Renewable Energy Projects

Project Name Project Description RE Orillia 2 10 MW solar project. Site consists of approximately 72 acres McLean's Mountain Wind Limited Partnership Wind 24 turbines with total generation capacity of Farm 60 MW Clarington 5 turbines with total generation capacity of 8.1 MW

RE Orillia 1 10 MW solar project. Site consists of approximately 65 acres Hamilton (Port Hope 4) Solar Facility 10 MW solar project. Site consist of approximately 83.7 acres Intech # 3 Thamesville 0.4MW solar project. Site consists of approximately 2.3 acres Kingston Gardiner TS Unity Road Solar Project 10 MW solar project. Site consists of approximately 163 acres RE Sunningdale 1 Solar Energy Project 7 MW solar project. Site consists of approximately 100 acres Intech 2 (Kent Bridge) Solar Farm 730 MW solar project. Site consists of approximately 4 acres 2176050 Solar Farm (also known as Spring Valley 9 MW solar project. Site consists of approximately 61.7763 acres Solar Farm) Little Creek Solar Project 10 MW solar project. Site consists of approximately 80 acres RE Orillia 3 6.5 MW solar project. Site consists of approximately 42 acres ENS Poultry Inc. A 0.137MW anaerobic digestion facility utilizing a combination of agricultural wastes Intech #4 (Rodney) 500 kw Solar Farm 0.5 MW solar project. Site consists of approximately 4 acres Westerhout Enterprises Wind Facility 3 turbines with total generation capacity of 0.048 MW Liskeard 1, 3 & 4 Solar Projects Three 30 MW solar projects. Site consists of approximately 337 acres

Page 1 of 84 09/26/2021 Projects

Project Type MOE Approval Number Solar 8968-8N9KH7 Wind 7733-8XUNS5

Wind

Solar 0002-8TRNBP Solar 0905-8S7M96 Solar Solar 8438-8XNQ3L Solar 6161-96DG52 Solar 5569-97YHEJ Solar 1962-8VFQAV

Solar 3068-93AP8E Solar 9070-8TRQM4 Bioenergy 9230-8QKPAR

Solar 9012-92QMZH Wind 4661-8ASRPE Solar 7263-8XDGMG

Page 2 of 84 09/26/2021 Renewable Energy Projects

Project Approval Type Proponent Name REA Orillia 2 ULC (Also Known as Recurrent Energy) REA McLean's Mountain Wind LP also Northland Power Inc.

REA Clarington wind Power (GP) Inc. o/a Clarington Wind Power LP (Leader Resources Services Corp.) REA Recurrent Energy REA Penn Energy REA Intech Clean Energy Inc. REA SunE Unity LP formerly 2225128 Ontario Inc. (SunEdison) REA RE Sunningdale 1 ULC REA Intech 2 (Kent Bridge) Solar Farm REA 2176050 Ontario Inc. (Also Canadian Solar)

REA Canadian Solar REA Recurrent Energy REA ENS Poultry Inc.

REA Intech Clean Energy Inc. REA Westerhout Enterprises REA 2225256 Ontario Inc., 2225342 Ontario Inc. and 2225345 Ontario Inc. o/a Canadian Solar Solutions Inc.

Page 3 of 84 09/26/2021 Renewable Energy Projects

Proponent Website Location http://ontariosolarfuture.ca/projects.php Simcoe County http://www.northlandpower.ca/WhatWeDo/Projects.aspx?projectID District of Manitoulin =14#m=2 http://www.lrsc.ca/?p=476 Regional Municipality of Durham

http://ontariosolarfuture.ca/projects.php#OR1 Simcoe County http://pennenergyrenewables.com/solar-ontario/hamiltonph4.html Northumberland County http://intech-solar.ca/projects/ Chatham-Kent County http://www.axiopower.ca/projects/ontario/unity-road/ Frontenac County http://ontariosolarfuture.ca/projects.php Middlesex County Chatham-Kent County http://www.canadian- Leeds & Grenville County solar.ca/docs/projects/2176050/Project_Description_Report.pdf http://www.littlecreeksolar.com/ County of Lennox and Addington http://ontariosolarfuture.ca/projects.php#OR1 Simcoe County Wellington County

http://intech-solar.ca/projects/ Elgin County Huron County

http://www.canadian-solar.ca/commercial/ District of Timiskaming

Page 4 of 84 09/26/2021 Renewable Energy Projects

MOE Region Application Status Central Approved Northern Approved

Central Under Technical Review

Central Approved Eastern Approved Southwest Under Technical Review Eastern Approved Southwest Approved Southwest Approved Eastern Approved

Eastern Approved Central Approved West Central Approved

Southwest Approved Southwest Approved Northern Approved

Page 5 of 84 09/26/2021 Renewable Energy Projects

OPA Contract EBR Number Location 1 Yes (44.577445, -79.499326) Yes (45.925159, -82.01792)

Yes 012-0615

Yes (44.585026, -79.493495) Yes (44.019898, -78.120755) Yes 012-0403 Yes Yes Yes Yes

No Yes (44.585827, -79.499259) Yes

Yes (42.564065, -81.685807) Yes Yes

Page 6 of 84 09/26/2021 Renewable Energy Projects

Latitude Longitude Zip Codes 44.577445 -79.499326 45.925159 -82.01792

44.585026 -79.493495 44.019898 -78.120755

44.585827 -79.499259

42.564065 -81.685807

Page 7 of 84 09/26/2021 Renewable Energy Projects

Sol-Luce Kingston Solar PV Energy Project 100 MW solar project. Site consists of approximately 644 acres RayLight Solar Park 10 MW solar project. Site consists of approximately 90 acres Wal-Mart Canada Corp. Wind Turbine 1 turbine with total generation capacity of 0.02 MW Sunny Shores Solar Project (Glen Manor) 10 MW solar project. Site consists of approximately 97.6 acres

Summerhaven Wind Energy Centre 58 turbines with total generation capacity of 128.82 MW Belleville North Solar Project 10 MW solar project. Site consists of approximately 98.8421 acres

Kawartha Biogas 9.8 MW biogas energy plant that will process organic material which will generate electricity and heat. Athlone Biopower 0.498 MW anaerobic digestor Penn Energy - Van Dorp Solar Projects 10 MW solar project. Site consists of approximately 138 acres

Conestogo Wind Energy Park 26 turbines with total generation capacity of 69 MW

RE Smiths Falls 6 10 MW solar project. Site consists of approximately 82 acres St. Columban Wind Farm 15 turbines with total generation capacity of 33 MW St. Clair Sombra Solar Farm 20 MW solar farm. Site consists of aproximately 347 acres South Branch Wind Farm 10 turbines with total generation capacity of 30 MW Burk's Falls East Solar Project 10 MW solar project. Site consists of approximately 98.8421 acres

Springwood Wind Farm Project 4 turbines with total generation capacity of 8.2 MW

Page 8 of 84 09/26/2021 Renewable Energy Projects

Solar Solar 2367-986H5X Wind 8032-8ELKMD Solar 0680-99WKVM

Wind 2484-8RQUS4 Solar 5943-8R8HYQ

Bioenergy 4765-92MKCJ

Bioenergy Solar

Wind

Solar 1157-8P5RAS Wind 7042-96FQB7 Solar 7195-8JVJYV Wind 8279-974KHK Solar 6662-8QVM6U

Wind 7563-8WYHXG

Page 9 of 84 09/26/2021 Renewable Energy Projects

REA Kingston Solar LP ( aka Samsung) REA RayLight LP (aka Canadian Solar) REA Wal-Mart Canada REA 2340124 Ontario Inc. operating as Glen Manor Wind Farm Limited Partnership REA Summerhaven Wind, LP REA Northland Power Inc.

