FALLBACK PROCEDURES FOR SYSTEM BREAKDOWN

PORT

1 FALLBACK PROCEDURES (PKA) eDCFZ System

1. POWER FAILURE 2. NETWORK FAILURE  Uninterruptable Power supply unit (UPS) in  PKA Data Centre is connected to Telekom PKA server room will be activated. through Metro-E fibre-based.  The UPS system is supported by generator sets  Secondary connection to Data Recovery Centre with automatic start mode. (DRC)  If failure unrectified within 4 hours, system can be accessed through DRC.

2 FALLBACK PROCEDURES (PKA) eDCFZ System

3. SYSTEM FAILURE 4. HARDWARE FAILURE  PKA will send an official notice to Careline  Servers with redundant units—cluster system.  Careline will disseminate information to all parties  Server mirroring concept. concerned on the breakdown.  If failure unrectified within 4 hours, system can  FZ Procedure be accessed through Data Recovery Centre (DRC), located in .  Agent will request to load the container/goods prior any declaration to PKA  PKA will instruct agent to apply via form/email with relevant details  PKA will inform terminal to load container/goods

3 FALLBACK PROCEDURES (PKA) eDCFZ System

3. SYSTEM FAILURE 4. HARDWARE FAILURE  DG Procedure  Servers with redundant units—cluster system.  Agent will submit declaration manually  Server mirroring concept.  Approval will be given at the print out  If failure unrectified within 4 hours, system can hardcopy. Agent can submit by fax, email or be accessed through Data Recovery Centre attend to PKA (DRC), located in Cyberjaya.  PKA will endorse at the hardcopy. Manual registration no will be given  1 copy will be faxed/email to terminal  Agent will submit electronically once system is recovered  Daily auto back to local server

4 FALLBACK PROCEDURES (NORTHPORT) Terminal Operating System / Contrak 2

1. POWER FAILURE 2. NETWORK FAILURE  Power sources are from TNB’s two separate  The data centres are connected to Telekom power substations. Malaysia through Metro-E fibre-based.  Data centres are equipped with uninterruptable  Secondary TM connection via wireless through power supply unit (UPS). microwave.  The UPS system is supported by dual power generator sets with automatic start mode.

5 FALLBACK PROCEDURES (NORTHPORT) Terminal Operating System / Contrak 2

3. SYSTEM FAILURE 4. HARDWARE FAILURE  Daily backup to local data centre and remote  Servers with redundant units—cluster system. storage.  Disk storage with redundant units-Redundant  Systems are co-located in two data centres with Array of Independent Disks (RAID). 2 km apart.  Network switches with redundant units.

6 FALLBACK PROCEDURES (WESTPORTS) Terminal Operating System / eTerminal Plus

1. POWER FAILURE 2. NETWORK FAILURE  Redundant power lines from TNB (electrical).  Data centres are connected with multiple  Generator set to supply power in case a internet service providers such as NTT, P1, blackout occurs (Tower block and CT 4). Unifi and Telekom Malaysia via different  Uninterruptable Power supply unit (UPS) connectivities i.e. wireless, fibre, etc. system for each server, PCs in all data centres.

7 FALLBACK PROCEDURES (WESTPORTS) Terminal Operating System / eTerminal Plus

3. SYSTEM FAILURE 4. HARDWARE FAILURE  Redundant data centre in two different locations  High availability of internal communication one at our Tower block and other at CT 4 equipment :– walkie talkie, wireless devices and operations building. handheld devices for internal port use.  Automated daily backup of all servers in each of  Redundant Array of Independent Disks (RAID) our data centres to a remote storage. configuration implemented for all data storages.

8 THANK YOU