Travelling by Car Settings for GPS Navigator S.P. 2 Km 6,800 from The

Total Page:16

File Type:pdf, Size:1020Kb

Travelling by Car Settings for GPS Navigator S.P. 2 Km 6,800 from The HOW TO REACH US V Travelling by car Settings for GPS navigator S.P. 2 Km 6,800 From the Motorway "A14" Trani Take the exit " Trani - Corato" and follow the road signs for Corato and for Corte Bracco dei Germani From the Highway "S.S. 16 bis" Coming from North: follow the direction for Bari and take the exit Trani centro - Corato, then follow the road signs for Corte Bracco dei Germani Coming from South: follow the direction for Foggia and take the exit Bisceglie centro - Corato, then follow the road signs for Corte Bracco dei Germani From the Road S.P. 231 (ex S.S. 98) Coming from North: follow the direction for Bari and take the exit Corato - Gravina, then follow the road signs for Corte Bracco dei Germani Coming from South: follow the direction for Foggia and take the exit Ruvo - Altamura, then follow the road signs for Corte Bracco dei Germani VV Travelling by train Coming from North: Ferrovie dello Stato: Barletta railway station Connection with Ferrovie Bari Nord: Corato railway station Coming from South: Ferrovie dello Stato: Bari Centrale railway station Connection with Ferrovie Bari Nord: Corato railway station Travelling by airplane Bari Palese Airport By car: follow the direction for Foggia and take the exit Bisceglie centro - Corato, then follow the road signs for Corte Bracco dei Germani.
Recommended publications
  • Case Study: Intermodal Railway Transport Between the Port of Ancona and Central European Logistics Hubs
    Task 5.1. Port to Rail/Highway Bottleneck Management Analysis Case Study: Intermodal Railway Transport Between The Port Of Ancona And Central European Logistics Hubs The project is co-funded by the European Union, Instrument for Pre-Accession Assistance Document Control Sheet Project number: Project acronym INTERMODADRIA SUPPORTING INTERMODAL TRANSPORT SOLUTIONS IN Project Title THE ADRIATIC AREA Start of the project OCTOBER 2012 Duration 29 MONTHS 5.1. PORT TO RAIL/HIGHWAY BOTTLENECK MANAGEMENT Related activity: ANALYSIS FEASIBILITY STUDY FOR INTERMODAL RAILWAY Deliverable name: TRANSPORT BETWEEN THE PORT OF ANCONA AND CENTRAL EUROPEAN LOGISTICS HUBS Type of deliverable STUDY Language ENGLISH Work Package Title INTERMODAL TRANSPORT SUPPORT MEASURES Work Package number 5 Work Package Leader Status Draft Author (s) ISFORT Version NOVEMBER 2014 Due date of deliverable Delivery date WP 5 Intermodal Transport Support Measures – Task 5.1. Port to Rail/Highway Bottleneck Management Analysis 2 The project is co-funded by the European Union, Instrument for Pre-Accession Assistance TABLE OF CONTENTS 1. Introduction 4 2. Accessibility As A Competitive Advantage 5 3. Ports And “Last-Mile” Railway Transport 9 4. Possible Railway Outline Intermodal Transport 12 4.1. The Port of Trieste’s Intermodal Transport Services 12 4.2. Assessing The Technical capacity Of the Railway Infrastructure 22 5. Organisational Analysis Of The Service – The Actors Involved 32 5.1. Local And Public Authorities 32 5.2. Businesses 33 6. Analysis Of The Potential Market 33 6.1 Potential Traffic Flows 33 6.2. The Port Of Ancona In The Development Of The European Railway Network 36 6.3.
