Morlais Scoping Report WG Morlais Tidal Array Document I&BPB5034R001F0.1 Number: Document Morlais Tidal Array Scoping Report Name: Revision Date 0.1/Final 04/04/18 Reviewed by Approved By JO/GM DG Disclaimer: Morlais, Mentor MON do not authorise copying or reproduction of this document in whole or part without permission. MTA Scoping Report Rev 0.1/Final HASKONINGDHV NEDERLAND B.V. 74/2 Commercial Quay Commercial Street Leith Edinburgh EH6 6LX Industry & Buildings Trade register number: 56515154 +44 131 5550506 T [email protected] E royalhaskoningdhv.com W Document title: Morlais Tidal Array Document short title: MTA Scoping Report Reference: I&BPB5034R001F0.1 Revision: 0.1/Final Date: 04 April 2018 Project name: MTA Project Project number: PB5034 Author(s): Fiona Moffatt Fiona Moffatt and Miriam Drafted by: Knollys Checked by: Frank Fortune Date / initials: FF 03/04/18 Approved by: Frank Fortune Date / initials: FF 04/04/18 Classification Disclaimer No part of these specifications/printed matter may be reproduced and/or published by print, photocopy, microfilm or by any other means, without the prior written permission of HaskoningDHV Nederland B.V.; nor may they be used, without such permission, for any purposes other than that for which they were produced. HaskoningDHV Nederland B.V. accepts no responsibility or liability for these specifications/printed matter to any party other than the persons by whom it was commissioned and as concluded under that Appointment. The integrated QHSE management system of HaskoningDHV Nederland B.V. has been certified in accordance with ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007. 04 April 2018 MTA SCOPING REPORT I&BPB5034R001F0.1 i Executive Summary Menter Môn Cyf (Menter Môn) is seeking a scoping opinion for the proposed Morlais Tidal Array (MTA) project, in accordance with the Transport and Works Act 1992 and the EIA Directive 2011/92/EU as amended by 2014/52/EU. Two earlier scoping reports have previously been submitted to Natural Resources Wales (NRW), the Marine Management Organisation (MMO) and the Isle of Anglesey County Council (IoACC) in support of earlier versions of the MTA project, and are now superseded as a result of further development in the project design. The proposed installed capacity of the project has been increased in response to industry demand, and the Project is now seeking consent for an array of up to 240MW capacity and associated supporting infrastructure. This report is submitted for the purpose of seeking a scoping opinion from the Welsh Government and other consultees including NRW, the MMO and IoACC on the revised scope of the Project. Comment is also sought and welcomed from other stakeholders with an interest in the proposed development. After receipt of a scoping opinion, an Environmental Impact Assessment (EIA) will be undertaken. A single Environmental Statement (ES) will be submitted to support a consent application to the Welsh Government, which will include offshore and onshore project components. The ES will also be used to support an application for a Marine Licence under the Marine and Coastal Access Act 2009, which will also include both onshore and offshore components. The EIA process will be informed by the scoping opinion received in relation to this scoping report. This scoping report has been produced by Royal HaskoningDHV and includes a description of the proposed development, description of baseline environment as currently understood and a description of the approach to the EIA. For further questions relating to the project please contact: Dafydd Gruffydd Managing Director Menter Môn Cyf Neuadd y Dref Llangefni Ynys Môn LL77 7XA +44 (0) 1248 725 713 [email protected] www.morlaisenergy.com 04 April 2018 MTA SCOPING REPORT I&BPB5034R001F0.1 2 Acronyms µm Micrometre °C Degrees Celsius ADCP Acoustic Doppler Current Profiler AfL Agreement for Lease AIS Automatic Identification System AONB Area of Outstanding Natural Beauty AoS Area of Search BAP Biodiversity Action Plan BC Before Christ BTO British Trust for Ornithology CAR Controlled Activities Regulations CCW Countryside Council for Wales CIA Cumulative Impact Assessment CION Connection and Infrastructure Options Note CO2 Carbon dioxide COWRIE Collaborative Offshore Wind Research into the Environment cSAC Candidate Special Area of Conservation CSEMP Clean Seas Environmental Monitoring Programme DECC Department for Energy and Climate Change DIO Defence Infrastructure Organisation DP Dynamic Positioning EIA Environmental Impact Assessment EMF Electro-magnetic field EPS European Protected Species ES Environmental Statement ESAS European Seabirds at Sea EU European Union HDD Horizontal Directional Drilling HGV Heavy Goods Vehicles HIA Heritage Impact Assessment HMHC Holyhead Mountain Heritage Coast HRA Habitats Regulations Assessment IoACC Isle of Anglesey County Council JNCC The Joint Nature