First Phase of Anti-Rodent Campaign 2017 in Tai Po District

Total Page:16

File Type:pdf, Size:1020Kb

First Phase of Anti-Rodent Campaign 2017 in Tai Po District Tai Po District Council Discussion Paper No. EHW 6/2017 For Environment, Housing and Works Committee Meeting on 11 January 2017 Food and Environmental Hygiene Department First Phase of Anti-rodent Campaign 2017 in Tai Po District Purpose To brief Members of the arrangements and details of the First Phase of Anti-rodent Campaign 2017 to be launched by the Food and Environmental Hygiene Department (FEHD) in Tai Po District. Background 2. The Second Phase of Anti-rodent Campaign 2016 organized by FEHD was launched from 4.7.2016 to 9.9.2016. Actions taken in the district and the results of the Campaign are detailed at Annex I. 3. With a view to sustaining anti-rodent control measures, FEHD is going to launch the Anti-rodent Campaign 2017, under the slogan “Prevent Disease Eliminate Rodent Nuisance”, in two phases as follows - (a) First Phase : 2.1.2017 to 10.3.2017 (b) Second Phase : 3.7.2017 to 8.9.2017 (Tentatively) First Phase of Anti-rodent Campaign 4. The First Phase of Anti-rodent Campaign is to be launched from 2.1.2017 to 10.3.2017 targeting at markets/ municipal services buildings, hawker bazaars, typhoon shelters, lanes adjacent to food premises and other problematic spots as well as their surroundings. The objectives of this phase are – (a) To arouse public awareness on the significance of rodent prevention and control in the community; (b) To promote participation of the public in rodent prevention and control work in their premises; and (c) To reduce the rodent population in the territory, particularly in the - 1 - target areas and their peripheries. 5. Poor environmental hygiene, improper handling and disposal of refuse, structural defects and inadequate rodent proofing are the major causes of rodent infestation in markets/ municipal services buildings, hawker bazaars, typhoon shelters, lanes adjacent to food premises and other rodent problematic spots. These problems will be addressed to during the First Phase of Anti-rodent Campaign 2017 with a view to raising awareness of the people living or working in those problematic areas on the importance of proper rodent prevention and control. Besides, rodent prevention and control work will be strengthened in areas with Rodent Infestation Rate (RIR) of 10 percent or higher obtained in the second half of 2016. To sustain the results of rodent prevention and control work, publicity education will be strengthened in areas with RIR below 10 percent obtained in the second half of 2016. Action Plan 6. During the Campaign period, our in-house and pest control contractors’ staff will, in accordance with the action plan at Annex II, carry out systematic inspections on rodent problem and disinfestation work in the target areas, and public places in their vicinity, such as vacant lands, sewers, flower beds, refuse collection points, etc, as well as other rodent problematic spots. Poisonous baiting stations or rodent traps will be set whenever signs of rodent infestation are detected. At the same time, staff of our Hawkers, Markets and Cleansing Sections will step up inspections to markets/ municipal services buildings, hawker bazaars, typhoon shelters, lanes adjacent to food premises and other problematic spots in the target areas, and to augment rodent prevention and control work in those areas. 