Sheffield City Region Integrated Rail Plan 2 Foreword 3
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Draftrail Strategy
South Yorkshire Passenger Transport Authority DRAFT RAIL STRATEGY Consultation Draft – October 2008 South Yorkshire, Making Rail a Better Choice 1 South Yorkshire, Making Rail a Better Choice Contents Contents Page Executive Summary 4 1. Introduction 5 2. The Rail Strategy in Context 9 National Context 10 Regional Context 10 Context Diagram 10 Strategy Objectives 11 3. Current Conditions 13 South Yorkshire Network 13 Local Network 13 Express Long Distance 15 Open Access 17 Freight 18 Rolling Stock 21 Train Capacity 23 South Yorkshire Stations 24 Access to Stations 28 Network Performance 29 Network Constraints 32 Ticketing and Pricing 34 Recent Land Use and Demand Changes 35 4. Recent Research 37 5. Future Conditions 39 Future Demand 39 New Stations 40 New Lines 41 Delivery Priorities 43 6. Action Plan 43 Details of Delivery/Funding 43 7. Monitoring and Consultation 46 Details of current Monitoring 46 Reporting processes 46 Consultation 48 2 Appendix One – The Rail Strategy in Context Appendix Two – Network Diagram/Map Appendix Three – Current Station Standards and Facilities Appendix Four – Proposed Housing Growth related to Rail Stations Appendix Five – Network bottlenecks and scheme dependencies Appendix Six – Delivery Plan 3 Executive Summary Executive Summary South Yorkshire, Making Rail a Better Choice To be drafted once contents are endorsed 4 Chapter 1 Introduction South Yorkshire, Making Rail a Better Choice Summary This document brings together changes in contextual policy and investment plans and Identifies the role of the Rail Strategy Provides an update on work completed since 2004 Summarises key developments and the effect on rail users Links all the above to explain the need for change Provides the planned actions to take the Strategy forward in the short, medium and long term 1.1 This Rail Strategy is produced by South Yorkshire Passenger Transport Executive (SYPTE), on behalf of South Yorkshire Passenger Transport Authority (SYPTA) and represents an update of the previous strategy issued in 2004. -
Investment Programme 2 3
TRANSPORT FOR THE Investment Programme 2 3 Introduction Developing the Investment Programme Transport for the North’s (TfN’s) Strategic Transport Plan sets out an ambitious vision for how transport can support transformational, inclusive growth in the This initial version of the Investment Programme builds North of England through to 2050. This accompanying Investment Programme on the strategic rail and road schemes previously comprises TfN’s advice to the Government on the long-term, multimodal priorities announced, and draws on the Integrated and Smart Travel programme, the Long Term Rail Strategy, the Strategic for enhanced pan-Northern connectivity. Outline Business Case for Northern Powerhouse Rail, the Major Road Network for the North, and the work done to date on the Strategic Development Corridors identified in the Strategic Transport Plan. It is important to consider future investments and decisions As with the Strategic Transport Plan, the Investment strategically, ensuring that infrastructure not only provides Programme has a horizon year of 2050, to align with the the basics for the economy, but also actively supports the Northern Powerhouse Independent Economic Review, long-term national interests. The Strategic Transport Plan and sets out TfN’s view of the appropriate pipeline of and this Investment Programme do just that, by ensuring investment in strategic transport to deliver those plans. that the North’s existing and future economic assets and This will enable TfN and its Partners to secure funding and clusters are better connected. delivery of the right schemes at the right time. The successful delivery of the Investment Programme will The Investment Programme aims to provide greater require continuous close working with TfN’s Constituent certainty for Local Transport and Highway Authorities Authority Partners, the national Delivery Partners (Highways to deliver complementary investment. -
Barnsley Rail Vision 2018 to 2033