Conservation Committee km Kilometre 04 April 2018 MTA SCOPING REPORT I&BPB5034R001F0.1 3 kV Kilovolts LGDU Local Government Data Unit m/s Metres per second m2 Metres Square MAIB Marine Accident Investigation Branch MCA Maritime and Coastguard Agency MCAA Marine and Coastal Access Act MCZ Marine Conservation Zone MDZ Morlais Demonstration Zone MGN Marine Guidance Note MHWS Mean High Water Springs MMO Marine Management Organisation MoD Ministry of Defence MPA Marine Protected Area MPS Marine Policy Statement MSFD Marine Strategy Framework Directive MSPD Marine Spatial Planning Directive MTA Morlais Tidal Array MW Mega Watt NERC Natural Environment and Rural Communities NGET National Grid Electric Transmission NNR National Nature Reserve NO2 Nitrogen dioxide NRA Navigational Risk Assessment NRW Natural Resources Wales NPS National Policy Statement NSP Noise Sensitive Properties O&M Operations and Maintenance OS Ordnance Survey PAC Pre-application Consultation PAM Passive Acoustic Monitoring PDE Project Design Envelope PEI Preliminary Environmental Information PEIR Preliminary Environmental Information Report PPG Pollution Prevention Guidelines PTEC Perpetuus Tidal Energy Centre RAF Royal Air Force 04 April 2018 MTA SCOPING REPORT I&BPB5034R001F0.1 4 RCAHMW Royal Commission on Ancient and Historical Monuments of Wales RES Renewable Energy Strategy RoRo Roll-On Roll-Off (vessel) RNLI Royal National Lifeboat Institution RSPB Royal Society for the Protection of Birds RYA Royal Yachting Association SAC Special Area of Conservation SAR Search and Rescue SCA Seascape Character Assessment SCI Site of Community Importance SEACAMS Sustainable Expansion of the Applied Coastal and Marine Sectors SLVIA Seascape and Landscape Visual Impact Assessment SPA Special Protected Area SPEN Scottish Power Energy Networks SSSI Site of Special Scientific Interest TAN Technical Advice Note TCE The Crown Estate TCPA Town and Country Planning Act TEC Tidal Energy Converter TIA Traffic Impact Assessment TSS Traffic Separation Scheme UK United Kingdom UNESCO United Nations Educational, Scientific and Cultural Organisation V Volts WADZ West of Anglesey Demonstration Zone (Morlais Demonstration Zone) WeBS Wetland Bird Survey WFD Water Framework Directive WNMP Welsh National Marine Plan WSI Written Scheme of Investigation 04 April 2018 MTA SCOPING REPORT I&BPB5034R001F0.1 5 Glossary Device This is a term used to refer to one unit of tidal technology installation, and includes foundation and tidal energy converter. Envelope This refers to the Project Design Envelope which seeks to provide a flexible set of technology parameters, outlining worst case scenarios against which consent can be granted. Menter Môn Cyf Menter Môn Morlais Demonstration Zone The Project will be developed within the Morlais Demonstration Zone (MDZ) Agreement for Lease (AfL) area MTA This refers to the Morlais Tidal Array project and is used to describe the project both as a concept and as a built development. Morlais Tidal Array The Project Offshore Scoping Area The offshore scoping area includes the MDZ, plus the embayment identified for landfall (in the area of Penrhos Feilw, to the south of South Stack lighthouse). This is the area primarily used for scoping environmental interests although, for some receptors a wider search area was used, details of which are provided in individual sections. This area includes all areas where development may occur. Onshore construction area This refers to the footprint of the onshore construction works Onshore scoping area Menter Môn is considering several landfall locations, located in Penrhos Feilw. The onshore scoping area includes all areas being considered for landfall, substation locations and onshore cable route locations, including a cable route for a 132kV connection at Valley, a 132kV connection at the Orthios Holyhead Eco Park and a 33kV connection at Parc Cybi. Rochdale Envelope This refers to the Project Design Envelope which seeks to provide a flexible set of technology parameters, outlining realistic worst case scenarios against which consent can be granted. Substation search area Potential locations have been identified for the onshore substation location; however, final locations have not been determined. TEC This is a term used to refer to one unit of tidal technology installation, and includes foundation and tidal energy converter. The Project This refers to the Morlais Tidal Array project and is used to describe the project as a concept and as a built development. 04 April 2018 MTA SCOPING REPORT I&BPB5034R001F0.1 6 Table of Contents 1 Non-Technical Summary 15 1.1 The Morlais Tidal Array Project 15 1.2 The Components
Recommended publications
  • Chapter 9: Landscape and Visual