7. Relevant government departments including the Agriculture, Fisheries and Conservation Department, the Drainage Services Department, the Highways Department, the Home Affairs Department, the Housing Department, the Lands Department, the Leisure and Cultural Services Department and the Marine Department, etc. have been notified of the First Phase of Anti-rodent Campaign 2017 and invited to take appropriate actions in rodent prevention and control in areas under their respective ambit. Publicity and Education 8. On publicity and education fronts, FEHD will adopt the following measures in addition to arranging television and radio announcements in public interest - - 2 - (a) To produce publicity posters, pamphlets, banners and educational materials on rodent prevention and control for public circulation; (b) To enhance and maintain close liaison with the relevant government departments and local organizations; (c) To disseminate messages on rodent prevention and control by broadcasting van and distribute publicity materials to the public; (d) To organize thematic talks to disseminate the message of rodent prevention and control and ectoparasites of rodent to stall tenants and the management of the public markets; (e) To organize roving exhibitions at major shopping malls of housing estates and outreaching health talks for students and management of housing estates; and (f) To hold thematic exhibitions at the FEHD Health Education Exhibition and Resource Centre, and include relevant information in the FEHD homepage. 9. To ensure smooth implementation of the Campaign, the Pest Control Advisory Section of the department would provide technical assistance in the rodent prevention and control operations and the related publicity and education activities. Local Participation 10. To enlist support and active participation of the District Council in the Campaign, Council Members and Committee Members will be invited to participate in related events, organize publicity activities and offer views on the rodent prevention and control work. Tai Po District Environmental Hygiene Office Food and Environmental Hygiene Department 21 December 2016 - 3 - Annex I Food and Environmental Hygiene Department Second Phase of Anti-rodent Campaign 2016 in Tai Po District The Second Phase of the Anti-rodent Campaign 2016 was launched between 4.7.2016 and 9.9.2016. During the period, related rodent prevention and control measures were carried out smoothly. The actions and results of the Second Phase of the Anti-rodent Campaign 2016 in the district are as follows: 1. Number of patrols conducted at target areas : 730 2. Number of rat cages placed : 4588 3. Number of rodent poison treatment operations conducted : 473 4. Number of live rodents trapped : 137 5. Number of dead rodents collected : 151 6. Number of rat holes filled : 79 7. Number of advice on rodent prevention given to members of the public : 180 8. Number of leaflets/posters distributed : 3659 9. Number of publicity/promotion activities conducted : 14 - 4 - Annex II First Phase of Anti-Rodent Campaign 2017 Action Plan in Tai Po District (2.1.2017 – 10.3.2017) Date Action Location Teams AM PM Fu Heng Estate Market and Shopping 2.1.2017 Long Ha, Ting Kok Road Centre, Wan Tau Street, Kwong Fuk Contractor Staff (Monday) Square Plover Cove Road Market, Departmental Plover Cove Road, Po Wu Lane, Fui Sha Wai, Sam Mun Tsai Road and 3.1.2017 Staff and Ting Kok Tsuen, Tai Wo, Typhoon Shelter, Cheung Uk Tei, Sun (Tuesday) Contractor Staff Treasure Garden, Jade Plaza, Lai Garden Fortune Plaza Departmental Fu Shin Estate, Cho Ma Wu, 4.1.2017 Near Tai Po Sports Ground, Sheung Ha Staff and Che Tei Tsuen, Cheung Shue Wun Yiu (Wednesday) Contractor Staff Tan 5.1.2017 Departmental Tai Wo Road near Greenery Fu Shin Estate Market and Shopping Staff and Plaza, Chui Lok Street, Chui Yi Centre, Fu Shin Estate Food Stall, Sun (Thursday) Contractor Staff Street Hing Garden, Kwong Fuk Estate Heung Sze Wui Street, Heung Sze Wui Square, Po Heung 6.1.2017 Departmental Lane, Po Heung Square, Kwong Tai Po Market MTR Station, Chung Staff and Fuk Lane, Tai Ming Lane, Wan Nga Road, Yuen Tun Ha, Pun Shan (Friday) Contractor Staff Tau Square, Tai Kwong Chau Lane, Tai Wing Lane, Tai Wo Tsuen, Tung Ping Chau Tai Wo Estate, Tai Yuen Estate Market 7.1.2017 Shui Wai Tsuen, Near Serenity Contractor Staff and Shopping Centre, Tai