REA PurEnergy Inc.

REA Athlone Farms Inc. REA Port Hope General Partner 1 Inc. / Port Hope General Partner 2 Inc. operating as Port Hope Solar Farm Partnership REA Canada Wind 3 Limited o/a Conestogo Wind Power Partnership REA Smiths Falls 6 ULC (Also Known as Recurrent Energy) REA St. Columban Energy LP REA First Solar Development (Canada), Inc. REA South Branch Wind Farm Inc. REA Northland Power Inc.

REA wpd Canada Corporation

Page 10 of 84 09/26/2021 Renewable Energy Projects

http://www.samsungrenewableenergy.ca/kingston County of Lennox and Addington http://raylightsolar.com/ Simcoe County http://www.windpowermedia.com/milton/ Halton Region Prince Edward County

http://www.canadianwindproposals.com/ Haldimand County http://www.northlandpower.ca/bellevillenorth/microsite.taf?linkId=1 Prince Edward County 25&_UserReference=0BF23DC32F6FD5274E1CB63E Peterborough County

County of Perth http://pennenergyrenewables.com/solar-ontario/vandorp.html Northumberland County

County of Perth

http://ontariosolarfuture.ca/projects.php Leeds & Grenville County Huron County

http://canada.firstsolar.com/ Lambton County Stormont, Dundas & Glengarry County

http://www.northlandpower.ca/WhatWeDo/Projects.aspx?projectID Parry Sound District =41#m=2 http://canada.wpd.de/projects/in-canada/springwood.html Wellington County

Page 11 of 84 09/26/2021 Renewable Energy Projects

Eastern Under Technical Review Central Approved Central Approved Eastern Approved

West Central Approved Eastern Approved

Eastern Approved

Southwest Received and screening for completeness Eastern Under Technical Review

Southwest Application Returned /or Withdrawn

Eastern Approved Southwest Approved Southwest Approved Eastern Approved Northern Approved

West Central Approved

Page 12 of 84 09/26/2021 Renewable Energy Projects

KC2-SOLLUCE-S 011-7585 Yes No Yes

Yes Yes (44.062969, -77.343043)

Yes

Yes Yes 011-9684

Yes

Yes (44.857643, -75.985486) Yes No Yes Yes (45.61117, -79.361885)

Yes

Page 13 of 84 09/26/2021 Renewable Energy Projects

44.062969 -77.343043

44.857643 -75.985486

45.61117 -79.361885

Page 14 of 84 09/26/2021 Renewable Energy Projects

Robert Jackson (Jackson Toyota) 1 turbine with total generation capacity of 2.3 MW Glenarm Solar Farm 10 MW solar project. Site consists of approximately 93 acres SunEdison Bruining 1 Solar Project 10 MW solar project. Site consists of approximately 111 acres Jericho Wind Energy Centre 97 turbines with total generation capacity of 150 MW Port Dover Solar Farm 0.1 MW solar project. Site consists of approximately 1 acre Bornish Wind Energy Centre 45 turbine with total wind generation capacity of 72.9 MW Crosby Solar Farm 10 MW solar project. Site consists of approximately 135 acres

Belleville TS Demorestville Solar Energy Project 10 MW solar project. Site consists of approximately 88.9579 acres Grimsby Biogas 1 MW anaerobic digestor Belleville South Solar Project 10 MW solar project. Site consists of approximately 98.8421 acres

Ramore Solar Project 8 MW solar project. Site consists of approximately 135.08 acres Goulais Wind Farm 11 turbines with total generation capacity of 25MW Port Ryerse Wind Farm 4 turbines with total generation capacity of 10 MW EarthLight Solar Farm 10 MW solar project. Site consists of approximately 152 acres RE Adelaide 1 Solar Farm 10 MW solar project. Site consists of approximately 91 acres Beamlight Solar Project 11.5 MW solar project. Site consists of approximately 134 acres

Kingston Gardiner hwy 2 South Solar Project (Also 10 MW solar project. Site consists of approximately 88 acres known as 2225056 Ontario Solar Project) Settlers Landing Wind Park 5 turbines with total generation capacity of 10MW

Page 15 of 84 09/26/2021 Renewable Energy Projects

Wind Solar 6928-95QPNP Solar 9412-998HM7 Wind Solar Wind 2494-94QQ97 Solar 2318-8Q6PXQ

Solar 5022-8XNQYT

Bioenergy Solar 8277-8RYRBG

Solar 2672-8T7QY9 Wind 3507-9ABJWH Wind Solar Solar 1678-94MLWU Solar 2351-97YFZR

Solar 5155-8WDH5G

Wind

Page 16 of 84 09/26/2021 Renewable Energy Projects

REA Robert Jackson REA Canadian Solar (SkyPower) REA SunE South Stormont GP Corp. (SunEdison) REA NextEra Energy Canada REA Port Dover Solar Farm REA Bornish Wind LP REA Northland Power Inc.

REA 2225051 Ontario Inc. (also Axio Power and SunEdison)

REA Grimsby Energy Inc. REA Northland Power Inc.

REA Ontario Solar PV Fields REA SP Development Limited Partnership (Sprott) REA UDI Renewables Corporation REA EarthLight LP (Canadian Solar) REA RE Adelaide 1 ULC REA BeamLight LP (also known as Canadian Solar Solutions Inc.) REA 2225056 Ontario Inc. (also Axio Power and SunEdison)

REA 2224358 Ontario Inc. o/a Settlers Landing Wind Park Limited Partnership

Page 17 of 84 09/26/2021 Renewable Energy Projects

http://www.jonesconsulting.com/projects.html Simcoe County Kawartha Lakes County Stormont, Dundas & Glengarry County http://www.nexteraenergycanada.com/projects/jericho.shtml Lambton County Norfolk County Middlesex County http://www.northlandpower.ca/WhatWeDo/Projects.aspx?projectID Leeds & Grenville County =43#m=2 http://www.sunedison.ca/demorestville/ Prince Edward County

http://grimsbyenergy.com/ Regional Municipality of Niagara http://www.northlandpower.ca/WhatWeDo/Projects.aspx?projectID Prince Edward County =40#m=2 http://www.ontariosolarpvfields.com/project7.html Cochrane District http://www.sprottpower.com/projects/goulais District of Algoma Norfolk County

http://earthlightsolarpark.com/ Regional Municipality of York http://ontariosolarfuture.ca/projects.php Middlesex County http://beamlightsolar.com/ Regional Municipality of York

http://www.axiopower.ca/projects/ontario/highway-2-south/ County of Lennox and Addington