Barnsley Rail Vision 2018 to 2033 Getting Barnsley on Track Key Messages 1 Barnsley Rail Vision Getting Barnsley on Track Foreword The 1980’s and earlier rail rationalisations were particularly savage in disconnecting Barnsley Dearne Valley and the former coalfield communities of South East Wakefield and the ‘Five towns’ from the direct inter-city and inter-regional rail network. This had the further consequence of those communities being marginalised by subsequent rail investment. Today Barnsley Dearne Valley passengers experience poor rolling stock deployed on routes with low line-speeds and journey times that compare poorly against car travel. The Barnsley Rail Vision is welcomed as setting out a strategy for re- connecting Barnsley and its neighbouring Wakefield and Kirklees communities more directly to inter-city and inter-regional rail services. Delivering the vision will enable the Barnsley Dearne Valley economy – 10th most populous built up area in the Northern Powerhouse – deliver its full potential to both Sheffield and Leeds City Regions and the Sheffield- Barnsley-Wakefield-Leeds growth corridor. We look forward to promoting to key stakeholders full awareness of the rail vision and its importance to the national and sub-national economy and urging them to ensure inclusion of its aspirations in their own infrastructure and operational investment strategies. In particular HS2, Northern Powerhouse Rail, Network Rail and inter- city/inter-regional franchise investment strategies must provide excellent, high quality services linking Barnsley Dearne Valley and its Wakefield and Kirklees neighbouring communities and into the national high speed networks. Dan Jarvis MBE MP, Mayor of the Sheffield City Region Barnsley, its Dearne Valley and western rural communities all have a place in the Barnsley Rail Vision. -
Goldthorpe and Bolton Upon Dearne Expansion
South Yorkshire Historic Environment Characterisation Project Barnsley Character Zone Descriptions Planned Industrial Settlements Areas within this Zone ‘Goldthorpe and Bolton Upon Dearne Expansion’, ‘Royston Miners Housing’, ‘Shafton Miners Housing’, ‘Brierley Colliery Housing’, ‘Carlton Miners Housing’, ‘Cudworth Miners Housing’, ‘Grimethorpe’, ‘Great Houghton Colliery Housing’, ‘Thurnscoe Colliery Village’, ‘Staincross Planned Colliery Housing’, ‘Middlecliff’, ‘Darton and Kexbrough Miners Housing’, ‘Penistone Industrial Expansion’, ‘Dodworth Colliery Housing’, ‘Planned Wombwell’, ‘Hoyland, Jump and Elsecar Planned Expansion’, ‘Darfield Planned Housing’, ‘Bolton Upon Dearne Miners Housing’, ‘Stairfoot Planned Housing’ Summary of Dominant Character As the coal seams are near to the surface in the west of the district they could be utilised from an early date and documentary evidence puts coal mining back as far as the medieval period. However, it wasn’t until between 1550 and 1700 that the industry expanded (Hill 2001, 54). These early mines were shallow, relatively small scale, short-lived operations because there were few transport links beyond local markets. These mines left few traces on the landscape and many did not survive long enough to be marked on the 1850s Ordnance Survey maps. This style of mining continued into the early 19 th century but the coming of railways in the mid 19 th and 20 th century and the building of the canals facilitated greater expansion. The greatest density of coal seams in the South Yorkshire coalfield was along the centre of the coal measures running through the east of Barnsley. This meant that although these seams had been worked for half a century longer than the concealed coal measures east of Barnsley there were similar reserves remaining (ibid, 14). -
Real-Life Experiences of the Poverty Premium
Paying over the odds? Real-life experiences of the poverty premium Jane Perry December 2010 2 paying over the odds? Acknowledgements This research was undertaken by Church Action on Poverty, working closely with South Yorkshire Credit Union. It was funded by the European Year for Combating Poverty and Social Exclusion as part of the regional programme for Yorkshire and Humberside, run in the UK by the Department for Work and Pensions. The experiences and perspectives of those living in poverty are fundamental to this report. Our biggest thanks go to the participants in the research, and their families, for giving their time to the project and for sharing their lives with us. We hope this report does justice to their honesty and openness. The research would