Contingency Timetable

Total Page:16

File Type:pdf, Size:1020Kb

Contingency Timetable Contingency Timetable Metro timetables Plan C (KRS 3) – Metro train services to be cancelled • 05:52 London Cannon Street to London Bridge • 06:02 London Bridge to London Cannon Street • 06:12 London Cannon Street to London Bridge • 06:20 London Bridge to London Cannon Street Metro pocket timetable 7A Monday to Friday Towards London • 04:34 Gillingham to London Charing Cross, scheduled to call at Chatham, Rochester, Strood, Higham, Gravesend, Greenhithe, Dartford, Crayford, Bexley, Albany Park, Sidcup, New Eltham, Mottingham, Lee, Hither Green, Lewisham, New Cross, London Bridge and London Waterloo East. • 09:54 Gillingham to London Charing Cross, scheduled to call at Chatham, Rochester, Strood, Higham, Gravesend, Greenhithe, Dartford, Abbey wood, Woolwich Arsenal, Charlton, Blackheath, Lewisham, London Bridge and London Waterloo East. • 12:24 Gillingham to London Charing Cross, scheduled to call at Chatham, Rochester, Strood, Higham, Gravesend, Greenhithe, Dartford, Abbey wood, Woolwich Arsenal, Charlton, Blackheath, Lewisham, London Bridge and London Waterloo East. Towards Gillingham • 11:39 London Charing Cross to Gillingham, scheduled to call at London Waterloo East, London Bridge, Lewisham, Blackheath, Charlton, Woolwich Arsenal, Abbey Wood, Dartford, Greenhithe, Gravesend, Higham, Strood, Rochester and Chatham. • 23:25 Dartford to Gillingham, scheduled to call at Stone Crossing, Greenhithe, Swanscombe, Northfleet, Gravesend, Higham, Strood, Rochester and Chatham. • 2 Metro pocket timetable 7B Monday to Friday Towards London • 12:01 Dartford to London Cannon Street, scheduled to call at Slade Green, Erith, Belvedere, Abbey Wood, Plumstead, Woolwich Arsenal, Woolwich Dockyard, Charlton, Westcombe Park, Maze Hill, Greenwich, Deptford and London Bridge. • 12:45 Slade Green to London Cannon Street, scheduled to call at Erith, Belvedere, Abbey Wood, Plumstead, Woolwich Arsenal, Woolwich Dockyard, Charlton, Westcombe Park, Maze Hill, Greenwich, Deptford and London Bridge. • 17:31 Dartford to London Cannon Street, scheduled to call at Slade Green, Erith, Belvedere, Abbey Wood, Plumstead, Woolwich Arsenal, Woolwich Dockyard, Charlton, Westcombe Park, Maze Hill, Greenwich, Deptford and London Bridge. • 20:16 Dartford to London Bridge scheduled to call at Slade Green, Erith, Belvedere, Abbey Wood, Plumstead, Woolwich Arsenal, Woolwich Dockyard, Charlton, Westcombe Park, Maze Hill, Greenwich and Deptford. • 21:46 Dartford to London Bridge scheduled to call at Slade Green, Erith, Belvedere, Abbey Wood, Plumstead, Woolwich Arsenal, Woolwich Dockyard, Charlton, Westcombe Park, Maze Hill, Greenwich and Deptford. Towards Dartford • 10:07 London Cannon Street to Barnehurst, scheduled to call at London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere, Erith and Slade Green. • 12:57 London Cannon Street to Dartford, scheduled to call at London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere, Erith and Slade Green. • 13:37 London Cannon Street to Barnehurst, scheduled to call at London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere, Erith and Slade Green. • 20:17 London Cannon Street to Slade Green, scheduled to call at London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere and Erith. 