Kawartha Lakes County

Page 18 of 84 09/26/2021 Renewable Energy Projects

Central Application Returned /or Withdrawn Eastern Approved Eastern Approved Southwest Under Technical Review West Central Application Returned /or Withdrawn Southwest Approved Eastern Approved

Eastern Approved

West Central Received and screening for completeness Eastern Approved

Northern Approved Northern Approved West Central Under Technical Review Central Under Technical Review Southwest Approved Central Approved

Eastern Approved

Eastern Received and screening for completeness

Page 19 of 84 09/26/2021 Renewable Energy Projects

Yes Yes Yes 011-9647 Yes Yes Yes (44.674382, -76.306805)

Yes

Yes Yes (44.067229, -77.315363)

Yes (48.438533, -80.326871) Yes Yes 012-0611 Yes 012-0402 Yes Yes

Yes

Yes

Page 20 of 84 09/26/2021 Renewable Energy Projects

44.674382 -76.306805

44.067229 -77.315363

48.438533 -80.326871

Page 21 of 84 09/26/2021 Renewable Energy Projects

Edwardsburgh Morrisburg Solar Project 10 MW solar project. Site consists of approximately 83 acres

FotoLight Solar Farm 10 MW solar project. Site consists of approximately 151 acres Mississippi Mills Solar Park 10 MW solar project. Site consists of approximately 100 acres SunEdison Oro 4 Line Solar Farm 10 MW solar project. Site consists of approximately 51 acres SparkleLight Solar Farm 10 MW solar project. Site consists of approximately 96 acres Westerhout Poultry Inc. Wind Facility 2 turbines with total generation capacity of 0.032 MW Alderville First Nation Solar Facility 5 MW solar projact Zephyr Farms Limited's Brooke-Alvinston Wind 4 turbines with total generation capacity of 10 MW Farm Flowerburn Solar Farm 0.5 MW solar project. Site consists of approximately 29 acres Northland Power Long Lakes Solar Project 10 MW solar project. Site consists of approximately 304 acres

Dove Tree Solar Farm 0.06 MW solar project. Site consists of approximately 62 acres Highlight Solar Project 10 MW solar project. Site consists of approximately 125 acres Ernestown Wind Farm 5 turbines with total generation capacity of 10MW

SunE Rutley Solar Farm 10 MW solar project. Site consists of approximately 494 acres

Q1WEC (Quixote One) 1 turbine with total generation capacity of 2.5 MW

RE Midhurst 2 3.5 MW solar project. Site consists of approximately 88 acres

Page 22 of 84 09/26/2021 Renewable Energy Projects

Solar 8486-8S7M8F

Solar 6974-9A4PYN Solar 9694-8X9J7X Solar 5896-99WKXR Solar 0399-99ESCE Wind 7806-8B2KH9 Solar 3090-8V3Q5C Wind 6250-8KFTCQ

Solar 6246-8T8G5W Solar 8430-9AEQ6M

Solar 4004-8W4KXD Solar 2332-936QYA Wind 8798-998GRW

Solar 7818-8L4PNL

Wind

Solar 1879-8TRRQ2

Page 23 of 84 09/26/2021 Renewable Energy Projects

Limited Partnership REA Penn Energy

REA FotoLight LP (also Canadian Solar) REA 2225213 Ontario Inc. (Canadian Solar) REA Oro-Medonte Solar Farm Inc. REA SparkleLight LP (also Canadian Solar) REA Westerhout Poultry REA Alderville First Nation REA Zephyr Farms Limited

REA Injasuti Developments REA Northland Power Solar Long Lakes Inc. operating as Northland Power Solar Long Lake L.P. REA John Dove REA CSI GP Val Caron Ltd. (Canadian Solar) REA Ernestown Windpark Inc. operating as Ernestown Windpark Limited Partnership REA SunE Rutley GP Corp

REA Quixote One Wind Energy Corp. (Leader Resources Services Corp.)

REA Recurrent Energy

Page 24 of 84 09/26/2021 Renewable Energy Projects

http://pennenergyrenewables.com/solar- Leeds & Grenville County ontario/edwardsburghmorrisburg1.html http://fotolightsolar.com/ Prince Edward County http://www.canadian-solar.ca/commercial/ Lanark County Simcoe County http://sparklelightsolar.com/ Regional Municipality of Durham Huron County Northumberland County http://oneworldenergy.com/public-review/brooke-alvinston-wind- Lambton County farm/ http://www.injasutidevelopments.com/flowerburn.html Elgin County http://www.northlandpower.ca/WhatWeDo/Projects.aspx?projectID Cochrane District =339#m=2 Kenora District Sudbury District

http://www.ernestownwind.com/project/site-description County of Lennox and Addington

http://www.sunedison.ca/aboutus--solar-energy-company- Stormont, Dundas & Glengarry County canada.php http://www.lrsc.ca/?page_id=22 County of Bruce

http://ontariosolarfuture.ca/projects.php#MH2 Simcoe County

Page 25 of 84 09/26/2021 Renewable Energy Projects

Eastern Approved

Eastern Approved Eastern Approved Central Approved Central Approved Southwest Approved Eastern Approved Southwest Approved

Southwest Approved Northern Approved

Northern Approved Northern Approved Eastern Approved

Eastern Approved

Southwest Under Technical Review

Central Approved

Page 26 of 84 09/26/2021 Renewable Energy Projects

Yes (44.727185, -75.49479)

Yes Yes Yes Yes Yes Yes No

Yes Yes

Yes Yes Yes

Yes (45.015314, -74.967472)

Yes 012-0571

Yes (44.538415, -79.762565)

Page 27 of 84 09/26/2021 Renewable Energy Projects

44.727185 -75.494790

45.015314 -74.967472

44.538415 -79.762565

Page 28 of 84 09/26/2021 Renewable Energy Projects

Dufferin Wind Farm 49 turbine with total wind generation capacity of 99.1 MW Merrick Landfill Site Landfill Gas Utilization Facility A 1.6 MW biogas energy plant utilizing landfill gas as fuel supply Fairview Wind Farm 8 turbines with total generation capacity of 18.4 MW Sumac Ridge Wind Farm Project 5 turbines with total generation capacity of 11.5 MW Alfred Solar Energy Project 10 MW solar project. Site consists of approximately 160 acres RE Waubaushene 3 10 MW solar project. Site consists of approximately 82 acres Wainright Solar Park 10 MW solar project. Site consists of approximately 104.4 acres Goshen Wind Energy Centre 72 turbines with total generation capacity of 102 MW Gesner Wind Energy Project 5 turbines with total generation capacity of 10 MW North American Free Trade Consultants Inc.'s 0.5 MW solar project. Site consists of approximately 15.13 acres NAFTC Energy Solar Project RE Smiths Falls 2 10 MW solar project. Site consists of approximately 90 acres Amherst Island Wind Farm Project 36 turbines with total generation capacity of 75 MW Bensfort Road Landfill Gas Generation Project A 1.6 MW biogas energy plant utilizing landfill gas as fuel supply Welland Ridge Road Solar Project 10 MW solar project. Site consists of approximately 93 acres GoldLight Solar Project 10 MW solar project. Site consists of approximately 94 acres RE Ingersoll 1 9.5 MW solar project. Site consists of approximately 98 acres Hybridyne Solar Project 2MW solar project. Site consists of approximately 10.5 acres Penn Energy- Ridgefield Solar Project 8 MW solar project. Site consists of approximately 61 acres

