ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PLAN (As Per EIA Notification, 2006) (Based on TOR Issued by MOEF Letter No

Total Page:16

File Type:pdf, Size:1020Kb

ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PLAN (As Per EIA Notification, 2006) (Based on TOR Issued by MOEF Letter No STRICTLY RESTRICTED FOR COMPANY USE ONLY RESTRICTED The information given in this report is not to be communicated either directly or indirectly to the press or to any person not holding an official position in the CIL/Government. ENVIRONMENTAL IMPACT ASSESSMENT & ENVIRONMENTAL MANAGEMENT PLAN (As per EIA Notification, 2006) (Based on TOR issued by MOEF letter No. J-11015/97/2018-IA (M) dated 7th January, 2019) For BASANTPUR TAPIN COKING COAL WASHERY Normative Capacity : 4.0 MTPA Raw Coal Land Requirement : 32.03 Ha Central Coalfield Limited (March, 2020) (Updated July, 2020) Prepared at Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) Environment Division,Kanke Road Ranchi - 834008 (Jharkhand), India CONTENTS CHAPTER NO. TITLE PAGE NO 1 INTRODUCTION I– 1-13 2 PROJECT DESCRIPTION II–1-22 3 DESCRIPTION OF THE ENVIRONMENT III–1-55 ANTICIPATED ENVORONMENTAL IMPACT ASSESSMENT 4 IV–1-26 & MITIGATION MEASURES 5 ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE) V-1-2 6 ENVIRONMENTAL MONITORING PROGRAMME VI–1-4 7 ADDITIONAL STUDIES VII–1-47 8 PROJECT BENEFITS VIII–1-2 9 ENVIRONMENTAL COST BENEFIT ANALYSIS IX–1 ENVIRONMENTAL MANAGEMENT PLAN 10 X–1-7 11 SUMMARY & CONCLUSION XI–1-11 12 DISCLOSURE OF CONSULTANTS ENGAGED XII-1-15 Basantpur- Tapin Washery (4.0 MTY) EIA_EMP ii ANNEXURE Sl No. TITLE Annexure No 1. COPY OF APPROVED TOR ANNEXURE- I 2. CIL REJECT POLICY ANNEXURE-II 3. CCL BOARD APPROVAL ANNEXURE-III 4. PUBLIC CONSULTATION DOCUMENT ANNEXURE-IV 5. RISK ASSESSMENT & MANAGEMENT PLAN ANNEXURE-V 6. NON COAL BEARING UNDERTAKING ANNEXURE-VI 7. GREEN BELT DEVELOPMENT PLAN ANNEXURE-VII 8. POWER REQUIREMENT ANNEXURE-VIII 9. ACCREDITATION OF CONSULTANT ANNEXURE-IX 10. CONSERVATION PLAN OF FAUNA ANNEXURE-X 11. CONCEPTUAL REPORT ANNEXURE-XI 12. COAL CHARACTERISTICS ANNEXURE-XII 13. LINKAGE DETAILS ANNEXURE-XIII 14. REPLY TO EDS RAISED ON 22.05.2020 ANNEXURE-XIV Basantpur- Tapin Washery (4.0 MTY) EIA_EMP iii LIST OF PLATES SL NO. DESCRIPTION PLATE NO. 1. LOCATION PLAN OF BASANTPUR-TAPIN WASHERY 1. 2. LOCATION ON TOPOSHEET 2. 3. DRAINAGE PLAN 3. 4. WATER TABLE CONTOUR MAP 4. LAYOUT MAP WITH PLANT SITE AND REJECT 5. 5. STORAGE SITE 6. PROCESS FLOW SHEET 6. 7. EQUIPMENT FLOW SHEET 7. 8. DETAILED WATER BALANCE 8. 9. LAND USE MAP 9. 10. REMOTE SENSING MAP OF CORE ZONE 10. 11. REMOTE SENSING MAP OF CORE AND BUFFER ZONE 11. 12. AMBIENT AIR AND NOISE MONITORING LOCATIONS 12. 13. WATER MONITORING LOCATIONS 13. 14. SOIL SAMPLING LOCATIONS 14. Basantpur- Tapin Washery (4.0 MTY) EIA_EMP iv QC/-NABET Scheme for accreditation of EIA Consultant Organisations/Version 3/June 201 5 ANNEXURE - VII DECLARATION BY EXPERTS CONTRIBUTING TO THE EIA of Basantpur Tapio Coking Coal Washcry, 4 MTPA I, hereby, certify that I was a part of the EIA team in the following capacity that developed the above EIA. Name of EIA Coordinator: Mr. D.P.Singh Signature: :>\~f Date: Period of involvement: March 2019 to till date Contact information: Environment Department, Central Mine Planning and Design Institute Limited, (A Subsidiary of Coal India Limited), Gondwana Place, Kanke Road, Ranchi, Jharkhand - 834031, Mobile:+91-8987789103, Landline: 0651-2230055, Email: [email protected]; [email protected] Associate EIA Coordinator: I. Mr. Amarjeet Singh ~ ~ 2. Mr. Abhishek Kumar b~ FUNCTIONAL AREA EXPERTS: s. FUNCTIONAL INVOLVEMENT SIGNATURE NAME OF THE EXPERT/S NO AREAS (PERIOD AND TASK) AND DATE March 2019 to till date ► Designing Air Quality Monitoring Network for FAE-Mr. D P Singh various pollutants and meteorological parameters-sampling locations, frequency and