3 • 20:47 London Cannon Street to Dartford, scheduled to call at London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere, Erith and Slade Green. • 21:20 London Bridge to Dartford, scheduled to call at London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere, Erith and Slade Green. • 22:50 London Bridge to Dartford, scheduled to call at London Bridge, Deptford, Greenwich, Maze Hill, Westcombe Park, Charlton, Woolwich Dockyard, Woolwich Arsenal, Plumstead, Abbey Wood, Belvedere, Erith and Slade Green. Sunday Towards Dartford • 19:20 Plumstead to London Bridge scheduled to call at Woolwich Arsenal, Woolwich Dockyard, Charlton, Westcombe Park, Maze Hill, Greenwich and Deptford. • 21:46 Plumstead to London Bridge scheduled to call at Woolwich Arsenal, Woolwich Dockyard, Charlton, Westcombe Park, Maze Hill, Greenwich and Deptford. Metro pocket timetable 7C Monday to Friday Towards London • 11:08 Barnehurst to London Cannon Street, scheduled to call at Bexleyheath, Welling, Falconwood, Eltham, Kidbrooke, Blackheath, Lewisham, St Johns, New Cross and London Bridge • 14:38 Barnehurst to London Cannon Street, scheduled to call at Bexleyheath, Welling, Falconwood, Eltham, Kidbrooke, Blackheath, Lewisham, St Johns, New Cross and London Bridge • 14:38 Dartford to London Victoria, scheduled to call at Barnehurst, Bexleyheath, Welling, Falconwood, Eltham, Kidbrooke, Blackheath, Lewisham, Nunhead, Peckham Rye and Denmark Hill. 4 Towards Dartford • 11:02 London Charing Cross to Dartford, scheduled to call at London Waterloo East, London Bridge, Lewisham, Blackheath, Kidbrooke, Eltham, Falconwood, Welling, Bexleyheath and Barnehurst. • 11:54 London Cannon Street to Slade Green, scheduled to call at London Bridge, New Cross, St Johns, Lewisham, Blackheath, Kidbrooke, Eltham, Falconwood, Welling, Bexleyheath and Barnehurst. • 15:24 London Cannon Street to Slade Green, scheduled to call at London Bridge, New Cross, St Johns, Lewisham, Blackheath, Kidbrooke, Eltham, Falconwood, Welling, Bexleyheath and Barnehurst. • 16:30 London Charing Cross to Dartford, scheduled to call at London Waterloo East, London Bridge, Lewisham, Blackheath, Kidbrooke, Eltham, Falconwood, Welling, Bexleyheath and Barnehurst. • 17:04 London Victoria to Dartford, scheduled to call at Denmark Hill, Peckham Rye, Nunhead, Lewisham, Blackheath, Kidbrooke, Eltham, Falconwood, Welling, Bexleyheath and Barnehurst. • 19:09 London Victoria to Dartford, scheduled to call at Denmark Hill, Peckham Rye, Nunhead, Lewisham, Blackheath, Kidbrooke, Eltham, Falconwood, Welling, Bexleyheath and Barnehurst. Saturday Towards Dartford • 19:32 London Charing Cross to Dartford, scheduled to call at London Waterloo East, London Bridge, Lewisham, Blackheath, Kidbrooke, Eltham, Falconwood, Welling, Bexleyheath and Barnehurst. 5 Metro pocket timetable 7D Monday to Friday Towards London • 04:34 Gillingham to London Charing Cross, scheduled to call at Chatham, Rochester, Strood, Higham, Gravesend, Greenhithe, Dartford, Crayford, Bexley, Albany Park, Sidcup, New Eltham, Mottingham, Lee, Hither Green, Lewisham, New Cross, London Bridge and London Waterloo East. • 05:23 Hither Green to London Cannon Street scheduled to call at Lewisham, New Cross and London Bridge. • 10:32 Gravesend to London Charing Cross, scheduled to call at Northfleet, Swanscombe, Greenhithe, Stone Crossing, Dartford, Crayford, Bexley, Albany Park, Sidcup, New Eltham, Mottingham, Lee, Hither Green, London Bridge and London Waterloo East. • 15:02 Gravesend to London Charing Cross, scheduled to call at Northfleet, Swanscombe, Greenhithe, Stone Crossing, Dartford, Crayford, Bexley, Albany Park, Sidcup, New Eltham, Mottingham, Lee, Hither Green, London Bridge and London Waterloo East. Towards Gravesend • London Charing Cross to Gravesend, scheduled to call at London Waterloo East, London Bridge, Hither Green, Lee, Mottingham, New Eltham, Sidcup, Albany Park, Bexley, Crayford, Dartford, Stone Crossing, Greenhithe, Swanscombe and Northfleet. 