    [Show full text]
  • Mission 3: Infrastructures for a Sustainable Mobility
    Mission 3: Infrastructures for a sustainable mobility Contents 1 M3C1 - High speed railways and safe roads3 2 M3C2 - Intermodality and integrated logistics 29 Mission’s main objectives: Mission’s financing snapshot: 2 1 M3C1 - High speed railways and safe roads Summary box Policy area: National rail and road mobility Objectives: The objectives of this component are: (i) the decarbonization and reduction of emissions through the shift of passengers and freight traffic from road to rail; (ii) the increased territorial connectivity and cohesion by reducing travel times; (iii) the digitalization of transport networks and improved security of bridges, viaducts and tunnels; (iv) the increased competitiveness of the productive systems in the South by improving railway links. These objectives are in line with the nationwide strategy on mobility of the Ministry of Infrastructure and Transport outlined in “#ItaliaVeloce”. The component is focused on the rail network known as Integrated National Transport System of 1st level (SNIT), with a clear priority on the TEN-T network (core and comprehensive). The implementing entity is primarily the public national company “Rete Ferroviaria Italiana” (RFI), besides some works to be carried out by regional railways. In the railway sector the interventions are focused on: (i) High-speed railway connections to the South for passengers and freight; (ii) High- speed lines in the North connecting to Europe; (iii) Diagonal connec- tions; (iv) Introducing the European Rail Transport Management System (ERTMS); (v) Strengthening metropolitan nodes and key national links; (vi) Strengthening regional railway lines; (vii) Up- grading, electrification and resilience of railways in the South; (viii) Upgrading railway stations in the South; (ix) Renewal of the rolling stock.
    [Show full text]
  • 2016 Sustainability Report(.Pdf — 8149
    SUSTAINA BILITY REPORT 2 The Group’s profile GROUP SUSTAINABILITY CORPORATE GOVERNANCE BUSINESS SUSTAINABILITY OUR ROLE IN THE COMMUNITY OUR PEOPLE RESPECTING AND PROTECTING ADDITIONAL 3 THE ENVIRONMENT INFORMATION FerroVIE Dello Stato Italiane SPA COMPANY OFFICERS Board of Directors Chairwoman Gioia Maria Ghezzi CEO Renato Mazzoncini and General Manager Directors Daniela Carosio Giuliano Frosini Simonetta Giordani Federico Lovadina Vanda Ternau Board of Statutory Auditors In office until 4 July 2016 Appointed on 4 July 20161 Chairwoman Alessandra dal Verme Carmine di Nuzzo Standing statutory auditors Roberto Ascoli2 Susanna Masi Claudia Cattani3 Roberto Ascoli4 Alternate statutory auditors Paolo Castaldi5 Paolo Castaldi6 Cinzia Simeone Cinzia Simeone COURT OF AUDITORS’ MAGISTRATE APPOINTED TO AUDIT FERROVIE DELLO STATO ITALIANE S.p.A. Angelo Canale MANAGER IN CHARGE OF FINANCIAL REPORTING Roberto Mannozzi INDEPENDENT AUDITORS KPMG SpA (2014-2022) 1 Following the shareholder’s resolution on the same date. 2 Appointed standing statutory auditor in place of Paolo Castaldi on 11 March 2016, when the latter returned to the position of alternate statutory auditor on the same date. 3 Resigned on 17 May 2016. 4 Appointed standing statutory auditor on 29 July 2016 in place of Paolo Castaldi. 5 Standing statutory auditor from 21 December 2015 to 11 March 2016 replacing Tiziano Onesti and from 17 May 2016 replacing Claudia Cattani. 6 Standing statutory auditor until 28 July 2016 replacing Francesco Notari, who did not accept the position. Reappointed
    [Show full text]
  • Ministero Delle Infrastrutture E Dei Trasporti DIREZIONE GENERALE PER LE INVESTIGAZIONI FERROVIARIE E MARITTIME
    Ministero delle Infrastrutture e dei Trasporti DIREZIONE GENERALE PER LE INVESTIGAZIONI FERROVIARIE E MARITTIME Commissione Ministeriale di Indagine di cui al D.D. n° 110 del 19 dicembre 2014 RELAZIONE DI INDAGINE “Eventi incidentali occorsi dal 01.01.2014 al 31.03.2015, con esiti gravi o mortali, caratterizzati da investimento di persone principalmente in ambito di stazioni o relative pertinenze”. Commissione Ministeriale di Indagine: Dott. Ing. Roberto LUCANI Dott. Ing. Marco BENEDETTI 23 maggio 2016 Indagine su “Investimenti di persone avvenuti principalmente in ambito stazione e relative pertinenze” INDICE (redatto in conformità all’Allegato V della Direttiva 2004/49/CE del 29 aprile 2004) 1. SINTESI ......................................................................................................................................... 4 1.1. BREVE DESCRIZIONE DELL’EVENTO ............................................................................. 4 1.2. SINTESI DELLE RACCOMANDAZIONI PRINCIPALI...................................................... 4 2. FATTI IN IMMEDIATA RELAZIONE ALL’EVENTO .............................................................. 5 2.1. EVENTO ................................................................................................................................... 5 2.1.1. DESCRIZIONE DEGLI EVENTI ....................................................................................... 8 3. RESOCONTO DELL’INDAGINE .............................................................................................
