Dredging Conservation Assessment for the Thames Estuary
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Whose River? London and the Thames Estuary, 1960-2014* Vanessa Taylor Univ
This is a post-print version of an article which will appear The London Journal, 40(3) (2015), Special Issue: 'London's River? The Thames as a Contested Environmental Space'. Accepted 15 July 2015. Whose River? London and the Thames Estuary, 1960-2014* Vanessa Taylor Univ. of Greenwich, [email protected] I Introduction For the novelist A.P. Herbert in 1967 the problem with the Thames was simple. 'London River has so many mothers it doesn’t know what to do. ... What is needed is one wise, far- seeing grandmother.’1 Herbert had been campaigning for a barrage across the river to keep the tide out of the city, with little success. There were other, powerful claims on the river and numerous responsible agencies. And the Thames was not just ‘London River’: it runs for over 300 miles from Gloucestershire to the North Sea. The capital’s interdependent relationship with the Thames estuary highlights an important problem of governance. Rivers are complex, multi-functional entities that cut across land-based boundaries and create interdependencies between distant places. How do you govern a city that is connected by its river to other communities up and downstream? Who should decide what the river is for and how it should be managed? The River Thames provides a case study for exploring the challenges of governing a river in a context of changing political cultures. Many different stories could be told about the river, as a water source, drain, port, inland waterway, recreational amenity, riverside space, fishery, wildlife habitat or eco-system. -
Long-Term Prospects for Northwest European Refining
LONG-TERM PROSPECTS FOR NORTHWEST EUROPEAN REFINING ASYMMETRIC CHANGE: A LOOMING GOVERNMENT DILEMMA? ROBBERT VAN DEN BERGH MICHIEL NIVARD MAURITS KREIJKES CIEP PAPER 2016 | 01 CIEP is affiliated to the Netherlands Institute of International Relations ‘Clingendael’. CIEP acts as an independent forum for governments, non-governmental organizations, the private sector, media, politicians and all others interested in changes and developments in the energy sector. CIEP organizes lectures, seminars, conferences and roundtable discussions. In addition, CIEP members of staff lecture in a variety of courses and training programmes. CIEP’s research, training and activities focus on two themes: • European energy market developments and policy-making; • Geopolitics of energy policy-making and energy markets CIEP is endorsed by the Dutch Ministry of Economic Affairs, the Dutch Ministry of Foreign Affairs, the Dutch Ministry of Infrastructure and the Environment, BP Europe SE- BP Nederland, Coöperatieve Centrale Raiffeisen-Boerenleenbank B.A. ('Rabobank'), Delta N.V., ENGIE Energie Nederland N.V., ENGIE E&P Nederland B.V., Eneco Holding N.V., EBN B.V., Essent N.V., Esso Nederland B.V., GasTerra B.V., N.V. Nederlandse Gasunie, Heerema Marine Contractors Nederland B.V., ING Commercial Banking, Nederlandse Aardolie Maatschappij B.V., N.V. NUON Energy, TenneT TSO B.V., Oranje-Nassau Energie B.V., Havenbedrijf Rotterdam N.V., Shell Nederland B.V., TAQA Energy B.V.,Total E&P Nederland B.V., Koninklijke Vopak N.V. and Wintershall Nederland B.V. CIEP Energy -
Digest of United Kingdom Energy Statistics 2012
Digest of United Kingdom Energy Statistics 2012 Production team: Iain MacLeay Kevin Harris Anwar Annut and chapter authors A National Statistics publication London: TSO © Crown Copyright 2012 All rights reserved First published 2012 ISBN 9780115155284 Digest of United Kingdom Energy Statistics Enquiries about statistics in this publication should be made to the contact named at the end of the relevant chapter. Brief extracts from this publication may be reproduced provided that the source is fully acknowledged. General enquiries about the publication, and proposals for reproduction of larger extracts, should be addressed to Kevin Harris, at the address given in paragraph XXIX of the Introduction. The Department of Energy and Climate Change reserves the right to revise or discontinue