Fareham Progress with 20
Total Page:16
File Type:pdf, Size:1020Kb
ITEM 5 HAMPSHIRE COUNTY COUNCIL ENVIRONMENT DEPARTMENT HIGHWAYS ACTION TEAM TRANSPORTATION MEETING - FAREHAM PROGRESS WITH 2010/11 SCHEMES PROGRAMME The attached tables detail the progress with: Table 1. Maintenance and Special Maintenance Schemes Update 2010/11 Table 2. Capital Programme Schemes Update 2010/11 Table 3a. Hampshire County Council Traffic Management Programme 2010/11 – Fareham Table 3b. Hampshire County Council Additional Traffic Management Programme Update 2010/11 Table 3c. Fareham Borough Council Traffic Management Programme Update 2010/11 Members are asked to note the current status. 1 Table 1. ITEM 5 FAREHAM Maintenance and Special Maintenance Schemes Update 2010/11 Principal Road Special Maintenance 2010/11 Road Name Ward Status Brief Details A27 The Avenue (Haunch repair) Fareham West Complete Surface dressing and patching A27 Portchester Bypass 1 Portchester East Quarter 4 Carriageway Resurface A27 Portchester Bypass 2 Portchester West Quarter 4 Carriageway Resurface A27 Portchester Road Portchester West Quarter 4 Carriageway Resurface Non Principal Road Special Maintenance 2010/11 (To be confirmed) Location Ward Status Brief Details Peters Road (FW) Park Gate In Progress Footway Resurface Cuckoo Lane (FW) Stubbington Deferred Defer to 11/12 for Hill Head Greyshott Avenue (FW) Titchfield In Progress In Progress 02/09/10 Old Street S (FW Hill Head Deferred Defer to 11/12 for Hill Head Nelson Lane (FW) Portchester Deferred Defer to 11/12 for Hill Head Ravens Close footpaths (FW) Stubbington In Progress Footway Resurface Southwick Avenue (FW) Portchester East Quarter 3 Footway Resurface Lysses Path (FW) Fareham East Quarter 3 Footway Resurface Richards Close (FW) Locks Heath Quarter 3 Footway Resurface Northways (DR) Stubbington Deferred Defer for Hill Head Beresford Road (FW) Stubbington Deferred Defer for Hill Head Hammond Rd (DR) Fareham North West In Progress Deferred from 09/10 due to Winter 2 Table 1. ITEM 5 Location Ward Status Brief Details restoration Downend Rd (DR) Portchester West Quarter 3 Deferred from 09/10 due to Winter restoration Blackbrook Rd (DR) Fareham West Complete Drainage Peak Lane Fareham West Quarter 3 Carriageway resurface Old Turnpike/North Hill Fareham East/North Quarter 4 Carriageway resurface Osborn Road Fareham East Quarter 4 Deferred from 09/10 due to Winter restoration Boarhunt Road Fareham East Quarter 4 Carriageway resurface Swivleton Lane Fareham East Quarter 4 Carriageway resurface Spurlings Lane Fareham East Quarter 4 Carriageway resurface Portsdown Hill Portchester East Complete Carriageway resurface Hospital Lane Portchester East Quarter 4 Carriageway resurface Miller Drive Fareham North Quarter 3 Carriageway resurface Delme Roundabout Fareham East Quarter 3 Carriageway resurface Funtley Road Fareham North Quarter 3 Carriageway resurface 3 Table 1. ITEM 5 Other Schemes 2010/11 Road Name Ward Status Brief Details Titchfield Road bypass (drainage) Titchfield Quarter 3 Replacement of drainage Posbrook Lane Titchfield In Progress Minor Works programme. Provision of footway and drainage. 4 Table 1. ITEM 5 Surface Dressing Road Name Ward Brief Details Approximate Dates Nelson Avenue Portchester East Carriageway surface dressing Complete Kenya Road Portchester East Carriageway surface dressing Complete Nyewood Avenue Portchester West Carriageway surface dressing Complete Stoneleigh Close Portchester West Carriageway surface dressing Complete Merrow Close Portchester West Carriageway surface dressing Complete Ashstead Close Portchester West Carriageway surface dressing Complete Rockingham Way Portchester West Carriageway surface dressing Complete Drift Road Fareham East Carriageway surface dressing Complete Oxford Close Fareham North Carriageway surface dressing Complete Kiln Road (Highlands Road – Fareham North Carriageway surface dressing Complete Funtley Hill) Oak Road Fareham West Carriageway surface dressing Complete Fayre Road Fareham South Carriageway surface dressing Complete Chamberlain Grove Fareham South Carriageway surface dressing Complete East Lodge Titchfield Carriageway surface dressing Complete Mancroft Avenue Hill Head Carriageway surface dressing Complete Southways Stubbington Carriageway surface dressing Complete 5 Table 1. ITEM 5 Road Name Ward Brief Details Approximate Dates Titchfield Road (Marks Tey Titchfield Footway surface dressing Complete Road – The Avenue) The Avenue (Mill Lane Titchfield Footway surface dressing Complete /Titchfield Rd – Highlands Rd/Ranvilles Lane 6 Table 2. ITEM 5 Capital Programme Scheme Update 2010/11 Fareham Ref Scheme name Project Programme Status cost date 1 Whiteley to Swanwick Station Works commenced 20 September 2010 and are programmed – Pedestrian and Cycle £260,000 2010/11 for 12 weeks. Accessibility 2 Duncan Road – footway Under Improvements to footway on northern side to assist access to 2009/10 improvements £50,000 Swanwick railway station. Complete. 