6 • London Charing Cross to Gravesend, scheduled to call at London Bridge, New Cross, St Johns, Lewisham, Hither Green, Lee, Mottingham, New Eltham, Sidcup, Albany Park and Bexley. • London Cannon Street to Crayford, scheduled to call at London Waterloo East, London Bridge, Hither Green, Lee, Mottingham, New Eltham, Sidcup, Albany Park, Bexley, Crayford, Dartford, Stone Crossing, Greenhithe, Swanscombe and Northfleet. Metro pocket timetable 8 Monday to Friday Towards Hayes • 22:57 Ladywell to Hayes, scheduled to call at Catford Bridge, Lower Sydenham, New Beckenham, Clock House, Elmers End, Eden Park and West Wickham. Metro pocket timetable 9 Monday to Friday Towards London • 05:23 Hither Green to London Cannon Street scheduled to call at Lewisham, New Cross and London Bridge. Saturday Towards London • 05:36 Sevenoaks to Orpington, scheduled to call at Dunton Green, Knockholt and Chelsfield. Towards Sevenoaks • 05:36 London Charing Cross to Hither Green, scheduled to call at London Waterloo East, London Bridge and Lewisham. 7 Sunday Towards London • 07:40 Orpington to Grove Park, scheduled to call at Petts Wood, Chislehurst and Elmstead Woods. Towards Sevenoaks • 22:30 Orpington to Grove Park to Orpington, scheduled to call at Elmstead Woods, Chislehurst and Petts Wood. 8.
Recommended publications
  • School Transport & Travel Guide 2020-2021
    SCHOOL TRANSPORT & TRAVEL GUIDE 2020-2021 WELCOME FIVE STAR SERVICE Dear Parent, All of our vehicles are modern, easy-to-board and are operated by the Thank you for your interest in our School made on a termly basis for regular travel, and ad- school or one of our audited coach operators. This means that they are Transport services. This guide for the 2020- hoc travel is paid for at the time of booking. all regularly maintained to the highest standard, giving you peace of mind 21 academic year provides information on the that your daughter is travelling in safety. wide range of travel options available to pupils at All of our school minibuses are maintained to Bromley High School and I hope you will find it of a high standard and equipped with seatbelts at use. every seat. We use friendly, DBS checked drivers who have all undertaken the MiDAS minibus or This year we are proposing to increase the size professional driving qualifications. As we expand We use dedicated drivers who work on the same route each day. These of our network in response to demand and our service this year we will also be using larger drivers get to know the pupils and are subject to an enhanced disclosure changing travel habits. We continue to follow all coaches on the most popular routes. These will be and barring service (DBS) check. government guidance for the safe operation of under contract from local providers who will have our services including measures to ensure that we to demonstrate that they provide the same level are COVID secure; services may have to change of professional standards and safety.