Yuen Estate Park (Saturday) Food Stall, Po Nga Court Departmental Yuen Leng Tsuen, Lam 9.1.2017 Tai Po Hui Market, Tai Mei Tuk Pier Staff and Tsuen Sun Tsuen, Yuen and Barbecue place (Monday) Contractor Staff Shin Road Sha Lan Tsuen, Tai Hang Departmental 10.1.2017 Tsuen, Yu On Street and Kwong Fuk Road, Shuen Wan Typhoon Staff and Wholesale Fish Market, Nam Shelter, Lai Pek Shan Tsuen (Tuesday) Contractor Staff Hang, Yat Yiu Avenue Shuen Wan Chan Uk Village, Tung Tsz Road near Treasure Spot Departmental 11.1.2017 Shuen Wan Chim Uk Village, Garden, Chai Kek Tsuen, Wo Liu , Ting Staff and Shuen Wan Lei Uk Village, Nga Court, Tit Mei Tsai, Tsz Tong (Wednesday) Contractor Staff Ping Long Tsuen Tsuen, Sa Po Tsai, San Villa Tong Hang Tung Chuen, Hang Ha Po 12.1.2017 Departmental Pak Tin Kong Tsuen, Kau Liu Tsuen, Ng Tung Chai Tsuen, Kau Hui Staff and Ha Tsuen, Tai Ping Industrial Chik Street, Mei Sun Lane, Chui Wo (Thursday) Contractor Staff Centre, Wong Nai Fai Lane, Cycling Track (Nam Wan Road to Tat Wan Road ) On Fu Road, Shung Tak Street, Wai Yi Street, Wai Sin Street, Nam Shing Street, Wai Yan Departmental Street, Pak Shing Street, Sui On 13.1.2017 Wai Tau Tsuen, Lo Fai Road, San Uk Staff and Street, Yan Wo Lane, Hei Yuen Tsai (Friday) Contractor Staff Street, Yan Hing Street, Fu Shin Street, Tsing Yuen Street, Sam Mun Tsai New Village, Hung Lam Road, Lookout Link Fung Wong Nga Court, Tai Po Industrial Yue Kok Tsuen, Tai Po Estate(Dai King Street, Dai Hei Street, 14.1.2017 Industrial Estate(Dai Fat Street, Contractor Staff Dai Fu Street, Dai Kwai Street, Dai Dai Wah Street, Dai Fuk (Saturday) Cheong Street, Dai Wang Street), Tai Po Street), Parc Versailles Garden Heung Sze Wui Street, Heung Sze Wui Square, Tai Po Hui Market, Po Heung Lane, Po Heung Square, Kwong Fuk Ta Tit Yan, Po Sam Pai Tsuen, Lane, Kwong Fuk Square, Tai Ming Departmental Chung Nga Court, Ko Tong,
Recommended publications
  • Geodiversity, Geoconservation and Geotourism in Hong Kong Global
    Proceedings of the Geologists’ Association 126 (2015) 426–437 Contents lists available at ScienceDirect Proceedings of the Geologists’ Association jo urnal homepage: www.elsevier.com/locate/pgeola Geodiversity, geoconservation and geotourism in Hong Kong Global Geopark of China Lulin Wang *, Mingzhong Tian, Lei Wang School of Earth Science and Resources, China University of Geosciences, Beijing 100083, China A R T I C L E I N F O A B S T R A C T Article history: In addition to being an international financial center, Hong Kong has rich geodiversity, in terms of a Received 22 November 2014 representative and comprehensive system of coastal landscapes, with scientific value in the study of Received in revised form 20 February 2015 Quaternary global sea-level changes, and esthetic, recreational and cultural value for tourism. The value Accepted 26 February 2015 of the coastal landscapes in Hong Kong was globally recognized when Hong Kong Global Geopark Available online 14 April 2015 (HKGG), which was developed under the well-established framework of Hong Kong Country Parks and Marine Parks, was accepted in the Global Geoparks Network (GGN) in 2011. With over 30 years of Keywords: experience gained from managing protected areas and a concerted effort to develop geoconservation and Coastal landscape geotourism, HKGG has reached a mature stage of development and can provide a well-developed Hong Kong Global Geopark Geodiversity example of successful geoconservation and geotourism in China. This paper analyzes the geodiversity, Geoconservation geoconservation and geotourism of HKGG. The main accomplishments summarized in this paper are Geotourism efficient conservation management, an optimized tourism infrastructure, a strong scientific interpretation system, mass promotion and education materials, active exchange with other geoparks, continuous training, and effective collaboration with local communities.