the text or any table contained in this Digest without prior notice. About TSO's Standing Order Service The Standing Order Service, open to all TSO account holders, allows customers to automatically receive the publications they require in a specified subject area, thereby saving them the time, trouble and expense of placing individual orders, also without handling charges normally incurred when placing ad-hoc orders. Customers may choose from over 4,000 classifications arranged in 250 sub groups under 30 major subject areas. These classifications enable customers to choose from a wide variety of subjects, those publications that are of special interest to them. This is a particularly valuable service for the specialist library or research body. All publications will be dispatched immediately after publication date. Write to TSO, Standing Order Department, PO Box 29, St Crispins, Duke Street, Norwich, NR3 1GN, quoting reference 12.01.013. -
South Essex Outline Water Cycle Study Technical Report
South Essex Outline Water Cycle Study Technical Report Final September 2011 Prepared for South Essex: Outline Water Cycle Study Revision Schedule South Essex Water Cycle Study September 2011 Rev Date Details Prepared by Reviewed by Approved by 01 April 2011 D132233: S. Clare Postlethwaite Carl Pelling Carl Pelling Essex Outline Senior Consultant Principal Consultant Principal Consultant WCS – First Draft_v1 02 August 2011 Final Draft Clare Postlethwaite Rob Sweet Carl Pelling Senior Consultant Senior Consultant Principal Consultant 03 September Final Clare Postlethwaite Rob Sweet Jon Robinson 2011 Senior Consultant Senior Consultant Technical Director URS/Scott Wilson Scott House Alençon Link Basingstoke RG21 7PP Tel 01256 310200 Fax 01256 310201 www.urs-scottwilson.com South Essex Water Cycle Study Limitations URS Scott Wilson Ltd (“URS Scott Wilson”) has prepared this Report for the sole use of Basildon Borough Council, Castle Point Borough Council and Rochford District Council (“Client”) in accordance with the Agreement under which our services were performed. No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by URS Scott Wilson. This Report is confidential and may not be disclosed by the Client or relied upon by any other party without the prior and express written agreement of URS Scott Wilson. The conclusions and recommendations contained in this Report are based upon information provided by others and upon the assumption that all relevant information has been provided by those parties from whom it has been requested and that such information is accurate. Information obtained by URS Scott Wilson has not been independently verified by URS Scott Wilson, unless otherwise stated in the Report. -
Basildon Borough Council Level 2 Strategic Flood Risk Assessment
Basildon Borough Council Level 2 Strategic Flood Risk Assessment Level 2 – Final Report September 2011 Prepared for Basildon Borough Council Level 2 Strategic Flood Risk Assessment Revision Schedule Basildon Borough Council Strategic Flood Risk Assessment – Level 2 September 2011 Rev Date Details Prepared by Reviewed by Approved by 01 June 2011 Draft Report for Eleanor Cole Emily Craven Jon Robinson Client Comment Assistant Hydrologist Senior Flood Risk Consultant Technical Director Sarah Littlewood Assistant Flood Risk Specialist 02 July 2011 Draft Report for Sarah Littlewood Emily Craven EA Comment Assistant Flood Risk Specialist Senior Flood Risk Consultant 03 Sept 2011 Final Report Sarah Littlewood Emily Craven Jon Robinson Assistant Flood Risk Specialist Principal Flood Risk Consultant Technical Director URS Scott Wilson 6-8 Greencoat Place London SW1P 1PL Tel +44 (0)20 7798 5000 Fax +44 (0)20 7798 5001 www.urs-scottwilson.com Basildon Borough Council Level 2 Strategic Flood Risk Assessment Non Technical Summary Overview Basildon Borough Council, in partnership with Rochford District Council and Castle Point Borough Council, has commissioned URS Scott Wilson to produce a Strategic Flood Risk Assessment (SFRA) in accordance with Planning Policy Statement 25 (PPS25): Development and Flood Risk1 and its accompanying Practice Guide2. This SFRA provides a revision to the Thames Gateway South Essex SFRA which was published in November 2006 and prepared under previous policy Planning Policy Guidance (PPG25) Development and Flood Risk. The following report constitutes a Level 2 SFRA for Basildon Borough Council which builds on the findings of the Level 1 SFRA and will contribute to the evidence base for the plan-making process of the Local Development Framework (LDF), in particular the Core Strategy. -