Team Members: number of samples ">\wf ► Identification of sources of Air Pollution, its I AP I .Mr. Amarjeet Singh, FAE (8 impact, and most suitable control devices and Category) mechanisms ► Preparing cost estimates for pollution control devices and suggesting measures for post ~ closure environmental monitoring FAE-Mr. D P Singh March 2019 to till date ' Team Members: ► Designing sampling network for water and waste ~~ 2 WP l .Mr. Amarjeet Singh, FAE (8 water and inspecting Baseline Data Generation Category) for water related samples. ~~ 0~ DECLARATION OF ASSOCIATION IN THE EIA ■ QCI-NABET Scheme for accreditation of EIA Consultant Organisations/Version 3/June 2015 SIGNATURE S. FUNCTIONAL INVOLVEMENT NAME OF THE EXPERT/S NO AREAS (PERIOD AND TASK) AND DATE ► Water Budgeting, optimising use of water for various sources of demand, suggesting measures for water conservation, recycling and reuse. ► Suggesting water treatment systems, drainage facilities ► Evaluating probable impacts of effluent/waste water discharges in to the receiving environment/water bodies and suggesting control measures. ► Preparing cost estimates for structures for treatment of wastewater like /ETP STP/Oil and Grease Trap/Settling tank and suggesting measures for post closure environmental monitoring March 2019 to till date ► Source of generation of non-hazardous solid waste and hazardous waste ~ ► Quantification of volume of non-hazardous solid ' waste and hazardous waste ~ . I 3 SHW FAE-Mr. D P Singh ► Management, handling and disposal techniques of non-hazardous solid waste and hazardous waste ► Suggesting measures for minimization of generation of waste and how it can be reused/recycled. March 2019 to till date ► Associated with Baseline data generation for · Socio-Economic. ► Interpretation of primary and secondary data to derive the socio-economic status of /PAFs PAPs 4 SE FAE- Mr. Shailesh Chandra and all related stakeholders. ► Assessment of social changes arising out of the project and impact on the people. ► Development of R & R plan and suggesting measures to enhance the socio economic status of the people living in and around the project. March 2019 to till date ► Associated with Baseline data generation for Flora and Fauna. FAE- 1. Mr. Nirbhay ► Biodiversity management and identification of Bhatnagar species labelled as rare, endangered and EB 5 2. Dr. Pramod Kumar threatened as per IUCN list. ► Impact of the project on flora and fauna. ► Preparation of conservation plan for Scheduled species. ► Su gge sting species for Road Plantation, soil and slope stabilization, greenbelt development. DECLARATION OF ASSOCIATION IN THE EIA ■ QCI-NABET Scheme for accreditation of EIA Consultant Organisations/Version 3/June 2015 S. FUNCTIONAL INVOLVEMENT SIGNATURE NAME OF THE EXPERT/S NO AREAS (PERIOD AND TASK) AND DATE March 2019 to till date ► Des igning of ground water table measurement and monitoring network, computation of ground water recharge, flow rate and direction. ► Analysi s and description of aqu ifer characteristics 6 HG FAE- D. Bandyopadhyay ► Preparation of water budget for an area. ► Determining the impact on groundwater table due to the project and suggesting artificial groundwater recharge and augmentation measures. March 2019 to till date ► Geology and Geo morphological analysis/description and Stratigraphy/Lithology. ► Developing geological maps. ► Development of Mining plan incorporating 7 GEO FAE-Mr. R.P. Singh environmental aspects like top soil preservation, waste dump management, reclamation/rehabilitation of mined out areas, run off management etc. ► Environmental impacts of 3 phases of mining - exploration, exploitation and post mining stages March 2019 to till date ► Associated in Baseline data generation for developing micro meteorological data for use in modeling FAE-Mr. Abhishek Kumar ► Collecting and using secondary