Port Dover Nanticoke Wind Farm 58 turbines with total generation capacity of 104.4 MW

Page 29 of 84 09/26/2021 Renewable Energy Projects

Wind 5460-98BPH8 Bioenergy 2494-8F8H5N Wind Wind 8037-9AYKBK Solar 0578-8XGMUG

Solar 6789-8T7NNN Solar 0148-92QL8R Wind Wind 3069-8NQQC7 Solar

Solar 8020-8R3PH2 Wind Bioenergy 6611-8U3J5R Solar 2432-95WLK8 Solar 0494-99WL4Q Solar 3402-8TUPFA Solar 8332-8ZXN8R Solar

Wind 2869-8VDRCV

Page 30 of 84 09/26/2021 Renewable Energy Projects

REA Dufferin Wind Power Inc REA North Bay Hydro REA wpd Fairview Wind Incorporated REA Wpd Canada Corporation REA SunE Alfred LP (SunEdison) formerly 2225049 Ontario Inc. REA Recurrent Energy REA Ontario Solar PV Fields 1LP REA Goshen Wind Inc. (Next Era) REA Saturn Power Inc. REA North American Free Trade Consultants Inc.

REA Smiths Falls 2 ULC (Also Known as Recurrent Energy) REA Windlectric Inc. REA Peterborough Utilities Inc. REA 2225045 Ontario Inc. (also SunEdison and Axio Power) REA GoldLight LP (Canadian Solar) REA Recurrent Energy REA Hybridyne Power Generation Site A Inc. REA Ridgefield General Partner 1 Inc. / Ridgefield General Partner 2 Inc. operating as Ridgefield Solar Farm Partnership REA Capital Power GP Holdings Inc.

Page 31 of 84 09/26/2021 Renewable Energy Projects

http://www.dufferinwindpower.ca/Home.aspx County of Dufferin http://www.northbayhydro.com/public/index/ District of Nippissing http://canada.wpd.de/projects/in-canada/fairview.html Simcoe County http://canada.wpd.de/projects/in-canada/sumac-ridge.html Kawartha Lakes County http://www.axiopower.ca/projects/ontario/alfred-concession-road- United Counties of Prescott and Russell 7/ http://ontariosolarfuture.ca/projects.php#OR1 Simcoe County http://www.ontariosolarpvfields.com/project1.html Kenora District http://www.nexteraenergycanada.com/projects/goshen.shtml Huron County http://www.saturnpower.ca/wind-development/wind-projects.html Chatham-Kent County http://www.greatlakesenergy.ca/ County of Essex

http://ontariosolarfuture.ca/projects.php Lanark County http://amherstislandwindproject.com/ County of Lennox and Addington http://www.pui.ca/home.htm Peterborough County http://www.sunedison.ca/wellandridge/ Regional Municipality of Niagara http://goldlightsolar.com/ Regional Municipality of York http://ontariosolarfuture.ca/projects.php#MH2 Oxford County http://hybridynepowergeneration.com/Page_02.01.htm Regional Municipality of Durham http://pennenergyrenewables.com/solar-ontario/ridgefield.html Kawartha Lakes County

http://www.capitalpower.com/OurOperations/ProposedProjects/Pa Haldimand County

Page 32 of 84 09/26/2021 Renewable Energy Projects

West Central Approved Northern Approved Central Under Technical Review Eastern Approved Eastern Approved

Central Approved Northern Approved Southwest Under Technical Review Southwest Approved Southwest Application Returned /or Withdrawn

Eastern Approved Eastern Under Technical Review Eastern Approved West Central Approved Central Approved Southwest Approved Central Approved Eastern Under Technical Review

West Central Approved

Page 33 of 84 09/26/2021 Renewable Energy Projects

Yes Yes (46.51527, -79.492431) Yes 012-0614 Yes Yes

Yes (44.657581, -79.808413) Yes Yes 011-9473 No No

Yes (44.953894, -76.114942) Yes 012-0774 Yes (44.227, -78.287) Yes Yes Yes (43.086409, -80.846615) Yes Yes 011-9683

Yes (42.867167, -80.068417)

Page 34 of 84 09/26/2021 Renewable Energy Projects

46.51527 -79.492431

44.657581 -79.808413

44.953894 -76.114942

44.227 -78.287

43.086409 -80.846615

42.867167 -80.068417

Page 35 of 84 09/26/2021 Renewable Energy Projects

Dave Rampel Solar Park 10 MW solar project. Site consists of approximately 160 acres William Rutely Solar Project 10 MW solar project. Site consists of approximately 111.197 acres Silvercreek Solar Park 10 MW solar project. Site will consist of approximately 88 acres RE Midhurst 3 3.5 MW solar project. Site consists of approximately 32 acres Vanzwolf Solar Park 5 MW solar project. Site consists of approximately 162 acres Almonte Solar Farm 10 MW solar project. Site consists of approximately 80 acres Kent Breeze Corp. Wind Farms 8 turbines with total generation capacity of 20 MW Cedar Point Wind Farm Project 46 wind turbines with total generation capacity of 100 MW Napier Wind Project 2 turbines with total generation capacity of 4.1 MW Suncor Energy Adelaide Wind Power Project 18 turbines with total generation capacity of 40MW Grand Valley Wind- Phase 3 14-17 turbines with total generation capacity of 40MW

RE Midhurst 6 9 MW solar project. Site consists of approximately 80 acres Majestic Wind 1 turbine with total generation capacity of 2MW

RE Smiths Falls 1 10 MW solar project. Site consits of approximately 80 acres Black Bay Solar Farm 1MW solar project. Site consists of approximately 29 acres Whittington Wind Farm Project 3 turbines with total generation capacity of 6.15 MW

Gunn's Hill Windfarm 10 turbines with total generation capacity of 25MW Aria Solar 9 MW solar project. Site consists of approximately 99 acres Oxley Wind Farm 3 turbines with total generation capacity of 6.15 MW

Page 36 of 84 09/26/2021 Renewable Energy Projects

Solar 9025-99ALT5 Solar 2663-8P2TWB Solar 7249-9CKRM3 Solar 5189-8SJNRC Solar 8090-99ALTC Solar 0112-94VKPR Wind 7988-8AVKM5 Wind Wind 8388-9B7N4J Wind 8279-9AUP2B Wind

Solar 0472-8Q6JK5 Wind

Solar 2014-8SNR4L Solar Wind 4092-92XHMC

Wind Solar Wind 3780-96UL7S

Page 37 of 84 09/26/2021 Renewable Energy Projects

REA Ontario PV Fields GP 4 Inc. REA Tempest Power Corporation (also Canadian Solar) REA Silvercreek Nominee Inc. REA Recurrent Energy REA Ontario PV Fields GP 3 Inc. REA Beckwith Solar Inc. (Formerly Effisolar Energy Corp) REA Kent Breeze Corp. REA Suncor Energy Products Inc. REA wpd Napier Wind Incorporated REA Suncor Energy Products Inc. REA Grand Valley Wind Farms Inc.

