WODEN TOWN CENTRE ACTIVE TRAVEL ACTIVE TRAVEL - City Wide Network Context
Total Page:16
File Type:pdf, Size:1020Kb
ACT GOVERNMENT WODEN TOWN CENTRE ACTIVE TRAVEL ACTIVE TRAVEL - City Wide Network Context Encourage participation Integrate with Public Transport Reduce car dependency • Complete the Off Road Networks – Shared Paths linking to Town Centres • Complete the On Road Networks – Arterial and Collector Roads • Deliver improved facilities in urban environments – separation etc. ACTIVE TRAVEL - City Wide Network Context Complete the Off Road Networks – Example Sullivans Creek Path ACTIVE TRAVEL - City Wide Network Context Complete the On Road Networks on Arterial and Collector Roads ‐ Example London Circuit to Parkes Way ACTIVE TRAVEL - City Wide Network Context Improved facilities in urban environments – Example Civic Cycle Loop ACTIVE TRAVEL – Woden Town Centre Work Completed to date; November 2015 –Woden Town Centre master plan completed 2015/ 16 ‐ Feasibility Study and design & construction of the Canberra Hospital link 2016/17 ‐ design & construction feasibility priority options at Easty Street and Matilda Street 2015/16 – Feasibility Study Future Priorities • Corinna Street cycle lanes (Concept plan complete) • Melrose Drive shared path (construction docs complete) • Callam Street shared path (Matilda to Launceston construction docs complete) • Bradley Street shared space • Hindmarsh Drive – crossing to trade area (construction docs complete) • Atlantic Street ramp (construction docs complete) 2017/18 Capital Works Program – Woden Valley • Town Centre Active Travel – Design + Construction • Phillip Parking Improvements ‐ Construction • Woden Library Revitalisation – Design + Construction • Phillip Oval Upgrades ‐ Construction • Woden Bus Depot Upgrade – Design + Construction • Hindmarsh Drive Intersections – Completed Projects nearby; • Cotter Road Duplication Stage 2 • Weston Creek Dog Park • Brierly Street Upgrade Capital Works – Woden Valley 2016/17 Design & Construction Canberra Hospital link Paths widened from 1.2m to 2m Intersections upgraded including new kerb ramps and signalisation of Bradley Street crossing • New ram 2016/17 Design & construction Matilda Street separated cycleway – design & construction ‐ $650k Due for completion October 17 Easty Street link Construction ‐ $240k Completed early 2017 2016/17 - Design & construction Hindmarsh Drive Intersections Completed mid 17 Woden Valley Community Council Thankyou.