data on meteorology like cloud cover, inversion related data, mixing heights etc., for modeling 8 AQ Team Members: ► Application of AERM OD air quality models in l .Mr. Amarjeet Singh prediction of dispersion of pollutants, plotting of isopleths of GLCs representing incremental pollution levels, worst case scenarios on suitable maps showing both, the sources of pollution as well as the environmentally sensitive receptors. March 2019 to till date ► Development of Landuse Map ► impact of project on surrounding land use ► Integration of land use related data/ information 9 LU FAE-Harihar Lal B. for assessing environmental impacts of deve lopmental projects. ► Suggesting post closure sustainable land use and mitigative measures for preventing degradation of land. FAE- March 2019 to till date Mr. Abhijit Sinha ► Identification of haza rds and hazardous 10 RH Team Members: substances I .Mr. Manoj Sanwal ► Risks and consequences analysis DECLARATION OF ASSOCIATION IN THE EIA QCI-NABET Scheme for accreditation of EIA Consultant Organisations/Version 3/June 2015 s. FUNCTIONAL INVOLVEMENT SIGNATURE NAM E OF THE EXPERT/S NO AREAS (PERIOD AND TASK) AND DATE ► Preparation of impact diagrams ► Vulnerability assessment ► Preparation of Emergency Preparedness Plan Declaration by the Head of the Accredited Consultant Organization/ Authorized Person I, Abhiiit Sinha, General Manager (Environment) hereby, confirm that the above mentioned experts prepared the Basantput Tapin Coking Coal Washery, 4 MTPA. I also confirm that the consultant organization shall be fully accountable for any mis-leading information mentioned in this statement. Signature: Name: Abhiiit Sinha Designation: General Manager (Environment) Name of the EIA consultant organization: Central Mine Planning and Design Institute Limited NABET Certificate No. & Issue Date: NABET/EIA/1720/RA 0092 dateds 28/05/2018. Minutes of 154th Accreditation Committee Meeting for Re-Accreditation held on Dec. 13, 2017. DECLARATION OF ASSOCIATION IN THE EIA ■ CHAPTER -1 INTRODUCTION 1.0 GENERAL The coal seams in mines under Central Coalfields
Recommended publications
  • Dto Name Jun 2016 Jun 2016 1Regn No V Type
    DTO_NAME JUN_2016 JUN_2016_1REGN_NO V_TYPE TAX_PAID_UPTO O_NAME F_NAME ADD1 ADD2 CITY PINCODE STATUS TAX_AMOUNT PENALTY TOTAL RANCHI N N JH01BZ8715 BUS 19-08-16 KRISHNA KUMHARS/O LATE CHHOTUBARA MURIKUMHAR CHHOTASILLI MURI RANCHI SUCCESS 6414 1604 8018 RANCHI N N JH01G 4365 BUS 15-08-16 ASHISH ORAONS/O JATRU ORAONGAMARIYA SARAMPO- MURUPIRIRANCHI -PS- BURMU 000000 SUCCESS 5619 1604 7223 RANCHI N N JH01BP5656 BUS 29-06-16 SURESH BHAGATS/O KALDEV CHIRONDIBHAGAT BASTIBARIATU RANCHI SUCCESS 6414 6414 12828 RANCHI N N JH01BC8857 BUS 22-07-16 SDA HIGH SCHOOLI/C HENRY SINGHTORPA ROADKHUNTI KHUNTI , M- KHUNTI9431115173 SUCCESS 6649 3325 9974 RANCHI Y Y JH01BE4699 BUS 21-06-16 DHANESHWARS/O GANJHU MANGARSIDALU GANJHU BAHERAPIPARWAR KHELARIRANCHI , M- 9470128861 SUCCESS 5945 5945 11890 RANCHI N N JH01BF8141 BUS 19-08-16 URSULINE CONVENTI/C GIRLSDR HIGH CAMIL SCHOOL BULCKERANCHI PATH , M- RANCHI9835953187 SUCCESS 3762 941 4703 RANCHI N N JH01AX8750 BUS 15-08-16 DILIP KUMARS/O SINGH SRI NIRMALNEAR SINGH SHARDHANANDANAND NAGAR SCHOOLRANCHI KAMRE , M- RATU 9973803185SUCCESS 3318 830 4148 RANCHI Y Y JH01AZ6810 BUS 12-01-16 C C L RANCHII/C SUPDT.(M)PURCHASE COLLY MGR DEPARTMENTDARBHANGARANCHI HOUSE PH.NO- 0651-2360261SUCCESS 19242 28862 48104 RANCHI Y Y JH01AK0808 BUS 24-04-16 KAMAKHYA NARAYANS/O NAWAL SINGH KISHORECHERI KAMRE NATHKANKE SINGH RANCHI SUCCESS 4602 2504 7106 RANCHI N N JH01AE6193 BUS 04-08-16 MRS. GAYTRIW/O DEVI SRI PRADEEPKONBIR KUMARNAWATOLI GUPTA BASIAGUMLA SUCCESS 4602 2504 7106 RANCHI Y Y JH01AE0222 BUS 22-06-16 RANCHI MUNICIPALI/C CEO CORPORATIONGOVT OF JHARKHANDRANCHI RANCHI SUCCESS 2795 3019 5814 RANCHI N N JH01AE0099 BUS 06-07-16 RANCHI MUNICIPALI/C CEO CORPN.GOVT.
