. Building 100 project (Note 1) Station 20 -2 78-90 Wing Lok Street project works Upgrading of Salt Public Water Supplies 112 Civil works 20 +2 Water Supply System works Department Private Redevelopment project at No. Building Between Wan Chai and 119 project (Note 1) 20 +2 472 Hennessy Road project Causeway Bay stations works Private Development project at No.78 Building 120 project (Note 1) Station 20 +1 Road project works Private Redevelopment project at No. Building Between Wan Chai and 125 project (Note 1) 20 +2 199-203 Hennessy Road project Causeway Bay stations works Private Redevelopment project at No. Building Between and 126 project (Note 1) 20 +1 383-385 King's Road project stations works Private Redevelopment project at No. Building 127 project (Note 1) Station 20 +2 44-50 project works Private Property development project Building Ventilation building near 21 project (Note 1) 20 -2 on Lee Nam Road, Ap Lei Chau project Lee Wing Street works

Wong Chuk Hang Station Private Building 67 Package 2 property project (Note 1) Wong Chuk Hang Depot 20 -5 project development works

Wong Chuk Hang Station Private Wong Chuk Hang Station Building 89 Package 3 property project (Note 1) and Wong Chuk Hang 20 -2 project development works Depot Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) Private LOHAS Park Package 10 property Building Near Tseung Kwan O 24 project (Note 1) 20 +2 development project Depot works Civil Engineering Between Tiu King Leng Footbridge of Tseung Kwan O – Public 75 Civil works and Development and Tseung Kwan O 20 +1 Lam Tin Tunnel works Department stations Private Building 78 Works at Tseung Kwan O Depot project (Note 1) Tseung Kwan O Depot 20 -3 project works Civil Engineering Public Near Tseung Kwan O 79 Cross Bay Link, Tseung Kwan O Civil works and Development 20 -3 works Depot Department Private Composite Development on Ko Building Ventilation Building at 98 project (Note 1) 20 +6 Chiu Road project works Private Yau Tong Ventilation Building Building Ventilation Building at 106 project (Note 1) 20 +6 Property Development project Yau Tong works Public Housing Development at Public Hong Kong Pak Shing Kok ventilation 113 Civil works 20 +3 Chiu Shun Road works Housing Authority Building Between Tseung Kwan O and Hang Hau stations, Public Water Supplies 121 Mainlaying in Tseung Kwan O Civil works and between Tseung 20 -1 works Department Kwan O and LOHAS Park stations , Airport Express and Disneyland Resort Line Private West Kowloon Cultural District – Building 28 project (Note 1) Near Kowloon Station 20 -15 Lyric Theatre Complex project works Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) Private Hong Kong International Airport Building Between Airport and 29 project (Note 1) 20 -3 Three-runway System project AsiaWorld-Expo stations works Civil Engineering Tung Chung New Town Public Between Siu Ho Wan and 30 Civil works and Development 20 -5 Extension works Tung Chung Station Department Public Highways Between Kowloon and 73 Central Kowloon Route Civil works 20 -13 works Department Olympic stations Private Airport Authority Office Tower Building Between Airport and 87 project (Note 1) 20 -1 Development project AsiaWorld-Expo stations works Private Airport Terminal 2 Building 102 project (Note 1) Airport Station 20 -6 demolition work project works Architectural Fire Station Building Public Between Kowloon and 111 Services 20 -5 Complex on To Wah Road project works Olympic stations Department

Central Kowloon Route Public Highways Between Kowloon and 123 Civil works 20 -1 Yau Ma Tei Ventilation Building works Department Olympic stations

East Rail Line Private Station property Building 38 project (Note 1) 50 -43 development project works Private Station improvement Building 88 project (Note 1) Lo Wu Station 20 -7 works project works^ Private Comprehensive Development at Building Between University and 103 project (Note 1) 20 -4 Pak Shek Kok project Market stations works Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) Shek Wu Hui Effluent Polishing Public Drainage Services Between 107 Civil works 20 -8 Plant work works Department and Lo Wu stations Provision of barrier-free facilities Public Highways Between and Fo 108 Civil works 20 -3 for highway structures works Department Tan stations