    [Show full text]
  • Ministero Delle Infrastrutture E Dei Trasporti
    Ministero delle Infrastrutture e dei Trasporti DIPARTIMENTO PER I TRASPORTI, LA NAVIGAZIONE, GLI AFFARI GENERALI ED IL PERSONALE DIREZIONE GENERALE PER IL TRASPORTO E LE INFRASTRUTTURE FERROVIARIE REGOLAMENTO (UE) N. 1300/2014 DELLA COMMISSIONE del 18 novembre 2014 relativo alle specifiche tecniche di interoperabilità (STI) per l'accessibilità del sistema ferroviario dell'Unione per le persone con disabilità e le persone a mobilità ridotta PIANO NAZIONALE DI ATTUAZIONE (NIP) INDICE 0. Contesto 0.1 Scenario 0.2 Quadro normativo 0.3 Metodologia per l'elaborazione del piano nazionale di attuazione 1. Situazione attuale 1.0 Premessa. Evoluzione delle ferrovie italiane 1.1 Panoramica degli inventari: stazioni 1.1.1 Stazioni. Infrastruttura ferroviaria nazionale 1.1.1.1 Gli investimenti in corso e programmati sulle stazioni della IFN 1.1.1.2 Le iniziative per le persone con disabilità attuate dal Gestore della IFN 1.1.2 Stazioni. Infrastrutture ferroviarie regionali 1.1.2.1 Gruppo La Ferroviaria Italiana 1.1.2.2 Ferrovie del Gargano 1.1.2.3 Ferrovie Emilia Romagna 1.1.2.4 Trasporto Unico Abruzzese 1.1.2.5 FERROVIENORD 1.1.2.6 Ente Autonomo Volturno 1.1.2.7 Sistemi Territoriali 1.1.2.8 Gruppo Torinese Trasporti 1.1.2.9 Ferrovie Udine Cividale 1.2 Panoramica degli inventari: materiale rotabile 1.2.1 Il Gruppo FSI 1.2.1.1 Presenza a bordo di posti specificatamente concepiti per l’accoglienza di PRM 1.2.1.2 Presenza a bordo di toilette specificatamente concepite per l’uso da parte delle PRM 1.2.1.3 Possibilità di “incarrozzamento” della Persona a Ridotta Mobilità nel rispetto delle STI 1.2.2 La società Nuovo Trasporto Viaggiatori – NTV S.p.A.