REA Midhurst 6 ULC (Also Known as Recurrent Energy) REA Majestic Wind Power (GP) Inc. o/a Majestic Wind Power LP REA Recurrent Energy REA Azgard Corporation REA wpd Canada Corporation

REA Prowind Canada Inc. REA Canadian Solar REA Oxley Wind Farm

Page 38 of 84 09/26/2021 Renewable Energy Projects

ges/DoverNanticoke.aspx http://www.ontariosolarpvfields.com/project4.html District of Rainy River http://www.canadian-solar.com/ Stormont, Dundas & Glengarry County http://silvercreeksolar.com/ Elgin County http://ontariosolarfuture.ca/projects.php#MH3 Simcoe County http://www.ontariosolarpvfields.com/project3.html District of Rainy River http://almontesolar.com/project.html Lanark County Chatham-Kent County http://www.suncor.com/en/about/4797.aspx Lambton County Middlesex County http://www.suncor.com/en/about/4565.aspx Middlesex County http://gretaenergy.com/our-projects/canada/grand-valley-wind- County of Dufferin farms-phase-3 http://ontariosolarfuture.ca/projects.php Simcoe County http://www.lrsc.ca/?page_id=22 County of Bruce

http://ontariosolarfuture.ca/projects.php#SF1 Leeds & Grenville County Thunder Bay District

http://canada.wpd.de/fileadmin/pdfs/rpt_2010-09-07_60605_PDR- County of Dufferin Whittington_dft.pdf http://www.prowind.ca/?page=projects-gunns-hill Oxford County http://ariasolarproject.com/ Simcoe County County of Essex

Page 39 of 84 09/26/2021 Renewable Energy Projects

Northern Approved Eastern Approved Southwest Approved Central Approved Northern Approved Eastern Approved Southwest Approved Southwest Under Technical Review Southwest Approved Southwest Approved West Central Received and screening for completeness

Central Approved Southwest Under Technical Review

Eastern Approved Northern Under Technical Review West Central Approved

Southwest Received and screening for completeness Central Under Technical Review Southwest Approved

Page 40 of 84 09/26/2021 Renewable Energy Projects

Yes Yes Yes Yes (44.474124, -79.567001) Yes Yes No Yes 012-0630 Yes Yes Yes

Yes (44.477163, -79.719463) Yes 012-0570

Yes Yes 012-0455 Yes

Yes Yes 012-0131 No

Page 41 of 84 09/26/2021 Renewable Energy Projects

44.474124 -79.567001

44.477163 -79.719463

Page 42 of 84 09/26/2021 Renewable Energy Projects

RE Waubaushene 5 5 MW solar project. Site consists of approximately 60 acres Brockville Solar Farm 10 MW solar project. Site consists of approximately 96 acres F-001542-SPV-130-505 Solar Farm 3 MW solar project. Site consists of approximately 100 acres Adelaide Wind Energy Centre 37 turbine with total generation capacity of 60 MW RE Midhurst 4 6.5 MW solar project. Site consists of approximately 48 acres Grand Renewable Energy Park - Wind Component 67 turbines with total generation capcity of 148.6 MW Brockville Solar Project (2176047 Ontario Inc) 10 MW solar project. Site consists of approximately 252.047 acres ZEP Wind Farm Ganaraska 10 turbines with total generation capacity of 20 MW Walpole Solar Farm 20 MW solar project. Site consists of aproximately 344 acres Lindsay – Ops Landfill Site Renewable Energy 0.335 MW biogas facility Generation Facility Burritts Rapids Solar Farm 7 MW solar project. Site consists of approximately 51.8921 acres

Roubos Wind Farm 1 turbine with total generation capacity of 0.5 MW River Canard Wind Energy Farm 1 turbines with total generation capacity of 0.5 MW LunarLight Solar Farm 10 MW solar project. Site consists of approximately 102 acres Illumination 10 MW solar project. Site consists of approximately 142 acres Woodville Solar Farm 10 MW solar project. Site consists of approximately 89 acres.

Glendale Solar Project 10 MW solar project. Site consists of approximately 111 acres. Mohawk College's Fennell Campus Wind Project 2 turbines with total generation capacity of 0.006 MW

Page 43 of 84 09/26/2021 Renewable Energy Projects

Solar 3079-8MRLAY Solar 0602-8RFLKT Solar 5141-9A3QXD Wind 8980-95RSLP Solar 7410-8U6MX9 Wind 0300-8UQPKR Solar 4549-8MKH7H Wind Solar 4519-8QLGZW Bioenergy

Solar 6691-8VMRLG

Wind Wind Solar Solar 7639-96SGEZ Solar 7438-8U6QJC

Solar 1565-8ULQT7 Wind 6806-8LWKVQ

Page 44 of 84 09/26/2021 Renewable Energy Projects

REA Waubaushene 5 ULC (Also Known as Recurrent Energy) REA Brockville Solar Inc. REA Balsam Lake Green Energy REA Kerwood Wind Inc. REA Recurrent Energy REA Grand Renewable Wind LP (also Samsung Renewable) REA Canadian Solar Solutions Inc. REA Ganaraska Nominee Ltd. REA First Solar Development (Canada), Inc. REA The Corporation of the City of Kawartha Lakes

REA 2225249 Ontario Inc. (also Canadian Solar)

REA Roubos Wind Farm REA River Canard Energy Inc. REA LunarLight LP (also Canadian Solar) REA Illumination LP (Canadian Solar) REA Invenergy Solar Canada

REA Northland Power Inc. REA Mohawk College

Page 45 of 84 09/26/2021 Renewable Energy Projects

http://ontariosolarfuture.ca/projects.php Simcoe County http://brockvillesolar.com/ Leeds & Grenville County Kawartha Lakes County Middlesex County http://ontariosolarfuture.ca/projects.php#MH4 Simcoe County http://www.samsungrenewableenergy.ca/haldimand Haldimand County http://www.canadian-solar.ca/commercial/ Leeds & Grenville County Regional Municipality of Durham http://canada.firstsolar.com/ Haldimand County Kawartha Lakes County

http://www.canadian- Ottawa Region solar.ca/docs/projects/Burritts_Rapids_Solar_Energy_Project/Dec ommissioning%20Plan%20Report.pdf Wellington County

http://rivercanardenergy.ca/ County of Essex http://lunarlightsolar.com/ County of Hastings Regional Municipality of Durham

http://woodville.invenergyllc.com/ Kawartha Lakes County

http://www.northlandpower.ca/Glendale Stormont, Dundas & Glengarry County http://www.mohawkcollege.ca/environmental-sustainability.html Hamilton

Page 46 of 84 09/26/2021 Renewable Energy Projects

Central Approved Eastern Approved Eastern Approved Southwest Approved Central Approved West Central Approved Eastern Approved Central Received and screening for completeness West Central Approved Eastern Under Technical Review

Eastern Approved

West Central Under Technical Review Southwest Refused Eastern Under Technical Review Central Approved Eastern Approved

Eastern Approved West Central Approved

Page 47 of 84 09/26/2021 Renewable Energy Projects

Yes (44.768049, -79.602376) Yes Yes Yes Yes (44.472142, -79.559217) KCA Yes Yes No No 012-0361

Yes

Yes 012-0404 Yes 011-6839 Yes 011-8538 Yes Yes

Yes No

Page 48 of 84 09/26/2021 Renewable Energy Projects

44.768049 -79.602376

44.472142 -79.559217

Page 49 of 84 09/26/2021 Renewable Energy Projects

South Glengarry Solar Project 10 MW solar project. Site consists of approximately 74.1 acres SunE Westbrook Solar Project 10 MW solar project. Site consists of approximately 173 acres

Mighty Solar Project 10 MW solar project. Site consists of approximately 87 acres De Bruin Farms Anaerobic Digester 0.36 MW bioenergy project Napanee TS Taylor Kidd Solar Energy Project 10 MW solar project. Site consists of approximately 84 acres.