    [Show full text]
  • PWSC(2021-22)5 on 21 April 2021
    For discussion PWSC(2021-22)5 on 21 April 2021 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 705 – CIVIL ENGINEERING Transport – Ferry Piers 58TF – Improvement works at Kau Sai Village Pier 59TF – Improvement works at Lai Chi Chong Pier Members are invited to recommend to the Finance Committee – (a) the upgrading of 58TF to Category A at an estimated cost of $77.8 million in money-of-the-day (MOD) prices; and (b) the upgrading of 59TF to Category A at an estimated cost of $108.8 million in MOD prices. PROBLEM We need to carry out the following works – (a) 58TF for reconstruction of Kau Sai Village Pier to improve the berthing condition and facilities of the pier; and (b) 59TF for reconstruction of Lai Chi Chong Pier to improve the structural condition and facilities of the pier. /PROPOSAL ….. PWSC(2021-22)5 Page 2 PROPOSAL 2. The Director of Civil Engineering and Development, with the support of the Secretary for Development, proposes to upgrade the following projects to Category A – (a) 58TF at an estimated cost of $77.8 million in MOD prices for the reconstruction of Kau Sai Village Pier; and (b) 59TF at an estimated cost of $108.8 million in MOD prices for the reconstruction of Lai Chi Chong Pier. PROJECT SCOPE 3. Details of the above two projects are provided at Enclosures 1 and 2 respectively. -------------------------------------- Development Bureau April 2021 Enclosure 1 to PWSC(2021-22)5 58TF – Improvement works at Kau Sai Village Pier PROJECT SCOPE We propose to upgrade 58TF to Category A and the scope of works comprises – (a) reconstruction of the existing pier, including provision of ancillary facilities such as roof cover, lighting system, benches, solar panels, Wi-Fi device, etc.; and (b) environmental monitoring and mitigation measures for the proposed works.
    [Show full text]
  • 1 Appendix 1 Issue of “2014 Hong Kong Definitive Stamps” and New
    Appendix 1 Issue of “2014 Hong Kong Definitive Stamps” and New Philatelic Products on 24 July 2014 A set of new “2014 Hong Kong Definitive Stamps” is designed by Ms. Shirman LAI and printed in lithography by Joh. Enschede B.V. of the Netherlands. “2014 Hong Kong Definitive Stamps” will be released on 24 July 2014. In parallel, “2006 Hong Kong Definitive Stamps” on the theme of birds, officially released on 31 December 2006, will continue to be on sale while stock lasts. In addition to the stamps and philatelic products of the new set of definitive stamps, an official souvenir cover and other philatelic products have been created to commemorate the concurrent sale of two sets of Hong Kong definitive stamps. They will also be released on the stamp issue day. Official First Day Covers for “2014 Hong Kong Definitive Stamps” at $1.2 each for small-sized covers and $2.2 each for large-sized covers as well as Official Souvenir Covers to commemorate the concurrent sale of the 2006 Hong Kong Definitive Stamps and the 2014 Hong Kong Definitive Stamps at $1.2 each will be on sale at all post offices from 10 July 2014. Advance orders for the additional philatelic products comprising two sets of definitive stamps can be placed at all post offices and online or mailed in from 26 May to 15 June 2014. These items and associated philatelic products will be displayed at the General Post Office, Tsim Sha Tsui Post Office, Tsuen Wan Post Office, Sha Tin Central Post Office and Tuen Mun Central Post Office from July 10.