    Penrhos Leisure Village Chapter 9: Landscape and Visual CHAPTER 9: LANDSCAPE AND VISUAL Introduction 9.1 This chapter assesses the landscape and visual impacts of the proposed development at Penrhos, Cae Glas and Kingsland. In particular, it considers the potential effects of the proposed development on the landscape character of the sites and the surrounding area, and assesses the visual impact of the proposals through the identification of sensitive visual receptors and key viewpoint locations. Refer to Figure 1 for site locations (Appendix 9.2) 9.2 The chapter describes the methods used to assess the impacts, the baseline conditions currently existing at the three sites and in the surrounding area, the potential impacts of the development, the mitigation measures required to prevent, reduce, or offset the impacts, and finally, the residual impacts. 9.3 This chapter has been written by Planit-IE Ltd, a registered practice of the Landscape Institute with considerable experience in all areas of landscape design and visual assessment. Planning Policy Context National Planning Policy Planning Policy Wales (PPW), Edition 4, (February 2011) 9.4 PPW contains current land use planning policy for Wales. It provides the policy framework for the effective preparation of local planning authorities’ development plans. PPW 4 reaffirms the need for local authorities to conserve and enhance the natural beauty of the landscape designations (AONBs and National Parks) in Wales. Paragraph 5.5.5 of PPW confirms that statutory designation does not necessarily prohibit development, but proposals for development must be carefully assessed for their effect on those natural heritage interests which the designation is intended to protect.
    [Show full text]
  • Stena Line Ports Limited
    Port of Holyhead Stena Line Ports Limited Oil Spill Contingency Plan Stena Line Ports Limited Station Approach Holyhead LL65 1DQ 01407 606700 Original: April 2017 Contents Preface Contents ......................................................................................................................................... 1 Distribution List ............................................................................................................................... 6 Revision Page ................................................................................................................................. 7 Glossary ......................................................................................................................................... 8 Part 1: Strategy Section 1: Introduction and Policy Introduction, Safety, Health and Environmental Policy ........................................................................................ 9 Stena Line Ports Limited, Company Health, Safety and Environmental Protection Policy .................................................................................................... 10 Introduction, Policy and Purpose of the Plan ................................................................................. 12 1.1 Purpose of the Plan ........................................................................................................... 12 1.2 Use of the Plan .................................................................................................................. 12
    [Show full text]
  • 4.44 Taw–Torridge Estuary
    4.44 TAW–TORRIDGE ESTUARY LTC site code:CT Centre grid: SS4631 JNCC estuarine review site:4 Habitat zonation: 926 ha intertidal, 498 ha subtidal, 208 ha nontidal Statutory status: Taw–Torridge SSSI, Northam Burrows SSSI, Braunton Burrows SSSI Winter waterbird interest: N/A SITE DESCRIPTION positions of the 19 sections counted for the survey. The Taw–Torridge Estuary is relatively isolated within a long stretch of non-estuarine coast in The Taw–Torridge is not designated an SPA but is north Devon. The two arms of the estuary tend to covered by several SSSI designations. As Figure support softer sediments than the mouth, which 4.44.2 shows, the area covered by the LTCs closely is sandy with areas of shingle. The mouth is also approximates the area of the Taw–Torridge Estuary backed by important dune systems on the north SSSI but near the mouth also overlaps the extent and south shores, at Braunton Burrows and of both the Braunton Burrows SSSI and Northam Northam Burrows respectively. Saltmarsh has Burrows SSSI (although the majority of these developed especially around Yelland and Penhill. latter two SSSIs were not covered by the LTCs). Tourism is most pronounced in the summer The main area covered by the LTCs but not months but is an important factor all year. designated as SSSI is the Torridge upstream of Watersports occur mostly around the mouth of Bideford Long Bridge. the estuary with other leisure pursuits widespread. Wildfowling takes place over limited Given the relative isolation of the Taw–Torridge parts of the site. There is a moderate amount of Estuary, there is not likely to be any interchange industrial activity, mostly around the harbours.