    [Show full text]
  • Promoting Maritime and Multimodal Freight Transport in the Adriatic Sea (Promares)
    PROMOTING MARITIME AND MULTIMODAL FREIGHT TRANSPORT IN THE ADRIATIC SEA (PROMARES) Activity 3.3 - Analysis of the current situation on maritime and multimodal freight transport D3.2.12. Analysis of the current situation on maritime and multimodal freight transport D.3.3.3, Cross-border action plan for enhancing maritime and multimodal freight transport Rijeka, Croatia, November 2019. European Regional Development Fund www.italy-croatia.eu/acronym Title: D.3.3.3 Cross-border action plan for enhancing maritime and multimodal freight transport Client: UNIVERSITY OF RIJEKA, FACULTY OF MARITIME STUDIES Studentska ulica 2 51000 Rijeka Republic of Croatia Contractor: AKSENTIJEVIĆ FORENSICS AND CONSULTING, Ltd. Gornji Sroki 125a 51216, Viškovo Republic of Croatia Project manager: Dražen Žgaljić, PhD Consultant: Saša Aksentijević, PhD 1 Table of contents: 1 INTRODUCTION ......................................................................................................................................................... 4 2 CROSS-BORDER ACTION PLAN FUNDAMENTALS ............................................................................................... 9 3 CROSS-BORDER STUDY ON MARITIME AND MULTIMODAL FREIGHT TRANSPORT ..................................... 12 3.1 SUMMARY OF TERRITORIAL REQUIREMENTS AND COVERAGE .................................................................................... 12 3.5.1 3.1.1 Interporto di Trieste-Fernetti / Port of Trieste .................................................................... 13 3.5.2 3.1.2
    [Show full text]
  • Preparatory Study on the Application of JESSICA in the Apulia Region
    Preparatory Study on the application of JESSICA in the Apulia Region Foggia Final Report Summary - Barletta-Andria-Trani March 2010 BARI Brindisi This document has been produced with financial assistance from the European Union. Taranto Lecce The opinions expressed herein should not be considered as the official positions of the European Union under any circumstances. CERTET - Centro di Economia regionale, dei trasporti e del turismo March 2010 This study is the result of joint work by the Centro di Economia Regionale, dei Trasporti e del Turismo (CERTeT), the Bocconi University of Milan and Gruppo Finanziaria Internazionale (Finint) and has been finalised in a single document by the European Investment Bank (EIB). The study was commissioned by the EIB from CERTeT and Finint following a request submitted by the Apulia Region, on 19 February 2009, to benefit from the programme of preparatory studies for the JESSICA programme currently taking place in Italy and in other Member States of the Union, thanks to co-funding from the European Commission and the EIB. The purpose of the study was to examine the potential methods for applying the JESSICA (Joint European Support for Sustainable Investment in City Areas) initiative to the Apulia Region's ERDF Operational Programme for 2007-2013, in the belief that this tool could play an important role in implementing the Operational Programme itself, in particular by making the implementation of the sustainable urban development strategy it contains more effective. Specific interest was expressed by the Region in determining the potential to use financial engineering instruments like JESSICA to support the "San Raffaele del Mediterraneo Hospital" project in Taranto and, consequently, this project was examined as a pilot project.
    [Show full text]
  • Visitor Information
    UNITED NATIONS GLOBAL SERVICE CENTRE Brindisi - Italy Visitor Information UNGSC Conference & Learning Centre Conference & Learning Centre UNGSC Conference & Learning Centre 2 3 Welcome to Brindisi Italy Foggia Bari Brindisi Taranto Lecce 2 3 UNGSC Conference & Learning Centre Index 05 The Conference & Learning Centre 10 Our Rooms 12 Clinic & Chemists 14 The UNGSC Map 15 Useful Information 17 Shopping Centres & Supermarkets 18 Restaurants 19 Bars & Pubs 21 Hotels 25 Public transportation 26 Brindisi Railway Timetable 28 Brindisi Centre Map 30 Apulia Map Last Update February 2015 4 5 Conference & Learning Centre The UNGSC Conference and Learning Centre (CLC) is the ideal setting for hosting and deliver- ing workshop and learning events for participants from DFS, DPKO, and other UN Departments and Agencies. Today the CLC facilities include conference rooms, multiple multifunctional class- rooms, breakout rooms, and computer-equipped laboratories. Facilities are equipped with cur- rent IT technology and VTC systems thereby offering the necessary means to enhance productiv- ity and communication. With an average of over 3000 visitors per year, the CLC is well positioned to provide essential lo- gistics and organizational support thus allowing trainers and participants to focus on the work at hand while enjoying their workshop and learning experience. The CLC assists trainers and participants with their accommodation, transportation from and to the base, post-travel services. In addition, CLC takes care of the printing of courses material, class- room setup according to specific requirements, and provides briefing packages and specialized services (recording of sessions, printing of DVDs, and note takers). Today the CLC also develops learning programmes, in-house training courses with both internal and external resources, briefing packages for new arrivals and delivers presentations to local schools to promote awareness and understanding of the GSC and its operations.