The DA GHGI Improvement Programme 2009-2010 Industry Sector Task
The DA GHGI Improvement Programme 2009-2010 Industry Sector Task DECC, The Scottish Government, The Welsh Assembly Government and the Northern Ireland Department of the Environment AEAT/ENV/R/2990_3 Issue 1 May 2010 DA GHGI Improvements 2009-2010: Industry Task Restricted – Commercial AEAT/ENV/R/2990_3 Title The DA GHGI Improvement Programme 2009-2010: Industry Sector Task Customer DECC, The Scottish Government, The Welsh Assembly Government and the Northern Ireland Department of the Environment Customer reference NAEI Framework Agreement/DA GHGI Improvement Programme Confidentiality, Crown Copyright copyright and reproduction File reference 45322/2008/CD6774/GT Reference number AEAT/ENV/R/2990_3 /Issue 1 AEA Group 329 Harwell Didcot Oxfordshire OX11 0QJ Tel.: 0870 190 6584 AEA is a business name of AEA Technology plc AEA is certificated to ISO9001 and ISO14001 Authors Name Stuart Sneddon and Glen Thistlethwaite Approved by Name Neil Passant Signature Date 20th May 2010 ii AEA Restricted – Commercial DA GHGI Improvements 2009-2010: Industry Task AEAT/ENV/R/2990_3 Executive Summary This research has been commissioned under the UK and DA GHG inventory improvement programme, and aims to research emissions data for a group of source sectors and specific sites where uncertainties have been identified in the scope and accuracy of available source data. Primarily this research aims to review site-specific data and regulatory information, to resolve differences between GHG data reported across different emission reporting mechanisms. The research has comprised: 1) Data review from different reporting mechanisms (IPPC, EU ETS and EEMS) to identify priority sites (primarily oil & gas terminals, refineries and petrochemicals), i.e. -
SAILING DIRECTIONS for the RIVER THAMES. Norie, 1817 (Medway and Harwich Etc Omitted)
14/09/2020 Sailing Directions,Norie 1817 - WHERE THAMES SMOOTH WATERS GLIDE SAILING DIRECTIONS FOR THE RIVER THAMES. Norie, 1817 (Medway and Harwich etc omitted) https://thames.me.uk/sailing1817.htm 1/12 14/09/2020 Sailing Directions,Norie 1817 - WHERE THAMES SMOOTH WATERS GLIDE https://thames.me.uk/sailing1817.htm 2/12 14/09/2020 Sailing Directions,Norie 1817 - WHERE THAMES SMOOTH WATERS GLIDE THE SAILING DIRECTIONS FOR THE RIVER THAMES,1817 Note. - Throughout the following Work, the Soundings are those taken at low Water, Spring Tides: the Bearings and Courses are Magnetic, or by Compass, an the Distances are in Nautic Miles, of 60 to a degree. The Variation allowed is Two Points and a Quarter West. It may be proper to premise, that the Sands in the River Thames frequently change their shapes and situations, thereby rendering many of the marks to avo them, obsolete, we shall endeavour to give such description as is adapted to the present time, leaving the Mariner to make such alterations as may hereafter b found necessary. Links to the latest mini charts from the Port of London Authority for comparison FROM LONDON BRIDGE TO THE NORE AND SHEERNESS. THE UPPER POOL, MODERN PLA chart THE UPPER POOL, 1817 The Upper Pool from London Bridge to Wappingness, lies nearly S.E. and N.W. Off the Custom-house is a shoal; and at Horsleydown-middle-tier, a hard shelf, on which are only 6 feet. Just above Fountain-stairs also is a shoal, which almost dries at low water; to avoid this, you must keep well over towards the ships at Wappingness. -
Environmental Information Report Section 36 Consent Variation