    [Show full text]
  • Coastal Area G
    West of Wales Shoreline Management Plan 2 Section 4. Coastal Area G November 2011 Final 9T9001 A COMPANY OF HASKONING UK LTD. COASTAL & RIVERS Rightwell House Bretton Peterborough PE3 8DW United Kingdom +44 (0)1733 334455 Telephone Fax [email protected] E-mail www.royalhaskoning.com Internet Document title West of Wales Shoreline Management Plan 2 Section 4. Coastal Area G Document short title Policy Development Coastal Area G Status Final Date November 2011 Project name West of Wales SMP2 Project number 9T9001 Author(s) Client Pembrokeshire County Council Reference 9T9001/RSection 4CABv1/303908/PBor Drafted by Claire Earlie, Gregor Guthrie and Victoria Clipsham Checked by Gregor Guthrie Date/initials check 11/11/11 Approved by Client Steering Group Date/initials approval 29/11/11 West of Wales Shoreline Management Plan 2 Coastal Area G, Including Policy Development Zones (PDZ) 17, 18 and 19. Isle of Anglesey Policy Development Coastal Area G 9T9001/RSection 4CABv1/303908/PBor Final -4G.i- November 2011 INTRODUCTION AND PROCESS Section 1 Section 2 Section 3 Introduction to the SMP. The Environmental The Background to the Plan . Principles Assessment Process. Historic and Current Perspective . Policy Definition . Sustainability Policy . The Process . Thematic Review Appendix A Appendix B SMP Development Stakeholder Engagement PLAN AND POLICY DEVELOPMENT Section 4 Appendix C Introduction Appendix E Coastal Processes . Approach to policy development Strategic Environmental . Division of the Coast Assessment (including
    [Show full text]
  • REPORT Holyhead Port Expansion
    REPORT Holyhead Port Expansion Environmental Scoping Report Client: Stena Line Ports Ltd. Reference: I&BPB6108R001F0.1 Revision: 0.1/Final Date: 28 April 2017 Project related 28 April 2017 I&BPB6108R001F0.1 ii Project related HASKONINGDHV UK LTD. Honeycomb Edmund Street Liverpool L3 9NG Industry & Buildings VAT registration number: 792428892 +44 151 2362944 T +44 151 2272561 F [email protected] E royalhaskoningdhv.com W Document title: Holyhead Port Expansion Document short title: Reference: I&BPB6108R001F0.1 Revision: 0.1/Final Date: 28 April 2017 Project name: Holyhead Port Expansion Project number: PB6108 Author(s): Claire Gilchrist; Jess Moran; Reinier Zoutenbier; Gemma Starmore; Courtney Clemence; Charlotte Clements; Sarah Mounce; Mark Smith; Charlotte Goodman Drafted by: Jess Moran; Claire Gilchrist Checked by: Jamie Gardiner Date / initials: 28/04/17 JVG Approved by: Jamie Gardiner Date / initials: 28/04/17 JVG Classification Project related Disclaimer No part of these specifications/printed matter may be reproduced and/or published by print, photocopy, microfilm or by any other means, without the prior written permission of HaskoningDHV UK Ltd.; nor may they be used, without such permission, for any purposes other than that for which they were produced. HaskoningDHV UK Ltd. accepts no responsibility or liability for these specifications/printed matter to any party other than the persons by whom it was commissioned and as concluded under that Appointment. The integrated QHSE management system of HaskoningDHV UK Ltd. has
    [Show full text]
  • Anglesey Catchment Management Plan Consultation Report February 1996