    [Show full text]
  • List of Recognized Villages Under the New Territories Small House Policy
    LIST OF RECOGNIZED VILLAGES UNDER THE NEW TERRITORIES SMALL HOUSE POLICY Islands North Sai Kung Sha Tin Tuen Mun Tai Po Tsuen Wan Kwai Tsing Yuen Long Village Improvement Section Lands Department September 2009 Edition 1 RECOGNIZED VILLAGES IN ISLANDS DISTRICT Village Name District 1 KO LONG LAMMA NORTH 2 LO TIK WAN LAMMA NORTH 3 PAK KOK KAU TSUEN LAMMA NORTH 4 PAK KOK SAN TSUEN LAMMA NORTH 5 SHA PO LAMMA NORTH 6 TAI PENG LAMMA NORTH 7 TAI WAN KAU TSUEN LAMMA NORTH 8 TAI WAN SAN TSUEN LAMMA NORTH 9 TAI YUEN LAMMA NORTH 10 WANG LONG LAMMA NORTH 11 YUNG SHUE LONG LAMMA NORTH 12 YUNG SHUE WAN LAMMA NORTH 13 LO SO SHING LAMMA SOUTH 14 LUK CHAU LAMMA SOUTH 15 MO TAT LAMMA SOUTH 16 MO TAT WAN LAMMA SOUTH 17 PO TOI LAMMA SOUTH 18 SOK KWU WAN LAMMA SOUTH 19 TUNG O LAMMA SOUTH 20 YUNG SHUE HA LAMMA SOUTH 21 CHUNG HAU MUI WO 2 22 LUK TEI TONG MUI WO 23 MAN KOK TSUI MUI WO 24 MANG TONG MUI WO 25 MUI WO KAU TSUEN MUI WO 26 NGAU KWU LONG MUI WO 27 PAK MONG MUI WO 28 PAK NGAN HEUNG MUI WO 29 TAI HO MUI WO 30 TAI TEI TONG MUI WO 31 TUNG WAN TAU MUI WO 32 WONG FUNG TIN MUI WO 33 CHEUNG SHA LOWER VILLAGE SOUTH LANTAU 34 CHEUNG SHA UPPER VILLAGE SOUTH LANTAU 35 HAM TIN SOUTH LANTAU 36 LO UK SOUTH LANTAU 37 MONG TUNG WAN SOUTH LANTAU 38 PUI O KAU TSUEN (LO WAI) SOUTH LANTAU 39 PUI O SAN TSUEN (SAN WAI) SOUTH LANTAU 40 SHAN SHEK WAN SOUTH LANTAU 41 SHAP LONG SOUTH LANTAU 42 SHUI HAU SOUTH LANTAU 43 SIU A CHAU SOUTH LANTAU 44 TAI A CHAU SOUTH LANTAU 3 45 TAI LONG SOUTH LANTAU 46 TONG FUK SOUTH LANTAU 47 FAN LAU TAI O 48 KEUNG SHAN, LOWER TAI O 49 KEUNG SHAN,
    [Show full text]
  • GEO REPORT No. 282
    EXPERT REPORT ON THE GEOLOGY OF THE PROPOSED GEOPARK IN HONG KONG GEO REPORT No. 282 R.J. Sewell & D.L.K. Tang GEOTECHNICAL ENGINEERING OFFICE CIVIL ENGINEERING AND DEVELOPMENT DEPARTMENT THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION EXPERT REPORT ON THE GEOLOGY OF THE PROPOSED GEOPARK IN HONG KONG GEO REPORT No. 282 R.J. Sewell & D.L.K. Tang This report was originally produced in June 2009 as GEO Geological Report No. GR 2/2009 2 © The Government of the Hong Kong Special Administrative Region First published, July 2013 Prepared by: Geotechnical Engineering Office, Civil Engineering and Development Department, Civil Engineering and Development Building, 101 Princess Margaret Road, Homantin, Kowloon, Hong Kong. - 3 - PREFACE In keeping with our policy of releasing information which may be of general interest to the geotechnical profession and the public, we make available selected internal reports in a series of publications termed the GEO Report series. The GEO Reports can be downloaded from the website of the Civil Engineering and Development Department (http://www.cedd.gov.hk) on the Internet. Printed copies are also available for some GEO Reports. For printed copies, a charge is made to cover the cost of printing. The Geotechnical Engineering Office also produces documents specifically for publication in print. These include guidance documents and results of comprehensive reviews. They can also be downloaded from the above website. The publications and the printed GEO Reports may be obtained from the Government’s Information Services Department. Information on how to purchase these documents is given on the second last page of this report.