Construction of Tong Hang No.3 Public Water Supplies Between Tai Wo and 110 Fresh Water Service Reservoir Civil works 20 -4 works Department stations and Associated Mainlaying

Road widening and retrofitting Civil Engineering Public Between Sha Tin and 115 noise barriers on Tai Po Road Civil works and Development 20 -3 works stations (Sha Tin Section) Department Private Between Kam Sheung Station viaduct Building 45 project (Note 1) Road and Yuen Long 20 -14 column improvement works project works stations Private Property development project – Building -14 53* project (Note 1) Near 20 Grand YOHO project (Note 2) works Private Yuen Long Station property Building 56 project (Note 1) Yuen Long Station 20 -8 development project works Private Industrial development project Building Between Mei Foo and 69 project (Note 1) 20 -4 on Wing Kei Road, Kwai Chung project Tsuen Wan West stations works Private Between Kam Sheung Building 72 Commercial project near project (Note 1) Road and Yuen Long 20 +4 project works stations Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) Private Building Near Kam Sheung Road 83 Package 1 Property project (Note 1) 20 -3 project Station Development works

Private Mariners' Club Redevelopment Building 85 project (Note 1) East 20 -1 Project project works

Civil Engineering Sewerage works of development Public Near Kam Sheung Road 92 Civil works and Development 20 -7 at South, Yuen Long works Station Department Phase 1 Private Kai Tak Area 1F Site 2 Building 93 project (Note 1) 20 -13 development project project works Private Kai Tak Area 1F Site 1 Building 94 project (Note 1) Kai Tak Station 20 -11 development project project works Private Kai Tak Area 1E Site 2 Building Between Kai Tak and 95 project (Note 1) 29 -21 development project project Diamond Hill stations works Public Rental Housing Development Phase 1 & 2 and Subsidised Sales Flats Building Public Hong Kong Diamond Station and 96 20 +2 Development at Diamond Hill project works Housing Authority adjacent section Comprehensive Development Area Provision of universal accessibility facilities at Public Highways 117 Civil works Near Station 20 -3 footbridges, elevated walkways works Department and subways Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) Private Highways Between and 118 Sai Sha Road widening works Civil works project 20 -1 Department stations works Private Kai Tai Area 1E Site 1 Building Between Kai Tak and 124 project (Note 1) 20 0 Development project project Diamond Hill stations works Light Rail Private Yuen Long Station property Building Near Light Rail 61 project (Note 1) 20 -16 development project Yuen Long Stop works Private property Building 62 project (Note 1) Light Rail Tin Wing Stop 150 -85 development project works Between Light Rail Tuen Water mains works in Public Water Supplies 80 Civil works Mun Ferry Pier Stop and 20 -2 District works Department Melody Garden Stop Between Light Rail Water mains works in Tuen Mun Public Water Supplies 86 Civil works and Light 20 -6 District works Department Rail Depot Stop Universal accessibility facilities Public Highways Near Light Rail 105 works at footbridge on Ming Civil works 20 -3 works Department Shek Pai Stop Kum Road Provision of universal accessibility facilities at Public Highways Light Rail 116 Civil works 20 0 footbridges, elevated walkways works Department Road Stop and subways Walkway cover works in Public Highways Near Light Rail 122 Civil works 20 -3 works Department

Public Housing Development at Building Public Hong Kong Near Light Rail Tuen Mun 129 20 -2 Hang Fu Street project works Housing Authority Swimming Pool Stop Settlement Nearby MTR Project Responsible Limit for Latest Settlement Code Project Project Type Station/Railway Nature Party Suspension Level (mm)# Facilities (mm) High Speed Rail West Kowloon Cultural District – Private Hong Kong West 114 Integrated basement and Civil works project (Note 1) 20 -1 Kowloon Station underground road in zone 2A works

# The figure in each item represents the maximum movement among monitoring points as at 1 February 2021. “+” and “-“ represent raised and settled levels respectively. The figures are based on the MTR Corporation’s records. * Relevant works were temporarily suspended. ^ Station improvement works

Note 1: The private project works concerned are subject to the regulation of the Buildings Department in accordance with the Buildings Ordinance. Note 2: Relevant construction works were suspended during the second half of 2013 due to the settlement extent reaching its settlement limit. Preventive underpinning works for nearby railway facility are currently in progress.