    [Show full text]
  • Buses from Maze Hill
    CENTRAL LONDON NORTH GREENWICH THAMESMEAD SURREY QUAYS WOOLWICH GREENWICH DEPTFORD NEW CROSS BLACKHEATH PECKHAM BEXLEYHEATH LEWISHAM ELTHAM SIDCUP Buses from Maze Hill Key 24 hour 188 service Russell Square 129 Day buses in black N1 for British Museum CENTRAL N1 Night buses in blue Tottenham Court Road Holborn LONDON —O Connections with London Underground o Connections with London Overground Aldwych for Covent Garden R River Thames Connections with National Rail River Thames Waterloo Bridge s for London Eye, DI Connections with Docklands Light Railway Southbank Arts Centre and IMAX Cinema B Connections with river boats Waterloo NORTH GREENWICH Connections with Emirates Air Line 24 hour St George’s Circus for Imperial War Museum 129 188 service 422 s North Greenwich for The O Millennium Village Elephant & Castle 2 Oval Square Bricklayer’s Arms Millennium Way Millennium THAMESMEAD Boord Street Primary School Millennium Village South Tower Bridge Road 177 N1 180 Blackwall Lane Thamesmead Belvedere Tunnel Avenue Town Centre Industrial Bermondsey SURREY Greenwich Peninsula Area E Odeon Cinema N AY Route finder Canada Water A W L QUAYS South Bus Station L H ©P1ndar Bermondsey L Day buses including 24-hour services C Sainsbury’s at Greenwich Peninsula A Surrey Quays Shopping Centre R ROAD East Greenwich PEL W 129 286 TON U K Woolwich Road H Library Woolwich Road s Greenwich C Bus route Towards Bus stops A Rainton Road Gallions Road TC Surrey Quays D C L Cutty Sark S D I B Thamesmead Greenwich R J Charlton 129 Greenwich A +G +L Thamesmead East
    [Show full text]
  • New Heart for East Greenwich
    Westcombe NEWS Est. 1973 Free to 3800 homes, also available in libraries & some shops May 2012 Issue 4 A community newspaper commended by the London Forum of Amenity and Civic Societies Monthly newspaper of The Westcombe Society: fostering a sense of community New Heart for East Greenwich GEOFF GARVEY reports on a massive project we had almost Virgin given up on – the old Greenwich District Hospital site London t long last plans have been Mace impressed us by demonstrating their Marathon announced for the re-development commitment and ability to deliver the PHOTOS: Aof the former Greenwich District scheme. We will ensure local residents are 2012 Laura Finch & Neville Grant Hospital at the foot of Vanbrugh Hill –a kept fully informed during construction.” development hailed over seven years ago Councillor Chris Roberts, Leader of as a “New Heart for East Greenwich”. Greenwich Council said: “It is great news The hospital closed eleven years ago for Greenwich. The scheme is a key part of and the original scheme to develop the area the Council’s drive to ensure residents was put on hold because of the financial have access to quality homes and modern situation. services in first-class buildings. It will see Now the scheme has taken an important the revival of a part of Greenwich, which step forward with the appointment of the also looks forward to the arrival of a cruise preferred development partner. liner terminal in time for 2012, and a new Hadley Mace will work with the Homes hotel. Residents, visitors and businesses and Communities Agency (HCA), will all benefit from the major regeneration Greenwich Council and NHS Greenwich of this part of the borough.” The Virgin London Marathon took place on April on the Heart of East Greenwich project.
    [Show full text]
  • From Sail to Steam: London's Role in a Shipbuilding Revolution Transcript
    From Sail to Steam: London's Role in a Shipbuilding Revolution Transcript Date: Monday, 24 October 2016 - 1:00PM Location: Museum of London 24 October 2016 From Sail to Steam: London’s Role in a Shipbuilding Revolution Elliott Wragg Introduction The almost deserted River Thames of today, plied by pleasure boats and river buses is a far cry from its recent past when London was the greatest port in the world. Today only the remaining docks, largely used as mooring for domestic vessels or for dinghy sailing, give any hint as to this illustrious mercantile heritage. This story, however, is fairly well known. What is less well known is London’s role as a shipbuilder While we instinctively think of Portsmouth, Plymouth and the Clyde as the homes of the Royal Navy, London played at least an equal part as any of these right up until the latter half of the 19th century, and for one brief period was undoubtedly the world’s leading shipbuilder with technological capability and capacity beyond all its rivals. Little physical evidence of these vast enterprises is visible behind the river wall but when the tide goes out the Thames foreshore gives us glimpses of just how much nautical activity took place along its banks. From the remains of abandoned small craft at Brentford and Isleworth to unique hulked vessels at Tripcockness, from long abandoned slipways at Millwall and Deptford to ship-breaking assemblages at Charlton, Rotherhithe and Bermondsey, these tantalising remains are all that are left to remind us of London’s central role in Britain’s maritime story.