Norfolk-Bloomsburg TS Solar Project 10 MW solar project. Site consists of approximately 71.6605 acres East Durham Wind Energy Centre 14 turbines with total generation capacity of 23 MW Sunderland Solar Farm 10 MW solar project. Site consists of approximately 106.3 acres

Penn Energy Brantgate Solar Project 8 MW solar project. Site consists of approximately 87 acres Roseplain Solar Farm 6.5 MW solar project. Site consists of approximately 88 acres

Ryerson University Wind Facility 6 turbines with total generation capacity of 0.0401 MW Kap Solar Project 6 MW solar project. Site consists of approximately 100 acres Niagara Region Wind Farm 77 turbines with total generation capacity of 230 MW Bow Lake Wind Farm 36 turbines with total generation capacity of 58.32 MW

Meyer Wind 2 turbines with total generation capacity of 4 MW GoodLight Solar Project 10 MW solar project. Site consists of approximately 126 acres

Page 50 of 84 09/26/2021 Renewable Energy Projects

Solar 2189-8NQPZ5 Solar 8768-92QLJT

Solar 3491-942JA7 Bioenergy 4236-8T9J49 Solar 0017-8YGJJM

Solar 0842-8T3UHJ Wind Solar 5015-95QGN7

Solar 1845-98SRNS Solar 4295-9AYK2S

Wind 6198-8CZT3T Solar 2004-8T7RKJ Wind

Wind 8443-9BMG23

Wind Solar 4324-96UL4W

Page 51 of 84 09/26/2021 Renewable Energy Projects

REA Penn Energy REA SunE Westbrook LP Formerly 2225055 Ontario Inc. (SunEdison) REA 239277 Ontario Corp. MightySolar LP REA De Bruins Farms Ltd. REA SunE Taylor Kidd LP formerly 2225053 Ontario Inc. (SunEdison) REA 2225050 Ontario Inc. (c/o Axio Power) REA East Durham Wind Inc. (NextEra) REA 2327049 Ontario Inc. Solray REA Penn Energy Renewables Ltd. REA Roseplain General Partner 1 Inc. Roseplain General Partner 2 Inc. operating as Roseplain Solar Farm Partnership (Penn Energy) REA Ryerson University REA Ontario Solar PV Fields REA Niagara Region Wind Corporation

REA Nodin Kitagan Limited Partnership and Nodin Kitagan 2 Limited Partnership (BlueEarth Renewables & Batchewana FN) REA Meyer Wind Power (GP) Inc. o/a Meyer Wind Power LP REA GoodLight LP (Canadian Solar

Page 52 of 84 09/26/2021 Renewable Energy Projects

http://pennenergyrenewables.com/solar-ontario/sglengarry.html Stormont, Dundas & Glengarry County Frontenac County

Stormont, Dundas & Glengarry County Frontenac County http://www.sunedison.ca/uploads/documentshare/240/sunedison_ County of Lennox and Addington taylorkidd_2ndpic_finalls.pdf http://www.axiopower.ca/projects/ontario/norfolk-bloomsburg/ Norfolk County http://www.nexteraenergycanada.com/projects/durham.shtml County of Grey Regional Municipality of Durham

http://pennenergyrenewables.com/solar-ontario/brantgate.html Brant County http://pennenergyrenewables.com/solar-ontario/roseplain.html Regional Municipality of Durham

http://www.ee.ryerson.ca/research/windtech.html Wellington County http://www.ontariosolarpvfields.com/project5.html Cochrane District http://www.nrwc.ca/ Regional Municipality of Niagara

http://www.bluearthrenewables.com/bowlakewind/ District of Algoma

http://www.lrsc.ca/?p=598 County of Bruce http://goodlightsolar.com/ Kawartha Lakes County

Page 53 of 84 09/26/2021 Renewable Energy Projects

Eastern Approved Eastern Approved

Eastern Approved Eastern Approved Eastern Approved

West Central Approved Southwest Under Technical Review Central Approved

West Central Approved Central Approved

West Central Approved Northern Approved West Central Under Technical Review

Northern Approved

Southwest Under Technical Review Eastern Approved

Page 54 of 84 09/26/2021 Renewable Energy Projects

Yes (45.110195, -74.687182) Yes

Yes Yes Yes

Yes Yes 011-9146 Yes

Yes Yes

Yes Yes Yes 012-0613

Yes

Yes 012-0569 Yes

Page 55 of 84 09/26/2021 Renewable Energy Projects

45.110195 -74.687182

Page 56 of 84 09/26/2021 Renewable Energy Projects

DiscoveryLight 10 MW solar project. Site consists of approximately 108 acres Snowy Ridge Wind Farm Project 5 turbines with total generation capacity of 10 MW

Amherstburg Solar Farm 10 MW solar project. Site consists of approximately 196 acres RE Smiths Falls 3 10 MW solar project. Site consists of approximately 125 acres C.J. Graphics Inc. 2 turbines with total generation capacity of 0.0048 MW Woolwich Bio-En Inc. A 2.85 MW biogas energy plant utilizing a variety of organic materials as fuel supply Skyway 126 Wind Energy Project 5 turbines with total generation capacity of 10 MW

Burk's Falls West Solar Project 10MW solar project. Site consists of approximately 130.965 acres

Beaver Creek Solar Farm 0.5 MW solar project. Site consists of approximately 16 acres RE Breen 2 10 MW solar project. Site consists of approximately 80 acres

Intech 1 Rodney 2 Solar Farm 0.49 MW solar project. Site consists of approximately 2.14 acres Lambton College Wind Turbine 1 turbines with total generation capacity of 0.001 MW Ostrander Point Wind Energy Park 9 turbines with total generation capacity of 22.5 MW

Morley Solar Park 10 MW solar project. Site consists of approximately 120.5 acres Armow Wind Project 92 turbines with total generation capacity of 180MW

Big Thunder Windpark 16 turbines with total generation capacity of 32 MW

South Kent Wind Project 124 turbines with total generation capacity of 270MW

Page 57 of 84 09/26/2021 Renewable Energy Projects

Solar 5883-99WR7P Wind

Solar 8816-8QLGZ4 Solar 8203-8TJGER Wind Bioenergy 6428-8LGLBH

Wind

Solar 5665-8YFKZU

Solar 2895-8QCJVX Solar 4282-8TRRSF

Solar Wind Wind 7681-8UAKR7

Solar 7714-992PAZ Wind 4544-9B7MYH

Wind

Wind 2871-8UKGPC

Page 58 of 84 09/26/2021 Renewable Energy Projects

REA DiscoveryLightLP (aka Canadian Solar Solutions Inc.) REA 2224352 Ontario Inc. o/a Snowy Ridge Wind Park Limited Partnership REA First Solar Development REA Recurrent Energy REA C.J. Graphics Inc. REA Woolwich Bio-En Inc.