    [Show full text]
  • Booth Name and Location
    BOOTH NAME AND LOCATION id PC BLK_NAME BOOTH_NO build_name BOOTH_LOC SENSITIVE build_id m_VOTERS f_VOTERS VOTERS 1 BARKATHA CHANDWARA 1 AAGANBADI KENDRA HARLI AAGANBADI KENDRA HARLI NORMAL 1 282 276 558 2 BARKATHA CHANDWARA 2 U.P.S. BIRSODIH U.P.S. BIRSODIH NORMAL 2 376 350 726 3 BARKATHA CHANDWARA 3 U.M.S. CHAMGUDOKHURD U.M.S. CHAMGUDOKHURD NORMAL 3 325 290 615 4 BARKATHA CHANDWARA 4 N.P.S. CHAMGUDOKALA N.P.S. CHAMGUDOKALA NORMAL 4 280 257 537 5 BARKATHA CHANDWARA 5 U.M.S. CHARKIPAHRI U.M.S. CHARKIPAHRI NORMAL 5 493 420 913 6 BARKATHA CHANDWARA 6 U.M.S. DIGTHU GAIDA U.M.S. DIGTHU GAIDA NORMAL 6 539 470 1009 7 BARKATHA CHANDWARA 7 SAMUDAYIK BHAWAN POKDANDA SAMUDAYIK BHAWAN POKDANDA NORMAL 7 337 341 678 8 BARKATHA CHANDWARA 8 U.M.S. PIPRADIH U.M.S. PIPRADIH NORMAL 8 605 503 1108 9 BARKATHA CHANDWARA 9 U.P.S. ARNIYAO U.P.S. ARNIYAO NORMAL 9 139 120 259 10 BARKATHA CHANDWARA 10 U.P.S. BANDACHAK U.P.S. BANDACHAK NORMAL 10 246 217 463 11 BARKATHA CHANDWARA 11 U.P.S. GARAYANDIH U.P.S. GARAYANDIH NORMAL 11 409 404 813 12 BARKATHA CHANDWARA 12 M.S. KANKO EAST PART M.S. KANKO EAST PART NORMAL 12 498 436 934 13 BARKATHA CHANDWARA 13 M.S. KANKO WEST PART M.S. KANKO WEST PART NORMAL 13 594 507 1101 14 BARKATHA CHANDWARA 14 U.P.S. KURMIDIH U.P.S. KURMIDIH NORMAL 14 195 159 354 15 BARKATHA CHANDWARA 15 U.M.S.