ENVIRONMENTAL INFORMATION REPORT SECTION 36 CONSENT VARIATION DAMHEAD CREEK 2 POWER STATION Name Job Title Signature Date Environmental John Bacon / Consultant / February Prepared Associate Director, 2016 Andrew Hepworth Aecom Technical Technical Director, February Kerry Whalley Review Aecom 2016 February Approved Richard Lowe Director, Aecom 2016 AMENDMENT RECORD Issue Date Issued Date Effective Purpose of Issue and Description of Amendment 1.0 January 2016 January 2016 S36 Variation Draft EIR for review 2.0 February 2016 February 2016 S36 Variation Final for Issue DHC2 Environmental Information Report 4-Feb-16 Page 2 of 116 TABLE OF CONTENTS Page Executive Summary 5 1. Introduction 9 1.1 Purpose of this Document 10 1.2 Planning history of DHC2 10 1.3 Environmental Assessment 11 2. Description of the Development 15 2.1 Proposed Development 15 2.2 Site Location 16 2.3 Application Site Context 17 2.4 Main Buildings and Plant 18 2.5 Process Description 19 2.6 Operational Information 21 2.7 Environmental Permit 22 2.8 Combined Heat and Power (CHP) 23 3. Legislative Framework 26 4. Status of Pre Commencement Planning Conditions 27 4.1 Operational Noise 27 4.2 Contamination of Watercourses 27 4.3 Ecological Enhancement and Protected Species 27 4.4 Ground Contamination 28 4.5 Landscaping and Creative Conservation 28 4.6 Archaeology 29 4.7 Layout and Design 29 4.8 Green Travel Plan 29 4.9 Construction and Construction Traffic 30 4.8 Other Planning Conditions 30 4.8 Other Planning Consents 30 5. Stakeholder Consultation 31 6. Environmental Appraisal 33 6.1 Methodology 33 6.2 Air Quality 35 6.3 Noise and Vibration 42 6.4 Landscape and Visual Amenity 48 6.5 Ecology 61 6.6 Water Quality 75 6.7 Geology, Hydrology and Land Contamination 82 6.8 Traffic and Infrastructure 93 6.9 Cultural Heritage 98 6.10 Socio-Economics 104 7. -
5A Planning Applications
PLANNING APPLICATIONS FOR 2 JANUARY 2008 Page no. 1 MC2007/0014 Peninsula Application for deemed planning permission under Section 90(2) of The Town and Country Planning Act 1990 for construction of two advanced supercritical (ASC) coal-fired generating units (demolition of power station) Kingsnorth Power Station, Kingsnorth, Hoo St. Werburgh, Rochester, Kent 3 2 MC2007/1517 Watling Subdivision of 1,817sqm floor area of existing Retail Warehouse into 2 separate and independent retail units and sale of non DIY goods. B&Q Plc Will Adams Way Gillingham Kent ME8 6BY 7 3 MC2007/1912 Watling Subdivision of 1,817sqm floor area of existing Retail Warehouse into a separate retail unit, provision of mezzanine to provide 1417sqm additional floorspace and sale of non DIY goods B&Q Plc Will Adams Way Gillingham Kent ME8 6BY 76 4 MC2005/0814 Luton & Wayfield Application for approval of reserved matters pursuant to condition 1 of MC2003/1285 for demolition of existing buildings and construction of three blocks of flats comprising of 96 residential units, associated garaging and landscaping 2 Ash Tree Lane Chatham Kent ME5 7BZ 87 5 MC2005/1707 Twydall Retrospective application for the construction of fire escape route and retaining wall Units A to E Invicta Business Centre, land adjoining Beechings Way, Gillingham, Kent. 90 6 MC2007/0265 Rainham Central Construction of a block of lock up garages Land between 21 and 23 Asquith Road Rainham Gillingham Kent 96 7 MC2007/1372 Strood Rural Proposed height increase of 14.3 metre high monopole by 2.5 metres to -
Internal Draft Version June 2006)
(Internal Draft Version June 2006) THURROCK LOCAL DEVELOPMENT FRAMEWORK (LDF) SITE SPECIFIC ALLOCATIONS AND POLICIES “ISSUES AND OPTIONS” DEVELOPMENT PLAN DOCUMENT [DPD] INFORMAL CONSULTATION DRAFT CONTENTS Page 1. INTRODUCTION 1 2. STRATEGIC & POLICY CONTEXT 4 3. CHARACTERISTICS OF THE BOROUGH 6 4. KEY PRINCIPLES 7 5. RELATIONSHIP WITH CORE STRATEGY VISION, 7 OBJECTIVES & ISSUES 6. SITE SPECIFIC PROVISIONS 8 7. MONITORING & IMPLEMENTATION 19 8. NEXT STEPS 19 APPENDICES 20 GLOSSARY OF TERMS REFERENCE LIST INTERNAL DRAFT VERSION JUNE 2006 1. INTRODUCTION 1.1 We would like to get your views on future development and planning of Thurrock to 2021. A new system of “Spatial Planning” has been introduced that goes beyond traditional land-use planning and seeks to integrate the various uses of land with the various activities that people use land for. The new spatial plans must involve wider community consultation and involvement and be based on principles of sustainable development. 