    ANGLESEY CATCHMENT MANAGEMENT PLAN CONSULTATION REPORT: 1996 aJM ANGLESEY CATCHMENT MANAGEMENT PLAN CONSULTATION REPORT FEBRUARY 1996 V National Rivers Authority Welsh Region I National Rivers Authority I information Centre ! Haad Office CIG3S No •♦•■••••••I ' Accession No ENVIRONMENT AGENCY 1 ■ HI II! Ill III III! 091988 r Further copies can be obtained from : The Catchment Planning Coordinator The Area Catchment Planner National Rivers Authority National Rivers Authority Welsh Region Ffordd Penlan Rivers House or Parc Menai St Mellons Business Park Bangor St Mellons Gwynedd , Cardiff LL57 4BP CF3 OLT Telephone Enquiries : Cardiff (0222) 770088 Bangor (01248) 670770 NRA Copyright Waiver. This report is intended to be used widely and may be quoted, copied or reproduced in any way, provided that the extracts are not quoted out of context and due acknowledgement is given to the National Rivers Authority. Acknowledgement Maps are based on the 1992 Ordnance Survey 1:50,000 scale map with the permission of the Controller of Her Majesty's Stationery Office © Copyright. WE 2 96 0.5k E AQNL AwiftSed for n c d k n « THE NRA's VISION FOR THE MANAGEMENT OF THE ANGLESEY CATCHMENT The island is unique, with the existing landscape being the result man's changes to the land use over centuries, combined with the effects of being exposed on all sides to the sea and receiving little shelter from the elements. The consequences of this long history provide us with a spectacular coastline of cliffs and sandy beaches together with lakes, marshes and fens of considerable conservation importance. The island is greatly valued by it's inhabitants but also an increasing number of visitors who exploit the extensive opportunities for recreational activities.
    [Show full text]
  • Isle of Anglesey Landscape Strategy (Update, 2011)
    Cyngor Sir Ynys Môn The Isle of Anglesey County Council Ynys Môn The Isle of Anglesey Anglesey Landscape Strategy Update 2011 ISLE OF ANGLESEY COUNCIL LANDSCAPE CHARACTER AREA UPDATE 2011 TACP 10 Park Grove Cardiff CF10 3BN 2 Contents 1.0 Introduction ...................................................................................................... 5 2.0 Landscape Character Areas............................................................................. 7 LANDSCAPE CHARACTER AREA 1: HOLYHEAD MOUNTAIN .............................. 8 LANDSCAPE CHARACTER AREA 2: HOLY ISLAND............................................. 11 LANDSCAPE CHARACTER AREA 3: INLAND SEA............................................... 15 LANDSCAPE CHARACTER AREA 4: NORTH WEST COAST............................... 19 LANDSCAPE CHARACTER AREA 5: NORTH WEST ANGLESEY........................ 23 LANDSCAPE CHARACTER AREA 6: AMLWCH AND ENVIRONS ........................ 28 LANDSCAPE CHARACTER AREA 7: PARYS MOUNTAIN .................................... 32 LANDSCAPE CHARACTER AREA 8: DULAS BAY HINTERLAND ........................ 35 LANDSCAPE CHARACTER AREA 9: RED WHARF BAY ...................................... 39 LANDSCAPE CHARACTER AREA 10: PENMON AND PUFFIN ISLAND .............. 43 LANDSCAPE CHARACTER AREA 11: EASTERN MENAI STRAIT ....................... 47 LANDSCAPE CHARACTER AREA 12: EAST CENTRAL ANGLESEY................... 52 LANDSCAPE CHARACTER AREA 13: WESTERN MENAI STRAIT ...................... 57 LANDSCAPE CHARACTER AREA 14: NEWBOROUGH ......................................