    [Show full text]
  • Academic Course Prospectus for the Session 2012-13
    PROSPECTUS 2012-13 With Application Form for Admission Secondary and Senior Secondary Courses fo|k/kue~loZ/kuaiz/kkue~ NATIONAL INSTITUTE OF OPEN SCHOOLING (An autonomous organisation under MHRD, Govt. of India) A-24-25, Institutional Area, Sector-62, NOIDA-201309 Website: www.nios.ac.in Learner Support Centre Toll Free No.: 1800 180 9393, E-mail: [email protected] NIOS: The Largest Open Schooling System in the World and an Examination Board of Government of India at par with CBSE/CISCE Reasons to Make National Institute of Open Schooling Your Choice 1. Freedom To Learn With a motto to 'reach out and reach all', NIOS follows the principle of freedom to learn i.e., what to learn, when to learn, how to learn and when to appear in the examination is decided by you. There is no restriction of time, place and pace of learning. 2. Flexibility The NIOS provides flexibility with respect to : • Choice of Subjects: You can choose subjects of your choice from the given list keeping in view the passing criteria. • Admission: You can take admission Online under various streams or through Study Centres at Secondary and Senior Secondary levels. • Examination: Public Examinations are held twice a year. Nine examination chances are offered in five years. You can take any examination during this period when you are well prepared and avail the facility of credit accumulation also. • On Demand Examination: You can also appear in the On-Demand Examination (ODES) of NIOS at Secondary and Senior Secondary levels at the Headquarter at NOIDA and All Regional Centres as and when you are ready for the examination after first public examination.
    [Show full text]
  • Jharkhand State Pollution Control Board Government of Jharkhand
    Jharkhand State Pollution Control Board Government of Jharkhand DIPP Point No. 109 Question 5d. Authorization under Hazardous Waste (Management and Handling) Rules, 1989 Q: Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification Supporting: URL: http://jhkocmms.nic.in/OCMMS/index.gsp Userid : O1618801720 Password: bigbang123@ Click Here Click Here and select ‘Hazardous Waste Management Jharkhand State Pollution Control Board Government of Jharkhand Fill in General details Fill in Product details Jharkhand State Pollution Control Board Government of Jharkhand Fill in Fee details Fill in Hazardous Waste details Jharkhand State Pollution Control Board Government of Jharkhand Upload files Click on ‘Proceed’ to continue Jharkhand State Pollution Control Board Government of Jharkhand Select the payment mode and make payment FOR TRACKING AND MONITORING STATUS User can track status from here SUPPORTING DOCUMENT Application Type Status Occ Name Designation Ind Name Address City District Mobile No Email Id A-3, 2nd-Phase, Adityapur Kandra SERAIKELA 303293 HWM pending Diloo B Parikh Director Mithila Motors Pvt. Ltd. Adityapur 9204058603 [email protected] Road, Adityapur KHARSAWAN LARGE SCALE INDUSTRIAL ESTATE, SERAIKELA 303321 HWM pending K Shankar Marar Managing Director TAYO ROLLS LIMITED GAMHARIA 9243587464 [email protected] GAMHARIA KHARSAWAN OM PRAKASH BALMUKUND SPONGE & MANJHILADIH, GADISRIRAMPUR, 319248 HWM
    [Show full text]
  • Block) Mobile No RAKESH KUMAR (71036) JHARKHAND (Garhwa
    Volunteer Name with Reg No State (District) (Block) Mobile no RAKESH KUMAR (71036) JHARKHAND (Garhwa) (Majhiaon) 7050869391 AMIT KUMAR YADAW (71788) JHARKHAND (Garhwa) (Nagar Untari) 0000000000 AMIRA KUMARI (70713) JHARKHAND (Garhwa) (Danda) 7061949712 JITENDRA KUMAR GUPTA (69517) JHARKHAND (Garhwa) (Sagma) 9546818206 HARI SHANKAR PAL (69516) JHARKHAND (Garhwa) (Ramna) 9905763896 RENU KUMARI (69513) JHARKHAND (Garhwa) (Dhurki) 8252081219 VANDANA DEVI (69510) JHARKHAND (Garhwa) (Meral) 840987061 PRIYANKA KUMARI (69509) JHARKHAND (Garhwa) (Bardiha) 8969061575 RAVIKANT PRASAD GUPTA (69496) JHARKHAND (Garhwa) (Chiniya) 9905448984 RAKESH TIWARI (71431) JHARKHAND (Garhwa) (Ramkanda) 9934009456 CHANDAN KUMAR RAM (72016) JHARKHAND (Garhwa) (Ramkanda) 6207157968 NEHA NISHE TIGGA (71038) JHARKHAND (Garhwa) (Bhandariya) 7061187175 SATENDRA KUMAR YADAV (71186) JHARKHAND (Garhwa) (Sadar) 8863853368 BHUSHBU KUMARI (69501) JHARKHAND (Garhwa) (Kandi) 9155478910 DURGA KUMARI (69499) JHARKHAND (Garhwa) (Dandai) 7070518032 CHATURGUN SINGH (69498) JHARKHAND (Garhwa) (Ranka) 7489917090 KUMARI SABITA SINGH (69766) JHARKHAND (Garhwa) (Chiniya) 8252202210 RAM AWATAR SHARMA (69497) JHARKHAND (Garhwa) (Kandi) 9939333182 RAHUL KUMAR PAL (69495) JHARKHAND (Garhwa) (Sadar) 9155182855 JIYA SHALIYA TIGGA (69502) JHARKHAND (Garhwa) (Bhandariya) 7323001422 CHANDAN KUMAR PAL (69569) JHARKHAND (Garhwa) (Ramna) 9608927730 MANAS KISHOR MEHTA (73595) JHARKHAND (Garhwa) (Majhiaon) 8002796352 OMPRAKASH YADAV (67380) JHARKHAND (Garhwa) (Bhavnathpur) 9504289861 NAGENDRA RAM (73338)
    [Show full text]
  • Sl.No. Area Project Village Vill-Address Khata-No Plot Nos
    Employment Details for the Year 2018-19 (Jan'19 To March'19) Relation Name of Person offered with the Place of Posting Designati Sl.No. Area Project Village Vill‐Address Khata‐No Plot Nos. Block‐Name District F/H‐Name Empl.Ref. No. Empl‐Letter‐Date Employment Land‐ (Area) on Owner PD/MP/Apptt/Land Security Deptt. CCL 1 Hazaribagh Kedla OC Kedla PO ‐ Kedla PS ‐ Mandu 15 951(P),955,959,960,962. Mandu Ramgarh Mohan Turi S/o Kamal Turi Self 02.01.2019 Cat‐I (T) Loser/L‐428 (HQ)Ranchi PD/MP/Apptt/Land P&IR Deptt. 2 M&A Amrapali Binglat, Saradhu,Honhe PO ‐ Kasiyadih PS ‐ Tandwa 45,31,31,2,53,46 413,305,305,1422,222, 568 Tandwa Chatra Narsingh Saw S/o Iswari Saw Self 11.01.2019 Cat‐I (T) Loser/L‐438 CCL,(HQ)Ranchi 344,345,354,376,389,472,689,842, PO ‐ Ganeshpur PS ‐Balumath & 973,1014,1422,22,25,28,56,58,185, Balumath & Latehar & PD/MP/Apptt/Land 3 M&A Magadh Ara, Kundi & Saradhu 132,4,4,254 Umesh Kumar S/o Keshwari Saw Self 11.01.2019 Rajhara Cat‐I (T) Tandwa 145,162,311,205,247,317,227,352, Tandwa Chatra Loser/L‐440 107,144(P),144(P),107,677. PD/MP/Apptt/Land Security Deptt. CCL 4 Kuju Topa Orla & Topa PO ‐ Topa PS ‐Mandu 19,76,58,58,59,28. 58,1053/2,670/8,670/4,863, 29. Mandu Ramgarh Binod Karmali S/o Mahaveer Karmali Self 15.01.2019 Cat‐I (T) Loser/L‐445 (HQ)Ranchi 36,91,176,178,282,327,342,355,362, 428,501,677,709,28,47,227,251,256, 267,326,358,376,399,400,429,502, PD/MP/Apptt/Land Security Deptt.
    [Show full text]
  • CHALLENGES in EFFICIENT WATER MANAGEMENT in DAMODAR RIVER VALLEY - ROLE of DVC 1 2 Dipankar Chaudhuri ; Satyabrata Banerjee
    CHALLENGES IN EFFICIENT WATER MANAGEMENT IN DAMODAR RIVER VALLEY - ROLE OF DVC 1 2 Dipankar Chaudhuri ; Satyabrata Banerjee Abstract The Damodar River Valley has an extensive history of developmental and planning activities since 1863. DVC was formed in the year 1948 by the act of Parliament to carry out the responsibilities for monitoring and developing this large watershed in an integrated manner. It is well aware that all the projects, planned originally could not be implemented till date by the DVC and the participatory states. Again, silt depositions in the existing reservoirs and channels due to erosions at the upper valley have reduced their respective storage and flowing capacities remarkably. On the other hand, demand of water has been increased many folds within the valley due to growth of industries, population etc. With passing of time, socio- economic and political condition of the valley has also changed a lot. So, considering the different constraints, DVC is trying to manage all its statutory obligations with its limitations. Performances of the operations in the different fields of activities like flood moderation, irrigation, municipal and irrigation water supply, Hydropower etc. have been studied elaborately in this article. Lots of new commendable initiatives to restore the lost-capacities and to increase the storage facilities have also been discussed. A Master Plan of the ecofriendly sustainable developmental activities of the valley in the different projected scenarios has already been prepared by DVC which has also been described in brief. Some scopes have been identified to take up a few new small Hydro schemes at different locations in the upper valley.