    [Show full text]
  • Development of a Bathing Beach at Lung Mei, Tai Po”
    40/F, Revenue Tower, 5 Gloucester Road, Wan Chai, Hong Kong 香港灣仔告士打道 5 號稅務大樓 40 樓 ACE Paper 27/2008 For advice Environmental Impact Assessment Report on “Development of a Bathing Beach at Lung Mei, Tai Po” Additional Information on Ecological Surveys PURPOSE On 14 January 2008, the Advisory Council on the Environment (ACE) endorsed with conditions the Environmental Impact Assessment (EIA) report on “Development of a Bathing Beach at Lung Mei, Tai Po”. This paper provides additional information to confirm the ecological status of the habitat of Lung Mei Beach as concluded in the EIA report, addresses the conditions in the endorsement and other concerns of the ACE. ADVICE SOUGHT 2. Members are invited to note and comment on the information provided in this paper. BACKGROUND 3. The views and recommendations of the ACE on the EIA report discussed at the meeting on 14 January 2008 were set out at Annex A. METHODOLOGY OF ECOLOGICAL SURVEYS AND IMPACT ASSESSMENT UNDER THE EIA REPORT ENDORSED BY ACE WITH CONDITIONS ON 14 JANUARY 2008 4. The purpose of the ecological survey focused on collecting representative ecological data to fill information gaps concerning the following: (i) to identify the dominant and typical flora and fauna species present in the Study Area (included 500 m from the Project Site Boundary); (ii) to establish the general ecological profile, physical and ecological characteristics of the site; and (iii) to determine the presence of key factors described in Notes 1 to 3 attached to Appendix A of Annex 16 of Technical Memorandum on Environmental Impact Assessment Process (TM), including recognized sites of conservation importance, important habitats where an ecological assessment will be necessary and species of conservation importance.
    [Show full text]
  • Expert Evaluation Report Is Based on the Following Materials Given by the Pland to the Consultant
    Planning Department Agreement No. PLNQ 56/2012 Category A1 - Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment Pak Shek Kok (East) Central Area, Tai Po Expert Evaluation – Final Report February 2014 Name Signature Prepared & Checked: Karl An Reviewed & Approved: Anna Chung Version: Final Date: 19 February 2014 Disclaimer This Expert Evaluation – Final Report is prepared for Planning Department and is given for its sole benefit in relation to and pursuant to Pak Shek Kok (East) Central Area, Tai Po Development and may not be disclosed to, quoted to or relied upon by any person other than Planning Department / identified recipient as requested under the Agreement with Planning Department without our prior written consent. No person (other than Planning Department) into whose possession a copy of this Expert Evaluation – Draft Report comes may rely on this Expert Evaluation – Draft Report without our express written consent and Planning Department may not rely on it for any purpose other than as described above. AECOM Asia Co. Ltd. 11/F, Grand Central Plaza, Tower 2, 138 Shatin Rural Committee Road, Shatin, NT, Hong Kong Tel: (852) 3105 8686 Fax: (852) 2317 7609 www.aecom.com QF001 – Submission Checking Record 3.0/10 Expert Evaluation and Advisory Services on Air Ventilation Assessment Pak Shek Kok (East) Central Area, Tai Po Planning Department, HKSAR Expert Evaluation – Final Report Table of Contents Page 1 INTRODUCTION .......................................................................................................................
    [Show full text]
  • OFFICIAL RECORD of PROCEEDINGS Wednesday, 24
    LEGISLATIVE COUNCIL ― 24 March 2021 4357 OFFICIAL RECORD OF PROCEEDINGS Wednesday, 24 March 2021 The Council met at Eleven o'clock MEMBERS PRESENT: THE PRESIDENT THE HONOURABLE ANDREW LEUNG KWAN-YUEN, G.B.M., G.B.S., J.P. THE HONOURABLE ABRAHAM SHEK LAI-HIM, G.B.S., J.P. THE HONOURABLE TOMMY CHEUNG YU-YAN, G.B.S., J.P. THE HONOURABLE JEFFREY LAM KIN-FUNG, G.B.S., J.P. THE HONOURABLE WONG TING-KWONG, G.B.S., J.P. THE HONOURABLE STARRY LEE WAI-KING, S.B.S., J.P. THE HONOURABLE CHAN HAK-KAN, B.B.S., J.P. THE HONOURABLE CHAN KIN-POR, G.B.S., J.P. DR THE HONOURABLE PRISCILLA LEUNG MEI-FUN, S.B.S., J.P. THE HONOURABLE WONG KWOK-KIN, S.B.S., J.P. THE HONOURABLE MRS REGINA IP LAU SUK-YEE, G.B.S., J.P. THE HONOURABLE PAUL TSE WAI-CHUN, J.P. THE HONOURABLE MICHAEL TIEN PUK-SUN, B.B.S., J.P. 4358 LEGISLATIVE COUNCIL ― 24 March 2021 THE HONOURABLE STEVEN HO CHUN-YIN, B.B.S. THE HONOURABLE FRANKIE YICK CHI-MING, S.B.S., J.P. THE HONOURABLE YIU SI-WING, B.B.S. THE HONOURABLE MA FUNG-KWOK, G.B.S., J.P. THE HONOURABLE CHAN HAN-PAN, B.B.S., J.P. THE HONOURABLE LEUNG CHE-CHEUNG, S.B.S., M.H., J.P. THE HONOURABLE ALICE MAK MEI-KUEN, B.B.S., J.P. THE HONOURABLE KWOK WAI-KEUNG, J.P. THE HONOURABLE CHRISTOPHER CHEUNG WAH-FUNG, S.B.S., J.P.