    [Show full text]
  • All London Green Grid River Cray and Southern Marshes Area Framework
    All River Cray and Southern Marshes London Area Framework Green Grid 5 Contents 1 Foreword and Introduction 2 All London Green Grid Vision and Methodology 3 ALGG Framework Plan 4 ALGG Area Frameworks 5 ALGG Governance 6 Area Strategy 8 Area Description 9 Strategic Context 10 Vision 12 Objectives 14 Opportunities 16 Project Identification 18 Project Update 20 Clusters 22 Projects Map 24 Rolling Projects List 28 Phase Two Early Delivery 30 Project Details 48 Forward Strategy 50 Gap Analysis 51 Recommendations 53 Appendices 54 Baseline Description 56 ALGG SPG Chapter 5 GGA05 Links 58 Group Membership Note: This area framework should be read in tandem with All London Green Grid SPG Chapter 5 for GGA05 which contains statements in respect of Area Description, Strategic Corridors, Links and Opportunities. The ALGG SPG document is guidance that is supplementary to London Plan policies. While it does not have the same formal development plan status as these policies, it has been formally adopted by the Mayor as supplementary guidance under his powers under the Greater London Authority Act 1999 (as amended). Adoption followed a period of public consultation, and a summary of the comments received and the responses of the Mayor to those comments is available on the Greater London Authority website. It will therefore be a material consideration in drawing up development plan documents and in taking planning decisions. The All London Green Grid SPG was developed in parallel with the area frameworks it can be found at the following link: http://www.london.gov.uk/publication/all-london- green-grid-spg .
    [Show full text]
  • Buses from North Greenwich Bus Station
    Buses from North Greenwich bus station Route finder Day buses including 24-hour services Stratford 108 188 Bus Station Bus route Towards Bus stops Russell Square 108 Lewisham B for British Museum Stratford High Street Stratford D Carpenters Road HOLBORN STRATFORD 129 Greenwich C Holborn Bow River Thames 132 Bexleyheath C Bromley High Street 161 Chislehurst A Aldwych 188 Russell Square C for Covent Garden Bromley-by-Bow and London Transport Museum 422 Bexleyheath B River Thames Coventry Cross Estate The O2 472 Thamesmead A Thames Path North CUTTER LANE Greenwich 486 Bexleyheath B Waterloo Bridge Blackwall Tunnel Pier Emirates East india Dock Road for IMAX Cinema, London Eye Penrose Way Royal Docks and Southbank Centre BLACKWALL TUNNEL Peninsula Waterloo Square Pier Walk E North Mitre Passage Greenwich St George’s Circus D B for Imperial War Museum U River Thames M S I S L T C L A E T B A N I Elephant & Castle F ON N Y 472 I U A W M Y E E Thamesmead LL A Bricklayers Arms W A S Emirates Air Line G H T Town Centre A D N B P Tunnel Y U A P E U R Emirates DM A A S E R W K Avenue K S S Greenwich Tower Bridge Road S T A ID Thamesmead I Y E D Peninsula Crossway Druid Street E THAMESMEAD Bermondsey Thamesmead Millennium Way Boiler House Canada Water Boord Street Thamesmead Millennium Greenwich Peninsula Bentham Road Surrey Quays Shopping Centre John Harris Way Village Odeon Cinema Millennium Primary School Sainsbury’s at Central Way Surrey Quays Blackwall Lane Greenwich Peninsula Greenwich Deptford Evelyn Street 129 Cutty Sark WOOLWICH Woolwich
    [Show full text]
  • Deptford Church Street & Greenwich Pumping Station
    DEPTFORD CHURCH STREET & GREENWICH PUMPING STATION ONLINE COMMUNITY LIAISON WORKING GROUP 13 July 2021 STAFF Chair: Mehboob Khan Tideway • Darren Kehoe, Project Manager Greenwich • Anil Dhillon, Project Manager Deptford • Natasha Rudat • Emily Black CVB – main works contractor • Audric Rivaud, Deptford Church Street Site Manager • Anna Fish– Deptford Church Street, Environmental Advisor • Robert Margariti-Smith, Greenwich, Tunnel & Site Manager • Rebecca Oyibo • Joe Selwood AGENDA Deptford Update • Works update • Looking ahead • Noise and vibration Greenwich Update • Works update • Looking ahead • Noise and vibration Community Investment Community Feedback / Questions DEPTFORD CHURCH STREET WHAT WE’RE BUILDING DEPTFORD WORKS UPDATE SHAFT & CULVERT Shaft • Vortex pipe installed and secondary lining complete • Tunnel Boring Machine crossing complete • Vortex generator works on-going Culvert • Excavation complete • Base slab and walls complete • Opening to shaft complete DEPTFORD WORKS UPDATE COMBINED SEWER OVERFLOW (CSO) CSO Phase 1: Interception Chamber • Internal walls and roof complete • Mechanical, Electrical, Instrumentation, Controls, Automation (MEICA) equipment installation on-going CSO Phase 2: Sewer connection • Protection works of Deptford Green Foul Sewer complete • Secant piling works complete • Capping beam and excavation to Deptford Storm Relief Sewer on-going time hours: Monday to Friday: 22:00 to 08:00 DEPTFORD 12 MONTHS LOOK AHEAD WHAT TO EXPECT AT DEPTFORD CSO: connection to existing sewer Mitigations • This work will take place over a 10 hour shift – the time of the shift • Method of works chosen to limit noise will be dependent on the tidal restrictions in the Deptford Storm Relief Sewer’ generation such as sawing concrete into • Lights to illuminate works and walkways after dark blocks easily transportable off site.