also not have been possible without the dedicated team of volunteer researchers: Sarah Baker, Hannah Jessop, Judith Marks, Eloise Nisbet, Kitty Sui, Julie Ward and John Whitmill. These Church Action on Poverty members and students freely gave their time and expertise to listen carefully to the participants and so provide an accurate, thorough and caring account of their lives. Thanks are also due to: South Yorkshire Credit Union – particularly Ian Guest, Gail Foster and staff at the Goldthorpe branch for sharing their office space and giving invaluable support and advice. Alan Thornton and staff at Church Action on Poverty, particularly Niall Cooper, Janet Gee, Jenny Lazarus and Liam Purcell. Alexan Westlake and Graham Whitham (Save the Children), Greg Brown (Thrive), Lucy Brill and Mike Quiggin (Oxfam and Bradford Resource Centre) for their advice and support. -
Illustrative Option Schemes in CP5 HLOS
Illustrative Option schemes in CP5 HLOS The Department worked with Network Rail, the train operators and the transport authorities in the major cities to build up shared information on current rail usage. As far as practicable a shared view was also agreed on forecast demand, using standard rail industry models but adjusting these where there was evidence of likely stronger growth. This forecast growth is stated as a peak demand to be met in the HLOS. The forecast growth was assessed against current plans for train service provision in 2019. Illustrative train service enhancements that provided the capacity to meet this demand were identified and modelled for the morning peak services in London, Birmingham, Manchester and Leeds. In many cases these were directly based on the work undertaken by recent rail industry Route Utilisation Strategies (RUS). In some cases, notably in Leeds and Manchester, recent Government commitments to funding electrification and capacity enhancements had happened after the RUS and so the Department worked with key stakeholders to determine the most likely train service patterns the infrastructure changes might produce. The illustrative peak train services are not what will happen; that will be guided both by the rail industry’s response to the HLOS in the Strategic Business Plan for CP5 where the industry will set out how it proposes to meet the HLOS, and by the outcome of future train operator franchise competitions. But the illustrative train services are needed for the Department to confirm that a value for money solution can be provided to meet peak demand. It is likely the rail industry will produce a more detailed and efficient solution, and in this context the illustrative option can be viewed as the simple answer that should be bettered. -
Goldthorpe and Bolton on Dearne Partnership Board Big Local Plan 2015 – 2018 April 2015
GOLDTHORPE AND BOLTON ON DEARNE PARTNERSHIP BOARD BIG LOCAL PLAN 2015 – 2018 APRIL 2015 Parish Church Goldthorpe Dearne Playhouse Goldthorpe Centre 1 CONTENTS Section One Introduction to Goldthorpe and Bolton on Dearne Big Local Page 1 Section Two Our Overall Role and Approach Page Section Three Shared vision Page Section Four Priorities Page Section Five Outcomes Page Section Six Action Plan Page Section Seven Communications Page Section Eight Goldthorpe and Bolton on Dearne Big Local Plan for our Entire Community Page Section Nine Real issues and Big Challenges Page Section Ten Budgets Page 2 List of Figures Figure 1 Big Local Pathway Page Figure 2 Map of the area Page Figure 3 Our Themes and Outcomes Page List of Appendices Appendix 1 List of Partnership members Appendix 2 Area Profile for Goldthorpe and Bolton on Dearne Big Local Area Appendix 3 ‘It’s time to turn your ideas into our Big Local Plan’ Appendix 4 Example Cinema Posters Appendix 5 Big Local Leaflet 3 Glossary of terms The Big Local Plan – This document Area Profile for Goldthorpe and Bolton on Dearne Big Local Area – the document produced from all the views from the community consultation, visioning events and statistics which helped draw up the Big Local Plan Communications Plan – the different ways we use to try and let as many people as possible know what is happening Action Plan – details of how we will make the plan happen. Each theme/project has an action plan Outcomes – what has changed by implementing the things in the plan 4 SECTION ONE INTRODUTION TO GOLDTHORPE -