    [Show full text]
  • Coalmine Methane Under Indian Mining Scenario
    Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations.
    [Show full text]
  • Camscanner 07-06-2020 17.45.18
    ftyk xzkeh.k fodkl vfHkdj.k] gtkjhckxA rduhfd lgk;d ¼lgk;d vfHk;ark ds led{k½ ds fjDr in ij fu;qfDr gsrq izkIr vkosnuksa dh izkjafHkd lwph ESSENTIAL QUALIFICATION ADDITIONAL QUALIFICATION OTHER CASTE AFFID B.E./ B.TECH IN CIVIL M.TECH/ P.G.D.C.A./ M.C.A/ MCA MARKS SL. STATE/ CERTIFI AVIT NAME F/H NAME SEX PERMANENT ADDRESS PRESENT ADDRESS D.O.B. CATG. AFTER 5 EXP. REMARKS NO. DISTRI CATE (YES/ TOTAL OBTAINE TOTAL OBTAINE POINTS CT (Y/N) COURSE % GE COURSE % GE NO) MARKS D MARKS MARKS D MARKS LESS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18PGDCA 19 20 21 22 VILLAGE-JARA TOLA, VILLAGE- SOLIYA, PO- B.E. IN MARKSHEE AVINASH LATE NARESH MURRAMKALA, PO PALANI, TALATAND, PS- 1 Male Y 25-11-1995 ST Y CIVIL N N T NOT MUNDA MUNDA +PS+DISTRICT-RAMGARH PATRATU, DISTRICT- ENGG. ATTACHED. 829122 Jharkhand Ramgarh 829119 Jharkhand G.R. HOUSE, SIR SYED G.R. HOUSE, SIR SYED NAGAR, KAJLAMANI ROAD, NAGAR, KAJLAMANI ROAD, B.E. IN MARKSHEE MD GAZNAFER JAMIL AKHTER KISHANGANJ, KISHANGANJ KISHANGANJ, KISHANGANJ 2 Male Y 01-05-1991 GEN - CIVIL N Y T NOT RABBANI RABBANI TOWN, TOWN, ENGG. ATTACHED. PS+BLOCK+DISTRICT- PS+BLOCK+DISTRICT- KISHANGANJ 855107 Bihar KISHANGANJ 855107 Bihar VILL- AMBAKOTHI, VILL- AMBAKOTHI, B.E. IN PRAMOD 3 SURESH RAM Male PO+PS+BLOCK+DISTRICT- PO+PS+BLOCK+DISTRICT- Y 20-03-1982 SC Y CIVIL 8000 5144 64.30 N Y KUMAR LATEHAR 829206 Jharkhand LATEHAR 829206 Jharkhand ENGG.
    [Show full text]
  • River Action Plan Damodar
    ACTION PLAN FOR REJUVENATION OF DAMODAR RIVER IN JHARKHAND JHARKHAND STATE POLLUTION CONTROL BOARD, DHURWA, RANCHI, JHARKHAND-834004 CONTENT CHAPTER I ❖ BACKGROUND ❖ INTRODUCTION ❖ PHYSIOGRAPHY ❖ WATER RESOURCES & RAINFALL ❖ ANNUAL RAINFALL ❖ DEVIATION OF RAINFALL ❖ SEASONAL RAINFALL ❖ RAINFALL TREND IN RABI SEASON ❖ AVERAGE MOTHLY RAINFALL ❖ MOVING AVERAGE OF THE RAINFALL ❖ EXTREME EVENT ANALYSIS ❖ SURFACE WATER RESOURCES ❖ GROUND WATER RESOURCES ❖ DRAINAGE SYSTEM AND MAPS CHAPTER II DAMODAR RIVER BASIN RIVER COURSE AND MAJOR TRIBUTARIES CHAPTER III- SOCIO-ECONOMIC IMPORTANCE ❖ WATER RESOURCES AND ITS USES ❖ MINING AND INDUSTRIAL ACTIVITIES ❖ NATURAL AND ANTHROPOGENIC HAZARDS ❖ IDENTIFIED STRETCHES FOR REDUCING POLLUTION CHAPTER IV- ACTION PLAN ❖ ACTION PLAN- SHORT TERM AND LONG TERM ACTION AND THE IDENTIFIED AUTHORITIES FOR INITIATING ACTIONS AND THE TIME LIMITS FOR ENSURING COMPLIANCE ❖ SHORT TERM AND LONG TERM ACTION PLANS FOR REJUVENATION OF RIVERS AND THE IMPLEMENTING AGENCIES RESPONSIBLE FOR EXECUTION OF THE ACTION PLANS AND THE TIME LIMITS ARE GIVEN IN TABLE AS BELOW ❖ PROPOSED ACTION PLAN BY VARIOUS DEPARTMENT OF GOVT. OF JHARKHAND ❖ PROPOSED ACTION PLAN FOR RESTORATION OF JHARKHAND RIVERS ❖ ACTION PLAN AT VILLAGE LEVEL ❖ TIMELINES FOR IMPLEMENTATION OF MODEL RESTORATION PLAN in 2019- 2020 and 2020-2021 Chapter-1 JHARKHAND & ITS WATER RESOURCES 1.1 BACKGROUND:-Hon’ble National Green Tribunal passed the following orders in OA No. 673/2018 & M.A. No. 1777/2018 titled News item published in “The Hindu “authored by Shri Jacob Koshy titled “More river stretches are now critically polluted: CPCB on 20.09.2018 as per excerpts below. “The issue taken up for consideration in this matter is abatement of pollution in 351 river stretches in the country, identified as such by the Central Pollution Control Board (CPCB).