3 Provision of new footway, drainage and street lighting. £40,000 Includes funds from the minor works programme and Posbrook Lane, Titchfield – 2010/11 provision of footway (est.) developer contributions. Works commenced 1 September 2010. 7 Table 3a. ITEM 5 Hampshire County Council Traffic Management Programme 2010/11 - Fareham Ref Scheme Name Estimated Programme Status Cost date 1 A and B road speed By 2011 The review is ongoing. Priority routes are currently being assessed. Limit review 2 Knowle Road £760 June 2010 Implementation of 50mph speed limit on Knowle Road - Implemented Fareham 27 September 2010 3 Gosport Road/Marks £500 May 2010 Existing cycle crossing to be upgraded to a toucan crossing. Cycle Road Fareham – route signing requires review and renewal – Signs ordered Review of cycle September 2010 signage 4 Warsash Road – Externally 2010/2011 Request for refuge island near to Brook Lane o/s COOP (identified on Refuge Island Funded issues log).– Investigations to date have indicated a difficulty in locating an island on the pedestrian desire line. Further investigations/consultation with Members required. Note: £10,000 for Miscellaneous minor traffic management measures has been removed from the programme due to 2010/11 budget cuts. 8 Table 3b. ITEM 5 Hampshire County Council Additional Traffic Management Issues in Progress Ref Scheme Name Estimated Programme Status Cost date 1 Warsash Road – £0 June 2010 Bollards to be installed at the entrance to the car park to Silver Fern Casualty Reduction public house to compliment signing and lining/ Negotiation with the pub Partnership scheme resulted in them undertaking the works – Completed 2 Portsdown Hill Road EF £15,000 March 2011 Explore measures to benefit cyclists / road safety in the vicinity of Skew Lane 3 A27 Bridge Road EF £26,000 March 2011 Investigate measures to facilitate the removal of the crawler lane on Sarisbury Bridge Road 4 Gudge Heath Lane – EF March 2011 Feasibility of the implementation of traffic management measures have traffic management £100,000 been undertaken and agreed with local Member that there is no measures justification for onerous measures on Gudge Heath Lane. Investigate enhancement to bus stops on Gudge Heath Lane and funding be used to investigate safety issues on Highlands Road, as identified in the Issue log 5 Dibles Road £500 January Review of the warning signs in Dibles Road. Concerns on pedestrian 2011 safety (related to Western Wards Distributor Road). 9 Table 3c. ITEM 5 Fareham Borough Council Traffic Management Programme Update 2010/11 REQUESTED SITE DESCRIPTION & JUSTIFICATION BY/WHEN Accidents Police Benefit/ Lines Sight Congestion Obstruction Duration/ Severity Environmental Economic Progress Carry forward from 2009/10 1 West Street Fareham Request from Amendment to pedestrianisation orders Formal approval of DfT for Pedestrianised area Community regarding parking/cycling signing TRO re cyclist and Safety HGV restrictions 2. Gull Coppice Councillor Congestion/obstruction/safety to school Implemented August 2010 Woodward and children Police 3. Hill View Road/Dore HCC/Police Parking on South side obstructs visibility to Implemented august 2010. Avenue vehicles emerging from Dore Avenue South 4. Lockswood Road Police Amend Speed Limit from 30mph to 40mph Not supported on safety grounds 2010/11 Programme 1 Geoffrey Crescent Paul Coates Fire Appliance access. Request has come Programmed 2010/11- No (Fareham East) Request Fire from an emergency service. Great difficulty in progress to date Station making progress due to parked vehicles on Manager either side of the road. Urgent action required. August 2009 2 Brook Farm Avenue Request from Used by commuters as all day car park Programmed 2010/11 – No (Fareham) residents progress to date 10 Table 3c. ITEM 5 REQUESTED SITE DESCRIPTION & JUSTIFICATION BY/WHEN Accidents Police Benefit/ Lines Sight Congestion Obstruction Duration/ Severity Environmental Economic Progress 3 Birdwood Grove Petition 2008, Obstruction caused by parking problems. Programmed 2010/11 – No CAT 2009 Residents have own drives progress to date 4 Waterside Lane Parking Extend double yellow lines and loading ban Programmed 2010/11 – No Services, progress to date Summer 09 5 Newtown Road, Mark Hoban MP Waiting restrictions wanted due to student Cllr meeting due Sept to Warsash and others parking at Maritime College discuss initial objections 6 Havelock Road May 2005 – Request for waiting restrictions. Refuse Programmed 2010/11 – No (Warsash) Member request vehicle unable to gain access progress to date 7 Cutlers