    [Show full text]
  • Highways Department Territory Development Department
    FORECAST OF INVITATIONS TO TENDER JANUARY 2002 TO JUNE 2002 2002 1 R 2002 666 RRR Probable Date Works Category PWP of Gazettal/ & Lowest Group Range of Item No. Inviting Permitted to Estimate of Name and Tel. No. of If Contract No. & Title of Contract Tenders Tender Cost Contact Person *� i**�»i*1m Y¥0- 1 If�3» 1H �*Jt1»ma 1t!5 {�Ht �� B- m1*3 Highways Department 736TH Deep Bay Link – Detailed ground Mar 2002 GROU M1 Mr. C.M. CHAN investigation 2002 � 3 J :)W�If ���%: Fwl�m®� – 1*:)W� 2762 3610 738TH Site investigation for direct connections with May 2002 GROU M1 Mr. P.K. LEE Tsing Lung Bridge at Tsing Lung Tau and 2002 � 5 J :)W�If :jt%: North Lantau 2762 3632 ����E*MW�m��*���m� m�ItW�If 759TH Shenzhen Western Corridor – Detailed ground May 2002 GROU M1 Mr. S.M. LI investigation 2002 � 5 J :)W�If :;�%: {mE'®� - 1*:)W� 2762 3998 - Resurfacing of Red Routes on Hong Kong May 2002 R&D M1 Mr. T.K. CHEUNG Island 2002 � 5 J Group A&B 5rf%: m��-:*:��TIf ��E�� 2231 5724 r*Ez* - Footpath reconstruction and associated May 2002 R&D M1 Mr K.W. YEUNG improvement works for King’s Road 2002 � 5 J Group A&B i�1%: ���1A�:�IfET�2�If ��E�� 2231 5720 r*Ez* 755TH Reconstruction and improvement of Tuen Jun 2002 GROU M1 Mr. H.T. MOK Mun Road – Ground Investigation 2002 � 6 J :)W�If �-�%: 4F0�:�E2�If - :)W� 2762 3641 - Reconstruction of Shek Pai Wan Road and Jun 2002 R&D M1 Mr.
    [Show full text]
  • Scheme Area Ma Liu Shui 馬
    TOLO HARBOUR гsгs ¥¥¥ PakPak ShekShek KokKok �…��…� CheungCheung ShueShue CheungCheung ShueShue CHONGCHONG SANSAN ROADROAD TanTan »›»› ·�·� HongHong KongKong ScienceScience ParkPark ¤¤¤ ˘˘˘ MAMA LIULIU SHUISHUI h¶h¶ ⁄⁄ MAMA LIULIU SHUISHUI RƒS¯RƒS¯ ShawShaw CollegeCollege ShawShaw CollegeCollege pÁX¦pÁX¦ s·È¨s·È¨ UnitedUnited CollegeCollege NewNew AsiaAsia CollegeCollege ª¨dª¨d ChekChek NaiNai PingPing ¤¤¡¤¤¡ CENTRALCENTRAL AVENUEAVENUE ¤¤¡¤¤¡ CENTRALCENTRAL AVENUEAVENUE ¤¤¡¤¤¡ CENTRALCENTRAL AVENUEAVENUE »›»›»› ·⁄⁄·⁄⁄·⁄⁄ TheThe ChineseChinese UniversityUniversity j⁄Hfi‰⁄�‚wj⁄Hfi‰⁄�‚wofof HongHong KongKong ¤¤ ˘fi�⁄�˘fi�⁄� Ma Liu Shui Ferry Pier R–�R–� TAITAI POPO ROADROAD -- MAMAChungChung LIULIU SHUISHUI ChiChi CollegeCollege j⁄˙j⁄˙j⁄˙ UniversityUniversityUniversity Station StationStation TOLOTOLOTOLO HIGHWAY HIGHWAY HIGHWAY TOLOTOLOTOLO HIGHWAY HIGHWAY HIGHWAY SHASHA TINTIN HOIHOI RÄW LAILAI PINGPING ROADROAD E¤{E¤{ KauKau ToTo VillageVillage _ÄQ_ÄQ @´o@´o Windsor ShatinShatin KnollKnoll HeightsHeights SCALE 1 : 15 000 METRES 300 0 300 600 METRES PLAN No. M / SP / 08 / 62 Scheme Area BASE PLANS No. 7-NE & SE Ma Liu Shui DATE 6. 6. 2008.