1.2 The main over-arching document within the LDF portfolio is the Core Strategy. This sets out the vision, objectives and strategy for the development of the whole area of the borough. The Site Specific Allocations and Policies is very important as it underpins the delivery of the Core Strategy. It enables the public to be consulted on the various specific site proposals that will guide development in accordance with the Core Strategy. 1.3 Many policies in the plans will be implemented through the day-to-day control of development through consideration of planning applications. This document also looks at the range of such Development Control policies that might be needed. -
Petroplus, Land Part of Area 418. Coryton Refinery, the Manorway, Stanford-Le-Hope
Planning Committee 14 January 2016 Application Reference: 15/00877/FUL Reference: Site: 15/00877/FUL Petroplus, land part of Area 418. Coryton Refinery, The Manorway, Stanford-le-Hope Ward: Proposal: Corringham and Full planning permission for the installation and operation of a Fobbing ground mounted solar photovoltaic array to generate electricity of up to 5MW capacity comprising photovoltaic panels, inverters, security fencing and cameras and other associated infrastructure. Plan Number(s): Reference Name Received 15K62-CV-GS-101 Rev. AB Site Location 21.12.15 15K62-CV-GS-104 Rev. AA Site Plan 21.09.15 15K62-EL-LY-101 Rev. AC Layout 21.12.15 15K62-EL-LY-101 A Rev. AB Layout 21.09.15 15K62-EL-LY-101 B Rev. AB Layout 21.09.15 15K62-EL-LY-101 C Rev. AB Layout 21.09.15 15K62-EL-LY-101 D Rev. AB Layout 21.09.15 15K62-HS-LY-104 Rev. AA CCTV Layout & CCTV Pole Details 21.09.15 15K62-CV-FC-103 Rev. AA Fence & Gate Details 21.09.15 15K62-CV-HS-101 Rev. AA Inverter Housing Elevation 21.09.15 15K06-CV-HS-102 Rev. AA Control Cabin Elevation 21.09.15 15K06-CV-HS-103 Rev. AA Storage Container Elevation 21.09.15 15K62-EL-PA-101 Rev. AA PV Array Elevation 21.09.15 15K62-EL-CR-101 Rev. AA Cable Route & PoC 21.09.15 The application is also accompanied by: Design and Access Statement Environmental Statement, including: - Screening Opinion - Layout of the Development - Landscape and Visual Assessment - Preliminary Ecological Assessment - Botanical Survey - Great Crested Newt Survey - Breeding Bird Survey - Reptile Survey - Water Vole Survey - Invertebrate Survey Planning Committee 14 January 2016 Application Reference: 15/00877/FUL - Flood Risk Assessment - Non-Technical Assessment Planning Statement Applicant: Validated: Sun4Net Limited 22 September 2015 Date of expiry: 12 January 2016 Recommendation: Approve subject to conditions. -
The Hydrography & Cartography of a Great
THE HYDROGRAPHY & CARTOGRAPHY OF A GREAT SEAPORT by C o m m a n d e r E. C. SHANKLAHD, R. H. R., F. R . S. E., R i v e r S uperintendent a n d H ydrographic S u r v e y o r , P o r t o f L o n d o n A u t h o r i t y . The Port of London Authority exercises jurisdiction over that part of the Thames which flows from Teddington Lock (approximately) to a line joining Havengore Creek in Essex and Warden Point in Sheppey, Kent. To depict the changes in the hydrography of the channels, creeks, whar ves, bridges and dock entrances the survey of the river requires continuous attention. CARTOGRAPHY. Within the dock system a regular watch is kept to maintain depth, as a considerable amount of silt in suspension finds its way inside the tidal gates. The triangulation and surveyor’s working sheets are connected with those of the Ordnance Survey and are divided up into convenient lengths of river, more or less identified with the Reaches so well known to mariners. The survey sheets and the scales on which they are projected are enumerated in the following table. LIST OF SURVEYS — RIVER THAMES TIDEWAY Chxvt Section of River. Date of Scale Survey i. 1929 1/1056 2. Cross Deep to Petersham Drawdock.................................................... 1929 )) 3- Petersham Drawdock to Richmond Lock and Weir........................ 1929 )) )) 4 - Richmond Lock and Weir to Church Ferry, Isleworth.................. 1928 *>• 1928 )) 6. 1927 )) )) 7- 1926-7 8. Barnes R ailw ay Bridge to Chiswick Ferry.........................................