REA 2224374 Ontario Inc. operating as Cloudy Ridge Wind Park Limited Partnership REA Northland Power

REA Injasuti Developments REA Recurrent Energy

REA Intech Clean Energy Inc. REA City of Sarnia REA Ostrander Point GP Inc., as general partner for and on behalf of Ostrander Point Wind Energy LP REA Ontario PV Fields GP 2 Inc. REA SP Armow Wind Ontario GP Inc. operating as SP Armow Wind Ontario LP REA Horizon Wind Inc.

REA South Kent Wind LP

Page 59 of 84 09/26/2021 Renewable Energy Projects

http://discoverylightsolar.com/ Regional Municipality of Durham Kawartha Lakes County

http://canada.firstsolar.com/ County of Essex http://ontariosolarfuture.ca/projects.php Lanark County Toronto Region http://www.bio-en.ca/ Waterloo Region

http://www.zeroemissionpeople.com/?avada_portfolio=zep- County of Grey skyway-126 http://www.northlandpower.ca/WhatWeDo/PrerevenueProjects/Vie Parry Sound District wAll.aspx?projectStageID=%20-1#m=2&s=3 http://injasutidevelopments.com/beavercreek.html Elgin County http://ontariosolarfuture.ca/projects.php#OR1 Middlesex County

http://intech-solar.ca/projects/ Elgin County Lambton County

http://www.gileadpower.com/ostrander_documents.htm Prince Edward County

http://www.ontariosolarpvfields.com/project2.html District of Rainy River http://www.armowwind.com/index.html County of Bruce

http://www.bigthunderwindpower.ca Thunder Bay District

http://www.southkentwind.com/ Chatham-Kent County

Page 60 of 84 09/26/2021 Renewable Energy Projects

Central Approved Eastern Received and screening for completeness

Southwest Approved Eastern Approved Central Approved West Central Approved

Southwest Received and screening for completeness

Northern Approved

Southwest Approved Southwest Approved

Southwest Under Technical Review Southwest Application Returned /or Withdrawn Eastern Approved

Northern Approved Southwest Approved

Northern Under Technical Review

Southwest Approved

Page 61 of 84 09/26/2021 Renewable Energy Projects

Yes Yes

No Yes (44.946724, -76.140294) Yes Yes (43.603, -80.552)

Yes

Yes

Yes Yes (42.984959, -80.959672)

Yes 012-0132

Yes (43.904, -77.001)

Yes KC2-ARMOW-W

Yes 011-8937

KCA

Page 62 of 84 09/26/2021 Renewable Energy Projects

44.946724 -76.140294

43.603 -80.552

42.984959 -80.959672

43.904 -77.001

Page 63 of 84 09/26/2021 Renewable Energy Projects

RE Smiths Falls 4 10 MW solar project. Site consists of approximately 86 acres David Brown Solar Park 10 MW solar project. Site consists of approximately 140 acres White Pines Wind Farm 29 turbines with total generation capacity of 60 MW RE Waubaushene 4 8 MW solar project. Site consists of approximately 82 acres Cornwall Solar Project 10 MW solar project. Site consists of approximately 61 acres Kingston Gardiner TS Odessa Solar Project 10 MW solar project. Site consists of approximately 116 acres SunE Newsboro 4 Solar Project 10 MW solar project. Site consists of approximately 247 acres

RE Smiths Falls 5 10 MW solar project. Site consists of approximately 112 acres K2 Wind Farm 140 turbine with total generation capacity of 270 MW

Grand Bend Wind Farm 48 turbine with total generation capacity of 100 MW

River Canard Energy North 1 turbine with total generation capacity of 0.5 MW McCann Solar Project 10 MW solar project. Site consists of approximately 98.8421 acres

SunE Newboro 1 Solar Energy Project 10 MW solar project. Site consists of approximately 350 acres CityLights Solar Farm 10 MW solar project. Site consists of approximately 103 acres

Page 64 of 84 09/26/2021 Renewable Energy Projects

Solar 2372-8UMGDK Solar Wind Solar 1762-8N8LCJ Solar 3195-92JKTY Solar 2294-8WJHD3 Solar

Solar 4377-8LMH9S Wind 3259-98EQ3G

Wind

Wind Solar 5636-8RAM88

Solar 0325-98FHZK Solar

Page 65 of 84 09/26/2021 Renewable Energy Projects

(also Samsung Renewable) REA Recurrent Energy REA Saturn Power Inc. REA wpd White Pines Wind Incorporated REA Waubaushene 4 ULC (Also Known as Recurrent Energy) REA Cornwall Solar Inc. (Algonquin Solar Subsidiary) REA 2225054 Ontario Inc. (also Axio Power and SunEdison) REA SunEdison

REA Smiths Falls 5 (Also Known as Recurrent Energy) REA K2 Wind Ontario Inc. operating as K2 Wind Ontario Limited Partnership REA Northland Power

REA River Canard Energy Inc. REA Northland Power Inc.

REA 2225054 Ontario Inc. (SunEdison) REA 2239279 Ontario Corp. operating as CityLights LP

Page 66 of 84 09/26/2021 Renewable Energy Projects

http://ontariosolarfuture.ca/projects.php Lanark County Stormont, Dundas & Glengarry County http://canada.wpd.de/projects/in-canada/white-pines.html Prince Edward County http://ontariosolarfuture.ca/projects.php Simcoe County Stormont, Dundas & Glengarry County http://www.axiopower.ca/projects/ontario/odessa/ County of Lennox and Addington http://www.sunedison.com/wps/portal/memc/memc/!ut/p/b1/04_Sj Leeds & Grenville County 9CPykssy0xPLMnMz0vMAfGjzOINDQO8fb3dDQ0MPPwtDDx9zY wtnULNDA2MzIEKIoEKDHAARwNC- r30o9Jz8pOAVoXrR4EVGxu6GhgZmxh6uHtbGBh4WrqEGrp7- Rm7GxtBFeCxzM8jPzdVvyA3ojI4IF0RAHk9KeU!/dl4/d5/L2dBISE vZ0FBIS9nQSEh/ http://ontariosolarfuture.ca/projects.php#SF5 Lanark County http://www.k2wind.ca/about-us/ Huron County

http://grandbend.northlandpower.ca/ Huron County (spanning the municipalities of Bluewater and Huron South) http://rivercanardenergynorth.ca/ County of Essex http://www.northlandpower.ca/WhatWeDo/Projects.aspx?projectID Leeds & Grenville County =38#m=2 Leeds & Grenville County Stormont, Dundas & Glengarry County

Page 67 of 84 09/26/2021 Renewable Energy Projects

Eastern Approved Eastern Under Technical Review Eastern Received and screening for completeness Central Approved Eastern Approved Eastern Approved Eastern Approved

