
FALLBACK PROCEDURES FOR SYSTEM BREAKDOWN PORT KLANG 1 FALLBACK PROCEDURES (PKA) eDCFZ System 1. POWER FAILURE 2. NETWORK FAILURE Uninterruptable Power supply unit (UPS) in PKA Data Centre is connected to Telekom PKA server room will be activated. Malaysia through Metro-E fibre-based. The UPS system is supported by generator sets Secondary connection to Data Recovery Centre with automatic start mode. (DRC) If failure unrectified within 4 hours, system can be accessed through DRC. 2 FALLBACK PROCEDURES (PKA) eDCFZ System 3. SYSTEM FAILURE 4. HARDWARE FAILURE PKA will send an official notice to Careline Servers with redundant units—cluster system. Careline will disseminate information to all parties Server mirroring concept. concerned on the breakdown. If failure unrectified within 4 hours, system can FZ Procedure be accessed through Data Recovery Centre (DRC), located in Cyberjaya. Agent will request to load the container/goods prior any declaration to PKA PKA will instruct agent to apply via form/email with relevant details PKA will inform terminal to load container/goods 3 FALLBACK PROCEDURES (PKA) eDCFZ System 3. SYSTEM FAILURE 4. HARDWARE FAILURE DG Procedure Servers with redundant units—cluster system. Agent will submit declaration manually Server mirroring concept. Approval will be given at the print out If failure unrectified within 4 hours, system can hardcopy. Agent can submit by fax, email or be accessed through Data Recovery Centre attend to PKA (DRC), located in Cyberjaya. PKA will endorse at the hardcopy. Manual registration no will be given 1 copy will be faxed/email to terminal Agent will submit electronically once system is recovered Daily auto back to local server 4 FALLBACK PROCEDURES (NORTHPORT) Terminal Operating System / Contrak 2 1. POWER FAILURE 2. NETWORK FAILURE Power sources are from TNB’s two separate The data centres are connected to Telekom power substations. Malaysia through Metro-E fibre-based. Data centres are equipped with uninterruptable Secondary TM connection via wireless through power supply unit (UPS). microwave. The UPS system is supported by dual power generator sets with automatic start mode. 5 FALLBACK PROCEDURES (NORTHPORT) Terminal Operating System / Contrak 2 3. SYSTEM FAILURE 4. HARDWARE FAILURE Daily backup to local data centre and remote Servers with redundant units—cluster system. storage. Disk storage with redundant units-Redundant Systems are co-located in two data centres with Array of Independent Disks (RAID). 2 km apart. Network switches with redundant units. 6 FALLBACK PROCEDURES (WESTPORTS) Terminal Operating System / eTerminal Plus 1. POWER FAILURE 2. NETWORK FAILURE Redundant power lines from TNB (electrical). Data centres are connected with multiple Generator set to supply power in case a internet service providers such as NTT, P1, blackout occurs (Tower block and CT 4). Unifi and Telekom Malaysia via different Uninterruptable Power supply unit (UPS) connectivities i.e. wireless, fibre, etc. system for each server, PCs in all data centres. 7 FALLBACK PROCEDURES (WESTPORTS) Terminal Operating System / eTerminal Plus 3. SYSTEM FAILURE 4. HARDWARE FAILURE Redundant data centre in two different locations High availability of internal communication one at our Tower block and other at CT 4 equipment :– walkie talkie, wireless devices and operations building. handheld devices for internal port use. Automated daily backup of all servers in each of Redundant Array of Independent Disks (RAID) our data centres to a remote storage. configuration implemented for all data storages. 8 THANK YOU 9.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages9 Page
-
File Size-