    [Show full text]
  • Landscape Restoration Due to Xylella Fastidiosa Invasion in Italy: Assessing the Hypothetical Public’S Preferences
    NeoBiota 66: 31–54 (2021) A peer-reviewed open-access journal doi: 10.3897/neobiota.66.67648 RESEARCH ARTICLE NeoBiota https://neobiota.pensoft.net Advancing research on alien species and biological invasions Landscape restoration due to Xylella fastidiosa invasion in Italy: Assessing the hypothetical public’s preferences Michel Frem1,4, Fabio Gaetano Santeramo2, Emilia Lamonaca2, Maroun El Moujabber3, Elia Choueiri4, Pierfederico La Notte5, Franco Nigro1, Francesco Bozzo6, Vincenzo Fucilli6 1 Università degli Studi di Bari – Aldo Moro, Dipartimento di Scienze del Suolo, della Pianta e degli Alimenti (Di.S.S.P.A.), Via Amendola 165/A, 70126, Bari, Italy 2 Università degli Studi di Foggia, Dipartimento di Scienze Agrarie, Alimenti, Risorse Naturali e Ingegneria, Via Napoli 25, 71122, Foggia, Italy 3 CIHEAM Bari, Istituto Agronomico Mediterraneo, Via Ceglie 9, 70010, Valenzano, Bari, Italy 4 Lebanese Agricultural Research Institute, Department of Plant Protection, Tal Amara, P.O. Box 287, Zahlé, Lebanon 5 Consiglio Nazionale delle Ricerche, Istituto per la Protezione Sostenibile delle Piante, Via Amendola 122/I, 70126, Bari, Italy 6 Università degli Studi di Bari – Aldo Moro, Dipartimento di Scienze Agro Ambientali e Territoriali (Di.S.A.A.T.), Via Amendola 165/A, 70126, Bari, Italy Corresponding author: Michel Frem ([email protected]) Academic editor: Shana McDermott | Received 20 April 2021 | Accepted 8 June 2021 | Published 2 July 2021 Citation: Frem M, Santeramo FG, Lamonaca E, El Moujabber M, Choueiri E, La Notte P, Nigro F, Bozzo F, Fucilli V (2021) Landscape restoration due to Xylella fastidiosa invasion in Italy: Assessing the hypothetical public’s preferences. NeoBiota 66: 31–54.
    [Show full text]
  • Italy Rail Report 2011 ENG-Final
    The Rail Market in Italy 2011 Brooks Market Intelligence Reports, part of Mack Brooks Exhibitions Ltd www.brooksreports.com Mack Brooks Exhibitions Ltd © 2011. All rights reserved. No guarantee can be given as to the correctness and/or completeness of the information provided in this document. Users are recommended to verify the reliability of the statements made before making any decisions based on them. Contents Introduction 4 1. Government 5 Ministry of Infrastructure and Transport 5 Political and funding environment 5 Subsidised services 6 Open access and regulation 6 European projects 7 2. Italian Railways: FS Group 8 Gruppo Ferrovie dello Stato (FS Group) 8 Rete Ferroviaria Italiana SpA (RFI) 10 High-speed/high-capacity (Alta velocità/Alta capacità 10 - AV/AC) lines Urban junctions 12 Messina Straits bridge 12 Other RFI investments 13 Major international projects 14 Trenitalia SpA 16 Passenger 16 Freight 17 Traffic 18 Rolling stock 18 3. Italian regional government and local railways 21 Abruzzo 21 Basilicata 22 Calabria 22 Campania 22 Emilia-Romagna 23 Friuli-Venezia-Giulia 24 Lazio 24 Liguria 24 Lombardia 25 Marche 26 Molise 26 Piemonte 26 Puglia 26 Sardegna 28 Sicilia 28 Mack Brooks Exhibitions Ltd © 2011 2 Toscana 28 Trentino-Alto Adige 29 Umbria 29 Valle d’Aosta 30 Veneto 30 4. Open access train operators active in Italy 31 Passenger operators 31 Freight operators 32 5. Urban rail systems in Italy 35 Bergamo 35 Brescia 35 Bologna 35 Cagliari 35 Catania 36 Firenze 36 Genova 36 Messina 36 Milano 36 Napoli 37 Palermo 38 Parma 38 Roma 38 Sassari 38 Torino 39 Trieste 39 Verona 39 Mack Brooks Exhibitions Ltd © 2011 3 Introduction In terms of route-km, Italy’s railway network is the fourth largest in Europe, after those of France, Germany and Poland.