    [Show full text]
  • IKF ITT Maps A3 X6
    51 Map of the IKF franchise area and routes Stratford International St Pancras Margate Dumpton Park (limited service) Westcombe Woolwich Woolwich Abbey Broadstairs Park Charlton Dockyard Arsenal Plumstead Wood Blackfriars Belvedere Ramsgate Westgate-on-Sea Maze Hill Cannon Street Erith Greenwich Birchington-on-Sea Slade Green Sheerness-on-Sea Minster Deptford Stone New Cross Lewisham Kidbrooke Falconwood Bexleyheath Crossing Northfleet Queenborough Herne Bay Sandwich Charing Cross Gravesend Waterloo East St Johns Blackheath Eltham Welling Barnehurst Dartford Swale London Bridge (to be closed) Higham Chestfield & Swalecliffe Elephant & Castle Kemsley Crayford Ebbsfleet Greenhithe Sturry Swanscombe Strood Denmark Bexley Whitstable Hill Nunhead Ladywell Hither Green Albany Park Deal Peckham Rye Crofton Catford Lee Mottingham New Eltham Sidcup Bridge am Park Grove Park ham n eynham Selling Catford Chath Rai ngbourneT Bellingham Sole Street Rochester Gillingham Newington Faversham Elmstead Woods Sitti Canterbury West Lower Sydenham Sundridge Meopham Park Chislehurst Cuxton New Beckenham Bromley North Longfield Canterbury East Beckenham Ravensbourne Brixton West Dulwich Penge East Hill St Mary Cray Farnigham Road Halling Bekesbourne Walmer Victoria Snodland Adisham Herne Hill Sydenham Hill Kent House Beckenham Petts Swanley Chartham Junction uth Eynsford Clock House Wood New Hythe (limited service) Aylesham rtlands Bickley Shoreham Sho Orpington Aylesford Otford Snowdown Bromley So Borough Chelsfield Green East Malling Elmers End Maidstone
    [Show full text]
  • Greenwich Park
    GREENWICH PARK CONSERVATION PLAN 2019-2029 GPR_DO_17.0 ‘Greenwich is unique - a place of pilgrimage, as increasing numbers of visitors obviously demonstrate, a place for inspiration, imagination and sheer pleasure. Majestic buildings, park, views, unseen meridian and a wealth of history form a unified whole of international importance. The maintenance and management of this great place requires sensitivity and constant care.’ ROYAL PARKS REVIEW OF GREEWNICH PARK 1995 CHAIRMAN’S FOREWORD Greenwich Park is England’s oldest enclosed public park, a Grade1 listed landscape that forms two thirds of the Maritime Greenwich World Heritage Site. The parks essential character is created by its dramatic topography juxtaposed with its grand formal landscape design. Its sense of place draws on the magnificent views of sky and river, the modern docklands panorama, the City of London and the remarkable Baroque architectural ensemble which surrounds the park and its established associations with time and space. Still in its 1433 boundaries, with an ancient deer herd and a wealth of natural and historic features Greenwich Park attracts 4.7 million visitors a year which is estimated to rise to 6 million by 2030. We recognise that its capacity as an internationally significant heritage site and a treasured local space is under threat from overuse, tree diseases and a range of infrastructural problems. I am delighted to introduce this Greenwich Park Conservation Plan, developed as part of the Greenwich Park Revealed Project. The plan has been written in a new format which we hope will reflect the importance that we place on creating robust and thoughtful plans.