    [Show full text]
  • Sanitary Survey Anglesey
    www.cefas.defra.gov.uk EC Regulation 854/2004 CLASSIFICATION OF BIVALVE MOLLUSC PRODUCTION AREAS IN ENGLAND AND WALES SANITARY SURVEY REPORT Anglesey January 2014 Cover photo: Red Wharf Bay © Crown copyright 2014 Current Cefas sanitary survey reports and reviews are available on our website at: http://www.cefas.defra.gov.uk/our-science/animal-health-and-food-safety/food- safety/sanitary-surveys/england-and-wales.aspx Contacts For enquires relating to this report or further For enquires relating to policy matters on information on the implementation of the implementation of sanitary surveys in sanitary surveys in England and Wales: Wales: Simon Kershaw Jayne Griffiths/ Tim Polisi Food Safety Group Bwyd/Food Policy Team Cefas Weymouth Laboratory Asiantaeth Safonau Bwyd Barrack Road /Food Standards Agency The Nothe Llawr 11, Ty Southgate/ Weymouth 11th Floor, Southgate House, Dorset Wood Street DT4 8UB Caerdydd/Cardiff CF10 1EW +44 (0) 1305 206600 +44 (0) 029 2067 8908 [email protected] [email protected] Statement of use This report provides a sanitary survey relevant to bivalve mollusc beds within Anglesey, as required under EC Regulation 854/2004 which lays down specific rules for official controls on products of animal origin intended for human consumption. It provides an appropriate hygiene classification zoning and monitoring plan based on the best available information with detailed supporting evidence. The Centre for Environment, Fisheries & Aquaculture Science (Cefas) undertook this work on behalf of
    [Show full text]
  • Penrhos Leisure Village Chapter 3: Site Description 3
    Penrhos Leisure Village Chapter 3: Site Description CHAPTER 3: SITE DESCRIPTION Introduction 3.1 This chapter describes the site context, which includes the location of the site, a brief site history and a description of the immediate site and the surrounding area. It also summarises the potential environmental constraints to the development of the site. 3.2 The context of the entire site is described but, where appropriate, the three component sites are discussed in turn under each heading to clearly present the baseline conditions across the development area. Site Location and Overview 3.3 The site is located on the eastern edge of Holy Island, which itself is located in western Anglesey. The site comprises three distinct but interrelated parcels of land referred to as Penrhos, Cae Glas and Kingsland. The overall site area is approximately 207.5ha. Penrhos 3.4 Penrhos covers approximately 80 hectares of land located immediately to the north east of the AAM former aluminium smelting plant and the A5. It comprises the parcel of land between the A5 and the coastline. 3.5 The Penrhos Coastal Park, which includes part of the Anglesey Coastal Path open to the public on a permissive access basis by AAM, occupies the majority of the site. The Coastal Park includes woodland and coastal areas featuring a network of footpaths and a public car park. 3.6 Buildings associated with the Penrhos Estate are located in the western section of the site. These include a series of listed buildings that are described in paragraph 3.58, below. Agricultural land at the far north of the site is currently used for grazing.
    [Show full text]
  • 18) Southern Anglesey on Leaving Holy Island by the Stanley
    18) Southern Anglesey On leaving Holy Island by the Stanley Embankment and rejoining the Anglesey mainland, the derelict site on the left of the main road is that of the former Valley Foundry, renowned over a wide area, which manufactured and supplied much equipment for the local quarries and mines. However, the crossroads community at Y Fali, or Valley is nowadays more usually associated with the island’s modern industries; the Wylfa nuclear power station and the major military installations of RAF Valley nearby. The local railway station was closed for passengers in 1965 and has remained so ever since despite various re-opening proposals. Although the L&NWR station house has lost its platforms, the picturesque wayside crossing recently retained the old-fashioned heavy wooden gates and lamps, with signal box adjacent. Valley must also be one of the smallest stations still to retain two goods yards in operation, for as well as the usual general traffic facility there is a modern fan of sidings with transporter crane, built to handle the transhipment of nuclear waste containers brought here by road from Wylfa. The RAF installations at Valley airfield cover a large tract of flat land towards Rhosneigr, and the aerodrome buildings and runways are surrounded by stereotyped workers’ housing dating from the last war and after. Helicopters providing the famous and efficient Snowdonia Mountain Rescue Service are operated from here. Several mills in the area to the south of the A5 road are of interest; Melin-y-Plas at Bryngwran (346774), built as late as 1867, was working until recently but has now lost its waterwheel.