    [Show full text]
  • Hazaribagh, District Census Handbook, Bihar
    ~ i ~ € :I ':~ k f ~ it ~ f !' ... (;) ,; S2 ~'" VI i ~ ~ ~ ~ -I fI-~;'~ci'o ;lO 0 ~~i~~s. R m J:: Ov c V\ ~ -I Z VI I ~ =i <; » -< HUm N 3: ~: ;;; » ...< . ~ » ~ :0: OJ ;: . » " ~" ;;; C'l ;!; I if G' l C!l » I I .il" '" (- l' C. Z (5 < ..,0 :a -1 -I ~ o 3 D {If J<' > o - g- .,. ., ! ~ ~ J /y ~ ::.,. '"o " c z '"0 3 .,.::t .. .. • -1 .,. ... ~ '" '"c ~ 0 '!. s~ 0 c "v -; '"z ~ a 11 ¥ -'I ~~ 11 CENSUS 1961 BIHAR DISTRICT CENSUS HANDBOOK 14 HAZARIBAGH PART I-INTRODUCTORY NOTE, CENSUS TABLES AND OFFICIAL STATISTICS -::-_'" ---..... ..)t:' ,'t" -r;~ '\ ....,.-. --~--~ - .... .._,. , . /" • <":'?¥~" ' \ ........ ~ '-.. "III' ,_ _ _. ~ ~~!_~--- w , '::_- '~'~. s. D. PRASAD 0 .. THE IlQ)IAJr AD:uJlIfISTBA'X'lVB SEBVlOE Supwtnundent 01 Oen.ua Operatio1N, B'h4r 1961 CENSUS PUBLICATIONS, BIHAR (All the Census Publications of this State will bear Vol. no. IV) Central Government Publications PART I-A General Report PART I-B Report on Vital Statistics of Bihar, 1951-60 PART I-C Subsidiary Tables of 1961. PART II-A General Population Tables· PART II-B(i) Economic Tables (B-1 to B-IV and B-VU)· PAR't II-B(ii) Economic Tables (B-V, B-VI, B-VIII and B-IX)* PART II-C Social and Cultural Tables* PART II-D Migration Tables· PART III (i) Household Economic Tables (B-X to B-XIV)* PART III (ii) Household Economic Tables (B-XV to B-XVII)* PART IV-A Report on Housing and Establishments· PART IV-B Housing and Establishment Table:,* PART V-A Special Tables for Scheduled Castes and Scheduled Tribe&* PART V-B Ethnographic Notes on Scheduled Castes and Scheduled Tribes PART VI Village Surveys •• (Monoglaphs on 37 selected villages) PART VII-A Selected Crafts of Bihar PART VII-B Fairs and Festivals of Bihar PART VIII-A Administration Report on Enumeration * } (Not for sale) PART VIII-B Administration Report on Tabulation PART IX Census Atlas of Bihar.
    [Show full text]
  • LIST of REPORTS SENT to the SPONSORER from 1St JANUARY, 2016 to MARCH, 2021
    LIST OF REPORTS SENT TO THE SPONSORER FROM 1st JANUARY, 2016 TO MARCH, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”.
    [Show full text]