Eastern Approved Southwest Approved

Southwest Under Technical Review

Southwest Application Returned /or Withdrawn Eastern Approved

Eastern Approved Eastern Under Technical Review

Page 68 of 84 09/26/2021 Renewable Energy Projects

Yes Yes 011-9664 Yes Yes (44.773986, -79.635501) Yes Yes Yes

Yes (44.941328, -76.12161) KC2-K2-W

Yes 011-9928

Yes Yes (44.684724, -76.273037)

Yes Yes 011-8539

Page 69 of 84 09/26/2021 Renewable Energy Projects

44.773986 -79.635501

44.941328 -76.12161

44.684724 -76.273037

Page 70 of 84 09/26/2021 Renewable Energy Projects

HAF Wind Power Project 5 turbine with total wind generation capacity of 9 MW

Conestogo Wind Energy Centre 10 turbines with total generation capacity of 22.92 MW Grand Renewable Energy Park- Solar Component 100 MW solar project Cochrane Solar Farm (Formerly Abitibi, Empire and 30 MW solar project. Site consists of approximately 745 acres Martin's Meadow) Belmont Solar Farm 20 MW solar project. Site consists of approximately 448 acres Sandringham Solar Farm 10 MW solar project. Site consists of approximately 207.321 acres Alfred Solar Energy Project 10MW solar project. Site consists of approximately 83 acres St. Clair Moore Solar Farm 20 MW solar farm. Site consists of approximately 297 acres Grey Highland Zero Emissions People Wind Park 5 turbines with total generation capacity of 10 MW Grey Highlands Clean Energy Wind Project 9 turbines with total generation capacity of 18.45MW

Wainfleet Wind Farm 5 turbines with total wind generation capacity of 9 MW Rideau Lakes Solar Farm 10 MW solar project. Site consists of approximately 123 acres

Toronto Zoo Biogas A 500 kW biogas energy plant utilizing landfill gas as fuel supply Wal-Mart Canada Corp. Wind Turbine 1 turbine with total generation capacity of 0.02 MW Project 41 turbines with total generation capacity of 60MW Marsh Hill Solar Farm 10 MW solar project. Site consists of approximately 89.2 acres Elgin Grovlea Farms Inc's Wind Farm 2 turbine with total generation capactiy of 0.032 MW Solar Spirit 4 Solar Farm 10 MW solar project. Site consists of approximately 380 acres

Page 71 of 84 09/26/2021 Renewable Energy Projects

Wind 1590-979LNP

Wind 3558-8KTHJP Solar 9560-8UJJXS Solar 1290-9A4KSE

Solar 6928-8QSMBZ Solar 4222-8U6RL8 Solar Solar 1901-8G3JES Wind Wind

Wind 7159-97BQAS

Solar 4501-8QUJ5A

Bioenergy Wind Wind 7483-94DPRF Solar 6143-94UQHV Wind 9716-8AVFSQ Solar 7420-9A6KGN

Page 72 of 84 09/26/2021 Renewable Energy Projects

REA Vineland Power Inc. (IPC Energy)

REA NextEra Energy Canada REA Grand Renewable Solar LP (also Samsung Renewable) REA Northland Power

REA First Solar Development REA Invenergy Solar Canada REA 2225228 Ontario Ltd. REA First Solar Development (Canada), Inc. REA Grey Highlands Nominee (No. 1) Ltd. REA Wind Park GP Inc. o/a Grey Highlands Clean Energy Limited Partnership REA Wainfleet Wind Engery Inc.

REA Northland Power Inc.

REA ZooShare Biogas Co-operative REA Wal-Mart Canada REA NextEra Energy Canada REA 2327461 Ontario Inc. REA Elgin Grovelea Farms REA 2224375 Ontario Inc. (SunEdison)

Page 73 of 84 09/26/2021 Renewable Energy Projects

http://www.wainfleetwindenergy.ca/hafwindenergy.ca/project_over Regional Municipality of Niagara view.html http://www.canadianwindproposals.com/ Wellington County http://www.samsungrenewableenergy.ca/haldimand Haldimand County Cochrane District

http://canada.firstsolar.com/ Elgin County & Middlesex County http://invenergyllc.com/projects.html Kawartha Lakes County United Counties of Prescott and Russell http://canada.firstsolar.com/ Lambton County County of Grey http://greyhighlandscleanenergy.com/index.html County of Grey

http://www.wainfleetwindenergy.ca/project_overview.html Regional Municipality of Niagara

http://www.northlandpower.ca/WhatWeDo/Projects.aspx?projectID Leeds & Grenville County =46#m=2 http://zooshare.ca/ Toronto Region http://www.windpowermedia.com/burlington/ Halton Region http://www.nexteraenergycanada.com/projects/bluewater.shtml Huron County Regional Municipality of Durham Elgin County County of Hastings

Page 74 of 84 09/26/2021 Renewable Energy Projects

West Central Approved

West Central Approved West Central Approved Northern Approved

Southwest Approved Eastern Approved Eastern Received and screening for completeness Southwest Approved Southwest Under Technical Review Southwest Received and screening for completeness

West Central Approved

Eastern Approved

Central Application Returned /or Withdrawn Central and West Central Application Returned /or Withdrawn Southwest Approved Central Approved Southwest Approved Eastern Approved

Page 75 of 84 09/26/2021 Renewable Energy Projects

Yes

Yes (43.801, -80.517) KCA Yes

No Yes Yes No Yes 012-0683 Yes

Yes

Yes (44.67048, -76.274671)

Yes No Yes Yes Yes Yes

Page 76 of 84 09/26/2021 Renewable Energy Projects

43.801 -80.517

44.67048 -76.274671

Page 77 of 84 09/26/2021 Renewable Energy Projects

Ashbridges Bay Biogas Cogeneration Plant A 9.912 MW MW biogas energy plant utilizing digester gas produced at the sewage treatment plant as fuel supply Mattawiskwia Solar Project 10 MW solar project. Site consists of approximately 330.6 acres North Burgess Solar Project 10MW solar project. Site consists of approximately 210.039 acres

Lindsay Solar Farm 10 MW solar project. Site consists of approximately 76 acres

Page 78 of 84 09/26/2021 Renewable Energy Projects

Bioenergy 1827-8EXJG6

Solar 9622-8T7Q6K Solar 5149-8YPMVG

Solar 0568-9AMQAB

Page 79 of 84 09/26/2021 Renewable Energy Projects

REA Toronto Hydro Energy Services Inc.

REA Ontario Solar PV Fields REA Northland Power

REA Lindsay Solar Farm Inc.

Page 80 of 84 09/26/2021 Renewable Energy Projects

http://www.torontohydroenergy.com/ Toronto Region

http://www.ontariosolarpvfields.com/project6.html Cochrane District http://www.northlandpower.ca/WhatWeDo/PrerevenueProjects/Vie Lanark County wAll.aspx?projectStageID=%20-1#m=2&s=3 Kawartha Lakes County

Page 81 of 84 09/26/2021 Renewable Energy Projects

Central Approved

Northern Approved Eastern Approved

Eastern Approved

Page 82 of 84 09/26/2021 Renewable Energy Projects

No

Yes Yes (44.825956, -76.312777)

Yes

Page 83 of 84 09/26/2021 Renewable Energy Projects

44.825956 -76.312777

Page 84 of 84 09/26/2021