    [Show full text]
  • Land to the Rear of 76 Vanbrugh Park, London SE3 7AN Consented Freehold Development Opportunity View More Information
    Home Description Location Terms • Consented single plot development opportunity • Planning permission for a 3 bedroom house measuring 1,786 sqft • Located in Blackheath • Close proximity to Westcombe Park Station • OIRO £500,000 f/h DESCRIPTION An opportunity to acquire a consented development site in a desirable location with planning permission for a modern 2/2.5 storey, plus basement house measuring 1,786 sqft. This rare chance to purchase a consented development site in Blackheath will appeal to developers and owner occupiers. PLANNING Planning consent was granted by Greenwich Council for the ‘Construction of new part 2/2.5 storey over basement house fronting Heathway with off-street parking and amenity space. Ref. ‘16/0428/F.’ FURTHER INFORMATION Copies of the following are available upon request: • Plans of consented scheme • Decision notice • Design and access statement • Title plans • Comparable evidence for re-sales Land to the rear of 76 Vanbrugh Park, London SE3 7AN Consented freehold development opportunity View more information... Land to the rear of 76 Vanbrugh Park, London SE3 7AN Home Description Location Terms View all of our instructions here... III III LOCATION The development site is located in Blackheath only 0.7 miles from Westcombe Park Railway Station which provides a direct and frequent service to London Bridge in less than 15 minutes. There are bus stops less than 180 metres away which services the local area. The iconic Greenwich Park is less than 0.2 miles away, whilst Blackheath Village is 1 mile from the site. The village includes a variety of popular restaurants and cafes, as well as national retailers including Costa and Barclays.
    [Show full text]
  • Regeneration in Deptford, London
    Regeneration in Deptford, London September 2008 Produced by Dr. Gareth Potts BURA Director of Research, Policy and Best Practice Contact: 07792 817156 Table of Contents Planning and Regeneration Strategy ......................................................................................................................... 3 Early Community Regeneration .............................................................................................................................. 11 Renewal of the Pepys Estate .................................................................................................................................... 15 Riverside Schemes ...................................................................................................................................................... 18 Inland Development ................................................................................................................................................... 24 Deptford Town Centre Regeneration Programme ............................................................................................ 33 Some Novel Approaches to Regeneration ........................................................................................................... 36 Appendices .................................................................................................................................................................. 38 Planning and Regeneration Strategy The Planning Framework The key planning guidelines are set out in the
    [Show full text]
  • Part 4: Conclusions and Recommendations & Appendices
    Twentieth Century Naval Dockyards Devonport and Portsmouth: Characterisation Report PART FOUR CONCLUSIONS AND RECOMMENDATIONS The final focus of this report is to develop the local, national and international contexts of the two dockyards to highlight specific areas of future research. Future discussion of Devonport and Portsmouth as distinct designed landscapes would coherently organise the many strands identified in this report. The Museum of London Archaeology Portsmouth Harbour Hinterland Project carried out for Heritage England (2015) is a promising step in this direction. It is emphasised that this study is just a start. By delivering the aim and objectives, it has indicated areas of further fruitful research. Project aim: to characterise the development of the active naval dockyards at Devonport and Portsmouth, and the facilities within the dockyard boundaries at their maximum extent during the twentieth century, through library, archival and field surveys, presented and analysed in a published report, with a database of documentary and building reports. This has been delivered through Parts 1-4 and Appendices 2-4. Project objectives 1 To provide an overview of the twentieth century development of English naval dockyards, related to historical precedent, national foreign policy and naval strategy. 2 To address the main chronological development phases to accommodate new types of vessels and technologies of the naval dockyards at Devonport and Portsmouth. 3 To identify the major twentieth century naval technological revolutions which affected British naval dockyards. 4 To relate the main chronological phases to topographic development of the yards and changing technological and strategic needs, and identify other significant factors. 5 To distinguish which buildings are typical of the twentieth century naval dockyards and/or of unique interest.
    [Show full text]