622A Thurnscoe – Wath Academy
622a Thurnscoe – Wath Academy Schooldays only Thurnscoe, Merrill Road/Houghton Road 0715 Thurnscoe, Hanover Street/Lancaster Street 0725 Goldthorpe, High Street/Jackson Street 0737 Manvers, Manvers Way/Meadows Road 0752 Wath, Doncaster Road/Burman Road 0756 Wath, Wath Academy Bus Park 0800 Wath, Wath Academy Bus Park 1455 Wath, Doncaster Road/Burman Road 1500 Manvers, Manvers Way/Meadows Road 1504 Goldthorpe, Barnsley Road/High Street 1518 Thurnscoe, Houghton Road/Garden Street 1523 Thurnscoe, Merrill Road/Houghton Road 1524 Route Details Thurnscoe to Wath Academy: From Thurnscoe, Merrill Road/Houghton Road via Merrill Road, Lingamore Leys, School Street, Houghton Road, Station Road, Windsor Street, Briton Street, Hanover Street, Lancaster Street, Grange Crescent, Stuart Street, Station Road, Shepherd Lane, Thurnscoe Bridge Lane, Nicholas Lane, Goldthorpe, Barnsley Road, High Street, Goldthorpe Road, Goldthorpe Green, Furlong Road, Station Road, Bolton upon Dearne, High Street, Wath Road, Dearne Road, Station Road, Manvers Way, Manvers Roundabout, Doncaster Road, Dearneway, Sandygate to Wath Academy Bus Park. Wath Academy to Thurnscoe: From Wath Academy Bus Park via Sandygate, Dearneway, Doncaster Road, Manvers Roundabout, Manvers Way, Station Road, Dearne Road, Wath Road, Bolton upon Dearne, High Street, Angel Street, Station Road, Furlong Road, Goldthorpe, Goldthorpe Green, Goldthorpe Road, High Street, Barnsley Road, Nicholas Lane, Thurnscoe Bridge Lane, Shepherd Lane, Thurnscoe, Houghton Road to Merrill Road/Houghton Road. Bus Stops: All Travel South Yorkshire bus stops to be observed. Destination Display: Wath Academy 622a Thurnscoe 622a . -
Hemsworth a Review of the Potential for Improved Local Connectivity Offered by HS2 and High Speed UK
New Station Opportunities for Hemsworth A Review of the Potential for Improved Local Connectivity offered by HS2 and High Speed UK A study by: Colin Elliff BSc CEng MICE Civil Engineering Principal, High Speed UK Contents 1 1. Introduction/Executive Summary 3 1.1. About HS2 4 1.2. About High Speed UK 6 1.3. About Hemsworth 7 2. Methodology 8 2.1. Assessment of HS2 and HSUK Intercity Journey Times 8 2.2. Allowances for Changes of Train 8 2.3. Allowance for Differences in Train Frequency 9 2.4. Assessment of Existing Journey Times to Hemsworth 10 2.5. Assessment of Proposed Journey Times to Hemsworth 10 2.6. Use of Hemsworth Parkway by Neighbouring South Yorkshire Communities 10 3. Case 1 : Connections to High Speed Rail Services via Local Links from Fitzwilliam and (potentially) Hemsworth 11 3.1. Existing Rail Network Connections from Fitzwilliam 11 3.2. Connections to HSUK and HS2 at Neighbouring Network Hubs 12 3.3. Contrast between Journey Time Reductions for Cities and Smaller Towns 13 4. Likely Locations of New Stations in Hemsworth 15 4.1. New HS2 Parkway at Hemsworth 15 4.2. New Main Line Station at Hemsworth 16 5. Case 2 : New HS2 Parkway at Hemsworth 18 5.1. High Speed Services from a new HS2 Hemsworth Parkway 18 5.2. Concerns regarding Viability of Parkway Stations 18 5.3. Likely Service Frequencies from new HS2 Hemsworth Parkway 19 5.4. Journey Times from new HS2 Hemsworth Parkway 21 5.5. HS2 Benefits for Barnsley?? 21 5.6. -
Goldthorpe and the Dearne Towns Green Belt Review
Barnsley Metropolitan Borough Council Barnsley Green Belt Review Green Belt: Goldthorpe (Dearne Towns) 01 Issue | August 2014 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility is undertaken to any third party. Job number 233367-00 Ove Arup & Partners Ltd 13 Fitzroy Street London W1T 4BQ United Kingdom www.arup.com Barnsley Metropolitan Borough Council Barnsley Green Belt Review Green Belt: Goldthorpe (Dearne Towns) Contents Page 1 Introduction 1 2 Assessment of Green Belt ‘General Areas’ 3 2.1 Introduction 3 2.2 Approach 3 3 General Area DE1 5 3.1 Stage 1: DE1 Green Belt Assessment Proforma 5 3.2 Introduction 5 3.3 Stage 2: Technical Site Assessment 11 3.4 Stage 3: Evaluating the Potential Newly Defined Green Belt Boundary 14 3.5 Conclusion for DE1 15 4 DE2 ‘General Area’ 17 4.1 Stage 1: DE2 Site Assessment Proforma 17 4.2 Conclusion for DE2 23 5 DE3 ‘General Area’ 24 5.1 Stage 1: DE3 General Area Assessment Proforma 24 5.2 Conclusion for DE3 30 6 DE4 ‘General Area’ 31 6.1 Stage 1: DE4 