    [Show full text]
  • Rete Ferroviaria Italiana S.P.A. RELAZIONE FINANZIARIA
    Rete Ferroviaria Italiana S.p.A. RELAZIONE FINANZIARIA ANNUALE AL 31 DICEMBRE 2019 RFI S.p.A. RETE FERROVIARIA ITALIANA – Società per Azioni – Gruppo Ferrovie dello Stato Italiane Società con socio unico soggetta all’attività di direzione e coordinamento di Ferrovie dello Stato Italiane S.p.A. a norma dell’art. 2497 sexies del codice civile e del D.Lgs. n. 112/2015 Sede legale: Piazza della Croce Rossa, 1 – 00161 Roma Capitale Sociale: euro 31.528.425.067,00 interamente versati Iscritta al Registro delle Imprese di Roma Codice Fiscale: 01585570581 e Partita IVA: 01008081000 - R.E.A. 758300 Relazione finanziaria annuale 2019 2 RFI S.p.A. MISSIONE DELLA SOCIETA’ Rete Ferroviaria Italiana S.p.A. (di seguito RFI) è la Società del Gruppo Ferrovie dello Stato Italiane (di seguito Gruppo FS) preposta alla gestione dell’Infrastruttura Ferroviaria Nazionale. In base al Decreto del Ministro dei Trasporti e della Navigazione 138 – T del 31 ottobre 2000, la Società gestisce in regime di concessione l’Infrastruttura Ferroviaria Nazionale. Tale concessione è stata rilasciata per la durata di 60 anni. RFI è proprietaria dell’infrastruttura in parte riveniente dall’ex Ente pubblico Ferrovie dello Stato (e costituente parte del patrimonio dell’Ente stesso) ed in parte successivamente acquisita sia con mezzi propri (ottenuti tramite finanziamenti da terzi e versamenti in conto capitale sociale dallo Stato prima e da Ferrovie dello Stato Italiane dopo) che, attualmente, attraverso contributi in conto impianti dallo Stato. Le principali attività correlate alla missione di RFI sono rappresentate da: . la progettazione, la costruzione, la messa in esercizio, la gestione e la manutenzione dell’Infrastruttura Ferroviaria Nazionale di cui al D.
    [Show full text]
  • Large Infrastructure Projects in Apulia Region Main Planning Acts in Apulia Region
    Bari, 21st november 2011 Large infrastructure projects In Apulia Region Main planning acts in Apulia Region Main acts in planning process • European Structural Funds (P.O. FESR 2007-2013 and P.O.N. 2007-2013) • Regional Transport Plan 2009-2013 • Agreements between national and regional government (Intesa Generale Quadro/Piano Sud) 21st November 2011 General objectives The cultural approach of the policy choices of the Apulia Region • The right to a better internal and external mobility • Appropriate levels of accessibility and interconnection between different transport systems • Appropriate connections with territories outside the region 21st November 2011 Specific objectives Ports System • Improve structures and services "land side" and "sea side" of strategic ports of regional interest • Improve accessibility to strategic ports of regional interest • Encourage, if possible, the rail mode than road mode 21st November 2011 Specific objectives Sustainable mobility • Interventions for urban transport systems in intermediate eco-friendly capabilities, including the testing of light rail lines and train-tram • Construction of interchange infrastructure accessible through main urban and/or suburban road • Cycle paths in urban areas in continuity with existing and planned tourist itineraries in European, national and regional level (as project CYRONMED) • Information systems to increase attractiveness and accessibility of public transport and to guide the users towards forms of integrated transport 21st November 2011 Specific objectives Logistics
    [Show full text]