    [Show full text]
  • LC Paper No. CB(1)666/20-21(03)
    LC Paper No. CB(1)666/20-21(03) For discussion on 23 March 2021 Legislative Council Panel on Development PWP Item No. 58TF – Improvement works at Kau Sai Village Pier and PWP Item No. 59TF – Improvement works at Lai Chi Chong Pier PURPOSE This paper briefs Members on the proposals to upgrade the following items to Category A: (a) 58TF – Improvement works at Kau Sai Village Pier, at an estimated cost of $77.8 million in money-of-the-day prices; and (b) 59TF – Improvement works at Lai Chi Chong Pier, at an estimated cost of $108.8 million in money-of-the-day prices. OVERVIEW 2. The Government has launched a policy initiative of Pier Improvement Programme (PIP), aiming to upgrade the structural safety and facilities of a number of existing public piers at remote areas in the New Territories and outlying islands, with a view to enhancing accessibility of some scenic spots and natural heritage as well as meeting the basic needs of local villagers relying on boats as their main transportation mode or fishermen’s operation. We are implementing the first phase of PIP covering ten public piers in full swing. Among them, the construction works for Pak Kok Pier on Lamma Island started in April 2020, the design work of Kau Sai Village Pier in Sai Kung District and Lai Chi Chong Pier in Tai Po District has been substantially completed, and the remaining piers are continuing with the design work at full speed. In view that the public welcome and support the implementation of PIP, we have advanced to kick off the second phase of PIP to enhance another 13 public piers, and the associated engineering feasibility studies would commence progressively from mid of this year.
    [Show full text]
  • Reconstruction of the Peng Chau Public Pier 5.18 – 5.24
    CHAPTER 5 Civil Engineering and Development Department Reprovisioning of public piers Audit Commission Hong Kong March 2005 This audit review was carried out under a set of guidelines tabled in the Provisional Legislative Council by the Chairman of the Public Accounts Committee on 11 February 1998. The guidelines were agreed between the Public Accounts Committee and the Director of Audit and accepted by the Government of the Hong Kong Special Administrative Region. Report No. 44 of the Director of Audit contains 8 Chapters which are available on our website at http://www.aud.gov.hk/ Audit Commission 26th floor, Immigration Tower 7 Gloucester Road Wan Chai Hong Kong Tel : (852) 2829 4210 Fax : (852) 2824 2087 E-mail : [email protected] REPROVISIONING OF PUBLIC PIERS Contents Paragraph PART 1: INTRODUCTION 1.1 Background 1.2 Marine landing facilities 1.3 – 1.5 Deterioration of piers 1.6 Reconstruction programme for deteriorated piers 1.7 Audit review 1.8 General response from the Administration 1.9 Acknowledgement 1.10 PART 2: DURABILITY OF REINFORCED CONCRETE PIERS 2.1 Consultancy study on deterioration of piers 2.2 – 2.3 Structural repairs required to prolong service lives 2.4 – 2.7 of deteriorated piers Upgrading of maintenance and repair efforts 2.8 – 2.9 Need for a new marine concrete specification 2.10 – 2.11 Audit observations 2.12 – 2.18 Audit recommendations 2.19 Response from the Administration 2.20 – 2.21 PART 3: PLANNING FOR RECONSTRUCTION 3.1 OF DETERIORATED PIERS Reconstruction programme for replacing deteriorated piers 3.2
    [Show full text]