General Area Assessment Proforma 31 6.2 Conclusion for DE4 37 7 DE5 ‘General Area’ 38 7.1 Stage 1: DE5 Green Belt Assessment Proforma 38 7.1 Stage 2: Technical Site Assessment 44 7.2 Conclusion for DE5 46 8 DE6 ‘General Area’ 47 8.1 Stage 1: DE6 Green Belt Assessment Proforma 47 8.2 Conclusion for DE6 53 9 DE7 ‘General Area’ 54 9.1 Stage 1: DE7 Green Belt Assessment Proforma 54 9.2 Conclusion for DE7 60 10 Summary 61 01 | Issue | August 2014 J:\230000\233367-00\0 ARUP\0-06 PM\0-06-08 REPORTS\PHASE 1 GB REVIEW\BARNSLEY GREEN BELT REVIEW_RESULTANT LAND PARCELS\GOLDTHORPE - DEARNE TOWNS\BARNSLEY GREEN BELT REVIEW - GOLDTHORPE AND DEARNE TOWNS ISSUE 2014.DOCX Barnsley Metropolitan Borough Council Barnsley Green Belt Review Green Belt: Goldthorpe (Dearne Towns) 1 Introduction This report provides an analysis of the Green Belt surrounding Goldthorpe (Dearne Towns, including Thurnscoe and Bolton on Dearne). -
New Railway Stations in North and West Yorkshire Feasibility Study Final Report West Yorkshire Combined Authority
New Railway Stations in North and West Yorkshire Feasibility Study Final Report West Yorkshire Combined Authority 14 October 2014 New Railway Stations in North and West Yorkshire Feasibility Study Final Report Notice This document and its contents have been prepared and are intended solely for West Yorkshire Combined Authority‟s information and use in relation to a feasibility study assessing new railway station locations in North and West Yorkshire. Atkins Ltd assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 66 pages including the cover. Document history Job number: 5124741 Document ref: Metro New Railway Stations Study Report Revision Purpose description Originated Checked Reviewed Authorised Date Rev 0.1 Draft for client comment JB,CW CW JT JT 07/03/2014 Rev 0.2 Revised draft CW CW JT JT 23/06/2014 incorporating initial client comments and two additional Stage 2 sites Rev 1.0 Final report CW CW JT JT 14//10/14 Atkins Final Report | Version 1.0 | 14 October 2014 | 5124741 2 New Railway Stations in North and West Yorkshire Feasibility Study Final Report Table of contents Chapter Pages 1. Introduction 6 Background 6 Study Context 6 Report Structure 6 2. Site Locations 7 3. Assessment Methodology 9 Stage 1 – Preliminary Sift 9 Identifying the Initial Shortlist (End of Stage 1) 13 Stage 2 – Detailed Feasibility Assessment 15 End of Stage 2 - Final Shortlist 16 4. Stage 1 Assessment – Preliminary Sift 17 Stage 1 Assessment Results Summary by Line 17 Shortlisted Sites for Stage 2 29 5. -
Dearne Valley Eco-Vision Final Report.Pdf
DEARNE VALLEY ECO-VISION “Perhaps we cannot raise the winds. But each of us can put up a sail, so that when the wind comes we can catch it.” E.F.Schumacher ‘The future of the Dearne Valley will be re-imagined by an eco-vision. The vision is of a place transformed by the know-how of its people and by the imagination and commitment of its communities and enterprises. It will be a place defined by action, in the knowledge that time is running out for the status quo. Within a decade it will be the lowest carbon community of its kind in the country. A pioneer proud to tell its story and share its experiences. Using its distinct resources, assets and potential as a foundation, the Dearne will build a lean, green economy in preparation for the challenges that lie ahead. But above all the eco-vision will rekindle the work ethic of the Dearne’s forefathers, providing a renewed sense of purpose and inspiration for the next generation.’ Published May 009 Sheffield City Region The Source 00 Meadowhall Way Sheffield S9 EA Tel: 0 6 5685 Email: [email protected] Web: www.sheffieldcityregion.org.uk The Dearne Valley eco-vision was commissioned by the Dearne Valley Special Board, one of the Sheffield City Region’s five thematic working groups. The eco-vision was produced by Nick Dodd, Jonathan Brown and John Sampson from URBED, with support from Richard Hindley, Nick Gardner and Joanne Parkin at SQW, and Jonathan Turner and Sarah Bull from DTZ. The authors wish to acknowledge the support of Joanne Wehrle from Rotherham Council, Martin Cantor from Barnsley Council and Stuart Jenkinson from the Environment Agency, as well as members of the Dearne Valley Officers Group and other key consultees (see Chapter 8 for a listing), in developing the eco-vision.