    [Show full text]
  • REPORT Holyhead Port Expansion Environmental Statement Addendum
    REPORT Holyhead Port Expansion Environmental Statement Addendum Client: Stena Line Ports Limited Reference: PB6108-RHD-ZZ-XX-RP-Z-0001 Status: Final/P01.01 Date: 30 September 2020 Project related HASKONINGDHV UK LTD. Honeycomb Edmund Street Liverpool L3 9NG United Kingdom Industry & Buildings VAT registration number: 792428892 +44 151 2362944 T +44 151 2272561 F [email protected] E royalhaskoningdhv.com W Document title: Holyhead Port Expansion Environmental Statement Addendum Document short title: Reference: PB6108-RHD-ZZ-XX-RP-Z-0001 Status: P01.01/Final Date: 30 September 2020 Project name: Holyhead Port Expansion Project number: PB6108 Author(s): David Brew; Sarah Marjoram; Ben Hughes; Keming Hu; Tanja Cooper; Helena Wickes; Helen Reilly; Anna Sweeny Drafted by: Nicholas Hill and Melissa Roe-Ely Christa Page; Gregor McNiven; Jen Checked by: Learmonth Date / initials: 28/09/2020 CP / GMcN / JL Approved by: Jamie Gardiner Date / initials: 30/09/2020 JVG Classification Project related Disclaimer No part of these specifications/printed matter may be reproduced and/or published by print, photocopy, microfilm or by any other means, without the prior written permission of HaskoningDHV UK Ltd.; nor may they be used, without such permission, for any purposes other than that for which they were produced. HaskoningDHV UK Ltd. accepts no responsibility or liability for these specifications/printed matter to any party other than the persons by whom it was commissioned and as concluded under that Appointment. The integrated QHSE management system of HaskoningDHV UK Ltd. has been certified in accordance with ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018.
    [Show full text]
  • Holyhead Breakwater Refurbishment Scheme
    REPORT Holyhead Breakwater Refurbishment Scheme EIA Screening Report Client: Isle of Anglesey County Council Reference: PB9014-RHD-ZZ-XX-RP-Z-0062 Status: Final/P01.01 Date: 30/07/2019 Project related HASKONINGDHV UK LTD. Honeycomb Edmund Street Liverpool L3 9NG Industry & Buildings VAT registration number: 792428892 +44 151 2362944 T +44 151 2272561 F [email protected] E royalhaskoningdhv.com W Document title: Holyhead Breakwater Refurbishment Scheme Document short title: EIA Screening Report Reference: PB9014-RHD-ZZ-XX-RP-Z-0062 Status: P01.01/Final Date: 30/07/2019 Project name: Project number: PB9014 Author(s): Sarah Marjoram Drafted by: Sarah Marjoram Checked by: Jamie Gardiner Date / initials: 02/08/2019 JVG Approved by: Jamie Gardiner Date / initials: 02/08/2019 JVG Classification Project related Disclaimer No part of these specifications/printed matter may be reproduced and/or published by print, photocopy, microfilm or by any other means, without the prior written permission of HaskoningDHV UK Ltd.; nor may they be used, without such permission, for any purposes other than that for which they were produced. HaskoningDHV UK Ltd. accepts no responsibility or liability for these specifications/printed matter to any party other than the persons by whom it was commissioned and as concluded under that Appointment. The integrated QHSE management system of HaskoningDHV UK Ltd. has been certified in accordance with ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007. 30/07/2019 EIA SCREENING REPORT PB9014-RHD-ZZ-XX-RP-Z-0062 i Project