ACT GOVERNMENT ACTIVE TRAVEL ACTIVE TRAVEL - City Wide Network Context

Encourage participation Integrate with Public Transport Reduce car dependency

• Complete the Off Road Networks – Shared Paths linking to Town Centres

• Complete the On Road Networks – Arterial and Collector Roads

• Deliver improved facilities in urban environments – separation etc. ACTIVE TRAVEL - City Wide Network Context

Complete the Off Road Networks – Example Sullivans Creek Path ACTIVE TRAVEL - City Wide Network Context

Complete the On Road Networks on Arterial and Collector Roads ‐ Example to ACTIVE TRAVEL - City Wide Network Context

Improved facilities in urban environments – Example Civic Cycle Loop ACTIVE TRAVEL – Woden Town Centre

Work Completed to date; November 2015 –Woden Town Centre master plan completed

2015/ 16 ‐ Feasibility Study and design & construction of the Hospital link

2016/17 ‐ design & construction feasibility priority options at Easty Street and Matilda Street 2015/16 – Feasibility Study

Future Priorities • Corinna Street cycle lanes (Concept plan complete)

• Melrose Drive shared path (construction docs complete)

• Callam Street shared path (Matilda to Launceston construction docs complete)

• Bradley Street shared space

– crossing to trade area (construction docs complete)

• Atlantic Street ramp (construction docs complete) 2017/18 Capital Works Program –

• Town Centre Active Travel – Design + Construction • Phillip Parking Improvements ‐ Construction • Woden Library Revitalisation – Design + Construction • Phillip Oval Upgrades ‐ Construction • Woden Bus Depot Upgrade – Design + Construction • Hindmarsh Drive Intersections – Completed

Projects nearby; • Cotter Road Duplication Stage 2 • Dog Park • Brierly Street Upgrade Capital Works – Woden Valley 2016/17 Design & Construction

Canberra Hospital link

Paths widened from 1.2m to 2m Intersections upgraded including new kerb ramps and signalisation of Bradley Street crossing

• New ram 2016/17 Design & construction

Matilda Street separated cycleway – design & construction ‐ $650k Due for completion October 17

Easty Street link Construction ‐ $240k Completed early 2017 2016/17 - Design & construction

Hindmarsh Drive Intersections Completed mid 17 Woden Valley Community Council